Route generation method, automated driving system, and program
By dividing work areas into sections and generating paths for each, the method optimizes work vehicle paths to address inefficiencies and constraints, ensuring efficient and appropriate work performance.
Patent Information
- Application Number
- JP2026034552
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Priority Date
- 2025-05-08
- Filing Date
- 2026-03-04
- Publication Date
- 2026-11-19
AI Technical Summary
Conventional path generation for work vehicles in complex fields often results in inefficient work due to unworked paths or constraints related to work conditions, leading to poor work efficiency.
A method and system that divides a work area into smaller sections using lines connecting points on the perimeter based on work conditions, generating a path for each section to optimize work efficiency and address constraints.
Enables efficient and appropriate work performance by autonomous driving, avoiding material shortages and collisions, and improving overall work efficiency.
Smart Images

Figure 2026182744000001_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to a path generation method, an automatic traveling system, and a program.
Background Art
[0002] Conventionally, it is known to set a traveling path for a field (work area) and cause a work vehicle to travel autonomously along the traveling path (see, for example, Patent Document 1).
Prior Art Documents
Patent Documents
[0003]
Patent Document 1
Summary of the Invention
Problems to be Solved by the Invention
[0004] For example, when the shape of a field is complex, there is a concern that simply generating a traveling path will result in a long unworked traveling path where no work is performed, leading to poor work efficiency. In addition, for example, there is a concern that simply generating a traveling path may cause a situation where work cannot be performed efficiently due to constraints related to work conditions.
[0005] In view of the above points, an object of the present invention is to provide a technique capable of appropriately performing work by automatic traveling.
Means for Solving the Problems
[0006] An exemplary path generation method of the present invention is a method for automatically generating a traveling path along which a work vehicle automatically travels, the method including: setting divided work areas by dividing one work area where the work vehicle performs work with lines connecting points on the outer periphery of the work area based on conditions related to the work or the work area; and generating the traveling path for each of the divided work areas.
[0007] Furthermore, an exemplary automated driving system of the present invention comprises a work vehicle and a control device that generates a driving path for the work vehicle to drive automatically, wherein the control device divides a single work area in which the work vehicle performs work by lines connecting points on the outer perimeter of the work area based on conditions related to the work or the work area, sets divided work areas, and generates the driving path for each divided work area.
[0008] Furthermore, an exemplary program of the present invention is a program that causes a computer to execute a method for generating a travel path for an automated work vehicle, wherein the computer is configured to function as a means for dividing a single work area in which the work vehicle performs work by lines connecting points on the outer perimeter of the work area based on the work or conditions related to the work area, thereby setting divided work areas, and for generating the travel path for each of the divided work areas. [Effects of the Invention]
[0009] According to an exemplary example of the present invention, work can be performed appropriately by autonomous driving. [Brief explanation of the drawing]
[0010] [Figure 1] Diagram showing the schematic configuration of an automated driving system. [Figure 2] Side view showing the general configuration of the work vehicle. [Figure 3] Block diagram showing the general configuration of the control device. [Figure 4] A flowchart illustrating the process of generating travel routes by the route generation unit. [Figure 5] A diagram illustrating a route generation method that serves as a comparative example to the route generation method of the first embodiment. [Figure 6] A diagram illustrating the path generation method of the first embodiment. [Figure 7] Figure illustrating a modified example of the first embodiment. [Figure 8] A diagram illustrating the path generation method of the second embodiment. [Figure 9] Diagram for explaining a method of setting divided work areas based on the estimated work time of a work vehicle [Figure 10] Diagram for explaining a modification of the example shown in FIG. 9 [Figure 11] Diagram for explaining a route generation method that serves as a comparative example of the route generation method according to the third embodiment [Figure 12A] Diagram for explaining the route generation method according to the third embodiment [Figure 12B] Diagram showing a modification of the configuration in FIG. 12A [Figure 12C] Diagram showing another modification of the configuration in FIG. 12A [Figure 13] Flowchart illustrating the flow of travel route generation processing executed after setting the divided work areas [Figure 14] Schematic diagram showing an example of a divided area setting method when a registered route exists [Figure 15] Schematic diagram showing an example of a divided area setting method when no registered route exists [Figure 16] Diagram for explaining problems that may arise when no divided areas are set for a work area [Figure 17] Diagram showing an example of work area division when the work vehicle is a combine harvester [Mode for Carrying Out the Invention]
[0011] Embodiments of the present invention will be described with reference to the drawings. Note that in the drawings, the same or corresponding parts are denoted by the same reference numerals, and repeated description thereof will be omitted where no particular explanation is required.
[0012] <1. Overview of Automated Travel System> FIG. 1 is a diagram showing a schematic configuration of an automated travel system 100 according to an embodiment of the present invention. As shown in FIG. 1, the automated travel system 100 includes a work vehicle 1 and a control device 2.
[0013] In this specification, "automatic driving" means that the control of the devices related to the driving of the work vehicle 1 is performed automatically, and at least steering control is performed automatically. In addition to steering control, automatic driving may also be configured in which at least one of the following is performed automatically: for example, gear shift control, braking control, and work equipment control.
[0014] [1-1. Work Vehicles] Work vehicles 1 broadly include work vehicles that travel within the field. Examples of work vehicles 1 include rice transplanters, tractors, combine harvesters, various harvesting machines, sprayers for applying chemical solutions, or weed cutters.
[0015] Figure 2 is a side view showing a schematic configuration of a work vehicle 1 according to an embodiment of the present invention. In Figure 2, reference numeral 200 denotes the ground of the field. The work vehicle 1 travels on the field (more precisely, on the ground 200 of the field). As shown in Figure 2, the work vehicle 1 comprises a traveling body 11 that travels on the field and a work machine 12 connected to the traveling body 11.
[0016] For the sake of convenience in the following explanation, we define direction as follows: The direction in which the traveling machine 11 and the work implement 12 are aligned is defined as the front-rear direction, and the work implement 12 is positioned behind the traveling machine 11. The left-right direction is defined as the left side when looking from rear to front, and the right side when looking from rear to front. Furthermore, the direction of gravity perpendicular to the front-rear and left-right directions is defined as the up-down direction, with the upstream side of the direction of gravity being upward and the downstream side being downward.
[0017] In this embodiment, the implement 12 is positioned behind the traveling body 11, but this is an example, and the implement 12 may be positioned in front of the traveling body 11. For example, if the work vehicle 1 is a rice transplanter or a tractor, the implement 12 is positioned behind the traveling body 11. Also, for example, if the work vehicle 1 is a combine harvester, the implement 12 is positioned in front of the traveling body 11.
[0018] The mobile body 11 comprises a main body portion 111 and a mobile unit 112 positioned below the main body portion 111.
[0019] The main body 111 includes a power source (not shown) for the driving of the work vehicle 1 and a power source (not shown) for the work. The power sources for driving and the power source for the work (for the work machine 12) may be shared, or they may be provided separately. The power sources are, for example, an engine or an electric motor. The main body 111 also includes a power transmission mechanism (not shown) that transmits power from the driving power source to the driving unit 112. The main body 111 also includes a power transmission mechanism (not shown) that transmits power from the work power source to the work machine 12.
[0020] The main body 111 may or may not include a driver's seat for the operator who drives the work vehicle 1. In other words, the work vehicle 1 may be configured to operate with or without a driver. The main body 111 may also be equipped with a fuel tank, battery, etc., as needed.
[0021] The running section 112 supports the main body 111 so that it can move. The configuration of the running section 112 is not particularly limited, and the running section 112 may be, for example, a crawler type or a wheel type. A crawler type running section 112 may be configured to have a pair of left and right crawlers. A wheel type running section 112 may be configured to have a pair of left and right front wheels and rear wheels. In detail, the running section 112 is provided so that the main body 111 can move forward and backward. The running section 112 is also provided so that the main body 111 can turn to the left and right.
[0022] The work implement 12 is connected to the traveling vehicle 11 via a coupling mechanism 13. The work implement 12 may be mounted so as to be able to move up and down or swing relative to the traveling vehicle 11, or it may be fixed relative to the traveling vehicle 11. Alternatively, the work implement 12 may be mounted so as to be detachable from the traveling vehicle 11. In this case, the work vehicle 1 will be equipped so as to be able to change the type of work implement 12.
[0023] For example, if work vehicle 1 is a rice transplanter, implement 12 is a planting machine that plants seedlings in the field ground 200. Also, for example, if work vehicle 1 is a tractor, implement 12 is a tiller, plow, fertilizer applicator, or pesticide sprayer, etc. Also, for example, if work vehicle 1 is a combine harvester, implement 12 is a harvesting device that harvests grain.
[0024] [1-2. Control Device] Figure 3 is a block diagram illustrating the schematic configuration of a control device 2 according to an embodiment of the present invention. Note that Figure 3 shows not only the control device 2, but also elements 3 to 6 that are directly or indirectly connected to the control device 2.
[0025] The control device 2 is a computer comprising, for example, an arithmetic unit, an input / output unit, and a storage unit 21. The arithmetic unit is a processor or microprocessor, etc. The storage unit 21 is a main memory such as ROM (Read Only Memory) and RAM (Random Access Memory). The storage unit 21 may further include an auxiliary storage device such as an HDD (Hard Disk Drive) or SSD (Solid State Drive). Various programs and data are stored in the storage unit 21. The arithmetic unit reads various programs from the storage unit 21 and performs arithmetic processing according to the programs to realize various functions.
[0026] In this embodiment, through the cooperation of the above-described hardware and software, the control device 2 can function as a field information acquisition unit 22, a route generation unit 23, a travel mode control unit 24, a travel control unit 25, a work implement control unit 26, and a notification control unit 27. The control device 2 may consist of a single piece of hardware, or it may consist of multiple pieces of hardware that can communicate with each other.
[0027] Each of the functional units 22-27 of the control device 2 may be implemented by having the arithmetic unit execute arithmetic processing according to a program, i.e., by software, as described above, but may also be implemented by other methods. Each of the functional units 22-27 may be implemented using, for example, an ASIC (Application Specific Integrated Circuit) or an FPGA (Field Programmable Gate Array). In other words, each of the functional units 22-27 may be implemented by hardware using a dedicated IC or the like. Furthermore, each of the functional units 22-27 may be implemented using a combination of software and hardware. Moreover, each of the functional units 22-27 is a conceptual component. The function performed by one component may be distributed among multiple components. Furthermore, the functions of multiple components may be integrated into one component.
[0028] The control device 2 may be installed, for example, on the work vehicle 1. Alternatively, the control device 2 may be installed on a terminal device such as a mobile communication terminal that is capable of communicating with the work vehicle 1. The terminal device may be, for example, a tablet terminal, smartphone, laptop computer, remote controller, etc. Also, for example, the control device 2 may consist of a control device installed on the work vehicle 1 and a control device installed on the terminal device. Furthermore, for example, at least a part of the functions of the control device 2 may be implemented by a server that is capable of communicating with the work vehicle 1 and the terminal device via a network such as the Internet. Also, for example, a part of the information stored in the storage unit 21 may be stored on the server.
[0029] As described above, Figure 3 also shows elements 3 to 6 that are directly or indirectly connected to the control device 2, in addition to the control device 2. These elements 3 to 6 and the control device 2 may be connected by wire or wireless. Alternatively, as another example, these elements 3 to 6 may be connected by wire or wireless to a device that can communicate with the control device 2, and thus indirectly connected to the control device 2 through that device.
[0030] The positioning communication unit 3 is installed in the work vehicle 1. The positioning communication unit 3 includes a positioning antenna (not shown), and uses positioning signals received by the positioning antenna from positioning satellites to acquire the position of the work vehicle 1 as information such as latitude and longitude. The positioning communication unit 3 outputs the position information of the work vehicle 1 to the control device 2. The positioning communication unit 3 may be configured to perform positioning using the known RTK-GNSS (Real Time Kinematic GNSS) method after receiving positioning signals from a reference station (not shown) in an appropriate manner. Alternatively, the positioning communication unit 3 may be configured to perform positioning using the DGNSS (Differential GNSS) method.
[0031] Sensor 4 is mounted on the work vehicle 1. Sensor 4 detects information related to the work vehicle 1 and outputs the detected information to the control device 2. Typically, multiple types of sensors 4 are mounted on the work vehicle 1. In this case, each of the multiple types of sensors 4 may output the detected information to the control device 2. The multiple types of sensors may include, for example, an inertial measuring device, an ambient condition monitoring sensor, or a lifting sensor.
[0032] The inertial measurement device includes, for example, a 3-axis angular velocity sensor and a 3-axis acceleration sensor, and is capable of measuring the posture of the work vehicle 1. The surrounding environment monitoring sensor is a sensor that monitors the environment around the work vehicle 1, and may be, for example, a camera, ultrasonic sensor, radar, or LiDAR (Light Detection and Ranging). The lifting / lowering sensor is, for example, a sensor that detects the lifting / lowering position of the work machine 12.
[0033] The operating device 5 enables the operator of the work vehicle 1 to issue commands to the control device 2. The operator may be a person riding in the work vehicle 1 or a person not riding in the work vehicle 1. The operating device 5 may be installed on at least one of the following: the work vehicle 1 or the terminal device (e.g., a tablet terminal). The operating device 5 may be, for example, a button, lever, dial, or touch panel. The operating device 5 may be a hardware switch or a software switch.
[0034] The notification device 6 appropriately notifies information in response to commands from the control device 2. The information is notified to operators, etc. The notification device 6 is, for example, a display device such as a liquid crystal display or an organic EL display, or an audio output device. When the notification device 6 is a display device, the display device may be configured to have a touch panel, so that the display device also functions as the operation device 5 described above. The notification device 6 may be provided on, for example, at least one of the work vehicle 1 and the terminal device (tablet terminal, etc.).
[0035] Next, we will explain the overview of the functional units 22-27 of the control device 2 shown in Figure 3.
[0036] The field information acquisition unit 22 acquires information about the field. Field information includes, for example, information such as the shape of the field, the location of the field, and entrances and exits to the field. The field information acquisition unit 22 may acquire field information from, for example, a database stored in the storage unit 21 or map information held by a server (not shown). Alternatively, the field information acquisition unit 22 may acquire field information from, for example, measurement information obtained when the shape and location of the field are actually measured.
[0037] The route generation unit 23 generates a travel route for the work vehicle 1 to travel automatically. In other words, the control device 2 generates a travel route for the work vehicle 1 to travel automatically. Specifically, the travel route for automatic travel is generated for the work area of the field. Details of the method for generating the travel route by the route generation unit 23 will be described later.
[0038] The driving mode control unit 24 controls the switching between manual driving mode and automatic driving mode. The switching between manual driving mode and automatic driving mode is performed, for example, in response to instructions from an operator using the operating device 5. Note that the switching from automatic driving mode to manual driving mode may be performed automatically in emergencies, etc.
[0039] In manual driving mode, the operation of the work vehicle 1 and the operation of the work machine 12 are performed by the operator. Manual operation by the operator may be performed by the operator while riding in the main body 111, or by the operator using a remote control device (for example, a terminal device such as the tablet mentioned above) without riding in the main body 111. In automatic driving mode, as described above, at least the steering control of the work vehicle 1's driving system is performed automatically. In automatic driving mode, the operator may or may not be riding in the main body 111.
[0040] The driving control unit 25 controls the driving system of the work vehicle 1 according to the driving mode. When the driving mode is manual driving mode, the driving control unit 25 controls the driving system of the work vehicle 1 according to instructions from the operating device 5. When the driving mode is automatic driving mode, the driving control unit 25 automatically controls at least the steering of the driving system of the work vehicle 1. When steering is automatically controlled (automatic steering), the driving control unit 25 controls the steering so that the work vehicle 1 travels along the driving path generated by the path generation unit 23. When automatic steering is performed, for example, the position and orientation of the work vehicle 1 are determined based on information obtained from the positioning communication unit 3 and the inertial measuring device included in the sensor 4. Then, calculations related to automatic steering are performed according to the positional relationship between the determined position of the work vehicle 1 and the driving path generated by the path generation unit 23, and steering control is performed according to the calculation results.
[0041] The work equipment control unit 26 controls the work equipment 12 of the work vehicle 1. When the work equipment 12 is controlled manually, the work equipment control unit 26 controls the operation of the work equipment 12 in accordance with instructions from the operating device 5. This operation control includes, for example, raising and lowering the work equipment 12 and switching the power transmission state to the work equipment 12 using the PTO power transmission unit (not shown). In the case of automatic driving, when the operation control of the work equipment 12 is performed automatically, the work equipment control unit 26 automatically controls the operation of the work equipment 12 when the automatic driving mode is selected.
[0042] The notification control unit 27 controls the notification device 6 to appropriately notify operators riding in the work vehicle 1 or operators operating the work vehicle 1 from outside of it of information about the work vehicle 1.
[0043] <2. About route generation> [2-1. Overview] Figure 4 is a flowchart illustrating the overview of the route generation process by the route generation unit 23. The process shown in Figure 4 is executed on the premise that the field information acquisition unit 22 has acquired field information, which is information about the field where the work vehicle 1 will perform work by automatic driving.
[0044] The flowchart shown in Figure 4 outlines the method for automatically generating the travel route for the work vehicle 1. Furthermore, the flowchart in Figure 4 includes the technical details of the computer program that enables the computer (control device 2) to implement the route generation method of this embodiment.
[0045] In step S1, the route generation unit 23 (control device 2) sets the work area, which is the area within the field where work will be performed, based on the field information acquired by the field information acquisition unit 22. The work area is, for example, an area for planting seedlings, an area for tilling, an area for harvesting crops such as grains, an area for mowing grass, or an area for spraying pesticides. Once the route generation unit 23 has set the work area, it proceeds to the next step S2.
[0046] In step S2, the route generation unit 23 (control device 2) sets divided work areas for the work area set in step S1. That is, the control device 2 divides one work area in which the work vehicle 1 performs work and sets divided work areas. The route generation method of this embodiment performs the division of one work area in which the work vehicle 1 performs work and sets divided work areas. The program that causes the computer to execute the route generation method of this embodiment causes the computer to function as a means to divide one work area in which the work vehicle 1 performs work and set divided work areas.
[0047] In detail, the route generation unit 23 divides a single work area based on the work performed by the work vehicle 1 or conditions related to the work area. These conditions (the work performed by the work vehicle 1 or conditions related to the work area) will be described later. The route generation unit 23 also divides a single work area with lines connecting points on the outer perimeter of the work area to set divided work areas. Two or more divided work areas can be set for a single work area. The location at which the work area is divided can be determined based on the area, distance, shape, etc. of the work area. The lines dividing the work area are not limited to straight lines; they may also be curved. Specific examples of work area division will be described later. Once the route generation unit 23 has set the divided work areas, it proceeds to the next step S3.
[0048] In step S3, the route generation unit 23 generates a travel route for automatic driving for each of the multiple divided work areas set in step S2. That is, the control device 2 generates a travel route for each divided work area. The route generation method of this embodiment performs the task of generating a travel route for each divided work area. The program that causes the computer to execute the route generation method of this embodiment causes the computer to function as a means to generate a travel route for each divided work area.
[0049] When the route generation unit 23 has finished generating the travel routes for each divided work area, it terminates the process of generating the travel route for the work vehicle 1 (the process shown in Figure 4). Preferably, the process of generating travel routes for automatic driving performed by the route generation unit 23 also includes travel routes that travel between multiple divided work areas.
[0050] After the route generation process by the route generation unit 23 is completed, the work vehicle 1 is instructed to perform automatic driving, and sequentially executes work on the multiple divided work areas that have been generated. This allows the work to be completed by automatic driving on the entire work area before division. In the configuration of this embodiment, one work area is divided into multiple divided work areas, and work is performed by automatic driving separately for each divided work area, thereby eliminating inconveniences arising from work conditions and work areas, and enabling the work to be performed by automatic driving appropriately. Details of these effects will be described later.
[0051] [2-2. Examples] The following explains, with specific examples, how to generate a travel path for the automated operation of work vehicle 1.
[0052] (2-2-1. First Example) Figure 5 is a diagram illustrating a path generation method that serves as a comparative example to the path generation method of the first embodiment. In Figure 5, reference numeral 7 denotes a work area (one work area) set in the field. In the example shown in Figure 5, the work area 7 is rectangular (more specifically, rectangular). A travel path P for performing work by automatic driving is set in the work area 7. In the example shown in Figure 5, the work performed by the work vehicle 1 is assumed to be seedling planting work as an example. Therefore, in the example shown in Figure 5, the work vehicle 1 is a rice transplanter.
[0053] In detail, the work area 7 is defined as a rectangular inner area 7a and an outer area 7b surrounding the inner area 7a. Multiple linear travel paths (linear travel paths) P1 parallel to the longitudinal direction of the work area 7 are set at intervals in the shorter direction of the work area 7 within the inner area 7a. Multiple travel paths (circular travel paths) P2 that circle the outside of the inner area 7a are set within the outer area 7b. Note that the linear travel paths P1 and circular travel paths P2 are included in the travel paths P set in the work area 7 for performing work by automatic driving.
[0054] In the example shown in Figure 5, the symbol S enclosed in a circle indicates the starting point, which is the work start position of work vehicle 1, and the symbol G enclosed in a circle indicates the finish point, which is the work end position of work vehicle 1. This notation method will also be used in other figures described below. This point will not be explained further below.
[0055] In Figure 5, the work vehicle 1, which started work from the starting point S, automatically travels along a straight travel path P1 while performing the work (planting seedlings). After completing work on one straight travel path P1, the work vehicle 1 travels along a connecting path (not shown) that connects the same-side endpoints of adjacent straight travel paths P1 to move to the next straight travel path P1. By traveling along this connecting path, the work vehicle 1 reverses its direction. That is, on the newly moved straight travel path P1, the work vehicle 1 performs the automatic travel work with the direction of travel opposite to that of the straight travel path P1 it traveled on immediately before. Note that the above-mentioned connecting path is a non-work path where no work is performed.
[0056] The work vehicle 1 repeats the above operation to complete the automated driving operation along all straight driving paths P1 set in the inner area 7a, and then performs automated driving operation along the circular driving path P2. Specifically, the work vehicle 1 starts the automated driving operation from the innermost circular driving path P2, and moves to the next outer circular driving path P2 after completing one lap, repeating this operation until it completes the automated driving operation along all circular driving paths P2 set in the outer area 7b and reaches the goal point G.
[0057] In the example shown in Figure 5, work vehicle 1 is to perform tasks that require the replenishment of materials at regular intervals. The materials are, for example, seedlings. Here, the regular distance is 500m, the long side of the work area 7 is 200m, and the short side of the work area 7 is 160m. In this case, when working in the inner area 7a, the round trip distance will be less than 400m, and by replenishing materials after each round trip, it is possible to avoid running out of materials during work. However, in the outer area 7b, the distance traveled per lap is expected to be around 600-700m, and a shortage of materials may occur before completing one lap of the circular travel route P2. For this reason, it becomes necessary to set a route for work vehicle 1 to travel non-working distances to replenish materials in the outer area 7b, or to set material replenishment points on other sides of the work area 7. These may lead to a decrease in work efficiency. In addition, in some cases, it may not be possible to set material replenishment points appropriately, and manual work may be required in some areas.
[0058] Figure 6 is a diagram illustrating the path generation method of the first embodiment. The configuration of the work area 7 in Figure 6 is the same as that shown in Figure 5, so a detailed explanation of that point will be omitted. Also, in the example shown in Figure 6, the work performed by the work vehicle 1 is assumed to be seedling planting work as an example.
[0059] In the path generation method of the first embodiment, as shown in Figure 6, the work area 7 is divided into a plurality of subdivided work areas 71 based on conditions related to the work performed by the work vehicle 1. The division is performed by dividing lines 8 that connect points on the outer perimeter of the work area 7. In Figure 6, as an example, the dividing lines 8 connect points on the opposite short sides that constitute the outer perimeter of the work area 7. In detail, two dividing lines are set, and each dividing line 8 extends in a direction parallel to the longitudinal direction of the work area 7. By setting two dividing lines 8, the work area 7 is divided into three subdivided work areas 71.
[0060] The position of the dividing line 8 is determined based on the conditions related to the work performed by the work vehicle 1. In this example, the aim is to solve the problems in the example shown in Figure 5 above, and the above condition is the drivable distance, which is the distance that the work vehicle 1 can continuously travel for work. In other words, the position of the dividing line 8 is determined based on the above drivable distance. More specifically, the drivable distance is the distance that the work vehicle 1 can travel before it needs to replenish the materials consumed by the work (specifically seedlings). By deciding where to divide the work area 7 while considering the drivable distance in this way, it is possible to appropriately deal with the constraints arising from the drivable distance and perform automated driving work efficiently.
[0061] As shown in Figure 6, the path generation unit 23 sets an inner region 71a and an outer region 71b surrounding the inner region 71a for each divided work area 71. In the example shown in Figure 6, the inner region 71a of each divided work area 71 is rectangular, and the outer region 71b is a rectangular frame shape.
[0062] The path generation unit 23 sets a linear travel path P1 in the inner region 71a and a circular travel path P2 in the outer region 71b for each divided work region 71, in the same manner as in the example shown in Figure 5. That is, the travel path P for each divided work region 71 includes a linear travel path P1 set in the inner region 71a and a circular travel path P2 set in the outer region 71b. Multiple linear travel paths P1 are set in the inner region 71a. At least one circular travel path P2 is set in the outer region 71b.
[0063] In Figure 6, of the three divided work areas 71 arranged in the short direction of the work area 7, the divided work area 71 located at one end in the short direction is designated as the first divided work area 711. Then, using the first divided work area 711 as a reference, the second divided work area 712 and the third divided work area 713 are arranged in order toward the other end in the short direction.
[0064] In the example shown in Figure 6, the work vehicle 1 starts its work (planting seedlings) by automatically driving from the starting point S1 set in the first divided work area 711. The work vehicle 1 completes the automatic driving work in the inner area 71a of the first divided work area 711 by driving along multiple straight driving paths P1, similar to the example shown in Figure 5. After completing the automatic driving work in the inner area 71a of the first divided work area 711, the work vehicle 1 performs the automatic driving work in the outer area 71b of the first divided work area 711. The work vehicle 1 reaches the goal point G1 set in the first divided work area 711 by driving along all the circular driving paths P2, similar to the example shown in Figure 5.
[0065] Upon reaching the goal point G1 of the first divided work area 711, the work vehicle 1 travels along the inter-area connection path 300 set between the divided work areas 71 to move to the starting point S2 set in the second divided work area 712. From the starting point S2, the work vehicle 1 begins the automated driving operation in the second divided work area 712. The automated driving operation in the second divided work area 712 proceeds in the same manner as in the first divided work area 711, in the order of inner area 71a and outer area 71b, and is completed upon reaching the goal point G2 set in the second divided work area 712. After this, by performing the same driving operation as described above, the work vehicle 1 reaches the goal point G3 set in the third divided work area 713. This completes the automated driving operation in the third divided work area 713. With this, the automated driving of the entire work area 7 is completed.
[0066] As can be seen from the above explanation, the travel paths P generated in each divided work area 71 can be set using the same method as the travel paths P generated in work area 7.
[0067] The path generation unit 23 sets the division lines 8 based on the drivable distance, keeping in mind that the work vehicle 1 will perform the above-described automatic driving work by generating a path for each divided work area 71. Here, as in the example shown in Figure 5 above, it is assumed that the work vehicle 1 needs to replenish materials (seedlings) every 500m. The long side of the work area 7 is 200m, and the short side of the work area 7 is 160m.
[0068] The route generation unit 23 sets each divided work area 71 such that the length of one lap of the circular travel route P2 is less than or equal to the above-mentioned drivable distance. Specifically, in each divided work area 71, the dividing lines 8 are set such that the length of one lap of the circular travel route P2 is less than or equal to the distance that the work vehicle 1 can travel before the materials consumed by the work need to be replenished. This prevents situations in which supplies run out during the work.
[0069] Specifically, the path generation unit 23 divides the work area 7 into three equal parts in the shorter direction of the work area 7, and sets the dividing line 8 after obtaining a calculation result that the length of one lap of the circular travel path P2 in each divided work area 71 is less than or equal to the above-mentioned travelable distance. Due to the above division into three equal parts, when working in the inner area 7a, the round trip distance is less than 400m, so by replenishing after each round trip, it is possible to avoid running out of materials during work. Also, due to the above division into three equal parts, when working in the outer area 7b, the travel distance for one lap can be made 500m or less, so by replenishing after each lap of the circular travel path P2, it is possible to avoid running out of materials during work.
[0070] In the above example, the configuration for setting the divided work areas 71 is based on one lap of the circular travel route P2, but this is merely an example. To prevent material shortages during automated travel (during circular travel), the route generation unit 23 may set the divided work areas 71 such that the length of multiple laps of the circular travel route P2 in each divided work area 71 is less than or equal to the above-mentioned travelable distance. Alternatively, for example, the divided work areas 71 may be set such that the total distance of each travel route P between the inner area 71a and the outer area 71b in each divided work area 71 is less than or equal to the above-mentioned travelable distance.
[0071] Furthermore, in the above example, an inner region 71a and an outer region 71b were set for each divided work area 71, but this is merely an example. Regions for further subdividing each divided work area 71 do not necessarily need to be set.
[0072] Furthermore, in the above example, the drivable range was determined based on the materials consumed during the work, but this is merely an example. The drivable range may also be the distance that work vehicle 1 can travel before it needs to refuel, or the distance that work vehicle 1 can travel before it needs to recharge its battery. Alternatively, the drivable range may be calculated based on the maximum amount of materials, fuel, or battery charge that work vehicle 1 possesses. However, this is merely an example, and the drivable range may also be calculated based on the currently possessed amount of materials, fuel, or charge.
[0073] Figure 7 is a diagram illustrating a modified version of the first embodiment. As shown in Figure 7, the path generation unit 23 may be configured to generate not only the travel path P for each divided work area 71, but also an outermost circular travel path OP that is common to all divided work areas 71. With such a configuration, it is possible to provide a travel path in which the automatic travel work is performed as close as possible to the outer edge of the work area 7. Furthermore, because the outermost circular travel path OP is close to the outer edge of the work area 7, it is highly likely that materials and other supplies can be supplied from outside the work area 7 during the work travel, and the modified configuration shown in Figure 7 is considered effective.
[0074] Furthermore, in a configuration in which an outermost circular travel path OP is provided, the area of the divided work areas 71 located at both ends of the direction in which the multiple divided work areas 71 are lined up (in the example shown in Figure 7, the shorter direction of the work area 7) may be different from the area of the divided work areas 71 located inside these two ends. In the example shown in Figure 7, the divided work areas 71 located at both ends of the direction in which the multiple divided work areas 71 are lined up are the first divided work area 711 and the third divided work area 713. The divided work area 71 located inside these two ends is the second divided work area 712. Considering the arrangement of the outermost circular travel path OP, the area of the second divided work area 712 may be smaller than that of the first divided work area 711 and the third divided work area 713, which are configured to have the same area.
[0075] (2-2-2. Second Example) Figure 8 is a diagram illustrating the path generation method of the second embodiment. In the second embodiment, it is assumed that the work vehicle 1 includes multiple work vehicles that perform different tasks on a single work area 7A. The multiple work vehicles 1 consist of, for example, a first work vehicle 1a having a disc mower for mowing as a work machine 12, and a second work vehicle 1b having a rake for collecting the grass cut by mowing as a work machine 12 (see Figure 9 below for both).
[0076] In the example shown in Figure 8, the work area 7A is rectangular. The work area 7A is divided into multiple subdivided work areas 71A by dividing lines 8A, which are lines connecting points on the outer perimeter of the work area 7A. The dividing lines 8A are set based on at least one of the following criteria: area, distance, number of divisions, speed of each work vehicle 1, and estimated work time of each work vehicle 1. In the example shown in Figure 8, the dividing line 8A is set at the center of the longitudinal direction of the work area 7A. That is, the work area 7A has two subdivided work areas 711A and 712A, whose area is divided in half.
[0077] For each divided work area 711A and 712A, a travel path P is set (generated) for the work vehicle 1 to travel automatically. Figure 8 shows the travel path P for the first work vehicle 1a to travel automatically for each divided work area 711A and 712A. The travel path P shown in Figure 8 is the travel path generated by the route generation unit 23 of the first work vehicle 1a. The travel path P for the first work vehicle 1a set for the first divided work area 711A and the second divided work area 712A is the same travel path P.
[0078] As shown in Figure 8, the first work vehicle 1a performing the disc mower operation first travels around the outer area of the first divided work area 711A, automatically driving along the travel path P from the starting point S1. After traveling around the outer area, the first work vehicle 1a repeatedly travels in a straight line along the travel path P in the inner area, automatically driving until it reaches the goal point G1 and completes the work in the first divided work area 711A. Once the first work vehicle 1a has completed the work in the first divided work area 711A, it travels along the inter-area connection path 300 to move to the next work target, the second divided work area 712A. After this, the first work vehicle 1a travels automatically in the same way as in the first divided work area 711A and completes the work in the second divided work area 712A. With this, the work on work area 7A by the first work vehicle 1a is completed.
[0079] Although not shown in the diagram, the route generation unit 23 of the second work vehicle 1b sets a travel route P for the second work vehicle 1b to automatically travel to each of the divided work areas 711A and 712A. This travel route P may be the same as, or different from, the travel route P shown in Figure 8, which is set by the route generation unit 23 of the first work vehicle 1a. After the first work vehicle 1a moves to the second divided work area 712A, the second work vehicle 1b starts the automatic travel work in the first divided work area 711A. After the work in the first divided work area 711A is completed, the second work vehicle 1b moves to the second divided work area 712A and proceeds with the automatic travel work in the second divided work area 712A in the same way as in the first divided work area 711A, and completes the work in the second divided work area 712A. With this, the work in the work area 7A by the second work vehicle 1b is completed.
[0080] As can be seen from the above explanation, by setting up multiple divided work areas 71A for the work area 7A, it is possible to avoid the risk of collisions between work vehicles in the work area 7A while allowing multiple work vehicles 1 to work on the work area 7A simultaneously. For this reason, work efficiency can be increased compared to a configuration in which the next work vehicle 1 performs work only after the work on the work area 7A is completed.
[0081] The above describes a configuration in which one work area 7A is divided equally according to the number of work vehicles 1 performing work on the work area 7A. However, this is merely an example, and the work area 7A does not necessarily have to be divided equally. The following explains this further.
[0082] In the path generation method of the second embodiment, the work area 7A may be divided into a plurality of subdivided work areas 71A based on conditions related to the work performed by the work vehicle 1. The above conditions may be the estimated work time until the work vehicle 1 completes the work (automatic driving work) in one work area 7A, or conditions related thereto. By setting a plurality of subdivided work areas 71A based on such conditions, work on the work area 7A can be efficiently performed by multiple work vehicles 1.
[0083] The estimated work time may be determined, for example, using past work performance (accumulated data), or from the speed of work vehicle 1 and the work distance in the work area 7A. Furthermore, the estimated work time will vary depending on the speed of work vehicle 1. For this reason, the speed of work vehicle 1 may be included in the above conditions regarding the estimated work time.
[0084] Figure 9 is a diagram illustrating a method for setting divided work areas 71A based on the estimated working time of each work vehicle 1. In the example shown in Figure 9, the divided work areas 71A are set based on the estimated working time of each of the multiple work vehicles 1. The multiple work vehicles 1 consist, in detail, of a first work vehicle 1a that performs disc mower work and a second work vehicle 1b that performs rake work. In this example, it is preferable that the control device 2 of the first work vehicle 1a and the control device 2 of the second work vehicle 1b are able to communicate with each other and share information related to their work.
[0085] In detail, the divided work areas 71A are configured such that no multiple work vehicles 1 perform work in each divided work area 71A. Furthermore, the divided work areas 71A are configured such that there are timings in which work is performed consecutively by different work vehicles 1 in multiple divided work areas 71A.
[0086] Specifically, in the example shown in Figure 9, the estimated work time for the first work vehicle 1a on the work area 7A is 60 minutes, and the estimated work time for the second work vehicle 1b on the work area 7A is 20 minutes. In other words, the second work vehicle 1b completes the work on the work area 7A at three times the speed of the first work vehicle 1a. In this case, according to the above method (setting requirements) for setting the divided work area 71A, the dividing line 8A is set at a position where the ratio of the area of the first divided work area 711A to the area of the second divided work area 712A is 3:1.
[0087] When the divided work area 71A is set up in this way, the first work vehicle 1a and the second work vehicle 1b can be operated as follows: First, the first work vehicle 1a completes the automatic driving operation in the first divided work area 711A. Having completed the work in the first divided work area 711A, the first work vehicle 1a moves to the second divided work area 712A and begins the automatic driving operation in the second divided work area 712A. In conjunction with the start of the work in the second divided work area 712A by the first work vehicle 1a, the second work vehicle 1b begins the automatic driving operation in the first divided work area 711A. Figure 9 shows this state.
[0088] As described above, the working speed of the second work vehicle 1b is three times that of the first work vehicle 1a, and the area of the first divided work area 711A is three times that of the second divided work area 712A. For this reason, at the same time that the first work vehicle 1a completes its automated driving operation in the second divided work area 712A, the second work vehicle 1b completes its automated driving operation in the first divided work area 711A. After this, the second work vehicle 1b moves to the second divided work area 712A and starts and completes its automated driving operation in the second divided work area 712A.
[0089] In this configuration, the work performed by the first work vehicle 1a and the second work vehicle 1b on the work area 7A can be carried out simultaneously without causing collisions between the work vehicles. Furthermore, in this configuration, not only the first work vehicle 1a but also the second work vehicle 1b can continuously complete the work in the first divided work area 711A and the work in the second divided work area 712A without causing any unnecessary waiting time.
[0090] In the above example, we have illustrated the case where there are two (two types) work vehicles 1 performing separate tasks on the work area 7A. However, there may be three (three or more types) of work vehicles 1 performing separate tasks on the work area 7A. In this case, the number of divided work areas 71A set in the work area 7A may also be more than two, in line with the number of work vehicles 1.
[0091] Figure 10 is a diagram illustrating a modified example of the example shown in Figure 9. In Figure 10, the multiple work vehicles 1 consist in detail of a first work vehicle 1a that performs disc mower work, a second work vehicle 1b that performs rake work, and a third work vehicle 1c that performs roll baler work to roll up the grass collected by the rake work.
[0092] In the example shown in Figure 10, it is assumed that the estimated working time for the first work vehicle 1a in the work area 7A is 60 minutes, and the estimated working time for the second work vehicle 1b and the third work vehicle 1c in the work area 7A is 30 minutes. In other words, the second work vehicle 1b and the third work vehicle 1c complete the work in the work area 7A at twice the speed of the first work vehicle 1a.
[0093] In the example shown in Figure 10, following the above-described method (setting requirements) for setting the divided work area 71A, the dividing line 8A is set at a position where the ratio of the area of the first divided work area 711A, the area of the second divided work area 712A, and the area of the third divided work area 713A is 4:2:1. With the divided work area 71A set in this way, the first work vehicle 1a, the second work vehicle 1b, and the third work vehicle 1c can be operated as follows.
[0094] First, the first work vehicle 1a completes its automated driving operation in the first divided work area 711A. Having completed its work in the first divided work area 711A, the first work vehicle 1a moves to the second divided work area 712A and begins its automated driving operation in the second divided work area 712A. In conjunction with the start of work in the second divided work area 712A by the first work vehicle 1a, the second work vehicle 1b begins its automated driving operation in the first divided work area 711A.
[0095] At the same time that the first work vehicle 1a completes its automated driving operation in the second divided work area 712A, the second work vehicle 1b completes its automated driving operation in the first divided work area 711A. Having completed its work in the second divided work area 712A, the first work vehicle 1a moves to the third divided work area 713A and begins its automated driving operation in the third divided work area 713A. Having completed its work in the first divided work area 711A, the second work vehicle 1b moves to the second divided work area 712A and begins its automated driving operation in the second divided work area 712A. In conjunction with these start times, the third work vehicle 1c begins its automated driving operation in the first divided work area 711A. Figure 10 illustrates this state.
[0096] At the same time that the first work vehicle 1a completes its automated driving operation in the third divided work area 713A, the second work vehicle 1b completes its automated driving operation in the second divided work area 712A. At this point, the third work vehicle 1c has only completed half of its automated driving operation in the first divided work area 711A. Having completed its automated driving operation in the second divided work area 712A, the second work vehicle 1b moves to the third divided work area 713A and begins and completes its automated driving operation in the third divided work area 713A. At this point, the third work vehicle 1c is still performing its automated driving operation in the first divided work area 711A. After this, the third work vehicle 1c sequentially completes its automated driving operations in the first divided work area 711A, the second divided work area 712A, and the third divided work area 713A, until all operations are completed.
[0097] Even with this configuration, the first work vehicle 1a, the second work vehicle 1b, and the third work vehicle 1c can perform work on the work area 7A simultaneously without causing collisions between the work vehicles. Furthermore, there are times when work is performed consecutively on multiple divided work areas 71A by different work vehicles 1 (this state occurs when focusing on the movements of the first work vehicle 1a and the second work vehicle 1b). As a result, wasted time is suppressed, and automated driving work on the work area 7A by the three work vehicles 1a to 1c can be performed efficiently.
[0098] Incidentally, there may be significant differences in estimated work times among multiple work vehicles 1. In such cases, if the divided work areas 71A are set according to the above method for setting divided work areas 71A, it may result in divided work areas 71A that are too narrow, making it impossible to properly set the travel path P for the work vehicle 1 to travel automatically. For this reason, a configuration may be used to determine whether or not to set the divided work areas 71A based on the time difference in estimated work times and the area of the set divided work areas 71A. In such a configuration, if the divided work areas 71A cannot be set, the system may be configured to notify the operator of this fact (division error).
[0099] (2-2-3. Third Example) Figure 11 is a diagram illustrating a path generation method that serves as a comparative example to the path generation method of the third embodiment. As shown in Figure 11, the work area 7B set in the field has a complex shape. In detail, the work area 7B is an octagon with 8 vertices, resembling a U-shape turned on its side.
[0100] When generating a travel path P for the work vehicle 1 to perform an automated driving operation within such a work area 7B, it is conceivable to generate multiple straight travel paths parallel to one side 70 that constitutes the outer perimeter of the work area 7B, as shown in Figure 11. However, with this method, due to the complexity of the work area 7B, as shown in Figure 11, it is easy for unnecessarily long paths to be generated in the connecting paths 400 for non-work-related movement from one straight travel path P to the next straight travel path P for work-related driving. The generation of unnecessarily long connecting paths 400 is undesirable because it not only leads to a decrease in work efficiency but also causes damage to the work area 7B.
[0101] In Figure 11, only the routes of the connecting path 400 that are longer than necessary are shown, and routes that do not pose any particular problems are not illustrated. Furthermore, even for a complex-shaped work area 7B as shown in Figure 11, a configuration may be provided that includes an inner area where a straight travel path is set and an outer area where a circular travel path is set, as in the first embodiment.
[0102] Figure 12A is a diagram illustrating the path generation method of the third embodiment. In the path generation method of the third embodiment, the work area 7B is divided into a plurality of subdivided work areas 71B based on conditions related to the work area 7B. In detail, the above condition is the shape of a single work area 7B. In a configuration in which a plurality of subdivided work areas 71B are set based on the shape of the work area 7B, it is possible to simplify the shape of each subdivided work area 71B as much as possible.
[0103] In the third embodiment, as a preferred configuration, the path generation unit 23 sets the divided work areas 71B such that the number of vertices in each divided work area 71B is less than the number of vertices in the work area 7B. In this case, it is more preferable for the path generation unit 23 to set the divided work areas 71B such that each divided work area 71B is rectangular in shape. By doing so, the shape of each divided work area 71B is simplified, and the occurrence of unnecessarily long non-work paths in each divided work area 71B is suppressed, making it possible to set a travel path P for automatic driving.
[0104] In the example shown in Figure 12A, two dividing lines 8B are set, connecting points on the outer perimeter of the work area 7B, so that each divided work area 71B is rectangular. As a result, three divided work areas 71B are set within the work area 7B. In detail, the dividing lines 8B are lines that extend one of the sides that make up the outer shape of the work area 7B. Also, the term "rectangular" includes not only rectangles but also shapes that are close to rectangles.
[0105] In the third embodiment as well, the path generation unit 23 generates a travel path P for automatically driving the work vehicle 1 for each divided work area 71B. Because a travel path P can be generated for each divided work area 71B, the inter-area connection paths 300 connecting the divided work areas 71B can be adjusted to be as short as possible, thereby suppressing the generation of unnecessary non-work paths. As a result, work efficiency can be improved and the deterioration of the work area 7B can be suppressed.
[0106] In the example shown in Figure 12A, the path generation unit 23 generates a travel path P for each divided work area 71B based on a reference travel direction set according to the shape of the divided work area 71B. The reference travel direction may be, for example, a direction along the edges that constitute the outer shape of the divided work area 71B, or a direction perpendicular to those edges, but in Figure 12A, it is a direction along the edges that constitute the outer shape of the divided work area 71B.
[0107] In detail, in the first divided work area 711B, the direction along one side 70a of the rectangular first divided work area 711B is set as the reference travel direction, and a travel path P is generated. In the second divided work area 712B, the direction along the dividing line 8B1 that constitutes one side of the rectangular second divided work area 712B is set as the reference travel direction, and a travel path P is generated. In the third divided work area 713B, the direction along one side 70b of the rectangular third divided work area 713B is set as the reference travel direction, and a travel path P is generated.
[0108] When the travel path P shown in Figure 12A is set, the work vehicle 1 will perform the following actions: The work vehicle 1 starts working automatically from the starting point S1 set in the first divided work area 711B. The work vehicle 1 automatically travels along multiple straight travel paths P set in the first divided work area 711B, performing work sequentially while reversing direction. The work vehicle 1 completes the work in the first divided work area 711B by reaching the goal point G1 set in the first divided work area 711B. Since the goal point G1 is set near the second divided work area 712B, the work vehicle 1 travels along the short inter-area connection path 300 to move to the starting point S2 of the second divided work area 712B.
[0109] Having moved to the starting point S2, work vehicle 1 begins its work by autonomous driving from there. Work vehicle 1 performs autonomous driving work in the same manner as in the first divided work area 711B and completes the work in the second divided work area 712B by reaching the goal point G2 set in the second divided work area 712B. In order for the goal point G2 to be set near the third divided work area 713B, work vehicle 1 travels along the short inter-area connection path 300 to move to the starting point S3 of the third divided work area 713B.
[0110] Having moved to the starting point S3, work vehicle 1 begins its work by autonomous driving from there. Work vehicle 1 performs autonomous driving work in the same way as in the first divided work area 711B, and completes the work in the third divided work area 713B by reaching the goal point G3 set in the third divided work area 713B. With this, work vehicle 1 completes the work in work area 7B.
[0111] Note that the configuration of the travel path P set in each divided work area 71B, and the configuration of the divided work area 71B set in the work area 7B, may be other than the configuration shown in Figure 12A. For example, the configurations shown in Figures 12B and 12C may be used.
[0112] Figure 12B shows the same configuration of the divided work area 71B as in Figure 12A, but with a different configuration of the travel path P. As shown in Figure 12B, the direction of the travel path P (reference travel direction) set for each divided work area 71B may be orthogonal to each other or close to it. The reference travel direction should be determined so that the non-work path including the inter-area connection path 300 is short, and this direction may be determined, for example, by trial and error. This point will be discussed later.
[0113] Figure 12C shows a different configuration of the divided work area 71B compared to Figure 12A. In Figure 12C, as in Figure 12A, three divided work areas 71B are set, but the position of the dividing line 8B is different. The dividing line 8B shown in Figure 12C is obtained by extending a different side of the work area 7B compared to Figure 12A. The configuration of the divided work area 71B may also be determined through trial and error to minimize non-work paths.
[0114] The divided work area 71B may have a shape other than a rectangle, such as a triangle. However, in order to properly form a travel path P with respect to the divided work area 71B, it is preferable that the following types of divided work areas are not generated: Divided work area 71B having vertices with an angle less than or equal to a predetermined angle, divided work area 71B having an area less than or equal to a predetermined area, or divided work area 71B having sides with a side length less than or equal to a predetermined side length. Furthermore, the system may be configured to allow setting a headland width for each divided work area 71B obtained by dividing the work area 7B. The headland formed by setting the headland width is used as a turning travel area for the work vehicle 1 that travels back and forth through the divided work area 71B. Furthermore, it is preferable that work on the headland is performed by circular travel (circular travel around the reciprocating travel path used for the above-mentioned reciprocating travel) of the work vehicle 1 after each completion of work by reciprocating through the divided work area 71B. The work involving circular travel may be performed manually, or it may be performed while automatically traveling along a circular route that has been generated for circular travel. The circular route may be generated after the automatic travel of the round trip route is completed, or it may be generated together with the round trip route before starting the automatic travel.
[0115] The process of generating the travel path P after setting the divided work area 71B will be explained in more detail below. Figure 13 is a flowchart illustrating the flow of the process of generating the travel path P that is executed after setting the divided work area 71B. The process shown in Figure 13 corresponds to a detailed example of the process in step S3 shown in Figure 4.
[0116] In step S31, the route generation unit 23 (control device 2) sets the variable N to "1". Once the route generation unit 23 has finished setting the variable N, it proceeds to the next step S32.
[0117] In step S32, the route generation unit 23 starts the process of generating the travel route P for the Nth divided work area. For example, if the variable N is "1", the Nth divided work area corresponds to the first divided work area 711B, and if the variable N is "2", the Nth divided work area corresponds to the second divided work area 712B. Once the route generation unit 23 starts the process of generating the travel route P for the Nth divided work area, it proceeds to the next step S33.
[0118] In step S33, the route generation unit 23 sets conditions for setting the travel route P. The condition setting includes setting a start point, which is the starting position of the work, for the Nth divided work area that is the target of generating the travel route P, and setting the above-mentioned reference travel direction.
[0119] The starting point is set near the entrance of work area 7B (field) if the Nth divided work area is the first divided work area where work (automatic driving work) begins. In the example shown in Figure 12A, the first divided work area 711B is the divided work area where work begins first. Furthermore, if the Nth divided work area is the divided work area where work begins following the N-1st divided work area, the starting point is set near the goal point, which is the end point of the work in the N-1st divided work area. The relationship between the Nth divided work area and the N-1st divided work area corresponds to the relationship between the second divided work area 712B and the first divided work area 711B, and the relationship between the third divided work area 713B and the second divided work area 712B, in the example shown in Figure 12A.
[0120] As described above, the reference travel direction is set to a direction along the edges of the Nth divided work area, for example, which is the target of generating the travel path P. For example, if the Nth divided work area is rectangular, the reference travel direction is set to a direction along the long side or short side. Once the path generation unit 23 has completed setting the conditions, it proceeds to the next step S34.
[0121] In step S34, the path generation unit 23 generates a temporary path according to the conditions set in step S33. The temporary path is generated by arranging multiple straight-line travel paths in the reference travel direction at a predetermined pitch with respect to the starting point. The predetermined pitch is determined by the work width, which is determined according to the work machine 12 used, and the amount of overlap that allows the work to overlap. Once the path generation unit 23 has generated the temporary path, it proceeds to the next step S35.
[0122] In step S35, the route generation unit 23 determines whether the endpoint (goal point) of the Nth divided work area, which is determined by the provisional route generation in step S34, is appropriate. Whether the endpoint is appropriate is determined, for example, in relation to the starting point that can be set for the N+1th divided work area where the next automated driving operation will be performed. Also, for example, if the endpoint is the endpoint of the work for the entire work area 7B, it is determined in relation to the exit of the work area 7B (field). For example, if the distance from the endpoint to the next settable starting point is greater than a predetermined distance, or if the endpoint is on the opposite side from the exit of the work area 7B, the endpoint is determined to be inappropriate. If the endpoint is determined to be appropriate (Yes in step S35), the route generation unit 23 proceeds to the next step S36. If the endpoint is determined to be inappropriate (No in step S35), the route generation unit 23 proceeds to step S39.
[0123] In step S36, the route generation unit 23 decides that there is no problem with the endpoint position and therefore the travel route P for the Nth divided work area will be the previously generated provisional route, and completes the process of generating the travel route P for the Nth divided work area. Once the route generation unit 23 has completed the process of generating the travel route P for the Nth divided work area, it proceeds to the next step S37.
[0124] In step S37, the route generation unit 23 determines whether the variable N has reached the total number of divided work areas 71B set for the work area 7B. In the example shown in Figure 12A, the total number is 3. If the variable N has reached the total number (Yes in step S37), the route generation unit 23 can determine that the generation of travel routes P for all divided work areas 71B is complete, and terminates the flow shown in Figure 13. If the variable N has not reached the total number (No in step S37), the route generation unit 23 proceeds to the next step S38.
[0125] In step S38, the path generation unit 23 performs the operation of adding "1" to the variable N (N = N + 1). Once the path generation unit 23 has completed the addition operation on the variable N, it returns to step S32 as described earlier. In this case, the processes from step S32 onward will be performed.
[0126] In step S39, the route generation unit 23 determines that the endpoint position of the provisional route is inappropriate and checks whether it is possible to change the conditions set in step S33 in order to generate a different provisional route. A case where the conditions cannot be changed is, for example, when none of the conditions that can be set in step S33 can be changed. For example, this applies when there is no changeable starting point and no changeable reference travel direction. A state where there are no changeable conditions occurs, for example, after various condition changes have already been tried.
[0127] If the condition change process is not possible (Yes in step S39), the route generation unit 23 determines that a route generation error has occurred because it cannot generate a travel route P. In this case, for example, the route generation unit 23 performs a process to reset the divided work area. This reset process corresponds to returning to step S2 in Figure 4. As another example, the system may be configured to notify the operator of the route generation error and prompt them to manually set the travel route P. On the other hand, if the condition change process is possible (No in step S39), the route generation unit 23 proceeds to step S40.
[0128] In step S40, the route generation unit 23 modifies the previously set conditions, such as the starting point position and the reference direction of travel. After performing the condition modification process, the route generation unit 23 returns to step S34, as described earlier, and executes the processes from step S34 onward.
[0129] <3. Things to keep in mind> Various technical features disclosed herein can be modified in various ways without departing from the spirit of the technical creation. Furthermore, the multiple embodiments, examples, and modifications shown herein may be combined as possible.
[0130] [3-1. First Supplementary Explanation] For example, in the above configuration, the setting of divided work areas relative to the work area is performed automatically, but this is just an example. The setting of divided work areas relative to the work area may be performed by a user, such as an operator, specifying the division points. The user may be able to choose whether to set the division points automatically or manually. The setting of division points by the user may be achieved, for example, by displaying the work area on the screen of a display device and having the user touch the position on the screen where they want to divide the work area. In such a configuration, after setting the divided work areas, the headland width may be set for each divided work area by touch operation or the like. The headland formed by setting the headland width is used as a turning area when the work vehicle 1 performs work by traveling back and forth, as described above. Typically, after the work by traveling back and forth is completed, work by traveling in a circular direction is performed on the headland. Work by traveling in a circular direction may be performed by manual driving, or a circular driving route for circular driving may be generated and performed while automatically driving along the circular direction. The circular route may be generated after the automatic round-trip route is completed, or it may be generated together with the round-trip route before the automatic run starts.
[0131] [3-2. Second Supplementary Explanation] A supplementary explanation of the method for setting subdivided areas, which is executed after the work area (the area where work will be performed within the field) has been established, will be provided with reference to Figures 14 and 15.
[0132] Figure 14 is an illustrative diagram showing an example of a method for setting the divided area 71C when a registered route already exists. In Figure 14, the left side of the white arrow indicates the state in the process of setting the divided area 71C, and the right side of the white arrow indicates the state when the setting of the divided area 71C is complete. The existence of a registered route means that the travel route P for automatic driving to the work area 7C is already stored in the storage unit 21. In the example shown in Figure 14, it is assumed that the travel route P for automatic driving is a series of parallel straight paths.
[0133] In this example, as shown in Figure 14, the division area 71C relative to the work area 7C can be set by specifying the number of travel paths P that constitute the division area 71C. For example, the control device 2 determines the position of the dividing line 8C so that an area containing the specified number of travel paths P is formed in one division area 71C. In the example shown in Figure 14, it is assumed that the position of the dividing line 8C is determined so that the number of travel paths P in each division area 71C is the same. However, due to the area of the work area 7C, one of the three division areas 711C, 712C, and 713C, division area 713C, has a smaller area than the others.
[0134] The number of travel paths P to be included in one divided region 71C may be set by the operator using the control device 5, or it may be set automatically by the control device 2. In either case, the number of travel paths P to be included in one divided region 71C may be set based on the distance that the work vehicle 1 can travel continuously for work (without stopping for refueling, etc.). In this sense, the example shown in Figure 14 can also be said to be a configuration in which the divided regions 71C are set based on conditions related to the work.
[0135] Figure 15 is an illustrative diagram showing an example of a method for configuring the partitioned area 71D when no registered routes exist. As with Figure 14, the left side of the white arrow indicates the state during the configuration of the partitioned area 71D, while the right side indicates the state after the configuration of the partitioned area 71D is complete.
[0136] If no registered paths exist, a division area 71D can be set for the work area 7D by selecting which edge of the outer perimeter of the work area 7D to use as the reference, as shown in Figure 15, and specifying the area or width of the division area. The width may be determined by multiplying the work width by the number of work lines. The work width is the work width of the work machine 12 and is a value specific to the work machine. The work width is automatically determined once the work machine 12 is determined. The number of work lines corresponds to the number of straight paths mentioned above. In a configuration where the width is determined by multiplying the work width by the number of work lines, the width for division can be determined by specifying the number of work lines.
[0137] For example, the control device 2 determines the position of the dividing line 8D according to the area or width specified as a unit of one divided region 71D. In the example shown in Figure 15, it is assumed that the position of the dividing line 8D is determined so that the area or width in each divided region 71D is the same. However, in consideration of the area of the work area 7D, one of the three divided regions 711D, 712D, and 713D, divided region 713D, has a smaller area than the others.
[0138] The area and width of one divided region 71D may be set by the operator using the control device 5, or by the control device 2 automatically. In either case, the area and width of one divided region 71D may be set based on the distance that the work vehicle 1 can travel continuously for work (without stopping for replenishment, etc.). In this sense, the example shown in Figure 15 can also be said to be a configuration in which the divided regions 71D are set based on the conditions related to the work.
[0139] [3-3. Third Supplementary Explanation] The above examples illustrate how the division of work areas can be determined based on the distance that work vehicle 1 can travel before the need for replenishment of materials, replenishment of fuel for driving, or charging of the driving battery arises. Alternatively, the division of work areas can be determined based on the distance that work vehicle 1 can travel before the need for discharge of harvested materials (driving distance). This will be explained in more detail below. Examples of harvested materials include grain, for example, when work vehicle 1 is a combine harvester. Discharge of harvested materials includes, for example, the discharge of grain from the combine harvester's grain tank.
[0140] Figure 16 illustrates the problems that may arise when no division areas are set for the work area 7E. In the example shown in Figure 16, the work vehicle 1 is a combine harvester. In the example shown in Figure 16, the work vehicle 1 performs what is known as circular harvesting, for example, by driving in a circular motion around the work area 7E from the outer perimeter to the inner perimeter (see arrow in Figure 16). In Figure 16, the symbol DP enclosed in a circle indicates the discharge point where the work vehicle 1 discharges the harvested material from the tank (grain tank) towards a transport vehicle or the like.
[0141] If the length of one side of the rectangular work area 7E is long, it may not be possible to store all of the harvested produce in the tank (grain tank) during a full rotation from the discharge point DP. In such cases, one might consider, for example, backing up to the discharge point DP when the tank is full, or moving the position of the discharge point DP (moving the position of the transport vehicle), but both are inefficient.
[0142] Furthermore, in the case of work vehicle 1, which automatically decides whether or not to go to the discharge point DP in automatic driving mode, the following situation may occur with the configuration shown in Figure 16. If it is predicted that the tank will be full before completing one full circle from the location of the discharge point DP after starting harvesting work from the starting point S, the vehicle may immediately head towards the discharge point DP even though there is still sufficient tank capacity as harvesting work has just begun. Such a situation is undesirable from the standpoint of improving work efficiency.
[0143] One of the factors contributing to the decreased efficiency of the work described above is that the work area 7E used for circular driving during harvesting (reaping) is too large. To address this, for example, a configuration like the one shown in Figure 17 can be adopted. Figure 17 shows an example of the division of the work area 7E when the work vehicle 1 is a combine harvester.
[0144] In the example shown in Figure 17, the work area 7E is divided into multiple (specifically two) divided areas 71E by dividing lines 8E so that the work vehicle 1 does not have to move to the discharge point DP before completing at least one full circuit from the discharge point DP. The work vehicle 1 then performs its work in each divided area 71E. The distance the work vehicle 1 travels to the discharge point DP can be said to be the drivable distance, which is the distance the work vehicle 1 can continuously travel for work (harvesting). For this reason, in the example shown in Figure 17, the setting of the divided work area is also based on the drivable distance.
[0145] In the example shown in Figure 17, the work vehicle 1 starts its work (grain harvesting) by automatically driving from the starting point S1 set in the first divided work area 711E. Initially, the work vehicle 1 performs the circular harvesting described above within the first divided work area 711E. After performing circular harvesting several times, the work vehicle 1 performs so-called back-and-forth harvesting, which involves harvesting along a straight path while reversing direction. The work vehicle 1 completes its work in the first divided work area 711E by arriving at the goal point G1 while performing back-and-forth harvesting. The dashed arrows shown in the figure illustrate the movement path of the work vehicle 1 when it moves to the straight path where it will perform the next work during back-and-forth harvesting. The work vehicle 1 also goes to the discharge point DP as needed to discharge the harvested crop. However, because the divided area 71E is set, the work vehicle will not move to the discharge point DP in the middle of a circular harvesting lap. Nor will it head to the discharge point DP if the tank has sufficient empty capacity.
[0146] Upon reaching the goal point G1 in the first divided work area 711E, the work vehicle 1 travels along the inter-area connection path (not shown) set between adjacent divided work areas 71E to move to the starting point S2 set in the second divided work area 712E. From the starting point S2, the work vehicle 1 begins working in the second divided work area 712E by automatic driving. The work vehicle 1 performs the automatic driving work in the second divided work area 712E in the same way as in the first divided work area 711E and reaches the goal point G2 set in the second divided work area 712E. With this, the automatic driving work for the entire work area 7E is completed.
[0147] <4. Addendum> An exemplary path generation method of the present invention is a method for automatically generating a travel path for a work vehicle, and may be configured (first configuration) to divide a single work area in which the work vehicle performs work into divided work areas by lines connecting points on the outer perimeter of the work area based on conditions related to the work or the work area, and to generate the travel path for each of the divided work areas.
[0148] In the route generation method of the first configuration described above, the condition may be configured to be a drivable distance, which is the distance over which the work vehicle can continuously travel for the work (second configuration).
[0149] In the route generation method of the second configuration described above, the drivable distance may be configured to be the distance the work vehicle can travel until it becomes necessary to replenish the materials consumed by the work, replenish the fuel for the work vehicle, charge the battery of the work vehicle, or discharge the harvested products from the work (third configuration).
[0150] In the route generation method of the second or third configuration described above, an inner region and an outer region surrounding the inner region are set for each divided work region, the travel route for each divided work region includes a circular travel route set in the outer region, and the divided work region is set in each divided work region such that the length of one or more laps of the circular travel route is less than or equal to the travelable distance (fourth configuration).
[0151] In the route generation method of the first configuration described above, the condition may be a configuration (fifth configuration) in which the work vehicle is estimated to complete the work in one work area or a condition related thereto.
[0152] In the route generation method of the fifth configuration described above, the work vehicles may include a plurality of work vehicles that perform separate tasks on a single work area, and the divided work areas may be set based on the estimated work time or related conditions for each of the plurality of work vehicles (sixth configuration).
[0153] In the route generation method of the sixth configuration described above, the divided work areas may be configured (seventh configuration) such that multiple work vehicles do not perform the work in each of the divided work areas, and that there are timings in which the work is performed consecutively by different work vehicles in multiple divided work areas.
[0154] In the path generation method of the first configuration described above, the condition may be the shape of one work area (the eighth configuration).
[0155] In the path generation method of the eighth configuration described above, the divided work areas may be configured such that the number of vertices in each of the divided work areas is less than the number of vertices in one of the work areas (the ninth configuration).
[0156] In the path generation method of the ninth configuration described above, the configuration in which each of the divided work areas is set to be rectangular (the tenth configuration) is also possible.
[0157] In the route generation method of any of the first to ten configurations described above, the travel route for each divided work area may be generated based on a reference travel direction set according to the shape of the divided work area (the eleventh configuration). [Explanation of symbols]
[0158] 1. Work vehicles 1a...First work vehicle 1b...Second work vehicle 1c...Third work vehicle 2. Control device 7, 7A, 7B...Work area 71, 71A, 71B...Divided work area 711, 711A, 711B... 1st divided work area 712, 712A, 712B...Second division work area 713, 713A, 713B...Third division work area 100...Automated driving system P... Driving route
Claims
1. A method for automatically generating a travel route for a work vehicle, The work area in which the aforementioned work vehicle performs work is divided into subdivided work areas by lines connecting points on the outer perimeter of the work area based on the conditions related to the work or the work area, and the subdivided work areas are defined. To generate the travel path for each of the divided work areas, A route generation method that executes this process.
2. The route generation method according to claim 1, wherein the condition is the drivable distance, which is the distance over which the work vehicle can continuously travel for the work.
3. The route generation method according to claim 2, wherein the drivable distance is the distance the work vehicle can travel until it becomes necessary to replenish the materials consumed by the work, replenish the fuel for the work vehicle, charge the battery for the work vehicle, or discharge the harvested products from the work.
4. Each of the divided work areas is defined as having an inner area and an outer area surrounding the inner area, and the travel path for each divided work area includes a circular travel path set in the outer area. The route generation method according to claim 2, wherein each of the divided work areas is set up such that the length of one or more laps of the circular travel path is less than or equal to the drivable distance.
5. The route generation method according to claim 1, wherein the condition is the estimated work time or a condition relating thereto until the work vehicle completes the work in one work area.
6. The aforementioned work vehicles include multiple work vehicles that perform separate tasks on the same work area. The route generation method according to claim 5, wherein the divided work area is set based on the estimated work time or conditions related thereto for each of the plurality of work vehicles.
7. The route generation method according to claim 6, wherein the divided work areas are set up such that no multiple work vehicles perform the work in each of the divided work areas, and there are timings in which the work is performed consecutively by different work vehicles in multiple divided work areas.
8. The path generation method according to claim 1, wherein the condition is the shape of the one work area.
9. The path generation method according to claim 8, wherein the divided work areas are set up such that the number of vertices in each of the divided work areas is less than the number of vertices in one of the work areas.
10. The path generation method according to claim 9, wherein each of the divided work areas is set up to be rectangular in shape.
11. The path generation method according to any one of claims 1 to 10, wherein the travel path for each of the divided work areas is generated based on a reference travel direction set according to the shape of the divided work area.
12. Work vehicles and A control device that generates a travel path for the aforementioned work vehicle to travel automatically, Equipped with, The control device is A work area in which the aforementioned work vehicle performs work is divided into divided work areas by lines connecting points on the outer perimeter of the work area based on the conditions related to the work or the work area, and a divided work area is set. A travel path is generated for each of the divided work areas. Automated driving system.
13. A program that causes a computer to execute a method for generating a travel route for an automated work vehicle, The aforementioned computer, The work area in which the aforementioned work vehicle performs work is divided into subdivided work areas by lines connecting points on the outer perimeter of the work area based on the conditions related to the work or the work area, and the subdivided work areas are defined. To generate the travel path for each of the divided work areas, A program that functions as a means to accomplish something.
Citation Information
Patent Citations
Ski things
JP1987053678A
