Construction method for an underground structure
FR3170529A1Pending Publication Date: 2026-06-26SOLETANCHE FREYSSINET SAS
Patent Information
- Authority / Receiving Office
- FR · FR
- Patent Type
- Applications
- Current Assignee / Owner
- SOLETANCHE FREYSSINET SAS
- Filing Date
- 2024-12-24
- Publication Date
- 2026-06-26
Abstract
Method for constructing an underground structure. Method for constructing an underground structure, in particular a tunnel segment, using at least one prefabricated caisson (10; 20), comprising the steps of: Constructing pre-support with at least upper reinforcing tubes (31) arranged above an excavation zone; Progressively excavating the ground in the excavation zone in front of the prefabricated caisson; Progressively driving the prefabricated caisson into the ground as excavation progresses, with adjustable-height sliding lower supports (90) interposed between the prefabricated caisson and the floor of the excavated cavity. Figure for the abstract: Fig. 3
Need to check novelty before this filing date? Find Prior Art