Method for controlling an electrolyzer arrangement having at least two electrolyzers for optimized balance of plant

IN603988BActive Publication Date: 2026-09-25SUZLON ENERGY LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
IN202321020421
Authority / Receiving Office
IN · IN
Patent Type
Patents
Current Assignee / Owner
Filing Date
2023-03-23
Publication Date
2026-09-25
Estimated Expiration
2043-03-23

AI Technical Summary

Technical Problem

Existing systems for renewable energy power plants combined with hydrogen production fail to effectively manage power and operation strategies, particularly in hybrid configurations with variable power sources, leading to inefficiencies and suboptimal hydrogen production.

Method used

A method for controlling an electrolyzer arrangement with multiple electrolyzers of different technologies, where a primary electrolyzer and secondary electrolyzers are managed based on available electrical power to optimize hydrogen production, with the secondary electrolyzer maintaining a warm state during standby to quickly start operation when power is sufficient, and the primary electrolyzer operating at a lower capacity for maximum efficiency.

Benefits of technology

This approach allows for efficient integration of electrolyzers, reduces hydrogen generation costs, minimizes electrolyzer degradation from cold start/stops, and maximizes the utilization of electrolyzers for cost-effective hydrogen production.

✦ Generated by Eureka AI based on patent content.
Patent Text Reader

Abstract

METHOD FOR CONTROLLING AN ELECTROLYZER ARRANGE-MENT HAVING AT LEAST TWO ELECTROLYZERS FOR OPTIMIZED BALANCE OF PLANT A method for controlling an electrolyzer arrangement (3) having at least two electrolyzers (4, 5) for optimized balance of plant, the method comprises the steps of: - obtaining electrical power provided by an electrical power source (2), - obtaining required electrical power of power plant (3) and - determining available power for hydrogen production based on provided electrical power and required electrical power, characterized in that - determining an upper and lower operating limit of a primary electrolyzer (5) of the electrolyzer arrangement (3) and - controlling the primary electrolyzer (5) and at least one secondary elec-trolyzer (4) depending on the available electrical power and operating limit of the primary electrolyzer (5). Fig. 2
Need to check novelty before this filing date? Find Prior Art

Description

FIELD OF INVENTIONThe present invention is directed to a method for controlling an electrolyzer arrangement, an electrolyzer arrangement for the same and a power plant havingsaid electrolyzer arrangement.BACKGROUNDIn prior art several systems of renewable energy power plants combined with hydrogen production plants are known as well as several control schemes for controlling the input power and system operation control are also known.One example is EP 3 957 773 A1, which discloses an energy composite hydrogenproduction system and a control method therefore. The energy composite hydrogen production system comprises: an energy power generation system, a powerconversion system, an alkali liquid hydrogen production system, and a non-alkaliliquid hydrogen production system. An output end of the power conversion system is connected to an input electrode of the alkali liquid hydrogen productionsystem and an input electrode of the non-alkali liquid hydrogen production system, respectively, so that the power conversion system can, according to the quantity of energy outputted by the energy power generation system, choose to providehydrogen production energy to the alkali liquid hydrogen production system orthe non-alkali liquid hydrogen production system. Furthermore, the non-alkaliliquid hydrogen production system can replace battery energy storage so as toimplement energy reception in a weak energy region, thereby avoiding the wasteof energy and improving the economic benefits of hydrogen production.Further prior art is IN 8992 / DELNP / 2012 A which discloses a nested configuration of electrolysis units, independently operated, the power output values ofwhich are descendant in such a manner that, for any unit of the system, the sum ofthe power output values of the smaller electrolysis units is always greater than orequal to the "dead band" (DB) of said units, allowing reduction of the dead bandof said hydrogen production system to negligible levels, avoiding loss or discharge of the energy generated in said renewable power stations, preferably one orseveral wind farms formed by a group of wind turbines, connected to the powergrid as a consequence of the implementation of a primary control service thereinor, in general, of any other active power control service, thereby optimizing thetotal energy obtained.Further prior art is EP 4 057 476 A2 which discloses a system for producing hydrogen from renewable energy and a control method thereof. The system includesa renewable-energy-based power generation system, a primary hydrogen production system, a secondary hydrogen production system, and a controller. An outputend of the renewable-energy-based power generation system is connected to theprimary hydrogen production system and the secondary hydrogen production system via an electrical conversion device. A capacity of the primary hydrogen production system is greater than or equal to a capacity of the secondary hydrogenproduction system. The controller is configured to monitor an output electricalperformance parameter of the renewable-energy-based power generation systemin real time, and control turn on and turn off of the primary hydrogen productionsystem and the secondary hydrogen production system.The prior art fails to address the system power management, operation and controlstrategy within the hybrid system configuration with variable power sources. Furthermore; the balance of plant system operation standby mode / part load operation / full load operation will have different operating and control strategies whichthe prior art fails to provide.OBJECT OF THE INVENTIONOne object of the present invention is to provide a method for controlling an electrolyzer arrangement with two or more electrolyzers of same or different technologies. Another object of the invention is to provide flexible operation modes formaximum capacity or maximum efficiency using the hybrid electrolyzer arrangement.SUMMARY OF THE INVENTIONThis object will be solved by a method for controlling an electrolyzer arrangementhaving at least two electrolyzers for optimized plant operation. In particular theelectrolyzer arrangement comprises of two or more electrolyzers of similar or different technologies. The method comprises the steps of obtaining electrical powerprovided by an electrical power source, obtaining required electrical power ofpower plant and determining available power for hydrogen production based onprovided electrical power and required electrical power, wherein determining anupper and lower operating limit of a primary electrolyzer of the electrolyzer arrangement and controlling the primary and at least one secondary electrolyzerdepending on the available electrical power and operating limit of the primaryelectrolyzer and secondary electrolyzer.Advantageously, the electrolyzer arrangement can be for example a combinationof alkaline electrolyzer (ALK) and alkaline electrolyzer with different sizes; polymer electrolyte membrane electrolyzer (PEM) and alkaline electrolyzer or alkaline electrolyzer and polymer electrolyte membrane electrolyzer and solid oxideelectrolyzer (SOEC). These electrolyzers are sized to meet the hydrogen production requirement while maintaining low level of cost of hydrogen.More advantageously, an electrical power source can be a wind power plant, solarpower plant, hydro power plant or energy storage system or a combination thereof.According to a preferred embodiment, the method further comprises the step ofstarting the primary electrolyzer if available electrical power is between upper andlower operating limit of the primary electrolyzer and the secondary electrolyzer isin standby mode.Advantageously, in this case the secondary electrolyzer is in standby mode. In thismode, the secondary electrolyzer consume minimum power to keep the electrolyzer in warm state so that it can quickly start it's operation when the power issufficient to initiate it's operation.According to a preferred embodiment, the method further comprises the step ofstarting the at least one secondary electrolyzer if the available electrical power isless than the lower operating limit of the primary electrolyzer, wherein the primary electrolyzer is in standby mode.Advantageously, in this case the primary electrolyzer is in standby mode. In thismode, the primary electrolyzer consume minimum power to keep the electrolyzerin warm state so that it can quickly start it's operation when the power is sufficient to initiate it's operation. Advantageously minimum available electrical power can be used for hydrogen production via the at least one secondary electrolyzer.According to a preferred embodiment, the method further comprises the step ofstarting the at least one secondary electrolyzer and primary electrolyzer if theavailable electrical power is higher than the upper operating limit of the primaryelectrolyzer.According to a preferred embodiment, the method further comprises the step ofoperating at least one secondary electrolyzer and primary electrolyzer, if theavailable electrical power is between maximal operation point of the upper operating limit of the electrolyzer arrangement and maximal operation point of the upperoperating limit of the primary electrolyzer then the electrolyzer arrangement provides maximum hydrogen production efficiency.According to a preferred embodiment, the method further comprises the step ofoperating at least one secondary electrolyzer and primary electrolyzer, if theavailable electrical power is at maximal operating point of the upper operatinglimit of the electrolyzer arrangement and is at maximal operation point of the upper operating limit of the primary electrolyzer then the electrolyzer arrangementprovides maximum hydrogen production rate.In particular, with this configuration the optimal load and most efficient point isreached. The at least one secondary electrolyzer provides additional capacity tothe primary electrolyzer and primary electrolyzer operates at operating point lower than maximum operating point and is at maximum hydrogen production efficiency. Advantageously, overpower of primary electrolyzer can be used for hydrogen production via the at least one secondary electrolyzer. In this context,starting has no restrictive meaning in sense of the respective electrolyzer startsfrom a non-operating point. It is clear that during the operation the available power can change and the electrolyzers can switch from standby mode to operationmode and vice versa. Especially in case the available power reaches the upperoperational limit of the primary electrolyzer the at least one secondary electrolyzerwill switch from standby mode to operation mode for providing additional capacity while the primary electrolyzer stays in operation mode,According to a preferred embodiment, the method further comprises that the primary electrolyzer is characterized by a slow response time, e.g. in minutes and orlimited low operating point and is higher in capacity and the at least one secondary electrolyzer is characterized by a fast response time, e.g. in seconds or similarresponse time and not limited by low operating point and is small in capacity.Advantageously, the primary electrolyzer is a slow responding type of electrolyzer and the at least one secondary electrolyzer is a fast responding type of electrolyzer. In a more preferred embodiment the electrolyzer arrangement comprises analkaline electrolyzer sized up to multi megawatt scale as primary electrolyzer andat least one polymer electrolyte membrane electrolyzer sized in kilowatt scale assecondary electrolyzer.According to a preferred embodiment, the method further comprises that the upper and lower operating limit of electrolyzers depending on the balance of plantpower requirement of the electrolyzers.A further aspect of the invention is directed to an electrolyzer arrangement forproducing hydrogen.The electrolyzer arrangement for producing hydrogen comprising at least twoelectrolyzers, wherein the electrolyzer arrangement comprise a primary electrolyzer and at least one secondary electrolyzer, connected to a controller configuredto executing said method mentioned above.Advantageously, the electrolyzer arrangement can be for example a combinationof alkaline electrolyzer (ALK) and alkaline electrolyzer with different sizes; polymer electrolyte membrane electrolyzer (PEM) and alkaline electrolyzer or alkaline electrolyzer and polymer electrolyte membrane electrolyzer and solid oxideelectrolyzer (SOEC). Size and count of the electrolyzers of the electrolyzer arrangement depends on the provided electrical power by the power source. Thehigher the provided available electrical power the higher can be the size and countof the electrolyzers of the electrolyzer arrangement.A further aspect of the present invention is directed to a power plant for producingelectrical power and hydrogen.The power plant for producing electrical power and hydrogen comprising at leastone wind turbine or at least one solar power plant or at least one hydro powerplant or at least one energy storage device or combination thereof, characterizedby said electrolyzer arrangement mentioned above.Advantageously, the power plant comprises of common water treatment & powerdistribution unit which regulates the input power as well as water required for theelectrolyzer arrangement. Further the balance of plant components for the electro-lyzer arrangement comprises a gas separation, purification equipment, thermalmanagement to handle the requirements of both primary as well as secondaryelectrolyzers.A further aspect of the present invention is directed to a method for operating saidpower plant.A further aspect of the present invention is directed to a computer program product.The computer program product comprises instructions which, when the programis executed by a computer, cause the computer to carry out the steps of said method mentioned above.Advantages of the present invention are:- Efficient integration of electrolyzers and their balance of power,- Lowering the cost of hydrogen generation since electrolyzers can be operated at maximum efficient point,- Lowering the degradation of the alkaline electrolyzer by limiting the coldstart / stop cycles and last but not least- Maximum utilization of electrolyzers to monetization of investment.BRIEF DESCRIPTION OF DRAWINGSThe invention will now be explained in more detail with respect to exemplaryembodiments with reference to the enclosed drawings, wherein:Figure 1 shows a power plant for producing electrical power and hydrogen;Figure 2 shows a flow diagram of the method for controlling an electrolyzerarrangement;Figure 3 shows a capacity-power-diagram andFigure 4 shows an efficiency-power-diagram.The foregoing and other aspects will become apparent from the following detaileddescription of the invention when considered in conjunction with the accompanying drawing figures.DETAILED DESCRIPTION OF THE INVENTIONFigure 1 depicts a power plant 1 having a power source 2 for providing electricalpower to an electrolyzer arrangement 3. Latter comprising at least two electrolyzers, wherein one electrolyzer configured as primary electrolyzer 5 and at least oneelectrolyzer configured as secondary electrolyzer 4. Even if Fig. 1 and in the following description refers to one secondary electrolyzer 4, the present inventionalso covers more than one secondary electrolyzer 4. The primary electrolyzer 5may have a slow response time, e.g. in minutes and can be operate at it's limitedlower operating point, wherein the secondary electrolyzer 4 may have a fast response time, e.g. in seconds and can be operated at low power load of the powersupply arrangement. For example the primary electrolyzer 5 is an alkaline electrolyzer having a multi kilowatt up to multi megawatt scale. And for example thesecondary electrolyzer 4 is a polymer electrolyte membrane electrolyzer having akilowatt scale. The primary electrolyzer 5 and secondary electrolyzer 4 are controlled by a controller 6. The control method will be explained later with Fig. 2.The power source 2 comprises a hybrid renewable power arrangement comprisingof solar power plant 7, a wind power plant 8 and a hydro power plant 9. The solarpower plant 7 comprises at least one solar panel and the wind power plant 8 comprises at least one wind turbine. In consequence the power source 2 provides electrical power from renewable power sources with natural fluctuations, natural dailypattern and seasonal variations. Such fluctuations and pattern can be handled bythe electrolyzer arrangement 3 according to the present invention, which will beexplained later. The electrolyzer arrangement 3 and remaining balance of plantcomponents of the electrolyzer arrangement 3 receives electrical power from thepower source 2. The electrolyzer arrangement 3 receives the electrical powerthrough a power management circuit 10. Further the power source 2 can optionally comprising of an energy storage device (not shown in Fig 1). The energy storage device can comprise one or more energy storage known in prior art.Further the power plant 1 comprises a water supply device 11 for providing waterfor hydrogen production. This water can be provided by tanks, pipelines and / ornatural water sources like river or sea. From the water supply device 11, waterwill be provided to a water purification device 12 for cleaning the water from particulates, salts and other contaminations. The purified water will be stored in apurified water storage device 13. The purified water will be transferred to the primary electrolyzer 5 and to the secondary electrolyzer 4 with the help of flow control arrangement (not shown) so that electrolyzer operation can be handled independently or together depending upon the need. Further a water re-circulationloop consists of polishing system to purify re-circulating water (not shown in Fig.1). Each of the electrolyzers 4, 5 is connected to a cooling system 14, 15. Thecooling systems 14, 15 make sure that the electrolyzers 4, 5 working under optimal conditions especially under optimal temperature conditions, which depend onthe electrolyzer in operation. The hydrogen output of the secondary electrolyzer 4is fed to a gas purification module 16. The hydrogen output of the secondary electrolyzer 4 may have purity of more or equal to 98% and pressure more or equal to1 barg, or more or equal to 15 barg or more or equal to 30 barg. The hydrogenoutput of the primary electrolyzer 5 is fed to a gas purification system 17. Thepurified hydrogen will be transported from the gas purification system 17 to thehydrogen storage device 18. The hydrogen will be transported to an applicationand / or consumer from the hydrogen storage device 18. As hydrogen storage device 18 can be used any type of storage known in prior art like compressed hydrogen, liquefied hydrogen, organic hydrogen carriers, physical storage and / or chemical storage. Alternative or additional the hydrogen can be used for producingammonia or other chemicals. The primary electrolyzer 5 and secondary electrolyzer 4 will have independent gas purification system 17 in order to handle thelimiting load operation.The controller 6 controls and manages the input power and provides regulatedpower to the primary electrolyzer 5 and secondary electrolyzer 4, which is indicated by dashed line. When the power source 2 provides low electrical power likebetween 5-30 % of nominal load required for primary electrolyzer 5, the controller6 configured so that the electrical power will be provided to the secondary electrolyzer 4 while the primary electrolyzer 5 is maintained in standby mode. In thismode, the primary electrolyzer 5 consume minimum power like between 1-5% ofnominal electrical capacity, to keep it in warm state so that it can quickly start it'soperation when the power is sufficient to initiate it's operation. If the electricalpower is in a sufficient range then the primary electrolyzer 5 will be activated andthe secondary electrolyzer 4 will be in standby mode. When more electrical poweravailable is than from the primary electrolyzer 5 is required, both the primaryelectrolyzer 5 and the secondary electrolyzer 4 operate to produce maximumamount of hydrogen. In another scenario, when more power is available both theelectrolyzer 4, 5 operates at highest efficiency point i.e. less than 100% capacityfactor e.g. 80-90% capacity point and varies from one technology to another. Inthis case there is no need to curtail the extra electrical power from the powersource 2. The additional electrical power can be diverted to energy storage device(not shown) while maintaining electrolyzer arrangement 3 operation at highestefficiency point. The secondary electrolyzer 4 is used in two scenarios; when input electrical power available is less than lower operating limit of the primaryelectrolyzer 5 and additional electrical power is available more than the primaryelectrolyzer 5 requirements beyond maximum efficiency point. The controller 6maybe is implemented in a park controller of the power plant (if available).In a not shown embodiment the power plant 1 can comprise more than one electrolyzer arrangement 3. These electrolyzer arrangements can be controlled by anindividual controller or by a central controller.In following the method for controlling an electrolyzer arrangement 3 will be explained with help of Fig. 2. The method for controlling the electrolyzer arrangement 3 having at least two electrolyzers 4, 5 for optimized balance of plant; themethod comprises at least the steps of S1 to S5. The electrolyzer arrangement 3comprises a primary electrolyzer 5 and a secondary electrolyzer 4 as describedabove.Step S1 comprises obtaining available electrical power provided by the powersource 2. This data will be provided to the controller 6. To obtain the electricalpower several methods are possible, for example measuring output power fromthe power source 2, in particular from the solar power plant 7, wind power plant 8and hydro power plant 9 via a measuring device not shown. Another example canbe that the plant controller of the respective power plants 7, 8, 9 maybe determinethe electrical power output and send the data to the controller 6. Or any other suitable method is possible. Available power check will be done continuously duringthe operation.Step S2 comprises obtaining a required electrical power of the electrolyzer arrangement 3. The required electrical power for the primary electrolyzer 5 and secondary electrolyzers 4 determined by excluding the power required for the auxiliaries of the power plant 1. This covers all required power of the primary electrolyzer 5 and secondary electrolyzer 4 for standby mode and operation mode. Depending on this as well as the size and count of the respective electrolyzers have influence of the required power. It is also possible that the remaining electrical powerconsuming components of the power plant 1 will be considered for determiningthe required electrical power. In this case also the consumed power of water supply device 11, water purification device 12, purified water storage device 13, cooling system 14, 15, gas purification module 16, gas purification system 17 and hydrogen storage / consumer 18 can be considered.Step S3 comprises determining available power for hydrogen production based onprovided electrical power and required electrical power. The available power forhydrogen production is the result of the difference between provided electricalpower of step S1 and required electrical power of step S2.Step S4 comprises of determining power consumption from a pre-defined upperand lower operating limit of the primary electrolyzer 5 of the electrolyzer ar-rangement 3. In particular, the upper and lower operating limit of the primaryelectrolyzer 5 depends on the stack operating limits and the balance of plant operating limits of the primary electrolyzer 5.Step S5 comprises controlling the primary electrolyzer 5 and the secondary electrolyzer 4 via the controller 6 depending on the available electrical power and determined operating limits of the primary electrolyzer 5. The individual primaryelectrolyzer 5 and secondary electrolyzer 4 will be switched from operation modeto standby mode and vice-versa depending on current available electrical power.Therefore the following configurations are possible:- starting the primary electrolyzer 5 if available electrical power is between upper and lower operating limit of the primary electrolyzer 5, wherein the secondary electrolyzer 4 is in standby mode ( Scenario 1);- starting the secondary electrolyzer 4 if the available electrical power is lessthan the lower operating limit of the primary electrolyzer 5, wherein the primary electrolyzer 5 is in standby mode ( Scenario 2);- starting the secondary electrolyzer 4 if the available electrical power is higherthan the upper operating limit of the primary electrolyzer 5, wherein the primary electrolyzer 5 is in operation mode (Scenario 3).In scenario 3 both the secondary electrolyzer 4 and primary electrolyzer 5 are inoperation mode. This means that the upper operating limit of the secondary electrolyzer 4 and upper operating limit of the primary electrolyzer 5 cumulating tothe upper operating limit of the electrolyzer arrangement 3 (see Fig. 3). In case theavailable electrical power is between maximal operation point of the upper operating limit of the electrolyzer arrangement 3 and maximal operation point of upperoperating limit of the primary electrolyzer 5, the secondary electrolyzer 4 andprimary electrolyzer 5 operating at maximum hydrogen production efficiency.Further in case the available electrical power is at maximal operating point of theupper operating limit of the electrolyzer arrangement 3 and is at maximal operation point of the upper operating limit of the primary electrolyzer 5, the secondaryelectrolyzer 4 and primary electrolyzer 5 operating at maximum hydrogen production rate.Fig. 3 depicts a capacity-power-diagram with an available power curve 19. As canbe seen if the available power is below the lower operating limit of the primaryelectrolyzer 5 the secondary electrolyzer 4 is in operation mode in which hydrogen will be produced. At the same time the primary electrolyzer 5 is in standbymode in which no hydrogen will be produced, but in standby mode the primaryelectrolyzer 5 consume minimum power to keep the primary electrolyzer 5 inwarm state so that it can quickly start it's operation when the available power issufficient to initiate it's operation. This happens when the available power increase and reaches the lower operating limit of the primary electrolyzer 5. So theprimary electrolyzer 5 switches from standby mode to operation mode to producehydrogen. If the available power is between the lower and upper operating limit ofthe primary electrolyzer 5 the secondary electrolyzer 4 switches form operationmode to standby mode in which no hydrogen will be produced, but in standbymode the secondary electrolyzer 4 consumes minimum power to keep the secondary electrolyzer 4 in warm state so that it can quickly start its operation when theavailable power is sufficient to initiate it's operation. If the available power increases further and reaches the upper operating limit of the primary electrolyzer 5then the secondary electrolyzer 4 switches from standby mode to operation mode.At this stage both the primary electrolyzer 5 and the secondary electrolyzer 4 arein operation mode and each produce hydrogen with most efficiency. Now theelectrolyzer arrangement 3 has maximum capacity for hydrogen production at anupper operating limit with of both the primary electrolyzer 5 and the secondaryelectrolyzer 4.Fig. 3 shows an upper operating limit of the electrolyzer arrangement 3. This isthe sum of the upper operating limit of the secondary electrolyzer 4 and upperoperating limit of the primary electrolyzer 5. Therefor the secondary electrolyzer4 and primary electrolyzer 5 are in operation mode. In case the available electricalpower is between maximal operation point of the upper operating limit of theelectrolyzer arrangement 3 and maximal operation point of upper operating limitof the primary electrolyzer 5, the secondary electrolyzer 4 and primary electrolyzer 5 operating at maximum hydrogen production efficiency. Further in case theavailable electrical power is at maximal operating point of the upper operatinglimit of the electrolyzer arrangement 3 and is at maximal operation point of theupper operating limit of the primary electrolyzer 5, the secondary electrolyzer 4and primary electrolyzer 5 operating at maximum hydrogen production rate.If the available electrical power decreasing below the upper operating limit of theprimary electrolyzer 5 then the secondary electrolyzer 4 switches from operationmode in standby mode. Also here in case that the available electrical power isbetween the upper and lower operating limit of the primary electrolyzer 5, it willstay in operation mode until the available electrical power falls below the loweroperating limit of the primary electrolyzer 5. If the available electrical power fallsbelow the lower operating limit of the primary electrolyzer 5 then the primaryelectrolyzer 5 switches from operation mode to standby mode. At the same timethe secondary electrolyzer 4 switches from standby mode to operation mode.This shows that over a wide bandwidth of available power the electrolyzer arrangement 3 can produce hydrogen with highest efficiency because of using allavailable electrical power and all electrolyzers working at optimal operation conditions. This optimal operation may help in reducing the production costs of hydrogen.Fig. 4 depicts an efficiency-power-diagram. This shows different efficiency pointsEP over an available electrical power curve 19. At EP1 only primary electrolyzer5 is in operation mode but at lower operating point, wherein seconday electrolyzer4 is in standby mode. At EP2 both the secondary electrolyzer 4 and primary electrolyzer 5 are in operation mode. At this point the highest efficiency is reached. AtEP3 only the primary electrolyzer 5 is in operation mode, wherein the secondaryelectrolyzer 4 is in standby mode or operation mode. As can be seen from Fig. 4the secondary electrolyzer 4 has the fast response time - means a quick switchfrom standby mode to operation mode and vice versa - the secondary electrolyzer4 can react very fast according to the changes in available electrical power. Theprimary electrolyzer 5 has the slow response time - means a slow switch fromstandby mode to operation mode and vice versa - the primary electrolyzer 5 reactsslowly to the fluctuations in available electrical power. This can be compensatedby the secondary electrolyzer 4, with described method above. In result there is asynergy effect of primary electrolyzer 5 and secondary electrolyzer 4 that according to the available electrical power hydrogen can be produced with highest efficiency or at maximum production rate.LIST OF REFERENCE SIGNS1 power plant2 power source5 3 electrolyzer arrangement4 secondary electrolyzer5 primary electrolyzer6 controller7 solar power plant10 8 wind power plant9 hydro power plant10 power management circuit11 water supply device12 water purification device15 13 purified water storage device14 cooling system-115 cooling system-216 gas purification module17 gas purification system20 18 hydrogen storage / consumer19 available power curve

Claims

1. A method for controlling an electrolyzer arrangement (3) having at least two electrolyzers (4, 5) for optimized balance of plant, the method comprises the steps of: - obtaining electrical power provided by an electrical power source (2), - obtaining required electrical power of power plant (1) and - determining available power for hydrogen production based on provided electrical power and required electrical power, characterized in that - determining an upper and lower operating limit of a primary electrolyzer (5) of the electrolyzer arrangement (3) and - controlling the primary electrolyzer (5) and at least one secondary electrolyzer (4) depending on the available electrical power and operating limit of the primary electrolyzer (5).

2. The method for controlling an electrolyzer arrangement (3) according to claim 1, wherein starting the primary electrrolyzer (5) if available electrical power is between upper and lower operating limit of the primary electrolyzer (5), wherein the at least one secondary electrolyzer (4) is in standby mode.

3. The method for controlling an electrolyzer arrangement (3) according to claim 1, wherein starting the at least one secondary electrolyzer (4) if the available electrical power is less than the lower operating limit of the primary electrolyzer (5), wherein the primary electrolyzer (5) is in standby mode.

4. The method for controlling an electrolyzer arrangement (3) according to claim 1, wherein starting the at least one secondary electrolyzer (4) and the primary electrolyzer (5) if the available electrical power is higher than the upper operating limit of the primary electrolyzer (5).

5. The method for controlling an electrolyzer arrangement according to claim 4, wherein operating at least one secondary electrolyzer (4) and primary electrolyzer (5), if the available electrical power is between maximal operation point of the upper operating limit of the electrolyzer arrangement (3) and maximal operation point of the upper operating limit of the primary electrolyzer (5) then the electrolyzer (3) arrangement provides maximum hydrogen production efficiency.

6. The method for controlling an electrolyzer arrangement according to claim 4, wherein operating at least one secondary electrolyzer (4) and primary electrolyzer (5), if the available electrical power is at maximal operating point of the upper operating limit of the electrolyzer arrangement (3) and is at maximal operation point of the upper operating limit of the primary electrolyzer (5) then the electrolyzer arrangement (3) provides maximum hydrogen production.

7. The method for controlling an electrolyzer arrangement (3) according to one of the claims 1 to 6, wherein the primary electrolyzer (5) is characterized by a slow response time and is with higher in capacity and the at least one secondary electrolyzer (4) is characterized by a fast response time.

8. The method for controlling an electrolyzer arrangement (3) according to one of the claims 1 to 7, wherein the upper and lower operating limit of a primary electrolyzer (5) depending on the balance of power of the primary electrolyzer (5).

9. An electrolyzer arrangement for producing hydrogen comprising at least two electrolyzers (4, 5), wherein the least two electrolyzers (4, 5) comprises a primary electrolyzer (5) and at least one secondary electrolyzer (4), con- nected to a controller (6) configured for executing a method according to one of the claims 1 to 8.

10. A power plant for producing electrical power and hydrogen comprising at least one wind power plant (8) or at least one solar power plant (7) or at least one hydro power plant (9) or at least one energy storage device or combination thereof, characterized by an electrolyzer arrangement (3) according to claim 9.

11. A method for operating a power plant according to claim 10.

12. A computer program product comprising instructions which, when the program is executed by a computer, cause the computer to carry out the steps of the method according to one of the claims 1 to 8.