The system addresses the challenge of quick power grid adjustments by using historical data to determine target power amounts for storage devices, enabling offline and timely power supply and demand balancing.

JP2026183055APending Publication Date: 2026-11-19SUMITOMO ELECTRIC INDUSTRIES LTD +2
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
JP2026205293
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2026-09-14
Publication Date
2026-11-19

AI Technical Summary

Technical Problem

Existing power supply and demand adjustment systems struggle to respond quickly to fluctuations in the power grid, particularly those based on renewable energy sources, as they either require offline communication with servers or rely on predictive methods that are not timely enough.

Method used

A power supply and demand adjustment system that includes a management server capable of determining a target remaining power amount for a power storage device based on historical charge/discharge data, allowing for offline adjustments to balance supply and demand rapidly.

Benefits of technology

Enables rapid response to power grid fluctuations by allowing power storage devices to adjust supply and demand independently, without real-time communication, thus maintaining grid stability.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2026183055000001_ABST
    Figure 2026183055000001_ABST
Patent Text Reader

Abstract

It adjusts supply and demand offline while responding quickly to fluctuations in the power grid. [Solution] The supply and demand adjustment device is a supply and demand adjustment device for performing supply and demand adjustments for each of a plurality of charge and discharge devices connected to a power grid, and comprises: a history acquisition unit that acquires a charge and discharge history showing the history of the amount of electricity charged or discharged by the charge and discharge device in past supply and demand adjustments for at least one of the plurality of charge and discharge devices; a determination unit that determines a target value for the remaining energy amount of the energy storage device before the start of the next supply and demand adjustment based on the charge and discharge history; and a control unit that limits the charging of the energy storage device during a predetermined period before the start of the next supply and demand adjustment based on the target value.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present disclosure relates to a power supply and demand adjustment device, a computer program, and a power supply and demand adjustment method.

Background Art

[0002] For the stable supply of electric power, the fundamental principle is that demand and supply must be equal at all times, and it is necessary to maintain a balance between power demand and power supply. Conventionally, fluctuations in demand and fluctuations in the output of power sources from renewable energy have been balanced by adjusting the output of thermal power plants and the like. However, in recent years, due to initiatives such as carbon neutrality, the number of power sources based on renewable energy has increased and the number of power sources such as thermal power has decreased, leading to a growing demand for enhanced adjustable power for supply and demand. In response to this, efforts are underway in the supply and demand adjustment market to trade adjustment capacity, which is commoditized as a claim for the right to provide and receive adjustable power amounts (Non-Patent Document 1). For example, primary adjustment capacity needs to be able to respond up to the upper limit of the bid amount in a short period of time, for example within 10 seconds, by operating offline, that is, by self-control.

[0003] Patent Document 1 discloses a server that handles a plurality of vehicles in an integrated manner, requests vehicles with a high SOC (State of Charge) to discharge and vehicles with a low SOC to charge, and performs supply and demand adjustment that can cope with both excess demand and excess supply.

[0004] Patent Document 2 discloses an energy management method that predicts the activation of adjustment capacity in advance based on weather information and the like, and adjusts the SOC to a level corresponding to the prediction in advance.

Prior Art Documents

Patent Documents

[0005]

Patent Document 1

Patent Document 2

Non-Patent Documents

[0006] [Non-Patent Document 1] Regarding the proposed market design concerning the revision of rules for primary to secondary adjustment capacity (2), composite products, and tertiary adjustment capacity (2), [online], [searched April 4, 2023], Internet<https: / / www.occto.or.jp / iinkai / chouseiryoku / jukyuchousei / 2021 / files / jukyu_shijyo_28_03_03.pdf> 67 pages [Overview of the project] [Problems that the invention aims to solve]

[0007] However, the vehicle described in Patent Document 1, which adjusts supply and demand while communicating with a server, cannot adjust supply and demand offline. Furthermore, the energy management method described in Patent Document 2, which adjusts in advance in response to predictions, cannot respond to fluctuations in the power grid in a short amount of time. [Means for solving the problem]

[0008] The supply and demand adjustment system relating to this disclosure is a supply and demand adjustment system for performing power supply and demand adjustment in a power grid, comprising: a charge / discharge device that charges a power storage device with power supplied from the power grid and discharges the power storage device in order to supply power to the power grid; and a management server that requests the charge / discharge device to charge or discharge the power storage device, wherein the management server includes a history acquisition unit that acquires a charge / discharge history showing the history of the power that the charge / discharge device has used to charge or discharge the power storage device in past supply and demand adjustments; and a determination unit that determines a target remaining power amount, which is a target value for the remaining power amount of the power storage device before performing the supply and demand adjustment, based on the charge / discharge history acquired by the history acquisition unit.

[0009] This disclosure can be implemented not only as a supply and demand adjustment system, a supply and demand adjustment device, a control method that uses characteristic processing in the supply and demand adjustment device as steps, and a control program for causing the supply and demand adjustment device to execute characteristic processing, but also as a semiconductor integrated circuit in whole or in part. [Effects of the Invention]

[0010] According to this disclosure, it is possible to adjust supply and demand offline while responding quickly to fluctuations in the power grid. [Brief explanation of the drawing]

[0011] [Figure 1] Figure 1 is a schematic diagram showing an overview of the power grid that transmits and distributes electricity. [Figure 2] Figure 2 is a conceptual diagram illustrating an example of frequency fluctuations in a power grid. [Figure 3] Figure 3 is a block diagram of the various components of the overall system, including the supply and demand system, in Embodiment 1. [Figure 4] Figure 4 is a functional block diagram showing the functional blocks included in the management server 32. [Figure 5] Figure 5 shows an example of charge / discharge power and cumulative charge power when supply and demand adjustments are implemented. [Figure 6] Figure 6 shows an example of a histogram of the maximum charge amount. [Figure 7] Figure 7 is a sequence diagram showing the operation of the entire system, including the supply and demand adjustment system. [Modes for carrying out the invention]

[0012] <Summary of the embodiments of this disclosure> The embodiments of this disclosure are outlined below.

[0013] (1) The power supply and demand adjustment system according to the present embodiment is a power supply and demand adjustment system that performs power supply and demand adjustment in an electric power system, and includes a charging and discharging device that charges a power storage device with power supplied from the electric power system and discharges the power storage device to supply power to the electric power system, and a management server that issues a request for charging or discharging of the power storage device to the charging and discharging device. The management server includes a history acquisition unit that acquires a charging and discharging history indicating a history of power with which the charging and discharging device charged or discharged the power storage device in the power supply and demand adjustment performed in the past, and a determination unit that determines a target remaining power amount, which is a target value of the remaining power amount of the power storage device before performing the power supply and demand adjustment, based on the charging and discharging history acquired by the history acquisition unit. Accordingly, it is possible to respond to fluctuations in the electric power system in a short time while performing power supply and demand adjustment offline.

[0014] (2) In the above (1), the management server may further include a transmission unit that transmits target information indicating the target remaining power amount determined by the determination unit to the charging and discharging device. Accordingly, the charging and discharging device that has received the target information can perform power supply and demand adjustment based on the target information.

[0015] (3) In the above (2), the management server further includes an adjustment time acquisition unit that acquires a scheduled start time and a scheduled end time of the power supply and demand adjustment, and the transmission unit may transmit time information indicating the scheduled start time and the scheduled end time acquired by the adjustment time acquisition unit to the charging and discharging device. Accordingly, the charging and discharging device that has received the time information can start and end the power supply and demand adjustment at the start time and the end time indicated by the time information.

[0016] (4) In the above (1), the management server further includes a power storage capacity acquisition unit that acquires the power storage capacity of the power storage device, and the determination unit may determine the target remaining power amount based on the power storage capacity and at least one of the maximum charge amount and the maximum discharge amount of the power storage device in the charging and discharging history. Accordingly, the management server can determine the target remaining power amount based on the maximum charge amount or the maximum discharge amount of the charging and discharging device, in consideration of the power storage capacity of the power storage device.

[0017] (5) In the above (4), the determination unit may determine the target remaining power amount based on a histogram of at least one of the maximum charge amount and the maximum discharge amount. Accordingly, the management server can determine the target remaining power amount corresponding to the appearance frequency of the maximum charge amount or the maximum discharge amount of the charge-discharge device.

[0018] (6) In the above (4), the target remaining power amount includes a maximum target value and a minimum target value of the remaining power amount of the power storage device, and the determination unit may determine the maximum target value based on the maximum charge amount in the charge-discharge history. Accordingly, the management server can determine the maximum target value of the remaining power amount of the power storage device so that the charge-discharge device can adjust supply and demand for the maximum charge amount.

[0019] (7) In the above (4), the target remaining power amount includes a maximum target value and a minimum target value of the remaining power amount of the power storage device, and the determination unit may determine the minimum target value based on the maximum discharge amount in the charge-discharge history. Accordingly, the management server can determine the minimum target value of the remaining power amount of the power storage device so that the charge-discharge device can adjust supply and demand for the maximum discharge amount.

[0020] (8) In the above (6), the charge-discharge device may execute limit control for restricting charging of the power storage device when the remaining power amount of the power storage device is larger than a reference power amount based on the target remaining power amount in a predetermined period before starting the supply and demand adjustment. Accordingly, when the remaining power amount of the power storage device approaches the target remaining power amount, by restricting the charging of the power storage device, power purchase from the power system is reduced, power sales such as photovoltaic power generation are increased, and operation can be performed more economically.

[0021] (9) In the above (1), the charge-discharge history may indicate a history of power amounts with which each of the plurality of charge-discharge devices charged or discharged the plurality of power storage devices in the supply and demand adjustment performed in the past. Accordingly, the management server can determine the target value (target remaining power amount) of the remaining power amount of the power storage device based on the charge-discharge histories of the plurality of charge-discharge devices.

[0022] (10) A supply and demand adjustment device according to this embodiment is a supply and demand adjustment device that adjusts the supply and demand of power in the power system by requesting a charge / discharge device to charge or discharge the energy storage device, which charges the energy storage device with power supplied from the power system and discharges the energy storage device in order to supply power to the power system, and comprises a history acquisition unit that acquires a history of the amount of power that the charge / discharge device has charged or discharged the energy storage device in the supply and demand adjustments that have been performed in the past, and a determination unit that determines a target remaining energy amount, which is a target value of the remaining energy of the energy storage device before the supply and demand adjustment is performed, based on the charge / discharge history. This makes it possible to respond to fluctuations in the power system in a short time while performing supply and demand adjustments offline.

[0023] (11) The control method according to this embodiment controls a supply and demand adjustment device that performs power supply and demand adjustment in the power system by requesting a charge / discharge device to charge or discharge the energy storage device, which charges the energy storage device with power supplied from the power system and discharges the energy storage device in order to supply power to the power system, and acquires a charge / discharge history that shows the history of the amount of power that the charge / discharge device has charged or discharged the energy storage device in the supply and demand adjustment performed in the past, and determines a target remaining energy amount, which is a target value of the remaining energy of the energy storage device before the supply and demand adjustment is performed, based on the charge / discharge history. This makes it possible to respond to fluctuations in the power system in a short time while performing supply and demand adjustment offline.

[0024] (12) The program according to this embodiment is a program for operating a computer that controls a power supply adjustment device which performs power supply and demand adjustment in the power system by requesting a charge / discharge device to charge or discharge the power storage device, which charges the power storage device with power supplied from the power system and discharges the power storage device in order to supply power to the power system, the program comprising the steps of acquiring a charge / discharge history showing the history of the amount of power that the charge / discharge device has charged or discharged the power storage device in the power supply adjustment performed in the past, and determining a target remaining power amount, which is a target value of the remaining amount of the power storage device before performing the power supply adjustment, based on the charge / discharge history. This makes it possible to respond to fluctuations in the power system in a short time while performing power supply and demand adjustment offline.

[0025] [Definition of Terms] The definitions of terms used in this application are as follows: • Power system: A system that integrates power generation, transformation, transmission, and distribution to supply electricity to the receiving facilities of consumers. • Consumer: A person who receives and uses goods or services such as electricity. • Supply and demand adjustment: Balancing the production and consumption of electricity. • Supply and demand adjustment market: A market where adjustment power is traded. • Reserve power: Electricity that can be adjusted in terms of supply and demand. • Adjustment capacity: The right to provide and undertake reserve power is commercialized as a claim. • Seller: A person who requires backup power and offers their adjustment capacity to the supply and demand adjustment market. • Bidders: Those who intend to provide reserve power and bid on and win the supply and demand adjustment market for adjustment capacity. • Listing Information: Information indicating the adjustment capacity of items listed by sellers in the supply and demand adjustment market. • Bidding Information: Information indicating the adjustment capabilities of bidders who have submitted bids to the supply and demand adjustment market and intend to win the bid. • Auction Information: Information showing the details of the adjustment capacity that the bidder won in the supply and demand adjustment market. Specifically, it shows the winning bid price, the amount of electricity that needs to be adjusted, and the start and end times of the adjustment. • Market Server: A server that manages transactions in the supply and demand adjustment market, where adjustment power for adjusting supply and demand is traded. • Management server: A server that requests charging or discharging of energy storage devices from the charging / discharging device. • Energy storage device: A device that converts electrical energy into chemical energy or other forms of energy for storage, and allows power to be extracted as needed. • Secondary battery: A battery that converts electrical energy into chemical energy for storage and then converts that chemical energy back into electrical energy to discharge power as needed. • Charging: The process of converting electrical energy into chemical energy or other forms of energy for storage. • Discharge: The process of converting stored chemical energy, etc., into electrical energy to produce electricity. • Charging and discharging device: A device that charges an energy storage device using electricity supplied from the power grid and discharges the energy storage device to supply electricity to the power grid. • Charge / Discharge Power: The power charged or discharged by the energy storage device when the charge / discharge device adjusts supply and demand. • Cumulative charging power: The cumulative value of charging and discharging power. • Maximum charge capacity: The maximum cumulative charging power. • Maximum discharge: The maximum cumulative discharge power, or in other words, the minimum cumulative charge power. • History: A record of a specific past event in the time axis direction. • Charge / discharge history: A time-axis record of cumulative charging power during past supply and demand adjustments. • Storage capacity: The maximum amount of electricity that can be charged into a storage device. • Remaining energy: The amount of energy currently stored in the energy storage device. This refers to the amount of energy the energy storage device can discharge in the future. • Storage capacity: The value obtained by subtracting the remaining energy from the storage capacity. This is the amount of energy that can be added and charged in the future. • Target remaining energy: The target value for remaining energy. • Target information: Information indicating the target remaining power amount. • Time information: Information indicating the scheduled start and end times for supply and demand adjustments. The successful bid information includes time information. • Histogram: A graph showing the frequency or number of occurrences of intervals or classes that are relatively prime to each other.

[0026] <Embodiment 1> [1. Details of Embodiment 1 of this Disclosure] The embodiments of this disclosure will be described in detail below with reference to the drawings. At least some of the embodiments described below may be combined in any way.

[0027] [1-1. Supply and Demand Adjustment Market] The supply and demand adjustment market is a market for trading adjustment capabilities, which are commodified as claims representing the right to provide and undertake electricity that can be adjusted in terms of supply and demand. The supply and demand adjustment system disclosed herein participates in the supply and demand adjustment market and implements electricity supply and demand adjustments in the power grid; therefore, the supply and demand adjustment market will be described below.

[0028] [Power system] Figure 1 is a schematic diagram showing the outline of a power transmission and distribution system. The power system 11 includes a power plant 12, transmission equipment 13, substation equipment 14, distribution equipment 15, consumer equipment 16, and energy storage equipment 17. The power plant 12 is equipment for generating electricity, such as a thermal power plant 12a using fossil fuels such as oil, or a power plant 12b using renewable energy such as wind power. The transmission equipment 13 is equipment for sending the electricity generated at the power plant 12 to areas where consumers are located. The substation equipment 14 is equipment that steps down the high-voltage electricity sent from the power plant 12 to the voltage required by the distribution equipment 15. The distribution equipment 15 is equipment that distributes the electricity stepped down by the substation equipment 14 to the consumer equipment 16.

[0029] The consumer equipment 16 is equipment located in a factory or a general household and consumes electricity distributed by the power distribution equipment 15. The energy storage equipment 17 is charged by the electricity distributed by the power distribution equipment 15 and supplies power to the power distribution equipment 15 with the stored power. The energy storage equipment 17 includes a charge / discharge device 33 and an energy storage device 34. The energy storage device 34 is a device that charges and discharges electricity and is composed of a secondary battery such as a lithium-ion battery. The charge / discharge device 33 charges the energy storage device 34 with electricity supplied from the power grid 11 and discharges the energy storage device 34 to supply power to the power grid 11. Although many devices participate in the power grid 11 in this way, they are all connected to a single power grid 11. For this reason, the electricity supplied by the power plant 12 and the electricity consumed by the consumer equipment 16 must always be balanced.

[0030] [Frequency fluctuations] Figure 2 is a conceptual diagram illustrating an example of frequency fluctuation in a power grid. As mentioned above, many facilities are connected to the power grid 11. When the total power supplied by multiple power plants 12 exceeds the total power consumed by multiple consumer facilities 16, the load on the generators of power plants 12 becomes lighter. As a result, the rotational speed of the generators of power plants 12 increases. For the power grid 11, this means that the frequency of the power grid 11 increases. Region 21 in Figure 2 represents this state. On the other hand, when the total power supplied by multiple power plants 12 falls below the total power consumed by multiple consumer facilities 16, the load on the generators of power plants 12 becomes heavier. As a result, the rotational speed of the generators of power plants 12 decreases. For the power grid 11, this means that the frequency of the power grid 11 decreases. Region 22 in Figure 2 represents this state.

[0031] Furthermore, if the total power supplied by the multiple power plants 12 falls below the total power consumed by the multiple consumer facilities 16, it means that the generators of power plants 12 are overloaded. As a result, the generators of power plants 12 become overloaded and are disconnected from the power grid 11 to avoid failure. When one generator is disconnected, the situation in which the total power supplied by the multiple power plants 12 falls below the total power consumed by the multiple consumer facilities 16 worsens, and generators are disconnected one after another from the power grid 11. In the worst case, the entire area connected to one power grid 11 experiences a blackout. Conversely, if the total power consumed by the multiple consumer facilities 16 decreases and the frequency of the power grid 11 increases, the power generated by the generators will not be consumed, resulting in energy and economic losses. For this reason, the frequency of the power grid 11 must always be controlled within a predetermined range.

[0032] [Supply and Demand Adjustment Market] As mentioned above, the power grid 11 needs to constantly control its frequency within a predetermined range. However, in recent years, power generation from renewable energy sources such as wind and solar power has been increasing. Since power generation from renewable energy sources depends on natural energy, it is affected by the weather. For this reason, the amount of power generated from renewable energy sources fluctuates significantly compared to conventional power generation from fossil fuels. Consequently, when there is a surplus of electricity, power resources are needed to accept the surplus, and when there is a shortage of electricity, power resources are needed to supply the insufficient electricity.

[0033] Therefore, a system design for a supply and demand adjustment market is underway that will allow consumers who possess power resources such as storage batteries to participate in adjusting the supply and demand of electricity. Traditionally, power resources have included large facilities such as pumped-storage power plants. However, large facilities such as pumped-storage power plants have challenges such as requiring time and cost to construct and making rapid supply and demand adjustment difficult. On the other hand, the spread of EVs (Electric Vehicles) has progressed. Therefore, it is being considered to allow the energy storage devices 34 (secondary batteries) of EVs in ordinary households to participate in supply and demand adjustment through a charge / discharge device 33. Note that the charge / discharge device 33 and the energy storage device 34 may be housed in a single enclosure, for example, in a residential energy storage system.

[0034] One way to involve consumers with electricity resources in the supply and demand adjustment market is to commodify the right to provide and receive adjustable electricity (hereinafter referred to as "reserve electricity") as a claim (hereinafter referred to as "adjustment capacity") and trade it. As a trading method, an auction market is being considered in which those who need reserve electricity (hereinafter referred to as "exhibitors") put their adjustment capacity up for auction, and those who are willing to provide reserve electricity (hereinafter referred to as "bidders") bid and win the auction. As an example, five categories of adjustment capacity are being considered as shown in Table 1.

[0035] [Table 1]

[0036] When the EV's energy storage device 34 is made to participate in supply and demand adjustment through the charging and discharging device 33, it can respond quickly, and therefore the energy storage device 34 will be placed in the category of primary adjustment power.

[0037] [1-2. Overall System Configuration] Figure 3 is a block diagram of the various components of the overall system, including the supply and demand system, in Embodiment 1. The overall system includes a market server 31, a management server 32, a charging / discharging device 33, a power storage device 34, and a bidder terminal 35. The communication line 36 is a communication line for the management server 32, the charging / discharging device 33, and the bidder terminal 35 to communicate with each other. Furthermore, the communication line 36 is also used for sellers to access the market server 31. The communication line may be a wired or wireless line.

[0038] [1-2-1. Market Server] The market server 31 is a server that manages the trading of adjustment power in the supply and demand adjustment market. The market server 31 is communicated to the communication line 36. The market server 31 includes a control unit 31a, a memory 31b, a communication interface (hereinafter referred to as communication I / F) 31c, and a communication bus 31d. The communication bus 31d is a bus for the control unit 31a, the memory 31b, and the communication I / F 31c to communicate data with each other.

[0039] [Control Unit] The control unit 31a includes, for example, a circuit configuration such as a processor. Specifically, the control unit 31a includes one or more CPUs (Central Processing Units). The processor included in the control unit 31a may be a GPU (Graphics Processing Unit). In this case, the control unit 31a reads a computer program stored in the memory 31b and performs various calculations and controls.

[0040] The control unit 31a may include a processor on which a predetermined program has been pre-programmed. For example, the control unit 31a may be an integrated circuit such as a CPLD (Complex Programmable Logic Device), FPGA (Field-Programmable Gate Array), or ASIC (Application Specific Integrated Circuit). In this case, the control unit 31a performs various calculations and controls based on the pre-programmed program.

[0041] [Memory] Memory 31b includes volatile memory and non-volatile memory, and stores various types of data. Volatile memory includes, for example, RAM (Random Access Memory). Non-volatile memory includes, for example, flash memory, HDD (Hard Disk Drive), SSD (Solid State Drive), or ROM (Read Only Memory).

[0042] Memory 31b stores, for example, computer programs and various parameters in non-volatile memory. Memory 31b may also store computer programs downloaded from external devices (not shown) via a network (not shown) and communication devices (not shown).

[0043] [Communication Interface] The communication interface 31c is connected to the communication bus 31d in a communication-enabled manner. The communication interface 31c is also connected to the communication line 36 in a communication-enabled manner. The communication interface 31c receives signals flowing through the communication line 36 via ports (not shown) and converts them into readable signals in the control unit 31a. The communication bus 31d is a bus for data communication between the control unit 31a, the memory 31b, and the communication interface 31c.

[0044] [1-2-2. Management Server] The management server 32 is a server that requests the charge / discharge device 33 to charge or discharge the energy storage device 34. The management server 32 is communicated to the communication line 36. The management server 32 includes a control unit 32a, a memory 32b, a communication interface 32c, and a communication bus 32d. The control unit 32a, memory 32b, communication interface 32c, and communication bus 32d of the management server 32 are the same as the control unit 31a, memory 31b, communication interface 31c, and communication bus 31d of the market server 31, so their explanation is omitted.

[0045] [1-2-3. Charge / discharge device] The charge / discharge device 33 charges the energy storage device 34 with power supplied from the power grid and discharges the energy storage device 34 to supply power to the power grid. The charge / discharge device 33 is communicatively connected to the communication line 36. The charge / discharge device 33 includes a control unit 33a, a memory 33b, a communication interface 33c, and a communication bus 33d, and further includes a communication interface 33e and a charge / discharge circuit 33f. The control unit 33a, memory 33b, communication interface 33c, and communication bus 33d of the charge / discharge device 33 are the same as the control unit 31a, memory 31b, communication interface 31c, and communication bus 31d of the market server 31, so their explanation is omitted.

[0046] The communication interface 33e is an interface for communicating with the energy storage device 34. The communication interface 33e transmits data to the energy storage device 34 via the communication bus 38. The communication interface 33e receives data transmitted by the energy storage device 34 via the communication bus 38.

[0047] The charge / discharge circuit 33f sends power supplied from the power grid to the energy storage device 34 and charges the secondary battery 34f of the energy storage device 34. The charge / discharge circuit 33f also discharges the secondary battery 34f of the energy storage device 34 in order to supply power to the power grid. The charge / discharge circuit 33f is, for example, an inverter. The charge / discharge circuit 33f and the secondary battery 34f are connected by a predetermined power cable 37.

[0048] The inverter of the charge / discharge circuit 33f is controlled to supply power to the power grid when the frequency of the power grid falls below a specified frequency. The inverter of the charge / discharge circuit 33f is controlled to charge the energy storage device with power supplied from the power grid when the frequency of the power grid rises above a specified frequency.

[0049] [1-2-4. Energy Storage Devices] The energy storage device 34 converts electrical energy into chemical energy or the like for storage, and extracts electricity as needed. The energy storage device 34 includes a control unit 34a, a memory 34b, a communication interface 34e, a communication bus 34d, and further includes a secondary battery 34f. The control unit 34a, memory 34b, communication interface 34e, and communication bus 34d of the energy storage device 34 are the same as the control unit 33a, memory 33b, communication interface 33e, and communication bus 33d of the charge / discharge device 33, so their explanation is omitted. In addition to chemical energy, kinetic energy may also be used. For example, a flywheel connected to a generator and a motor.

[0050] The secondary battery 34f converts electrical energy into chemical energy for storage and, as needed, converts chemical energy back into electrical energy to discharge electricity. The secondary battery is, for example, a lithium-ion battery, a nickel-metal hydride battery, or a lead-acid battery, but is not limited to these. The secondary battery 34f is connected to the charge / discharge circuit 33f of the charge / discharge device 33 via a power cable 37.

[0051] [1-2-5. Bidder Terminal] The bidder terminal 35 is a terminal for bidders to transmit bid information and successful bid information to the supply and demand adjustment market. The bidder terminal 35 is connected to a communication line 36 for communication. The bidder terminal 35 includes a control unit 35a, a memory 35b, a communication interface 35c, a communication bus 35d, and further includes an input / output unit 35e. The control unit 35a, memory 35b, communication interface 35c, and communication bus 35d of the bidder terminal 35 are the same as the control unit 31a, memory 31b, communication interface 31c, and communication bus 31d of the market server 31, so their explanation is omitted. The input / output unit 35e is, for example, a liquid crystal display with a touch panel. Bidders input bid information by touching the touch panel. The successful bid information is displayed on the liquid crystal display.

[0052] [1-3. Functions of the Overall System] The overall system, including the supply and demand adjustment system according to this embodiment, functions through the coordinated efforts of the market server 31, management server 32, charge / discharge device 33, energy storage device 34, and bidder terminal 35.

[0053] [1-3-1. Market Server] Market server 31 is a server that manages the trading of adjustment power in the supply and demand adjustment market. In the supply and demand adjustment market, adjustment power is traded, which is a commodification of the right to provide and receive reserve power as a claim. The trading method is to create an auction market called the supply and demand adjustment market, in which those who need reserve power put their adjustment power up for auction, and those who are willing to provide reserve power bid and win the auction. Those who need reserve power and those who are willing to provide reserve power do not meet in person, but participate in the supply and demand adjustment market established on market server 31 via a communication line 36 from a PC (Personal Computer), tablet terminal, or mobile phone.

[0054] The market server 31 receives information indicating the adjustment capacity offered by the seller (hereinafter referred to as "listing information"). The listing information includes the expected winning bid price, the electricity to be adjusted, and the start and end times of the adjustment. The market server 31 also receives information indicating the adjustment capacity that bidders intend to win (hereinafter referred to as "bid information"). The bid information includes the bid price, the electricity that can be adjusted, and the start and end times of the adjustment. The listing information and bid information are transmitted from the seller or bidder, for example, a PC, tablet terminal, or mobile phone, and received by the market server 31 via the communication line 36.

[0055] The offered adjustment capacity and the adjustment capacity to be bid on are auctioned and successfully bid on according to a predetermined procedure. The market server 31 transmits information indicating the successfully bid on the adjustment capacity (hereinafter referred to as "winning bid information") to the successful bidder. The winning bid information indicates the winning bid price, the power that needs to be adjusted, and the start and end times of the adjustment. The winning bid information may also include identification information specifying the charge / discharge device 33 that will perform the adjustment. The market server 31 transmits the winning bid information to the management server 32, but may also transmit it to the bidder's PC, tablet terminal, or mobile phone.

[0056] [1-3-2. Management Server] Figure 4 is a functional block diagram showing the functional blocks included in the management server 32. The management server 32 is a server that requests the charging / discharging device to charge or discharge the energy storage device. The management server 32 also receives the successful bid information transmitted by the market server 31. The management server 32 includes, as a functional block, a history acquisition unit 41, a determination unit 43, a transmission unit 45, an adjustment time acquisition unit 44, and an energy storage capacity acquisition unit 42.

[0057] [History Acquisition Section] Figure 5 shows an example of charge / discharge power and cumulative charge power when supply and demand adjustments are implemented. The history acquisition unit 41 acquires a charge / discharge history showing the history of the amount of electricity charged or discharged by the charge / discharge device to the energy storage device during the supply and demand adjustments performed in the past. The charge / discharge power is the power charged or discharged by the energy storage device when the charge / discharge device performed supply and demand adjustments. For example, each time the charge / discharge device 33 performs a supply and demand adjustment, it sends the charge / discharge history of the performed supply and demand adjustment to the management server 32, and the management server 32 stores the transmitted charge / discharge history in memory 32b. The storage location is not limited to the management server's memory 32b, but may also be the market server's memory 31b or the charge / discharge device's memory 33b.

[0058] The diagram shown at the top of Figure 5 illustrates an example of charging and discharging power. In the example shown in Figure 5, the energy storage device is initially charged after the start of supply and demand adjustment, then discharged, and after a period of no charging or discharging, it is charged again, and the supply and demand adjustment is completed. In other words, during the period when the energy storage device is being charged, it absorbs surplus power in the power grid and contributes to lowering the frequency of the power grid. On the other hand, during the period when the energy storage device is discharging, it supplies power that is insufficient in the power grid and contributes to raising the frequency of the power grid.

[0059] The diagram shown at the bottom of Figure 5 is an example of cumulative charging power. Cumulative charging power is the cumulative value of charging and discharging power. In other words, it is the integral of charging and discharging power. In the example shown in Figure 5, during the initial period when the energy storage device 34 is being charged, power flows into the secondary battery 34f, and the amount of stored energy increases. When the energy storage device 34 then starts discharging, power flows out of the secondary battery 34f, and the amount of stored energy decreases. During periods when the energy storage device 34 is neither charging nor discharging, no power flows into or out of the secondary battery 34f, and the amount of stored energy remains constant. When the energy storage device 34 starts charging, power flows into the secondary battery 34f, and the amount of stored energy increases. That is, the amount of stored energy in the secondary battery 34f changes according to the cumulative charging power.

[0060] The history acquisition unit 41 acquires the history of either the charge / discharge power or the cumulative charge power from supply and demand adjustments performed in the past. The history of charge / discharge power and cumulative charge power is stored in the memory 33b of the charge / discharge device 33, for example, when supply and demand adjustments are made. The history acquisition unit 41 acquires the history of either the charge / discharge power or the cumulative charge power from the memory 33b. If the history of charge / discharge power is acquired, the history acquisition unit 41 integrates the acquired history of charge / discharge power to acquire the history of cumulative charge power. The history acquisition unit 41 acquires the history of either the charge / discharge power or the cumulative charge power at the time of the supply and demand adjustment each time the charge / discharge power undergoes a supply and demand adjustment.

[0061] The charge / discharge history may show the history of the amount of electricity each of the multiple charge / discharge devices used to charge or discharge multiple energy storage devices during past supply and demand adjustments. This allows the determination unit 43, described later, to determine the target remaining energy amount considering the charge / discharge history of the multiple energy storage devices. In this case, differences may arise, such as different storage capacities for each energy storage device or different times when supply and demand adjustments are performed. For example, if the storage capacities are different, the target remaining energy amount can be determined based on the ratio to the storage capacity of each energy storage device. Also, if the times when supply and demand adjustments are performed are different, a predetermined coefficient can be applied to correct this for each time period.

[0062] [Energy storage capacity acquisition unit] The energy storage capacity acquisition unit 42 acquires the energy storage capacity of the energy storage device 34. If the energy storage device 34 has stored the energy storage capacity, the energy storage capacity acquisition unit 42 sends a command to the charge / discharge device 33 to acquire the energy storage capacity of the energy storage device 34 and send the acquired energy storage capacity to the management server 32, thereby acquiring the energy storage capacity. If the charge / discharge device 33 has stored the energy storage capacity, the energy storage capacity acquisition unit 42 sends a command to the charge / discharge device 33 to send the stored energy storage capacity to the management server 32, thereby acquiring the energy storage capacity. If the energy storage device 34 has stored the energy storage capacity, for example, in a database, the energy storage capacity acquisition unit 42 acquires the energy storage capacity by referring to the database.

[0063] [Decision Section] The determination unit 43 determines the target remaining power amount, which is the target value of the remaining power amount of the energy storage device before the supply and demand adjustment is performed, based on the charge and discharge history acquired by the history acquisition unit. The determination unit 43 may also determine the target remaining power amount based on the energy storage capacity and at least one of the maximum charge amount and maximum discharge amount of the energy storage device in the charge and discharge history.

[0064] Specifically, in order for the energy storage device 34 to adjust supply and demand to the maximum extent, the determination unit 43 refers to past charge and discharge history to identify the largest cumulative charge power value, and then determines the target remaining energy amount so that the energy storage device 34 can charge the identified cumulative charge power. More specifically, before performing supply and demand adjustment, the energy storage device 34 needs to have enough capacity to charge the maximum cumulative charge power. Here, capacity is the value obtained by subtracting the amount of energy currently stored in the energy storage device 34 (hereinafter referred to as "remaining energy") from the energy storage capacity of the energy storage device 34. Hereafter, this capacity will be referred to as energy storage capacity. Therefore, there is a relationship between energy storage capacity, energy storage capacity, and remaining energy: "Energy storage capacity = Energy storage capacity + Remaining energy".

[0065] Therefore, in supply and demand adjustment, for the energy storage device 34 to charge with the maximum cumulative charging power acquired by the history acquisition unit 41, the remaining energy storage capacity must be greater than or equal to the maximum cumulative charging power acquired by the history acquisition unit 41. In other words, the relationship "remaining energy storage capacity > maximum cumulative charging power" is required. Since the relationship "storage capacity = remaining energy storage capacity + remaining energy" is given, the remaining energy must be "remaining energy < storage capacity - maximum cumulative charging power". Accordingly, the determination unit 43 determines the target remaining energy amount, which is the target value of the remaining energy amount, based on the charge and discharge history acquired by the history acquisition unit 41, so that the relationship "remaining energy amount < storage capacity - maximum cumulative charging power" is satisfied.

[0066] On the other hand, in supply and demand adjustment, in order for the energy storage device 34 to discharge to the minimum accumulated charge power acquired by the history acquisition unit 41, the remaining energy must be greater than or equal to the maximum accumulated discharge power acquired by the history acquisition unit 41. In other words, the maximum accumulated discharge power is the minimum accumulated charge power. Therefore, the determination unit 43 determines the target remaining energy, which is the target value of the remaining energy, based on the charge and discharge history acquired by the history acquisition unit 41, so that the relationship "remaining energy > maximum accumulated discharge power" holds true.

[0067] Therefore, before initiating supply and demand adjustment, the remaining power is adjusted so that the largest cumulative charge power can be charged to the energy storage device 34 by referring to past charge and discharge history. As a result, the charge and discharge device 33 can perform supply and demand adjustment offline without communicating with the management server during the period in which it is performed. Furthermore, before initiating supply and demand adjustment, the remaining power is adjusted so that the smallest cumulative charge power, i.e., the largest cumulative discharge power, can be discharged by the energy storage device 34 by referring to past charge and discharge history. As a result, the charge and discharge device 33 can perform supply and demand adjustment offline without communicating with the management server during the period in which it is performed.

[0068] The determination unit 43 may determine the target remaining energy based on a histogram of at least one of the maximum charge amount and the maximum discharge amount. Figure 6 shows an example of a histogram of the maximum charge amount. The horizontal axis represents the maximum value of cumulative charging power in supply and demand adjustment, classified into 1kWh intervals. The vertical axis represents the number of times the cumulative charging power with the maximum value in that interval appeared. The determination unit 43 determines the target remaining energy to cover, for example, 80% of the maximum values ​​of cumulative charging power that have appeared. In the case of Figure 6, the target remaining energy is determined to cover the lowest 20 samples out of 24 samples.

[0069] [Adjustment time acquisition section] The adjustment time acquisition unit 44 acquires the scheduled start time and scheduled end time of the supply and demand adjustment. Specifically, the start time and end time of the supply and demand adjustment include the successful bid information transmitted by the market server 31 via the communication line 36, as described above. The adjustment time acquisition unit 44 receives the transmitted successful bid information via the communication I / F 32c and acquires the start time and end time of the supply and demand adjustment from the received successful bid information. If the successful bid information is transmitted from the successful bidder's mobile phone, etc., the unit receives the successful bid information transmitted from the mobile phone, etc., and acquires the start time and end time of the supply and demand adjustment from the received successful bid information.

[0070] [Transmitter] The transmitting unit 45 transmits target information, which indicates the target remaining power amount determined by the determination unit 43, to the charging / discharging device. The transmitting unit 45 transmits the target information to the charging / discharging device 33 via the communication I / F 32c and the communication line 36. The transmitting unit 45 also transmits time information, which indicates the scheduled start time and scheduled end time, acquired by the adjustment time acquisition unit 44, to the charging / discharging device 33.

[0071] [1-3-3. Charge / discharge device] The charge / discharge device 33 charges the energy storage device 34 with power supplied from the power grid and discharges the energy storage device 34 to supply power to the power grid. The charge / discharge device 33 receives target information transmitted by the transmission unit 45 of the management server 32. Based on the received target information, the charge / discharge device 33 controls the charge / discharge circuit during the period before supply and demand adjustment is performed, and charges and discharges the energy storage device so that the remaining power amount becomes the target remaining power amount. During the supply and demand adjustment period, the charge / discharge device 33 performs supply and demand adjustment within the range of power that needs to be adjusted, as included in the successful bid information.

[0072] The charging / discharging device 33 may perform limiting control to restrict charging to the energy storage device 34 if, during a predetermined period before the start of supply and demand adjustment, the remaining energy in the energy storage device 34 is greater than a reference energy amount based on the target remaining energy amount. The predetermined period before the start of supply and demand adjustment is, for example, the period from one hour before the start of supply and demand adjustment until the start of supply and demand adjustment. The reference energy amount based on the target remaining energy amount is, for example, 95% of the target remaining energy amount. The limiting control to restrict charging to the energy storage device 34 is, for example, a limiting control that limits the charging current to the energy storage device 34 to zero or 10% of the normal charging current. That is, as an example, during the period from one hour before the start of supply and demand adjustment until the start of supply and demand adjustment, if the remaining energy is greater than 95% of the target remaining energy amount, the charging current to the energy storage device 34 is limited to 10% of the normal amount. By restricting in this way, the purchase of electricity from the power grid is suppressed, and the sale of electricity generated from renewable energy to the power grid is promoted, making supply and demand adjustment more economical.

[0073] The charge / discharge circuit 33f is controlled by the control unit 33a. The charge / discharge circuit 33f charges and discharges the energy storage device 34 under the control of the control unit 33a. The charge / discharge circuit 33f is, for example, an inverter. The inverter converts a predetermined voltage AC from the power grid to a predetermined voltage DC required when the secondary battery 34f is charged. The inverter also converts a predetermined voltage DC from the energy storage device 34 to supply a predetermined voltage AC to the power grid.

[0074] Communication I / F 33e communicates with the energy storage device 34 via the communication bus 38 and communication I / F 34e. The charge / discharge device 33 obtains information including the energy storage capacity and remaining power of the energy storage device 34 through this communication. The charge / discharge device 33 also transmits commands to the energy storage device 34 through this communication.

[0075] As described above, the charge / discharge device 33 controls the charge / discharge circuit based on the target information received by the charge / discharge device 33, and performs charging and discharging to bring the remaining energy of the energy storage device to the target remaining energy. However, even during the period when the charge / discharge device 33 is charging and discharging to bring the remaining energy of the energy storage device 34 to the target remaining energy, EV users may want to charge the energy storage device 34 beyond the target remaining energy. For example, this may happen if they have plans to go somewhere. To meet such demands, the charge / discharge device 33 may be configured so that the user can operate to charge the energy storage device 34 beyond the target remaining energy.

[0076] [1-3-4. Energy Storage Devices] The energy storage device 34 converts electrical energy into chemical energy or the like for storage, and extracts power as needed. Specifically, the energy storage device 34 charges the secondary battery 34f it contains with power supplied from the power grid, and discharges it to supply power to the power grid. The control unit 34a, memory 34b, and communication interface 34e of the energy storage device 34 manage the secondary battery 34f. The management of the secondary battery 34f includes obtaining the remaining energy of the secondary battery 34f and storing its charge capacity.

[0077] [1-3-5. Bidder Terminal] The bidder terminal 35 is a terminal used by bidders to transmit bid information to the supply and demand adjustment market, as well as to transmit successful bid information. Bidders input bid information by touching the touch panel. The successful bid information is displayed on the LCD screen.

[0078] [1-4. Overall System Operation] Figure 7 is a sequence diagram showing the operation of the entire system, including the supply and demand adjustment system.

[0079] [Bidding terminal] [Step S01] The bidder terminal 35 transmits the bid information to the market server 31. The bid information is entered, for example, by the bidder operating the touch panel. After the bidder terminal 35 transmits the bid information, the process proceeds to step S02.

[0080] [Market Server] [Step S02] Next, the market server 31 receives the bid information transmitted by the bidder terminal. The market server 31 auctions the adjustment power that the bidder intends to win, as indicated by the received bid information, against the adjustment power offered by the seller, according to a predetermined procedure, and determines the winning bid. The market server 31 transmits the winning bid information, including the information of the winning bid, to the management server 32 indicated by the winning bid information. If the winning bid information indicates a charge / discharge device 33 or an energy storage device 34, the market server 31 identifies the management server 32 that manages the charge / discharge device 33 or energy storage device 34, according to a predetermined procedure. The market server 31 transmits the winning bid information to the identified management server 32. The market server 31 may also transmit the winning bid information to the bidder terminal 35. In this case, since the winning bid information is transmitted to the bidder terminal 35, the bidder inputs the winning bid information into the charge / discharge device 33 or transmits the winning bid information to the management server 32, according to a predetermined procedure such as operating the charge / discharge device 33. After the market server 31 sends the successful bid information, it proceeds to step S03.

[0081] [Management Server] [Step S03] Next, the history acquisition unit 41 of the management server 32, which has received the successful bid information, first acquires a charge / discharge history showing the history of the amount of electricity charged or discharged by the charge / discharge device to the energy storage device in the supply and demand adjustments performed in the past. Each time the charge / discharge device 33 performs a supply and demand adjustment, it sends the charge / discharge history of the performed supply and demand adjustment to the management server 32, and the management server 32 stores the transmitted charge / discharge history in memory 32b, so the history acquisition unit 41 accesses memory 32b to acquire the charge / discharge history. If the charge / discharge history is stored in a location other than memory 32b, the history acquisition unit 41 accesses the location where the charge / discharge history is stored and acquires the charge / discharge history. Note that the charge / discharge history may show the history of the amount of electricity charged or discharged by each of the multiple charge / discharge devices to multiple energy storage devices in the supply and demand adjustments performed in the past. After the history acquisition unit 41 has acquired the charge / discharge history, the process proceeds to step S04.

[0082] [Step S04] Next, the energy storage capacity acquisition unit 42 acquires the energy storage capacity of the energy storage device. If the energy storage device 34 has stored the energy storage capacity, the energy storage capacity acquisition unit 42 sends a command to the charge / discharge device 33 to acquire the energy storage capacity of the energy storage device 34 and send the acquired energy storage capacity to the management server, thereby acquiring the energy storage capacity. If the charge / discharge device 33 has stored the energy storage capacity, the energy storage capacity acquisition unit 42 sends a command to the charge / discharge device 33 to send the stored energy storage capacity to the management server, thereby acquiring the energy storage capacity. If the energy storage device 34 has stored the energy storage capacity, for example, in a database, the energy storage capacity acquisition unit 42 acquires the energy storage capacity by referring to the database. After the energy storage capacity acquisition unit 42 has acquired the energy storage capacity, the process proceeds to step S05.

[0083] [Step S05] Next, the determination unit 43 determines the target remaining energy amount, which is the target value of the remaining energy amount of the energy storage device before the supply and demand adjustment is performed, based on the charge and discharge history acquired by the history acquisition unit. Specifically, the determination unit 43 determines the target remaining energy amount, which is the target value of the remaining energy amount, based on the charge and discharge history acquired by the history acquisition unit 41, such that the relationship "remaining energy amount < energy storage capacity - maximum cumulative charging power" holds true. The energy storage capacity is acquired by the energy storage capacity acquisition unit 42. The determination unit 43 identifies the maximum value by referring to the charge / discharge history acquired by the history acquisition unit 41, and determines the maximum cumulative charge power. The determination unit 43 may also determine the target remaining power amount based on the histogram of at least one of the maximum charge amount and the maximum discharge amount. After the determination unit 43 has determined the target remaining power amount, the process proceeds to step S06.

[0084] [Step S06] Next, the adjustment time acquisition unit 44 acquires the scheduled start time and scheduled end time of the supply and demand adjustment. Specifically, the start time and end time of the supply and demand adjustment are included in the successful bid information transmitted from the market server 31 to the management server 32. The adjustment time acquisition unit 44 acquires the start time and end time of the supply and demand adjustment from the received successful bid information. If the successful bid information is transmitted from the successful bidder's mobile phone, etc., the adjustment time acquisition unit 44 receives the successful bid information transmitted from the mobile phone, etc., and acquires the start time and end time of the supply and demand adjustment from the received successful bid information. After the adjustment time acquisition unit 44 has acquired the scheduled start time and scheduled end time, the process proceeds to step S07.

[0085] [Step S07] Next, the transmitting unit 45 transmits target information, which indicates the target remaining power amount determined by the determination unit 43, to the charging / discharging device 33. The transmitting unit 45 also transmits time information, which indicates the scheduled start time and scheduled end time, obtained by the adjustment time acquisition unit 44, to the charging / discharging device 33. After the transmitting unit 45 transmits the target information and time information, the process proceeds to step S08.

[0086] [Charge / discharge device] [Step S08] Next, the charge / discharge device 33 receives the target information and time information transmitted by the transmission unit 45 of the management server 32. Based on the received target information, the charge / discharge device 33 controls the charge / discharge circuit during the period before supply and demand adjustment is performed, charging and discharging the energy storage device 34 so that the remaining energy of the energy storage device becomes the target remaining energy.

[0087] The charge / discharge device 33 may perform limiting control to restrict charging to the energy storage device 34 if, during a predetermined period before the start of supply and demand adjustment, the remaining energy of the energy storage device 34 is greater than a reference energy amount based on the target remaining energy amount. The predetermined period before the start of supply and demand adjustment is, for example, the period from one hour before the start of supply and demand adjustment until the start of supply and demand adjustment. The reference energy amount based on the target remaining energy amount is, for example, 95% of the target remaining energy amount. The limiting control to restrict charging to the energy storage device 34 is, for example, a limiting control that restricts the charging current to the energy storage device 34 to zero or 10% of the normal charging current. That is, as an example, during the period from one hour before the start of supply and demand adjustment until the start of supply and demand adjustment, if the remaining energy is greater than 95% of the target remaining energy amount, the charging current to the energy storage device 34 is restricted to 10% of the normal amount. When the time has elapsed to the time to start supply and demand adjustment as indicated by the time information, the charge / discharge device 33 proceeds to step S09.

[0088] [Step S09] Next, the charging / discharging device 33 performs supply and demand adjustment during the supply and demand adjustment period, within the range of power that must be adjusted as indicated by the successful bid information. The start and end times of the supply and demand adjustment are indicated by the time information. After the end time of the supply and demand adjustment has elapsed, the charging / discharging device 33 finishes performing the supply and demand adjustment and proceeds to step S10.

[0089] [Step S10] Next, after the charge / discharge device 33 has finished performing supply and demand adjustment, it transmits the charge / discharge history during the supply and demand adjustment to a storage location that stores the charge / discharge history. If the storage location is the charge / discharge device 33, it transmits to the charge / discharge device 33. If the storage location is the management server 32, it transmits to the management server 32. If the storage location is the market server 31, it transmits to the market server 31 via the management server 32. After the charge / discharge device 33 transmits the charge / discharge history, the process proceeds to step S11.

[0090] [Step S11] Next, the charge / discharge device 33, the management server 32, and the market server 31, upon receiving the charge / discharge history, store the history in their respective memories. The stored charge / discharge history is then used during the next supply and demand adjustment. Furthermore, each of the above steps may be moved between the market server 31, the management server 32, and the charging / discharging device 33 to the extent possible.

[0091] [1-5. Summary] As described above, before starting supply and demand adjustment, the remaining power is adjusted so that the largest cumulative charge power can be charged by the energy storage device 34 by referring to past charge and discharge history. Therefore, the charge and discharge device 33 can perform supply and demand adjustment offline without communicating with the management server during the period in which it is performed. The supply and demand adjustment system can respond to fluctuations in the power grid in a short time while performing supply and demand adjustment offline. Although the management server 32 and the charge / discharge device 33 were described as separate devices, they may be combined into a single device.

[0092] <Embodiment 2> [2. Details of Embodiment 2 of this Disclosure] [2-1. Incentives] The supply and demand adjustment system described in this disclosure adjusts the remaining power so that the largest cumulative charge power can be charged to the energy storage device by referring to past charge and discharge history before the supply and demand adjustment begins. As a result, the charge and discharge device can perform supply and demand adjustment offline without communicating with the management server during the period in which the adjustment is performed. Because the system is offline during the period in which the supply and demand adjustment is performed, there are times when the awarded adjustment power cannot be fully fulfilled. In other words, there are times when the accepted reserve power cannot be supplied to or received by the power grid. On the other hand, sellers who require reserve power want the awarded adjustment power to be fulfilled as fully as possible.

[0093] Therefore, some kind of incentive is given to bidders who fully fulfill the adjustment power they won. The incentive shown in Figure 7 is an example of this. For example, the incentive could be a virtual currency that can be paid as payment for the electricity purchased. This would motivate bidders to fulfill the adjustment power they won as much as possible, increasing the probability that the awarded adjustment power will be fully fulfilled.

[0094] [3. Note 1] The embodiments disclosed herein are illustrative in all respects and are not restrictive. The scope of the present invention is indicated by the claims rather than by the embodiments described above, and includes all modifications within the meaning and scope of the equivalents of the claims. [Explanation of symbols]

[0095] 11 Power system 12 Power Plants 12a Thermal power plant 12b Renewable energy power plants 13 Power transmission equipment 14 Substations 15 Power distribution equipment 16 Consumer equipment 17. Energy storage equipment 31 Market Server 31a Control Unit 31b Memory 31c Communication I / F 31d Communications Bus 32 Management Server 32a Control Unit 32b memory 32c Communication I / F 32d Communications Bus 33 Charge / discharge device 33a Control Unit 33b Memory 33c Communication I / F 33d Communications Bus 33f charge / discharge circuit 34 Energy storage device 34a Control Unit 34b memory 34c Communication I / F 34d Communications Bus 34f secondary battery 35 Bidders' Terminals 35a Control Unit 35b memory 35c Communication I / F 35d Communications Bus 35e input / output section 36 Communication lines 37 Power Cables 38 Communications Bus 41 History Acquisition Unit 42 Energy storage capacity acquisition unit 43 Decision Section 44 Adjustment time acquisition section 45 Transmitter

Claims

1. A supply and demand adjustment device for performing supply and demand adjustments for each of multiple charge and discharge devices connected to a power grid, A history acquisition unit that acquires a charge / discharge history showing the amount of electricity charged or discharged by the charge / discharge device in past supply and demand adjustments for at least one of the plurality of charge / discharge devices, A determination unit that determines a target value for the remaining energy of the energy storage device before the start of the next supply and demand adjustment based on the charge and discharge history, A control unit that limits the charging of the energy storage device during a predetermined period before the start of the next supply and demand adjustment, based on the aforementioned target value, Equipped with, Supply and demand adjustment device.

2. The determination unit calculates at least one of the maximum charge amount and the maximum discharge amount of the energy storage device based on the charge and discharge history. The target value of the remaining energy is determined based on at least one of the calculated maximum charge amount and maximum discharge amount. The supply and demand adjustment device according to claim 1.

3. The determination unit determines a target value for the remaining energy based on the histogram of at least one of the maximum charge amount and the maximum discharge amount. The supply and demand adjustment device according to claim 2.

4. The determination unit determines at least one of the maximum target value and the minimum target value of the remaining power. The supply and demand adjustment device according to claim 1.

5. The control unit restricts charging during a predetermined period before the start of the next supply and demand adjustment so that the remaining power does not exceed the maximum target value. The supply and demand adjustment device according to claim 4.

6. The control unit charges and discharges the energy storage device during a predetermined period before the start of the next supply and demand adjustment, such that the remaining energy amount becomes the minimum target value. The supply and demand adjustment device according to claim 4.

7. The charge / discharge history is acquired for each of the multiple charge / discharge devices. The determination unit determines a target value for the remaining power of each charge / discharge device based on the charge / discharge history of each of the plurality of charge / discharge devices. A supply and demand adjustment device according to any one of claims 1 to 6.

8. A computer program for operating a computer that controls a supply and demand adjustment device according to any one of claims 1 to 6, The history acquisition unit performs a history acquisition step of acquiring the charge / discharge history, The determination unit performs a determination step of determining the target value, The control unit performs a control step of limiting the charging of the energy storage device during a predetermined period before the start of the next supply and demand adjustment, based on the target value. A computer program designed to execute something.

9. A supply and demand adjustment method performed by a supply and demand adjustment device according to any one of claims 1 to 6, The history acquisition unit performs a history acquisition step of acquiring the charge / discharge history, The determination unit performs a determination step of determining the target value, The control unit performs a control step of limiting the charging of the energy storage device during a predetermined period before the start of the next supply and demand adjustment, based on the target value. A supply and demand adjustment method, including the above.

Citation Information

Patent Citations

  • Energy management method and energy management device

    JP2020137395A

  • Server and power management system

    JP2021093831A