Construction Method for Synchronous Erection of Beams on Each Layer of Common-pier Three-deck Bridge of Main Line and Ramp

IES20240450A2Pending Publication Date: 2026-07-29CHINA RAILWAY SEVENTH GRP CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Authority / Receiving Office
IE · IE
Patent Type
Applications
Current Assignee / Owner
CHINA RAILWAY SEVENTH GRP CO LTD
Filing Date
2024-07-28
Publication Date
2026-07-29

Smart Images

  • Figure 00000016_0000
    Figure 00000016_0000
  • Figure 00000016_0001
    Figure 00000016_0001
  • Figure 00000017_0000
    Figure 00000017_0000
Patent Text Reader

Abstract

The invention discloses a construction method for synchronous erection of beams on each layer of common-pier three-deck bridge of main line and ramp. Firstly, complete bent cap construction for three layers of the bridge at one time; secondly, place bridge erecting machine on main line bridge deck on top. When beam carriers are respectively on ramp A of bottom layer, ramp B of middle layer and main line of top line, transport beams from the bottom layer, middle layer and top layer by coordinating with the bridge erecting machine, achieving beam erection of ramp A on bottom layer, ramp B on middle layer and main line of top layer. The invention effectively avoids mutual constraints of alternating operations between bent cap construction and bridge erection in each layer of the bridge, significantly improves the construction efficiency, reduces construction time and costs and provides valuable construction experience for similar projects.