Planting plan evaluation system, planting plan evaluation device, planting plan evaluation method, and program
The planting plan evaluation system addresses inefficiencies in selecting plants for harsh conditions by using 3D data to assess suitability, enhancing planting plan efficiency and reducing environmental stress in large-scale developments.
Patent Information
- Application Number
- JP2026204509
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2026-09-11
- Publication Date
- 2026-11-19
AI Technical Summary
Existing technologies are cumbersome and inefficient in selecting and arranging plants under harsh environmental conditions, particularly in large-scale developments with high-rise buildings, and do not adequately consider herbaceous plants or green space structure, leading to challenges in formulating effective planting plans.
A planting plan evaluation system that includes an acquisition unit for acquiring a planting plan, a calculation unit for determining sunshine hours and sky ratio, and an evaluation unit for assessing plant suitability based on associated environmental conditions, using 3D city and satellite data to evaluate plant suitability for a planned site.
Enables efficient formulation of planting plans by reducing poor plant growth due to environmental stress and selecting optimal plants, thereby improving planting planning in large-scale developments.
Smart Images

Figure 2026183035000001_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to a planting plan evaluation system, a planting plan evaluation device, a planting plan evaluation method, and a program.
Background Art
[0002] In large-scale developments such as urban redevelopment, cases of large-scale greening are increasing against the backdrop of the promotion of green infrastructure. For example, in central urban redevelopment, it is required to formulate planting plans under conditions where high-rise buildings stand in clusters. In particular, for planting plans in areas adjacent to high-rise buildings, it is necessary to select planting plants that can adapt to harsh environmental conditions such as shade and strong winds caused by the high-rise buildings, and arrange them at appropriate positions. For example, Non-Patent Document 1 discloses tree arrangement that considers the thermal environment and landscape, and Non-Patent Document 2 discloses green space arrangement that considers the thermal environment and ecosystem networks. Further, for example, Non-Patent Document 3 discloses qualitative findings such as the growing environment of main planting plants, and Non-Patent Document 4 discloses the environmental tolerance of some plants to sunlight conditions. In addition, Patent Document 1 discloses that actual tree growth evaluations under existing buildings with similar building shapes and tree species are compiled into a database to predict the growth of plants under the environmental conditions of a planned building and determine whether the growth is possible or not.
Prior Art Literature
Patent Documents
[0003]
Patent Document 1
Non-Patent Documents
[0004]
Non-Patent Document 1
[0005] However, even with the use of Non-Patent Documents 1-4, selecting and arranging plants under harsh environmental conditions in planting plans is cumbersome, as it requires visually comparing known knowledge with planting plan drawings and lists to confirm suitability. Furthermore, while various plants are used in urban greening, Patent Document 1 is limited to trees and does not consider herbaceous plants. In addition, Patent Document 1 does not consider the green space structure and arrangement of planting plans, which have a significant impact on plants growing at the forest edge and on the forest floor, such as herbaceous plants. Thus, there has been a problem in efficiently formulating planting plans in large-scale developments.
[0006] The present invention has been made in view of the above points, and aims to provide a planting plan evaluation system, a planting plan evaluation device, a planting plan evaluation method, and a program that can efficiently formulate planting plans in large-scale development. [Means for solving the problem]
[0007] The present invention has been made to solve the above problems, and one aspect of the present invention is a planting plan evaluation system comprising: an acquisition unit for acquiring a planting plan at a planned site; a calculation unit for calculating the amount of sunshine hours and the sky ratio at the planned site; and an evaluation unit for evaluating whether the plants included in the planting plan are suitable for the planned site, based on the amount of sunshine hours, the sky ratio, and plant information to which environmental conditions are associated for each plant.
[0008] Furthermore, one aspect of the present invention is a planting plan evaluation device comprising: an acquisition unit for acquiring a planting plan at a planned site; a calculation unit for calculating the amount of sunshine and the sky ratio at the planned site; and an evaluation unit for evaluating whether the plants included in the planting plan are suitable for the planned site, based on the amount of sunshine, the sky ratio, and plant information to which environmental conditions are associated for each plant.
[0009] Furthermore, one aspect of the present invention is a planting plan evaluation method executed by a computer of a planting plan evaluation device, comprising: an acquisition process for acquiring a planting plan at a planned site; a calculation process for calculating the amount of sunshine and the sky ratio at the planned site; and an evaluation process for evaluating whether the plants included in the planting plan are suitable for the planned site, based on the amount of sunshine, the sky ratio, and plant information to which environmental conditions are associated for each plant.
[0010] Furthermore, one aspect of the present invention is a program that causes the computer of a planting plan evaluation device to execute an acquisition step of acquiring a planting plan for a planned site; a calculation step of calculating the amount of sunshine hours and the sky ratio for the planned site; and an evaluation step of evaluating whether the plants included in the planting plan are suitable for the planned site, based on the amount of sunshine hours, the sky ratio, and plant information to which environmental conditions are associated for each plant. [Effects of the Invention]
[0011] According to the embodiments of the present invention, a planting plan can be efficiently formulated in large-scale development. [Brief Description of the Drawings]
[0012] [Figure 1] It is a system configuration diagram showing an example of the configuration of the planting plan evaluation system according to the first embodiment. [Figure 2] It is a block diagram showing an example of the configuration of the planting plan evaluation device according to the first embodiment. [Figure 3] It is a diagram showing an example of planting plant information according to the first embodiment. [Figure 4] It is a block diagram showing an example of the configuration of the model management device according to the first embodiment. [Figure 5] It is a block diagram showing an example of the configuration of the satellite data management device according to the first embodiment. [Figure 6] It is a flowchart showing an example of planting plan evaluation processing according to the first embodiment. [Modes for Carrying Out the Invention]
[0013] <First Embodiment> Hereinafter, embodiments of the present invention will be described with reference to the drawings.
[0014] [Configuration of Planting Plan Evaluation System] First, the planting plan evaluation system SYS according to the first embodiment will be described. Figure 1 is a system configuration diagram showing an example of the configuration of the planting plan evaluation system SYS according to the first embodiment of the present invention. The planting plan evaluation system SYS is configured to include a planting plan evaluation device 1, a model management device 2, and a satellite data management device 3. The planting plan evaluation device 1, the model management device 2, and the satellite data management device 3 are communicably connected via a network NW.
[0015] The planting plan evaluation device 1 has a function of, when acquiring a planting plan for a planned site, evaluating whether or not the planting plants included in the planting plan are planting plants suitable for the planned site. Specifically, the planting plan evaluation device 1 acquires the planting plan for the planned site. The planting plan evaluation device 1 calculates the sunshine duration at the planned site and the sky view factor at the planned site. The planting plan evaluation device 1 evaluates whether the planting plants included in the planting plan are planting plants suitable for the planned site, based on the sunshine duration, the sky view factor, and planting plant information in which environmental conditions are associated with each planting plant.
[0016] More specifically, the planting plan evaluation device 1 acquires 3D city model information and calculates the sunshine duration of the planned site. The 3D city model is three-dimensional geospatial data that virtually reproduces a city in the real world (physical space) in a virtual world (cyberspace), and is, for example, a model including the shape, arrangement, and the like of buildings. In addition, the planting plan evaluation device 1 acquires 3D satellite data, and calculates the sky view factor based on the green space structure and arrangement within the planting area in the planting plan. The 3D satellite data is three-dimensional data composed of the ground surface and the elevation of the surface of features existing thereon, and is a model including the heights of buildings, trees, and the like. The planting plan evaluation device 1 evaluates whether the planting plants included in the planting plan are planting plants suitable for the planned site, based on the sunshine duration, the sky view factor, and planting plant information in which environmental conditions are associated with each planting plant.
[0017] The model management device 2 has a function as a server device that manages the 3D city model. The satellite data management device 3 has a function as a server device that manages the 3D satellite data.
[0018] [Configuration of Planting Plan Evaluation Device] Next, the configuration of the planting plan evaluation device 1 will be described. Figure 2 is a block diagram showing an example of the functional configuration of the terminal device according to the first embodiment. The planting plan evaluation device 1 comprises a communication unit 11, a control unit 12, a storage unit 13, an input unit 14, and an output unit 15. The communication unit 11, the control unit 12, the storage unit 13, the input unit 14, and the output unit 15 are interconnected via a bus.
[0019] The input unit 14 is an input device such as a mouse, keyboard, or touch panel. The output unit 15 is an output device such as a display unit or a speaker.
[0020] The communication unit 11 communicates with the model management device 2 and the satellite data management device 3 via the network. The communication unit 11 is controlled by the control unit 12 and transmits various information output from the control unit 12 to the other devices. The communication unit 11 receives various information such as content transmitted from the other devices and outputs the received information to the control unit 12.
[0021] The control unit 12 controls the processing of each part of the planting plan evaluation device 1 and enables the planting plan evaluation device 1 to perform its functions. The control unit 12 may be composed of dedicated hardware, or it may be composed of a general-purpose computer system. The computer system includes at least an arithmetic processing unit and a storage medium. As the arithmetic processing unit, for example, a processor such as a CPU (Central Processing Unit) may be used. As the storage medium, a storage unit (not shown) and flash memory (not shown) may be used. The arithmetic processing unit reads a program that has been pre-stored in the flash memory, and loads the read program into the storage unit. The arithmetic processing unit executes the program loaded into the storage unit to realize the functions of the control unit 12.
[0022] In this context, "CPU" refers to processors in general, and includes not only devices commonly known as CPUs in the narrow sense, but also, for example, GPUs and DSPs. Furthermore, the CPU referred to here is not limited to being implemented by a single processor, but may be implemented by combining multiple processors of the same or different types.
[0023] The control unit 12 includes an acquisition unit 121, a calculation unit 122, an evaluation unit 123, an output processing unit 124, and a plant information update unit 125. The acquisition unit 121 includes a planning information acquisition unit 1211, a 3D city model acquisition unit 1212, and a 3D satellite data acquisition unit 1213.
[0024] The planning information acquisition unit 1211 acquires planning information input from the user. The planning information is the planting plan for the planned site. The planting plan includes the plant species to be planted, the green space structure within the planting site, the arrangement of the plants, etc. The planning information acquisition unit 1211 stores the acquired planning information in the planning information storage unit 131.
[0025] The 3D city model acquisition unit 1212 acquires a 3D city model from the model management device 2 via the communication unit 11. The 3D city model acquisition unit 1212 stores the acquired 3D city model in the 3D city model storage unit 132.
[0026] The 3D satellite data acquisition unit 1213 acquires 3D satellite data from the satellite data management device 3 via the communication unit 11, and stores the acquired 3D satellite data in the 3D satellite data storage unit 133.
[0027] The calculation unit 122 includes a sunshine duration calculation unit 1221 and a sky ratio calculation unit 1222. The sunshine duration calculation unit 1221 reads planning information from the planning information storage unit 131 and reads a 3D city model from the 3D city model storage unit 132. The sunshine duration calculation unit 1221 performs a shadow analysis based on the shape and arrangement of surrounding buildings, including the planned site, from the 3D city model. Specifically, the sunshine duration calculation unit 1221 calculates the average daily sunshine duration for the summer solstice, spring equinox, and autumn equinox in the exterior space, including planted areas. The sunshine duration calculation unit 1221 classifies the calculated average sunshine duration into one of several classes based on predetermined thresholds. The sunshine duration calculation unit 1221 classifies the sunshine duration based on the calculated sunshine duration, for example, class "I" if it is 4 hours or more, class "II" if it is 2 hours 30 minutes or more but less than 4 hours, class "III" if it is 1 hour or more but less than 2 hours 30 minutes, class "IV" if it is 20 minutes or more but less than 1 hour, and class "V" if it is less than 20 minutes. The sunshine duration calculation unit 1221 generates a sunshine duration distribution map based on the sunshine duration classification results. The sunshine duration calculation unit 1221 outputs the generated sunshine duration distribution map to the evaluation unit 123.
[0028] The sky ratio calculation unit 1222 reads planning information from the planning information storage unit 131 and 3D satellite data from the 3D satellite data storage unit 133. The sky ratio calculation unit 1222 calculates the sky ratio from the 3D satellite data based on the heights of surrounding buildings, trees, etc., including the planned site. The sky ratio calculation unit 1222 classifies the calculated sky ratio into one of several classes based on predetermined thresholds. For example, the sky ratio calculation unit 1222 classifies the sky ratio into "Class I" if it is 35% or more, "Class II" if it is 25% or more but less than 35%, "Class III" if it is 15% or more but less than 25%, "Class IV" if it is 5% or more but less than 15%, and "Class V" if it is less than 5%, based on the calculated sky ratio. The sky ratio calculation unit 1222 generates a sky ratio distribution map based on the sky ratio classification results. The sky ratio calculation unit 1222 outputs the generated sky ratio distribution map to the evaluation unit 123.
[0029] The calculation unit 122 may calculate parameters for various environmental conditions, such as soil conditions (soil thickness, moisture content), microtopography (slope), and wind conditions (wind speed), in addition to or instead of light conditions (sunlight duration, sky ratio). In this case, the calculation unit 122 can classify each calculated parameter into one of several classes based on predetermined thresholds.
[0030] The evaluation unit 123 includes an average calculation unit 1231, an appropriateness determination unit 1232, an unsuitable plant extraction unit 1233, an unsuitable list generation unit 1234, an alternative plant extraction unit 1235, and an alternative list generation unit 1236.
[0031] The average calculation unit 1231 calculates the average sunshine duration and average sky ratio based on the sunshine duration distribution map input from the sunshine duration calculation unit 1221, the sky ratio distribution map input from the sky ratio calculation unit 1222, and the planting plan read from the planning information storage unit 131. Specifically, the average calculation unit 1231 overlays the sunshine duration distribution map, the sky ratio distribution map, and plant data (polygons or points, etc.) representing the planted plants included in the planting plan on a digital map, and calculates the average values of environmental condition parameters such as sunshine duration and sky ratio in the vicinity of the planting site, for example, within a radius of 5m. The average calculation unit 1231 outputs the calculated average values of environmental condition parameters such as sunshine duration and sky ratio to the appropriateness determination unit 1232.
[0032] The suitability determination unit 1232 determines whether the plants included in the planting plan are suitable plants for the planned site, based on the average values of environmental condition parameters such as the average amount of sunshine hours and the average amount of sky ratio input from the average calculation unit 1231, and the planting information read from the planting information storage unit 134. Specifically, the suitability determination unit 1232 refers to the planting information and determines whether the environmental conditions of the plants included in the planting plan are within the appropriate range of environmental conditions included in the planting information.
[0033] Specifically, the suitability determination unit 1232 determines that the planting plan is "suitable" if the environmental conditions of the planting plants included in the planting plan are within the appropriate range of environmental conditions included in the planting plant information. On the other hand, the suitability determination unit 1232 determines that the planting plan is "unsuitable" if the environmental conditions of the planting plants included in the planting plan are not within the appropriate range of environmental conditions included in the planting plant information, that is, outside the appropriate range of environmental conditions. Within the appropriate range means, for example, that the environmental conditions of the planting plants included in the planting plan are in a class that matches the environmental conditions of the corresponding planting plants included in the planting plant information.
[0034] More specifically, the suitability determination unit 1232 refers to the planting plant information and determines whether the environmental conditions of the plants included in the planting plan are within the appropriate range of the environmental conditions included in the planting plant information. As a result, if the conditions are within the appropriate range, the suitability determination unit 1232 can evaluate that the plants included in the planting plan are suitable for the planned site; if they are outside the appropriate range, it can evaluate that the plants included in the planting plan are not suitable for the planned site.
[0035] Furthermore, the appropriate range may include multiple classes, including the environmental condition class of the relevant plant included in the plant information. For example, if the environmental condition of the relevant plant included in the plant information is Class II, the appropriate range may be pre-defined using multiple classes such as Class I, Class II, and Class III.
[0036] The suitability determination unit 1232 stores the determination result of whether the planting plants in the planting plan for the planned site are appropriate or not in the list storage unit 135, in correspondence with the planting plan and the environmental condition parameters calculated by the calculation unit 122.
[0037] The unsuitable plant extraction unit 1233 reads the results of the determination of whether the plantings in the planting plan at the planned site are appropriate or not from the list storage unit 135 and extracts the plantings that have been determined to be "unsuitable". The unsuitable plant extraction unit 1233 outputs the extraction results representing the extracted "unsuitable" plantings to the unsuitable list generation unit 1234.
[0038] The unsuitable list generation unit 1234 generates an unsuitable list, which is a list of planting plants that have been determined to be "unsuitable" by the unsuitable planting plant extraction unit 1233. The unsuitable list generation unit 1234 stores the generated unsuitable list in the list storage unit 135, associating it with the planting plan.
[0039] The alternative plant extraction unit 1235 extracts alternative plants based on the unsuitable list read from the list storage unit 135 and the plant information read from the plant information storage unit 134. Specifically, for each plant included in the unsuitable list, the alternative plant extraction unit 1235 extracts the plant species or plant name of a plant whose environmental conditions fall within the appropriate range from the plant information as a candidate alternative plant. The alternative plant extraction unit 1235 outputs the extraction results to the alternative list generation unit 1236.
[0040] The alternative list generation unit 1236 generates an alternative list of candidate alternative plants for each plant included in the unsuitable list extracted by the alternative plant extraction unit 1235. The alternative list generation unit 1236 stores the generated alternative list in the list storage unit 135, associating it with the planting plan.
[0041] The output processing unit 124 reads the unsuitable list from the list storage unit 135 and outputs the unsuitable list via the communication unit 11 or the output unit 15. The unsuitable list may be in list format or drawing format. The output processing unit 124 also reads the alternative list from the list storage unit 135 and outputs the alternative list via the communication unit 11 or the output unit 15. The alternative list may be in list format or drawing format.
[0042] The plant information update unit 125 periodically or irregularly acquires plant name, plant type, growth environment type, and various environmental conditions from users or other server devices via the communication unit 11 and input unit 14, and constructs and updates plant information stored in the plant information storage unit 134.
[0043] The memory unit 13 includes a planning information memory unit 131, a 3D city model memory unit 132, a 3D satellite data memory unit 133, a planted plant information memory unit 134, and a list memory unit 135.
[0044] The planning information storage unit 131 stores planning information. The 3D city model memory unit 132 stores the 3D city model. The 3D satellite data storage unit 133 stores 3D satellite data. The plant information storage unit 134 stores information about the planted plants.
[0045] The list storage unit 135 stores the results of determining whether the planting plants in the planting plan for the planned site are appropriate, in association with the planting plan and the environmental condition parameters calculated by the calculation unit 122. The list storage unit 135 also stores an unsuitable list in association with the planting plan. The list storage unit 135 also stores an alternative list in association with the planting plan.
[0046] Next, we will explain the plant information stored in the plant information storage unit 134. Figure 3 shows an example of plant information according to the first embodiment. Plant information refers to information about trees, herbaceous plants, and other planted plants used in urban greening, associating them with environmental conditions such as light conditions, soil conditions, microtopographic conditions, and wind conditions suitable for the growth environment of each plant. For example, plant information uses sunshine duration and sky ratio as parameters for light conditions. Plant information also uses soil thickness and moisture as parameters for soil conditions. Furthermore, plant information uses gradient as a parameter for microtopographic conditions. Finally, plant information uses wind speed as a parameter for wind conditions.
[0047] In this embodiment, the parameters of each environmental condition in the planted plant information are not numerical data themselves, but rather values that represent classes obtained by classifying the numerical data into multiple stages, for example, five stages, using predetermined thresholds.
[0048] In the illustrated example, the plant information is information that associates "plant name" with "plant species," "growing environment type," "light environment conditions," "soil environment conditions," "microtopographic environment conditions," and "wind environment conditions."
[0049] For example, the "Plant Name" in the plant information represents the name of the planted plant. The "Plant Species" represents the specific type of plant, such as "Evergreen Tree," "Deciduous Tree," "Evergreen Shrub," or "Herbaceous Plant." The "Growing Environment Type" represents the growing environment of the planted plant, such as "Evergreen Forest," "Deciduous Forest," or "Grassland." The "Light Environment Conditions" are represented by the parameters "Sunshine Hours" and "Sky View Factor." These parameters are categorized into Class I, Class II, Class III, Class IV, or Class V based on their respective values and predetermined thresholds. The "Soil Environment Conditions" are represented by the parameters "Soil Thickness" and "Moisture Content." These parameters are categorized into Class I, Class II, Class III, Class IV, or Class V based on their respective values and predetermined thresholds. The "Microtopographic Environment Conditions" are represented by the parameter "Gradient." The "gradient" parameter is represented by one of the following classes: Class I, Class II, Class III, Class IV, or Class V, depending on the gradient value and a predetermined threshold. The "wind environment conditions" are represented by the "wind speed" parameter. The "wind speed" parameter is represented by one of the following classes: Class I, Class II, Class III, Class IV, or Class V, depending on the wind speed value and a predetermined threshold.
[0050] [Model Management System] Next, we will explain the configuration of the model management device 2. Figure 4 is a block diagram showing an example of the configuration of the model management device 2 according to the first embodiment. The model management device 2 comprises a communication unit 20, a control unit 22, and a 3D city model storage unit 24.
[0051] The communication unit 20 communicates with the planting plan evaluation device 1 via the network. The communication unit 20 is controlled by the control unit 22 and transmits various information output from the control unit 22 to other devices. The communication unit 20 receives various information transmitted from other devices and outputs the received information to the control unit 22.
[0052] The control unit 22 controls the processing of each part of the model management device 2, thereby enabling the model management device 2 to perform its functions. The control unit 22 includes a 3D city model providing unit 221. The 3D city model providing unit 221 reads a 3D city model from the 3D city model storage unit 24. The 3D city model providing unit 221 provides the read 3D city model to the planting plan evaluation device 1 via the communication unit 20.
[0053] The 3D city model memory unit 24 stores the 3D city model.
[0054] [Satellite data management device] Next, we will explain the configuration of the satellite data management device 3. Figure 5 is a block diagram showing an example of the configuration of the satellite data management device 3 according to the first embodiment. The satellite data management device 3 comprises a communication unit 30, a control unit 32, and a 3D satellite data storage unit 34.
[0055] The communication unit 30 communicates with the planting plan evaluation device 1 via the network. The communication unit 30 is controlled by the control unit 32 and transmits various information output from the control unit 32 to other devices. The communication unit 30 receives various information transmitted from other devices and outputs the received information to the control unit 32.
[0056] The control unit 32 controls the processing of each part of the satellite data management device 3, thereby enabling the satellite data management device 3 to perform its functions. The control unit 32 includes a 3D satellite data provision unit 321. The 3D satellite data provision unit 321 reads 3D satellite data from the 3D satellite data storage unit 34. The 3D satellite data provision unit 321 provides the read 3D satellite data to the planting plan evaluation device 1 via the communication unit 30.
[0057] The 3D satellite data storage unit 34 stores 3D satellite data.
[0058] [Planting plan evaluation process] Next, we will explain the process for evaluating the planting plan. Figure 6 is a flowchart showing an example of the planting plan evaluation process according to the first embodiment. In step S101, the planting plan evaluation device 1 receives input of planning information, including the planting plan, from the user and acquires the planning information. Next, the planting plan evaluation device 1 executes the process in step S103.
[0059] In step S103, the planting plan evaluation device 1 acquires a 3D city model from the model management device 2 or the 3D city model storage unit 132. Then, the planting plan evaluation device 1 executes the process in step S105. In step S105, the planting plan evaluation device 1 acquires 3D satellite data from the satellite data management device 3 or the 3D satellite data storage unit 133. Next, the planting plan evaluation device 1 performs the process in step S107.
[0060] In step S107, the planting plan evaluation device 1 calculates the average daily sunshine hours for the summer solstice, spring equinox, and autumn equinox in the exterior space including the planting area. The planting plan evaluation device 1 classifies the calculated average sunshine hours into one of several classes based on predetermined thresholds. The planting plan evaluation device 1 generates a sunshine hours distribution map based on the sunshine hours classification results. The planting plan evaluation device 1 also calculates the sky ratio based on the heights of surrounding buildings and trees, including the planned site, from 3D satellite data. The planting plan evaluation device 1 classifies the calculated sky ratio into one of several classes based on predetermined thresholds. The planting plan evaluation device 1 generates a sky ratio distribution map based on the sky ratio classification results. Next, the planting plan evaluation device 1 executes the process in step S109.
[0061] In step S109, the planting plan evaluation device 1 overlays a sunshine duration distribution map, a sky view ratio distribution map, and plant data (polygons or points, etc.) representing the plants included in the planting plan on a digital map, and calculates the average values of environmental condition parameters such as sunshine duration and sky view ratio in the vicinity of the planting site, for example, within a radius of 5m. The planting plan evaluation device 1 refers to the plant information and determines whether the environmental conditions of the plants included in the planting plan are within the appropriate range of environmental conditions included in the plant information. Next, the planting plan evaluation device 1 executes the process in step S111.
[0062] In step S111, the planting plan evaluation device 1 extracts "unsuitable" planting plants based on the judgment result in step S109. Next, the planting plan evaluation device 1 executes the process in step S113. In step S113, the planting plan evaluation device 1 generates an unsuitable list, which includes unsuitable planting plants. Next, the planting plan evaluation device 1 performs the process in step S115.
[0063] In step S115, the planting plan evaluation device 1 extracts candidate alternative plants for the "unsuitable" plants from the planting plant information. Next, the planting plan evaluation device 1 performs the process in step S117. In step S117, the planting plan evaluation device 1 generates an alternative list including candidate alternative planting plants. Then, the planting plan evaluation process shown in Figure 6 is terminated.
[0064] As described above, the planting plan evaluation system SYS according to this embodiment includes a calculation unit 122 that calculates the amount of sunshine hours and the sky ratio at the planned site, and an evaluation unit 123 that evaluates whether the plants included in the planting plan are suitable for the planned site based on the amount of sunshine hours, the sky ratio, and plant information to which environmental conditions are associated for each plant.
[0065] This allows the planting plan evaluation system to reduce poor plant growth caused by environmental stress. Furthermore, it enables the selection of optimal plants and the development of effective planting plans. Therefore, it allows for efficient planting planning in large-scale development projects.
[0066] Furthermore, the calculation unit 122 calculates the amount of sunlight based on the shape and arrangement of surrounding buildings at the planned site, and the sky ratio based on the structure and arrangement of green spaces within the planting area included in the planting plan.
[0067] This allows the planting plan evaluation system to develop planting plans that reduce poor growth of planted plants caused by light environment conditions such as insufficient sunlight.
[0068] Furthermore, the calculation unit 122 calculates the average value of sunshine hours and the average value of sky ratio within a predetermined range in the planting area, and the evaluation unit 123 evaluates whether the plants included in the planting plan are suitable for the planned site based on the average value of sunshine hours and the average value of sky ratio, and the planting plant information.
[0069] This allows the planting plan evaluation system to formulate planting plans that take into account the structure and layout of surrounding buildings at the planned site.
[0070] Furthermore, if the plants included in the planting plan are not suitable for the planned site, the system also includes an extraction unit (alternative plant extraction unit 1235) that extracts alternative plant candidates from the plant information.
[0071] This allows the planting plan evaluation system to select plants that are suitable for the growing environment at the planned site.
[0072] Furthermore, at least a portion of the planting plan evaluation device 1 in the above-described embodiment, for example, the plan information acquisition unit 1211, the 3D city model acquisition unit 1212, the 3D satellite data acquisition unit 1213, the sunshine duration calculation unit 1221, the sky ratio calculation unit 1222, the average calculation unit 1231, the suitability determination unit 1232, the unsuitable plant extraction unit 1233, the unsuitable list generation unit 1234, the alternative plant extraction unit 1235, the alternative list generation unit 1236, the output processing unit 124, and the planting plant information update unit 125, may be implemented by computer. In that case, the program for realizing this control function may be recorded on a computer-readable recording medium, and the program recorded on this recording medium may be read by a computer system and executed. Hereinafter, "computer system" refers to the computer system built into the planting plan evaluation device 1, and includes hardware such as an OS and peripheral devices.
[0073] Furthermore, "computer-readable recording media" refers to portable media such as flexible disks, magneto-optical disks, ROMs, and CD-ROMs, as well as storage devices such as hard disks built into computer systems. In addition, "computer-readable recording media" may also include those that dynamically hold programs for a short period of time, such as communication lines used when transmitting programs over networks such as the Internet or communication lines such as telephone lines, and those that hold programs for a certain period of time, such as volatile memory inside computer systems that act as servers or clients in such cases. Moreover, the above-mentioned programs may be for the purpose of realizing some of the functions described above, and may also be able to realize the above-mentioned functions in combination with programs already recorded in the computer system.
[0074] Furthermore, some or all of the planting plan evaluation device 1 in the above-described embodiment may be implemented as an integrated circuit such as an LSI (Large Scale Integration). Each functional block of the planting plan evaluation device 1 may be individually processorized, or some or all of them may be integrated into a single processor. In addition, the method of implementing the integrated circuit is not limited to LSIs; it may also be implemented using dedicated circuits or general-purpose processors. Furthermore, if an integrated circuit technology that can replace LSIs emerges due to advances in semiconductor technology, an integrated circuit using that technology may be used.
[0075] Although one embodiment of this invention has been described in detail above with reference to the drawings, the specific configuration is not limited to that described above, and various design changes can be made without departing from the spirit of this invention.
[0076] The Sustainable Development Goals (SDGs) are 17 international goals adopted at the UN Summit in September 2015. The planting evaluation system, planting evaluation device, planting evaluation method, and program according to this embodiment can contribute to achieving some of the 17 SDGs, such as Goal 15, "Conserve and sustainably use terrestrial ecosystems." [Explanation of symbols]
[0077] SYS Planting Plan Evaluation System 1. Planting plan evaluation device 11 Communications Department 12 Control Unit 121 Acquisition Department 1211 Planning Information Acquisition Department 1212 3D City Model Acquisition Department 1213 3D Satellite Data Acquisition Unit 122 Calculation Section 1221 Sunshine duration calculation unit 1222 Sky rate calculation part 123 Evaluation Department 1231 Average calculation part 1232 Appropriateness Determination Unit 1233 Unsuitable planted plant extraction section 1234 Unsuitable List Generation Unit 1235 Alternative Plant Extraction Department 1236 Alternative List Generation Unit 124 Output Processing Unit 125 Plant information update department 13 Storage section 131 Planning Information Storage Unit 132 3D City Model Memory Unit 133 3D Satellite Data Storage Unit 134 Plant information storage section 135 List Storage Unit 14 Input section 15 Output section 2 Model Management Devices 20 Communications Department 22 Control Unit 221 3D City Model Provision Department 24 3D City Model Memory Unit 3. Satellite data management device 30 Communications Department 32 Control Unit 321 3D Satellite Data Provision Department 34 3D Satellite Data Storage Unit
Claims
1. The acquisition unit acquires the planting plan for the planned site, A calculation unit that calculates the sunshine hours at the planned site and the sky ratio at the planned site, An evaluation unit that evaluates whether the plants included in the planting plan are suitable for the planned site based on the aforementioned sunshine hours, the aforementioned sky ratio, and plant information to which environmental conditions are associated for each plant, A planting plan evaluation system equipped with the following features.
2. The calculation unit calculates the sunshine hours based on the shape and arrangement of surrounding buildings in the planned site, and the sky ratio based on the structure and arrangement of green spaces within the planting area included in the planting plan. The planting plan evaluation system according to claim 1.
3. The calculation unit calculates the average value of the sunshine hours and the average value of the sky ratio within a predetermined range in the planting area. The evaluation unit evaluates whether the plants included in the planting plan are suitable for the planned site, based on the average value of the sunshine hours, the average value of the sky ratio, and the planting plant information. The planting plan evaluation system according to claim 2.
4. If the plants included in the planting plan are not suitable for the planned site, an extraction unit extracts alternative plant candidates from the plant information. The evaluation system according to claim 3, further comprising:
5. The acquisition unit acquires the planting plan for the planned site, A calculation unit that calculates the sunshine hours at the planned site and the sky ratio at the planned site, An evaluation unit that evaluates whether the plants included in the planting plan are suitable for the planned site based on the aforementioned sunshine hours, the aforementioned sky ratio, and plant information to which environmental conditions are associated for each plant, A planting plan evaluation device equipped with the following features.
6. A planting plan evaluation method performed by a computer of a planting plan evaluation device, The process of obtaining the planting plan for the planned site, A calculation process for determining the sunshine hours at the aforementioned planned site and the sky ratio at the aforementioned planned site, An evaluation process is performed to evaluate whether the plants included in the planting plan are suitable for the planned site, based on the aforementioned sunshine hours, the aforementioned sky ratio, and plant information to which environmental conditions are associated for each plant. A useful method for evaluating planting plans.
7. The computer in the planting plan evaluation device, The acquisition steps involve obtaining the planting plan for the planned site, A calculation step for calculating the sunshine hours at the planned site and the sky view ratio at the planned site, An evaluation step to evaluate whether the plants included in the planting plan are suitable for the planned site, based on the aforementioned sunshine hours, the aforementioned sky ratio, and plant information to which environmental conditions are associated for each plant; A program to execute.
Citation Information
Patent Citations
Growth evaluation control device, growth evaluation method and growth evaluation control program
JP2022063658A
