User equipment
Patent Information
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- SHARP KK
- Filing Date
- 2023-07-12
- Publication Date
- 2026-07-17
AI Technical Summary
In 5G systems, the overload problem when the UE returns to the network has not been effectively solved during unavailability periods caused by discontinuous coverage of NR satellite access, and there is a lack of clear time offset control information and processing mechanism.
The UE has built-in first and second timers, which are used to handle the unavailability period and continuous coverage loss period of NR satellite access, respectively, and perform timer management to achieve appropriate overload control by receiving the maximum waiting time and type information from the network.
An effective time offset control mechanism is provided during the discontinuous coverage of NR satellite access, ensuring information transmission and processing between the UE and the network, and reducing the risk of network overload.
Smart Images

Figure 00000000_0000_ABST