Construction management system and construction diagram creation method

GB2645390APending Publication Date: 2026-10-21NOHARA GRP INC
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
GB2026003544
Authority / Receiving Office
GB · GB
Patent Type
Applications
Current Assignee / Owner
Priority Date
2024-06-28
Filing Date
2024-06-28
Publication Date
2026-10-21
Patent Text Reader

Abstract

Provided is a mechanism for creating a construction diagram from BIM information. This construction management system for a building comprises: an acquisition unit that acquires BIM information including information about a building and constituent members thereof; a selection reception unit that receives selection of a first constituent member from among the constituent members; a model information generation unit that generates construction diagram model information necessary for drawing a construction diagram model, which is a three-dimensional model for creating a construction diagram, on the basis of information relating to the first constituent member; and an output unit that outputs the generated construction diagram model information.
Need to check novelty before this filing date? Find Prior Art

Citation Information

Patent Citations

  • Cad system linked with building quantity estimation

    JP2002117080A

  • Building design construction managing system

    JP2002197126A

  • Building production information integration system

    WO2003040969A1

  • Design assistance system and design assistance method

    WO2023095715A1