Plan generation support device, plan generation support method, and program

The plan generation support device assists organizations in creating and refining draft plans using acquired plan information and a generation model, addressing the lack of plan generation support in existing technologies.

JP2026112686APending Publication Date: 2026-07-07NEC NEXSOLUTIONS

Patent Information

Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
NEC NEXSOLUTIONS
Filing Date
2024-12-25
Publication Date
2026-07-07

AI Technical Summary

Technical Problem

Existing technologies do not support the generation of plans within organizations, lacking the capability to assist in creating plan proposals.

Method used

A plan generation support device and method that acquires plan information from higher-level and ongoing plans within an organization, using a generation model to generate draft plans, and allows for revisions and feedback to refine the proposals.

Benefits of technology

Enables the support of plan generation within organizations by generating and refining draft plans based on existing plans and feedback, enhancing the planning process.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2026112686000001_ABST
    Figure 2026112686000001_ABST
Patent Text Reader

Abstract

To support the generation of planning proposals within an organization. [Solution] The plan draft generation support device according to this disclosure supports the generation of plan drafts related to a predetermined theme in an organization. The plan draft generation support device includes: a first acquisition means for acquiring plan information including a plan related to a predetermined theme in a higher-level organization which is a higher-level organization of the organization, an overall plan in the organization, and an ongoing plan related to a predetermined theme in the organization which is currently being implemented; a second acquisition means for inputting the plan information acquired by the first acquisition means into a generation model and acquiring a plan draft related to a predetermined theme in the organization which is generated by the generation model based on the input plan information; and an output means for outputting the plan draft acquired by the second acquisition means.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present disclosure relates to a plan generation support device, a plan generation support method, and a program.

Background Art

[0002] In recent years, technologies for supporting the formulation of plans in organizations (e.g., countries, prefectural governments, municipal governments, etc.) have been proposed. For example, Patent Document 1 discloses a technology that, when receiving the content and issues of a business plan from a user who is the main promoter of the business plan, obtains a predicted value of the effect of the business plan on the received issues, and provides the obtained predicted value to the user as support information.

Prior Art Documents

Patent Documents

[0003]

Patent Document 1

Summary of the Invention

Problems to be Solved by the Invention

[0004] However, the technology disclosed in Patent Document 1 is a technology that provides a predicted value of the effect of a business plan to a user as support information, and is not a technology that supports the generation of a plan itself. Therefore, a technology that can support the generation of plans in organizations is desired.

[0005] Therefore, an object of the present disclosure is to provide a plan generation support device, a plan generation support method, and a program that can support the generation of plans in organizations in view of the above problems.

Means for Solving the Problems

[0006] A plan generation support device according to one aspect is A plan generation support device that assists in generating plan proposals related to a given theme within an organization, A first acquisition means for acquiring plan information including a plan related to the predetermined theme in a higher-level organization which is a higher-level organization than the said organization, an overall plan in the said organization, and an ongoing plan related to the predetermined theme in the said organization that is currently being implemented. A second acquisition means inputs the plan information acquired by the first acquisition means into a generation model and acquires a draft plan related to the predetermined theme in the organization, which is generated by the generation model based on the input plan information. The system includes an output means for outputting the draft plan obtained by the second acquisition means.

[0007] One method for supporting the generation of a draft plan is: A plan generation support method performed by a plan generation support device that assists in generating plan proposals related to a predetermined theme within an organization, A first acquisition step of acquiring plan information including a plan related to the predetermined theme in a higher-level organization which is a higher-level organization of the said organization, an overall plan in the said organization, and an ongoing plan related to the predetermined theme in the said organization that is currently being implemented. A second acquisition step involves inputting the plan information acquired in the first acquisition step into a generation model, and acquiring a draft plan related to the predetermined theme in the organization, which is generated by the generation model based on the input plan information. The system includes an output step which outputs the proposed plan obtained in the second acquisition step.

[0008] A program according to one aspect is: A computer that assists in generating plan proposals related to a given theme within an organization, A first acquisition procedure for acquiring plan information including a plan related to the predetermined theme in a higher-level organization which is a higher-level organization than the said organization, an overall plan in the said organization, and an ongoing plan related to the predetermined theme in the said organization that is currently being implemented. A second acquisition procedure involves inputting the plan information acquired by the first acquisition procedure into a generation model, and acquiring a draft plan related to the predetermined theme in the organization, which is generated by the generation model based on the input plan information. The system is configured to execute an output procedure that outputs the draft plan obtained by the second acquisition procedure described above. [Effects of the Invention]

[0009] According to the above-described embodiment, the effect is obtained that a plan generation support device, a plan generation support method, and a program capable of supporting the generation of plan proposals within an organization can be provided. [Brief explanation of the drawing]

[0010] [Figure 1] This figure shows an example of the configuration of the plan generation support system related to this disclosure. [Figure 2] This block diagram shows an example configuration of the plan generation support device related to this disclosure. [Figure 3] This diagram explains the definitions of ongoing plans and completed plans related to this disclosure. [Figure 4] This flowchart illustrates an example of the workflow for generating a draft plan related to a predetermined theme within an organization using the draft plan generation support device described herein. [Figure 5] This flowchart illustrates an example of the operation flow when the plan draft generation support device related to this disclosure accepts revisions to the plan draft after the operation shown in Figure 4. [Figure 6] This flowchart illustrates an example of the operation flow when receiving feedback on the draft plan after the operation shown in Figure 4 in the draft plan generation support device related to this disclosure. [Figure 7] This block diagram shows an example configuration of the plan generation support device related to this disclosure. [Figure 8] This flowchart illustrates an example of the workflow for generating a draft plan related to a predetermined theme within an organization using the draft plan generation support device described herein. [Figure 9]It is a block diagram showing a hardware configuration example of a computer that realizes a plan generation support device according to the present disclosure.

Embodiments for Carrying Out the Invention

[0011] Hereinafter, embodiments of the present disclosure will be described with reference to the drawings. Note that, for clarity of explanation, the following description and drawings are appropriately omitted and simplified. Also, in each of the following drawings, the same elements are denoted by the same reference numerals, and redundant explanations are omitted as necessary.

[0012] <Embodiment 1> First, the configuration of a plan generation support system 1 according to the present disclosure will be described. FIG. 1 is a diagram showing a configuration example of a plan generation support system 1 according to the present disclosure. The plan generation support system 1 is a system that supports the generation of plans related to a predetermined theme in an organization.

[0013] In the present disclosure, an organization is assumed to be an organization in which there is a superior organization that is a higher-level organization. For example, the organization is a local government of a municipality, a local government of a prefecture, etc. Also, when the organization is a local government of a municipality, the superior organization is a local government of a prefecture, a country, etc. Also, when the organization is a local government of a prefecture, the superior organization is a country, etc.

[0014] Also, for example, the predetermined theme is sports promotion, regional disaster prevention, regional welfare, child-rearing, welfare for the disabled, welfare for the elderly, long-term care insurance business, gender equality, promotion of women's active participation, prevention of DV (Domestic Violence), etc.

[0015] As shown in FIG. 1, the plan generation support system 1 includes a plan generation support device 10 and a generation model 20. The plan generation support device 10 is a device that uses a generation model 20 to support the generation of plan proposals related to a predetermined theme within an organization. The plan generation support device 10 may be a physical server or a virtual server located on the cloud.

[0016] The generative model 20 is a model that generates proposed plans related to a given theme within an organization. For example, the generative model 20 can be implemented using a large language model (LLM) with artificial intelligence (AI). The generative model 20 is envisioned to be hosted on the cloud, but is not limited to this.

[0017] Next, we will explain the configuration of the plan generation support device 10 related to this disclosure. Figure 2 is a block diagram showing an example configuration of the plan generation support device 10 related to this disclosure. As shown in Figure 2, the plan generation support device 10 includes a first acquisition unit 11, a second acquisition unit 12, an output unit 13, and a reception unit 14.

[0018] The first acquisition unit 11 accesses the server (not shown) of the higher-level organization and acquires planning information from the server of the higher-level organization. The first acquisition unit 11 also accesses the server (not shown) of the organization and acquires planning information from the server of the organization.

[0019] Here, we will explain the definitions of ongoing plans and completed plans, which will be discussed later. Figure 3 is a diagram illustrating the definitions of the ongoing plan and the completed plan related to this disclosure. An "in progress" plan is defined as a plan that is currently being implemented. A "completed" plan is defined as a plan that was in progress at the time the "in progress" plan was generated.

[0020] In the example in Figure 3, the plan currently being implemented is Plan C. Therefore, the plan currently being implemented is Plan C. Also, the plan being implemented when Plan C was generated was Plan B. Therefore, the completed plan is Plan B.

[0021] Furthermore, in this disclosure, the plan generation support device 10 assists in generating plan proposals related to a predetermined theme within the organization. Therefore, if the plan in Figure 3 is related to a predetermined theme within the organization, the plan proposal supported by the plan generation support device 10 will be plan D.

[0022] In detail, the first acquisition unit 11 acquires information on plans related to a predetermined theme in the higher-level organization from the higher-level organization's server. The first acquisition unit 11 also acquires information on the organization's overall plan and information on ongoing plans related to the predetermined theme in the organization from the organization's server. Hereinafter, this plan information acquired by the first acquisition unit 11 will be collectively referred to as plan information.

[0023] For example, if the organization is a prefectural government, the organization's comprehensive plan is the highest-level plan for administrative operations within the local government. It outlines the future goals and policies of the local government that are shared by all residents, and serves as a basic guideline for the actions of all residents, businesses, and the administration. In other words, the organization's comprehensive plan is the foundation of prefectural administration, and it is the highest-level basic and comprehensive plan concerning all aspects of prefectural administration, comprehensively and systematically summarizing the basic direction of the prefecture's policies. Furthermore, the specific items of the organization's comprehensive plan include the purpose of plan formulation, background, basic philosophy, basic policies, future vision, and urban development strategy. Examples of basic policies include disaster prevention measures, crime prevention, traffic safety, environment, school education, sports, arts, and medical care.

[0024] Furthermore, for example, the generation model 20 is a type (hereinafter referred to as Type #1) that generates a draft plan related to a given theme in the organization based on the implementation plan of a plan related to a given theme in the higher-level organization, the implementation plan of the overall plan in the organization, and the implementation plan of a plan related to a given theme in the organization.

[0025] If the generation model 20 is of type #1, the first acquisition unit 11 acquires information on ongoing plans as plans related to a predetermined theme in the higher-level organization. The first acquisition unit 11 also acquires information on ongoing plans as an overall plan for the organization.

[0026] Alternatively, the generation model 20 is a type (hereinafter referred to as Type #2) that generates a draft plan related to a given theme in the organization based on the difference between the completed plan and the ongoing plan related to a given theme in the higher-level organization, the difference between the completed plan and the ongoing plan of the overall plan in the organization, and the ongoing plan related to a given theme in the organization.

[0027] If the generation model 20 is of type #2, the first acquisition unit 11 acquires information on completed plans and plans in progress as plans related to a predetermined theme in the higher-level organization. The first acquisition unit 11 also acquires information on completed plans and plans in progress as an overall plan for the organization.

[0028] The second acquisition unit 12 accesses the generation model 20 and inputs the plan information acquired by the first acquisition unit 11 into the generation model 20. If the generation model 20 is type #1, the plan information input into the generation model 20 by the second acquisition unit 12 includes the ongoing plans for plans related to a predetermined theme in the higher-level organization, the ongoing plans for the overall plan in the organization, and the ongoing plans for plans related to a predetermined theme in the organization. If the generation model 20 is type #2, the plan information input into the generation model 20 by the second acquisition unit 12 includes the completed and ongoing plans for plans related to a predetermined theme in the higher-level organization, the completed and ongoing plans for the overall plan in the organization, and the ongoing plans for plans related to a predetermined theme in the organization.

[0029] If the generation model 20 is of type #1, the generation model 20 first generates a draft structure of the proposed plan related to the given theme in the organization, based on the ongoing implementation plan of the plan related to the given theme in the higher-level organization and the ongoing implementation plan of the overall plan in the organization, and outputs the generated draft structure. For example, the draft structure is a draft table of contents for the proposed plan (the same applies hereafter).

[0030] Furthermore, if the generation model 20 is of type #2, the generation model 20 first generates a draft plan for the proposed plans related to a given theme in the organization based on the difference between the completed and ongoing plans related to a given theme in the higher-level organization, and the difference between the completed and ongoing plans of the overall plan in the organization, and outputs the generated draft plan.

[0031] The second acquisition unit 12 acquires a systematic draft of plans related to a predetermined theme within the organization, which is output by the generation model 20.

[0032] The output unit 13 outputs a systematic plan related to a predetermined theme within the organization, which has been acquired by the second acquisition unit 12. Methods for outputting information such as the systematic plan by the output unit 13 include, but are not limited to, displaying the information on a display unit (not shown) within the plan generation support device 10, transmitting the information to an external display device (not shown), or transmitting the information to an external system (not shown). (The same applies hereinafter.)

[0033] The reception unit 14 receives the revisions to the system plan related to a predetermined theme within the organization, which are output by the output unit 13. For example, the entity that submits revisions to the system plan is a user belonging to a council formed to generate and deliberate on the plan. Methods for receiving information such as revisions by the reception unit 14 include, but are not limited to, displaying a reception screen on a display unit (not shown) within the plan generation support device 10 that allows information input, transmitting the above-mentioned reception screen to an external display device (not shown), or transmitting the above-mentioned reception screen to an external system (not shown).

[0034] When the reception unit 14 receives the revisions to the system plan related to a predetermined theme within the organization, the second acquisition unit 12 accesses the generation model 20 again and inputs the revisions to the system plan received by the reception unit 14 into the generation model 20.

[0035] If the generation model 20 is of type #1, the generation model 20 generates a draft plan related to a given theme in the organization based on the ongoing plans related to a given theme in the higher-level organization, the ongoing plans for the overall plan in the organization, the ongoing plans related to a given theme in the organization, and the modifications to the draft system, and outputs the generated draft plan.

[0036] Furthermore, if the generation model 20 is of type #2, the generation model 20 generates a draft plan related to a given theme in the organization based on the difference between the completed and ongoing plans related to a given theme in the higher-level organization, the difference between the completed and ongoing plans of the overall plan in the organization, the ongoing plans related to a given theme in the organization, and the modifications to the system plan, and outputs the generated draft plan.

[0037] Furthermore, if a certain amount of time has elapsed after the output unit 13 has output the system plan, and the receiving unit 14 has not received any modifications to the system plan, the second acquisition unit 12 may input an instruction message indicating that there are no modifications or the already generated system plan into the generation model 20. In this case, the generation model 20 should generate the plan using the already generated system plan instead of the modifications to the system plan used above.

[0038] The second acquisition unit 12 acquires the draft plan related to a predetermined theme within the organization, which is output by the generation model 20. The output unit 13 outputs a draft plan related to a predetermined theme within the organization, which has been acquired by the second acquisition unit 12.

[0039] Here, the generative model 20 may not only output a plan related to a given theme in the organization, but also output the reason for generating that plan. For example, the generative model 20 may output the reason for generating the plan by expressing in natural language the elements that had the greatest influence among the elements used to generate the plan (for example, when calculating the dependent variable using multiple explanatory variables, the explanatory variable with the largest coefficient among the multiple explanatory variables). Specifically, if the organization is a municipal government and the higher-level organization is a prefectural government, the generative model 20 may output the following reasons as the reason for generating the plan. In this case, the second acquisition unit 12 acquires the plan and the reason for generating the plan output by the generative model 20, and the output unit 13 outputs the plan and the reason. "We prioritized continuity from the plans currently underway." "We focused on the changes in the prefectural plan." "We have created a plan that is strongly aligned with the latest comprehensive plan." "We have created a plan that incorporates the most frequent requests from residents, such as 'We would like you to do ○○○.'"

[0040] Furthermore, the generation model 20 may generate a draft plan in a way that allows for the identification of differences between the draft plan and the plan currently under implementation. For example, the generation model 20 may highlight differences in red, bold, emphasize differences, or add comments to differences in the draft plan. In this case, the second acquisition unit 12 acquires the draft plan output by the generation model 20, which allows for the identification of differences between the plan currently under implementation and the draft plan, and the output unit 13 outputs the draft plan.

[0041] From this point forward, the reception unit 14 may accept the revisions to the draft plan related to a predetermined theme within the organization, which have been output by the output unit 13. For example, the entity submitting the revisions to the draft plan may be a user belonging to the aforementioned council.

[0042] When the reception unit 14 receives the revisions to the draft plan related to a predetermined theme within the organization, the second acquisition unit 12 accesses the generation model 20 again and inputs the revisions to the draft plan received by the reception unit 14 into the generation model 20. The generation model 20 then revises the draft plan based on the revisions and outputs the revised draft plan. In this case, the second acquisition unit 12 acquires the revised draft plan output by the generation model 20, and the output unit 13 outputs the revised draft plan.

[0043] Furthermore, if a certain amount of time has elapsed after the output unit 13 has output the draft plan, and the receiving unit 14 has not received any modifications to the draft plan, the subsequent operations described above may be canceled.

[0044] Furthermore, the reception unit 14 may subsequently accept opinions on the draft plan related to a predetermined theme within the organization, which have been output by the output unit 13. For example, the entities submitting opinions on the draft plan are not limited to users belonging to the aforementioned council; public users and experts may also submit such opinions.

[0045] When the reception unit 14 receives opinions on a proposed plan related to a predetermined theme within the organization, the second acquisition unit 12 accesses the generation model 20 again and inputs the opinions on the proposed plan received by the reception unit 14 into the generation model 20. The generation model 20 then identifies specific opinions on the proposed plan that are worthy of modification, modifies the plan based on the identified specific opinions, and outputs the modified plan. In this case, the second acquisition unit 12 acquires the modified plan output by the generation model 20, and the output unit 13 outputs the modified plan.

[0046] Furthermore, if a certain amount of time has elapsed after the output unit 13 has output the draft plan, and the receiving unit 14 has not received any comments on the draft plan, the subsequent operations described above may be canceled.

[0047] Next, we will explain the operation flow of the plan generation support device 10 related to this disclosure. Figure 4 is a flowchart illustrating an example of the workflow for generating a draft plan related to a predetermined theme within an organization using the draft plan generation support device 10 described herein. In Figure 4, the generation model 20 is assumed to be type #1.

[0048] As shown in Figure 4, first, the first acquisition unit 11 acquires plan information including the implementation plan for a predetermined theme in the higher-level organization, the implementation plan for the overall plan in the organization, and the implementation plan for a predetermined theme in the organization (step S11).

[0049] Next, the second acquisition unit 12 inputs the plan information acquired by the first acquisition unit 11 into the generation model 20. The generation model 20 then generates a systematic draft of the plan proposals related to the predetermined theme in the organization, based on the ongoing plans related to the predetermined theme in the higher-level organization and the ongoing plans for the overall plan in the organization, and outputs the generated systematic draft. Therefore, the second acquisition unit 12 acquires the systematic draft output by the generation model 20 (step S12).

[0050] Next, the output unit 13 outputs a systematic plan related to a predetermined theme within the organization, which was acquired by the second acquisition unit 12 (step S13).

[0051] Subsequently, the system waits until the revisions to the draft plan related to a predetermined theme within the organization, output by the output unit 13, are received by the reception unit 14 (step S14).

[0052] When the reception unit 14 receives the revisions to the system plan related to a predetermined theme in the organization (Yes in step S14), the second acquisition unit 12 inputs the revisions to the system plan received by the reception unit 14 into the generation model 20. The generation model 20 then generates a plan related to the predetermined theme in the organization based on the ongoing implementation plan for the plan related to the predetermined theme in the higher-level organization, the ongoing implementation plan for the overall plan in the organization, the ongoing implementation plan for the plan related to the predetermined theme in the organization, and the revisions to the system plan, and outputs the generated plan. Therefore, the second acquisition unit 12 acquires the plan output by the generation model 20 (step S15).

[0053] Subsequently, the output unit 13 outputs the draft plan related to a predetermined theme within the organization, which was acquired by the second acquisition unit 12 (step S16).

[0054] Figure 5 is a flowchart illustrating an example of the operation flow when the plan generation support device 10 related to this disclosure accepts modifications to the plan after the operation shown in Figure 4.

[0055] As shown in Figure 5, in the operation of Figure 4, after the output unit 13 outputs a draft plan related to a predetermined theme in the organization, the system waits until the receiving unit 14 accepts any modifications to that draft plan (step S21).

[0056] When the reception unit 14 receives the revisions to the draft plan related to a predetermined theme within the organization (Yes in step S21), the second acquisition unit 12 inputs the revisions to the draft plan received by the reception unit 14 into the generation model 20. The generation model 20 then revises the draft plan based on the revisions and outputs the revised draft plan. Therefore, the second acquisition unit 12 acquires the revised draft plan output by the generation model 20 (step S22).

[0057] Subsequently, the output unit 13 outputs a revised draft plan related to a predetermined theme within the organization, which was acquired by the second acquisition unit 12 (step S23).

[0058] Figure 6 is a flowchart illustrating an example of the operation flow when the plan generation support device 10 related to this disclosure receives opinions on the plan after the operation shown in Figure 4.

[0059] As shown in Figure 6, in the operation of Figure 4, after the output unit 13 outputs a draft plan related to a predetermined theme in the organization, the system waits until the receiving unit 14 receives opinions on the draft plan (step S31).

[0060] When the reception unit 14 receives opinions on a proposed plan related to a predetermined theme within the organization (Yes in step S31), the second acquisition unit 12 inputs the opinions on the proposed plan received by the reception unit 14 into the generation model 20. The generation model 20 then identifies specific opinions on the proposed plan that are worthy of modification, modifies the plan based on the identified specific opinions, and outputs the modified plan. Therefore, the second acquisition unit 12 acquires the modified plan output by the generation model 20 (step S32).

[0061] Subsequently, the output unit 13 outputs a revised draft plan related to a predetermined theme within the organization, which was acquired by the second acquisition unit 12 (step S33).

[0062] In the plan generation support device 10, the operations shown in Figures 5 and 6 are assumed to be performed simultaneously and in parallel, but this is not the only option; they may be performed independently at different times.

[0063] As described above, according to this embodiment 1, first, the plan generation support device 10 acquires plan information including the implementation plan for a predetermined theme in the higher-level organization, the implementation plan for the overall plan in the organization, and the implementation plan for a predetermined theme in the organization, and inputs the acquired plan information into the generation model 20. Next, the plan generation support device 10 acquires the systematic plan for a predetermined theme in the organization, which is generated by the generation model 20 based on the plan information, and outputs the acquired systematic plan. Next, when the plan generation support device 10 receives a revised version of the systematic plan, it inputs the revised version of the systematic plan into the generation model 20. Next, the plan generation support device 10 acquires the plan generated by the generation model 20 based on the plan information and the revised version of the systematic plan, and outputs the acquired plan. This makes it possible to support the generation of plan proposals in the organization.

[0064] In this embodiment 1, the generation model 20 has been described as a type #1 or type #2 model that generates a plan related to a predetermined theme in the organization based on the planning information described above, but it is not limited to this. The generation model 20 may also be a type (hereinafter referred to as type #3) model that generates a plan related to a predetermined theme in the organization based on additional information along with the planning information described above.

[0065] If the generation model 20 is of type #3, for example, the first acquisition unit 11 only needs to acquire additional information that includes at least one of the following. The source of the additional information is a server of a higher-level organization, an organization, or an organization other than the organization. • Information related to the organization's surroundings: For example, information related to public trends. Specifically, information from social networking services (SNS), news articles, publications, etc. • Information related to individuals belonging to the organization: For example, the results of a survey of residents belonging to the organization, the attributes of the residents, etc. • Plans that can be considered by organizations other than the organization itself: For example, if the organization is a municipal government, comprehensive plans and plans related to a specified theme in other municipal governments. • Statistical information from higher-level organizations: For example, if the organization is a municipal or prefectural government, national statistical information, white papers, etc. • Reports on completed plans related to a given theme within the organization.

[0066] In this case, the second acquisition unit 12 inputs the above-mentioned plan information and additional information into the generation model 20 and acquires the draft plan related to a predetermined theme in the organization, which is generated by the generation model 20 based on the plan information and additional information.

[0067] <Embodiment 2> This second embodiment corresponds to an embodiment that expands upon the concept of the first embodiment described above. First, we will explain the configuration of the plan generation support device 10X related to this disclosure. Figure 7 is a block diagram showing an example configuration of the plan generation support device 10X related to this disclosure. The plan generation support device 10X, like the plan generation support device 10, is a device that uses a generation model 20 to support the generation of plan proposals related to a given theme within an organization.

[0068] As shown in Figure 7, the plan generation support device 10X includes a first acquisition unit 11X, a second acquisition unit 12X, and an output unit 13X.

[0069] The first acquisition unit 11X acquires plan information including plans related to a predetermined theme in a higher-level organization which is a higher-level organization of the organization, an overall plan for the organization, and plans related to a predetermined theme within the organization which are currently being implemented.

[0070] The second acquisition unit 12X inputs the plan information acquired by the first acquisition unit 11X into the generation model 20 and acquires a draft plan related to a predetermined theme in the organization, which is generated by the generation model 20 based on the input plan information. The output unit 13X outputs a draft plan related to a predetermined theme within the organization, which has been acquired by the second acquisition unit 12X.

[0071] Next, we will explain the operation flow of the plan generation support device 10X related to this disclosure. Figure 8 is a flowchart illustrating an example of the workflow for generating a plan related to a predetermined theme within an organization using the plan generation support device 10X described herein.

[0072] As shown in Figure 8, first, the first acquisition unit 11X acquires planning information including plans related to a predetermined theme in the higher-level organization, an overall plan in the organization, and an implementation plan for the plan related to the predetermined theme in the organization (step S41).

[0073] Next, the second acquisition unit 12X inputs the plan information acquired by the first acquisition unit 11X into the generation model 20 and acquires a draft plan related to a predetermined theme in the organization, which is generated by the generation model 20 based on the input plan information (step S42).

[0074] Subsequently, the output unit 13X outputs a draft plan related to a predetermined theme within the organization, which was acquired by the second acquisition unit 12X (step S43).

[0075] This means that, according to this second embodiment, it becomes possible to support the generation of plan proposals within an organization.

[0076] Furthermore, the first acquisition unit 11X may acquire planning information that includes currently implemented plans as plans related to a predetermined theme in the higher-level organization, as well as currently implemented plans as an overall plan for the organization. This case is when the generation model 20 is type #1.

[0077] Furthermore, the first acquisition unit 11X may acquire plan information that includes, as a plan related to a predetermined theme in the higher-level organization, currently being implemented plans and completed plans that were in operation when the current plans were generated, as well as as an overall plan for the organization, currently being implemented plans and completed plans that were in operation when the current plans were generated. This case is when the generation model 20 is type #2.

[0078] Furthermore, the plan generation support device 10X may also include a reception unit. The second acquisition unit 12X may acquire a system plan of the plan generated by the generation model 20 based on the input plan information. The output unit 13X may output the system plan acquired by the second acquisition unit 12X. The reception unit may also accept modifications to the system plan. The second acquisition unit 12X may input the modifications to the system plan received by the reception unit into the generation model 20 and acquire the plan generated by the generation model 20 based on the input plan information and the modifications to the system plan.

[0079] Furthermore, the plan generation support device 10X may also include a receiving unit that receives modifications to the plan output by the output unit 13X. The second acquisition unit 12X may input the modifications to the plan received by the receiving unit into the generation model 20, and the generation model 20 may acquire the modified plan based on the input modifications to the plan. The output unit 13X may also output the modified plan acquired by the second acquisition unit 12X.

[0080] Furthermore, the plan generation support device 10X may also include a receiving unit that receives opinions on the plan output by the output unit 13X. The second acquisition unit 12X may input the opinions on the plan received by the receiving unit to the generation model 20 and acquire a revised plan by the generation model 20 based on a specific opinion among the input opinions on the plan. The output unit 13X may also output the revised plan acquired by the second acquisition unit 12X.

[0081] Furthermore, the second acquisition unit 12X may acquire the proposed plan generated by the generation model 20 and the reasons for generating the proposed plan. Also, the output unit 13X may output the proposed plan and reasons acquired by the second acquisition unit 12X.

[0082] Furthermore, the second acquisition unit 12X may acquire a draft plan generated by the generation model 20 in a way that allows for the identification of the difference between the implementation plan and the draft plan related to a predetermined theme within the organization.

[0083] Furthermore, the first acquisition unit 11X may acquire additional information, including at least one of the following: information related to the periphery of the organization, information related to persons belonging to the organization, plans that can be considered in organizations other than the organization, statistical information of higher-level organizations, and reports of completed plans that were in operation when the in-progress plan related to a predetermined theme in the organization was generated. The second acquisition unit 12X may input the plan information and additional information acquired by the first acquisition unit 11X into the generation model 20 and acquire a draft plan generated by the generation model 20 based on the input plan information and additional information. This case is when the generation model 20 is type #3.

[0084] <Hardware configuration of the plan generation support device> Figure 9 is a block diagram showing an example of the hardware configuration of a computer 90 that implements the plan generation support devices 10 and 10X related to this disclosure.

[0085] As shown in Figure 9, the computer 90 includes a processor 91, memory 92, storage 93, input / output interface (I / F) 94, and communication interface (Communication I / F) 95, etc. The processor 91, memory 92, storage 93, input / output interface 94, and communication interface 95 are connected to each other by a data transmission path for sending and receiving data.

[0086] The processor 91 is a processing unit such as a CPU (Central Processing Unit) or a GPU (Graphics Processing Unit). The memory 92 is a memory such as RAM (Random Access Memory) or ROM (Read Only Memory). The storage 93 is a storage device such as an HDD (Hard Disk Drive), SSD (Solid State Drive), or memory card. The storage 93 may also be a memory such as RAM or ROM.

[0087] A program is stored in the storage 93. This program, when loaded into a computer, includes a set of instructions (or software code) that causes the computer 90 to perform one or more functions of the above-described plan generation support devices 10, 10X. The components of the above-described plan generation support devices 10, 10X may also be realized by the processor 91 loading and executing the program stored in the storage 93. Furthermore, the storage function of the above-described plan generation support devices 10, 10X may be realized by memory 92 or storage 93.

[0088] Furthermore, the programs described above may be stored on non-temporary computer-readable media or tangible storage media. Examples, but not limited to, include RAM, ROM, flash memory, SSD or other memory technologies, CD (Compact Disc)-ROM, DVD (Digital Versatile Disc), Blu-ray® disc or other optical disc storage, magnetic cassettes, magnetic tapes, magnetic disk storage or other magnetic storage devices. The programs may also be transmitted over temporary computer-readable media or communication media. Examples, but not limited to, include electrical, optical, acoustic or other forms of propagating signals.

[0089] The input / output interface 94 is connected to a display device 941, an input device 942, a sound output device 943, etc. The display device 941 is a device that displays a screen corresponding to the drawing data processed by the processor 91, such as an LCD (Liquid Crystal Display), a CRT (Cathode Ray Tube) display, or a monitor. The input device 942 is a device that receives operator input, such as a keyboard, mouse, and touch sensor. The display device 941 and the input device 942 may be integrated and implemented as a touch panel. The sound output device 943 is a device that outputs sound corresponding to the acoustic data processed by the processor 91, such as a speaker.

[0090] The communication interface 95 transmits and receives data to and from external devices. For example, the communication interface 95 communicates with external devices via a wired communication path or a wireless communication path.

[0091] Although the present disclosure has been described above with reference to embodiments, the present disclosure is not limited to the embodiments described above. Various modifications to the structure and details of the present disclosure can be made as can be understood by those skilled in the art within the scope of the present disclosure. Furthermore, each embodiment can be combined with other embodiments as appropriate.

[0092] Furthermore, each drawing is merely illustrative to illustrate one or more embodiments. Each drawing may be associated not only with one specific embodiment but also with one or more other embodiments. As those skilled in the art will understand, various features or steps described with reference to any one drawing may be combined with features or steps shown in one or more other drawings to create embodiments that are not explicitly illustrated or described. Not all features or steps shown in any one drawing to illustrate an exemplary embodiment are necessarily required, and some features or steps may be omitted. The order of steps shown in any of the drawings may be changed as appropriate.

[0093] Furthermore, some or all of the embodiments described above may also be described as follows, but are not limited to these. (Note 1) A plan generation support device that assists in generating plan proposals related to a given theme within an organization, A first acquisition means for acquiring plan information including a plan related to the predetermined theme in a higher-level organization which is a higher-level organization than the said organization, an overall plan in the said organization, and an ongoing plan related to the predetermined theme in the said organization that is currently being implemented. A second acquisition means inputs the plan information acquired by the first acquisition means into a generation model and acquires a draft plan related to the predetermined theme in the organization, which is generated by the generation model based on the input plan information. The system comprises an output means for outputting the draft plan obtained by the second acquisition means, A device to support the generation of plan proposals. (Note 2) The first acquisition means acquires the plan information, which includes plans currently being implemented as plans related to the predetermined theme in the higher-level organization, and also includes plans currently being implemented as an overall plan in the organization. The plan generation support device described in Appendix 1. (Note 3) The first acquisition means acquires the plan information, which includes, as a plan related to the predetermined theme in the higher-level organization, currently being implemented plans and completed plans that were in operation when the current plans were generated, and as an overall plan in the organization, currently being implemented plans and completed plans that were in operation when the current plans were generated. The plan generation support device described in Appendix 1. (Note 4) Further measures to facilitate registration will be provided. The second acquisition means acquires the system of the plan generated by the generation model based on the input plan information, The output means outputs the system plan acquired by the second acquisition means, The aforementioned receiving means receives the content of the revisions to the proposed system, The second acquisition means inputs the modification content to the system draft received by the reception means into the generation model, and acquires the plan draft generated by the generation model based on the input plan information and the modification content to the system draft. The plan generation support device described in Appendix 1. (Note 5) The system further includes a receiving means for receiving the content of revisions to the draft plan output by the output means, The second acquisition means inputs the modification content of the plan received by the reception means into the generation model, and acquires the modified plan by the generation model based on the input modification content of the plan. The output means outputs the revised plan acquired by the second acquisition means. The plan generation support device described in Appendix 1. (Note 6) The system further includes a receiving means for receiving opinions on the draft plan output by the output means, The second acquisition means inputs the views on the proposed plan received by the reception means into the generation model, and acquires the proposed plan modified by the generation model based on a specific view among the input views on the proposed plan. The output means outputs the revised plan acquired by the second acquisition means. The plan generation support device described in Appendix 1. (Note 7) The second acquisition means acquires the proposed plan generated by the generation model and the reason for generating the proposed plan, The output means outputs the proposed plan and the reasons obtained by the second acquisition means. The plan generation support device described in Appendix 1. (Note 8) The second acquisition means acquires the draft plan generated by the generative model in a manner that allows for the identification of the difference between the implementation plan and the draft plan related to the predetermined theme in the organization. The plan generation support device described in Appendix 1. (Note 9) The first acquisition means further acquires additional information including information relating to the periphery of the organization, information relating to persons belonging to the organization, plans that can be considered in organizations other than the organization, statistical information of the higher-level organization, and at least one of reports of completed plans that were in place when the implementation plan related to the predetermined theme in the organization was generated. The second acquisition means inputs the plan information and additional information acquired by the first acquisition means into the generation model, and acquires the draft plan generated by the generation model based on the input plan information and additional information. The plan generation support device described in Appendix 1. (Note 10) A plan generation support method performed by a plan generation support device that assists in generating plan proposals related to a predetermined theme within an organization, A first acquisition step of acquiring plan information including a plan related to the predetermined theme in a higher-level organization which is a higher-level organization of the said organization, an overall plan in the said organization, and an ongoing plan related to the predetermined theme in the said organization that is currently being implemented. A second acquisition step involves inputting the plan information acquired in the first acquisition step into a generation model, and acquiring a draft plan related to the predetermined theme in the organization, which is generated by the generation model based on the input plan information. The output step includes outputting the plan obtained by the second acquisition step, A method for supporting the generation of plan proposals. (Note 11) A computer that assists in generating plan proposals related to a given theme within an organization, A first acquisition procedure for acquiring plan information including a plan related to the predetermined theme in a higher-level organization which is a higher-level organization than the said organization, an overall plan in the said organization, and an ongoing plan related to the predetermined theme in the said organization that is currently being implemented. A second acquisition procedure involves inputting the plan information acquired by the first acquisition procedure into a generation model, and acquiring a draft plan related to the predetermined theme in the organization, which is generated by the generation model based on the input plan information. An output procedure is performed to output the plan obtained by the second acquisition procedure described above. program.

[0094] Furthermore, some or all of the elements (e.g., configuration and function) described in Appendices 2 to 9 that are subordinate to Appendice 1 may also be subordinate to Appendices 10 and 11 in the same way as those described in Appendices 2 to 9. Some or all of the elements described in any appendice may be applied to various hardware, software, recording means, systems, and methods for recording software. [Explanation of Symbols]

[0095] 1. Plan Generation Support System 10,10X Plan Generation Support Device 11,11X 1st acquisition part 12,12X 2nd acquisition part 13,13X Output Section 14 Reception Department 20 Generative Models 90 Computer 91 processors 92 memory 93 Storage 94 Input / Output Interfaces 941 Display device 942 Input device 943 Sound output device 95 Communication Interface

Claims

1. A plan generation support device that assists in generating plan proposals related to a given theme within an organization, A first acquisition means for acquiring plan information including a plan related to the predetermined theme in a higher-level organization which is a higher-level organization of the said organization, an overall plan in the said organization, and an ongoing plan related to the predetermined theme in the said organization that is currently being implemented. A second acquisition means inputs the plan information acquired by the first acquisition means into a generation model and acquires a draft plan related to the predetermined theme in the organization, which is generated by the generation model based on the input plan information. The system comprises an output means for outputting the draft plan obtained by the second acquisition means, A device to support the generation of plan proposals.

2. The first acquisition means acquires the plan information, which includes plans currently being implemented as plans related to the predetermined theme in the higher-level organization, and also includes plans currently being implemented as an overall plan in the organization. A plan generation support device according to claim 1.

3. The first acquisition means acquires the plan information, which includes, as a plan related to the predetermined theme in the higher-level organization, currently being implemented plans and completed plans that were in operation when the current plans were generated, and as an overall plan in the organization, currently being implemented plans and completed plans that were in operation when the current plans were generated. A plan generation support device according to claim 1.

4. Further measures to facilitate registration will be provided. The second acquisition means acquires the system of the plan generated by the generation model based on the input plan information, The output means outputs the system plan acquired by the second acquisition means, The aforementioned receiving means receives the content of the revisions to the proposed system, The second acquisition means inputs the modification content for the system plan received by the reception means into the generation model, and acquires the plan plan generated by the generation model based on the input plan information and the modification content for the system plan. A plan generation support device according to claim 1.

5. The system further includes a receiving means for receiving the content of revisions to the draft plan output by the output means, The second acquisition means inputs the modification content of the plan received by the reception means into the generation model, and acquires the modified plan by the generation model based on the input modification content of the plan. The output means outputs the revised plan acquired by the second acquisition means. A plan generation support device according to claim 1.

6. The second acquisition means acquires the proposed plan generated by the generation model and the reason for generating the proposed plan, The output means outputs the proposed plan and the reasons obtained by the second acquisition means. A plan generation support device according to claim 1.

7. The second acquisition means acquires the draft plan generated by the generative model in a manner that allows for the identification of the difference between the implementation plan and the draft plan related to the predetermined theme in the organization. A plan generation support device according to claim 1.

8. The first acquisition means further acquires additional information including information relating to the periphery of the organization, information relating to persons belonging to the organization, plans that can be considered in organizations other than the organization, statistical information of the higher-level organization, and at least one of reports of completed plans that were in place when the implementation plan related to the predetermined theme in the organization was generated. The second acquisition means inputs the plan information and additional information acquired by the first acquisition means into the generation model, and acquires the draft plan generated by the generation model based on the input plan information and additional information. A plan generation support device according to claim 1.

9. A plan generation support method performed by a plan generation support device that assists in generating plan proposals related to a predetermined theme within an organization, A first acquisition step of acquiring plan information including a plan related to the predetermined theme in a higher-level organization which is a higher-level organization than the said organization, an overall plan in the said organization, and an ongoing plan related to the predetermined theme in the said organization that is currently being implemented. A second acquisition step involves inputting the plan information acquired in the first acquisition step into a generation model, and acquiring a draft plan related to the predetermined theme in the organization, which is generated by the generation model based on the input plan information. The output step includes outputting the plan obtained by the second acquisition step, A method for supporting the generation of plan proposals.

10. A computer that assists in generating plan proposals related to a given theme within an organization, A first acquisition procedure for acquiring plan information including a plan related to the predetermined theme in a higher-level organization which is a higher-level organization than the said organization, an overall plan in the said organization, and an ongoing plan related to the predetermined theme in the said organization that is currently being implemented. A second acquisition procedure involves inputting the plan information acquired by the first acquisition procedure into a generation model, and acquiring a draft plan related to the predetermined theme in the organization, which is generated by the generation model based on the input plan information. The output procedure for outputting the plan obtained by the second acquisition procedure is executed. program.