Hybrid electrolytic plants and related methods, media, and computer program products
A hybrid electrolytic plant with an energy storage unit addresses the slow response of electrolytic cells by distributing frequency-response power, ensuring rapid grid frequency adjustments.
Patent Information
- Application Number
- JP2026522603
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Priority Date
- 2023-10-25
- Filing Date
- 2024-10-16
- Publication Date
- 2026-11-19
AI Technical Summary
Electrolysis plants are unable to provide the fast frequency response required by grid operators due to the slow response of electrolytic cells, and existing solutions like adding an auxiliary converter do not adequately address this issue.
A hybrid electrolytic plant system comprising an electrolytic device and an energy storage unit, which distributes frequency-response power to compensate for the slow response of the electrolytic device, allowing for rapid adjustment of grid-connected active power.
The system provides a fast frequency response to grid disturbances by leveraging the energy storage unit to complement the slow response of the electrolytic device, meeting grid operator requirements.
Smart Images

Figure 2026538988000001_ABST
Abstract
Description
TECHNICAL FIELD
[0001] Technical Field The present disclosure relates to a hybrid electrolysis plant, a method for operating a hybrid electrolysis plant, a computer-readable storage medium, and a computer program product.
BACKGROUND ART
[0002] Background Hydrogen, as an environmentally friendly energy carrier, can power a variety of applications such as long-distance transport (e.g., via heavy-duty trucks, airplanes, ferries, etc.), steelmaking, and ammonia production. Currently, hydrogen is produced by electrolyzing water in electrolysis plants.
[0003] However, the response of the electrolysis devices in electrolysis plants is usually too slow to provide grid ancillary services, such as frequency response services, as required by grid operators.
[0004] The prior art document "A Novel Multi-Scale Frequency Regulation Method for Hybrid Rectifier Circuits and Its Specific Application to Electrolytic Hydrogen Production" discloses that an auxiliary converter is installed between the grid connection point and the electrolysis device to compensate for the rather slow response of the main converter connected between the grid connection point and the electrolysis device. However, this prior art document ignores the fact that the main reason why electrolysis plants cannot provide the relatively fast response required by grid operators is the rather slow response of the electrolytic cell itself, rather than the main converter. Therefore, adding an auxiliary converter as in the above prior art document cannot solve the problem that the electrolysis plant cannot provide the relatively fast response required by grid operators.
[0005] The methods described in this section are not necessarily previously conceived or adopted. Unless otherwise specified, none of the methods described in this section should be considered prior art simply because they are included in this section. Similarly, the problems mentioned in this section should not be considered universally recognized in any prior art unless otherwise specified. [Overview of the Initiative] [Problems that the invention aims to solve]
[0006] overview This disclosure provides a hybrid electrolytic plant, a method for operating a hybrid electrolytic plant, a computer-readable storage medium, and a computer program product. [Means for solving the problem]
[0007] According to one aspect of the present disclosure, a method for operating a hybrid electrolytic plant is provided. The hybrid electrolytic plant comprises an electrolytic device and an energy storage unit, which are connected to a grid at a grid connection point. The method comprises determining a frequency-response power in response to satisfying a frequency response condition, the frequency response condition comprising at least one of receiving a frequency adjustment service command from a grid control center of the grid and detecting frequency disturbances in the grid, and the method comprises distributing the frequency-response power to the electrolytic device and the energy storage unit, at least in part on the response characteristics of the electrolytic device, to adjust the grid-connected active power of the hybrid electrolysis plant taking the frequency-response power into consideration. According to some embodiments, by distributing the frequency-response power corresponding to the frequency response to the electrolytic device and the energy storage unit, the energy storage unit can compensate for a fairly slow response of the electrolytic device, thereby providing a fairly fast frequency response of the grid-connected active power as determined by the grid operator.
[0008] According to some embodiments, determining the frequency response power in response to satisfying a frequency response condition includes determining a response curve of the frequency response power according to at least one of a received frequency regulation service command and the grid frequency in response to satisfying a frequency response condition at response initiation timing, wherein the response curve of the frequency response power changes by the total contracted power during the total ramp period, and the frequency response power is determined based on the response curve of the frequency response power and the time from response initiation timing. According to some embodiments, different types of grid frequency regulation services can be implemented according to at least one of a received frequency regulation service command and the grid frequency.
[0009] According to some embodiments, the response characteristics of an electrolytic device include the rate of change of the active power of the electrolytic device. According to some embodiments, distributing frequency response power to an electrolytic device and an energy storage unit includes setting a first contracted power based at least in part on the total contracted power, the first contracted power being distributed to the electrolytic device, and the response curve of the active power of the electrolytic device changing by the amount of the first contracted power during the electrolytic device ramp period according to the rate of change of the active power of the electrolytic device, and determining a second contracted power based on the total contracted power and the first contracted power, the second contracted power being distributed to an energy storage unit, and including determining the rate of change of grid-connected active power based on the total contracted power and the total ramp period, determining the response curve of the active power of the energy storage unit based on the rate of change of grid-connected active power, the total ramp period, the rate of change of the active power of the electrolytic device, the electrolytic device ramp period, and the second contracted power, and setting the active power of the energy storage unit based on the response curve of the active power of the energy storage unit and the time from the response start timing. According to some embodiments, the active power response curve of the energy storage unit can be set to compensate for a fairly slow rate of change in the active power of the electrolytic unit, which would be insufficient to meet grid requirements with the electrolytic unit alone.
[0010] According to some embodiments, setting a first contracted power based at least in part on the total contracted power includes at least one of setting a first contracted power based on the total contracted power and the grid electricity rate in response to the grid electricity rate being greater than a rate threshold, and setting the first contracted power as the total contracted power in response to the charge state of the energy storage unit being lower than a storage threshold, wherein the first contracted power is less than the total contracted power. According to some embodiments, it is possible to achieve a balance between the economic efficiency of the hybrid electrolysis plant and / or the state of charge of the energy storage unit.
[0011] According to some embodiments, determining the response curve of the active power of an energy storage unit based on the rate of change of grid-connected active power, total ramp period, rate of change of the active power of the electrolytic unit, electrolytic unit ramp period, and second contracted power includes determining a first rate of change of the active power of the energy storage unit based on the rate of change of the active power of the electrolytic unit and the rate of change of grid-connected active power, where the first rate of change is the rate of change of the active power of the energy storage unit from response start timing during the total ramp period; determining a second rate of change of the active power of the energy storage unit based on the rate of change of the active power of the electrolytic unit, where the second rate of change is the rate of change of the active power of the energy storage unit after the total ramp period has elapsed from response start timing during the electrolytic unit ramp period; and determining the response curve of the active power of the energy storage unit based on the total ramp period, electrolytic unit ramp period, first and second rates of change of the active power of the energy storage unit, and second contracted power. According to some embodiments, the rate of change of the active power of the energy storage unit can be set to compensate for a fairly slow rate of change of the active power of the electrolytic unit.
[0012] According to some embodiments, a method for operating a hybrid electrolytic plant further includes determining the frequency-response power according to a frequency-response power recovery curve in response to satisfying recovery conditions at recovery initiation timing, the recovery conditions including at least one of detecting that a support period has elapsed from response initiation timing, receiving a service termination command, and detecting that the grid frequency is within the frequency recovery range, the frequency-response power recovery curve recovers to the grid-connected active power of the hybrid electrolytic plant at recovery initiation timing, at a recovery rate change from recovery initiation timing, and / or during the recovery period. According to some embodiments, termination of frequency-response service can be performed, and the frequency-response power can be determined according to a frequency-response power recovery curve, thereby satisfying the grid operator's requirements for termination of frequency-response service.
[0013] According to some embodiments, detecting grid frequency disturbances includes detecting grid frequency disturbances based on at least one of the grid frequency, the amount of change in the grid frequency, and the rate of change of the grid frequency. According to some embodiments, grid frequency disturbances can be accurately detected.
[0014] According to some embodiments, detecting a grid frequency disturbance based on at least one of the grid frequency, the amount of change in the grid frequency, and the rate of change in the grid frequency includes at least one of detecting that the grid frequency is below a first frequency threshold, that the grid frequency is above a second frequency threshold, that the amount of change in the grid frequency is greater than a threshold for the amount of change, and that the rate of change in the grid frequency is greater than a threshold for the rate of change. According to some embodiments, frequency disturbances can be detected according to different criteria.
[0015] According to some embodiments, a method for operating a hybrid electrolytic plant further includes setting the active power of an energy storage unit according to at least one of the grid electricity rates, the hydrogen demand of the hybrid electrolytic plant, and the charge state of the energy storage unit, in response to the frequency response conditions not being met after the hybrid electrolytic plant has started up, or to the frequency response power recovering to the grid-connected active power of the hybrid electrolytic plant at the response start timing. According to some embodiments, the hybrid electrolytic plant has operational adaptability to optimize hydrogen production and charging / discharging of the integrated energy storage system based on available information on market energy prices and / or the charge state of the energy storage unit.
[0016] According to some embodiments, the energy storage unit comprises a battery and a supercapacitor, and the distribution of frequency-responsive power to the electrolytic device and the energy storage unit further includes distributing the active power of the energy storage unit to the supercapacitor in response to the support period corresponding to the frequency-responsive condition being shorter than a period threshold, and distributing the active power of the energy storage unit to the battery in response to the support period corresponding to the frequency-responsive condition being greater than or equal to a period threshold. According to some embodiments, the active power of the energy storage unit can be distributed to different types of energy storage units according to the support period.
[0017] According to some embodiments, a method for operating a hybrid electrolytic plant further includes, in response to detecting that the voltage at the grid connection point is lower than an LVRT threshold, reducing the active power of the electrolytic unit to a lower limit of the active power of the electrolytic unit, setting the active power of the energy storage unit as the active power of the electrolytic unit, and setting the grid-connected reactive power of the hybrid electrolytic plant based on the grid voltage. According to some embodiments, the energy storage unit ensures the reliability of the electrolytic unit and avoids long restart times for the electrolytic unit by providing active power to the electrolytic unit to maintain its operation. By reducing the active power of the electrolytic unit to a lower limit, the energy consumption of the energy storage unit is reduced. The hybrid electrolytic plant supports the grid by providing reactive power to the grid.
[0018] According to some embodiments, a method for operating a hybrid electrolytic plant further includes setting the grid-connected reactive power of the hybrid electrolytic plant based on the grid voltage in response to detecting that the voltage at the grid connection point is lower than a first voltage threshold or higher than a second voltage threshold, where the first voltage threshold is lower than the second voltage threshold. According to some embodiments, the hybrid electrolytic plant can provide a reactive power versus voltage service.
[0019] According to some embodiments, a method for operating a hybrid electrolytic plant further includes setting the grid-connected reactive power of the hybrid electrolytic plant based on the power factor of the grid in response to detection that the power factor at the grid connection point is lower than a power factor threshold. According to some embodiments, the hybrid electrolytic plant can provide high power factor operation.
[0020] According to another aspect of the present disclosure, a grid-connected hybrid electrolytic plant is provided. The hybrid electrolytic plant comprises an electrolytic device, an energy storage unit, and a plant controller configured to perform any one of the claims described in the present disclosure.
[0021] According to yet another aspect of the present disclosure, a computer-readable storage medium is provided. The computer-readable storage medium stores computer-readable instructions that, when executed by a processor, cause the processor to perform any one of the claims set forth in the present disclosure.
[0022] According to yet another aspect of the present disclosure, a computer program product is provided. The computer program product, when executed by a computer, causes the computer to perform any one of the claims set forth in the present disclosure.
[0023] Since the technical effects of the above-described method can be applied to the hybrid electrolysis plant, the computer-readable storage medium, and the computer program product, descriptions thereof are omitted herein.
[0024] It should be understood that the content set forth in this section is not intended to identify key or essential features of the embodiments of the present disclosure, nor is it intended to limit the scope of the present disclosure. Other features of the present disclosure will be readily appreciated through the following specification.
[0025] The drawings illustrate embodiments and constitute a part of the specification. Together with the written description of the specification, the drawings are used to show exemplary implementations of the embodiments. The illustrated embodiments are for illustrative purposes only and do not limit the scope of the claims. Throughout all the drawings, similar reference numerals denote similar elements, which are not necessarily identical elements. [Brief Description of the Drawings]
[0026] [Figure 1] 1 is a schematic diagram illustrating a hybrid electrolysis plant in accordance with some embodiments of the present disclosure. [Figure 2] 1 is a flowchart illustrating a method of operating a hybrid electrolysis plant in accordance with some embodiments of the present disclosure. [Figure 3]This is a schematic diagram showing the response curve of frequency response power according to some embodiments of the present disclosure. [Figure 4] This flowchart shows a procedure for distributing the frequency-response power shown in Figure 2 to an electrolytic device and an energy storage unit, according to some embodiments of the present disclosure. [Figure 5A] This is a schematic diagram showing the distribution of frequency-responsive power to the electrolytic device and energy storage unit. [Figure 5B] Schematic diagram showing the distribution of frequency-responsive power to the electrolytic device and energy storage unit. [Figure 6A] This is a schematic diagram showing the distribution of frequency-responsive power to the electrolytic device and energy storage unit. [Figure 6B] This is a schematic diagram showing the distribution of frequency-responsive power to the electrolytic device and energy storage unit. [Figure 7A] This is a schematic diagram showing the distribution of frequency-responsive power to the electrolytic device and energy storage unit. [Figure 7B] This is a schematic diagram showing the distribution of frequency-responsive power to the electrolytic device and energy storage unit. [Figure 8] This is a schematic diagram showing a computing device that can be used in accordance with the methods disclosed in this disclosure. [Modes for carrying out the invention]
[0027] Detailed description of the embodiment The present disclosure will be described in detail below with reference to the drawings and embodiments. It should be understood that the embodiments described herein are not intended to limit the present disclosure, but are merely used to illustrate the relevant disclosures. For the sake of clarity, the drawings show only the parts relevant to the relevant disclosures.
[0028] Furthermore, the embodiments and features of these embodiments can be combined with each other without contradiction. Unless otherwise explicitly stated in the context, if the number of elements is not specifically defined, there may be one or more elements. Also, the number of steps or functional modules used in this disclosure is used merely to identify the steps or functional modules and does not limit the order in which the steps are performed or the relationships between the functional modules. When used in this disclosure, the term "and / or" includes any combination or all combinations of one or more items from the enumerated items. The term "based on" should be interpreted as "based on at least in part."
[0029] Currently, grid operators may require electrolytic plants to provide grid support services, such as frequency response services. In particular, frequency response services require electrolytic plants to help the grid navigate frequency disturbances by rapidly adjusting (i.e., increasing or decreasing) the grid's active power demand and providing active power support to the grid. However, the response of electrolytic devices within an electrolytic plant is usually too slow to meet the fairly fast response required by grid operators.
[0030] To solve the above problems, the Disclosure provides a method for operating a hybrid electrolytic plant, the hybrid electrolytic plant comprising an electrolyzer and an energy storage unit, connected to a grid at a grid connection point, the method comprising determining a frequency response power in response to satisfying a frequency response condition, the frequency response condition comprising at least one of receiving a frequency adjustment service command from a grid control center of the grid and detecting frequency disturbances in the grid, and the method comprising distributing the frequency response power to the electrolyzer and the energy storage unit, at least in part on the response characteristics of the electrolyzer, to adjust the grid-connected active power of the hybrid electrolysis plant taking the frequency response power into consideration.
[0031] Furthermore, this disclosure provides a grid-connected hybrid electrolytic plant. The hybrid electrolytic plant comprises an electrolytic unit, an energy storage unit, and a plant controller configured to perform any of the methods of this disclosure.
[0032] According to some embodiments, by distributing frequency-response power corresponding to the frequency response to the electrolytic device and the energy storage unit, the energy storage unit can compensate for the fairly slow response of the electrolytic device, thereby providing a fairly fast frequency response of the grid-connected active power required by the grid operator.
[0033] Figure 1 is a schematic diagram showing a hybrid electrolytic plant 100 according to some embodiments of the present disclosure.
[0034] As shown in Figure 1, the hybrid electrolysis plant 100 comprises an electrolytic device 101, an energy storage unit 102, and a plant controller 103. Although Figure 1 shows only one electrolytic device 101 and one energy storage unit 102, it should be understood that Figure 1 is merely illustrative and that the hybrid electrolysis plant 100 may include multiple electrolytic devices 101 and / or energy storage units 102. For example, the hybrid electrolysis plant 100 may include multiple electrolytic devices 101 and multiple energy storage units 102.
[0035] Furthermore, as shown in Figure 1, the hybrid electrolysis plant 100 is connected to the grid 110 at the grid connection point 120. According to some embodiments, the plant controller 103 detects electrical parameters (e.g., grid frequency, grid voltage) at the grid connection point in order to control the electrolyzer 101 and the energy storage unit 102.
[0036] According to some embodiments, each of the electrolytic device and energy storage unit has a subcontroller, which receives control signals, such as active power control signals, from the plant controller 103.
[0037] According to some embodiments, the energy storage unit 102 is integrated into the hybrid electrolysis plant 100, i.e., the energy storage unit 102 becomes part of the hybrid electrolysis plant 100. Thus, together with the electrolyzer 101, the energy storage unit 102 can provide frequency-responsive power as required by the grid operator. According to some embodiments, the electrolyzer 101 and the energy storage unit 102 may be connected to the grid 110 via transformers and / or power converters. For example, the electrolyzer 101 and the energy storage unit 102 may be connected to a bus (e.g., a DC bus or an AC bus) via corresponding power converters, and then connected to the grid 110 via grid-connected transformers and / or grid-connected converters. According to some embodiments, multiple buses may be present to improve the reliability and / or capacity of the hybrid electrolysis plant. This disclosure is not intended to limit specific connections between the electrolyzer 101 and the energy storage unit 102 within the hybrid electrolysis plant 100, or between the hybrid electrolysis plant 100 and the grid 110.
[0038] Figure 2 is a flowchart of Method 200 for operating a hybrid electrolytic plant according to some embodiments of the present disclosure. According to some embodiments, Method 200 can be used to operate a hybrid electrolytic plant of the present disclosure (e.g., hybrid electrolytic plant 100 in Figure 1), which comprises an electrolytic device and an energy storage unit and is connected to a grid.
[0039] As shown in Figure 2, Method 200 includes step S210 of determining frequency-response power in response to satisfying frequency response conditions, the frequency response conditions including at least one of receiving frequency adjustment service commands from the grid control center of the grid and detecting frequency disturbances in the grid. Method 200 also includes step S220 of distributing the frequency-response power to the electrolyzer and energy storage units, at least in part, based on the response characteristics of the electrolyzer.
[0040] According to some embodiments, the frequency response service can be initiated, for example, by satisfying a frequency response condition corresponding to one criterion.
[0041] In Example 1, the plant controller receives a frequency adjustment service command from the grid control center when the grid frequency is in a normal state (e.g., the grid frequency is within the acceptable normal frequency deviation range) or an abnormal state (e.g., the grid frequency is outside the acceptable normal frequency deviation range), and activates the instructed frequency response service.
[0042] As an example, the plant controller detects grid frequency disturbances (i.e., the amount of change in grid frequency is greater than a threshold for change, and / or the rate of change (RoCoF) is greater than a threshold for rate of change) based on local measurements, and initiates a corresponding frequency response service with a very short startup time (e.g., less than 1 second) that does not require a service command from the grid control center.
[0043] According to some other embodiments, the frequency response service can be initiated in response to the fulfillment of frequency response conditions corresponding to multiple criteria. For example, the frequency response service can be initiated in response to receiving a frequency adjustment service command and detecting a frequency disturbance. This helps to avoid unintentionally triggering the frequency response service.
[0044] According to some embodiments, “frequency response conditions” refer to conditions for determining whether or not to initiate a frequency response service.
[0045] According to some embodiments, “electrolytic device” refers to a component that can decompose water into hydrogen and oxygen using electricity, “energy storage unit” refers to a component that can store energy and output the stored energy as needed, such as a supercapacitor or battery, and “grid” refers to a network that provides electricity to power consumers.
[0046] According to some embodiments, the frequency services provided by the hybrid electrolytic plant may include inertial response, frequency recovery reserve (FFR), frequency maintenance response (FCR), automatic frequency recovery reserve (aFRR), equilibrium energy and equilibrium capacity (mFRR), and reserve recovery or replacement reserve (RR). According to some embodiments, the frequency services can be initiated according to frequency adjustment service commands from a grid control center and / or local frequency measurements of the hybrid electrolytic plant.
[0047] According to some embodiments, a “frequency regulation service directive” refers to a directive from a grid control center indicating that a plant should provide specific frequency services. These specific frequency services define the active power regulation of the plant.
[0048] According to some embodiments, "grid control center" refers to a grid control center that controls the power flow of the grid.
[0049] According to some embodiments, “frequency-responsive power” refers to the power required for a hybrid electrolytic plant to provide frequency regulation services by adjusting in response to satisfying frequency response conditions.
[0050] According to some embodiments, the "response characteristics" of an electrolytic device are characteristics that reflect the rate of change of the active power of the electrolytic device when the active power of the electrolytic device changes from one value to another.
[0051] According to some embodiments, "grid-connected active power" refers to the active power at the grid connection point. When active power flows from the grid to the hybrid electrolysis plant, the grid-connected active power is positive, and when active power flows from the hybrid electrolysis plant to the grid, the grid-connected active power is negative.
[0052] According to some embodiments, "active power of the electrolytic device" refers to the active power consumed by the electrolytic device.
[0053] According to some embodiments, "active power of the energy storage unit" refers to the active power that the energy storage unit is charging or discharging. When the energy storage unit is discharging, the active power of the energy storage unit is positive, and when the energy storage unit is charging, the active power of the energy storage unit is negative.
[0054] According to some embodiments, detecting grid frequency disturbances includes detecting grid frequency disturbances based on at least one of the grid frequency, the amount of change in the grid frequency, and the rate of change in the grid frequency. According to some embodiments of the present disclosure, grid frequency disturbances can be accurately detected.
[0055] According to some embodiments, the rate of change of the grid frequency is calculated based on the difference between the measured frequency of the grid and the fundamental frequency of the grid. According to some embodiments, the rate of change of the grid frequency may be calculated as the time derivative of the frequency of the power system, i.e., RoCoF.
[0056] According to some embodiments, detecting grid frequency disturbances based on at least one of the grid frequency, the amount of change in the grid frequency, and the rate of change in the grid frequency includes at least one of detecting that the grid frequency is below a first frequency threshold, that the grid frequency is above a second frequency threshold, that the amount of change in the grid frequency is greater than a threshold for the amount of change, and that the rate of change in the grid frequency is greater than a threshold for the rate of change. According to some embodiments of the present disclosure, frequency disturbances can be detected according to different criteria.
[0057] According to some embodiments, determining the frequency response power in response to satisfying frequency response conditions includes determining a response curve of the frequency response power according to at least one of the received frequency regulation service command and the grid frequency in response to satisfying at least one frequency response condition at response initiation timing, wherein the response curve of the frequency response power changes by the total contracted power over the total ramp period, and the frequency response power is determined based on the response curve of the frequency response power and the time from response initiation timing. According to some embodiments, different types of grid frequency regulation services can be implemented according to at least one of the received frequency regulation service command and the grid frequency.
[0058] According to some embodiments, the grid frequency adjustment service provided by the hybrid electrolysis plant may be provided on different time scales.
[0059] According to some embodiments, the "response start timing" refers to the timing at which the frequency response begins, that is, the time at which the frequency response conditions are met.
[0060] According to some embodiments, “total contracted power” refers to the power that the hybrid electrolysis plant promises to adjust in accordance with the contract.
[0061] According to some embodiments, the "total ramp period" refers to the period during which the active power of the hybrid electrolysis plant changes by the total contracted power.
[0062] Figure 3 is a schematic diagram showing the response curve of the frequency response power 301. At timing t0, the hybrid electrolytic plant is in normal operating mode, and its active power is Pnor.
[0063] At timing t1, the frequency response service is initiated, and the active power of the hybrid electrolysis plant begins to change from Pnor.
[0064] At timing t2, after the total ramp period d1 has elapsed since timing t1, the active power of the hybrid electrolysis plant decreases by the total contracted power Pcom.
[0065] According to some embodiments, the response characteristics of an electrolytic device include the rate of change of the active power of the electrolytic device. It should be understood that the response characteristics of an electrolytic device may also include other similar parameters that can reflect the response speed of the active power of the electrolytic device, for example, the time it takes for the output power of the electrolytic device to change from one value to another.
[0066] Figure 4 is a flowchart illustrating the procedure (e.g., step S220 in Figure 2) for distributing the frequency response power of Figure 2 to the electrolytic device and energy storage unit according to some embodiments of the present disclosure. According to some embodiments, step S220 includes setting a first contracted power (S401) based at least in part on the total contracted power, the first contracted power being distributed to the electrolytic device, and the response curve of the active power of the electrolytic device changing by the amount of the first contracted power during the electrolytic device ramp period, according to the rate of change of the active power of the electrolytic device.
[0067] According to some embodiments, the control mechanism can be simplified by distributing the total contracted power to the electrolytic device. According to some embodiments, the total contracted power may be distributed between the electrolytic device and the energy storage device. In this case, the first contracted power is distributed to the electrolytic device, and the second contracted power is distributed to the energy storage unit.
[0068] According to some embodiments, the distribution of total contracted power can be performed based on grid electricity rates and / or the state of charge (SOC) of energy storage units. According to some embodiments, setting a first contracted power based at least in part on total contracted power includes at least one of setting a first contracted power based on total contracted power and grid electricity rates in response to grid electricity rates being greater than a rate threshold, and setting the first contracted power as total contracted power in response to the state of charge of energy storage units being lower than a storage threshold, wherein the first contracted power is less than the total contracted power. According to some embodiments of the present disclosure, it is possible to achieve a balance between the economic efficiency of a hybrid electrolytic plant and / or the SOC of energy storage units.
[0069] This includes determining a second contracted power based on the total contracted power and the first contracted power (S402), and the second contracted power is distributed to the energy storage units.
[0070] According to some embodiments, the second contracted power is set as the difference between the total contracted power and the first contracted power. According to other embodiments, the second contracted power can be set to be greater than the difference between the total contracted power and the first contracted power. As a result, it is possible to ensure that the hybrid electrolytic plant satisfies the frequency response requirements, taking into account measurement and control deviations.
[0071] This includes determining the rate of change of grid-connected active power based on the total contracted power and total ramp period (S403).
[0072] The rate of change of grid-connected active power is the slope of grid-connected active power during the total ramp period (e.g., the period from timing t1 to timing t2).
[0073] This includes determining the response curve of the active power of the energy storage unit based on the rate of change of grid-connected active power, the total ramp period, the rate of change of the active power of the electrolytic device, the electrolytic device ramp period, and the second contracted power (S404).
[0074] As mentioned above, the rate of change of the active power of the electrolytic unit is smaller than the rate of change of the frequency response power. As a result, the electrolytic unit ramp period, i.e., the period during which the active power of the electrolytic unit changes by the amount of the first contracted power, is usually longer than the total ramp period. Therefore, the demand for energy storage units may differ in the following three stages of the frequency response service: 1) the first stage from the response start timing until the timing when the grid-connected active power changes by the amount of the total contracted power; 2) the second stage from the timing when the grid-connected active power has changed by the amount of the total contracted power until the timing when the active power of the electrolytic unit changes by the amount of the first contracted power; and 3) the third stage from the timing when the active power of the electrolytic unit has changed by the amount of the first contracted power until the end of the frequency response service.
[0075] According to some embodiments, determining the response curve of the active power of an energy storage unit based on the rate of change of grid-connected active power, the total ramp period, the rate of change of the active power of the electrolytic device, and the electrolytic device ramp period is possible. This includes determining a first rate of change of the active power of the energy storage unit based on the rate of change of the active power of the electrolytic device and the rate of change of the grid-connected active power, wherein the first rate of change is the rate of change of the active power of the energy storage unit from the response start timing during the total ramp period. This includes determining a second rate of change of the active power of the energy storage unit based on the rate of change of the active power of the electrolytic device, wherein the second rate of change is the rate of change of the active power of the energy storage unit after the total ramp period has elapsed from the response start timing during the electrolytic device ramp period, and This includes determining the response curve of the active power of the energy storage unit based on the total lamp period, the electrolytic device lamp period, the first and second rates of change of the active power of the energy storage unit, and the second contracted power.
[0076] According to some embodiments, the first rate of change of the active power of the energy storage unit is the rate of change of the first stage of the frequency response service described above, and the first rate of change may be set as the difference between the rate of change of the grid-connected active power and the rate of change of the active power of the electrolyzer, and may be set to be greater than the difference between the rate of change of the grid-connected active power and the rate of change of the active power of the electrolyzer so that the hybrid electrolyzer can provide a faster frequency response.
[0077] According to some embodiments, the second rate of change of the active power of the energy storage unit is the rate of change of the second stage of the frequency response service described above, and the second rate of change may be set as a negative number of the rate of change of the active power of the electrolytic device, or it may be set to be less than a negative number of the rate of change of the active power of the electrolytic device. Thus, taking into account measurement and control deviations, it is possible to ensure that the hybrid electrolytic plant satisfies the frequency response requirements.
[0078] This includes setting the active power of the energy storage unit based on the response curve of the energy storage unit's active power and the time from the response start timing (S405).
[0079] According to some embodiments, once the response curve of the active power of the energy storage unit is determined, it is also possible to determine a function of the active power of the energy storage unit with respect to time from the response start timing.
[0080] Figures 5A-5B are schematic diagrams showing the distribution of frequency-response power to the electrolytic device and energy storage unit. In Figures 5A-5B, curve 301 is the response curve for frequency-response power, curve 302 is the response curve for the active power of the electrolytic device, and curve 303 is the response curve for the active power of the energy storage unit. d1 is the total ramp period, and d2 is the ramp period for the electrolytic device. Pnom is the grid-connected active power in normal operating mode, and Pcom is the total contracted power.
[0081] Figure 5A shows the situation where the total contracted power is equal to the first contracted power (for example, when the charge state of the energy storage unit is lower than the storage threshold). Therefore, curve 301 (i.e., the response curve of frequency response power) and curve 302 (i.e., the response curve of the active power of the energy storage unit) overlap in the stable state (i.e., after timing t3).
[0082] Specifically, at timing t0, the hybrid electrolytic plant is in normal operating mode, its active power is Pnor, and the active power of the energy storage unit is zero. It should be understood that the active power of the energy storage unit may be a non-zero value. For example, if the electricity charge is greater than the charge threshold at timing t0, the energy storage unit may discharge an active power Pen at timing t0, and the active power of the energy storage unit during frequency response service may be adjusted from this non-zero value.
[0083] At timing t1, the frequency response service is initiated, and the active power of the hybrid electrolytic plant begins to change from Pnor. In this case, the first rate of change of the energy storage unit can be calculated based on the rate of change of the grid-connected active power and the rate of change of the active power of the electrolytic unit, so that the energy storage unit increases its output power to meet the requirements of the frequency response service.
[0084] At timing t2, after the total ramp period d1 has elapsed from timing t1, the active power of the hybrid electrolysis plant decreases by the total contracted power Pcom, but the decrease in the active power of the electrolysis unit does not reach the total contracted power Pcom. In this case, the second rate of change of the energy storage unit can be calculated based on the rate of change of the active power of the electrolysis unit so that the energy storage unit continues to compensate for the difference between the change in the active power of the electrolysis unit and the total contracted power.
[0085] At timing t3, both the active power reduction of the hybrid electrolysis plant and the active power reduction of the electrolysis unit have reached the total contracted power, and the active power of the energy storage unit has returned to zero.
[0086] At timing t4, both the active power reduction of the hybrid electrolysis plant and the active power reduction of the electrolysis equipment are maintained at the total contracted power, and the active power of the energy storage unit is maintained at zero.
[0087] Figure 5B shows a situation where the total contracted power is not equal to the first contracted power (for example, when the grid electricity rate is greater than the rate threshold). Therefore, curve 301 (i.e., the response curve of frequency response power) and curve 302 (i.e., the response curve of active power of the energy storage unit) do not overlap in the stable state (i.e., after timing t3).
[0088] Specifically, at timing t0, the hybrid electrolytic plant is in normal operating mode, its active power is Pnor, and the active power of the energy storage unit is zero. It should be understood that the active power of the energy storage unit may be a non-zero value. For example, if the electricity charge is greater than the charge threshold at timing t0, the energy storage unit may discharge an active power Pen at timing t0, and the active power of the energy storage unit during frequency response service may be adjusted from this non-zero value.
[0089] At timing t1, the frequency response service is initiated, and the active power of the hybrid electrolytic plant begins to change from Pnor. In this case, the first rate of change of the energy storage unit can be calculated based on the rate of change of the grid-connected active power and the rate of change of the active power of the electrolytic unit, so that the energy storage unit increases its output power to meet the requirements of the frequency response service.
[0090] At timing t2, after a total ramp period d1 has elapsed from timing t1, the active power of the hybrid electrolysis plant decreases by the total contracted power Pcom, but the decrease in the active power of the electrolysis device does not reach the first contracted power Pcom1. In this case, the second rate of change of the energy storage unit can be calculated based on the rate of change of the active power of the electrolysis device so that the energy storage unit continues to compensate for the difference between the active power and frequency response power of the electrolysis device.
[0091] At timing t3, the reduction in active power of the hybrid electrolysis plant is maintained at the total contracted power Pcom, the reduction in active power of the electrolysis equipment reaches the first contracted power Pcom1, and the active power of the energy storage equipment decreases by the second contracted power Pcom2.
[0092] At timing t4, the reduction in active power of the hybrid electrolysis plant is maintained at the total contracted power Pcom, the reduction in active power of the electrolysis equipment is maintained at the first contracted power Pcom1, and the active power of the energy storage unit is maintained at the second contracted power Pcom2.
[0093] According to some embodiments, the frequency response service terminates when the frequency disturbance ends and / or when the grid control center requests the hybrid electrolytic plant to stop the frequency response service.
[0094] According to some embodiments, a method for operating a hybrid electrolytic plant further includes determining the frequency-response power according to a frequency-response power recovery curve in response to satisfying recovery conditions at recovery initiation timing, the recovery conditions including at least one of detecting that a support period has elapsed from response initiation timing, receiving a service termination command, and detecting that the grid frequency is within the frequency recovery range, the frequency-response power recovery curve recovers to the grid-connected active power of the hybrid electrolytic plant at recovery initiation timing, at a recovery rate change from recovery initiation timing, and / or during the recovery period. According to some embodiments, termination of frequency-response service can be performed, and the frequency-response power can be determined according to a frequency-response power recovery curve, thereby satisfying the grid operator's requirements for termination of frequency-response service.
[0095] According to some embodiments, the “recovery condition” is a condition for determining whether or not to recover from frequency response service to normal operating mode.
[0096] According to some embodiments, the “recovery initiation timing” refers to the timing at which the hybrid electrolytic plant begins to recover from its frequency response, i.e., the time at which the recovery conditions are met.
[0097] According to some embodiments, after determining the frequency response power according to the recovery curve of the frequency response power, the frequency response power is distributed to the electrolyzer and energy storage unit so as to adjust the grid-connected active power of the hybrid electrolyzer plant taking the frequency response power into consideration.
[0098] Figures 6A-6B are schematic diagrams showing the distribution of frequency-response power to the electrolytic device and energy storage unit. Similar to Figures 5A-5B, in Figures 6A-6B, curve 301 is the response curve for frequency-response power, curve 302 is the response curve for the active power of the electrolytic device, and curve 303 is the response curve for the active power of the energy storage unit. d1 is the total ramp period, and d2 is the ramp period for the electrolytic device. Pnom is the grid-connected active power in normal operating mode, and Pcom is the total contracted power.
[0099] When the total contracted power is equal to the first contracted power, the frequency-response power is distributed to the electrolytic device so that the active power adjustment of the electrolytic device is equal to the frequency-response power. Figure 6A shows the distribution of frequency-response power to the electrolytic device and energy storage unit when the total contracted power is equal to the first contracted power.
[0100] Figure 6A differs from Figure 5A in that the hybrid electrolytic plant begins to recover from frequency response service at timing t4.
[0101] From timing t4 to timing t5, curves 301 and 302 overlap, meaning the active power of the electrolytic device is equal to the frequency response power, and curve 303 is kept at zero, meaning the active power of the energy storage unit is kept at zero.
[0102] At timing t5, the active power of the electrolytic unit and the active power of the hybrid electrolytic plant recover to Pnom, and the hybrid electrolytic plant recovers from frequency response service.
[0103] If the total contracted power is not equal to the first contracted power, the frequency-response power is distributed between the electrolyzer and the energy storage unit. Figure 6B shows the distribution of frequency-response power to the electrolyzer and energy storage unit when the total contracted power is not equal to the first contracted power.
[0104] Figure 6B differs from Figure 5B in that the hybrid electrolytic plant begins to recover from frequency response service at timing t4.
[0105] From timing t4 to timing t5, curves 301 and 302 do not overlap, meaning the active power of the electrolytic device is not equal to the frequency response power, and curve 303 drops from Pcom2 to zero, meaning the active power of the energy storage unit drops from Pcom2 to zero.
[0106] At timing t5, the active power of the electrolytic unit and the active power of the hybrid electrolytic plant recover to Pnom, the active power of the energy storage unit recovers to zero, and the hybrid electrolytic plant recovers from frequency response service.
[0107] According to some embodiments, the frequency response of the hybrid electrolytic plants shown in Figures 5A-5B and 6A-6B should be considered as the minimum required performance, and the actual frequency response of a hybrid electrolytic plant with integrated energy storage can reach a predetermined frequency response power in a shorter ramp period than that shown in Figures 5A-5B and 6A-6B.
[0108] According to some embodiments, a hybrid electrolytic plant can provide frequency response services to the grid via an automatic power control (AGC) system. The AGC system is a control function of a grid control center for adjusting the power output of generators and flexible loads so that an acceptable grid frequency is maintained for fluctuations in load and variable resources under normal or abnormal grid frequency conditions. According to some embodiments, a hybrid electrolytic plant can accurately track AGC control signals and optimize the response of electrolyzers and energy storage units based on grid electricity rates, hydrogen production needs, and other constraints.
[0109] As an exemplary example, Figures 7A and 7B are schematic diagrams illustrating the distribution of frequency-responsive power to an electrolytic device and an energy storage unit.
[0110] At timing t0, the active power of the hybrid power plant is Pact0, the active power of the electrolyzer is Pact0, and the active power of the energy storage unit is zero. This means that no power compensation from the energy storage unit is required at timing t0.
[0111] At timing t1, in response to the active power of the hybrid power plant decreasing to Pact1, the active power of the electrolyzer also decreases to Pact1, and the active power of the energy storage unit is maintained at zero.
[0112] At timing t2, in response to the active power of the hybrid power plant decreasing to Pact2, the active power of the electrolyzer remains unchanged, but the energy storage unit reduces the active power of the hybrid electrolyzer plant by discharging at Psto.
[0113] At timing t3, in response to the active power of the hybrid power plant increasing to Pact3, the active power of the energy storage unit decreases to zero. This means that the energy storage unit stops discharging to compensate for the active power of the hybrid power plant, and the active power of the electrolyzer changes to the active power of the hybrid power plant Pact3.
[0114] According to some embodiments, a method for operating a hybrid electrolytic plant further includes setting the active power of an energy storage unit according to at least one of the grid electricity rates, the hydrogen demand of the hybrid electrolytic plant, and the charge state of the energy storage unit, in response to the fact that none of the frequency response conditions are met after the hybrid electrolytic plant is started, or that the frequency response power has recovered to the grid-connected active power of the hybrid electrolytic plant at the response start timing. According to some embodiments, the hybrid electrolytic plant has operational adaptability to optimize hydrogen production and charging / discharging of the integrated energy storage system based on available information on market energy prices and / or the charge state of the energy storage unit.
[0115] For example, during periods when electricity rates are low and hydrogen demand is low, the planned demand can be maintained by charging the energy storage unit. Similarly, during periods when electricity rates are high and hydrogen demand is high, the planned demand can be maintained by discharging the energy storage unit.
[0116] According to some embodiments, the energy storage unit comprises a battery and a supercapacitor. According to some embodiments, distributing frequency-responsive power to an electrolytic device and an energy storage unit further includes distributing the active power of the energy storage unit to the supercapacitor in response that the support period corresponding to at least one frequency-responsive condition is shorter than a period threshold, and distributing the active power of the energy storage unit to the battery in response that the support period corresponding to at least one frequency-responsive condition is greater than or equal to a period threshold.
[0117] According to some embodiments, the "support period" refers to the period of frequency response service, for example, the period from timing t1 to timing t5 in Figures 6A to 6B.
[0118] According to some embodiments, the active power of an energy storage unit can be distributed to different types of energy storage units according to the support period.
[0119] Currently, hybrid electrolytic plants are expected to maintain hydrogen production during periods of low grid voltage caused by grid failures. Hybrid electrolytic plants exhibit Low-Voltage Ride-Through (LVRT) with the support of energy storage units. According to some embodiments, a method for operating an electrolytic plant further includes, in response to detecting that the voltage at the grid connection point is lower than an LVRT threshold, reducing the active power of the electrolytic unit to a lower limit of the active power of the electrolytic unit, setting the active power of the energy storage unit as the active power of the electrolytic unit, and setting the grid-connected reactive power of the hybrid electrolytic plant based on the grid voltage.
[0120] According to some embodiments, the energy storage unit provides active power to the electrolytic device to maintain its operation. This ensures the reliability of the electrolytic device and avoids long restart times. The energy consumption of the energy storage unit is reduced by lowering the active power of the electrolytic device to a minimum value. The hybrid electrolytic plant supports the grid by providing reactive power to the grid.
[0121] According to some embodiments, a method for operating an electrolytic plant further includes setting the reactive power of a hybrid electrolytic plant based on the grid voltage in response to detecting that the voltage at the grid connection point is lower than a first voltage threshold or higher than a second voltage threshold, where the first voltage threshold is lower than the second voltage threshold. According to some embodiments of the present disclosure, a hybrid electrolytic plant can provide a reactive power versus voltage service.
[0122] According to some embodiments, a method for operating an electrolytic plant further includes setting the reactive power of the hybrid electrolytic plant to compensate for the power factor at the grid connection point in response to detection that the power factor at the grid connection point is lower than a power factor threshold. According to some embodiments of the present disclosure, a hybrid electrolytic device can provide high power factor operation.
[0123] According to some embodiments, a computer-readable storage medium is provided. The computer-readable storage medium stores computer-readable instructions, which, when executed by a processor, cause the processor to perform a method for operating the hybrid electrolytic plant of the present disclosure.
[0124] According to some embodiments, a computer program product is provided. When executed by a computer, the computer program product includes instructions that cause the computer to perform a method for operating the hybrid electrolytic plant of the present disclosure.
[0125] See Figure 8 below. Figure 8 is a schematic diagram showing an exemplary computing device 800 that can be used in accordance with the methods described herein. The computing device 800 includes at least one processor 802 that executes instructions stored in memory 804. The instructions may be, for example, instructions for implementing a function performed by one or more components described above, or instructions for implementing one or more methods described above. The processor 802 can access memory 804 via a system bus 806.
[0126] The computing device 800 further includes a data store 808 accessible to the processor 802 via the system bus 806. The data store 808 may contain executable instructions, log data, and the like. The computing device 800 also includes an input interface 810 that allows external devices to communicate with the computing device 800. For example, the input interface 810 can be used to receive instructions from, for example, an external computer device or a user. Furthermore, the computing device 800 includes an output interface 812 for connecting the computing device 800 to one or more external devices. For example, the computing device 800 can display, for example, text or images via the output interface 812.
[0127] External devices communicating with the computing device 800 via the input interface 810 and output interface 812 are expected to be part of an environment that provides substantially any type of user interface with which the user can interact. Examples of user interfaces include graphical user interfaces and natural user interfaces. For example, a graphical user interface can receive input from a user using input devices such as a keyboard, mouse, or remote control, and provide output to an output device such as a display. Furthermore, a natural user interface allows the user to interact with the computing device 800 without being constrained by input devices such as a keyboard, mouse, or remote control. Rather, a natural user interface can rely on speech recognition, touch and stylus recognition, on-screen and adjacent-screen gesture recognition, air gestures, head and eye tracking, voice and speech, vision, touch, gestures, machine intelligence, etc.
[0128] Furthermore, although the computing device 800 is shown as a single system, it should be understood that it may be a distributed system. Therefore, for example, multiple devices can communicate via a network connection and collectively perform tasks executed by the computing device 800.
[0129] The following embodiments relate to specific embodiments of the present disclosure. 1. A method for operating a hybrid electrolytic plant, wherein the hybrid electrolytic plant comprises an electrolytic device and an energy storage unit, and is connected to a grid at a grid connection point, and the method is The method includes determining the frequency response power in response to satisfying a frequency response condition, the frequency response condition including at least one of receiving a frequency adjustment service command from the grid control center of the grid and detecting a frequency disturbance in the grid, and the method is This includes distributing frequency-responsive power to electrolyzers and energy storage units, at least in part, based on the response characteristics of the electrolyzers, in order to adjust the grid-connected active power of a hybrid electrolysis plant with respect to frequency-responsive power.
[0130] 2. In the method described in Embodiment 1, Determining the frequency response power in response to satisfying the frequency response conditions is, The process includes determining a response curve for frequency response power according to at least one of the received frequency regulation service command and grid frequencies, in response to satisfying the frequency response conditions at the response initiation timing, wherein the response curve for frequency response power changes by the total contracted power during the total ramp period. This includes determining the frequency response power based on the response curve of the frequency response power and the time from the response onset timing.
[0131] 3. In the method of Embodiment 2, The response characteristics of an electrolytic device include the rate of change of the active power of the electrolytic device. Distributing frequency-responsive power to the electrolytic device and energy storage unit is This includes setting a first contracted power based at least in part on the total contracted power, the first contracted power being distributed to the electrolytic device, and the response curve of the electrolytic device's active power changing by the amount of the first contracted power during the electrolytic device ramp period, according to the rate of change of the electrolytic device's active power. This includes determining a second contracted power based on the total contracted power and the first contracted power, and the second contracted power is distributed to the energy storage units. Based on the total contracted power and total ramp period, the rate of change of grid-connected active power is determined, Based on the rate of change of grid-connected active power, total ramp period, rate of change of electrolytic device active power, electrolytic device ramp period, and second contracted power, the response curve of the active power of the energy storage unit is determined. This includes setting the active power of an energy storage unit based on the active power response curve of the energy storage unit and the time from the response start timing.
[0132] 4. In the method described in Embodiment 3, Setting the first contracted power based at least partially on the total contracted power is, In response to the grid electricity rate being greater than the rate threshold, a first contracted power is set based on the total contracted power and the grid electricity rate, and This includes at least one of setting a first contracted power as the total contracted power in response to the charge state of an energy storage unit being lower than a storage threshold, The first contracted power is smaller than the total contracted power.
[0133] 5. In the method described in Embodiment 3, Determining the response curve of the energy storage unit's active power based on the rate of change of grid-connected active power, total ramp period, rate of change of electrolytic device active power, electrolytic device ramp period, and second contracted power is: This includes determining a first rate of change of the active power of the energy storage unit based on the rate of change of the active power of the electrolytic device and the rate of change of the grid-connected active power, wherein the first rate of change is the rate of change of the active power of the energy storage unit from the response start timing during the total ramp period. This includes determining a second rate of change of the active power of the energy storage unit based on the rate of change of the active power of the electrolytic device, wherein the second rate of change is the rate of change of the active power of the energy storage unit after the total ramp period has elapsed from the response start timing during the electrolytic device ramp period, and This includes determining the response curve of the active power of the energy storage unit based on the total lamp period, the electrolytic device lamp period, the first and second rates of change of the active power of the energy storage unit, and the second contracted power.
[0134] 6. In the method described in any one of the embodiments 2 to 5, The method further includes determining the frequency response power according to the recovery curve of the frequency response power in response to the satisfaction of the recovery conditions at the recovery initiation timing, The recovery conditions are: Detecting when the support period has expired since the response started, Receiving a service termination command, and This includes at least one of detecting that the grid frequency is within the frequency recovery range, The frequency response power recovery curve recovers to the grid-connected active power of the hybrid electrolytic plant at the recovery initiation timing, at the recovery rate from the recovery initiation timing, and / or during the recovery period.
[0135] 7. In the method described in any one of the embodiments 1 to 6, Detecting grid frequency disturbances includes detecting grid frequency disturbances based on at least one of the grid frequency, the amount of change in the grid frequency, and the rate of change of the grid frequency.
[0136] 8. In the method described in Embodiment 7, Detecting grid frequency disturbances based on at least one of the grid frequency, the amount of change in the grid frequency, and the rate of change in the grid frequency is possible. Detecting when the grid frequency is lower than the first frequency threshold, Detecting when the grid frequency is higher than the second frequency threshold, Detecting when the amount of change in the grid frequency is greater than the threshold amount of change, and This includes at least one of detecting that the rate of change of the grid frequency is greater than a threshold rate of change.
[0137] 9. In the method described in embodiment 6, The further includes setting the active power of the energy storage unit according to at least one of the grid electricity rates, the hydrogen demand of the hybrid electrolysis plant, and the charge state of the energy storage unit, in response to the frequency response conditions not being met after the start of the hybrid electrolysis plant, or the frequency response power recovering to the grid-connected active power of the hybrid electrolysis plant at the response initiation timing.
[0138] 10. In the method described in Embodiment 3, The energy storage unit includes a battery and a supercapacitor. Distributing frequency-responsive power to the electrolytic device and energy storage unit is In response to the support period corresponding to the frequency response condition being shorter than the period threshold, the active power of the energy storage unit is distributed to the supercapacitor, and The system further includes distributing the active power of an energy storage unit to a battery in response to the support period corresponding to a frequency response condition being greater than or equal to a period threshold.
[0139] 11. In the method described in any one of the embodiments 1 to 10, In response to detecting that the voltage at the grid connection point is lower than the LVRT threshold, the active power of the electrolytic unit is reduced to the lower limit of the active power of the electrolytic unit, and the active power of the energy storage unit is set as the active power of the electrolytic unit, and This further includes setting the grid-connected reactive power of the hybrid electrolysis plant based on the grid voltage.
[0140] 12. In the method described in any one of the embodiments 1 to 11, In response to detecting that the voltage at the grid connection point is lower than a first voltage threshold or higher than a second voltage threshold, the grid connection reactive power of the hybrid electrolytic plant is set based on the grid voltage, or In response to detecting that the power factor at the grid connection point is lower than a power factor threshold, the system further includes setting the grid-connected reactive power of the hybrid electrolytic plant based on the power factor of the grid. The first voltage threshold is lower than the second voltage threshold.
[0141] 13. A hybrid electrolytic plant connected to a grid, Electrolytic device and Energy storage unit, The system includes a plant controller configured to perform any of the embodiments 1 to 12.
[0142] 14. A computer-readable storage medium that stores computer-readable instructions that, when executed by a processor, cause the processor to execute any of the embodiments 1 to 12.
[0143] 15. A computer program product that, when executed by a computer, contains instructions that cause the computer to perform any of the embodiments 1 to 12.
[0144] The various functions described in this disclosure can be implemented in hardware, software, or any combination thereof. When implemented in software, the functions may be stored as one or more instructions or codes on a computer-readable medium, or transmitted through a computer-readable medium. Computer-readable medium includes computer-readable storage media. Computer-readable storage media may be any available storage medium accessible by a computer. Such computer-readable storage media may be used to hold or store desired program code in the form of instructions or data structures, and may include computer-accessible RAM, ROM, EEPROM, CD-ROM or other optical disk storage devices, magnetic disk storage devices or other magnetic storage devices, or any other medium. The terms magnetic disk and disk used in this disclosure include compact disks (CDs), laser disks, optical disks, digital-purpose disks (DVDs), floppy disks, and Blu-ray disks (BDs). A magnetic disk typically copies data magnetically, while a disk optically copies data using a laser. Propagated signals are not included in the scope of computer-readable storage media. Computer-readable media also includes communication media, which include any medium that enables the transfer of computer programs from one location to another. Connections may, for example, be communication media. For example, when transmitting software from a website, server, or other remote source using coaxial cable, fiber optic cable, twisted pair, digital subscriber line (DSL), or wireless technologies such as infrared, radio, and microwave, these are included in the definition of communication media. Furthermore, any combination of the above should also be included in the scope of computer-readable media. Computer program products may be stored on non-temporary computer-readable storage media or downloaded via communication media.
[0145] In the accompanying drawings, flowcharts and block diagrams illustrate possible implementation architectures, functions, and operations of systems, methods, and computer program products according to various embodiments of the present disclosure. In this regard, each block in a flowchart or block diagram may represent a module, program segment, or portion of code, which includes one or more executable instructions for implementing a logical function. It should also be noted that in some alternative embodiments, the functions shown in a block may be executed in an order different from the order shown in the accompanying drawings. For example, two blocks shown consecutively may actually be executed substantially in parallel, or in reverse order depending on the related functions. It should also be noted that each block in a block diagram and / or flowchart, and combinations of blocks in a block diagram and / or flowchart, may be implemented by a dedicated hardware-based system that performs the function or operation, or by a combination of dedicated hardware and computer instructions.
[0146] The above description is merely a description of preferred embodiments and applied technical principles of the present disclosure. Those skilled in the art should understand that the scope of the present disclosure, as included in embodiments of the present disclosure, is not limited to technical solutions formed by specific combinations of the aforementioned technical features, but also includes other technical solutions formed by any combination of the aforementioned technical features or their equivalents, without departing from the concept of the present invention. For example, technical solutions formed by substituting the aforementioned technical features with technical features having similar functions to (but not limited to) those disclosed in embodiments of the present invention are also included in the scope of the present disclosure.
Claims
1. A method (200) for operating a hybrid electrolytic plant (100), the hybrid electrolytic plant (100) comprising an electrolytic device (101) and an energy storage unit (102), connected to a grid (110) at a grid connection point (120), and the method The method includes determining the frequency response power in response to satisfying a frequency response condition (S210), wherein the frequency response condition includes at least one of receiving a frequency adjustment service command from the grid control center of the grid and detecting frequency disturbances in the grid, and the method is (S220) includes distributing the frequency response power to the electrolyzer and the energy storage unit, at least partially based on the response characteristics of the electrolyzer, in order to adjust the grid-connected active power of the hybrid electrolysis plant in consideration of the frequency response power, Determining the frequency response power in response to satisfying the frequency response conditions (S210) is, In response to the meeting of the frequency response conditions at the response initiation timing, the response curve of the frequency response power is determined according to at least one of the received frequency adjustment service command and the frequency of the grid, wherein the response curve of the frequency response power changes by the total contracted power during the total ramp period. A method comprising determining the frequency response power based on the response curve of the frequency response power and the time from the response start timing.
2. The response characteristics of the electrolytic device include the rate of change of the active power of the electrolytic device, Distributing the frequency response power to the electrolytic device and the energy storage unit (S220) The process includes setting a first contracted power based at least partially on the total contracted power (S401), wherein the first contracted power is distributed to the electrolytic device, and the response curve of the active power of the electrolytic device changes by the amount of the first contracted power during the electrolytic device ramp period, according to the rate of change of the active power of the electrolytic device. The process includes determining a second contracted power based on the total contracted power and the first contracted power (S402), wherein the second contracted power is distributed to the energy storage unit. Based on the total contracted power and the total ramp period, the rate of change of the grid-connected active power is determined (S403), Based on the rate of change of the grid-connected active power, the total ramp period, the rate of change of the active power of the electrolytic device, the electrolytic device ramp period, and the second contracted power, the response curve of the active power of the energy storage unit is determined (S404). The method according to claim 1, further comprising setting the active power of the energy storage unit based on the response curve of the active power of the energy storage unit and the time from the response start timing (S405).
3. Setting the first contracted power based at least partially on the total contracted power (S401) In response to the electricity charges of the grid being greater than a charge threshold, the first contracted power is set based on the total contracted power and the electricity charges of the grid, and This includes at least one of setting the first contracted power as the total contracted power in response to the charge state of the energy storage unit being lower than the storage threshold, The method according to claim 2, wherein the first contracted power is smaller than the total contracted power.
4. Determining the response curve of the active power of the energy storage unit based on the rate of change of the grid-connected active power, the total ramp period, the rate of change of the active power of the electrolytic device, the electrolytic device ramp period, and the second contracted power (S404) is as follows: The process includes determining a first rate of change of the active power of the energy storage unit based on the rate of change of the active power of the electrolytic device and the rate of change of the grid-connected active power, wherein the first rate of change is the rate of change of the active power of the energy storage unit from the response start timing during the total ramp period. The process includes determining a second rate of change of the active power of the energy storage unit based on the rate of change of the active power of the electrolytic device, wherein the second rate of change is the rate of change of the active power of the energy storage unit after the total lamp period has elapsed from the response start timing during the electrolytic device lamp period, and The method according to claim 2, comprising determining the response curve of the active power of the energy storage unit based on the total lamp period, the electrolytic device lamp period, the first rate of change and the second rate of change of the active power of the energy storage unit, and the second contracted power.
5. The method further includes determining the frequency response power according to the recovery curve of the frequency response power in response to the satisfaction of the recovery condition at the recovery initiation timing, The aforementioned recovery conditions are: To detect that the support period has elapsed since the aforementioned response initiation timing, Receiving a service termination command, and This includes at least one of detecting that the frequency of the grid is within the frequency recovery range, The method according to any one of claims 1 to 4, wherein the recovery curve of the frequency response power recovers to the grid-connected active power of the hybrid electrolytic plant at the recovery start timing, at the recovery start timing, and / or during the recovery period, at the recovery rate change from the recovery start timing and / or during the recovery period.
6. The method according to any one of claims 1 to 5, wherein detecting the frequency disturbance of the grid includes detecting the frequency disturbance of the grid based on at least one of the frequency of the grid, the amount of change of the frequency of the grid, and the rate of change of the frequency of the grid.
7. Detecting the frequency disturbance of the grid based on at least one of the frequency of the grid, the amount of change of the frequency of the grid, and the rate of change of the frequency of the grid is: To detect that the frequency of the grid is lower than a first frequency threshold, To detect that the frequency of the grid is higher than a second frequency threshold, To detect that the amount of change in the frequency of the grid is greater than the threshold amount of change, and The method according to claim 6, comprising at least one of detecting that the rate of change of the frequency of the grid is greater than a threshold for the rate of change.
8. The method according to claim 5, further comprising setting the active power of the energy storage unit according to at least one of the electricity rates of the grid, the hydrogen demand of the hybrid electrolysis plant, and the charge state of the energy storage unit, in response to the frequency response condition not being met after the start of the hybrid electrolysis plant, or the frequency response power recovering to the grid-connected active power of the hybrid electrolysis plant at the response start timing.
9. The energy storage unit comprises a battery and a supercapacitor, Distributing the frequency response power to the electrolytic device and the energy storage unit is In response to the support period corresponding to the frequency response condition being shorter than the period threshold, the active power of the energy storage unit is distributed to the supercapacitor, and The method according to claim 2, further comprising distributing the active power of the energy storage unit to the battery in response to the support period corresponding to the frequency response condition being greater than or equal to a period threshold.
10. In response to detecting that the voltage at the grid connection point is lower than the LVRT threshold, the active power of the electrolytic device is reduced to the lower limit of the active power of the electrolytic device, and the active power of the energy storage unit is set as the active power of the electrolytic device, and The method according to any one of claims 1 to 9, further comprising setting the grid-connected reactive power of the hybrid electrolytic plant based on the voltage of the grid.
11. In response to detecting that the voltage at the grid connection point is lower than a first voltage threshold or higher than a second voltage threshold, the grid connection reactive power of the hybrid electrolysis plant is set based on the voltage of the grid, or In response to detecting that the power factor of the grid connection point is lower than a power factor threshold, the grid-connected reactive power of the hybrid electrolysis plant is set based on the power factor of the grid. The method according to any one of claims 1 to 10, wherein the first voltage threshold is lower than the second voltage threshold.
12. A hybrid electrolytic plant connected to the grid, Electrolytic device and Energy storage unit, A hybrid electrolytic plant comprising a plant controller configured to perform the method described in any one of claims 1 to 11.
13. A computer-readable storage medium that stores computer-readable instructions, which, when executed by a processor, cause the processor to perform the method described in any one of claims 1 to 11.
14. A computer program product that, when executed by a computer, includes instructions causing the computer to perform the method described in any one of claims 1 to 11.