Existing facility utilizing plan making device and existing facility utilizing plan making method

JP2024174081A5Active Publication Date: 2025-03-12HITACHI GE NUCLEAR ENERGY LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
JP2024167927
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2024-09-26
Publication Date
2025-03-12
Estimated Expiration
2041-03-16

AI Technical Summary

Technical Problem

The lack of a unified framework for utilizing decommissioned generators as synchronous phase modifiers across different organizations involved in power transmission, distribution, and generation, leading to inefficiencies in optimizing the return on investment for system reinforcement and renewable energy integration.

Method used

A device and method that utilizes a storage unit for system reinforcement plan information, an index evaluation unit to calculate the return on investment for using decommissioned generators as synchronous phase modifiers, and a decision unit to determine which generators to utilize, considering wide-area power system simulations and data from various power transmission and distribution companies.

Benefits of technology

Optimizes the return on investment for power transmission and distribution companies' system reinforcement plans and power generation companies' conversion of obsolete generators, enhancing the stability and efficiency of renewable energy integration.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 00000000_0000_ABST
    Figure 00000000_0000_ABST
Patent Text Reader

Abstract

To optimize a system reinforcement plan made by a power transmission and distribution company, and a return on investment when a decommissioned power generator of a power generation company is utilized as a synchronous phase modifier.SOLUTION: An existing facility utilizing plan making device 100 includes a storage unit that stores system reinforcement plan information for identifying a point where system reinforcement is required on the basis of a wide power system simulating a power system of each area, an index evaluation unit 119 that, by using the system reinforcement plan information stored in the storage unit, calculates an index of return on investment when a decommissioned power generator is utilized as a synchronous phase modifier, and a decommissioned power generator utilization determination unit 121 that determines the decommissioned power generator to be utilized as a synchronous phase modifier on the basis of the index.SELECTED DRAWING: Figure 1
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to an existing facility utilization plan formulation device and an existing facility utilization plan formulation method. [Background technology]

[0002] The Paris Agreement was adopted at the 21st Conference of the Parties to the United Nations Framework Convention on Climate Change (COP21) in 2015, outlining a new international framework for reducing greenhouse gas emissions from 2020 onwards. Within this international framework, Japan has set targets of reducing greenhouse gas emissions by 26.0% by 2030 compared to fiscal 2013 levels, and by 80% by 2050 compared to fiscal 2013 levels.

[0003] To achieve this goal, the Agency for Natural Resources and Energy announced in its 2015 "Long-Term Energy Supply and Demand Outlook" a policy of setting a medium-term target of a renewable energy ratio of 22-24% in the power generation mix in fiscal year 2030. Under this policy, Japan is promoting the introduction of renewable energy (RE) such as solar, wind, biomass, geothermal and hydroelectric power. The share of renewable energy in Japan's total power generation has increased from 12% in fiscal year 2014 to 16% in fiscal year 2019, and this share is expected to continue to increase in the future.

[0004] However, it is expected that power grids that connect renewable energy will face various issues, such as supply and demand balance, excess transmission capacity, voltage fluctuations, frequency fluctuations, and stability. This is due to the fact that the output of variable renewable energy (VRE) such as solar and wind power generation is affected by ever-changing weather conditions, the reduction in the number of thermal power synchronous generators reduces system inertia, and the limited number of suitable locations for solar and wind power generation increases the transmission capacity when delivering electricity from variable renewable energy generation sites to demand sites, making it easy for localized transmission line overloads to occur.

[0005] In response to these issues, plans are being made to reinforce grids in order to stably deliver electricity from variable renewable energy sources from supply points to demand points. For example, within Japan, for offshore wind power generation in Chiba and off the coast of Akita, where an increase in connection volume is expected in the future, construction is being planned to increase the number of transmission lines to Tokyo, an area of ​​demand, and to increase transmission capacity. Similarly, for solar power generation in Kyushu, where an increase in connection volume is also expected in the future, plans are being made to increase the operating capacity of the Chugoku-Kyushu interconnector. However, the enormous costs involved in these grid reinforcement plans are an issue.

[0006] In this way, in a situation where it is necessary to consider stability and economic efficiency at the same time, rather than simply increasing the ratio of variable renewable energy, it is thought that utilizing decommissioned generators as synchronous condensers will become important in the future. A synchronous condenser is a device that supplies inertial and reactive power to the power system by disconnecting the decommissioned generator and turbine, receiving power from the power system, and running the generator at its own pace. The advantages of a synchronous condenser are that it can be implemented at a low cost compared to other measures such as a STATCOM (Static var Compensator), which supplies reactive power in the same way as a synchronous condenser, by utilizing an existing generator, and that it can supply inertial force that a STATCOM does not have, thereby suppressing generator oscillation during an accident of about a few seconds.

[0007] In order to increase the amount of renewable energy connections in the future, it is necessary to curb investment for increasing the amount of renewable energy connections by not only investing in new facilities such as strengthening the grid, but also by utilizing existing facilities and optimizing their operation.

[0008] The abstract of Patent Document 1 states, "To provide a power generation plan determination system, a power generation plan determination method, and a program capable of ensuring transient stability even when the capacity of the generator is reduced," and describes determining an optimal operation plan for existing generators as renewable energy increases. Patent Documents 2 and 3 also describe using idle generators as synchronous phase modifiers to maintain the voltage of the power system and improve transient stability during a system accident. [Prior art documents] [Patent documents]

[0009] [Patent Document 1] Japanese Patent Application Publication No. 8-198883 [Patent Document 2] Japanese Patent Application Publication No. 5-312995 [Patent Document 3] JP 2019-143626 A Summary of the Invention [Problem to be solved by the invention]

[0010] As described in the background art, utilizing decommissioned generators as synchronous modifiers has the advantage that it can be realized at a lower cost than installing new facilities to address issues such as inertia and insufficient supply of reactive power due to an increase in the amount of renewable energy connected. However, due to the recent power system reform and separation of power generation and transmission, the country that decides the renewable energy introduction plan, the power transmission and distribution company in charge of power transmission and distribution such as grid reinforcement, and the power generation company that owns the decommissioned generators are separated. As a result, the organization that decides the process to utilize decommissioned generators as synchronous modifiers is not centralized. Therefore, a new framework that spans countries, power transmission and distribution companies, and power generation companies is needed to decide the process to utilize decommissioned generators as synchronous modifiers.

[0011] This paper will explain from the perspectives of the government, electricity transmission and distribution companies, and power generation companies why there is no centralized organization that decides the process for utilizing decommissioned generators as synchronous modifiers. As a country, the amount of renewable energy introduced in each area is determined according to the country's natural environment, such as wind conditions and solar radiation. In the case of Japan, the above-mentioned areas include areas with different power transmission operators, such as Tokyo, Tohoku, and Kansai. At this stage, the amount of renewable energy introduced in each area is determined only by the introduction potential due to the natural environment, so the potential for an increase in the amount of connections by utilizing decommissioned generators as synchronous modifiers is not taken into account.

[0012] Next, as a power transmission and distribution company, since the power generation and demand areas are geographically separated and power is transmitted across each area, when considering measures against power system accidents, they must consider not only the power system jurisdiction of their own jurisdiction but also the power systems under the jurisdiction of other power transmission and distribution companies. This is because suitable locations for introducing renewable energy are ubiquitous, and the power generation and consumption areas are geographically separated. Therefore, a framework is needed to collect data from different power transmission and distribution companies when identifying issues when such long-distance power transmission occurs and when deciding on measures to resolve these issues.

[0013] In addition, power generation companies have the challenge of being unable to consider the return on investment of using their own decommissioned generators as synchronous modifiers on their own. Because grid expansion plans are the responsibility of the transmission and distribution companies, a framework is needed to discuss with the transmission and distribution companies the benefits of using decommissioned generators as synchronous modifiers in the plan. From the perspective of the transmission and distribution companies, when considering the return on investment of using decommissioned generators as synchronous modifiers, it is necessary to collect information such as construction costs and useful life from surveys conducted by the power generation companies, so the transmission and distribution companies also need a framework to exchange information with the power generation companies.

[0014] Therefore, an object of the present invention is to optimize the investment-effectiveness of power transmission and distribution company system reinforcement plans and power generation company investment-effectiveness of converting decommissioned generators into synchronous modifiers. [Means for solving the problem]

[0015] In order to solve the above-mentioned problems, the existing equipment utilization plan development device of the present invention is characterized in that it comprises: a memory unit that stores system reinforcement plan information that identifies locations where system reinforcement is necessary based on a wide-area power system that simulates the power system of each area; an index evaluation unit that uses the system reinforcement plan information stored in the memory unit to calculate an index of return on investment when utilizing a decommissioned generator as a synchronous phase modifier; and a decommissioned generator utilization determination unit that determines which of the decommissioned generators to utilize as synchronous phase modifiers based on the index. Other means will be described in the description of the embodiment of the invention. Effect of the Invention

[0016] According to the present invention, it is possible to optimize the investment-effectiveness of the grid expansion plans of power transmission and distribution companies and the investment-effectiveness of the conversion of decommissioned generators to synchronous modifiers by power generation companies. Furthermore, it is also possible to optimize the investment-effectiveness of the national renewable energy introduction plan. [Brief description of the drawings]

[0017] [Figure 1] 1 is a configuration diagram of an existing facility utilization plan formulation device according to a first embodiment of the present invention. [Diagram 2] FIG. 1 is a cross-sectional configuration diagram of a wide-area power system. [Diagram 3] FIG. 2 is a diagram showing the configuration of contingency data; [Figure 4] FIG. 2 is a cross-sectional diagram showing a system accident situation. [Diagram 5] FIG. 13 is a diagram showing a system fault analysis screen. [Figure 6] 1 is a cross-sectional view of a power system for explaining a procedure for identifying a generator to be utilized as a synchronous phase modifier. FIG. [Figure 7] FIG. 13 is a diagram showing a system fault analysis screen. [Figure 8A] FIG. 11 is a diagram showing investment evaluation information according to the second embodiment. [Figure 8B] FIG. 13 is a diagram showing investment evaluation information. [Figure 9] FIG. 13 is a diagram showing benefit assessment information according to the third embodiment. [Figure 10] FIG. 13 is a diagram showing a cost-benefit evaluation method according to the fourth embodiment. [Figure 11] FIG. 13 is a diagram showing a comparison function with other policies in a cost-benefit evaluation according to the fifth embodiment. [Figure 12] FIG. 13 is a configuration diagram of an existing facility utilization plan formulation device according to a sixth embodiment. [Figure 13] FIG. 23 is a diagram showing a modification of a renewable energy introduction plan for each area according to the seventh embodiment. [Figure 14] 13 is a flowchart showing a process of correcting a renewable energy introduction plan for each area. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0018] Hereinafter, embodiments of the present invention will be described in detail with reference to the accompanying drawings. First Embodiment FIG. 1 is a configuration diagram of an existing facility utilization plan development device 100 according to a first embodiment of the present invention. The utilization plan formulation device 100 includes a renewable energy introduction planning unit 101, a system augmentation planning unit 102, a generator utilization planning unit 103, and an index evaluation unit 119. The utilization plan formulation device 100 formulates a plan to utilize an existing decommissioned generator in association with the decommissioning process of an existing power plant (e.g., a nuclear power plant). In the utilization plan formulation device 100, for example, a computer equipped with a CPU (Central Processing Unit), a ROM (Read Only Memory), a RAM (Random Access Memory), and a storage unit executes a utilization plan formulation program (not shown), thereby realizing the functions of each unit.

[0019] The renewable energy introduction planning unit 101 is a component that stores, in a storage unit (not shown), renewable energy introduction plan information, which is a predicted value of the future renewable energy connection amount for each area, and information on the amount of renewable energy introduction, in the renewable energy database 107. Here, the renewable energy introduction plan information includes current connection amount information or predicted connection amount information of one or more renewable energies selected from wind power, offshore wind power, solar power, wave power, tidal power, running water, geothermal power, and biomass. The renewable energy introduction plan information includes current connection amount information or predicted connection amount information of the amount of renewable energy connection for each area.

[0020] 1 illustrates an amount of introduced renewable energy 107a in area #1, an amount of introduced renewable energy 107b in area #2, and an amount of introduced renewable energy 107c in area #3. Information on the amounts of introduced renewable energy 107a, 107b, 107c, etc. is stored in a renewable energy database 107 and is referred to by the system reinforcement planning unit 102. Note that each area may be under the jurisdiction of the same power transmission and distribution business operator, or may be under the jurisdiction of a different power transmission and distribution business operator.

[0021] The system reinforcement planning unit 102 is a part that evaluates the effects of a power system reinforcement plan. The system reinforcement planning unit 102 includes a wide-area system cross section creation unit 108, a contingent fault condition selection unit 109, a system impact evaluation unit 110, a system countermeasure review unit 111, and an effect evaluation unit 112. The system reinforcement planning unit 102 stores system reinforcement plan information that identifies locations where system reinforcement is required, based on a wide-area power system that simulates the power system of each area.

[0022] The wide-area system cross section creation unit 108 creates a simulated power system cross section across each area based on the renewable energy introduction plan information in the renewable energy database 107. For each area, the wide-area system cross section creation unit 108 creates a system cross section required for system impact evaluation using current connection amount or connection amount forecast information on the renewable energy connection amount, and the system configuration, system impedance, installation capacity, and generator data included in the system reinforcement plan information.

[0023] Here, the wide-area system cross section creation unit 108 stores the system configuration, line impedance (R+jX), earth capacitance (susceptance: jB), data required for system configuration and state estimation (such as threshold value of bat data), generator data, and other data required for power flow calculation, state estimation, and time-series change calculation. In addition, the wide-area system cross section creation unit 108 refers to information in the renewable energy database 107 to simulate the power system when renewable energy is connected as assumed by the renewable energy introduction planning unit 101. The power system created by this wide-area system cross section creation unit 108 (see FIG. 1) is shown in FIG. 2, which will be described later.

[0024] Figure 2 is a cross-sectional diagram of a wide-area system. This wide-area system shows a cross section of a power system connecting area 20a (area #1) and area 20b (area #2). In area 20a, a renewable energy power generation unit 202 including renewable energy power sources 202a to 202c is installed, and is connected to an electricity demand area 201 by a transmission line 203a.

[0025] Area 20b is configured by connecting power demand areas 201a and 201b with a power transmission line 203b. Furthermore, renewable energy power generation unit 202 in area 20a and power demand area 201a are connected with a power transmission line 21. In this way, renewable energy power generation unit 202 supplies power to power demand areas 201, 201a, and 201b.

[0026] At this time, the power demand area 201 a receives the power generated by the renewable energy power generation unit 202 via the power transmission line 21 . The wide area system cross section creation unit 108 (see FIG. 1) simulates not only the transmission line 21 connecting the renewable energy power generation unit 202 and the power demand area 201a, but also the transmission line 203a connecting the renewable energy power generation unit 202 and the power demand area 201 in area 20a, the transmission line 203b connecting the power demand area 201a in area 20b and another power demand area 201b in area 20b, and all transmission lines (not shown) in areas 20a and 20b.

[0027] Returning to FIG. 1, the explanation will continue. The cross sections created by the wide-area system cross section creation unit 108 must take into consideration changes in renewable energy output and generator output on a daily and annual basis. The number of cross sections varies depending on the state of the target power system, but a day is divided into several hours, and a cross section for one year is prepared. For example, if a day is divided into 24 hours, the cross sections for one year are 8640 cross sections, which is 24 multiplied by 365. The power system information created by the wide-area system cross section creation unit 108 is transmitted to the contingent fault condition selection unit 109.

[0028] The contingency condition selection unit 109 has a function of preparing a system fault scenario for evaluating stability (synchronization stability, voltage stability, frequency stability, etc.) when an accident (ground fault in a transmission line, generator tripping, etc.) occurs in the power system in the cross section created by the wide area system cross section creation unit 108. In other words, the contingency condition selection unit 109 selects the contingency condition to be analyzed in the wide area system cross section creation unit 108. The data of the contingency case prepared by the contingency condition selection unit 109 is shown in FIG. 3 described later.

[0029] FIG. 3 is a diagram showing the structure of contingency data. The contingency database 300 stores contemplated failure data. The contingency database 300 is a collection of data at each date and time, and each data is assigned date and time data 301. The columns of each data include a contingency case column 302, a failure location column 303, and a failure mode column 304, and the rows store data related to each contingency failure case.

[0030] Data may be stored for any time interval in the contingency database 300. The fault mode column 304 stores the phase of the faulted line, the number of lines, a combination of the fault mode, and the like.

[0031] Here, "3φ6LG(ABCA'B'C')" stored in the fault mode column 304 indicates a three-phase six-wire ground fault in "3φ6LG", and "(ABCA'B'C')" indicates that phases A, B, C, A', B', and C' have ground faults.

[0032] Contingency case C1 shows that a three-phase, six-wire ground fault occurs at the sending end of transmission line A1. Contingency case C2 shows that a three-phase, six-wire ground fault occurs at the sending end of transmission line A2. Contingency case C3 shows that a three-phase, six-wire ground fault occurs at the sending end of transmission line A1 and the sending end of transmission line A2.

[0033] The assumed fault case C4 indicates that a power supply site A1 will become disconnected. The contingent fault case C5 indicates that a three-phase six-wire ground fault occurs at the sending end of the transmission line B1. By including such information, the system impact for each contingency can be assessed and contingency conditions can be selected.

[0034] Returning to Fig. 1, the explanation will be continued. The system influence evaluation unit 110 calculates the system constraint conditions before the system fault (normal time) and at the time of the system fault, based on the system cross section created by the wide area system cross section creation unit 108 and the contingent fault case selected by the contingent fault condition selection unit 109. Here, the system constraints include the generator internal phase difference angle in synchronous stability, the maximum and minimum frequency values ​​in frequency stability, the load margin up to the nose point of the PV curve in voltage stability, transient voltage, overload, and the like.

[0035] The system impact assessment unit 110 evaluates stability at the time of a system fault by simulating a contingency case selected by the contingency condition selection unit 109 using the cross section created by the wide area system cross section creation unit 108. The system impact assessment unit 110 performs power flow calculation and transient stability calculation when a fault selected by the contingency condition selection unit 109 occurs. An example of a system fault is shown in Fig. 4 described later.

[0036] FIG. 4 is a schematic diagram of a cross section of a power system showing a system accident situation. The power system faults shown here cover the power systems related to area 20a and area 20b. Power system fault 401 is a fault related to power transmission line 203a. Power system fault 402 is a fault related to power transmission line 21. Power system fault 403 is a fault related to power transmission line 203b.

[0037] FIG. 5 is a diagram showing a system fault analysis screen 5. As shown in FIG. The system fault analysis screen 5 is a screen displayed on the display unit of the utilization plan development device 100. This system fault analysis screen 5 displays a system diagram 501, a legend 504, a date column 502a, a time column 502b, and a contingency condition selection result 503.

[0038] The system diagram 501 is an area illustrating the system targeted by the utilization plan development device 100, and is created by the wide-area system cross section creation unit 108 and displayed by the system impact evaluation unit 110. The system diagram 501 changes depending on the date and time displayed in the date column 502a and the time column 502b.

[0039] The legend 504 is an area showing the meaning of each icon and symbol shown in the system diagram 501. In the system diagram 501, system information such as a synchronous generator, a renewable energy power source, a load, a transformer, a busbar, and a line is shown as icons and symbols. The date and time of the system diagram 501 and the assumed fault condition selection result 503 are displayed in a date column 502a and a time column 502b.

[0040] The contingency condition selection result 503 includes a contingency case column 5031, a power control amount column 5032 and a negative control amount column 5033 in the grid stabilization control amount column, a generator phase angle column 5034, a voltage column 5035, and a frequency column 5036 in the column direction, and displays the analysis results of the power flow calculation and the transient stability. The contingency condition selection result 503 indicates whether grid constraints such as a generator phase angle, voltage, and frequency can be ensured for each accident scenario described in the contingency database 300. The controlled object is a generator or a load, but may also be a battery, a rechargeable secondary battery, a storage battery of an electric vehicle, a flywheel, a phase modifying equipment, or the like. The grid constraint is appropriately determined, for example, such that the generator phase angle is 100 degrees or less even during a grid accident.

[0041] The contingency fault condition selection result 503 includes an indication of whether or not the grid constraints can be ensured. In the generator phase angle column 5034, voltage column 5035, and frequency column 5036 in FIG. 5, a circle indicates a case where the grid constraints can be ensured, and an x ​​indicates a case where the grid constraints cannot be ensured.

[0042] Returning to Fig. 1, the explanation will be continued. The system countermeasure review unit 111 verifies the effect of improving system stability by replacing decommissioned generators with synchronous phase modifiers as a countermeasure in the case where system constraints cannot be ensured during a system accident in the evaluation by the system impact evaluation unit 110. In other words, the system countermeasure review unit 111 proposes countermeasures for improving the stability of the power system based on the results of the evaluation by the system impact evaluation unit 110.

[0043] FIG. 6 is a cross-sectional view of a power system for explaining a procedure for identifying a generator to be utilized as a synchronous phase modifier. Fig. 6 shows that a system fault 402 related to the power transmission line 21 has occurred. This corresponds to the contingency fault case C4 of the contingency fault condition selection result 503 shown in Fig. 5. At this time, the system constraints of the generator phase angle, voltage, and frequency cannot be ensured. If the system constraint conditions cannot be satisfied in the evaluation of the system constraint conditions in the system impact evaluation unit 110, the system measure examination unit 111 identifies the position of the power system where the problem occurs.

[0044] For a system fault 402 in which system constraints at the time of the fault cannot be ensured, the system countermeasure examination unit 111 selects a generator 602 that can supply inertial force and reactive power. This generator 602 is connected to the power transmission line 21 and to the area 20b side of the fault point of the system fault 402, and is an obsolete generator that can contribute to problem solving when utilized as a synchronous phase modifier.

[0045] In the event of such a system fault 402, the system countermeasure examining unit 111 analyzes the system fault to see if the system stability can be improved by utilizing the selected generator 602 as a synchronous phase modifier.

[0046] FIG. 7 is a diagram showing the system fault analysis screen 5. As shown in FIG. The system fault analysis screen 5 in FIG. 7 displays a system diagram 501, a legend 504, a date column 502a, a time column 502b, and a result of selection of assumed fault conditions 503.

[0047] In the contingency condition selection result 503, "x → o" is displayed in the generator phase angle column 5034, voltage column 5035, and frequency column 5036 for contingency fault case C4. This indicates that if contingency fault case C4 occurs before the countermeasure, that is, before the obsolete generator is converted into a synchronous phase modifier, the generator phase angle difference, voltage, and frequency cannot ensure the system constraints. Furthermore, it indicates that if contingency fault case C4 occurs after the countermeasure, that is, before the obsolete generator is converted into a synchronous phase modifier, the generator phase angle difference, voltage, and frequency can ensure the system constraints.

[0048] The process up to the display of the system fault analysis screen 5 in Fig. 7 will be described with reference to Fig. 1. The evaluation result of the system countermeasures examining unit 111 is transmitted to the effect evaluation unit 112. The effect evaluation unit 112 evaluates (verifies) the effect of utilizing the decommissioned generator as a synchronous modifier. This effect evaluation unit 112 evaluates (verifies) the effect of the countermeasures proposed by the system countermeasures examining unit 111.

[0049] The effect evaluation unit 112 selects, as the system constraint conditions, one or more of the following effects to be evaluated: the generator internal phase angle in synchronous stability, the maximum and minimum frequency values ​​in frequency stability, the load margin up to the nose point of the PV curve in voltage stability, transient voltage, and overload.

[0050] When the system countermeasure examining unit 111 confirms the value of the improvement in system stability when the decommissioned generator is utilized as a synchronous phase modifier, it transmits information such as the location and required capacity of the selected generator to the generator utilization planning unit 103. This enables the generator utilization planning unit 103 to evaluate the details of construction work for utilizing the decommissioned generator as a synchronous phase modifier and the useful life.

[0051] The generator utilization planning unit 103 includes a generator database 116, which is a collection of generator information for two or more areas, a construction content determination unit 117, and an investment cost evaluation unit 118. The generator utilization planning unit 103 stores generator utilization plan information having information on decommissioned generators in each area in a storage unit (not shown). The generator database 116 has, for example, generator information 116a for area A, generator information 116b for area B, and generator information 116c for area C. The generator information 116a, 116b, 116c, etc. has one or more of information on the capacity of the decommissioned generator, the response speed to external commands, the number of years in operation, the useful life, the maintenance status of the generator's stator windings, and the understanding of local residents regarding generator utilization. The generator information 116a, 116b, 116c, etc. includes generator utilization plan information. The information in the generator database 116 is referenced by the construction content determination unit 117.

[0052] The construction content determination unit 117 determines specific construction content for utilizing the decommissioned generator as a synchronous phase modifier based on the information in the generator database 116, transmits the determined content to the investment cost evaluation unit 118, and further evaluates the performance of the synchronous phase modifier after modification. The construction content determination unit 117 selects one or more of the following construction content for utilizing the decommissioned generator as a synchronous phase modifier: installation of a driving machine, installation of a driving inverter, operation of the driving machine, protection of the driving machine, operation of the driving inverter, protection of the driving inverter, installation of a monitoring panel, installation of a central control room panel, turbine disconnection, installation of a lubricating oil device, installation of a cooling water device, installation of an inverter transformer, installation of a foundation for a turbine opening, and cable work. The investment cost evaluation unit 118 calculates (evaluates) the investment costs such as the construction costs actually required based on the determination contents from the construction content determination unit 117, and transmits them to the investment effect evaluation unit 120 of the index evaluation unit 119. In other words, the investment cost evaluation unit 118 calculates the investment cost from one or more of the initial cost required for the construction contents, the operating cost of the synchronous phase modifier, and the labor cost for operating the synchronous phase modifier. Note that the investment cost evaluation unit 118 may apply a levelized cost calculation that takes a discount rate into consideration when calculating the investment cost.

[0053] The index evaluation unit 119 includes an investment return evaluation unit 120 and a decommissioned generator utilization decision unit 122. The index evaluation unit 119 calculates an index of investment return when utilizing a decommissioned generator as a synchronous phase modifier using renewable energy introduction plan information, generator utilization plan information, and grid reinforcement plan information. However, the present invention is not limited to this, and the index evaluation unit 119 may calculate an index of investment return when utilizing a decommissioned generator as a synchronous phase modifier using only grid reinforcement plan information. The index evaluation unit 119 may also calculate an index of investment return when utilizing a decommissioned generator as a synchronous phase modifier using grid reinforcement plan information and renewable energy introduction plan information. Furthermore, the index evaluation unit 119 may further use information on decommissioned generators installed in each area to calculate an index of investment return. The information on these decommissioned generators is stored in a storage unit (not shown).

[0054] The signal from the effect evaluation unit 112 and the signal from the investment cost evaluation unit 118 are transmitted to an investment effect evaluation unit 120 of an index evaluation unit 119. The investment effect evaluation unit 120 calculates an index of the investment effect of utilizing the decommissioned generator as a synchronous phase modifier, based on the effect evaluated by the effect evaluation unit 112 and the investment cost evaluated by the investment cost evaluation unit 118. A decommissioned generator utilization determination unit 122 determines which decommissioned generator to utilize as a synchronous phase modifier, based on the index of the investment effect.

[0055] Here, if there are any additional study items that are required in order to utilize the decommissioned generator as a synchronous modifier from the viewpoint of investment effectiveness, the information on these is transmitted to the system countermeasures study unit 111 .

[0056] The system countermeasure examining unit 111 evaluates the system stability when the decommissioned generator is utilized as a synchronous phase modifier in the same manner as described above, taking into consideration the additional examination items, and transmits the evaluation result to the effect evaluation unit 112 and the generator utilization planning unit 103. By exchanging information between the system reinforcement planning unit 102, the generator utilization planning unit 103, and the index evaluation unit 119 in this manner, the details of the construction work regarding which decommissioned generator is to be utilized as a synchronous phase modifier and the operation method as a synchronous phase modifier are ultimately determined.

[0057] According to the present embodiment, it is possible to optimize the return on investment of the grid expansion plan of the power transmission and distribution company and the power generation company by converting decommissioned generators into synchronous modifiers. Furthermore, it is also possible to optimize the return on investment of the national renewable energy introduction plan.

[0058] Second Embodiment In the investment cost evaluation unit 118 of the first embodiment, it is possible to estimate the investment cost from the construction cost and the operation cost. Therefore, in the second embodiment, information is prepared that organizes the investment cost from the viewpoint of the construction cost, which is an initial cost, and the other operation costs, and is utilized in the investment cost evaluation unit 118.

[0059] 8A and 8B are diagrams showing investment evaluation information according to the second embodiment. The investment cost evaluation unit 118 classifies the investment costs into construction costs (CAPEX: Capital Expenditure) and operating costs (OPEX: Operating Expenditure).

[0060] FIG. 8A is a diagram showing construction cost information 802. The construction cost information 802 is composed of an item column 8021 and an evaluation result column 8022 in the column direction, and information relating to each item is stored in the row direction.

[0061] The item column 8021 in the construction cost information 802 includes installation of a drive machine, installation of a drive inverter, protection of the drive machine, installation of a monitoring panel, installation of a cooling device, operation of the drive inverter, protection of the drive inverter, shutting off the turbine, installation of lubricating oil, installation of a cooling water device, installation of an inverter transformer, installation of a foundation for the turbine opening, cable work, etc. Construction items other than those exemplified above may be added to the construction cost information 802. The evaluation result column 8022 of the construction cost information 802 lists the construction cost required for each construction item in yen.

[0062] FIG. 8B is a diagram showing the operating cost information 803. The operating cost information 803 is composed of an item column 8031 ​​and an evaluation result column 8032 in the column direction, and information relating to each item is stored in the row direction.

[0063] In this operation cost information 803, operation-related costs such as the operating cost (electricity cost) of the synchronous phase modifier and the labor cost for operating the synchronous phase modifier are evaluated. Note that construction items other than those listed as examples in the operation cost information 803 may be added. In the operation cost information 803, the cost required for each operation is listed in yen per year.

[0064] Third embodiment In the effect evaluation unit 112 of the first embodiment, it is possible to estimate the effect of replacing a decommissioned generator with a synchronous modifier based on the cost related to greenhouse gas reduction. Therefore, in the third embodiment, a database is prepared that summarizes the effect of replacing a decommissioned generator with a synchronous modifier based on items related to greenhouse gas reduction, and the effect evaluation unit 112 utilizes this database.

[0065] 9 is a diagram showing benefit assessment information 901 according to the third embodiment. The benefit assessment information 901 is an example of the result of assessment by the effect assessment unit 112. The benefit evaluation information 901 includes an item column 9011 and an evaluation result column 9012 in the column direction, and evaluation information relating to each item is stored in the row direction.

[0066] The item column 9011 lists, as evaluation items, costs related to greenhouse gas reduction, such as the cost of reducing fossil fuels associated with an increase in the amount of renewable energy connections, the cost of reducing carbon dioxide emission rights purchased associated with carbon dioxide emissions, and the cost of reducing the cost of strengthening the grid in the absence of a synchronous modifier. Note that items other than those listed as examples may be added to the item column 9011. The evaluation result column 9012 lists the benefit of each item in yen. The total of the evaluation result column 9012 is the benefit calculated by the effect evaluation unit 112.

[0067] In other words, the effect evaluation unit 112 selects, as the effect of utilizing the decommissioned generator identified by the system countermeasures examination unit 111 as a synchronous phase modifier, one of the following: the reduction cost of fossil fuels associated with the relative decrease in output of thermal power plants due to an increase in the amount of connected renewable energy, the reduction cost of purchasing carbon dioxide emission rights associated with the decrease in carbon dioxide emissions due to an increase in the amount of connected renewable energy, and the reduction cost of system reinforcement that is no longer necessary due to the utilization of a synchronous phase modifier.

[0068] Fourth embodiment In the investment return evaluation unit 120 of the first embodiment, it is possible to use a cost-benefit ratio as an index used in the index evaluation unit 119. Therefore, in this embodiment, the investment return evaluation unit 120 uses the cost-benefit ratio for evaluation.

[0069] FIG. 10 is a diagram showing a cost-benefit evaluation method according to the fourth embodiment. In the fourth embodiment, the effect evaluation unit 112 evaluates the benefit of utilizing a decommissioned generator as a synchronous phase modifier as a monetary value. Examples of the benefit of utilizing a decommissioned generator as a synchronous phase modifier include the cost of reducing fossil fuel costs described in the third embodiment, the cost of reducing carbon dioxide emission rights purchase costs associated with carbon dioxide emissions, and the cost of reducing grid reinforcement costs. The effect evaluation unit 112 transmits the evaluated benefit to the investment return evaluation unit 120.

[0070] Furthermore, the investment cost evaluation unit 118 estimates the investment cost required to utilize the decommissioned generator as a synchronous phase modifier. Examples of the investment cost required to utilize the decommissioned generator as a synchronous phase modifier include the construction cost and operation cost described in the second embodiment. The investment cost evaluation unit 118 transmits the estimated investment cost to the investment effect evaluation unit 120.

[0071] The investment return evaluation unit 120 calculates a cost-benefit ratio based on the benefit calculated by the effect evaluation unit 112 and the cost calculated by the investment cost evaluation unit 118. Specifically, the investment return evaluation unit 120 calculates the cost-benefit ratio by dividing the cost from the benefit. The greater the benefit relative to the cost, the greater the cost-benefit ratio. A large cost-benefit ratio indicates a more beneficial investment return.

[0072] That is, the investment-benefit evaluation unit 120 calculates the economic benefit of using the decommissioned generator as a synchronous phase modifier and the cost required to use the decommissioned generator as a synchronous phase modifier, and selects the cost-benefit ratio obtained by dividing the benefit by the cost as an indicator of investment-benefit. The investment-benefit evaluation unit 120 calculates the economic benefit of using the decommissioned generator as a synchronous phase modifier by adding up one or more of the following: the cost of reducing fossil fuels associated with the decrease in output of thermal power plants that is relatively reduced due to the increase in the amount of renewable energy connections, the reduction in the cost required to purchase carbon dioxide emission rights, and the cost of reducing grid reinforcement that is no longer necessary due to the use of the synchronous phase modifier. The investment-benefit evaluation unit 120 calculates the cost required to use the decommissioned generator as a synchronous phase modifier from one or more of the initial cost required for the construction work, the operating cost of the synchronous phase modifier, and the labor cost required to operate the synchronous phase modifier.

[0073] The retired generator utilization determination unit 122 compares the cost-benefit ratio with a reference value, and if the cost-benefit ratio is greater than the reference value, determines to utilize the retired generator as a synchronous phase modifier. In this way, the retired generator utilization determination unit 122 can determine which retired generator to utilize as a synchronous phase modifier based on the cost-benefit ratio calculated by the investment effect evaluation unit 120.

[0074] Fifth embodiment In the investment return assessment unit 120 of the first embodiment, when calculating the investment return of a synchronous phase modifier of a decommissioned generator, it is necessary not only to calculate the investment return but also to compare the calculated investment return with the effects of other measures. Therefore, in the fifth embodiment, in order to compare the investment return when utilizing a decommissioned generator as a synchronous phase modifier with other measures, a function for comparison from various viewpoints such as a cost-benefit ratio and an evaluation of the impact on grid constraints has been invented to add to the investment return assessment unit 120.

[0075] FIG. 11 is a diagram showing a comparison screen 1100 with other policies in a cost-benefit evaluation according to the fifth embodiment. This comparison screen 1100 includes a countermeasure case column 1101, a cost-benefit evaluation column 1102, an inertia column 1103, a reactive power column 1104, and a reactive power column 1105 in the column direction, and a table showing the results for each countermeasure case is displayed in the row direction. This comparison screen 1100 is displayed by the investment return evaluation unit 120 shown in FIG. 1.

[0076] The countermeasure case column 1101 is a column displaying countermeasures such as installing a reactive power compensator, strengthening the power transmission line system, and using storage batteries and electric vehicles, in addition to replacing the decommissioned generator with a synchronous phase modifier. The cost-benefit evaluation column 1102 is a column for displaying an index for evaluating the investment effectiveness of each policy, and displays the cost-benefit evaluation of the fourth embodiment. The inertia column 1103, the reactive power column 1104, and the reactive power column 1105 are columns that display evaluation items related to grid constraints.

[0077] Returning to Fig. 1, the function of the investment return evaluation unit 120 will now be described. In this embodiment, in order to compare the investment return for each of several measures, several countermeasure cases are examined in advance. The countermeasure cases include, in addition to converting decommissioned generators to synchronous phase modifiers, the installation of reactive power compensation devices, strengthening the transmission line system, and the use of storage batteries and electric vehicles.

[0078] The power system countermeasure examining unit 111 plans other countermeasures using reactive power supply equipment. Here, the reactive power supply equipment is a static var compensator or a self-commutated var compensator. The effect evaluation unit 112 calculates a cost-benefit ratio by dividing the costs of these other measures from the benefits of these other measures as an index of the return on investment of these other measures. The effect evaluation unit 112 calculates the benefit of these other measures by adding up one or more of the following: the cost of reducing fossil fuels due to the decrease in output of thermal power plants that decreases relatively due to the increase in the amount of renewable energy connections; and the reduction in costs required for purchasing carbon dioxide emission rights. The effect evaluation unit 112 calculates the cost of these other measures by adding up one or more of the construction costs, operating costs, and labor costs of the other measures.

[0079] Next, the investment return evaluation unit 120 displays the cost-benefit evaluation of the fourth embodiment in a cost-benefit evaluation column 1102 of the comparison screen 1100 as an index for evaluating the investment return. In calculating this cost-benefit evaluation, the system measure examining unit 111 and the effect evaluation unit 112 perform trial calculations of the effect of each measure. In the trial calculation of the cost, in the case of a reactive power compensator, for example, the manufacturing cost and operating cost of the reactive power compensator are obtained from a server (not shown) that stores information related to the reactive power compensator, in the same way as the generator utilization planning unit 103.

[0080] The index evaluation unit 119 calculates the cost-benefit ratio of each measure based on the costs and benefits associated with each measure, and displays it in the cost-benefit evaluation field 1102 of the comparison screen 1100. This allows the user to determine the most effective measure in terms of the cost-benefit ratio.

[0081] In comparison of each countermeasure case, it is considered necessary to consider the impact on the grid constraint in addition to the cost-benefit ratio. Therefore, the investment effect evaluation unit 120 of this embodiment displays evaluation items related to the grid constraint in an inertia column 1103, a reactive power column 1104, and a reactive power column 1105 of the comparison screen 1100 for comparison. In addition to these evaluation items, evaluation items related to the grid constraint, such as frequency stability and synchronizing ability, may be evaluated and displayed on the comparison screen 1100. By displaying the performance of each of these evaluation items in a comparative manner, the user can select a countermeasure that is required from the viewpoint of the grid constraint, not only from the viewpoint of the cost-benefit ratio.

[0082] Sixth Embodiment The renewable energy introduction planning unit 101 described in the first embodiment did not take into account the evaluation of return on investment in the grid reinforcement planning unit 102, the generator utilization planning unit 103, and the index evaluation unit 119 as described in the second, third, fourth, and fifth embodiments.

[0083] However, if the investment return evaluation unit 120 predicts that there is a possibility of increasing the amount of renewable energy connected by utilizing synchronous generators in areas with high investment return, the amount of introduction for each area in the renewable energy introduction planning unit 101 may change, and the renewable energy database 107 may be revised. Therefore, in this embodiment, a function of reflecting the results of the investment return evaluation unit 120 in the renewable energy database 107 is added.

[0084] FIG. 12 is a configuration diagram of an existing-facility utilization plan development device 100 according to the sixth embodiment. The renewable energy introduction planning unit 101 includes a renewable energy introduction plan correction unit 121. This renewable energy introduction plan correction unit 121 has a function of receiving a result from the decommissioned generator utilization determination unit 122, correcting the renewable energy database 107 in response to that result, and displaying the contents of the renewable energy database 107 on a renewable energy introduction plan correction screen 1401. This renewable energy introduction plan correction unit 121 corrects the amount of renewable energy introduction in each area based on the capacity of the synchronous modifier determined by the decommissioned generator utilization determination unit 122 and analysis information of the power system in each area.

[0085] FIG. 13 is a flowchart showing the process of correcting the renewable energy introduction plan for each area. Upon receiving the result of the decommissioned generator utilization determination unit 122, the renewable energy introduction plan correction unit 121 evaluates the capacity when the decommissioned generator is utilized as a synchronous modifier (step S10). Then, the renewable energy introduction plan correction unit 121 analyzes the power system of each area (step S11). The renewable energy introduction plan correction unit 121 calculates the amount of renewable energy that can be introduced into each area based on the capacity of the synchronous modifier and the analysis result of the power system (step S12), and then ends the processing in FIG.

[0086] FIG. 14 is a diagram showing a renewable energy introduction plan correction screen 1401 for each area according to the sixth embodiment. The renewable energy introduction plan amendment screen 1401 is configured to include, in the column direction, an area name column 14011, a pre-change renewable energy introduction amount column 14012, and a post-change renewable energy introduction amount column 14013, and information on each area is arranged in the row direction.

[0087] 12 and 13, the amount of renewable energy introduced in each area changes according to a signal from the renewable energy introduction plan correction unit 121. Here, assuming that the location where the synchronous generator is installed is area #1, the amount of renewable energy introduced before the change is α, and the amount of renewable energy introduced after the change is α1, the amount of renewable energy connection (α1-α) increases due to the installation of the synchronous modifier. The amount of renewable energy introduced may also change for area #2 and area #3.

[0088] That is, when the target value of the amount of renewable energy introduced is set as a constraint, in consideration of the increase in the amount of renewable energy connected in area #1, the total amount of renewable energy introduced in areas #2, #3, ... may or may not be reduced by (α1-α). As a result, the total amount of renewable energy introduced in all areas after the change can be increased more than the total amount of renewable energy introduced in all areas before the change.

[0089] Seventh embodiment In the first embodiment, the return on investment is calculated by the index evaluation unit 119 using all the information from the renewable energy introduction planning unit 101, the grid reinforcement planning unit 102, and the generator utilization planning unit 103. However, depending on the constraint conditions, the effect of the present invention can be obtained by using only two pieces of information from the renewable energy introduction planning unit 101, the grid reinforcement planning unit 102, and the generator utilization planning unit 103, and it becomes possible to achieve the reduction in greenhouse gas emissions while reducing the grid reinforcement costs when increasing the amount of renewable energy connections, which was a problem of the present invention. Therefore, in this embodiment, it is invented to define such constraint conditions.

[0090] First, regarding the generator utilization planning unit 103 of the first embodiment, when the investment required for evaluation in the investment return evaluation unit 120, such as the construction cost and useful life related to converting a decommissioned generator into a synchronous phase modifier, is publicly known information that does not require information from the generator utilization planning unit 103, it is not necessary to transmit information from the effect evaluation unit 112 to the generator utilization planning unit 103. In this case, the investment return on utilizing a synchronous phase modifier of a decommissioned generator can be calculated by exchanging information only between the renewable energy introduction planning unit 101 and the grid reinforcement planning unit 102.

[0091] In addition, if the planned site for connecting renewable energy is located in a location where the supply of reactive power and synchronizing power by a synchronous phase modifier can be expected, the introduction of a synchronous phase modifier can be expected to increase the amount of renewable energy connected in the relevant area. In such a case, even without trial calculations by the system expansion planning unit 102, it is possible to carry out a study on converting a decommissioned generator into a synchronous phase modifier only by exchanging information between the renewable energy introduction planning unit 101 and the generator utilization planning unit 103.

[0092] Furthermore, even if the renewable energy database 107 is not transmitted from the renewable energy introduction planning unit 101 to the system expansion planning unit 102, the wide-area system cross section creation unit 108 can independently create a wide-area system cross section for future expansion of renewable energy connection amount based on the publicly known current renewable energy introduction amount and the target value of the renewable energy introduction amount reported in national policy, and can perform subsequent evaluation. In this case, the exchange of information between the system expansion planning unit 102 and the generator utilization planning unit 103 makes it possible to consider utilization of synchronous modifiers of decommissioned generators.

[0093] As described above, in the seventh embodiment, the effects of the present invention can be achieved by using information from two of the renewable energy introduction planning unit 101, the grid reinforcement planning unit 102, and the generator utilization planning unit 103. Therefore, the present invention is not limited to the invention using all of the information from the renewable energy introduction planning unit 101, the grid reinforcement planning unit 102, and the generator utilization planning unit 103.

[0094] (Modification) The present invention is not limited to the above-described embodiment, and includes various modified examples. For example, the above-described embodiment has been described in detail to clearly explain the present invention, and is not necessarily limited to those having all of the configurations described. It is possible to replace a part of the configuration of one embodiment with the configuration of another embodiment, and it is also possible to add the configuration of another embodiment to the configuration of one embodiment. In addition, it is also possible to add, delete, or replace a part of the configuration of each embodiment with another configuration.

[0095] The above configurations, functions, processing units, processing means, etc. may be realized in part or in whole by hardware such as an integrated circuit. The above configurations, functions, etc. may be realized by software by a processor interpreting and executing a program that realizes each function. Information such as the program, table, file, etc. that realizes each function can be stored in a recording device such as a memory, a hard disk, or an SSD (Solid State Drive), or a recording medium such as a flash memory card or a DVD (Digital Versatile Disk).

[0096] In each embodiment, the control lines and information lines are those that are considered necessary for the explanation, and not all control lines and information lines in the product are necessarily shown. In reality, it may be considered that almost all components are connected to each other.

[0097] The original claims of the original application are reproduced below.

[0098] [1] A storage unit that stores grid reinforcement plan information that identifies locations where grid reinforcement is required based on a wide-area power system that simulates the power system of each area; an index evaluation unit that calculates an index of return on investment when utilizing a decommissioned generator as a synchronous modifier, by using the grid reinforcement plan information stored in the storage unit; a retired generator utilization determination unit that determines the retired generator to be utilized as a synchronous phase modifier based on the index; An existing facility utilization plan formulation device comprising: [2] The storage unit stores renewable energy introduction plan information that predicts the future introduction amount of renewable energy in each area, The index evaluation unit also uses the renewable energy introduction plan information when calculating an index of return on investment. 2. The existing facility utilization plan formulation device according to claim 1. [3] The storage unit stores information on decommissioned generators installed in each area, The index evaluation unit also uses information on the decommissioned generator when calculating the index of return on investment. 2. The existing facility utilization plan formulation device according to claim 1. [4] The renewable energy introduction plan information includes current connection amount information or connection amount forecast information of one or more renewable energies selected from wind power, offshore wind power, solar power, wave power, tidal power, running water, geothermal power, and biomass; 3. The existing facility utilization plan formulation device according to claim 2. [5] The renewable energy introduction plan information includes current connection amount information or connection amount forecast information of the renewable energy connection amount, 3. The existing facility utilization plan formulation device according to claim 2. [6] Each of the areas is under the jurisdiction of the same electricity transmission and distribution company. 2. The existing facility utilization plan formulation device according to claim 1. [7] Each of the areas is under the jurisdiction of a different electricity transmission and distribution company. 2. The existing facility utilization plan formulation device according to claim 1. [8] A wide-area system cross section creation unit that creates a power system cross section across each of the areas based on the renewable energy introduction plan information; a contingency condition selection unit that selects a contingency condition to be analyzed in the wide area system cross section creation unit; a system influence evaluation unit that performs a power flow calculation and a transient stability calculation when the fault selected by the contingency fault condition selection unit occurs; A power system countermeasures review unit that develops countermeasures for improving the stability of the power system based on the results of the evaluation by the power system influence evaluation unit; an effect evaluation unit that evaluates the effects of measures proposed by the power system measure examination unit; 3. The existing facility utilization plan formulation device according to claim 2. [9] The wide-area system cross section creation unit creates a system cross section required for system impact evaluation for each of the areas based on the renewable energy introduction plan information, using current connection amount or connection amount forecast information of the renewable energy connection amount and the system configuration, system impedance, installation capacity, and generator data included in the system reinforcement plan information. 9. The existing facility utilization plan formulation device according to claim 8.

[10] The system influence evaluation unit calculates system constraint conditions during an accident and during normal operation based on the system cross section created by the wide-area system cross section creation unit and information on the contingency failure set by the contingency failure condition selection unit. 10. The existing facility utilization plan formulation device according to claim 9.

[11] The system influence evaluation unit selects, as the system constraint condition, one or more of a generator internal phase angle in synchronous stability, a maximum value and a minimum value of a frequency in frequency stability, a load margin up to a nose point of a PV curve in voltage stability, a transient voltage, and an overload. 11. The existing facility utilization plan formulation device according to claim 10.

[12] The power system measure examination unit identifies a position of the power system where a problem occurs if the power system constraint condition cannot be satisfied in the evaluation of the power system constraint condition by the power system impact evaluation unit. 11. The existing facility utilization plan formulation device according to claim 10.

[13] The system countermeasure examination unit selects a decommissioned generator that can contribute to solving the problem when used as a synchronous phase modifier for a position of the power system where the problem occurs, 13. The existing facility utilization plan formulation device according to claim 12.

[14] The effect evaluation unit verifies an effect when the retired generator identified by the system countermeasure examination unit is utilized as the synchronous modifier. 14. The existing facility utilization plan formulation device according to claim 13.

[15] The effect evaluation unit selects, as the system constraint conditions, one or more of a generator internal phase angle in synchronous stability, a maximum value and a minimum value of a frequency in frequency stability, a load margin up to a nose point of a PV curve in voltage stability, a transient voltage, and an overload as effects to be evaluated. 14. The existing facility utilization plan formulation device according to claim 13.

[16] The effect evaluation unit selects, as an effect when the decommissioned generator identified by the grid countermeasure examination unit is utilized as a synchronous condenser, any one of the following: a reduction cost of fossil fuels associated with a decrease in output of a thermal power plant that is relatively reduced due to an increase in the amount of connected renewable energy; a reduction cost of purchasing carbon dioxide emission rights associated with a decrease in carbon dioxide emissions due to an increase in the amount of connected renewable energy; and a reduction cost of grid reinforcement that becomes unnecessary due to the utilization of the synchronous condenser. 14. The existing facility utilization plan formulation device according to claim 13.

[17] The storage unit further stores generator utilization plan information having information on decommissioned generators in each of the areas; a construction content determination unit that determines construction content for utilizing the decommissioned generator as the synchronous modifier based on the generator information of each of the areas included in the generator utilization plan information; an investment cost evaluation unit that evaluates the investment cost based on the contents determined by the construction content determination unit; 17. The existing facility utilization plan formulation device according to claim 16, further comprising:

[18] The generator information for each of the areas includes one or more of the following information: capacity of the decommissioned generators, response speed to external commands, years of operation, service life, maintenance status of the generators' stator windings, and information on local residents' understanding of generator utilization; 18. The existing facility utilization plan formulation device according to claim 17.

[19] The generator information for each area includes the generator utilization plan information. 18. The existing facility utilization plan formulation device according to claim 17.

[20] The construction content determination unit selects one or more of the following construction contents for utilizing the decommissioned generator as the synchronous phase modifier: installation of a driving machine, installation of a driving inverter, operation of the driving machine, protection of the driving machine, operation of the driving inverter, protection of the driving inverter, installation of a monitoring panel, installation of a central control room panel, shutting off the turbine, installation of a lubricating oil device, installation of a cooling water device, installation of an inverter transformer, installation of a foundation for a turbine opening, and cable construction; 18. The existing facility utilization plan formulation device according to claim 17. [twenty one] The investment cost evaluation unit calculates the investment cost from the initial cost required for the construction work. 21. The existing facility utilization plan formulation device according to claim 20. [twenty two] The investment cost evaluation unit calculates the investment cost from one or more of an operating cost of the synchronous phase condenser and a labor cost required for operating the synchronous phase condenser. 21. The existing facility utilization plan formulation device according to claim 20. [twenty three] The investment cost evaluation unit applies a levelized cost calculation that takes into account a discount rate when calculating the investment cost. 21. The existing facility utilization plan formulation device according to claim 20. [twenty four] The index evaluation unit includes an investment effect evaluation unit that calculates an index of investment effect of utilizing the decommissioned generator as a synchronous modifier based on the effect evaluated by the effect evaluation unit and the investment cost evaluated by the investment cost evaluation unit. 21. The existing facility utilization plan formulation device according to claim 20. [twenty five] The investment return evaluation unit calculates the economic benefit of utilizing the decommissioned generator as a synchronous phase modifier and the cost required to utilize the decommissioned generator as a synchronous phase modifier, and selects a cost-benefit ratio obtained by dividing the benefit by the cost as an index of the investment return. 25. The existing facility utilization plan formulation device according to claim 24.

[26] The investment-benefit evaluation unit calculates the economic benefit of using the decommissioned generator as a synchronous condenser by adding up one or more of the following: the cost of reducing fossil fuels due to the decrease in output of thermal power plants that is relatively reduced due to the increase in the amount of renewable energy connections; the reduction in the cost required for purchasing carbon dioxide emission rights; and the cost of reducing grid reinforcement that is no longer necessary due to the use of the synchronous condenser. 26. The existing facility utilization plan formulation device according to claim 25.

[27] The investment-effectiveness evaluation unit calculates the cost required to utilize the decommissioned generator as a synchronous phase condenser from one or more of the initial cost required for the construction work, the operating cost of the synchronous phase condenser, and the labor cost required for operating the synchronous phase condenser. 26. The existing facility utilization plan formulation device according to claim 25.

[28] The power system countermeasures examination department further develops other measures using reactive power supply equipment, The effect evaluation unit further calculates an index of the return on investment of the other measures. 26. The existing facility utilization plan formulation device according to claim 25.

[29] The system countermeasure examination unit selects a static var compensator or a self-commutated var compensator as the reactive power supply equipment. 29. The existing facility utilization plan formulation device according to claim 28.

[30] The effect evaluation unit calculates a cost-benefit ratio by dividing the cost of the other measure from the benefit of the other measure as an index of the investment effect of the other measure. 29. The existing facility utilization plan formulation device according to claim 28.

[31] The effect evaluation unit calculates, as the benefit of the other measures, one or more of the following: the cost of reducing fossil fuels due to the decrease in output of thermal power plants that is relatively reduced due to the increase in the amount of renewable energy connections; and the reduction in the cost required for purchasing carbon dioxide emission rights. 31. The existing facility utilization plan formulation device according to claim 30.

[32] The effect evaluation unit calculates the cost of the other measures by adding up one or more of the construction costs, operating costs, and labor costs of the other measures; 31. The existing facility utilization plan formulation device according to claim 30.

[33] Further comprising a renewable energy introduction plan correction unit that corrects the amount of renewable energy introduction in each area based on the index calculated by the index evaluation unit; 2. The existing facility utilization plan formulation device according to claim 1.

[34] The renewable energy introduction plan correction unit corrects the amount of renewable energy introduction in each of the areas based on the capacity of the synchronous modifier determined by the decommissioned generator utilization determination unit and analysis information of the power system in each of the areas; 34. The existing facility utilization plan formulation device according to claim 33.

[35] A step in which an index evaluation unit calculates an index of return on investment when utilizing a decommissioned generator as a synchronous modifier, using system reinforcement plan information that identifies locations where system reinforcement is required based on a wide-area power system that simulates the power system of each area; A step in which a retired generator utilization determination unit determines the retired generator to be utilized as a synchronous modifier based on the index; A method for formulating a plan for utilizing existing facilities, comprising the steps of: [Explanation of symbols]

[0099] 100 Utilization planning device 101 Renewable Energy Introduction Planning Department 107 Renewable Energy Database 107a Renewable energy introduction amount 107b Renewable energy introduction amount 107c Renewable energy introduction amount 102 System Expansion Planning Department 108 Wide-area System Profile Creation Department 109 Expected fault condition selection section 110 System Impact Assessment Department 111 Power System Countermeasures Department 112 Effectiveness Evaluation Department 103 Generator Utilization Planning Department 116 Generator Database 116a Generator Information 116b Generator Information 116c Generator Information 117 Construction Contents Decision Department 118 Investment Cost Evaluation Department 119 Index Evaluation Department 120 Investment Evaluation Department 121 Renewable Energy Introduction Plan Revision Section 122 Decision-making Division for Utilizing Disused Generators 20a Area 20b Area 201,201a,201b Electricity demand area 21,203a,203b Power transmission line 202 Renewable Energy Power Generation Department 202a~202c Renewable energy sources 300 Contingency Database 301 Date and time data 302 Expected fault case column 303 Fault location column 304 Malfunction Symptoms Column 401~403 System accident 5 System accident analysis screen 501 Family tree 502a Date column 502b Time field 503 Expected fault condition selection results 5031 Expected fault case column 5032 Electricity control amount field 5033 Negative limit field 5034 Generator phase angle column 5035 Voltage column 5036 Frequency column 504 Legend 602 Generator 802 Construction cost information 8021 Item field 8022 Evaluation result column 803 Operating expense information 8031 Item field 8032 Evaluation result column 803 Investment Cost Evaluation Information 901 Benefits Assessment Information 9011 Item field 9012 Evaluation result column 1100 comparison screen 1101 Countermeasures Case Column 1102 Cost-benefit assessment section 1103 Inertia field 1104,1105 Reactive power column 1401 Renewable energy introduction plan revision screen 14011 Area name column 14012 Renewable energy introduction amount before change 14013 Renewable energy introduction amount after change

Claims

1. A system reinforcement planning unit that obtains system reinforcement plan information that identifies locations where system reinforcement is required based on renewable energy introduction plan information that predicts the future amount of renewable energy introduction in each area under the jurisdiction of different power transmission companies and wide-area power system information that simulates a power system spanning each area under the jurisdiction of the power transmission companies; and a system countermeasure examination unit that selects a decommissioned generator owned by a power generation company that improves system stability when the decommissioned generator is utilized as a synchronous modifier based on the system reinforcement plan information; An existing facility utilization plan formulation device comprising:

2. A wide-area system cross section creation unit that creates a power system cross section across each of the areas based on the renewable energy introduction plan information; a contingency condition selection unit that selects a contingency condition to be analyzed in the wide area system cross section creation unit; a system influence evaluation unit that performs a power flow calculation and a transient stability calculation when the fault selected by the contingency fault condition selection unit occurs; an effect evaluation unit that evaluates the effect of the retired generator selected by the grid countermeasure examination unit based on the result of evaluation by the grid impact evaluation unit; 2. The existing facility utilization plan formulation device according to claim 1, further comprising:

3. The renewable energy introduction plan information includes current connection amount information or connection amount forecast information of one or more renewable energies selected from wind power, offshore wind power, solar power, wave power, tidal power, running water, geothermal power, and biomass.

3. The existing facility utilization plan formulation device according to claim 2.

4. The renewable energy introduction plan information includes current connection amount information or connection amount forecast information of the renewable energy connection amount, 4. The existing facility utilization plan formulation device according to claim 3.

5. An index evaluation unit that calculates a cost-benefit ratio, which is an index, based on the benefit brought about by the retired generator selected by the system countermeasure examination unit and the cost required to utilize the retired generator as a synchronous modifier; a retired generator utilization determination unit that determines which retired generator to utilize as a synchronous modifier based on the index determined by the index evaluation unit; 2. The existing facility utilization plan formulation device according to claim 1, further comprising:

6. Further comprising a renewable energy introduction plan correction unit that corrects the amount of renewable energy introduction in each of the areas based on the index calculated by the index evaluation unit.

6. The existing facility utilization plan formulation device according to claim 5.

7. A step in which a system reinforcement planning unit obtains system reinforcement plan information that identifies locations where system reinforcement is required based on renewable energy introduction plan information that predicts the future amount of renewable energy to be introduced in each area under the jurisdiction of different transmission companies and wide-area power system information that simulates a power system spanning each area under the jurisdiction of the transmission companies; A step in which a system countermeasure examination unit selects a decommissioned generator owned by a power generation company that improves system stability when the decommissioned generator is utilized as a synchronous modifier based on the system reinforcement plan information; A method for formulating a utilization plan for existing facilities, comprising: