Dynamic feedback multi-pilot tunnel mechanical tunneling construction method for small-clear-distance-oblique-crossing super-long-span high-speed railway tunnels

IES20250124A2Pending Publication Date: 2026-10-07CHINA RAILWAY 24TH BUREAU GROUP CO LTD +3
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
IES20250124
Authority / Receiving Office
IE · IE
Patent Type
Applications
Current Assignee / Owner
Filing Date
2025-03-27
Publication Date
2026-10-07

Smart Images

  • Figure 00000001_0000
    Figure 00000001_0000
  • Figure 00000016_0000
    Figure 00000016_0000
  • Figure 00000016_0001
    Figure 00000016_0001
Patent Text Reader

Abstract

A dynamic feedback multi-pilot tunnel mechanical tunnelling construction method for small-clear-distance oblique-crossing super-long-span high-speed railway tunnels is disclosed. Multi-source monitoring data from the surrounding rock, the new tunnel, and the existing tunnel structure are collected in real time and transmitted wirelessly to enable dynamic feedback for the design and construction of the new tunnel while taking the operating conditions of the existing tunnel into consideration. This method achieves the dual safety objectives of ensuring both the safety of the existing tunnel and the construction safety of the new tunnel.
Need to check novelty before this filing date? Find Prior Art