Novel systems and methods for effective infrastructure management

The real-time infrastructure management system addresses the inadequacies of current systems by dynamically adjusting fluid flow paths using sensors and adaptive control strategies, ensuring effective management during unpredictable weather events.

JP2026538999APending Publication Date: 2026-11-19HYDRODIGITAL LLC
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
JP2026523185
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Priority Date
2023-10-25
Filing Date
2024-10-25
Publication Date
2026-11-19

AI Technical Summary

Technical Problem

Current infrastructure management systems are inadequate in responding to rapid changes in fluid flow due to unpredictable weather conditions and storm events, leading to infrastructure stress and failure, particularly in urban environments.

Method used

A real-time infrastructure management system utilizing sensors, flow controllers, and flow distribution components that dynamically adjust fluid flow paths to mitigate stress on infrastructure during climatic events, incorporating machine learning models for predictive analysis and adaptive control strategies.

Benefits of technology

Effectively manages fluid infrastructure by minimizing stress and preventing overflow or failure during unpredictable weather conditions, enhancing the resilience of urban fluid systems.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2026538999000001_ABST
    Figure 2026538999000001_ABST
Patent Text Reader

Abstract

Novel systems and methods for infrastructure management are described herein. Exemplary novel systems and methods include using a network of sensors for measuring fluid condition attributes at constrained locations within the infrastructure, a fluid flow controller for calculating stresses at the constrained locations, and flow redistribution components for redistributing fluid flow through one or more paths within the infrastructure to alleviate stresses at the constrained locations. Novel systems and method strategies for implementing infrastructure management strategies are also described herein. They include structural components for performing features such as acquiring data and / or estimates, calculating and / or estimating stress values, developing flow redistribution strategies to alleviate stresses within the infrastructure, and implementing these strategies to alleviate stresses. Novel systems and methods for adapting flow control to changing storm conditions are also described herein. These systems and methods adjust flow redistribution strategies in real time in response to changing storm severity.
Need to check novelty before this filing date? Find Prior Art

Description

TECHNICAL FIELD

[0001] This patent application claims priority to U.S. Provisional Patent Application No. 63 / 592,923 filed on October 25, 2023, the disclosure of which is incorporated herein by reference in its entirety for all purposes.

[0002] The present teachings generally relate to novel systems and methods for effectively controlling fluid flow in the event of urban development, changes in water usage patterns, and / or varying weather conditions, particularly notably climatic events. More specifically, the present teachings relate to novel systems and methods for effectively controlling fluid flow in the event of urban development, changes in water usage patterns, and / or varying weather conditions, particularly notably climatic events (storm events), by redistributing fluid flow to mitigate undesirable stresses caused by overflow or flooding in fluid infrastructure and / or failure of fluid infrastructure. BACKGROUND ART

[0003] Fluid infrastructure includes items such as catchment areas, sub-catchment areas, pumps, diversion facilities, storage tanks, wells, treatment units, and conveying equipment used during the transport or disposal of fluid or water. Examples of fluid infrastructure networks include sewage systems, groundwater well systems, aquifers, waterway networks, and rainwater collection systems. These types of infrastructure networks are designed to collect and deliver fluid flow, and sometimes treat the delivered fluid flow. As an example, infrastructure networks dedicated to collecting and delivering treated water for drinking, as well as agricultural and industrial uses, are essential to human life and therefore must be properly managed. Unfortunately, current infrastructure management, regardless of whether flow treatment is required, has several drawbacks as it is time-consuming, labor-intensive, and financially burdensome. Furthermore, these drawbacks are insignificant when compared to the inability of current infrastructure management to respond appropriately during climatic events. [Overview of the Initiative] [Problems that the invention aims to solve]

[0004] Therefore, there is a need for novel systems and methods to effectively manage infrastructure during climate events without the shortcomings of current infrastructure management. [Means for solving the problem]

[0005] This instruction provides a novel system and method (hereinafter referred to as "the System," "the Configuration," and "the Method," respectively) designed to effectively manage fluid infrastructure without the shortcomings of current infrastructure management techniques. The Configuration and Method effectively manage infrastructure such as wastewater or sewage systems, in particular, during fluctuating and sometimes unpredictable weather conditions, such as changes in water use patterns and / or storm events. This instruction recognizes that in urban environments, for example, sudden water intrusions resulting from storms tend to increase fluid flow in wastewater flows beyond their predetermined limits. Excessive increases in fluid flow ultimately lead to wastewater or sewage overflows within the infrastructure and / or infrastructure failure, and undesirably, contaminate the clean water flows and sources supplying the infrastructure.

[0006] Based on these understandings, this teaching implements novel methods for monitoring and reducing or minimizing the resulting excessive stress on infrastructure caused by excessive wastewater overflow, as needed, such as in the event of specific climatic events (e.g., storm events). Under specific methods, this teaching provides systems and methods for balancing fluid flow across multiple paths to reduce or minimize stress on one or more parts of infrastructure subjected to excessive stress during climatic events, for example, at constrained locations.

[0007] In stark contrast to current infrastructure management systems and methods that are not capable of responding sufficiently quickly to rapid changes in conditions during climatic events, the system and method described herein enables real-time infrastructure management using the novel dynamic response techniques described herein. As a result, even when the intensity of a climatic event is not accurately predicted, the system and method dynamically changes from one response strategy to another, more effective response strategy that adequately reduces or minimizes the stress placed on the infrastructure. The dynamic response features implemented by the system and method address both small and large storm events by replacing the response strategy in response to changing conditions.

[0008] The system and method can also learn from past events to improve the future performance of wastewater infrastructure management. Specific aspects of the system and method described in the claims of this application effectively solve these problems through various features and components, such as a network of sensors, flow control and / or flow distribution / redistribution components, and a processor. Other aspects of the system and method perform real-time data processing, perform predictive modeling using a remote telemetry unit (RTU) (hereinafter "RTU"), and / or implement adaptive flow control strategies.

[0009] In some embodiments, this teaching provides a real-time infrastructure management system. One such exemplary system includes (1) an initial sensor located at or near an initial location, which measures fluid condition attributes at the initial location and generates an initial value; (2) a subsequent sensor located downstream from the initial sensor, which measures fluid condition attributes at the subsequent location and generates a subsequent value; and (3) a plurality of intermediate sensors, at least one of which is located at or near one location on a first path, which measures fluid condition attributes at that location and generates an intermediate value, and at least one of the plurality of intermediate sensors is located at or near one location on a second path, which measures fluid condition attributes at that location and generates an additional intermediate value, and each of the first and second paths facilitates fluid communication between the initial location and the subsequent location, and the second path differs from the first path in that it connects the initial location, one location on the first path, and one location on the second path. (4) A plurality of intermediate sensors which are constraint locations in the infrastructure when the measured values ​​of fluid condition attributes at each of the initial location, one location of the first path, one location of the second path, and each of the subsequent locations may reach or exceed predetermined acceptable threshold attribute values ​​assigned to each of the initial location, one location of the first path, one location of the second path, and each of the subsequent locations, at least in part due to the acceptance of fluid flow from a plurality of intermediate flows during a climatic event, and (4) a plurality of flow controllers which are communicably coupled to receive initial values ​​from the initial sensor, subsequent values ​​from the subsequent sensor, and intermediate and additional intermediate values ​​from the plurality of intermediate sensors in real time, and determine the stress value of each of the constraint locations during a climatic event and in real time based on the initial value, subsequent value, intermediate and additional intermediate values, and implement one or more flow redistribution strategies based on at least one stress value of at least one constraint location,(5) One or more flow distribution components located at one or more fluid flow intersections, the one or more flow distribution components located downstream from the initial location and in fluid communication with the initial location through the initial path, so that the fluid flow leaving the initial location flows into one or more flow distribution components through the initial path, each of the fluid flow intersections representing the intersection of the initial path, the first path and the second path, and at least one flow distribution component redistributes the fluid flow between the initial path, the first path and the second path through at least one fluid flow intersection, based on one or more flow distribution strategies received from one or more flow controllers during a climatic event and in real time, in order to effectively correct at least one of the stress values ​​obtained from at least one of the constraint locations so that it is less than or equal to a predetermined acceptable threshold attribute value assigned to at least one of the constraint locations.

[0010] In some embodiments, this teaching provides other real-time infrastructure management systems. One such exemplary system includes (1) an initial sensor located at or near an initial location, which measures fluid condition attributes at the initial location and generates an initial value; (2) a subsequent sensor located at or near a subsequent location, which measures fluid condition attributes at the subsequent location and generates a subsequent value, and which is located downstream from the initial sensor; and (3) one or more intermediate sensors located at or near one location of a first path, which measure fluid condition attributes at that location and generate intermediate values, wherein the first path facilitates fluid communication between the initial location and the subsequent location, and the initial location, one location of the first path and the subsequent location assign the measured values ​​of fluid condition attributes at each of the initial location, one location of the first path and the subsequent location to each of the initial location, one location of the first path and the subsequent location, at least in part, due to the acceptance of fluid flow from multiple intermediate flows during a climatic event. When a predetermined acceptable threshold attribute value is reached or may be exceeded, one or more intermediate sensors are constraint locations in the infrastructure; (4) one or more flow controllers that are communicably coupled to receive initial values ​​from initial sensors, subsequent values ​​from subsequent sensors and intermediate values ​​from one or more intermediate sensors in real time, and determine the stress value of each constraint location during a climatic event and in real time based on the initial values, subsequent values ​​and intermediate values, and implement one or more flow redistribution strategies based on at least one stress value of at least one constraint location; and (5) one or more flow distribution components located at one or more fluid flow intersections, the one or more flow distribution components being located downstream from the initial location and in fluid communication with the initial location through the initial path, so that the fluid flow leaving the initial location flows into one or more flow distribution components through the initial path, each of the fluid flow intersections represents an intersection of the initial path and a first path, and at least one flow distribution component isThe system includes one or more flow distribution components that redistribute fluid flow between an initial path and a first path through at least one fluid flow intersection, based on one or more flow distribution strategies received from one or more flow controllers during a climatic event and in real time, in order to effectively correct at least one of the stress values ​​obtained from at least one of the constraint locations so that it is less than or equal to a predetermined acceptable threshold attribute value assigned to at least one of the constraint locations.

[0011] In some embodiments, this teaching provides other real-time infrastructure management systems. One such exemplary system is a successor sensor located downstream from an initial location, which is located at or near a successor location and measures fluid condition attributes at the successor location to generate successor values, and a successor sensor located downstream from an initial location, and a plurality of intermediate sensors, at least one of which is located at or near one location on a first path and measures fluid condition attributes at that location to generate intermediate values, and at least one of the plurality of intermediate sensors is located at or near one location on a second path and measures fluid condition attributes at that location to generate additional intermediate values, wherein each of the first and second paths facilitates fluid communication between the initial location and the successor location, and the second path differs from the first path in that each of the locations on the first path, the second path, and the successor location measures the fluid condition attributes at each of the locations on the first path, the second path, and the successor location. However, during a climate event, at least in part due to the acceptance of fluid flow from multiple intermediate flows, a predetermined acceptable threshold attribute value assigned to each of the locations in the first path, the second path, and the subsequent location may be reached or exceeded, the constraint locations in the infrastructure include: (3) one or more flow controllers communicably coupled to receive subsequent values ​​from the subsequent sensors, as well as intermediate and additional intermediate values ​​from the multiple intermediate sensors in real time, and to determine the stress value of each of the constraint locations during the climate event and in real time based on the subsequent values, intermediate and additional intermediate values, and to implement one or more flow redistribution strategies based on at least one stress value of at least one constraint location; and (4) one or more flow distribution components located at one or more fluid flow intersections, the one or more flow distribution components located downstream from the initial location and in fluid communication with the initial location through the initial path, as a result,The fluid flow leaving the initial location flows through the initial path into one or more flow distribution components, each of which fluid flow intersections represents the intersection of a first path and a second path, and at least one flow distribution component includes one or more flow distribution components that redistribute the fluid flow between the first and second paths through at least one fluid flow intersection, based on one or more flow distribution strategies received from one or more flow controllers during climatic events and in real time, in order to effectively correct at least one of the stress values ​​obtained from at least one of the constraint locations to be less than or equal to a predetermined acceptable threshold attribute value assigned to at least one of the constraint locations.

[0012] In some embodiments, this teaching provides other real-time infrastructure management systems. One such exemplary system is a successor sensor located downstream from the initial location, which is located at or near a successor location and measures fluid condition attributes at the successor location to generate successor values, and a plurality of intermediate sensors, at least one of which is located at or near one location of a first path and measures fluid condition attributes at said location to generate intermediate values, and at least one of the plurality of intermediate sensors is located at or near one location of a second path and measures fluid condition attributes at said location to generate one or more additional intermediate values, wherein the first and second paths facilitate fluid communication between the initial location and the successor location, and the fluid condition attributes at one location of the first path and one location of the second path are affected by one or more intermediate flows flowing into the first and second paths before one location of the first path and one location of the second path, respectively. (3) Multiple intermediate sensors and multiple intermediate remote monitoring and control units ("RTUs"), at least two of which are communicatively coupled to the multiple intermediate sensors, at least one of the multiple intermediate RTUs internally stores one flow model, the flow model being a synchronized machine learning model designed to estimate and generate an RTU estimation range of intermediate values ​​for one location of a first path as a function of time, based on weather event forecasts and one or more intermediate values ​​for one location of the first path, at least another of the multiple intermediate RTUs internally stores another flow model, the other flow model being a synchronized machine learning model designed to estimate and generate an additional RTU estimation range of intermediate values ​​for one location of a second path as a function of time, based on weather event forecasts and one or more additional intermediate values ​​for one location of the second path, and if one or more of the intermediate values ​​are not within the RTU estimation range of intermediate values ​​for one location of the first path,(4) One or more intermediate remote monitoring and control units ("RTUs") designed to transmit one or more intermediate values, and also designed to transmit one or more additional intermediate values ​​if one or more of the additional intermediate values ​​are not within the additional RTU estimation range of the intermediate values ​​for one location of the second path; and (4) a server designed to be communicatively coupled to the multiple intermediate RTUs, the server storing in part a digital twin model of one flow model, the digital twin of one flow model being substantially similar to one flow model stored in one of the intermediate RTUs, the server estimating fluid condition attributes at or near one location of the first path based on weather event forecasts and one or more intermediate values, and providing a server estimation range of the intermediate values ​​for one location of the first path, the server also storing in part a digital twin of another flow model, the digital twin of another flow model being within the multiple intermediate RTUs monitoring one location of the second path The server is substantially similar to another flow model stored in another, and the server generates at least one additional server estimated range of intermediates based on weather storm event forecasts and one or more additional intermediates, and the server is designed to receive from one or more of a plurality of intermediate RTUs one or more intermediates that are not within the RTU estimated range of intermediates for one location of a first path, and also to receive one or more additional intermediates that are not within the additional RTU estimated range of intermediates for one location of a second path, and the server is designed to transmit one or more intermediates that are not within the server estimated range of intermediates for one location of a second path, and (5) initial values ​​from initial sensors, subsequent values ​​from subsequent sensors, one or more intermediates from the server or at least one of the server estimated ranges of intermediates, or(6) One or more flow controllers designed to communicate with and receive in real time one or more or at least one server-estimated additional intermediate values, one of the flow controllers programmed to determine in real time the stress values ​​of the initial location and the subsequent location, the stress values ​​or estimated stress values ​​of one location in the first path and one location in the second first path, based on the initial value, the subsequent value, one or more intermediate values ​​or at least one of the server-estimated ranges of the intermediate values, or one or more additional intermediate values ​​or at least one of the additional server-estimated ranges of the intermediate values, and (6) One or more flow distribution components designed to be located at one or more fluid flow intersections, one or more flow distribution components located downstream from the initial location and in fluid communication with the initial location through the initial path, and as a result, the fluid flow leaving the initial location flows through the initial path to the flow distribution components (7) Constraint locations include (7) Constraint locations include (8) Constraint locations include (9) Constraint locations include (1 Locations include (1) Constraint Locations include (1) Constraint Locations include (1) Constraint Locations include (1) Constraint Locations include (1) Constraint Locations include (1) Constraint Locations include (1) Constraint Locations include (1) Constraint Locations include (1) Constraint Locations include (1) Constraint Locations include (1) Constraint Locations include (1) Constraint Locations include (1) Constraint Locations include (1A location selected from a group including one location and subsequent locations of a second path, wherein measured fluid condition attributes at that location may reach or exceed predetermined acceptable threshold attribute values ​​assigned to that location, at least in part, due to the acceptance of fluid flow from multiple intermediate flows during a climatic event.

[0013] In some embodiments, this teaching provides other real-time infrastructure management systems. One such exemplary system includes: (1) an initial sensor located on an initial path, designed to be positioned at or near an initial location, which measures fluid condition attributes at the initial location and generates initial values, wherein the fluid condition attributes at the initial location are influenced by one or more intermediate flows flowing into the initial path before the initial location; (2) an initial remote monitoring and control unit ("RTU") communicatively coupled to the initial sensor and internally storing an initial flow model, wherein the initial flow model is a synchronized machine learning model designed to estimate fluid condition attributes at the initial location as a function of time, and for climatic events, to generate an RTU estimation range of initial values ​​based on climatic event forecasts and initial values, wherein the initial RTU is designed to transmit initial values ​​if the initial values ​​are not within the RTU estimation range of initial values; and (3) an initial remote monitoring and control unit ("RTU") designed to be positioned at or near a subsequent location, which measures fluid condition attributes at the subsequent location and generates initial values (4) A subsequent sensor that generates values, the subsequent sensor is located downstream from the initial sensor, and the fluid condition attributes at the subsequent location are influenced by one or more intermediate flows flowing into the subsequent location; (4) A subsequent RTU that is communicatively coupled to the subsequent sensor and internally stores a subsequent flow model, the subsequent flow model being a synchronized machine learning model designed to estimate the fluid condition attributes at the subsequent location as a function of time, the subsequent RTU being designed to generate an RTU estimation range for subsequent values ​​based on climate event forecasts and subsequent values, and the subsequent RTU being designed to transmit subsequent values ​​if the subsequent values ​​are not within the RTU estimation range for subsequent values; (5) One or more intermediate sensors, at least one of which is designed to be located at or near one location in the first path, measuring fluid condition attributes at one location to generate one or more intermediate values, the first path facilitating fluid communication between the initial location and the subsequent location.(6) One or more intermediate sensors, each of which is communicably coupled to at least one of the intermediate sensors, and which internally stores one flow model, the fluid condition attribute at one location of the first path is influenced by one or more intermediate flows flowing into the first path before that location of the first path, and one or more intermediate RTUs, each of which internally stores one flow model, the flow model is a synchronized machine learning model designed to estimate the fluid condition attribute at one location of the first path as a function of time, and of the intermediate RTUs One or more of the following are designed to generate an estimated RTU range for a climate event based on one or more of the climate event forecast and median values, and the intermediate RTU is designed to transmit one or more of the median values ​​if one or more of the median values ​​are not within the estimated RTU range for the intermediate value, and one or more intermediate RTUs are designed to be communicatively coupled with one or more of the initial RTU, subsequent RTU and intermediate RTU, and (7) store in a digital twin of the initial flow model, subsequent flow model and one flow model The server has an initial flow model, a subsequent flow model, and a digital twin of one flow model, which are substantially similar to the initial flow model, the subsequent flow model, and the one flow model stored in one of the initial RTU, the subsequent RTU, and the intermediate RTU, respectively, and the server estimates the fluid condition attributes at the initial location, the subsequent location, and one location of the first path, respectively, based on the forecast of the climate event and one or more of the initial value, the subsequent value, and the intermediate value, and the server estimates the server estimate range for the initial value, the server estimate range for the subsequent value and The server is designed to provide a server-estimated range for intermediate values, and if the initial value is not within the initial value's RTU estimated range, the server receives the initial value from the initial RTU; if the subsequent value is not within the subsequent value's RTU estimated range, the server receives the subsequent value from the subsequent RTU; and if the intermediate value is not within the intermediate value's RTU estimated range, the server receives one or more intermediate values ​​from the intermediate RTU; and the server is designed to transmit values ​​from the initial value, subsequent value, and intermediate value that are not within the server-estimated range for the initial value, the subsequent value, and the intermediate value, respectively.(8) One or more flow controllers designed to be communicatively coupled to receive from a server in real time an initial value or server estimated range of an initial value, a subsequent value or server estimated range of a subsequent value, an intermediate value or server estimated range of an intermediate value, one or more flow controllers, each programmed to determine in real time the stress value or estimated stress value of an initial location, a subsequent location, and one of the locations of the first path, based on the initial value or server estimated range of an initial value, a subsequent value or server estimated range of a subsequent value, and an intermediate value of the server estimated range of an intermediate value, and (10) One or more flow distribution components designed to be located at one or more fluid flow intersections, the one or more flow distribution components located downstream from the initial location and in fluid communication with the initial location through the initial path, so that the fluid flow leaving the initial location flows through the initial path into one or more of the flow distribution components, the fluid flow intersection represents the intersection of the initial path and the first path, and each of the flow distribution components is the first path (11) When the measured or estimated stress values ​​at a constraint location are likely to reach or exceed a predetermined acceptable threshold attribute value assigned to the constraint location, at least in part due to excessive fluid flow from a plurality of intermediate flows, the initial location, the subsequent location, and the subsequent location, the initial location, the subsequent location, each of the initial location, the subsequent location, and the subsequent location, the initial location, the subsequent location, each of the initial location, the subsequent location, and the subsequent location,It is a constraint location within the infrastructure.

[0014] In some embodiments, this teaching provides other real-time infrastructure management systems. One such exemplary system includes: (1) a successor sensor located at or near a successor location, which measures fluid condition attributes at the successor location and generates successor values, the successor sensor being located downstream from the initial location, and the fluid condition attributes at the successor location being influenced by one or more intermediate flows flowing into the successor location; (2) a successor RTU communicatively coupled to the successor sensor and internally storing a successor flow model, the successor flow model being a synchronized machine learning model designed to estimate fluid condition attributes at the successor location as a function of time, the successor RTU being designed to generate an RTU estimation range of successor values ​​based on climate event forecasts and successor values ​​during climate events, and the successor RTU being designed to transmit successor values ​​if the successor value is not within at least one of the RTU estimation ranges of successor values; and (3) a plurality of intermediate sensors, at least one of which is located at or near one location in the first path. The system generates an intermediate value for a first intermediate sensor by measuring fluid condition attributes at one location, and at least one of the multiple intermediate sensors is located at or near one location of a second path, and generates an intermediate value for a second intermediate sensor by measuring fluid condition attributes at that location, and each of the first and second paths facilitates fluid communication between an initial location and a subsequent location, and the second path differs from the first path in that each of the locations of the first path, the second path, and the subsequent location is a constraint location in the infrastructure, where the measured values ​​of the fluid condition attributes at each of the locations of the first path, the second path, and the subsequent location may reach or exceed predetermined acceptable threshold attribute values ​​assigned to each of the locations of the first path, the second path, and the subsequent location, at least in part due to the acceptance of fluid flow from multiple intermediate flows during a climatic event, and the system generates an intermediate value for a second intermediate sensor,(4) A plurality of intermediate RTUs, at least two of which are communicably coupled to two or more intermediate sensors, at least one of which internally stores one flow model, which is a synchronized machine learning model designed to generate an RTU estimation range for intermediate values ​​with respect to one location of a first path as a function of time, at least one of the plurality of intermediate RTUs internally stores another flow model, which is a synchronized machine learning model designed to generate an additional RTU estimation range for intermediate values ​​with respect to one location of a second path as a function of time, at least one of the RTUs is designed to transmit one or more intermediate values ​​if one or more of the intermediate values ​​are not within the RTU estimation range for intermediate values ​​with respect to one location of the first path, and at least one of the plurality of intermediate RTUs is designed to transmit one or more of the additional intermediate values ​​if one or more of the additional intermediate values ​​are not within the additional RTU estimation range for intermediate values ​​with respect to one location of a second path. A server which is configured to communicate with a plurality of intermediate RTUs, (5) a successor RTU, and one or more of the intermediate RTUs, and which stores in the digital twins of each of the successor flow model, one flow model, and another flow model, wherein each digital twin of the successor flow model, one flow model, and another flow model is substantially similar to the successor flow model, one flow model, and another flow model stored in the successor RTU, one of the intermediate RTUs, and another RTU, respectively, The server is designed to estimate fluid condition attributes at a subsequent location, one location on the first path, and one location on the second path, respectively, based on climate event forecasts and subsequent values, median values, and additional median values, and to provide server-estimated ranges for subsequent values, median values, and additional server-estimated ranges for median values. The server receives subsequent values ​​from the subsequent RTU if the subsequent value is not within the estimated RTU range for subsequent values, and receives one or more median values ​​from the median RTU if the median value is not within the estimated RTU range for median values.(6) One or more flow controllers designed to communicately couple to the server to receive the successor value or server range for the successor value, the successor value or server range for the successor value, the successor value or server range for the successor value, and the additional server range for the successor value, if the additional intermediate value is not within the additional RTU estimation range for the successor value, the server range for the successor value, and the additional server range for the successor value, respectively, one or more flow controllers designed to communicate to receive the successor value or server range for the successor value, the successor value or server range for the successor value, the successor value or server range for the successor value, and the additional intermediate value or additional server range for the successor value from the server in real time, one of the flow controllers programmed to determine in real time the stress value or estimated stress value for each of the successor location, one location on the first path, and one location on the second path, respectively, based on the successor value or server range for the successor value, the midpoint of the server range for the successor value, and the additional intermediate value or additional server range for the successor value, respectively (7) a fluid flow controller and one or more flow distribution components located at one or more fluid flow intersections, the one or more flow distribution components located downstream from the initial location and in fluid communication with the initial location through the initial path, so that the fluid flow leaving the initial location flows through the initial path into one or more of the flow distribution components, each of the fluid flow intersections representing the intersection of a first path and a second path, and at least one of the flow distribution components redistributes the fluid flow between the first path and the second path through at least one of the fluid flow intersections, based on one or more flow distribution strategies received from one or more of the flow controllers during a climatic event and in real time, in order to effectively modify the stress value or estimated stress value obtained for at least one of the constraint locations to be less than a predetermined acceptable threshold attribute value assigned to at least one of the constraint locations.

[0015] In some embodiments, this teaching provides a real-time method for infrastructure management. One such exemplary method is to (1) obtain an initial value using an initial sensor located in or near an initial location in one or more fluid flow controllers, which measures fluid condition attributes at the initial location; (2) obtain a subsequent value using a subsequent sensor located in or near a subsequent location in one or more fluid flow controllers, which measures fluid condition attributes at the subsequent location, the subsequent sensor being located downstream from the initial sensor; (3) obtain one or more intermediate values ​​using one or more intermediate sensors in one or more fluid flow controllers, which at least one of the intermediate sensors is located in or near one location on a first path providing fluid communication between the initial location and the subsequent location, which measures the fluid flowing into or stored in that location; and (4) obtain an initial path stress value and a first path stress value To generate, in real time, using one or more fluid flow controllers, determine stress values ​​at each of the initial location, one location on the first path, and subsequent locations based on initial values, one or more intermediate values, and subsequent values, respectively; (5) identify which of the initial path stress value and the first path stress value is the highest and reaches the maximum stress path value, wherein the initial path stress value represents at least the stress value at the initial location, and the first path stress value represents the sum of the stress values ​​at at least one location on the first path and subsequent locations; and (6) in real time during a climatic event, using one or more flow distribution components, redistributing the fluid flow in the initial path and the first path based on one or more flow redistribution strategies, wherein one or more of the flow distribution components are located at one or more fluid flow intersections, each of which is located downstream from the initial location, and as a result,The fluid flow leaving the initial location flows through the initial path into one or more of the flow distribution components, each of which a fluid flow intersection intersects the initial path and a first path, and one or more of the flow distribution components are communicably coupled to one or more of the fluid flow controllers, including redistribution.

[0016] In some embodiments, this teaching provides other real-time methods for infrastructure management. One such exemplary method is to (1) acquire a success value in one or more fluid flow controllers using a success sensor located at or near a success location and measuring fluid condition attributes at the success location, the success sensor being located downstream from the initial location; (2) acquire a plurality of intermediate values ​​in one or more fluid flow controllers using a plurality of intermediate sensors, at least one of the plurality of intermediate sensors located at or near one location on a first path and measuring fluid condition attributes at that location to generate one or more intermediate values, at least another of the plurality of intermediate sensors located on one location on a second path and measuring fluid condition attributes at that location to generate one or more additional intermediate values, each of the first and second paths providing fluid communication between the initial location and the success location; and (3) acquire a first path stress value and a second (4) Identify and generate which of the first path stress value and the second path stress value is the highest, by using one or more fluid flow controllers in real time to determine the stress value at each of the locations on the first path, the second path, and the subsequent location, based on one or more intermediate values, one or more additional intermediate values, and subsequent values, in order to generate path stress values, by identifying and generating the first path stress value, which represents the sum of the stress values ​​at each of the locations on the first path and the subsequent location, and the second path stress value, which represents the sum of the stress values ​​at each of the locations on the second path and the subsequent location, and (5) Redistribute the fluid flow between the first path and the second path in real time during a climatic event, based on one or more flow redistribution strategies, by using one or more flow distribution components,The system is configured to be located at one or more fluid flow intersections, each of which is located downstream from the initial location, and as a result, the fluid flow leaving the initial location flows through the initial path into one or more of the flow distribution components, each of which intersects the first and second paths, and one or more of the flow distribution components are communicatively coupled to one or more of the fluid flow controllers, and includes redistribution.

[0017] In some embodiments, this teaching provides other methods for implementing infrastructure management strategies. One such exemplary method is to (1) obtain initial values ​​using initial sensors located in or near an initial location in one or more fluid flow controllers and measuring fluid condition attributes at the initial location; (2) obtain subsequent values ​​using subsequent sensors located in or near a subsequent location in one or more fluid flow controllers and measuring fluid condition attributes at the subsequent location, wherein the subsequent sensors are downstream from the initial sensors; (3) obtain one or more intermediate values ​​using one or more intermediate sensors located in or near one of a first path providing fluid communication between a first location and a subsequent location and measuring fluid condition attributes at that location; and (4) obtain one or more server-estimated ranges of intermediate values ​​based on weather event forecasts and one or more of the intermediate values ​​using a server operating with one or more of the intermediate sensors, wherein the server obtains one or more of the intermediate values ​​or Designed to receive multiple values, the server is communicatively coupled to one or more fluid flow controllers to transmit one or more server-estimated intermediate values ​​or one or more intermediate values, and the server transmits the intermediate values ​​if one or more of the intermediate values ​​are not within the server-estimated range of intermediate values, and (5) in real time, using one or more fluid flow controllers to generate an initial path stress value and a first path stress value or an estimated first path stress value, the server determines the stress value of the initial location and the subsequent location based on the initial and subsequent values, and determines the stress value or estimated stress value of one location of the first path based on one or more intermediate values ​​and one or more server-estimated intermediate values, respectively, and (6) identifies which of the initial path stress value, the first path stress value and the estimated first path stress value is the highest and reaches the highest stress path value, wherein the initial path stress value represents the stress value at least at the initial location.The first path stress value represents the sum of the stress values ​​at one location and subsequent locations in the first path, and the estimated first path stress value represents at least the estimated stress value at one location in the first path and the sum of the stress values ​​at subsequent locations; (7) formulating multiple infrastructure management strategies to reduce the maximum stress path value based on the maximum flow stress value; (8) comparing the infrastructure management strategies to the results of climatic events using one or more keypoint indicators of the success of reducing the maximum flow stress value; (9) determining one or more successful infrastructure management strategies that effectively reduce the maximum flow stress value based on the comparison using one or more of the keypoint indicators of the success of reducing the maximum flow stress value; and (10) storing one or more of the successful infrastructure management strategies in one or more of the fluid flow controllers.

[0018] In some embodiments, this teaching provides other real-time methods for infrastructure management. One such exemplary method is to (1) acquire a success value using a success sensor located in or near a success location in one or more fluid flow controllers, the success sensor being located downstream from the initial location, and the success value being acquired by (2) acquiring multiple intermediate values ​​using multiple intermediate sensors, the success sensor being located in or near a location in a first path, the success sensor being located in or near a location in a second path, the success sensor being located in or near a location in a second path, the success sensor being located in or near a location in a second path, the success sensor being located in or near a location in a second path, the success sensor being located in or near a location in a second path, the success sensor being located in or near a location in a second path, the success sensor being located in a second intermediate value, and the successor to each of the first and second paths providing fluid communication between the first location and the successor location, and the acquisition of multiple intermediate values ​​by (3) using a server operating with at least one of the intermediate sensors to forecast and acquire weather events. (4) In real time,(5) Using one or more fluid flow controllers, respectively, to determine the stress value of the subsequent location and the stress value or estimated stress value of each location of the first path and the second path based on one or more subsequent values, one or more intermediate values, or one or more server estimated ranges of intermediate values, one or more additional intermediate values, or one or more additional server estimated ranges of intermediate values, and based on the respective stress value or estimated stress value of one location of the first path and one location of the second path, and to generate the respective stress value or estimated stress value of the first path and the second path, and (5) to identify which of the stress value or estimated stress value of the first path and the stress value or estimated stress value of the second path is the greatest and reaches the maximum stress path value, wherein the stress value or estimated stress value of the first path is at least the stress value or estimated stress value of one location of the first path and the subsequent location (6) To effectively reduce the magnitude of the highest stress path value, during a climate event, in real time, redistributing the fluid flow between the first and second paths using one or more flow distribution components based on one or more flow redistribution strategies, wherein one or more of the flow distribution components are located at one or more fluid flow intersections, each of which is located downstream from the initial location, and as a result, the fluid flow leaving the initial location flows through the initial path into one or more of the flow distribution components, each of which is located at one or more fluid flow intersections, and one or more of the flow distribution components are communicably coupled to one or more fluid flow controllers.

[0019] In some embodiments, this teaching provides other ways of implementing an infrastructure strategy. One such exemplary method is to (1) use a server operating with one or more initial sensors to obtain a server-estimated range of initial values ​​based on initial values ​​and forecasts of climatic events, wherein at least one of the one or more initial sensors is located at or near an initial location and measures fluid condition attributes at that location to generate initial values, and the server is communicatively coupled to one or more fluid flow controllers to transmit the initial values ​​or the server-estimated range of initial values, and the server transmits the initial values ​​if the initial values ​​are not within the server-estimated range of initial values; (2) use a successor sensor located at or near a successor location in one or more fluid flow controllers to obtain successor values, wherein the successor sensor is located downstream from the initial sensor; and (3) use a server operating with one or more intermediate sensors to obtain forecasts of climatic events and (4) Obtaining a server estimated range of intermediate values ​​based on intermediate values, wherein at least one of one or more intermediate sensors is located at or near one location on a first path, and measures fluid condition attributes at that location to generate intermediate values, and the server is communicably coupled to transmit the intermediate values ​​or server estimated range of intermediate values ​​to one or more fluid flow controllers, and the server transmits intermediate values ​​if the intermediate values ​​are not within the server estimated range of intermediate values, and the first path provides fluid communication between the initial location and the subsequent location, and (5) In one or more fluid flow controllers, determining the stress values ​​of the subsequent location based on the subsequent values, and determining the stress values ​​or estimated stress values ​​of the initial location and one or more intermediate values ​​or server estimated range of intermediate values, respectively, and (6) the stress values ​​of the subsequent location, and(6) Formulating one or more infrastructure management strategies to reduce stress values ​​or estimated stress values ​​at the initial location and / or stress values ​​or estimated stress values ​​at one location on the first path, based on the stress values ​​or estimated stress values ​​at the initial location and / or one location on the first path; (7) Formulating one or more successful infrastructure management strategies to reduce stress values ​​or estimated stress values ​​at the initial location and / or stress values ​​or estimated stress values ​​at one location on the first path, based on comparisons using one or more of the key point indicators of success in reducing stress values ​​or estimated stress values ​​at the initial location and / or one location on the first path; (8) determining a management strategy; (9) storing one or more successful infrastructure management strategies in one or more fluid flow controllers; (10) redistributing fluid flow between the initial path and the first path using one or more successful infrastructure management strategies to effectively reduce stress at the initial location and / or one location of the first path during the subsequent climatic event, the redistribution being performed using one or more flow distribution components located at one or more flow intersections, each of which is downstream from the initial location, and consequently, the fluid flow leaving the initial location flows through the initial path into one or more flow distribution components, each of which fluid flow intersections intersects the initial path and the first path.

[0020] In some embodiments, this teaching provides methods for implementing an infrastructure strategy. One such exemplary method is to (1) obtain a success value using a success sensor located in or near a success location in one or more fluid flow controllers, the success sensor being located downstream from the initial location, and the success value being obtained using a success sensor, the success sensor being located downstream from the initial location; (2) obtain a plurality of intermediate values ​​using a plurality of intermediate sensors, the success sensor being located in or near a location in a first path, the success sensor being located in or near a location in a second path, the success sensor being located in or near a location in a second path, the success sensor being located in a success sensor, the success sensor being located in a success sensor, and the success sensor being located downstream from the initial location; and (3) obtain a plurality of intermediate values ​​using a server operating with at least one of the intermediate sensors to forecast and intermediate climate events. (4) In real time,Using one or more fluid flow controllers, the stress values ​​of the subsequent locations, and the stress values ​​or estimated stress values ​​of each location in the first and second paths, are calculated based on one or more subsequent values, one or more intermediate values, or one or more server-estimated ranges of intermediate values, one or more additional intermediate values, or one or more additional server-estimated ranges of intermediate values, respectively, and based on the stress values ​​or estimated stress values ​​of each location in the first and second paths. (5) Determine the stress value and generate the stress value or estimated stress value for each of the first and second paths, and identify which of the stress value or estimated stress value for the first path and the stress value or estimated stress value for the second path is the highest and reaches the highest stress path value, wherein the stress value or estimated stress value for the first path represents at least the sum of the stress value or estimated stress value for one location in the first path and the stress values ​​for subsequent locations, and the stress value or estimated stress value for the second path represents at least the sum of the stress values ​​for one location in the second path. (6) To identify, in order to effectively reduce the magnitude of the highest stress path value, the fluid flow between a first path and a second path in real time during a climatic event, using one or more flow distribution components and based on one or more flow redistribution strategies, wherein one or more of the flow distribution components are located at one or more fluid flow intersections, each of which is located downstream from the initial location, and as a result, the fluid flow leaving the initial location is (7) Based on a comparison using one or more keypoint indicators of the success of stress value or estimated stress value reduction in each of the first and second paths, and in each of the first and second paths, the flow flows through a path into one or more of the flow distribution components, and each of the first and second paths intersects the first and second paths, and one or more of the flow distribution components are communicatively coupled to one or more of the fluid flow controllers,(8) including determining one or more successful infrastructure management strategies and storing one or more of the successful infrastructure management strategies in one or more of the fluid flow controllers.

[0021] In some embodiments, this teaching provides other ways of implementing an infrastructure strategy. One such exemplary method is to (1) use a server operating with one or more initial sensors to obtain a server-estimated range of initial values ​​based on initial values ​​and forecasts of climatic events, wherein at least one of the one or more initial sensors is located at or near the initial location and generates an initial value by measuring fluid condition attributes at that location, and the server is communicatively coupled to one or more fluid flow controllers and transmits the initial value or the server-estimated range of initial values ​​to one or more fluid flow controllers, and the server transmits the initial value if the initial value is not within the server-estimated range of initial values, and (2) use a server operating with one or more subsequent sensors to obtain a server-estimated range of subsequent values ​​based on subsequent values ​​and forecasts of climatic events, wherein at least one of the one or more subsequent sensors is located at or near the subsequent location and generates a subsequent value by measuring fluid condition attributes at that location, and the server transmits the subsequent value or (3) Using a server operating with one or more intermediate sensors to obtain one or more server-estimated intermediate ranges of values ​​based on climate event forecasts and one or more intermediate values, wherein at least one of the one or more intermediate sensors is located at or near one location on a first path that provides fluid communication between an initial location and a subsequent location, and at least one of the intermediate sensors measures fluid condition attributes at one location on the first path to generate one or more intermediate values, the server transmits one or more intermediate values ​​or one or more server-estimated intermediate ranges of values ​​to one or more fluid flow controllers, the server transmits one or more server-estimated intermediate ranges of values, and (4) respectively, an initial value or a server-estimated range of an initial value,Determining stress values ​​or estimated stress values ​​for an initial location, one location in the first path, and a subsequent location based on one or more intermediate values ​​or one or more server-estimated ranges of intermediate values, and a subsequent value or one or more server-estimated ranges of subsequent values, the determination includes using one or more fluid flow controllers, where each of the initial location, one location in the first path, and a subsequent location may, at least in part, cause the measured or estimated fluid condition attribute values ​​at or near the constraint location to reach or exceed a predetermined acceptable threshold attribute value assigned to the constraint location, due to the acceptance of fluid flow from multiple intermediate flows during a climatic event, the infrastructure (5) determining the constraint locations within the initial path and the first path, and establishing the stress values ​​or estimated path stress values ​​for each of the initial and first paths by adding the stress values ​​or estimated stress values ​​of the constraint locations present along each of the initial and first paths to generate the initial path stress value or estimated initial path stress value and the first path stress value or estimated first path stress value, (6) identifying which of the initial path stress value or estimated initial path stress value and the first path stress value or estimated first path stress value has the highest magnitude in order to reach at least one highest stress path value, and (7) redistributing the fluid flow in the initial and / or first path in real time during a climatic event and based on one of the flow redistribution strategies to effectively reduce the magnitude of at least one of the highest stress path values.

[0022] In some embodiments, this teaching provides other ways of implementing an infrastructure strategy. One such exemplary method is to (1) use a server operating with one or more successor sensors to obtain one or more server-estimated ranges of successor values ​​based on successor values ​​and forecasts of climatic events, wherein at least one of the one or more successor sensors is located at or near a successor location and measures fluid condition attributes at that location to generate successor values, and the server transmits the successor value or server-estimated range, and if the successor value is not within the server-estimated range of the successor value, the server transmits the successor value, and (2) use a server operating with multiple intermediate sensors to obtain server-estimated ranges of intermediate values ​​and additional server-estimated ranges of intermediate values ​​based on forecasts of climatic events and multiple intermediate values, wherein at least one of the multiple intermediate sensors is located at or near one location on a first path and measures fluid condition attributes at that location to generate one or more intermediate values, and at least one of the multiple intermediate sensors is located at one location on a second path (3) The server is located at or near the initial location and measures fluid condition attributes at the location to generate one or more additional intermediate values, the first and second paths provide fluid communication between the initial location and the subsequent location, the server estimates the intermediate value server range based on the intermediate value, the additional server estimates the intermediate value server range based on the additional intermediate value, the server transmits one or more of the intermediate value or the server estimates the intermediate value and the additional intermediate value or the additional server estimates the intermediate value to one or more of the fluid flow controllers, the server transmits one or more of the intermediate values ​​if one or more of the intermediate values ​​are not within the server estimates the intermediate value server range, the server transmits one or more of the additional intermediate values ​​if one or more of the additional intermediate values ​​are not within the additional server estimates the intermediate value server range, obtaining the server estimates the intermediate value server range and the additional server estimates the intermediate value server range, and (4) in one or more of the fluid flow controllers, the server estimates the subsequent value or the server estimates the subsequent value, one or more of the intermediate values ​​or the server estimates the intermediate value server range,determining the stress value or estimated stress value for each of the subsequent location, one location on the first route, and one location on the second route, based on one or more of the additional intermediate values or an additional server estimation range for the intermediate values; (4) formulating a plurality of infrastructure management strategies for reducing stress along the first route and / or the second route, based on the stress value or estimated stress value for each of the subsequent location, one location on the first route, and one location on the second route; (5) comparing each of the infrastructure management strategies against the outcome of a climatic event, using one or more key performance indicators for the degree of success in reducing the stress value or estimated stress value of the first route and / or the second route; (6) making a determination based on the comparison using one or more of the key performance indicators for the degree of success in reducing the stress value or estimated stress value of the first route and / or the second route; and (7) storing one or more of the successful infrastructure management strategies in one or more of the fluid flow controllers.

[0023] The structure and operation of the present system and teachings, together with its additional objects and advantages, will be better understood from the following detailed description of specific embodiments when read in conjunction with the accompanying drawings described later. Brief Description of the Drawings

[0024] [Figure 1] It is a schematic diagram of a conventional approach to wastewater treatment that provides both low-quality and high-quality sewage treatment. [Figure 2] A simplified schematic diagram of the underlying infrastructure targeted by the present infrastructure management system, which highlights how excess fluid flow from intermediate flows (e.g., stormwater drainage systems and smaller sewage lines) flows into fluid flow paths (e.g., trunk lines and interceptor lines that provide fluid communication between initial locations such as retention ponds, catchment areas and sub-catchment areas, and subsequent locations such as wastewater treatment facilities), which exerts undesirable stress on the infrastructure during climatic events. [Figure 3]FIG. 1 is a diagram showing the present infrastructure management system according to an embodiment of the present configuration, in which three fluid flow path options, for example, an initial fluid flow path (hereinafter referred to as "initial path"), a first fluid flow path (hereinafter referred to as "first path"), and a second fluid flow path (hereinafter referred to as "second path") alleviate stress on the infrastructure. [Figure 4] FIG. 2 is a diagram showing another infrastructure management system according to another embodiment of the present configuration, which provides two fluid flow path options for alleviating stress on the infrastructure, for example, a first path and a second path. [Figure 5] FIG. 3 is a diagram showing still another infrastructure management system according to still another embodiment of the present configuration, which provides two fluid flow path options for alleviating stress on the infrastructure, for example, an initial path and a first path. [Figure 6] FIG. 4 is a perspective view of a flow distribution component according to an embodiment of the present system, which is incorporated into dynamic underflow control in a novel manner and redistributes flow between various fluid flow path options as shown in FIGS. 3 to 5 to reduce undesirable stress on the infrastructure. [Figure 7] FIG. 5 is a perspective view of another flow distribution component according to another embodiment of the present configuration, which is incorporated into an outlet storage facility and redistributes flow between various fluid flow path options as shown in FIGS. 3 to 5 to reduce undesirable stress on the infrastructure. [Figure 8] FIG. 6 is a perspective view of still another flow distribution component according to still another embodiment of the present configuration, which is incorporated into an off-line storage facility and redistributes flow between various fluid flow path options as shown in FIGS. 3 to 5 to reduce undesirable stress on the infrastructure. [Figure 9] FIG. 7 is a perspective view of still another flow distribution component according to another embodiment of the present configuration, which is incorporated into a storage facility (for example, a rainwater storage tank) and redistributes flow between various fluid flow path options as shown in FIGS. 3 to 5 to reduce undesirable stress on the infrastructure. [Figure 10]Figure 9 shows a control scheme according to one embodiment of this teaching, implemented under different climatic conditions to control the operation of the flow distribution components shown and reduce undesirable stresses on the infrastructure. [Figure 11A] Figure 9 shows a graph representing the stress values ​​against the fluid condition attributes of the fluid stored in the storage facility, illustrating the setting of a relatively high predetermined acceptable threshold attribute value in the case of a small-scale storm. [Figure 11B] Figure 9 shows a graph representing the stress values ​​against the fluid condition attributes of the fluid flowing through the storage facility, illustrating the setting of a relatively high predetermined acceptable threshold attribute value in the case of a small-scale storm. [Figure 12A] Figure 9 shows a graph representing stress values ​​against fluid condition attributes of the fluid stored in the reservoir, illustrating the setting of relatively low predetermined acceptable threshold attribute values ​​in the case of a large-scale storm. [Figure 12B] Figure 9 shows a graph representing the stress values ​​against the fluid condition attributes of the fluid flowing through the storage facility, illustrating the setting of a relatively low predetermined acceptable threshold attribute value in the case of a large-scale storm. [Figure 13] This is a schematic diagram of a decision support system according to one embodiment of the present configuration, which preferably operates independently of the acquisition of sensor measurements and / or estimated sensor values ​​in real time, generates one or more flow redistribution strategies to assist an operator in easing stress and implementing one or more of the flow redistribution strategies. [Figure 14] This figure shows a control system architecture according to one embodiment of this configuration, including high-level strategy, low-level control, and local control. [Figure 15] Figure 13 is a schematic diagram of a part of an infrastructure network management system according to one embodiment of this configuration, which includes a decision support system, a remote monitoring and control unit (hereinafter referred to as "RTU") which is communicatively coupled to sensors and a server, and a server which is communicatively coupled to the RTU. [Figure 16]Figure 15 is a schematic diagram of a portion of the infrastructure network management system, which includes a server that is communicatively coupled to multiple RTUs and, for the sake of simplicity, stores internally a digital twin model that estimates sensor values ​​of internal fluid state attributes of infrastructure items monitored by one of the RTUs as a function of time. [Figure 17] This is a schematic diagram of a portion of an infrastructure network management system according to another embodiment of this configuration, which includes one copy of the digital twin model stored on a server and another copy of the digital twin model stored on an RTU. [Figure 18] This is a schematic diagram of a part of an infrastructure network management system that, according to another embodiment of this configuration, uses a digital twin model of a server to generate estimated sensor values ​​for one or more fluid condition attributes inside a remotely located infrastructure item, thereby facilitating the management of the item. [Figure 19] This is a schematic diagram of part of an infrastructure network management system that, according to yet another embodiment of this configuration, uses a digital twin model—namely, one copy residing on the server and another copy residing on the RTU—to determine whether the forecasts of environmental or climatic conditions used by the digital twin model in generating estimated sensor values ​​for fluid state attributes are outliers and should be maintained, or whether the digital twin model no longer provides reliable estimates and should be updated, recalibrated, or rebuilt. [Figure 20] This flowchart illustrates an infrastructure management method according to one embodiment of this teaching, which involves redistributing fluid flow among multiple fluid channel options available to reduce undesirable stress on the infrastructure. [Figure 21-1]This flowchart illustrates another method of infrastructure management, according to a different embodiment, which uses estimated intermediate values ​​obtained by a server operating with one or more intermediate sensors that measure the fluid condition attributes of the fluid flowing to one location in a fluid flow path that facilitates fluid communication between an initial location and a subsequent location, or the fluid stored there. [Figure 21-2] This flowchart illustrates another method of infrastructure management, according to a different embodiment, which uses estimated intermediate values ​​obtained by a server operating with one or more intermediate sensors that measure the fluid condition attributes of the fluid flowing to one location in a fluid flow path that facilitates fluid communication between an initial location and a subsequent location, or the fluid stored there. [Figure 22-1] This figure illustrates a method for implementing an infrastructure management strategy according to one embodiment of the present invention, which involves redistributing fluid flow in accordance with one or more successful infrastructure management strategies among multiple fluid flow path options available to reduce undesirable stress on the infrastructure. [Figure 22-2] This figure illustrates a method for implementing an infrastructure management strategy according to one embodiment of the present invention, which involves redistributing fluid flow in accordance with one or more successful infrastructure management strategies among multiple fluid flow path options available to reduce undesirable stress on the infrastructure. [Figure 23-1] This flowchart illustrates another method of infrastructure management, according to another embodiment of this instruction, which uses estimated sensor values ​​of constraint locations, such as an initial location, locations on one or more fluid flow paths, and subsequent locations, to reduce undesirable stress on the infrastructure. [Figure 23-2]This flowchart illustrates another method of infrastructure management, according to another embodiment of this instruction, which uses estimated sensor values ​​of constraint locations, such as an initial location, locations on one or more fluid flow paths, and subsequent locations, to reduce undesirable stress on the infrastructure. [Modes for carrying out the invention]

[0025] In the following description, numerous specific details are provided to give a complete understanding of the system, method, teachings, and configuration. However, it will be apparent to those skilled in the art that the system, method, teachings, and configuration can be practiced without being limited to some or all of these specific details. In other instances, well-known process steps are not described in detail so as not to unnecessarily obscure the system, method, teachings, and configuration.

[0026] This instruction provides efficient fluid flow control in response to urban development, changes in water use patterns, and / or fluctuating weather conditions, particularly climate events (e.g., storm events), by monitoring and regulating fluid flow to mitigate undesirable stresses in infrastructure.

[0027] This instruction provides the configurations and methods for infrastructure management and the implementation of infrastructure management strategies. These configurations include certain key components such as sensors, one or more fluid flow controllers, and one or more flow distribution components. The sensor network may include initial sensors located at initial locations (e.g., large reservoir locations), subsequent sensors located at subsequent locations (e.g., wastewater treatment plant locations), and one or more intermediate sensors along one or more fluid channels providing fluid communication between the initial and subsequent locations. Each of these sensors at various locations measures one or more fluid condition attributes selected from the group including fluid flow rate, fluid height, volume, hydraulic capacity, residence time, storage capacity, contaminant concentration, and fluid quality.

[0028] One or more flow controllers in this system receive data from a sensor network in real time and perform several critical functions, such as calculating stress values ​​at various locations (e.g., constraint locations along the path) based on sensor data, and preferably also determining path stress values ​​by adding up the stress values ​​of various locations of objects present along each path, and based on these types of stress values, a flow redistribution strategy to reduce undesirable stress on the infrastructure can be developed and implemented. One or more flow controllers may incorporate a proportional-integral-differential control mechanism for data processing and strategy implementation.

[0029] Where used herein, “stress value” refers to a value obtained by calculating the ratio of a measured fluid condition attribute at a particular location to a predetermined acceptable threshold attribute value assigned to that location. The fluid condition attribute value may be a fluid flow rate value or a fluid storage value through that location, and is typically obtained using a sensor located at or near that location. The predetermined acceptable threshold attribute value may be set by an engineer using historical sensor data. For example, an engineer may examine historical sensor data to assess the stresses experienced at one or more problem locations within the infrastructure during a particular climatic event and set an appropriate value for the predetermined acceptable threshold attribute value. According to this teaching, measured fluid condition attribute values ​​at a particular location within the infrastructure should not exceed the predetermined acceptable threshold attribute value assigned, which results in a stress value greater than 1. According to this teaching, a location recording a stress value greater than 1 is considered to be operating in an undesirable mode, i.e., in an overcapacity mode. Operating infrastructure locations in overcapacity mode is undesirable because it not only causes infrastructure failures but also leads to sewage or wastewater contamination of clean water masses such as rivers, lakes, and reservoirs.

[0030] This instruction recognizes the need to address this issue among other problems encountered during climatic events and proposes effectively reducing stress at one or more constraint locations within the infrastructure by redistributing fluid flow as described below. According to this instruction, a location within the infrastructure is considered a constraint location if, during a climatic event, the measured or estimated values ​​of the fluid condition attributes at that location may reach or exceed predetermined acceptable threshold attribute values ​​assigned to that location.

[0031] This instruction recognizes that within an infrastructure, there may be multiple distinct paths extending from an initial location (e.g., the location of a large reservoir) to a subsequent location (e.g., the location of a wastewater treatment plant), and that each of these paths may contain one or more constraint locations. For this purpose, this instruction proposes calculating a path stress value or estimated path stress value, which represents the sum of the stress values ​​or estimated stress values ​​of each constraint location present along the path. The redistribution of fluid flow as described in this instruction also effectively reduces undesirable stresses in paths that experience high stress values ​​or estimated stresses during climatic events, using multiple distinct sets of paths available as options for mitigating stress within the infrastructure.

[0032] This instruction recognizes that a given acceptable threshold attribute value may vary based on the intensity of a climatic event, such as a storm. To effectively manage internal stress on the infrastructure, this instruction recommends using a relatively high given acceptable threshold attribute value for small storms and a relatively low given acceptable threshold attribute value for large storms.

[0033] Regardless of the intensity of climatic events, redistributing fluid flow among multiple different paths within the infrastructure in accordance with this teaching allows fluid condition attribute values ​​at constrained locations to remain below their assigned predetermined acceptable thresholds and / or enables stress reduction in high-stress paths. For this purpose, this teaching recognizes the importance of identifying the existence of multiple different paths available as options for mitigating stress within the infrastructure. One or more flow distribution components of the system are preferably used to perform the fluid flow redistribution function and are located at the intersections of multiple paths. The flow distribution components redistribute fluid flow based on instructions from a flow controller and include facilities or components such as fluid facilities, pump stations, gates, inflatable dams, weirs, or valves.

[0034] This system and teachings provide components or features for infrastructure management and the implementation of infrastructure management strategies. The method includes features such as obtaining data and / or estimates, calculating and / or estimating stress values, developing flow redistribution strategies to alleviate stress within infrastructure, and implementing these strategies to alleviate stress. For the purpose of adapting to this teaching, the method does not rely on any specific system or structure. However, implementing the method using this system represents a preferred embodiment of this teaching.

[0035] As an example, the data acquisition function of this method preferably uses sensors that continuously measure fluid condition attributes and transmit sensor measurement data to a flow controller in real time. Similar to the use of a network of sensors, the value estimation function of this method preferably uses a server. The server is communicatively coupled to one or more RTUs that operate with these sensors located at or near the constraint location. To perform specific local control functions, the RTU maintains a synchronized machine learning flow model, and its digital twin is maintained on the server. Based on specific RTU criteria, during a climate event, the RTU transmits actual sensor measurements received from sensors at or near the constraint location to the server. The server may estimate the values ​​of fluid condition attributes at or near the constraint location, i.e., sensor measurements, during a climate event. The server preferably transmits the sensor measurements or these estimates to one or more fluid flow controllers in real time, depending on which the server considers more reliable.

[0036] As another example, the stress calculation feature of this instruction uses one or more flow controllers that can calculate stress values ​​and / or estimated stress values ​​at each monitored location in the infrastructure based on sensor measurement data and the estimates described above, and further calculate path stress values ​​and / or estimated path stress values ​​as shown above.

[0037] As another example, based on stress values ​​and / or estimated stress values ​​at constraint locations, path stress values ​​and / or estimated path stress values, and predetermined acceptable threshold attribute values ​​used for various types of storms, the fluid flow controller in this teaching formulates a flow redistribution strategy to alleviate stress within the infrastructure.

[0038] As another example, one or more flow distribution components redistribute fluid flow at intersections between fluid channels available as options for accommodating excess flow, thereby reducing undesirable stresses on high-stress paths and / or high-stress constraint locations within the infrastructure. For example, this feature maintains stress levels within the infrastructure at an acceptable level by redistributing fluid flow through multiple different paths so that the stress level at the constraint location is below a predetermined acceptable threshold attribute value to which is assigned. In a preferred embodiment of this teaching, the fluid condition attribute value at the constraint location with the maximum stress value is modified so that it is below a predetermined acceptable threshold attribute value to which is assigned for effective infrastructure management.

[0039] Using these features, this teaching also provides advanced functions and features for effective infrastructure management. One such advanced feature, as an example, is storm event adaptation, which is also referred to herein as “adaptive flow control,” as it enables the infrastructure management system to adapt flow control to changing storm conditions, i.e., to adjust the flow redistribution strategy in real time based on the changing severity of the storm. Specifically, the system changes predetermined threshold settings in real time as needed, preferably when conditions develop unpredictably.

[0040] For example, if an expected small storm unexpectedly develops into a large storm, this method dynamically changes the stress threshold setting from a relatively high predetermined acceptable threshold value to a relatively low predetermined acceptable threshold value. Furthermore, if a small storm occurs instead of the expected large storm event, this method dynamically changes the stress threshold setting from a relatively low predetermined acceptable threshold value to a relatively high predetermined acceptable threshold value.

[0041] This system and method provide a proactive flow reallocation strategy by estimating future fluid condition attribute values ​​and stress values ​​using climate event forecasts and digital twin models, enabling effective proactive measures for infrastructure management.

[0042] This system and method allows for the evaluation of the effectiveness of multiple flow redistribution strategies after a climate event and stores successful flow redistribution strategies for future use. This enables continuous improvement of infrastructure management over time.

[0043] In relation to wastewater treatment facilities that include high-quality and low-quality treatment methods, this system and method effectively manage fluid flow, as well as within the infrastructure. However, the specific embodiments of this teaching do not directly redistribute fluid flow between the high-quality and low-quality treatment methods within the wastewater treatment facility.

[0044] This system and method provides a comprehensive approach for real-time, effective infrastructure management, integrating advanced monitoring, predictive modeling, and adaptive control strategies to maintain the integrity of existing infrastructure during various climatic events. In specific embodiments of this system and method, this teaching prioritizes infrastructure stress management and performance over cost optimization, focusing on maintaining stress levels below critical thresholds across one or more constraint locations.

[0045] Figure 1 shows a sewage management facility 10, which includes a sewage system 15 connected to a wastewater treatment facility 25. The sewage system 15 has specific components, namely a catchment area 12, a storage tank 14, an outlet 16, a high-quality treatment line 18, and a low-quality treatment line 20. The treatment system 25 provides high-quality and low-quality treatment.

[0046] In low-quality treatment, the fluid is partially treated to produce water. Low-quality treatment does not rely on biological treatment, which can be time-consuming. Rather, low-quality treatment implements mechanical and chemical treatment to enable high throughput of the fluid treatment. In contrast, high-quality treatment provides "complete" treatment of water, in which all contaminants, including bacteria, are reduced to below the limits established by the Environmental Protection Agency. Thus, high-quality treatment incorporates mechanical, chemical, and biological treatment of wastewater to produce water.

[0047] According to the configuration in Figure 1, the contents of the storage tank 14 are transported through a high-quality treatment line 18 for high-quality treatment performed using a primary tank 22 and a secondary tank 24. Typically, the primary tank 22 has a higher treatment flow rate capacity than the secondary tank 24. In the high-quality treatment, the contents of the storage tank 14 are first subjected to solid removal, and then treated for bacteria and nutrients. When the flow rate capacity of the high-quality treatment reaches its maximum capacity, the contents of the storage tank 14 are transported through a low-quality treatment line 20 to a low-quality treatment tank 26. In this conventional method for wastewater treatment, the primary tank 22 is configured to perform mechanical and chemical treatment, and the secondary tank is preferably configured to perform contaminant removal.

[0048] A low-quality treatment tank (e.g., tank 26 in Figure 1) produces relatively low-quality treated wastewater, but this occurs at high flow rates. As a result, treatment methods that rely on high flow rates for wastewater treatment, such as those realized when low-quality treatment is activated during a storm event, reduce the chance of overflow from the outlet of the storage tank (e.g., outlet 16 of storage tank 14 in Figure 1). In particular, if the storm event is considered a "large-scale storm event," conventional methods activate low-quality treatment well in advance of the storm's arrival. If low-quality treatment is not activated during a large-scale storm event, conventional methods recognize that the undesirable consequence of "overflow" will occur. Furthermore, if the storm event is considered a "small-scale storm event," conventional methods consider the energy expenditure required to activate and keep low-quality treatment active to be unnecessary and, from one perspective, even more undesirable than releasing low-quality fluid into the environment. According to this method, not enabling low-quality processing for "minor storm events" not only avoids unnecessary energy consumption but also prevents the undesirable consequences of "overflow." A major storm event may involve more than 2.54 cm (1 inch) of rainfall in one hour, while a minor storm event may involve less than 0.254 mm (0.01 inches) of rainfall in one hour.

[0049] Untreated sewage overflow is the least desirable outcome, while low-quality sewage treatment is a desirable outcome compared to sewage overflow. Against this backdrop, this conventional method analyzes the desirability of these outcomes, "untreated sewage overflow" or "no untreated sewage overflow," in light of the amount of energy consumed to avoid overflow. In specific situations under the conventional method, "untreated sewage overflow" is an acceptable outcome if no energy is wasted to enable low-quality treatment. Consequently, a decision must be made before a storm arrives whether or not to enable low-quality treatment under the conventional method, and this decision may be based on the magnitude of the storm.

[0050] Based on these types of results and taking into account their underlying energy requirements, this conventional wastewater treatment method enables low-quality or high-flow treatment with ample buffer time before the arrival of a storm. Furthermore, in this method, the cost of achieving the results for the sewage system is established based on the number of times one or more results are achieved. As an example, the following cost function is used.

[0051] C storage =Y / (X+Y) (Equation 1) In Equation 1, "Y" is equal to the number of times one of the possible outcomes (in the initial path 210) is realized, and "X" is equal to the number of times the other of the possible outcomes (in the initial path 210 step 210) is realized. In this example, one of the possible outcomes (e.g., "no untreated sewage overflow") is different from the other of the possible outcomes (e.g., "untreated sewage overflow").

[0052] This conventional wastewater treatment method also calculates another competing cost function based on the number of fluid condition attributes in the sewage system.

[0053]

number

[0054] Therefore, this teaching demonstrates that the operation of the fluid flow controller in the conventional method is cost C to achieve the results for the sewage system. storage The cost C of the flow through the sewage system stIt is recognized that conventional fluid flow controllers are limited to controlling the fluid or sewage flow through the sewage system 10 to minimize the difference between the above and the above. In other words, conventional fluid flow controllers are limited to controlling the risk of overflow (C) while adapting to changing climatic conditions and treatment methods. storage (represented by) and operating cost (C st It operates with limited capabilities to minimize both of the following:

[0055] One or more fluid flow controllers of this system and method achieve a distinctly different objective of effectively mitigating stress within infrastructure, independently of conventional methods for wastewater treatment, in stark contrast. In this context, preferred embodiments of this system and method do not need to include, and do not rely on, (1) determining a cost function for the flow inside the infrastructure, (2) determining a cost function for one or more possible outcomes of the infrastructure during a climatic event, (3) minimizing the difference between the cost function for one or more possible outcomes of the infrastructure and the cost function for the flow inside the infrastructure, and (4) redistributing fluid flow at the intersection locations of high-quality and low-quality treatment methods.

[0056] This instruction recognizes, in particular, that excessive fluid flow from intermediate flows entering fluid channels providing fluid communication between initial and subsequent locations during climatic events can impose undesirable stresses on infrastructure. In connection with this recognition, Figure 2 shows an infrastructure layout 50 that includes a route 55 (e.g., bypass lines, main lines and / or interceptor lines) that starts at an initial location 52 (e.g., fluid reservoirs, catchment areas and subcatchment areas), passes through an intermediate location 54, and extends to a subsequent location 56 (e.g., wastewater treatment facilities). Fluid flow from intermediate flows 58 (e.g., stormwater drainage systems and smaller sewer lines) is introduced into route 55 before and after intermediate location 54.

[0057] According to this instruction, as an example, excess fluid flow from intermediate flow 58 prior to intermediate location 54 may generate undesirable stress at intermediate location 54 if, during a climatic event, for example, the fluid condition attribute value at intermediate location 54 may reach or exceed a predetermined acceptable threshold attribute value assigned to intermediate location 54. According to this instruction, similarly, as another example, excess fluid from intermediate flow 58 prior to subsequent location 56 may generate undesirable stress at subsequent location 56 if, during a climatic event, for example, the fluid condition attribute value at subsequent location 56 may reach or exceed a predetermined acceptable threshold attribute value assigned to subsequent location 56. As yet another example, flow from other intermediate flows entering or entering prior to initial location 52 may generate undesirable stress at initial location 52 if, during a climatic event, for example, the fluid condition attribute value at initial location 52 may reach or exceed a predetermined acceptable threshold attribute value assigned to initial location 52.

[0058] Under these circumstances, this teaching considers each of the initial location 52, intermediate location 54, and subsequent location 56 as a “constrained location.” This is because, during a climatic event, the fluid condition attribute values ​​at each of these locations within the infrastructure may, undesirably, reach or exceed predetermined acceptable threshold attribute values ​​assigned to each of these locations. Therefore, according to this teaching, a location within the infrastructure is considered a “constrained location” if it satisfies the condition that, for any reason, it records high fluid condition attribute values ​​due to excessive flow and, undesirably, may reach or exceed predetermined acceptable threshold attribute values ​​assigned to that location.

[0059] Figures 3–5 show several different exemplary configurations of the underlying infrastructure that are effectively managed by the method and system. Although not shown in Figures 3–5 for the sake of illustration, there are intermediate flows similar to the intermediate flow 58 in Figure 2 that generate excess flow in various paths within the infrastructure during climatic events, resulting in undesirable stresses at constrained locations. The system and method operate on the underlying infrastructure to reduce or eliminate these undesirable stresses. Furthermore, this teaching recognizes that several different sets of paths present in each of Figures 3–5 are available as options for accepting and redistributing this excess fluid flow using the flow distribution components or redistribution features of the system and method, thereby reducing or eliminating undesirable stresses within the infrastructure.

[0060] Figure 3 shows one exemplary configuration of the base infrastructure 104, and this teaching recognizes the existence of three different path options for infrastructure stress relief. In Figure 3, the fluid flow starts at an initial location 106 in the fluid reservoir 108, passes through an initial path 110 to an intersection location, where a flow distribution component 116 is located. At the intersection location, the flow distribution component 116 can redistribute the fluid flow among three path options: the initial path 110, a first path 112, and a second path 114. In this configuration, both the first path 112 and the second path 114 facilitate fluid communication between the initial location 106 and a subsequent location 128. An intermediate location 118 represents one location on the first path 112, and another intermediate location 120 represents one location on the second path 114. A combined sewer overflow (CSO) 122 is located on the first route 112 after the intermediate location 118, and a surge tank 126 is located between the CSO 122 and the subsequent location 128.

[0061] This instruction recognizes that the presence of flow distribution components 116 at appropriate intersection locations redistributes fluid flow between the initial path 110, the first path 112, and the second path 114, thereby easing stress within the infrastructure. Furthermore, this instruction also recognizes that such fluid flow redistribution also reduces or eliminates undesirable overflows that may occur from the CSO 122 and / or surge tank 126 under extreme climatic conditions.

[0062] As background, CSO122 is commonly used in conventional infrastructure as a single pipe that carries both sewage and rainwater runoff. For example, under normal climatic conditions such as dry weather and light rain, the fluid in the first path 112 and the second path 114 is transported as usual, i.e., without the first path 112 and the second path 114 being subjected to stress, to the subsequent location 128, for example, a wastewater treatment plant. However, during climatic events such as heavy rain or snowmelt, the fluid volume at the intermediate location 118 on the first path 112 may exceed the allowable capacity at the intermediate location 118. This instruction recognizes that, in the absence of flow distribution components 116 and under these unexpected excessive flow conditions, CSO 122 risks (1) overflowing directly into nearby water masses 124 (e.g., rivers, lakes, or coastal waters), (2) discharging untreated or partially treated wastewater that contaminates water sources, and (3) imposing water pollution problems and health risks. Furthermore, this instruction also recognizes that reducing undesirable overflows from CSO 122 to achieve compliance with environmental regulations through infrastructure improvements, green infrastructure, and rainwater runoff systems may be excessively costly.

[0063] Surge tanks 126 are commonly incorporated as storage facilities in conventional infrastructure. They are used to manage rapid changes in flow rates, particularly during large storm events, and to provide an additional buffer to prevent sewer overflow. This teaching recognizes that using surge tanks 126 in the absence of flow distribution components 116 and in the event of an unexpected large storm carries similar risks associated with sewer overflow due to improper sizing and placement within the infrastructure.

[0064] According to this instruction, the presence of a flow distribution component 116 at an appropriate intersection location redistributes the fluid flow between the initial path 110, the first path 112, and the second path 114, thereby preventing undesirable sewage overflows that might otherwise occur from the CSO 122 and surge tank 126 in the absence of the flow distribution component 116.

[0065] Figure 4 shows one exemplary configuration of the base infrastructure 204, and this teaching recognizes the existence of two different paths available as options for infrastructure stress relief. In Figure 4, the fluid flow starts from the fluid reservoir 208, passes through the initial path to the intersection location, where a flow distribution component 216 is located. At the intersection location, the flow distribution component 216 can redistribute the fluid flow between two path options, namely a first path 212 and a second path 214. In this configuration, both the first path 212 and the second path 214 facilitate fluid communication between the fluid reservoir 208 and the subsequent location 128. Intermediate location 218 represents one location on the first path 212, and another intermediate location 220 represents one location on the second path 214. A combined sewer system (hereinafter referred to as "CSO") 222 is located on the first route 212 after the intermediate location 218, and a surge tank 226 is located between the CSO 222 and the subsequent location 228. In the absence of the flow distribution component 216 and during a climatic event, the CSO 222 is at risk of overflowing directly into the nearby water mass 224.

[0066] This instruction recognizes that the presence of flow distribution components 216 at appropriate intersection locations redistributes fluid flow between the first path 112 and the second path 114, thereby easing stress within the infrastructure. Furthermore, this instruction also recognizes that such fluid flow redistribution also reduces or eliminates undesirable overflows that may occur from the CSO 222 and / or surge tank 226 under extreme climatic conditions.

[0067] Figure 5 shows one exemplary configuration of the base infrastructure 204, and this teaching recognizes the existence of two different paths available as options for infrastructure stress relief. These two path options are different from those discussed in relation to Figure 4. In Figure 5, the fluid flow starts at the initial location 306 in the fluid reservoir 308, passes through the initial path 310 to the intersection location, where a flow distribution component 316 is located. At the intersection location, the flow distribution component 316 can redistribute the fluid flow between the initial path 310 and the first path 312. In this configuration, both the initial path 310 and the first path 312 facilitate fluid communication between the initial location 306 and the subsequent location 328. The intermediate location 318 represents one location on the first path 312. The CSO 322 is located after the intermediate location 318 on the first path 312, and the surge tank 326 is located between the CSO 322 and the subsequent location 328. In the absence of the flow distribution component 316 and during a climatic event, CSO 322 risks overflowing directly into the nearby water mass 324.

[0068] This instruction recognizes that the presence of flow distribution components 316 at appropriate intersection locations redistributes fluid flow between the initial path 306 and the first path 312, thereby easing stress within the infrastructure. Furthermore, this instruction also recognizes that such fluid flow redistribution also reduces or eliminates undesirable overflows that may occur from the CSO222 and / or surge tank 226 under extreme climatic conditions.

[0069] Figures 6-9 show several different embodiments of the flow distribution component according to one embodiment of this configuration, which redistributes flow between multiple different path options, as shown in Figures 3-5, in order to reduce undesirable stress on the infrastructure. For example, the flow distribution component in Figures 6-9 can be used with the infrastructure configuration in Figure 3 to redistribute flow between the initial path 110, the first path 112, and the second path 114 shown in Figure 3. As another example, the flow distribution component in Figures 6-9 can be used with the infrastructure configuration in Figure 4 to redistribute flow between the first path 212 and the second path 214 shown in Figure 4. As yet another example, the flow distribution component in Figures 6-9 can be used with the infrastructure configuration in Figure 5 to redistribute flow between the initial path 310 and the first path 312 shown in Figure 5.

[0070] Figure 6 shows a flow distribution component according to one embodiment of the configuration incorporated into dynamic underflow control. As an example, the dynamic underflow control in Figure 6 is shown as being used with the underlying infrastructure shown in Figure 5. In the dynamic underflow controller of Figure 6, an intermediate flow 340 (e.g., a main line) is provided with a diversion weir 348, which restricts the flow of fluid along a fluid path 324 toward the receiving area. The intermediate flow 340 is in fluid communication with a first path 312 (e.g., an interceptor line that can accept fluid flow from other intermediate flows, as shown in Figure 2) through an underflow line 342. The arrows indicate the direction of fluid flow within the first path 312 toward a subsequent location 328. A gate 346 is provided in the parallel underflow line 344 that provides fluid communication between the intermediate flow 340 and the first path 312. In these embodiments, the gate 346 serves as the flow distribution component 316 shown in Figure 5.

[0071] During climatic events that generate excessive fluid flow, the gate 346 in Figure 6, similar to the flow distribution component 316 in Figure 5, has available paths as options for redistributing such fluid flow and reducing stress within the infrastructure. Using one option path involves regulating the fluid flow through the first path 312, while using another option involves regulating the fluid flow so that the fluid flows back into the intermediate flow 340, preferably towards the location of its source, such as a fluid reservoir, for example, a catchment area or sub-catchment area.

[0072] The magnitude of the flow rate is modified through each path option by adjusting the status of gate 346, i.e., fully open, partially open, and closed, and infrastructure stress is relieved accordingly. For example, relating to Figure 5, if gate 346 is located at an intersection where flow distribution component 316 is present, opening gate 346 to a greater extent during a climatic event allows more water from the overloaded fluid reservoir 308 (e.g., an overloaded sub-catchment area) to enter the first path 312, thereby providing stress relief for the overloaded fluid reservoir 308, and in particular for the initial location 306 which is subjected to undesirable stress if the initial location 306 is considered a constrained location. As another example, closing the gate 346 to a greater extent during a climatic event allows more water from the overloaded first path 312 to flow back into the fluid reservoir 308 through the initial path 310, thereby providing stress relief to the overloaded first path 312, and in particular to the intermediate location 318, which is subjected to undesirable stress on the first path 312 if the intermediate location 318 is considered a constrained location.

[0073] As a result, the system and method enable the management of hydraulic grade lines (HGLs) in various paths within infrastructure during climatic events that generate undesirable excessive flow, using dynamic underflow control in this configuration.

[0074] Figure 7 shows another flow distribution component according to another embodiment of this configuration, incorporated into the discharge reservoir. For example, the discharge reservoir in Figure 7 is shown as being used in conjunction with the infrastructure shown in Figure 5. In this embodiment of the discharge reservoir, the intermediate flow 340' (e.g., the main line) is provided with one or more diversion weirs 348, which restrict the flow of fluid along the fluid path 324 toward the receiving area. In this figure, the intermediate flow 340' is in fluid communication with a first path 312' that transports the fluid flow toward a subsequent location 328 via a throttle line 354. A fluid line 350 equipped with a drainage pump 350 transports the fluid flow from the intermediate flow 340' to the first path 312'. In these embodiments, the drainage pump 352 serves as the flow distribution component 316 shown in Figure 5.

[0075] During climatic events that generate excessive fluid flow, the drainage pump 352 in Figure 7, similar to the flow distribution component 316 in Figure 5, has two optional paths for redistributing such fluid flow and reducing stress within the infrastructure. Using one optional path involves regulating the fluid flow through the first path 312', while using the other option involves regulating the fluid flow through the intermediate flow 340' so that the fluid flows back into the intermediate flow 340', preferably toward the location of a fluid reservoir, such as its source, catchment area, or sub-catchment area.

[0076] The magnitude of the flow rate is corrected by adjusting the pump flow rate of the drainage pump 352 through each optional path. For example, relating to Figure 5, if the drainage pump 352 is located at an intersection where the flow distribution component 316 is present, the fluid flow can be contained within the intermediate flow 340', which can be considered similar to the initial path 310 in Figure 5, by either reducing the pump flow rate of the drainage pump 352 or completely shutting off the drainage pump 352, thereby preventing the outflow of sewage or contaminated fluid into the water mass 324, and if the intermediate location 318 is considered a constrained location, stress relief is provided for the upstream intermediate location 318 which is subjected to undesirable stress, as shown in Figure 5. As another example, when the stress inside the first path 312' decreases, opening the drain pump 352 allows the fluid stored inside the intermediate flow 340' to flow out through the first path 312' to the subsequent location 324, thereby providing stress relief to the intermediate flow 340' when it is filled to its capacity with stored fluid, and especially to the initial location 310 which has been subjected to undesirable stress on the first path 310 as shown in Figure 5, if the initial location 310 is considered a constrained location.

[0077] Figure 8 shows yet another flow distribution component in yet another embodiment of this configuration, incorporated into an offline storage unit. For example, the offline storage unit in Figure 8 is shown as being used in conjunction with the underlying infrastructure shown in Figure 5. In the offline storage unit embodiment of this configuration, an intermediate flow 340'' (e.g., a main line) transports fluid to a rainy-day storage tank 356 through a filling line 358 equipped with a filling gate 360, and the rainy-day storage tank 356 is reconnected to the intermediate flow 340'' through a fluid line 350'. The fluid line 350' is equipped with a drainage pump 352', which pumps fluid from the rainy-day storage tank 356 into the intermediate flow 340'' flowing toward a subsequent location 328. In these embodiments, the drainage pump 352' functions as the flow distribution component 316 shown in Figure 5.

[0078] The rainy-day storage tank 356 may be a tunnel. Drainage using the drainage pump 352' and filling using the tunnel or the rainy-day storage tank 356 are based on downstream constraints. For example, if the offline storage section in Figure 8 is shown to be used in conjunction with the underlying infrastructure shown in Figure 3, the filling operations described above may be performed when the downstream first path 112 and / or second path 114 shown in Figure 3 are subjected to undesirable stress, and / or when the downstream intermediate location 118 on the first path 112 and / or intermediate location 120 on the second path 114 shown in Figure 3 are subjected to undesirable stress and are considered to be constrained locations within the infrastructure. When such undesirable stress decreases, the drainage operations described above may be performed.

[0079] Figure 9 shows yet another flow distribution component according to yet another embodiment of this configuration, which is incorporated into a rainwater storage tank. For example, the rainwater storage tank of Figure 9 may be used in conjunction with the infrastructure shown in Figure 5. In the rainwater storage tank embodiment of this configuration, an intermediate flow (e.g., a main line) transports fluid through a filling line 358' to the rainwater storage tank 356', which connects to a gate 352'' and advances through a fluid line 350', preferably returning to the intermediate flow, an interceptor line, or a subsequent location 328 as shown in Figure 5. In these embodiments, the gate 352'' serves as the flow distribution component 316 shown in Figure 5.

[0080] The rainwater storage tank 356' stores liquid of varying volumes, which fills the rainwater storage tank 356' to several different fluid levels, namely, a disused fluid level 362, a flood prevention capacity 364, and an overflow prevention capacity 366. In this embodiment of the teaching, the flood prevention capacity 364 stores enough liquid to prevent flooding, and the overflow prevention capacity 366 stores enough liquid to prevent overflow in the rainwater storage tank 356'.

[0081] Figure 10 illustrates a control scheme 370 according to one embodiment of the present teachings that controls the filling and draining operations of the rainwater storage tank 356' shown in Figure 9. In a preferred embodiment of the present teachings, the control scheme 370 operates at a local control level that is entirely implemented within a SCADA system, enabling the rainwater storage tank 356' to operate properly even in the event of a failure in the SCADA system.

[0082] The control scheme 370 of Figure 10 under dry weather conditions, designated by reference numeral 372, leaves the gate 352'' of Figure 9 in the "open" position. In the overflow prevention configuration designated by reference numeral 374 in Figure 10, Level > Lwet, where "Level" refers to the fluid level present in the rainwater storage tank 356' shown in Figure 9, and "Lwet" refers to the length of pipe that experiences increased flow during rainy weather conditions, such as an intermediate flow pipe (e.g., a main line), that conveys excess fluid or sewage to the rainwater storage tank 356' through the fill line 358'. When Level > Lwet, the control scheme 370 of Figure 10 adjusts the operation of the gate 352'' of Figure 9 (e.g., controls its appropriate opening) so as to maintain the overflow prevention capacity 366 in the rainwater storage tank 356' shown in Figure 9. This operation of the control scheme 370 of Figure 10 avoids contamination of the water body by preventing overflow or discharge of fluid (e.g., sewage) into the water body. When Level < Lwet, the control scheme 370 of Figure 10 returns to dry weather conditions and operates accordingly, leaving the gate 352'' of Figure 9 in the "open" position.

[0083] Under the flood prevention condition designated by reference numeral 376 in FIG. 10, Level>Lsp, where "Lsp" refers to the length of a pipe flowing in a full flow state or operating at full capacity, for example, an intermediate flow pipe (e.g., a main line) that conveys excess fluid or sewage to the rainwater storage tank 356' through the filling line 358' is operating at full capacity. When Level>Lsp, the control scheme 370 of FIG. 10 adjusts the operation of the gate 352'' of FIG. 9 (e.g., controls its appropriate opening) so as to maintain the flood prevention capacity 364 in the rainwater storage tank 356' shown in FIG. 9. This operation of the control scheme 370 of FIG. 10 avoids contamination of the water body by preventing the overflow of fluid (e.g., sewage) into the water body. When Level<Lsp, the control scheme 370 of FIG. 10 returns to the overflow prevention condition 374 of FIG. 10 and operates accordingly, keeping the gate 352'' of FIG. 9 appropriately open to maintain the flood prevention capacity 364 of FIG. 9.

[0084] FIG. 11A shows a graphical representation 386 of stress values in the infrastructure (e.g., stress values calculated for constraint locations) versus storage level (e.g., the storage level in the CSO 122 of FIG. 3) for small-scale storms. According to this figure, in order to maintain a desired stress value of 1 (dimensionless quantity) during a small-scale storm, the storage level in the CSO 122 of FIG. 3 is preferably set to a value of "2", which is preferably expressed in units of distance (e.g., feet or meters) as the fluid level inside the CSO 122 of FIG. 3. Further, for the fluid condition attribute of the fluid level, the value of "2" is a setting for a relatively high predetermined allowable threshold attribute value (shown as a dashed line extending vertically in FIG. 11A). As a result, during a small-scale storm, when the fluid level inside the CSO 122 of FIG. 3 exceeds the value of "2", the stress value at the CSO 122 of FIG. 3 becomes higher than 1, and the CSO 122 of FIG. 3 requires stress relief through fluid flow redistribution in accordance with the present teachings.

[0085] Figure 11B shows a graphical representation of stress values ​​versus fluid flow rates within infrastructure for a small storm (for example, the bottleneck flow rate in the throttle line 354 in Figure 7 may be constrained due to a constrained location subjected to undesirable stress). According to this figure, in order to maintain a desired stress value of 1 during a small storm, the fluid flow rate is preferably set to a value of "4000" reported in units of flow rate, i.e., volume per unit time, flowing through the throttle line 354 in Figure 7. Furthermore, for the fluid condition attribute of the fluid flow rate, the value of "4000" is set against a relatively high predetermined acceptable threshold attribute value (shown as a vertically extending dashed line in Figure 11B). As a result, during a small storm, if the fluid flow rate inside the throttle line 354 in Figure 7 exceeds the value of "4000", the stress value in the throttle line 354 in Figure 7 becomes greater than 1, and the throttle line 354 in Figure 7 requires stress relief through fluid flow redistribution according to this teaching.

[0086] Figure 12A shows a graphical representation of stress values ​​versus storage levels (e.g., storage levels in CSO122 in Figure 3) within the infrastructure for a large storm. According to this figure, in order to maintain a desired stress value of 1 during a large storm, the storage level in CSO122 in Figure 3 is preferably set to a value of "1", which is preferably expressed in units of distance (e.g., feet or meters) as the fluid level inside CSO122 in Figure 3. Furthermore, for the fluid condition attribute of the fluid level, the value of "1" is set relative to a relatively low predetermined acceptable threshold attribute value (shown as a vertically extending dashed line in Figure 12A). As a result, during a large storm, if the fluid level inside CSO122 in Figure 3 exceeds the value of "1", the stress value in CSO122 in Figure 3 becomes higher than 1, and CSO122 in Figure 3 requires stress relief through fluid flow redistribution according to this teaching.

[0087] Figure 11B shows a graphical representation of stress values ​​versus fluid flow rates (e.g., bottleneck flow rates in throttle line 354 in Figure 7) within the infrastructure during a large storm. According to this figure, during a large storm, in order to maintain a desired stress value of 1, the fluid flow rate is preferably set to a value of "3000" reported in units of flow rate, i.e., volume per unit time, flowing through throttle line 354 in Figure 7. Furthermore, for the fluid condition attribute of the fluid flow rate, the value of "3000" is set relative to a relatively low predetermined acceptable threshold attribute value (shown as a vertically extending dashed line in Figure 12B). As a result, during a large storm, if the fluid flow rate inside throttle line 354 in Figure 7 exceeds the value of "3000", the stress value in throttle line 354 in Figure 7 becomes higher than 1, and throttle line 354 in Figure 7 requires stress relief through fluid flow redistribution according to this teaching.

[0088] For the sake of simplifying the examples and facilitating the discussion, in Figures 11A, 11B, 12A, and 12B, the stress value function is shown to have a linear relationship with the value of the monitored fluid condition attribute. However, this instruction recognizes that the stress value function f(x) (where x refers to a fluid condition attribute value) can also be linear as long as it satisfies these two conditions: (1) f(pptav) = 1 (where "pptav" refers to a predetermined acceptable threshold attribute value) and f'(x) ≥ 0 (where f'(x) refers to the first derivative of f(x)). Furthermore, for small storms, this instruction recommends setting the "pptav" of the constraint location to a relatively high predetermined acceptable threshold attribute value, and for large storm events, this instruction recommends setting the "pptav" of the constraint location to a relatively low predetermined acceptable threshold attribute value.

[0089] Against this backdrop, this teaching provides adaptive flow control for effective infrastructure management. This teaching modifies predetermined threshold settings in real time, preferably dynamically, as needed, when conditions develop unpredictably. If an expected small storm unpredictably develops into a large storm, this teaching dynamically changes the stress threshold setting from a relatively high predetermined acceptable threshold attribute value to a relatively low predetermined acceptable threshold attribute value. Furthermore, if an expected large storm unpredictably develops into a small storm, this teaching dynamically changes the stress threshold setting from a relatively low predetermined acceptable threshold attribute value to a relatively high predetermined acceptable threshold attribute value.

[0090] Figure 13 shows a decision support system 400 according to one embodiment of the present configuration for setting predetermined acceptable threshold attribute values ​​for different constraint locations to effectively manage undesirable stresses arising from storms of different intensities. In a particular embodiment, the decision support system of this teaching retrieves weather event or rainfall forecasts 416 via a network 410, e.g., the Internet, and runs through multiple scenarios of rainfall patterns that may be transported to a decision support engine 406. Preferably, whenever a new rainfall or weather event forecast becomes available, sensors such as rain gauges 440 and fluid flow and / or fluid level meters collect sensor measurements. These measurements are transmitted to a sensor historian database 420, which transports them to the decision support engine 406 via a firewall / data diode. Thus, the decision support engine 406 is preferably continuously updated whenever a new weather event or new rainfall forecast becomes available. Furthermore, in situations where sensor measurements are unavailable, or to obtain estimates of sensor values ​​at a future point in time, a digital twin model server 408 (described in detail with respect to Figures 15 to 19) is preferably used. The digital twin model server 408 provides server-estimated sensor values ​​to the decision support engine 406. Based on this data, among other types of data, the operator 436 sets various predetermined acceptable threshold attribute values ​​described herein (e.g., predetermined acceptable threshold attribute values, relatively low predetermined acceptable threshold attribute values, relatively high predetermined acceptable threshold attribute values) and returns them to the decision support engine 406.

[0091] Based on the setting of these predetermined thresholds, the decision support engine 406 formulates flow redistribution strategies to alleviate stress within the infrastructure. These flow redistribution strategies are transmitted to the digital twin model server 408 via the information channel 432. After implementing one or more of these flow redistribution strategies during one or more climate events, the digital twin model server 408 generates results, e.g., an evaluation, based on specific key-point indicators of the effectiveness of the particular flow redistribution strategy in alleviating stress during the particular climate event (e.g., reduction of overflow, reduction of flood volume, reduction of energy consumption, and improvement of river water quality). The digital twin model server 408 returns the results to the decision support engine 406 via another information channel 434. As a result, the flow redistribution strategies are continuously improved in the decision support engine 406, and the decision support engine 406 stores one or more successful flow redistribution strategies in light of recent climate events. In a particular embodiment, the decision support engine 406 recommends to the operator 436 one or more successful flow redistribution strategies for the current and / or future climate events, based on the key point indicators described above. Preferably, the operator 436 implements these strategies using flow distribution component 438, which is the same as the flow distribution components 116, 216, and 316 shown in Figures 3 to 5, respectively; gates 346 and 352' shown in Figures 6 and 9, respectively; and drainage pumps 352 and 352' shown in Figures 7 and 8, respectively.

[0092] Figure 14 shows a control system architecture according to a specific embodiment of this configuration, including a high-level strategy 550, low-level control, and local control (collectively designated by reference numeral 552). The high-level strategy 550 implements a network-scale strategy and is described in Figure 13. The high-level strategy 550 relies on a digital twin model server 508 that functions substantially similarly to the digital twin model 408 shown in Figure 13. The digital twin model server 508 communicates with the decision support engine 506 through information paths 532 and 534, and therefore they are functionally substantially similar to their corresponding elements shown in Figure 13, namely the decision support engine 406, information paths 432 and 434. In Figure 14, the sensor historian database 520 and operator 540 are also functionally substantially similar to their corresponding elements shown in Figure 13, namely the sensor historian database 420 and operator 436. As shown in Figure 14, the sensor historian database 520 provides updated historical sensor information to enable local control and low-level control 412, and the operator 540 performs low-level control using a programmable logic controller (PLC) ("PLC") 556 and SCADA historians 554 in response to current and future climate events.

[0093] At the local control level, operator 540 uses PLC 556 to receive measurements from storage sensor 512 and control the operation of flow distribution component 516. Flow distribution component 516 in Figure 14 is functionally substantially the same as its corresponding component shown in Figure 13, namely flow distribution component 438. At the low level control 412, the sensor network 412 (also shown in Figure 13) transmits its measurements to the SCADA historian 554 for storage.

[0094] The system and method may rely on synchronized machine learning models, referred to as digital twin models, to implement its real-time decision support system. In one configuration, one of the digital twin models operates on an RTU, and the other operates on a server (e.g., digital twin model 408 in Figure 13 or 508 in Figure 14), which is communicatively coupled to multiple RTUs distributed within a fluid infrastructure network and aggregates data from these RTUs. In this configuration, at least one RTU is connected to a sensor, and the RTU and sensor are located at monitoring locations (e.g., constraint locations) of the fluid infrastructure network that are remote to the server (e.g., digital twin model 408 in Figure 13 or 508 in Figure 14). As a result, the server can be considered a central processor that aggregates remotely collected data and digital twin models for the management of the fluid network. Typical fluid infrastructure items in this configuration and instruction include conduits, reservoirs, orifices, weirs, pumps, and wastewater treatment plants.

[0095] According to this instruction, a digital twin model is used to generate estimates of sensor measurements in the RTU and the server. In one embodiment of this instruction, the RTU compares the actual sensor measurement with an RTU estimated range of values ​​obtained from the digital twin model (operating in the RTU). If the actual sensor measurement and the estimate from the digital twin model are within an acceptable range, the actual sensor measurement is not transmitted from the RTU (where the measurement exists) to the server. In this situation, the server (e.g., digital twin model 408 in Figure 13 or 508 in Figure 14) relies on the digital twin model stored therein and assumes that the other server estimated range of values ​​obtained from the digital twin model (located in the server) is the actual sensor measurement.

[0096] However, if the actual sensor measurement and the RTU estimated range of the value from the RTU's digital twin model are not within an acceptable range, the actual sensor measurement is transmitted from the RTU to the server (e.g., digital twin model 408 in Figure 13 or 508 in Figure 14). At the server, information regarding the realized environmental conditions (e.g., precipitation) is received and used together with the actual sensor measurement received from the RTU to obtain the server estimated range of the value for the sensor measurement from the server's digital twin model. If the difference between the actual sensor measurement and the server estimated range of the value from the server's digital twin model is outside the acceptable range, the realized environmental condition is considered an outlier. In this situation, this teaching assumes that the digital twin model on the RTU side and the digital twin model on the server side are synchronized, and therefore, the server side digital twin model is maintained and the actual sensor measurement received from the RTU is reported to one or more of the system's fluid flow controllers.

[0097] However, if the difference between the actual sensor measurements and the server-estimated range of values ​​for the sensor measurements obtained from the digital twin model on the server is within an acceptable range, then the RTU and the digital twin model on the server are considered not synchronized according to this teaching. Therefore, the server-side digital twin model is updated or rebuilt to synchronize with the digital twin model present in the RTU.

[0098] Figure 15 shows a fluid infrastructure network management system 1100 designed to monitor fluid infrastructure, according to one embodiment of this configuration. The fluid infrastructure monitoring system 1100 includes an RTU 1102 and a server 1104, which are commutably coupled through a communication network 1110 (e.g., the Internet or satellite). Furthermore, the RTU 1102 is powered by a battery 1132 to perform a wide variety of functions.

[0099] The RTU 1102 includes an RTU microprocessor 1128 which is communicatively coupled to an RTU communication module 1134, which is communicatively coupled to a network 1110. Inside the RTU 1102, an RTU memory module is bidirectionally coupled to the RTU microprocessor 1128. A sensor module 1136 receives data from a sensor 1112, which is configured to measure fluid condition attributes of remote fluid infrastructure items located remotely relative to a server 1104.

[0100] According to Figure 15, the sensor measurement values ​​obtained by sensor 1112 are transmitted from sensor module 1136 to RTU microprocessor 1128 via communication coupling. After processing, or without processing, the calculated values ​​based on the sensor measurement values ​​or the sensor measurement values ​​themselves are transmitted from RTU microprocessor 1128 to RTU communication module 1134.

[0101] In an alternative embodiment of this fluid infrastructure monitoring system, the sensor module 1136 is directly coupled to the RTU communication module 1134, and the sensor measurements obtained at sensor 1112 do not need to pass through the RTU microprocessor 1128 to reach the RTU communication module 1134. In this alternative configuration, the sensor measurements obtained at sensor 1112 are transmitted directly from the sensor module 1136 to the RTU communication module 1134. Regardless of whether the RTU microprocessor 1128 is included in the communication of the sensor measurements obtained at sensor 1112, the sensor measurements are transmitted from the RTU communication module 1134 to the server 1104 via the network.

[0102] Server 1104, which is substantially the same as the digital twin model server 408 in Figure 13 or 508 in Figure 14, includes a server communication module 1138 bidirectionally coupled to a server processor 1140, which is bidirectionally coupled to a database 1142. The server communication module 1138, like the RTU communication module 1134, is communicatively coupled to the network 1110. In relation to sensor measurements obtained at sensor 1112, the server communication module 1138 receives sensor measurements from the network 1110 and forwards them to the server processor 1140, which uses them for comparison, for example, as described below.

[0103] Figure 15 shows that server 1104 is communicably coupled to a single RTU 1102 via network 1110, but the configuration is not limited thereto. For this purpose, Figure 16 shows a fluid infrastructure network management system 1200, according to another embodiment of the configuration, in which server 1204 is communicably coupled to multiple RTUs, e.g., RTU 1202 and other RTUs 1214A, 1214B, and 1214C via network 1210. In this embodiment, RTU 1202, network 1210, and server 1204 are substantially the same as their corresponding elements shown in Figure 15, namely RTU 1102, network 1110, and server 1104, respectively.

[0104] Figure 16 shows that the server 1204 of the fluid infrastructure network management system 1200 is internally running the machine learning engine 1206 and the RTU digital twin model 1208. One or more sensor measurements obtained from sensor 1212 are transmitted from RTU 1202 to server 1204 via network 1210. Sensor measurements are not the only information transmitted in this manner. Sensor parameter information related to sensor 1212 in Figure 16, which is substantially the same as sensor 1112 in Figure 15, is transmitted from RTU 1202 to server 1204 via network 1210 (e.g., the internet or satellite). Similarly, other sensor measurements obtained using one or more different sensors (i.e., different from sensor 1212) are transmitted from one or more RTUs associated with one or more of these different sensors (e.g., RTU1214A, RTU1214B, and RTU1214C, where each of these RTUs is associated with a fluid infrastructure item that provides input or input flow to RTU1202) to server 1204 via network 1210.

[0105] In one embodiment of this configuration, within server 1204, the machine learning engine 1206 constructs a digital twin model of RTU 1202 using a probability distribution function of sensor parameter information of the fluid infrastructure network, sensor measurements of inputs to and outputs from the fluid infrastructure item at the constraint location for which the digital twin model is built, and environmental information surrounding the sensor (e.g., sensor 1212 in Figure 16). The digital twin model according to a preferred embodiment of this teaching is a probabilistic predictive model that predicts measurements from one or more sensors in the fluid infrastructure network.

[0106] Representative sensor measurements of fluid condition attributes related to fluids within or at constraint locations of fluid infrastructure items include flow rate data, flow level data, hydrostatic pressure data, flow velocity data, concentration data of one or more chemical species of interest, pH, turbidity, total suspended solids, residual chlorine, total chlorine, total organic carbon, dissolved oxygen, ammonia, nitrates, and phosphorus. Fluid condition attribute values ​​obtained using sensors are transmitted to server 1204 via network 1210 using their associated RTUs (e.g., RTU1214A, RTU1214B, and RTU1214C, where each of these RTUs is associated with a fluid infrastructure item that provides an input or input flow to RTU1202, or provides an output or output flow out of RTU1202).

[0107] In relation to the input to the target fluid infrastructure item (e.g., an infrastructure item whose fluid condition attributes are measured by sensor 1212), the input information used to construct the digital twin model 1208 includes at least one piece of information selected from the group including precipitation information around the sensor or constraint location (e.g., measurements from sensor 1212 estimated by the digital twin model 1208), fluid levels of one or more different inputs to the fluid infrastructure item or constraint location, and flow rates of one or more different inputs to the fluid infrastructure item or constraint location. For example, if RTU1214A acts as a fluid infrastructure item and is associated with a conduit that transports fluid from a storage tank, i.e., another fluid infrastructure item monitored by RTU1214B, to RTU1202, then fluid velocity sensor readings from the conduit are transmitted from RTU1214A to server 1204 via network 1210, and / or fluid level sensor readings from the storage tank are transmitted from RTU1214B to server 1204 via network 1210. Furthermore, these sensor readings for input to RTU1202 are transmitted to the server via the network for the construction of a digital twin model 1208, one of which will also ultimately reside within RTU1202.

[0108] As another example, server 1204 receives precipitation data 1216 from the National Weather Service, which forecasts the amount and timing of precipitation in the area surrounding the location of a remote sensor (e.g., sensor 1212), in order to build a digital twin model (e.g., digital twin model 1208) of an RTU (e.g., RTU 1202) using machine learning engine 1206. In this way, a digital twin model of each RTU (e.g., RTU 1202, RTU 1214A, 1214B, or 1214C) is built and preferably stored inside a server (e.g., server processor 1140 in Figure 15).

[0109] Similarly, with respect to the outputs of a target fluid infrastructure item (e.g., an infrastructure item whose fluid condition attributes are measured by sensor 1212), the output information used to construct the digital twin model 1208 includes at least one piece of information selected from the group including evaporation information around the sensor (e.g., measurements of sensor 1212 estimated by the digital twin model 1208), fluid levels of one or more different outputs leaving the fluid infrastructure item, and flow rates of one or more different outputs leaving the fluid infrastructure item. Fluid flow rate and / or fluid level measurements of outputs or output flows leaving the target (monitored by RTU 1202) fluid infrastructure item are transmitted from their respective RTUs to the server via the network. Such sensor measurements of outputs leaving RTU 1202 are used to construct the digital twin model 1208.

[0110] Examples of sensor parameters include the location of the sensor (e.g., sensor 1212 which may be located in a constrained location), the type of sensor, the critical high / low transmission speed of the sensor and / or RTU (e.g., RTU1202, RTU1214A, 1214B, or 1214C), and the remaining battery level of the sensor. Some or all of these parameters are obtained from the sensor, RTU, or entered in the server.

[0111] In one embodiment of this teaching, a digital twin model (e.g., digital twin model 1208 in Figure 16) is first created using the information described above with a microprocessor (e.g., microprocessor 128 in Figure 15) located in the RTU (e.g., RTU 1102 in Figure 15), and then a copy of that digital twin model is transmitted to a server (e.g., server 1204 in Figure 16). However, the server may have superior data processing capabilities compared to the RTU, and therefore, in a preferred embodiment of this teaching, the digital twin model 1208 is first constructed within the server 1204, and then a copy of the digital twin model is transported to the RTU 1202 via the network 1210, resulting in copies of the digital twin model 1208 existing in both the server 1204 and the RTU 1202. Server 1204 in Figure 16 is preferably substantially the same as the digital twin model server 408 in Figure 13 or 508 in Figure 14.

[0112] In this context, Figure 17 shows a fluid infrastructure network management system 1300 according to a preferred embodiment of the present configuration and teaching, in which RTU 1302 is communicatively coupled to server 1304 via network 1310 and also communicatively coupled to multiple RTUs, namely RTU 1314A, RTU 1314B and RTU 1314C. Furthermore, server 1304 internally records a machine learning engine 1306 and a digital twin model 1308 used to predict or forecast measurements of sensors monitored by RTU 1302 (e.g., sensor 1212 in Figure 16). In this configuration, RTU1302, network 1310, server 1304, RTU1314A, RTU1314B and RTU1314C, machine learning engine 1306 and digital twin model 1308 are substantially the same as their corresponding elements shown in Figure 16, namely RTU1202, network 1210, server 1204, RTU1214A, RTU1214B and RTU1214C, machine learning engine 1206 and digital twin model 1208. Furthermore, in this configuration, a copy of the digital twin model is preferably transmitted from server 1304 to RTU1302 via network 1310. As a result, there are two copies of the digital twin model: one at server 1304 designated by reference numeral "1308" and another at RTU1302 designated by reference numeral "1318".

[0113] This teaching recognizes that, thus, digital twin models of other infrastructure items located at other constraint locations within the fluid infrastructure network, monitored by other RTUs, e.g., RTU1314A, RTU1314B, and RTU1314C, are preferably created either in server 1304 or RTU1302, and then copies of the digital twin models are transmitted to the other, i.e., preferably RTU1302 or server 1304. Regardless of the method by which the initial digital twin models are created, the server, e.g., server 1304, stores copies of the digital twin models stored within each of the RTUs that monitor different fluid infrastructure items located at or near different constraint locations within the infrastructure. More importantly, this teaching recognizes that the server preferably incorporates infrastructure connections between RTUs to automatically determine a “system-scale digital twin model” (for example, RTU1314B monitors a tank, the tank is located downstream from RTU1314A, and RTU1314A monitors a conduit connected to a fluid infrastructure item monitored by RTU1302). For this purpose, this teaching also recognizes that such a “system-scale digital twin model” may enable several scheduled transmissions of actual sensor measurements from one or more RTUs to the server, and that more precise estimates of sensor measurements monitored by one or more RTUs can be obtained without dramatically increasing the energy requirements associated with the transmission of sensor assumptions from RTUs to the server. It is not necessary to create a “system-scale digital twin model,” and this teaching recognizes that it is simply possible to build different digital twin models within the server, with each copy also stored in the RTU, and this configuration provides the benefits of RTUs without relying on the monitoring activities of the RTUs.

[0114] Figure 18 shows a fluid infrastructure network management system 1400 according to a preferred embodiment of the present configuration. As described below, the management system 1400 relies on one or more estimated ranges of values ​​of the fluid condition attributes inside the fluid infrastructure item by a server, which are either sensor measurements or estimates thereof of the fluid condition attributes inside the fluid infrastructure item. In this embodiment of the teaching, the management system 1400 preferably does not receive sensor measurements from an RTU that monitors the fluid infrastructure item and periodically receives sensor measurements of its internal fluid condition attributes.

[0115] In the embodiment shown in Figure 18, the RTU 1402 preferably receives, from time to time, forecasts of precipitation data 1416 (which may be in the form of a probability distribution function, for example, the time and amount of precipitation) via the network 1410. Using the forecast of precipitation data, the RTU digital twin model 1418 preferably instructs the machine learning engine 1420 (loaded in the RTU) to generate a probability distribution function that estimates fluid condition attributes that may be measured by the sensor at a future point in time or over a future period. As another input, the RTU 1402 also receives sensor measurements from sensor 1412 in sensor module 1422, which measures fluid condition attributes inside a fluid infrastructure item. Thus, the RTU 1402 is well-positioned to compare the sensor measurements with one or more of the RTU's estimated fluid condition attribute values. In a preferred embodiment of this instruction, the RTU1402 electronically compares sensor measurements with the probability distribution function of estimated fluid condition attribute values, and the graphical representation of this comparison is designated by reference numeral "1424".

[0116] If the sensor measurement falls within the confidence interval of one or more RTU estimation ranges (for example, within the range of approximately ±10% to ±15% of the mean of the probability distribution function), this teaching recognizes that, as an energy-saving measure, the RTU does not need to transmit the actual sensor measurement to the server.

[0117] Server 1404 also receives precipitation data 1416 forecasts (which may be in the form of a probability distribution function, for example, the time and amount of precipitation) via network 1410. Server 1404 uses its digital twin model 1408 to generate a probability distribution function that uses the precipitation data 1416 to estimate the fluid condition attribute values ​​of infrastructure items. In a preferred embodiment of this configuration, the digital twin model 1408 instructs the machine learning engine 1406 to use the precipitation data 1416 to generate a probability distribution function that estimates the fluid condition attribute values. Regardless of how the fluid condition attribute sensor measurements are estimated, Server 1404 assumes that the sensor measurements are the mean of the probability distribution function that estimates the fluid condition attribute values, and reports the mean of the server's probability distribution function in the server's user interface as either the sensor measurement or an estimate of the sensor measurement.

[0118] Sensor reports may be periodic, for example, every 5 minutes, and do not need to be performed after the passage of a future time point, which forms the basis of the estimated sensor measurement, for example, the probability distribution function. In one preferred embodiment of this teaching, after the passage of a future time point, or after the passage of a future time period, and the server 1404 does not receive sensor measurement from the RTU 1402, the server reports to the user the mean of the server's probability distribution function as the sensor measurement, or as a reliable estimate of the sensor measurement.

[0119] Furthermore, even if the actual sensor measurement falls within a confidence interval, the RTU 1402 may transmit the actual sensor measurement to the server 1404 via the network 1410. Under such conditions, and to conserve energy, the RTU 1402 may transmit the actual sensor measurement at a relatively low frequency, for example, once a day or once a week. In a particular embodiment of this teaching, if the server 1408 does not receive sensor measurement from the RTU 1402 during a predefined time, during or after that predefined time, the server 1408 calculates a server-estimated range of values ​​based on precipitation data and, for example, based on a probability distribution function, reports the mean of these estimated fluid condition attribute values ​​as sensor measurement values ​​or as a reliable estimate of sensor measurement values.

[0120] This instruction also recognizes the importance of the possibility that sensor measurements may be outside the confidence interval of one or more estimated fluid condition attribute values ​​of the RTU (e.g., outside the range of approximately ±10% to ±15% of the mean of the probability distribution function), in which case this instruction recognizes that an additional condition must be tested, namely whether the actual amount of precipitation realized is an outlier or within the expected amount of precipitation (as determined from precipitation data 516).

[0121] In the embodiment shown in Figure 19, the fluid network management system 1500 includes an RTU 1502 which is communicably coupled to a server 1504 via a network 1510. Furthermore, in Figure 19, RTU1502, Server1504, Server Machine Learning Engine1506, Server Digital Twin Model1508, Network1510, Sensor1512, RTU Digital Twin Model1518, RTU Machine Learning Engine1520, Sensor Module1522, Graph representation of Sensor Data for RTU Estimated Sensor Data1524, and Graph representation of Sensor Data for Server Estimated Sensor Data1526 are substantially the same as their corresponding elements shown in Figure 18, namely RTU1402, Server1404, Server Machine Learning Engine1406, Server Digital Twin Model1408, Network1410, Sensor1412, RTU Digital Twin Model1418, RTU Machine Learning Engine1420, Sensor Module1422, Graph representation of Sensor Data for RTU Estimated Sensor Data424, and Graph representation of Sensor Data for Server Estimated Sensor Data426.

[0122] Precipitation data 1516, for example, forecasts of environmental conditions within the area surrounding one or more sensors such as sensor 1512, are preferably transmitted to both RTU 1502 and server 1504 via network 1510. In this configuration, RTU 1502 uses the machine learning engine 1520 and the forecasts of environmental conditions obtained from the precipitation data 1516 to determine new estimated fluid condition attribute values ​​for the RTU within the fluid infrastructure item at a given time or over a given period of time.

[0123] If the absolute difference between the sensor measurements obtained from sensor 1512 and sensor module 1522 and the new estimated fluid condition attribute values ​​of RTU 1502 is greater than a predetermined threshold tolerance, or if the sensor measurements for that time point or time period fall outside the predefined confidence intervals of multiple estimated fluid condition attribute values ​​of RTU 1502, the sensor measurements that form the basis for calculating the estimates are transmitted from RTU 1502 to server 1504 via network 1510. In server 1502, precipitation data 1516, for example, the actual amount of precipitation realized around the area surrounding one or more sensors such as sensor 1512, is used to calculate new estimated fluid condition attribute values ​​in one or more servers 1504 (see, for example, the curve in graphical representation 1526). These estimates represent the fluid condition attributes within the fluid infrastructure item monitored by sensor 1512 at a given time point or time period. Server 1504 compares the sensor measurements obtained from sensor 1512 with one or more new estimated fluid condition attribute values ​​of Server 1504 (e.g., a probability distribution function containing multiple estimates), as shown in the graphical representation 1526.

[0124] If the absolute difference between the sensor measurement and one of the server's newly estimated fluid condition attribute values ​​is greater than or equal to the check predefined threshold tolerance value, or if the sensor measurement at a given point in time or over a period of time falls outside the check predefined confidence interval for multiple servers' newly estimated fluid condition attribute values, the digital twin model 1508 on server 1504 is maintained. In this scenario, the teaching recognizes that the actual precipitation occurring in the area surrounding sensor 1512 is an outlier to the forecast precipitation in that area. As a result, the teaching does not consider the digital twin model to be inaccurate in estimating the fluid condition attributes inside the remotely located fluid infrastructure item, but rather understands that the forecast did not accurately predict the amount of precipitation. Furthermore, the server transmits the actual sensor measurement to one or more of the system's flow controllers.

[0125] However, if the absolute difference between a sensor measurement and one of the new estimated fluid condition attribute values ​​of the server is less than the check predefined threshold acceptable value, or if the sensor measurement at a certain point in time or over a certain period falls within the check predefined confidence interval of the new estimated fluid condition attribute values ​​of multiple servers, the digital twin model 1508 on the server 1504 side is updated, recalibrated, or rebuilt. A copy of this updated, recalibrated, or rebuilt digital model is transmitted to the RTU 1502, and as a result, the "twin" nature of the digital model is re-established. This teaching suggests that the digital twin model is updated, recalibrated, or rebuilt because the estimated fluid condition attribute values ​​of the previous digital twin model are recognized as unreliable or otherwise unacceptable. Consequently, this teaching suggests updating, recalibrating, or rebuilding the new digital twin model as necessary so that the estimated fluid condition attribute values ​​are reliable and acceptable.

[0126] This teaching recognizes that, for predictive modeling, e.g., infrastructure management at future points in time and / or the present time when sensor measurements are unavailable, estimated sensor measurements may be relied upon to generate the estimated stress values ​​or highest stress path values ​​described above. Therefore, this teaching provides a real-time infrastructure management system that relies on estimated sensor values ​​to reduce stress within the infrastructure. One such exemplary infrastructure management system includes (1) an initial sensor (e.g., sensor 412 shown in Figures 13 and 14, or the sensor shown in Figure 14, located at initial location 306 shown in Figure 5) designed to measure fluid condition attributes at the initial location and generate initial values, and (2) (3) a successor sensor designed to be located at or near the successor location to measure fluid condition attributes at the successor location and generate successor values ​​(for example, the sensor 412 shown in Figures 13 and 14 or the sensor shown in Figure 14, located at the successor location 328 shown in Figure 5), and (4) one or more intermediate sensors, at least one of which is designed to be located at one of the locations of the first path to measure fluid condition attributes at one of the locations of the first path and generate intermediate values ​​(for example, the sensor 412 shown in Figures 13 and 14 or the sensor shown in Figure 14, located at the intermediate location 318 of the first path 312 shown in Figure 5).

[0127] Since the subsequent location is downstream from the initial location within the underlying infrastructure, the subsequent sensor is positioned downstream from the initial sensor. Furthermore, the first path 312 facilitates fluid communication between the initial location 306 and the subsequent location 328. Moreover, this teaching recognizes that the fluid condition attribute at one location in the first path may exceed a predetermined acceptable threshold attribute value assigned to that location due to excessive fluid flow from one or more intermediate flows entering the first path before that location. In stark contrast, conventional infrastructure management systems simply do not recognize, and / or provide, solutions to mitigate the internal stresses on the infrastructure caused by excessive flow from such intermediate flows.

[0128] A particular preferred embodiment of this infrastructure management system includes one or more intermediate RTUs (e.g., RTU 1302 and several RTUs 1314A, 1314B, and 1314C shown in Figure 17). Each RTU is communicatively coupled to at least one of the intermediate sensors and internally stores a flow model, which is a synchronized machine learning model designed to estimate fluid condition attributes at one location of a first path as a function of time (e.g., RTU 1402 is communicatively coupled to one or more sensors 1412, substantially similar to the sensor 412 shown in Figures 13 and 14 or the sensor shown in Figure 14, located at intermediate location 318 of the first path 312 shown in Figure 5). One or more of the intermediate RTUs are designed to generate at least one RTU estimated intermediate value based on forecasts and intermediate values ​​of future climate events, such as storms. (For example, the graph representation 1424 in RTU1402 or 1524 in RTU1502 shown in Figures 18 and 19 respectively convey a probability distribution function for estimating the fluid condition attribute values ​​inside a fluid infrastructure item located at the intermediate location 318 of the first path 312 shown in Figure 5 in one configuration, under the specific conditions described above.)

[0129] The servers in this configuration are designed to be communicatively coupled to one or more intermediate RTUs and internally store a digital twin of one flow model (for example, as shown in Figures 18 and 19, server 1404 has the RTU1 digital twin model 1408, or server 1504 has the RTU1 digital twin model 1408). The digital twin of one flow model is substantially equivalent to the flow model stored in one of the intermediate RTUs. The servers are designed to estimate fluid condition attribute values ​​at one location of a first path based on climate event forecasts and median values, and to provide at least one server-estimated range of median values ​​for climate events. (For example, the graph representation 1426 in server 1404 or the graph representation 1526 in server 1504 shows a probability distribution function for estimating fluid condition attribute values ​​inside a fluid infrastructure item).

[0130] One or more flow controllers in this configuration are designed to be communicatively coupled to receive in real time an initial value from an initial sensor, a subsequent value from a subsequent sensor, and at least one of the server-estimated range of intermediate values ​​or one or more intermediate values ​​from a server (for example, the decision support engine 406 receives sensor values ​​from sensor 412 located on the intermediate location 318 shown in Figure 5 and estimates from the digital twin model server 408 shown in Figure 13). Based on at least one of the initial value, subsequent value, server-estimated intermediate range of values ​​or one or more intermediate values, one of the flow controllers is programmed to determine in real time the stress values ​​for the initial location and the subsequent location, as well as the stress value or estimated stress value for one location on the first path.

[0131] One or more flow distribution components in this configuration are preferably designed to be located at one or more fluid flow intersections, which are located downstream from the initial location and are in fluid communication with the initial location through the initial path (for example, flow distribution component 438 shown in Figure 13 or flow distribution component 516 shown in Figure 14 are substantially the same as flow distribution component 316 shown in Figure 5). As a result, the fluid flow leaving the initial location flows through the initial path to one or more of the flow distribution components. In a particular configuration of the infrastructure, a fluid flow intersection represents the intersection of the initial path and a first path (for example, flow distribution component 316 shown in Figure 5 is located at the intersection where the initial path 310 and the first path 312 intersect). In a preferred embodiment of the system for managing these infrastructure configurations, each flow distribution component receives, in real time during a storm event, one or more flow redistribution strategies from one or more flow controllers based on stress values ​​at the initial and subsequent locations, as well as stress values ​​or estimated stress values ​​at one location along the first path (for example, flow distribution component 438 receives a strategy from the decision support engine 406 shown in Figure 13, flow distribution component 516 receives a strategy from the decision support engine 506 shown in Figure 14, or each of flow distribution components 438 or 516 is substantially the same as flow distribution component 316 shown in Figure 5).

[0132] Some of these flow redistribution strategies effectively modify stress values ​​and / or estimated stress values ​​at at least one of the constraint locations within the infrastructure, and / or modify path stress values ​​and / or estimated path stress values ​​within the infrastructure. For example, the stress value or estimated stress value at a constraint location is reduced so that the fluid condition attribute value at least one of the constraint locations is less than or equal to a predetermined acceptable threshold attribute value assigned to that constraint location. Thus, at least one of the flow distribution components in one of the underlying infrastructure configurations is designed to redistribute the fluid flow at a fluid flow intersection location between the initial path and the first path according to one of the flow redistribution strategies in order to reduce the stress value and / or estimated stress value at at least one of the constraint locations. (For example, the flow distribution component 316 shown in Figure 5 redistributes the fluid flow between the initial path 310 and the first path 312 in order to reduce the stress at at least one of the constraint locations, including the initial location 306, the intermediate location 318 of the first path 312, and the subsequent location 328 shown in Figure 5). According to other flow redistribution strategies, at least one of the flow distribution components redistributes the fluid flow at the location of the fluid flow intersection between the initial path and the first path in order to reduce the stress value or estimated stress value of the initial path if the initial path is under undesirable stress levels, or to reduce the stress value or estimated stress value of the first path if the first path is under undesirable stress levels.

[0133] For example, in an infrastructure configuration where a fluid flow intersection represents the intersection of an initial path and a first path as shown in Figure 5, the constraint location may be one location within the infrastructure selected from a group including the initial location, one location on the first path, and a subsequent location. In this infrastructure configuration, each of the initial location, one location on the first path, and the subsequent location is considered a constraint location because, during a climatic event, the measured values ​​of the fluid condition attributes at any of these locations may reach or exceed a predetermined acceptable threshold attribute value assigned to each of these locations.

[0134] In this exemplary infrastructure configuration of an initial path and a first path as shown in Figure 5, one or more of the flow controllers of the system are preferably programmed to execute the following commands: (1) commands to determine the stress values ​​of the initial path and the estimated stress values ​​of the first path by (i) adding the stress values ​​of each constraint location present along the initial path to generate an initial path stress value, and (ii) adding the stress values ​​or estimated stress values ​​of each constraint location present along the first path to generate an estimated first path stress value; (2) commands to identify which of the initial path stress value and the estimated first path stress value has the highest magnitude in order to generate a maximum stress path value; and (3) commands to redistribute the fluid flow at at least one of the fluid flow intersections between the first path and the initial path in order to effectively reduce the magnitude of the maximum stress path value using one or more of the flow redistribution strategies.

[0135] The estimated first path stress value preferably represents the sum of the stress values ​​of at least subsequent locations and the estimated stress value at one location on the first path, while the initial path stress value is represented by the stress value at the initial location if no other constraint locations are present on the initial path.

[0136] In a specific configuration of the underlying infrastructure, as shown in Figure 3, three paths, e.g., an initial path, a first path, and a second path, are available as options for mitigating stress within the infrastructure (hereinafter referred to as the "three infrastructure path options"). In a specific embodiment of the system designed to manage such an infrastructure configuration, at least one of the intermediate sensors is positioned at one location on the second path to measure fluid condition attributes at one location on the second path, and is designed to generate one or more additional intermediate values. (For example, sensor 412 shown in Figure 13 or sensor 412 or 512 shown in Figure 14 is positioned at intermediate location 320 on the second path 314 shown in Figure 3). The second path is different from the first path, but nevertheless facilitates fluid communication between the initial location and the subsequent location.

[0137] This infrastructure management system enables the generation of estimated stress values ​​or highest stress path values ​​using multiple estimated intermediate sensor measurements from multiple intermediate sensors. In one exemplary embodiment of this teaching, multiple estimated sensor measurements from multiple intermediate sensors located on the same and / or different paths are used. For this purpose, certain preferred embodiments of this infrastructure management system also include using multiple intermediate RTUs in relation to multiple intermediate sensors located on different paths. For example, at least two of the intermediate RTUs are communicatively coupled to two or more of the intermediate sensors, and at least one of the intermediate sensors is located on one location of a second path different from a first path. As described above, the intermediate sensor located on one location of the second path measures fluid condition attributes at one location of the second path to generate one or more additional second intermediate values, i.e., generated in addition to the intermediate values ​​generated by the intermediate sensor located on one location of the first path.

[0138] In one embodiment, at least one of the system's multiple intermediate RTUs stores another flow model, which is a synchronized machine learning model designed to estimate fluid condition attributes as a function of time at one location on a second path. In relation to one or more intermediate sensors located on the second path, one or more intermediate RTUs generate an additional RTU estimation range for at least one intermediate based on a forecast of a climatic event and one or more additional intermediate values.

[0139] In these preferred embodiments, the server is designed to communicate with multiple intermediate RTUs and internally stores a digital twin of another flow model. The server's digital twin of the other flow model is substantially the same as the other flow model stored in one of the intermediate RTUs monitoring one location of the second path. In these configurations, the server generates an additional server estimated range of at least one intermediate value based on weather event forecasts and one or more of the additional intermediate values. As a result, in these preferred embodiments, one or more of the flow controllers are communicated to receive at least one of the additional server estimated intermediate fluid condition attribute values ​​in real time. However, if there are (actual) additional intermediate values ​​on the server that do not fall within the additional RTU estimated range of the intermediate value, those additional intermediate values ​​are communicated to one or more of the fluid flow controllers of the system.

[0140] Furthermore, based on at least one of the initial value, subsequent value, and intermediate server-estimated intermediate value, and at least one of the additional server-estimated intermediate value or additional intermediate value, one of the flow controllers is preferably programmed to determine the stress values ​​for the initial location and the subsequent location, respectively, as well as the estimated stress value at one location in the first path and the additional estimated stress value at one location in the second path. Problems arising from undesirable stress values ​​or estimated stress values ​​can be mitigated by one or more of the flow distribution components located on the fluid flow intersection of the initial location, the first path, and the second path in these preferred embodiments.

[0141] Based on the stress values ​​of the initial and subsequent locations, as well as the estimated stress value at one location in the first path and an additional estimated stress value at one location in the second path, at least one of the flow distribution components of the system redistributes the fluid flow at fluid flow intersections between the initial path, the first path, and the second path in real time during a climatic event. Thus, one of the flow distribution components of the system effectively modifies the stress values ​​and / or estimated stress values ​​based on one of the flow redistribution strategies that reduces the fluid condition attribute value of at least one of the constraint locations in the infrastructure to be below a predetermined acceptable threshold attribute value that has been assigned. In one preferred embodiment of this teaching, the constraint locations are selected from the group including the initial location, one location in the first path, one location in the second path, and the subsequent location, in relation to three path options of the infrastructure. Each of the initial location, one location on the first path, one location on the second path, and subsequent locations is considered a “constrained location” because the measured fluid condition attribute values ​​at any of those locations may reach or exceed their respective predetermined acceptable threshold attribute values, at least in part, due to the acceptance of fluid flow from multiple intermediate flows during a climatic event.

[0142] Alternatively, one of the flow distribution components of this system effectively modifies the path stress values ​​and / or estimated path stress values ​​based on one of the flow redistribution strategies that reduces one or more of the undesirable path stress values. In relation to constraint locations present along these paths, one or more flow controllers of the infrastructure management system may be programmed to execute the following commands: (i) commands to determine the respective path stress values ​​for the initial path, the first path, and the second path by (a) adding the stress values ​​of constraint locations present along the initial path to generate an initial path stress value; (b) adding the stress values ​​and estimated stress values ​​of constraint locations present along the first path to generate an estimated first path stress value; and (c) adding the stress values ​​and estimated stress values ​​of constraint locations present along the second path to generate an estimated second path stress value; (iii) commands to identify which of the initial path stress value, the estimated first path stress value, and the estimated second path stress value has the highest magnitude in order to provide the highest stress path value; and (iv) commands to redistribute the fluid flow at at least one of the fluid flow intersections between the first path, the second path, and the initial path in order to effectively reduce the magnitude of one or more undesirable path stress values ​​using one or more flow redistribution strategies.

[0143] In other preferred embodiments of this system, one or more flow controllers redistribute between a first path and a second path. This is because these paths are two options available within the infrastructure to reduce undesirable stress present in one or more of those paths. In this scenario, one or more flow controllers are programmed to execute the following commands: (1) an instruction to determine the estimated path stress values ​​for the first and second paths by (a) generating an estimated first path stress value by adding the stress values ​​and estimated stress values ​​of constraint locations along the first path, and (b) generating an estimated second path stress value by adding the stress values ​​and estimated stress values ​​of constraint locations along the second path; (2) an instruction to identify which of the estimated first and second path stress values ​​has the highest magnitude in order to provide the highest stress path value; and (3) an instruction to redistribute the fluid flow at at least one of the fluid flow intersections between the first and second paths in order to effectively reduce the magnitude of the highest stress path value using one or more flow redistribution strategies. In these embodiments, the estimated second path stress value represents the sum of the stress values ​​of subsequent locations and the estimated stress value at one location in the second path.

[0144] In this system, the RTU may also work in conjunction with one or more initial sensors and / or one or more subsequent sensors to provide estimated sensor measurements at locations other than intermediate locations in order to effectively mitigate undesirable stresses within the infrastructure.For this purpose, a particular preferred embodiment of the system includes: (1) an initial sensor designed to be located at or near the initial location to measure fluid condition attributes at the initial location and generate initial values; (2) an initial remote monitoring and control unit ("RTU") communicatively coupled to the initial sensor and internally storing an initial flow model, wherein the initial flow model is a synchronized machine learning model designed to estimate fluid condition attributes at the initial location as a function of time, and the initial RTU is designed to generate at least one RTU estimation range of initial values ​​for a climate event based on climate event forecasts and initial values ​​(for example, RTU 1402 is substantially similar to sensor 412 shown in Figure 13 or sensor 412 or 512 shown in Figure 14, and is communicatively coupled to one or more sensors 1412 located at or near the initial location 306 shown in Figure 5); and (3) an initial remote monitoring and control unit ("RTU") designed to measure fluid condition attributes at the subsequent location and generate subsequent values ​​at the subsequent location (4) A subsequent sensor designed to be located downstream from the initial sensor, and a subsequent RTU communicatively coupled to the subsequent sensor and internally storing a subsequent flow model, the subsequent flow model being a synchronized machine learning model designed to estimate fluid condition attributes at a subsequent location as a function of time, and the subsequent RTU being designed to generate at least one RTU estimation range of subsequent values ​​for a climate event based on storm event forecasts and subsequent values ​​(for example, RTU 1402 is communicatively coupled to one or more sensors 412 shown in Figure 13 or sensors 412 or 512 shown in Figure 14 and located at or near the subsequent location 328 shown in Figure 5), and (5) one or more intermediate sensors, at least one of which is designed to be located on one location of the first path to measure fluid condition attributes at one location of the first path and generate one or more intermediate values.

[0145] In the context of a foundational infrastructure configuration, such as the one shown in Figure 5, which has two paths available as options for mitigating undesirable stresses, for example, an initial path and a first path, the first path facilitates fluid communication between the initial location and the subsequent location. Furthermore, in this infrastructure configuration, the fluid condition attributes at one location of the first path are influenced by one or more intermediate flows that flow into the first path before one location of the first path which is considered a “constraining location”. One or more intermediate RTUs, each communicatively coupled to at least one of the intermediate sensors, internally store one flow model, which is a synchronized machine learning model designed to estimate the fluid condition attributes at one location of the first path as a function of time.

[0146] In these systems, one or more of the intermediate RTUs are designed to generate an estimated range of one or more intermediate RTUs for a climate event, based on the storm event forecast and one or more of the intermediate values. In some of these systems, the server also provides a server-estimated range of values, as described below.

[0147] The server may be communicatively coupled to one or more of the initial RTU, subsequent RTU, and intermediate RTU, and may internally store digital twins of the initial flow model, subsequent flow model, and single flow model. Each digital twin of the initial flow model, subsequent flow model, and single flow model is substantially identical to the initial flow model, subsequent flow model, and single flow model stored in one of the initial RTU, subsequent RTU, and intermediate RTU. In this configuration of the system, the server is designed to provide server-estimated ranges for initial values, server-estimated ranges for subsequent values, and server-estimated ranges for intermediate values, respectively, based on storm event forecasts and one or more of the initial values, subsequent values, and intermediate values. As described above, initial values, subsequent values, and intermediate values ​​may reside on the server based on specific criteria.

[0148] In these configurations, one or more flow controllers are designed to be communicatively coupled to a server to receive, in real time, one or more server-estimated ranges or initial values ​​for initial values, one or more server-estimated ranges or subsequent values ​​for subsequent values, and one or more server-estimated ranges or intermediate values ​​for intermediate values. Furthermore, based on these values ​​received from the server, one or more flow controllers are programmed to determine, in real time, the estimated stress values ​​for the initial location, the subsequent location, and one of the locations in the first path, respectively.

[0149] In this configuration, one or more flow distribution components are designed to receive information from one or more flow controllers. One or more flow distribution components are located at one or more fluid flow intersections, which are located downstream from the initial location within the infrastructure and are in fluid communication with the initial location through the initial path. As a result, the fluid flow leaving the initial location flows through the initial path to one or more flow distribution components. In one configuration of the underlying infrastructure, the location of a fluid flow intersection represents the intersection of the initial path and a first path. In this infrastructure configuration, the initial location is a constraint location on the initial path. Furthermore, the subsequent location and one location on the first path are constraint locations on the first path.

[0150] Based on the initial location, subsequent conditions, and estimated stress values ​​at each of the locations of the first path, received from one or more flow controllers, each of these flow distribution components implements one of the flow redistribution strategies to redistribute the fluid flow at the fluid flow intersection locations between the initial path and the first path in real time during a climatic event, in order to effectively modify the estimated stress values ​​obtained at the locations of the first path to be less than a predetermined acceptable threshold attribute value assigned to the locations of the first path, and / or to effectively modify the estimated stress values ​​obtained at the initial location to be less than a predetermined acceptable threshold attribute value assigned to the initial location.

[0151] In these systems, with respect to the initial path and first path available as options for mitigating undesirable stresses, as shown in Figure 5, one or more flow controllers are programmed to execute the following commands: (1) a command to determine the estimated path stress values ​​for the initial path and the first path by adding the estimated stress values ​​of constraint locations present along each of the initial path and the first path to generate the estimated initial path stress value and the estimated first path stress value; (2) a command to identify which of the estimated initial path stress value and the estimated first path stress value has the highest magnitude in order to provide the highest stress path value; and (3) a command to redistribute the fluid flow at at least one of the fluid flow intersections between the initial path and the first path in real time during a storm event, using one or more flow redistribution strategies to effectively reduce the magnitude of the highest stress path value. Therefore, if the initial location, one location on the first path, and subsequent locations are each considered as constraint locations within the infrastructure, the estimated initial path stress value is represented by the estimated stress value at the initial location, and the estimated first path stress value represents the sum of the estimated stress values ​​at the subsequent locations and one location on the first path.

[0152] In these systems, one or more of the flow controllers may be programmed for different infrastructure configurations, where each of the locations of the first path, the second path, and subsequent locations is a constraint location located within the infrastructure. In this underlying infrastructure configuration, the fluid flow intersection represents the intersection of the first path and the second path, as shown in Figure 4. Furthermore, one or more flow controllers involved in managing this configuration are programmed to execute the following commands: (1) a command to determine the estimated path stress values ​​for the first and second paths by adding the estimated stress values ​​of constraint locations present along each of the first and second paths to generate an estimated first path stress value and an estimated second path stress value; (2) a command to identify which of the estimated first and second path stress values ​​has the highest magnitude in order to provide the highest stress path value; and (3) a command to redistribute the fluid flow at at least one of the fluid flow intersections between the first and second paths in real time during a climatic event, using one or more flow redistribution strategies to effectively reduce the magnitude of the highest stress path value. Therefore, in the infrastructure configuration shown in Figure 4, if each of the locations of the first path, the second path, and the subsequent location is considered a constraint location within the infrastructure, the estimated stress value of the first path represents the sum of the estimated stress values ​​of the subsequent location and the location of the first path, and the estimated stress value of the second path represents the sum of the estimated stress values ​​of the subsequent location and the location of the second path.

[0153] This instruction also provides novel methods for infrastructure management. While these methods do not require a specific system configuration, the novel methods implemented using the structural details shown in Figures 15-19 represent preferred embodiments of the configuration.

[0154] In relation to estimated sensor measurements, one exemplary infrastructure management method preferably begins with a “Get Digital Twin Model” element, which includes acquiring a digital twin model within each of the server (e.g., server 1104 in Figure 15) and RTU (e.g., RTU 1102 in Figure 15). As described above, the digital twin model provides estimates of one or more fluid condition attributes within a fluid infrastructure item for a given point in time or a given time period. The exemplary method then proceeds to a receiving element, which includes receiving a forecast of environmental conditions around the area surrounding a sensor (e.g., sensor 1112 in Figure 15) for the given point in time or the given time period. The estimation element then runs, and for the given point in time or the given time period, uses the forecast of environmental conditions (acquired in the receiving element) and the digital twin model (acquired in the “Get Digital Twin Model” element) in the RTU to generate an estimated range of values ​​for the fluid infrastructure item located on the constraint location.

[0155] The estimation element may also include, at the server, estimation to generate a range of one or more server values ​​for the fluid infrastructure item for the given time point or time period using environmental condition forecasts and a digital twin model. In another embodiment, in the exemplary method, another element different from the estimation element is implemented to reach the estimated range of one or more server values ​​for the fluid infrastructure item. As a result, generating these two estimates, namely the estimated range of RTU for the fluid infrastructure item value and the estimated range of the server, may be considered as two separate or single elements of the exemplary method.

[0156] Whether one element or two elements are implemented to generate these estimated fluid condition attribute values, the exemplary method proceeds to an element that “gets RTU sensor measurements,” which includes obtaining sensor measurements of the fluid condition attributes inside the fluid infrastructure item at RTU using a sensor (e.g., sensor 1112 in Figure 15). The exemplary method then proceeds to a comparison element that compares the sensor measurements with an estimated RTU range of values ​​at RTU. In the comparison element, the sensor measurements of the fluid condition attributes inside the fluid infrastructure item at RTU are compared with one or more estimated RTU ranges of values. As an example, Figure 18 shows a graphical representation 1424 as an exemplary illustration of the “comparison” performed under the comparison element.

[0157] Preferably, the reporting element is performed after the comparison element is completed. According to one embodiment of the exemplary method, the reporting element includes reporting that, for the above time point or time period, the server estimated range of the value is either the sensor measurement of the fluid condition attribute inside the fluid infrastructure item or an estimate of the sensor measurement, if the absolute value of the difference between the sensor measurement and the estimated range of the value's RTU is less than or equal to a predetermined threshold acceptable value, or if, for the above time point or time period, the sensor measurement falls within a predefined confidence interval of the estimated range of the value's RTU. As an example, Figure 18 shows a graphical representation 1426 as an exemplary illustration of the “report” performed under the reporting element.

[0158] In another preferred embodiment of this teaching, the reporting element includes reporting that if, after the passage of the above time point or time period, no sensor measurement of the fluid condition attribute inside the fluid infrastructure item is received by the server, the server's estimated fluid condition attribute is provided instead of the sensor measurement of the fluid infrastructure item. In one embodiment of this embodiment, if the RTU determines that the absolute value of the difference between the sensor measurement and the RTU estimated range of the value is less than or equal to a predetermined threshold acceptable value, or determines that the sensor measurement falls within a predefined confidence interval of multiple estimated fluid condition attribute values ​​of the RTU of the fluid infrastructure item for the above time point or time period, the RTU does not transmit the sensor measurement of the fluid infrastructure item to the server.

[0159] Prior to implementing the comparison and / or reporting elements, the exemplary method more preferably does not involve transmitting sensor measurements of fluid condition attributes within the fluid infrastructure item from the RTU to the server.

[0160] Another exemplary method by another embodiment of this teaching includes performing the elements described above: “Acquire a digital twin model,” “Receive,” “Estimate,” “Acquire sensor measurements in the RTU,” “Compare,” and “Report.” Instead of performing the “Compare” element, this exemplary method provides a “Transmit” element, corresponding to a situation where the RTU transmits sensor measurements of fluid condition attributes inside a fluid infrastructure item to a server.

[0161] Therefore, the transmission element includes transmitting the sensor measurement for the above time point or time period from the RTU to the server if the absolute value of the difference between the sensor measurement and one of the RTU estimated ranges of the value is greater than a predetermined threshold tolerance, or if it determines that the sensor measurement falls outside the predefined confidence interval of the RTU estimated fluid condition attribute value for the above time point or time period. As an example, Figure 18 shows a graphical representation 1524 as an illustrative diagram of the underlying calculations prior to “transmission” as described in the transmission element.

[0162] This exemplary method includes a “receiving information on realized environmental conditions” element, which includes receiving information on realized environmental conditions, i.e., information on environmental conditions realized around the area surrounding the fluid infrastructure item and sensor, at the aforementioned time or after the passage of the time period, on the server. However, in one embodiment of the exemplary method, the “receiving information on realized environmental conditions” element of this teaching may be performed before the passage of the aforementioned time or before the time period.

[0163] Next, this exemplary method includes performing a determination element, which involves determining a new estimated fluid condition attribute value for the server inside the fluid infrastructure item for the above time point or time period, based on information about realized environmental conditions (obtained from the "Receive information about realized environmental conditions" element) and a digital twin model residing on the server side.

[0164] Next, this exemplary method includes a comparison element in the server, which includes comparing a sensor measurement (obtained from a transmission element) with one of the server's newly estimated fluid condition attribute values ​​(obtained from a determination element).

[0165] Next, this exemplary method proceeds to a maintenance element, which includes maintaining the server-side digital twin model if the absolute difference between the sensor measurement and one of the new estimated fluid condition attribute values ​​of the server is greater than or equal to the check predefined threshold acceptable value, or if the sensor measurement at the above time or time period falls outside the check predefined confidence interval of the new estimated range of values ​​for multiple servers. As an example, Figure 19 shows a graphical representation 1526 for illustrating the underlying calculations performed before “maintenance” as described under Maintenance. Furthermore, if the absolute difference between the sensor measurement and one of the new estimated fluid condition attribute values ​​of the server is greater than or equal to the check predefined threshold acceptable value, or if the sensor measurement at the above time or time period falls outside the check predefined confidence interval of the new estimated range of values ​​for the server, the sensor measurement is transmitted from the server to one or more of the fluid flow controllers of this teaching.

[0166] The elements described above relating to exemplary methods and other exemplary methods may be implemented in a wide variety of different embodiments. For example, the “obtain a digital twin model” element includes constructing a digital twin model within the server or RTU that provides estimated fluid condition attribute values ​​for one or more fluid infrastructure items for the above time point or time period. In one preferred embodiment, the “obtain a digital twin model” element of this teaching includes constructing a probabilistic predictive model using sensor parameter information, a probability distribution function of environmental information in the area surrounding the sensor, and input and output information related to the fluid infrastructure item. For this purpose, Figure 16 shows an exemplary digital twin model 1208 formed on the server 1204 side.

[0167] Sensor parameter information includes at least one item selected from the group including the sensor's location, sensor type, critical high fluid condition attribute detectable by the sensor, critical low fluid condition attribute detectable by the sensor, sensor data transmission rate, and sensor battery level.

[0168] The input information includes at least one piece of information selected from the group that includes precipitation information in the area surrounding the sensor associated with the RTU, fluid levels of one or more different inputs to the fluid infrastructure item, and flow rates of one or more different inputs to the fluid infrastructure item.

[0169] The output information includes at least one piece of information selected from the group including evaporation information around the sensor associated with the RTU, fluid levels of one or more different outputs exiting the fluid infrastructure item, and flow rates of one or more different outputs exiting the fluid infrastructure item.

[0170] In addition to fluid level and / or fluid velocity, the fluid condition attributes of the input and output information may also include at least one attribute selected from the group including water head, groundwater flux, rate of change of groundwater flux, pH, conductivity, total organic compound concentration, total suspended solids, and turbidity.

[0171] The construction envisioned under the element of “acquiring a digital twin model” preferably involves using a machine learning module to generate a probability distribution function of estimated sensor measurements of fluid condition attributes within a fluid infrastructure item.

[0172] Regardless of the manner in which the digital twin model is obtained, the “obtaining a digital twin model” element may include modifying the digital twin model using RTU and sensors (for example, sensor measurements provide insights into the reliability of the digital twin model's estimates) until the fluid condition attributes within the fluid infrastructure item are reliably estimated. For example, modifying the digital twin model may include correcting the values ​​of one or more parameters associated with the fluid infrastructure item used to construct the initial version of the digital twin model until one or more of the estimates of the fluid condition attributes obtained from the digital twin model are equal to or close to sensor measurements (for example, sensor measurements obtained from sensor 1212 in Figure 16).

[0173] In one preferred embodiment of this teaching, the modification of the digital twin model includes determining that the Nash-Sutcliff coefficient of the digital twin model is greater than a predetermined acceptable value, or determining that the root mean square deviation between estimates of fluid state attributes obtained at different points in time or different time periods and sensor measurements of fluid condition attributes is less than or equal to a predetermined error value.

[0174] This teaching recognizes that, if these elements are implemented, construction and modification preferably provide at least one of the digital twin models (e.g., digital twin model 1208 in Figure 16) within a server (e.g., server 1204 in Figure 16). Furthermore, the server (e.g., server 1204 in Figure 16) has a machine learning engine (e.g., machine learning engine 1206 in Figure 16) installed or is communicatively coupled to a machine learning engine, which constructs the digital twin model and verifies that the digital twin model is an acceptable model for reliably estimating the fluid condition attributes within the fluid infrastructure item.

[0175] According to a particular preferred embodiment of this teaching, given that an acceptable digital twin model resides on a server, the exemplary method includes a transmission element that transmits or sends a copy of the digital twin model from the server to a remote monitoring and control device (for example, server 1304 transmits a copy of digital twin model 1308 to RTU 1302 via network 1310 so that the copy is stored as digital twin model 1318 as shown in Figure 17).

[0176] After an acceptable digital twin model has been acquired on the server, the exemplary method preferably further includes storing the digital twin model in memory associated with the server (e.g., server 1104 in Figure 15) (e.g., database 1142 in Figure 15), and in remote memory located remotely from the memory (e.g., database 1142 in Figure 15) or the server (e.g., server 1104 in Figure 15) (e.g., memory 1130 of the RTU in Figure 15).

[0177] In one embodiment of the receiving element, an exemplary method includes receiving a probability distribution function for the above time point or time period that forecasts the amount of precipitation that will occur around the area surrounding the sensor. Preferably, the probability distribution function provides a plurality of estimates of the amount of precipitation that will occur around the area surrounding the sensor.

[0178] According to a preferred embodiment of this teaching, when implementing the estimation elements of the exemplary method, a neural network calculates the server estimated range of values ​​for the above time point or time period. Furthermore, a machine learning engine located within the RTU calculates the RTU estimated range of values ​​for the above time point or time period. Moreover, each of the server estimated range of values ​​and the RTU estimated range of values ​​is preferably a probability distribution function. As an example, in Figure 18, the graph representation 1426 in server 1404 and the graph representation 1424 in RTU 1402 each show a probability distribution function for estimating the fluid condition attribute values ​​inside a fluid infrastructure item.

[0179] Continuing in this example, with regard to the “obtaining RTU sensor measurements” element described in relation to the exemplary embodiment, preferably, in RTU, the sensor measurements of fluid condition attributes are compared with the probability distribution function of RTU for the time point or time period, i.e., the estimated range of values ​​for fluid infrastructure items at the constraint location.

[0180] The reporting element of this method preferably includes reporting the mean of the server's probability distribution function for the time period described above as a sensor measurement or estimate of the fluid condition attribute inside the fluid infrastructure item, if the sensor measurement for the time period described above falls within a predefined confidence interval of the mean of the probability distribution function of the RTU. In one embodiment, this teaching recognizes that the confidence interval extends to a predefined range of estimated fluid condition attribute values ​​that deviate from the mean of the probability distribution function of the RTU.

[0181] In one preferred embodiment of the exemplary method, the receiving element includes receiving forecasts of environmental conditions around the area surrounding the sensor at a certain periodic rate. In one embodiment of this embodiment, the estimation element of this teaching includes estimating fluid condition attributes inside a fluid infrastructure item in RTU at or below the above periodic rate to generate one or more RTU estimation ranges of values. Continuing in this embodiment, “obtaining RTU sensor measurements” in this teaching includes obtaining sensor measurements at the sensor’s sampling rate. In this embodiment, the sampling rate is greater than the periodic rate.

[0182] Furthermore, if the absolute value of the difference between a sensor measurement and one of the RTU estimation ranges for the value is greater than a predetermined threshold tolerance, or if the sensor measurement falls outside a predefined confidence interval of multiple estimated fluid condition attribute values ​​of the RTU for the given time point or time period, the teaching control method preferably further includes a transmission element described in relation to another exemplary method for transmitting the sensor measurement obtained for the given time point or time period from the RTU to a server at or below the given sampling rate.

[0183] These preferred embodiments further include a receiving element (substantially similar to the receiving element described in relation to another exemplary method) that, after the expiration of the above time point or time period, receives information about realized environmental conditions (e.g., amount of precipitation) realized around the area surrounding the sensor for the above time point or time period. Then, similar to the determination element described in relation to another exemplary method, based on the information about realized environmental conditions and a digital twin model present on the server side, the control method of this teaching provides a similar determination element that includes determining a new estimated range for the server of the value for the above time point or time period. In one embodiment of the similar determination element, the new estimated range for the server of the value is a probability distribution function (e.g., the probability distribution function shown in graph representation 1526 in Figure 19).

[0184] Next, on the server, the control method of this instruction performs similar comparison elements (substantially similar to those described in relation to another exemplary method), including comparing the sensor measurement with the server's new estimated range of values. Then, the control method of this instruction proceeds to maintain the server-side digital twin model if the absolute difference between the sensor measurement and one of the server's new estimated ranges of values ​​is greater than or equal to the check predefined threshold acceptable value, or if the sensor measurement at the above time or time period falls outside the check predefined confidence interval of the multiple server's new estimated ranges of values. If the digital twin model is maintained on the server side, the control method of this instruction includes maintaining a copy of the digital twin model on the RTU side. Furthermore, if the absolute difference between the sensor measurement and one of the server's new estimated ranges of values ​​is greater than or equal to the check predefined threshold acceptable value, or if the sensor measurement at the above time or time period falls outside the check predefined confidence interval of the server's estimated range of values, the sensor measurement is transmitted from the server to one or more of the fluid flow controllers of this instruction.

[0185] In a preferred embodiment, the control method of this teaching includes obtaining a new digital twin model, different from the (original) digital twin model, within each server and within the RTU, if the absolute difference between a sensor measurement and one of the new estimated ranges of the server values ​​is less than a check predefined threshold acceptable value, or if the sensor measurement at the above time or time period falls within the check predefined confidence interval of the new estimated ranges of the multiple servers values.

[0186] In relation to another exemplary method, this teaching provides additional different embodiments for the effective management of a fluid network. In one such embodiment, another exemplary method involves obtaining a new digital twin model within the RTU if the absolute difference between a sensor measurement and one of the newly estimated ranges of the RTU of the value is less than a check predefined threshold acceptable value, or if the sensor measurement at the above time or time period falls within the check predefined confidence interval of the multiple newly estimated ranges of the RTU of the value.

[0187] Continuing in this embodiment, another exemplary method preferably further includes transmitting a new digital twin model formed in the RTU to a server. In this embodiment, the function of transmission is performed using a communication coupling between the RTU and the server. In this configuration, the server is communicatively coupled to multiple RTUs and stores one copy of the digital twin model, which is also stored in one of the RTUs. Furthermore, each RTU is coupled to a sensor that measures a specific type of fluid condition attribute inside a fluid infrastructure item located at or near the constraint location. The server-side digital twin model allows the server to use information about the amount of precipitation realized to reach a new estimated range of values ​​for the server at the aforementioned time point or after the passage of the aforementioned time period, and to operate potentially independently of the RTU, thereby saving energy.

[0188] Whether actual sensor measurements are available or estimated sensor values ​​are relied upon, this teaching provides an infrastructure management method that can be used either way to effectively reduce stress within the infrastructure.

[0189] Figure 20 shows an infrastructure management method 2000 according to one embodiment of this teaching. Method 2000 preferably begins with an “Acquire Initial Values” element 2002, which includes acquiring initial values ​​using initial sensors located at or near the initial location and measuring fluid condition attributes at the initial location. In this element, initial values ​​may be acquired by one or more fluid flow controllers (for example, the decision support engine 406 in Figure 13 receives sensor information through components included in the low-level control and local control 552 shown in Figure 14). As an example, a sensor 412 shown in Figures 13 and 14 or a sensor 512 shown in Figure 14, located at or near the initial location 306 shown in Figure 5 and measuring fluid condition attributes at the initial location 306, provides initial values ​​to one or more fluid flow controllers.

[0190] As shown in Figure 20, Method 2000 further includes “Acquiring Successive Values” 2004, which includes acquiring successive values ​​using successive sensors located at or near a successive location and measuring fluid condition attributes at the successive location. For example, sensors 412 shown in Figures 13 and 14 or 512 shown in Figure 14, located at or near a successive location 328 shown in Figure 5 and measuring fluid condition attributes at the successive location 328, provide successive values ​​to one or more fluid flow controllers. In accordance with the configuration of the underlying infrastructure, the successive sensors are located downstream from the initial sensors.

[0191] Method 2000 further includes “acquiring intermediate values” 2006. Intermediate value element 2006 includes acquiring one or more intermediate values ​​using one or more intermediate sensors, of which at least one is located on one location of a first path, and which measure the flow flowing through or stored in that location. For example, sensor 412 shown in Figures 13 and 14 or sensor 512 shown in Figure 14, located on intermediate location 318 of a first path 312 shown in Figure 5, provide intermediate values ​​to one or more fluid flow controllers.

[0192] The "Get Initial Value" element 2002, the "Get Successor Value" element 2004, and the "Get Intermediate Value" element 2006 are not executed in any particular order, but are preferably executed simultaneously.

[0193] Method 2000 then proceeds to a determination element 2008, which includes determining stress values ​​at each of the initial path, one location on the first path, and subsequent locations in order to generate an initial path stress value and a first path stress value. This element is based on one or more initial and intermediate values ​​and subsequent values ​​obtained in the preceding element. In one embodiment of element 2008, as discussed in relation to the base infrastructure configuration in Figure 5, the initial path stress value represents the stress value at least at the initial location (e.g., 306 shown in Figure 5) when it is the only indicated constraint location on the initial path (e.g., initial path 310 shown in Figure 5). If additional constraint locations exist on the initial path, the initial path stress value will represent the sum of the stress values ​​at the initial location and the stress values ​​at the additional constraint locations on the initial path.

[0194] Therefore, according to the embodiment in Figure 5, since one location and subsequent locations of the first path are the only shown constraint locations on the first path, the first path stress value represents the sum of the stress values ​​of at least one location (e.g., the first location 318 shown in Figure 5) and the subsequent location (e.g., the subsequent location 328 shown in Figure 5) on the first path (e.g., the first path 312 shown in Figure 5). If additional constraint locations exist on the first path, the initial path stress value will represent the sum of the stress values ​​of one location of the first path, the subsequent locations, and the additional constraint locations on the initial path.

[0195] Method 2000 then proceeds to an identification element 2010, which includes identifying which of the initial path stress value and the first path stress value is of the highest magnitude and generates the highest stress path value. Next, Method 2000 proceeds to a redistribution element 2012, which includes redistributing the fluid flow in the initial path and / or the first path during a climatic event using one or more flow distribution components based on one or more flow redistribution strategies in order to effectively reduce the magnitude of the highest stress path value.

[0196] In this exemplary method, one or more flow distribution components are located at one or more fluid flow intersections (for example, where flow distribution component 316 shown in Figure 5 is located). The fluid flow intersections are located downstream from the initial location (for example, initial location 306 shown in Figure 5), and as a result, the fluid flow leaving the initial location flows through the initial path (for example, initial path 310 shown in Figure 5) to one or more of the flow distribution components. In one configuration of the infrastructure as shown in Figure 5, each fluid flow intersection intersects the initial path and the first path (for example, initial path 310 and first path 312 shown in Figure 5).

[0197] In this system, one or more of the flow distribution components (for example, flow distribution components 116, 216, 316, 438, and 516 shown in Figures 3 to 5, 13, and 14, respectively) are communicably coupled to one or more of the fluid flow controllers (for example, digital support engines 406 and 506 shown in Figures 13 and 14, respectively), and as a result, information can flow between one or more of the fluid flow controllers and one or more of the flow distribution components.

[0198] This real-time method for managing the infrastructure applies to the infrastructure configuration shown in Figure 5, where the initial location, one location in the first path, and subsequent locations are each considered constraint locations within the infrastructure. Constraint locations are considered constraint locations because, during a storm event, measured fluid condition attributes at these locations may reach or exceed predetermined acceptable threshold attribute values ​​assigned to them. Excess fluid flow in the initial path and the first path is at least partially due to excess fluid flow into the initial path and the first path from multiple intermediate flows (e.g., intermediate flows 58 shown in Figure 2).

[0199] This teaching addresses problems caused by at least two different types of climate events, e.g., large-scale storm events and small-scale storm events. This teaching sets the fluid condition attributes at constraint locations to a relatively high predetermined threshold acceptable attribute value or a relatively low predetermined threshold acceptable attribute value, depending on the flow redistribution strategy implemented to alleviate stress on infrastructure during a particular type of climate event, under one method. In a preferred embodiment, the redistribution element 2012 shown in Figure 20 includes reducing the stress value of at least one of the constraint locations (e.g., the initial location, one location on the first path, and subsequent locations) to a relatively low predetermined acceptable threshold attribute value or less during a large-scale storm (e.g., Figures 12A and 12B). During a small-scale storm, redistribution includes implementing one of the flow redistribution strategies that reduces the stress value of at least one of the constraint locations to a relatively high predetermined acceptable threshold attribute value or less during a small-scale storm (e.g., Figures 11A and 11B).

[0200] Under this approach, this teaching also enables infrastructure management methods even when storm conditions change. For this purpose, this teaching also enables adaptive control strategies to maintain the integrity of infrastructure management systems and methods during fluctuating weather conditions. Starting with predicted climatic conditions, the redistribution element 2012 shown in Figure 20 may include replacing the implementation of one flow redistribution strategy with another during a smaller storm event that develops into an unexpectedly large storm event. In this adaptive control strategy, one flow redistribution strategy modifies the fluid condition attributes through at least one of the constraint locations such that the fluid condition attribute value of at least one of the constraint locations is less than or equal to a predetermined relatively high acceptable threshold attribute value assigned to at least one of the constraint locations. By the adaptive control strategy replacing the other flow distribution strategy, the fluid condition attributes through at least one of the constraint locations are modified so that the fluid condition attribute value of at least one of the constraint locations is less than or equal to a predetermined relatively low acceptable threshold attribute value assigned to at least one of the constraint locations. In other words, during the transition from a small-scale storm event to a large-scale storm event, the redistribution element 2012 shown in Figure 20 replaces predefined stress threshold settings with relatively high predetermined acceptable threshold attribute values ​​(e.g., Figures 11 and 11B) with relatively lower predetermined acceptable threshold attribute values ​​(e.g., Figures 12A and 12B).

[0201] In a base infrastructure configuration where each fluid flow intersection intersects the initial path and a first path, this teaching provides an alternative embodiment for reducing stress within the infrastructure. According to a particular alternative embodiment of this teaching, the redistribution element 2012 shown in Figure 20 does not need to focus on reducing the highest stress path value; rather, the focus may be on reducing stress values ​​at one or more critical locations located along one or more paths within the infrastructure.

[0202] For example, in the infrastructure configuration shown in Figure 5, the alternative redistribution element of this teaching redistributes the fluid flow by effectively modifying the fluid flow through one of the flow distribution components located on at least one fluid flow intersection between the initial path and the first path, such that the stress value obtained at one location of the first path (e.g., intermediate location 318 of the first path 312 shown in Figure 5) is less than a predetermined acceptable threshold attribute value assigned to one location of the first flow path, and / or that the stress value obtained at the initial location (e.g., initial location 306 shown in Figure 3) is less than a predetermined acceptable threshold attribute value assigned to the initial location.

[0203] As another example, in the infrastructure configuration shown in Figure 5, yet another alternative redistribution element of this teaching redistributes the fluid flow by effectively modifying the fluid flow through one of the flow distribution components located on at least one fluid flow intersection to reduce the combination of stress values ​​of the initial location and one location on the first path to a "reduced combination of stress values ​​of the initial location and one location on the first path," in which the stress value of the initial location is reduced and the stress value of the location on the first path is increased but within a predetermined acceptable threshold level, or the stress value of the location on the first path is reduced and the stress value of the initial location is increased but within a predetermined acceptable threshold level.

[0204] In specific embodiments of this teaching, in relation to the infrastructure configuration shown in Figures 3 and 4, multiple intermediate sensor measurements are obtained from one path and / or different paths (e.g., a first path and a second path, respectively, in Figures 3 and 4). In these embodiments of the Method, “obtaining intermediate values” includes obtaining multiple intermediate measurements using multiple intermediate sensors. As described above, at least one of the multiple intermediate sensors is located on one location of the first path and generates an intermediate measurement by measuring the fluid flowing through or stored within that location. Furthermore, in these embodiments of the Method, at least another of the multiple intermediate sensors is located on one location of the second path and generates one or more additional intermediate values ​​by measuring the fluid flowing through or stored within that location. In the context of the underlying infrastructure shown in Figures 3 and 4, the second path facilitates the flow of fluid from the initial location to the subsequent locations.

[0205] In these embodiments of the present method, in addition to the first path stress value, the determination element includes generating a second path stress value, the second path stress value representing the sum of at least one stress value at one location on the second path (e.g., intermediate location 120 of the first path 114 shown in Figure 3 and intermediate location 220 of the first path 214 shown in Figure 4) and at least one stress value at subsequent locations (e.g., subsequent locations 128 and 228 shown in Figures 3 and 4, respectively). Furthermore, in relation to the infrastructure configuration shown in Figure 3, the determination element 2008 shown in Figure 20 includes identifying which of the initial path stress value, the first path stress value, and the second path stress value has the greatest magnitude in order to reach the maximum stress path value. In relation to the infrastructure configuration shown in Figure 3, the redistribution element 2012 shown in Figure 20 also includes redistributing the fluid flow to one path selected from a group including the initial path, the first path, and the second path, based on one or more flow redistribution strategies, in order to effectively reduce the magnitude of the highest stress path value.

[0206] In relation to Figure 3 and the adaptive control strategies provided by this instruction, during a large-scale storm event, the redistribution element 2012 of Figure 20 includes implementing one of the flow redistribution strategies to reduce the stress value of at least one of the initial path, the first path, and the second path to below a relatively low predetermined acceptable threshold path stress value assigned to each of the initial path, the first path, and the second path, respectively. During a small-scale storm, the redistribution element 2012 of Figure 20 includes implementing one of the flow redistribution strategies to reduce the stress value of at least one of the initial path, the first path, and the second path to below a relatively high predetermined acceptable threshold attribute value assigned to each of the initial path, the first path, and the second path, respectively.

[0207] As shown in Figure 5, the method recognizes that the underlying infrastructure configuration may not have a second path available as an option for mitigating stress within the infrastructure. In such situations, the redistribution element 2012 shown in Figure 20 effectively modifies the fluid flow through one of the flow distribution components (e.g., flow distribution component 316 shown in Figure 5) such that the stress value acquired at one location of the first path (e.g., intermediate location 318 of the first path 312 shown in Figure 5) is less than a predetermined acceptable threshold attribute value assigned to one location of the first flow path, and / or that the stress value acquired at the initial location (e.g., initial location 306 shown in Figure 5) is less than a predetermined acceptable threshold attribute value assigned to the initial location.

[0208] However, if a second path is available, for example, within the underlying infrastructure as an option for stress relief as shown in Figure 5, the method includes reducing at least one path stress value selected from the group including the initial path stress value, the first path stress value, and the second path stress value, based on one or more of the flow redistribution strategies. In these embodiments of the method, each of the initial location, one location of the first path, one location of the second path, and the subsequent location is preferably considered to be a constraint location within the infrastructure.

[0209] In another embodiment, the redistribution element of the method reduces a combination of stresses at multiple constraint locations. In these embodiments of the method, the redistribution element includes reducing a combination of stresses at constraint locations to within their assigned predefined acceptable threshold stress values, so as to reach a "reduced stress combination of constraint locations." In other words, in a "reduced stress combination of constraint locations," it is possible to reduce the stress at one constraint location in exchange for another constraint location, while keeping the increased stress value at the other constraint location within its assigned predetermined acceptable threshold attribute value. This also achieves the objective of the teaching, which is to reduce undesirable stresses within the infrastructure.

[0210] As an example, relating to Figure 3, in the "combination of reduced stress values ​​for constrained locations," the stress value of one initial location 106 is reduced, and the stress value of at least one of the intermediate locations 118 of the first path 112 and / or intermediate locations 120 of the second path 114 is increased, but within a predetermined acceptable threshold level assigned to intermediate locations 118 and / or 120, or the stress value of at least one of the intermediate locations 118 and / or 120 is reduced, and the stress value at the initial location 106 is increased, but within a predetermined acceptable threshold level assigned to the initial location 106.

[0211] As another example, relating to Figure 4, in the "combination of reduced stress values ​​at constrained locations," the stress value at intermediate location 218 of the first path 212 is reduced, and the stress value at intermediate location 220 of the second path 214 is increased, but within a predetermined acceptable threshold level assigned to intermediate location 220, or the stress value at intermediate location 220 is reduced, and the stress value at intermediate location 218 is increased, but within a predetermined acceptable threshold level assigned to intermediate location 218.

[0212] As another example, relating to Figure 5, in the "combination of reduced stress values ​​at constrained locations," the stress value at the initial location 306 is reduced, and the stress value at the intermediate location 318 of the first path 312 is increased, but within a predetermined acceptable threshold level assigned to the intermediate location 318, or the stress value at the intermediate location 318 is reduced, and the stress value at the initial location 306 is increased, but within a predetermined acceptable threshold level assigned to the intermediate location 306.

[0213] The method recognizes that the underlying infrastructure configuration may not have an initial path available as an option for stress relief, as shown in the infrastructure configuration of Figure 4. In these embodiments of the method, the redistribution element 2012 shown in Figure 20 includes reducing the fluid flow rate through the first path 212 and / or the second path 214. Under other circumstances in such a situation, the redistribution element of the method for relieving stress in the infrastructure does not consider the paths involved. Rather, the redistribution element of the method is based on a combination of stress values ​​at multiple constraint locations. In relation to Figure 4, the “reduced combination of stress values ​​at constraint locations” includes reducing from a combination of stress values ​​at one location on the first path and one location on the second path until it reaches the “reduced combination of stress values ​​at one location on the first path and one location on the second path”. In the "reduced combination of stress values ​​for one location on the first path and one location on the second path," the stress value of intermediate location 318 on the first path 312 is reduced and the stress value of intermediate location 320 on the second path 314 is increased, provided that it is within a predetermined acceptable threshold level assigned to intermediate location 320, or the stress value of intermediate location 320 on the second path 314 is reduced and the stress value of intermediate location 318 on the first path 312 is increased, provided that it is within a predetermined acceptable threshold level assigned to intermediate location 318.

[0214] Regardless of the infrastructure configuration, the fluid condition attribute is at least one attribute selected from the group including fluid flow rate, fluid height, fluid volume, hydraulic capacity, fluid residence time, storage capacity, and fluid quality.

[0215] After the reallocation element shown in Figure 20 is completed, the method of infrastructure management may proceed to the implementation of other elements. For example, the comparison element of the method includes comparing the results obtained as a result of implementing each of the infrastructure management strategies during a storm event. In one embodiment of this example, the comparison includes using one or more measures of success in reducing stress values ​​at one location on the first path and one location on the second path. Keypoint indicators provide insights into the effectiveness of the infrastructure management strategies by evaluating infrastructure metrics such as reduced overflow, reduced flood volume, reduced energy consumption, and improved river water quality. The method then preferably stores one or more of the successful infrastructure management strategies in one or more of the fluid flow controllers.

[0216] Next, the method preferably implements a determination element. In a preferred embodiment of this teaching, the determination element includes determining one or more successful infrastructure management strategies that effectively reduce stress values ​​at one or more of the constraint locations during a storm event, based on a comparison element. For example, in Figures 3 and 4, where the base infrastructure configuration includes one location on the first path and one location on the second path as constraint locations among other locations, the determination element includes determining one or more successful infrastructure management strategies that effectively reduce stress values ​​at the one location on the first path and one location on the second path. In another example, as shown in Figure 5, in a base infrastructure configuration where the constraint locations include the initial location and one location on the first path among other locations, the determination element includes determining one or more successful infrastructure management strategies that effectively reduce stress values ​​at the initial location and one location on the first path.

[0217] Regardless of the number and nature of constraint locations, a memory element may be executed after the decision element. The memory element includes storing one or more successful infrastructure management strategies in one or more of the fluid flow controllers.

[0218] This instruction provides a method for implementing an infrastructure management strategy, for example, at the present time and in the absence of sensor measurements, and / or at a future time. Figures 21-1 and 21-2 illustrate a method for implementing method 2100 of the infrastructure management strategy according to a specific embodiment of this instruction. Method 2100 includes an “Acquire Initial Values” element 2102, which includes acquiring initial values ​​using an initial sensor located at or near the initial location and measuring fluid condition attributes at the initial location. The “Acquire Initial Values” element 2102 is substantially similar to “Acquire Initial Values” 2002 shown in Figure 20. Method 2100 also includes “Acquire Subsequent Values” 2104, which includes acquiring subsequent values ​​using a subsequent sensor located at or near the subsequent location and measuring fluid condition attributes at the subsequent location. The “Acquire Subsequent Values” element 2104 is substantially similar to “Acquire Subsequent Values” element 2004 shown in Figure 20.

[0219] As shown in Figures 21-1 and 21-2, Method 2100 includes an “Obtain Estimated Midpoints” element 2106, which includes obtaining one or more server-estimated midpoint ranges of values ​​based on climate event forecasts and one or more midpoints. This element is performed using a server operating with one or more midpoint sensors, at least one of which is located at or near one location on a first path, and which measures fluid condition attributes at that location to generate one or more midpoints. For example, the digital twin model servers 408 or 508 or server 1504 in Figures 13, 14 and 15 may provide an estimated range of values ​​based on climate event forecasts and one or more midpoints. As shown in Figure 15, the server 1504 uses precipitation data 1516, for example, the actual amount of precipitation realized around the area surrounding one or more sensors (e.g., sensor 1512), to calculate one or more server-estimated ranges of intermediate values ​​(see, for example, the curve in the graphical representation 1526).

[0220] In a preferred embodiment of the method for implementing an infrastructure management strategy, the subsequent sensors are downstream from the initial sensors. Furthermore, the “obtaining estimated intermediate values” element includes using a server operating with one or more intermediate sensors (e.g., a server 1304 operating with multiple RTUs 1314A, 1314B, and 1314C, each associated with an intermediate sensor). At least one of the intermediate sensors is located at one location on a first path (e.g., sensor 1512 shown in Figure 19 is located at intermediate location 318 on path 312 shown in Figure 5) and measures fluid condition attributes at one location on the first path to generate one or more intermediate values ​​(e.g., sensor 1512 located at intermediate location 318 on path 312 shown in Figure 5 will generate the intermediate values). Furthermore, in these embodiments, which rely on the infrastructure configuration shown in Figure 5, the initial location, one location on the first path, and the subsequent location are each constraint locations, and the first path facilitates fluid communication between the initial location and the subsequent location.

[0221] In this method for implementing an infrastructure management strategy, the server may be communicatively coupled to one or more fluid flow controllers (for example, the server 1404 in Figure 18 is the same as the digital twin model server 408 shown in Figure 13, which is communicatively coupled to the decision support engine 406, which is a fluid flow controller).

[0222] The method for implementing the infrastructure management strategy method 2100 preferably includes a determination element 2108, which in real time uses one or more fluid flow controllers to determine stress values ​​at each of the initial and subsequent locations, as well as an estimated stress value at one location of the first path, based on one or more of initial, subsequent, and estimated intermediate values, respectively, thereby generating an initial path stress value and an estimated first path stress value.

[0223] One or more servers and / or fluid flow controllers may perform an identification element 2110, which includes identifying which of the initial path stress value and the estimated first path stress value is the highest and reaches the maximum stress path value. The initial path stress value preferably represents the stress value at least at the initial location. The estimated first path stress value preferably represents the sum of the estimated stress value at at least at one location in the first path and the stress values ​​at subsequent locations. Based on the maximum flow stress value, the method proceeds to perform a formulation element 2112, which includes formulating one or more infrastructure management strategies to reduce the maximum stress path value.

[0224] A preferred embodiment of the Method for implementing Method 2100 for implementing an infrastructure management strategy then implements a comparison element 2114, which includes comparing each of the infrastructure management strategies with the results of a storm event. The comparison element 2114 is preferably implemented using one or more keypoint indicators of the success of reducing the maximum flow stress value. The keypoint indicators include at least one metric selected from the group including overflow, flood volume, energy consumption, and river water quality.

[0225] Next, the Method 2100 for implementing the infrastructure management strategy implements a determination element 2116 which includes determining one or more successful infrastructure management strategies that effectively reduce the maximum flow stress value. This element is preferably based on a comparison using one or more key point indicators of the success of the reduction of the maximum flow stress value. Next, as part of a storage element 2118, the Method 2100 for implementing the infrastructure management strategy implements preferably stores one or more of the successful infrastructure management strategies in one or more of the fluid flow controllers.

[0226] During a subsequent climatic event, the Method implements an extraction element 2120 in which one or more fluid flow controllers (e.g., decision support engines 406 or 506 shown in Figures 13 and 14) implement an infrastructure management strategy Method 2100. In this element, one or more fluid flow controllers extract one or more successful infrastructure management strategies. Based on one or more successful infrastructure management strategies, the Method redistributes the fluid flow in real time during a subsequent storm event using one or more flow distribution components (e.g., flow distribution component 316 that redistributes the fluid flow in the initial path 310 and the first path 312 shown in Figure 5) that redistribute the fluid flow in the initial path and / or first path to effectively reduce the magnitude of the highest stress path value.

[0227] In the specific embodiments of this teaching, “obtaining estimated intermediate values” 2106 includes (1) using one or more intermediate sensors operating with intermediate RTUs, each of which is communicably coupled to a server (e.g., sensor 1412 operating with RTU 1402 communicably coupled to server 1404 as shown in Figure 18, or sensor 1512 operating with RTU 1502 communicably coupled to server 1504 as shown in Figure 19), and (2) receiving one of the estimated intermediate values ​​from the server based on the intermediate remote monitoring and control device (e.g., receiving the output of assumed sensor data 1426 as shown in Figure 18 from server 1404, or receiving the output of estimated sensor data 1526 of the RTU as shown in Figure 19 from server 1504). In these embodiments, the initial location, one location on the first path, and subsequent locations are each considered to be constraint locations within the infrastructure.

[0228] In relation to adaptive control strategies using estimated stress values, a particular embodiment of the Method 2100 for implementing an infrastructure management strategy provides a redistribution element 2122 for implementing one of a flow redistribution strategy to reduce the stress value and / or estimated stress value of at least one of the constraint locations so that the fluid condition attribute value of at least one of the constraint locations is below a predetermined acceptable threshold attribute value that is relatively high during a small storm (e.g., Figures 11A and 11B). During a large storm event, the redistribution element 2122 includes implementing one of a flow redistribution strategy to reduce the stress value and / or estimated stress value of at least one of the constraint locations so that the fluid condition attribute value of at least one of the constraint locations is below a predetermined acceptable threshold attribute value that is relatively low (e.g., Figures 12A and 12B).

[0229] During a climatic event, the redistribution element 2122 shown in Figure 21-2 of a preferred embodiment of this teaching includes replacing the implementation of one flow redistribution strategy with another. In the redistribution element 2122, when a small storm unexpectedly develops into a large storm, one flow redistribution strategy modifies the fluid condition attributes through at least one of the constraint locations such that the modified fluid condition attribute value of at least one of the constraint locations is less than or equal to a predetermined relatively high acceptable threshold attribute value assigned to at least one of the constraint locations, and the other flow redistribution strategy modifies the fluid condition attributes through at least one of the constraint locations such that the modified fluid condition attribute value of at least one of the constraint locations is less than or equal to a predetermined relatively low acceptable threshold attribute value assigned to at least one of the constraint locations.

[0230] For example, when the initial location and one location of the first path are constrained locations as shown in Figure 5, the redistribution element effectively modifies the fluid flow through one of the flow distribution components such that the stress value obtained and / or estimated stress value at one location of the first path is less than a predetermined acceptable threshold attribute value assigned to one location of the first flow path, and / or the stress value obtained and / or estimated stress value at the initial location is less than a predetermined acceptable threshold attribute value assigned to the initial location. Instead of focusing on reducing stress values ​​at specific constrained locations, this teaching also recognizes that similar techniques can be used to reduce the magnitude of the highest stress path value.

[0231] In relation to the infrastructure configuration shown in Figure 3, the method may rely on a plurality of estimated intermediate values, i.e., at least one sensor in addition to at least one sensor located on one location of the first path. In a particular embodiment of the method, the element of obtaining one or more estimated intermediate ranges of values ​​includes using a plurality of intermediate sensors, at least one of which is located on one location of the second path and measures the fluid flowing through or stored within that location to generate another estimated intermediate value (for example, sensors 1412 or 1512 shown in Figures 18 and 19 are located at intermediate location 120 of the second path 114 shown in Figure 3). The second path provides fluid communication between the initial location and the subsequent location.

[0232] In these embodiments, the determinant of the method includes generating an estimated second path stress value, which represents the sum of the estimated stress value at at least one location on the second path and the stress values ​​at subsequent locations, these locations being known constraint locations in the infrastructure configuration of Figure 3. The estimated stress value at one location on the second path is based on another estimated intermediate value. In this scenario, the determinant of the method includes identifying which of the initial path stress value, the estimated first path stress value, and the estimated second path stress value has the greatest magnitude in order to reach the maximum stress path value.

[0233] Therefore, when three different paths, namely the initial path, the first path, and the second path, are available as options for reducing stress within the infrastructure, the redistribution element 2122 shown in Figure 21-2 preferably includes redistributing the fluid flow to one path selected from the group including the initial path, the first path, and the second path, based on one or more of the flow redistribution strategies, in order to effectively reduce the magnitude of the highest stress path value.

[0234] In relation to adaptive control strategies, the redistribution element 2122 shown in Figure 21-2 preferably includes implementing one of the flow redistribution strategies to reduce the stress value of at least one of the initial paths, the estimated first path stress value, and the estimated second path stress value to be below a relatively high predetermined acceptable threshold attribute value during small-scale storm events. During large-scale storms, the redistribution element of the method preferably includes implementing one of the flow redistribution strategies to reduce the stress value of at least one of the initial path, the first path, and the second path to be below a relatively low predetermined acceptable threshold attribute value.

[0235] Continuing in relation to adaptive control strategies, during climatic events, the redistribution element of the method may include replacing the implementation of one flow redistribution strategy with another. One flow redistribution strategy modifies the fluid condition attributes through at least one of the initial path, the first path, and the second path such that each of the initial path stress values, the estimated first path stress values, and the estimated second path stress values ​​are less than or equal to a relatively high predetermined acceptable threshold attribute value assigned to one of the initial path, the first path, and the second path. Furthermore, another flow distribution strategy modifies the fluid condition attributes through at least one of the initial path, the first path, and the second path such that each of the initial path stress values, the estimated first path stress values, and the estimated second path stress values ​​are less than or equal to a relatively low predetermined acceptable threshold attribute value assigned to one of the initial path, the first path, and the second path.

[0236] In this method for implementing an infrastructure management strategy, the redistribution element 2122 shown in Figure 21-2 effectively modifies the fluid flow through one of the flow distribution components in the context of the constraint locations, i.e., the initial location, one location of the first path, and one location of the second path, as shown in Figure 3, thereby generating at least one reduced stress condition.

[0237] One redistribution element of this method for implementing an infrastructure management strategy under a single approach may include reducing a combination of stress values ​​at constrained locations to a “reduced combination of stress values ​​at constrained locations.” In the “reduced combination of stress values ​​at constrained locations” applied to the infrastructure configuration shown in Figure 3, the stress value of the initial path is reduced, and the stress value and / or estimated stress value of at least the other constrained locations, i.e., one location on the first path and one location on the second path, is increased, but within a predetermined acceptable threshold level; or the estimated stress value of one location on the first path is reduced, and the stress value and / or estimated stress value of at least the other constrained locations, i.e., the initial location and one location on the second path, is increased, but within a predetermined acceptable threshold level; or the estimated stress value of one location on the second path is reduced, and the stress value and / or estimated stress value of at least the other constrained locations, i.e., the initial location and one location on the first path, is increased, but within a predetermined acceptable threshold level.

[0238] From the perspective of analyzing the amount of stress imposed on each of the three involved paths, e.g., the initial path, the first path, and the second path, the redistribution element of the method for implementing an infrastructure management strategy preferably includes reducing one path stress value selected from the group including the initial path stress value, the estimated first path stress value, and the estimated second path stress value, based on one or more of the flow redistribution strategies.

[0239] If two paths, for example, a first path and a second path, are available as options for reducing stress on the infrastructure as shown in Figure 4, the redistribution element of the method includes reducing the fluid flow rate through the first path and / or the second path (e.g., the first path 212 and the second path 214 shown in Figure 4). In the configuration of these two paths, the element for obtaining one or more of the estimated intermediate fluid condition attribute values ​​preferably includes obtaining the multiple estimated intermediate fluid condition attribute values ​​using a server that operates with a plurality of intermediate sensors. At least one of the plurality of intermediate sensors is located at one location on the first path, and another of the plurality of intermediate sensors is located at one location on the second path. (For example, sensors of the type specified by reference numeral "1412" or "1512" shown in Figures 18 and 19, respectively, are located on intermediate location 218 of the first path 212 and intermediate location 220 of the second path 214 shown in Figure 4). Furthermore, as mentioned above in relation to Figures 21-1 and 21-2, at least one of the intermediate sensors measures fluid condition attributes at one location of the first path, and at least another of the intermediate sensors measures fluid condition attributes at one location of the second path. In addition to the estimated stress value at one location of the first path, the determinants of the method may include providing an estimated stress value at one location of the second path based on a plurality of estimated intermediate values.

[0240] As shown in Figure 3, in a scenario where each location of a fluid flow intersection intersects the initial path, the first path, and the second path, the redistribution element of the Method for implementing the infrastructure management strategy includes redistributing the fluid flow between the first path and the second path to effectively reduce stress along the first path and / or the second path, thereby reducing the estimated stress value at one location on the first path and / or one location on the second path. This redistribution element is based on the stress values ​​at the initial and subsequent locations, as well as the estimated stress value at one location on the first path and the estimated stress value at one location on the second path. In a particular embodiment of the Method, the redistribution element may be considered as reducing the fluid flow rate through the first path and / or reducing the fluid flow rate through the second path.

[0241] When three paths, for example, an initial path, a first path, and a second path as shown in Figure 3, are available as options for reducing stress on the infrastructure, the redistribution element of the method includes redistribution by implementing at least one strategy selected from the group including reducing the fluid flow rate through the initial path, reducing the fluid flow rate through the first path, and reducing the fluid flow rate through the second path.

[0242] In some embodiments, this teaching provides a method for implementing an infrastructure management strategy that relies not only on estimated sensor measurements at intermediate locations along a path, but also on estimated sensor measurements at initial locations within the infrastructure. One such exemplary method 2200, as shown in Figures 22-1 and 22-2, relies on estimating sensor measurements at initial locations and one location along a first path to reduce stress within the infrastructure. This exemplary method features a “get estimated initial values” element 2202, which includes using a server operating with one or more initial sensors (e.g., a server 1404 or 1504 operating with one or more of the sensors 1412 or 1512 shown in Figures 18 and 19) to obtain server-estimated initial values ​​based on initial values ​​and forecasts of climatic events. At least one of the initial sensors is located at or near the initial location to measure fluid condition attributes at the initial location and generate initial values ​​(e.g., a sensor 1412 or 1512 shown in Figures 18 and 19, located at initial location 106 shown in Figure 3).

[0243] As shown in Figures 22-1 and 22-2, Method 2200 includes an “Get Estimated Successor Value” element 2204, which includes obtaining a successor value using a successor sensor located at or near a successor location and measuring fluid condition attributes at the successor location. The successor sensor is located downstream from the initial sensor. The “Get Successor Value” element 2204 shown in Figure 22-1 is substantially similar to the “Get Successor Value” successor value acquisition element 2104 shown in Figure 21-1.

[0244] Method 2200 for implementing an infrastructure management strategy provides a “Get Estimated Midpoints” element 2206, which includes obtaining a server-estimated range of one or more midpoints based on a storm event forecast and one or more midpoints. The “Get Estimated Midpoints” element 2206 obtains one or more of the estimated midpoints using a server operating with one or more midpoint sensors. At least one of the midpoint sensors is located at one location on a first path and measures fluid condition attributes at one location on the first path to generate one or more of the midpoints. The “Get Estimated Midpoints” element 2206 in Figure 22-1 is substantially similar to the “Get Estimated Midpoints” element 2106 shown in Figure 21-1.

[0245] In the infrastructure configuration shown in Figure 5, the first path provides fluid communication between the initial location and the subsequent location, and the server is communicatively coupled to one or more of the fluid flow controllers (for example, the digital twin server 408 or 508 is communicatively coupled to the decision support engine 406 or 506 shown in Figures 13 and 14, respectively). Once sensor measurements for the initial location and one of the locations on the first path are estimated, the decision element 2208 is executed.

[0246] The determination element 2208 includes determining the stress values ​​of subsequent locations and the estimated stress values ​​of the initial location and one of the locations on the first path, based on one or more of the subsequent values, the server estimated range of the initial value, and the server estimated range of the intermediate value.

[0247] In a preferred embodiment of the determination element 2208, the determination element generates an initial path stress value and an estimated first path stress value based on the stress values ​​of the subsequent locations and the server-estimated range of the stress values ​​of the initial location and one of the locations of the first path.

[0248] Next, the method 2200, which implements the infrastructure management strategy, performs an identification element 2210, which includes identifying which of the initial path stress value and the estimated first path stress value is the highest and reaches the maximum flow stress value.

[0249] Method 2200 for implementing an infrastructure management strategy then implements a formulation element 2212. In this element, Method 2200 for implementing an infrastructure management strategy provides for formulating one or more infrastructure management strategies for reducing stress along the initial path and / or the first path, based on two available paths as options for reducing stress in the infrastructure, e.g., an initial path and a first path, and the stress values ​​at subsequent locations and the estimated stress values ​​at each of the initial location and one location of the first path. As a result, the formulation element 2210 preferably reduces the server estimated range of stress values ​​in the initial path and / or the server estimated range of stress values ​​at the first location of the first path.

[0250] Next, comparison element 2214 includes comparing each of the infrastructure management strategies with the outcome of the storm event. This element is performed using one or more keypoint indicators of the success of reducing estimated stress values ​​along the initial path and / or estimated stress values ​​at the first location along the first path.

[0251] The method for implementing the infrastructure management strategy 2200 includes a determination element 2216, which involves determining one or more successful infrastructure management strategies that effectively reduce estimated stress along the initial path and / or first path. The determination element 2216 is performed based on a comparison of the infrastructure management strategies using one or more of the keypoint indicators and an evaluation of which of the infrastructure management strategies reduces the estimated stress values ​​along each of the initial path and / or first path.

[0252] The memory element 2218 then preferably includes storing one or more successful infrastructure management strategies. In a particular embodiment of the Method 2200 that implements an infrastructure management strategy, the memory element 2218 is performed using one or more fluid flow controllers (e.g., decision support engines 406 or 506 shown in Figures 13 and 14).

[0253] During a subsequent storm event, if one or more fluid flow controllers are used to store one or more successful infrastructure management strategies, the retrieval element 2220 retrieves one or more successful infrastructure management strategies from one or more of the fluid flow controllers.

[0254] Method 2200 for implementing an infrastructure management strategy features a redistribution element 2222 that includes redistributing fluid flow between the initial path and the first path by using one or more of successful infrastructure management strategies to effectively reduce stress along the initial path and / or the first path, thereby reducing stress values ​​at one location of the initial location and / or the first path during a subsequent storm event.

[0255] The redistribution element 2222 is performed using one or more flow distribution components (for example, the flow distribution component 316 shown in Figure 5) located at one or more flow intersections. Each of the flow distribution components is located downstream from the initial location, and as a result, the fluid flow leaving the initial location flows through the initial path to one or more of the flow distribution components.

[0256] In the infrastructure configuration shown in Figure 5, each of the fluid flow intersection locations intersects the initial path and the first path. Furthermore, in this infrastructure configuration, the initial location, one of the locations on the first path, and each of the subsequent locations are considered constraint locations within the infrastructure.

[0257] Another redistribution element in this method for implementing infrastructure management strategies may include, during a small-scale storm event, implementing one of the flow redistribution strategies to reduce the stress value and / or estimated stress value of at least one of the constraint locations so that the fluid condition attribute value of at least one of the constraint locations is below a predetermined acceptable threshold attribute value that is relatively high. During a large-scale storm event, redistribution includes implementing one of the flow redistribution strategies to reduce the stress value and / or estimated stress value of at least one of the constraint locations so that the fluid condition attribute value of at least one of the constraint locations is below a predetermined acceptable threshold attribute value that is relatively low.

[0258] During a climate event, another redistribution element includes replacing the implementation of one flow redistribution strategy with another. In this embodiment of the redistribution element, when a small storm unexpectedly develops into a large storm, one flow redistribution strategy modifies the fluid condition attribute through at least one of the constraint locations such that the fluid condition attribute value of at least one of the constraint locations is less than or equal to a predetermined relatively high acceptable threshold attribute value assigned to at least one of the constraint locations, and the other flow redistribution strategy modifies the fluid condition attribute through at least one of the constraint locations such that the modified fluid condition attribute value of at least one of the constraint locations is less than or equal to a predetermined relatively low acceptable threshold attribute value assigned to at least one of the constraint locations.

[0259] Viewpointing to the initial location 306 and the intermediate location 318 of the first path 312 as shown in Figure 5, the redistribution feature of the method can effectively modify the fluid flow through one of the flow distribution components 316 such that the stress value and / or estimated stress value obtained at one location of the first path is less than a predetermined acceptable threshold attribute value assigned to one location of the first flow path, and / or the stress value and / or estimated stress value obtained at the initial location is less than a predetermined acceptable threshold attribute value assigned to the initial location.

[0260] The redistribution feature of this method includes reducing, under a different method, a combination of estimated stress values ​​for an initial location and one location on the first path to a "reduced combination of estimated stress values ​​for an initial location and one location on the first path." In the "reduced combination of estimated stress values ​​for an initial location and one location on the first path," the estimated stress value for the initial location is reduced and the estimated stress value for one location on the first path is increased, but within a predetermined acceptable threshold level, or the estimated stress value for one location on the first path is reduced and the estimated stress value for the initial location is increased, but within a predetermined acceptable threshold level.

[0261] Method 2200 for implementing the infrastructure management strategy shown in Figures 22-1 and 22-2 applies to the underlying infrastructure configuration shown in Figure 3. In certain embodiments of this teaching, the “obtain intermediate estimates” element 2206 may include obtaining multiple intermediate estimates using multiple intermediate sensors. In these embodiments, at least one additional intermediate sensor is located on the first and / or second paths, in addition to the intermediate sensors located on the first path. Furthermore, obtaining multiple intermediate estimates in addition to at least one intermediate estimate includes generating additional intermediate estimates using at least one more of the multiple intermediate sensors operating with the server. The other of the multiple intermediate sensors is located at one location on the second path and measures the fluid flowing through or stored within that location.

[0262] The determination element, when applied to the infrastructure configuration shown in Figure 3, includes generating an estimated second path stress value that can represent the sum of the estimated stress values ​​at at least one location on the second path and the stress values ​​at subsequent locations. The estimated stress value at one location on the second path may be based on another intermediate estimate. In these embodiments, the identification element 2210 preferably includes identifying which of the initial path stress value, the estimated first path stress value, and the estimated second path stress value has the highest magnitude in order to reach the highest stress path value. Thus, the redistribution feature, when applied to the infrastructure configuration shown in Figure 3, includes redistributing the fluid flow to one path selected from the group including the initial path, the first path, and the second path, based on one or more flow redistribution strategies, in order to effectively reduce the magnitude of the highest stress path value.

[0263] This instruction acknowledges that certain embodiments of the method include RTUs for estimating sensor results. For example, the “Obtain Estimated Intermediate Values” element 2206 includes (1) obtaining additional RTU estimation ranges for intermediate values ​​at the server using one or more intermediate RTUs, each operating with one or more intermediate sensors and also communicatively coupled to the server, and (2) receiving one or more intermediate RTU estimation ranges from the server based on specific criteria.

[0264] In relation to the adaptive flow control strategy implemented in the underlying infrastructure configuration shown in Figure 3, the redistribution element of this method includes implementing one of the flow redistribution strategies to reduce the stress value of at least one of the initial path, the first path, and the second path to a relatively high predetermined acceptable threshold attribute value or lower during a small storm. During a large storm, the redistribution element includes implementing one of the flow redistribution strategies to reduce the stress value of the initial path and / or the estimated stress value of at least one of the first path and the second path to a relatively low predetermined acceptable threshold attribute value or lower.

[0265] During a climatic event, the redistribution elements related to the underlying infrastructure configuration shown in Figure 3 may include replacing the implementation of one flow redistribution strategy with another. When a small storm unexpectedly develops into a large storm, one of the flow redistribution strategies modifies the fluid condition attributes through the initial path, the first path, and at least one of the second path so that at least one of the estimated initial path stress value, the estimated first path stress value, and the estimated second path stress value is less than or equal to a relatively high predetermined acceptable threshold attribute value assigned to at least one of the initial path, the first path, and the second path, while the other flow redistribution strategy modifies the fluid condition attributes through the initial path, the first path, and at least one of the second path so that at least one of the estimated initial path stress value, the estimated first path stress value, and the estimated second path stress value is less than or equal to a relatively low predetermined acceptable threshold attribute value assigned to at least one of the constraint locations.

[0266] In relation to the constraint locations shown in Figure 5, for example, the initial location and one location of the first path, the redistribution element of the method preferably effectively modifies the fluid flow through one of the flow distribution components such that the estimated stress value obtained at the initial location is less than a predetermined acceptable threshold attribute value assigned to the initial location, and / or the estimated stress value obtained at one location of the first path is less than a predetermined acceptable threshold attribute value assigned to one location of the first flow path.

[0267] In relation to three available paths for mitigating stress in the infrastructure as shown in Figure 3, e.g., an initial path, a first path, and a second path, the redistribution feature of the method includes reducing one estimated path stress value selected from the group including an estimated initial path stress value, an estimated first path stress value, and an estimated second path stress value, based on one or more of the flow redistribution strategies.

[0268] Each of the initial location, one location on the first path, one location on the second path, and a subsequent location is considered a constraint location within the infrastructure. In a particular embodiment of the method, redistribution involves reducing a combination of estimated stress values ​​for constraint locations to a “reduced combination of estimated stress values ​​for constraint locations.” In a “reduced combination of stress values ​​for constraint locations,” as applicable to Figure 3, the estimated stress value of one constraint location, i.e., the initial location, is reduced, and the stress values ​​or estimated stress values ​​of at least the other constraint locations are increased, but within a predetermined acceptable threshold level; or the estimated stress value of another constraint location, e.g., one location on the first path, is reduced, and the stress values ​​and / or estimated stress values ​​of at least the other constraint locations (including the initial location in this case) are increased, but within a predetermined acceptable threshold level; or the estimated stress value of one location on the second path is reduced, and the stress values ​​and / or estimated stress values ​​of at least the other constraint locations are increased, but within a predetermined acceptable threshold level.

[0269] In a case where two paths, for example, a first path and a second path, are available as options for reducing stress on the infrastructure as shown in Figure 4, the redistribution feature of this method includes reducing the fluid flow rate through the first path and / or the second path.

[0270] A preferred embodiment of the Method for implementing an infrastructure strategy does not include, or is not based on, (1) determining or establishing a cost function for the internal flow of the infrastructure; (2) determining a cost function for realizing one or more potential consequences of the infrastructure during a storm event; (3) minimizing the difference between the cost function for realizing one or more potential consequences of the infrastructure and the cost function for the internal flow of the infrastructure; (4) not including the reallocation of fluid flow at the intersection locations of high-quality and low-quality processing methods; and (5) not including the reallocation to minimize the difference between the cost function for realizing one or more potential consequences of the fluid-flow infrastructure and the cost function for the internal flow of the fluid-flow infrastructure.

[0271] The method for implementing an infrastructure management strategy may further include a comparison element, which is applied to the underlying infrastructure configuration shown in Figure 4. This element includes comparing the results obtained as a result of implementing each of the infrastructure management strategies during a climatic event. In these embodiments, the comparison element of the method preferably includes using one or more keypoint indicators as a measure of the success of reducing estimated stress values ​​at one location on the first path and one location on the second path. Following the comparison element, the method for implementing an infrastructure management strategy then features a determination element, which includes determining one or more successful infrastructure management strategies that effectively reduce estimated stress values ​​at one location on the first path and one location on the second path during a climatic event. The method for implementing an infrastructure management strategy may then proceed to store one or more of the successful infrastructure management strategies in one or more of the fluid flow controllers.

[0272] The present method of implementing an infrastructure management strategy during subsequent climatic events features a redistribution element that can be performed in relation to the underlying infrastructure configuration shown in Figure 3. In this embodiment, the redistribution element uses one or more flow distribution components in real time during a subsequent storm event to redistribute fluid flow to at least one route selected from the group comprising an initial route, a first route and a second route, based on one or more of the successful infrastructure management strategies, so as to effectively reduce the magnitude of the highest stress route value. In this embodiment of the present method, three routes, for example, the initial route, the first route and the second route, are available as options for relieving stress within the infrastructure.

[0273] In the case where two routes, for example, the initial route and the first route, are available as options for reducing stress on the infrastructure as shown in Figure 5, the redistribution feature of the present method provides for redistribution using one or more of the flow distribution components, each arranged at one or more fluid flow intersections located downstream from the initial location, such that the fluid flow leaving the initial location flows through the initial route to one or more of the flow distribution components. In this configuration, each of the fluid flow intersections intersects the initial route and the first route, and one or more of the flow distribution components are communicatively coupled to one or more of the fluid flow controllers.

[0274] Figures 23-1 and 23-2 illustrate a method 2300 for implementing an infrastructure management strategy in accordance with certain embodiments of the present teachings. The method 2300 includes an "obtain estimated initial values" element 2302, which comprises obtaining one or more server estimation ranges for initial values based on the initial values and a forecast of a climate event. The "obtain estimated initial values" element 2302 is performed using a server operating in conjunction with one or more initial sensors. At least one of the initial sensors is disposed at or near an initial location, and measures a fluid condition attribute at the initial location to generate an initial value. The "obtain estimated initial values" element 2302 is substantially similar to the "obtain estimated initial values" element 2202 shown in Figure 22-1.

[0275] The method 2300 also includes an "obtain estimated subsequent values" element 2304, which comprises obtaining one or more server estimation ranges for subsequent values based on the subsequent values and a forecast of a climate event. The "obtain estimated subsequent values" element 2304 uses a server operating in conjunction with one or more subsequent sensors. At least one of the subsequent sensors is disposed at or near a subsequent location, and measures a fluid condition attribute at the subsequent location to generate a subsequent value.

[0276] The method 2300 also includes an "obtain estimated intermediate values" element, which comprises obtaining one or more server estimation ranges for intermediate values based on a forecast of a climate event and one or more intermediate values. The "obtain estimated intermediate values" element 2306 uses a server operating in conjunction with one or more intermediate sensors. At least one of the intermediate sensors is disposed at a location on a first path, and measures a fluid condition attribute at the location on the first path to generate one or more of the intermediate values. The "obtain estimated intermediate values" element 2306 is substantially similar to the "obtain estimated intermediate values" element 2106 shown in Figure 21-1.

[0277] In the infrastructure shown in Figures 3 to 5, the first path provides fluid communication between the initial location and the subsequent location. The server used in this method is communicatively coupled to one or more fluid flow controllers.

[0278] The method for implementing the infrastructure management strategy includes a decision element 2308 that is performed using one or more fluid flow controllers. Decision element 2308 includes determining estimated stress values ​​for each of the initial location, one location on the first path, and the subsequent location, based on estimated initial values, one or more estimated intermediate values, and estimated subsequent values, respectively. Each of the initial location, one location on the first path, and the subsequent location is considered a constraint location within the infrastructure.

[0279] When two paths, for example, an initial path and a first path, are available as options for relieving stress on the infrastructure as shown in Figure 5, Method 2300 proceeds to an establishment element 2310, which includes establishing estimated path stress values ​​for each of the initial path and the first path by adding the stress values ​​of constraint locations present along each of the initial path and the first path to generate an estimated initial path stress value and an estimated first path stress value. The estimated initial path stress value preferably includes estimated stress values ​​at least at the initial location, and the estimated first path stress value preferably represents the sum of estimated stress values ​​at at least one location of the first path and estimated stress values ​​at subsequent locations.

[0280] Next, method 2300 performs a discriminant element 2312, which includes identifying which of the estimated initial path stress value and the first path stress value has the greatest magnitude to reach at least one maximum stress path value.

[0281] Method 2300 features a redistribution element 2314 that, in real time during a subsequent weather event, redistributes the fluid flow in the initial path and / or a first path to effectively reduce the magnitude of at least one of the highest stress path values ​​based on one or more of the flow redistribution strategies.

[0282] Specific embodiments of this method for implementing infrastructure management strategies include additional elements. In specific embodiments of this teaching, Method 2300 further includes a formulation element that includes formulating one or more infrastructure management strategies to reduce estimated initial path stress values ​​and / or estimated first path stress values ​​based on estimated stress values ​​for each of the initial location, one location on the first path, and subsequent locations.

[0283] These embodiments preferably further include comparing each of the infrastructure management strategies with the results of a climatic event using one or more keypoint indicators of the success of reducing the estimated initial path stress and / or the estimated first path stress. These methods then proceed to determine one or more successful infrastructure management strategies that effectively reduce the highest stress values, based on the comparison using one or more of the keypoint indicators of the success of reducing the estimated initial path stress and / or the estimated first path stress.

[0284] Next, the method includes storing one or more successful infrastructure management strategies in one or more of the fluid flow controllers. During a subsequent storm event, the method teaches one or more of the fluid flow controllers to retrieve one or more successful infrastructure management strategies and to redistribute the fluid flow between the initial path and the first path using one or more successful infrastructure management strategies to effectively reduce stress along the initial path and / or the first path. As a result, the method reduces the estimated initial path stress values ​​and / or estimated first path stress values ​​during the subsequent climatic event. The redistribution feature of the method is performed using one or more flow distribution components located at one or more flow intersections downstream from the initial location, each of which is located downstream from the initial location, such that the fluid flow leaving the initial location flows through the initial path to one or more of the flow distribution components, each of which is located at a fluid flow intersection where the initial path and the first path intersect.

[0285] The following description includes numerous specific details to provide a complete understanding of this instruction and its structure. However, it will be apparent to those skilled in the art that this instruction and its structure can be practiced without being limited to some or all of these specific details.

Claims

1. A real-time infrastructure management system, An initial sensor located at or near the initial location, which measures fluid condition attributes at the initial location and generates initial values; A subsequent sensor located at or near a subsequent location, which measures the fluid condition attributes at the subsequent location and generates subsequent values, the subsequent sensor being located downstream from the initial sensor, A plurality of intermediate sensors, at least one of which is located at or near one location of a first path and measures the fluid condition attribute at the one location to generate an intermediate value, at least one of the plurality of intermediate sensors is located at or near one location of a second path and measures the fluid condition attribute at the one location to generate an additional intermediate value, each of the first path and the second path facilitates fluid communication between the initial location and the subsequent location, and the second path differs from the first path in that it connects the initial location, one location of the first path, and the second Each of the one location and the subsequent location of the path is a constraint location in the infrastructure, when the measured values ​​of the fluid condition attribute at each of the initial location, the one location of the first path, the one location of the second path, and the subsequent location may reach or exceed predetermined acceptable threshold attribute values ​​assigned to each of the initial location, the one location of the first path, the one location of the second path, and the subsequent location, at least in part due to the acceptance of fluid flow from multiple intermediate flows during a climatic event, with multiple intermediate sensors, One or more flow controllers, which are communicably coupled to receive the initial value from the initial sensor, the subsequent value from the subsequent sensor, and the intermediate and additional intermediate values ​​from the plurality of intermediate sensors in real time, determine the stress value of each of the constraint locations during the climatic event and in real time based on the initial value, the subsequent value, the intermediate and additional intermediate values, and implement one or more flow redistribution strategies based on at least one of the stress values ​​of at least one of the constraint locations, One or more flow distribution components are located at one or more fluid flow intersections, the one or more flow distribution components are located downstream from the initial location and are in fluid communication with the initial location through the initial path, and as a result, the fluid flow leaving the initial location flows through the initial path into one or more of the flow distribution components, each of the fluid flow intersections represents an intersection of the initial path, the first path and the second path, and at least one of the flow distribution components redistributes the fluid flow between the initial path, the first path and the second path through at least one of the fluid flow intersections, based on one or more flow distribution strategies received from one or more of the flow controllers during the climatic event and in real time, in order to effectively modify at least one stress value obtained from at least one of the constraint locations such that the fluid condition attribute value obtained from at least one of the constraint locations is less than or equal to a predetermined acceptable threshold attribute value assigned to at least one of the constraint locations. A real-time infrastructure management system equipped with [features / equipment].

2. The real-time infrastructure management system according to claim 1, wherein each of the initial sensor, the subsequent sensor, and the plurality of intermediate sensors is any sensor selected from the group including a level meter for measuring the height or liquid level of a fluid stored in the constrained location, a flow meter for measuring the flow rate of a fluid flowing in the constrained location, and a contaminant sensor for measuring the concentration of contaminants in a fluid flowing in the constrained location.

3. The real-time infrastructure management system according to claim 1, wherein one or more of the flow controllers are proportional-integral-derivative controllers that control the operation at the constraint location, the operation being selected from the group including pump measure, gate opening, valve opening and weir opening.

4. The real-time infrastructure management system according to claim 1, wherein each of the initial sensor, the subsequent sensor, and the intermediate sensor measures at least one of the fluid condition attributes selected from the group including fluid flow rate, fluid height, fluid volume, hydraulic capacity, fluid residence time, fluid strategic capacity, contaminant concentration, and fluid quality.

5. The real-time infrastructure management system according to claim 1, wherein one or more of the flow distribution components include at least one item selected from the group including fluid facilities, fluid pump stations, gates, inflatable dams, weirs, pumps, and valves.

6. The real-time infrastructure management system according to claim 1, wherein the subsequent location includes a wastewater treatment facility that internally provides a high-quality treatment method and / or a low-quality treatment method.

7. A real-time infrastructure management system according to claim 6, wherein, based on the stress values ​​in each of the initial location, the one location of the first path, the one location of the second path, and the wastewater treatment plant, one or more of the flow distribution components do not redistribute the fluid flow between the high-quality treatment method and the low-quality treatment method, and the low-quality treatment method is located at a location separate from the location of the high-quality treatment method.

8. One or more of the aforementioned flow controllers have the following functions, namely: The function determines the path stress values ​​for each of the initial path, the first path, and the second path by adding the stress values ​​of the constraint locations existing along each of the initial path, the first path, and the second path to generate the initial path stress value, the first path stress value, and the second path stress value. A function to identify which of the initial path stress value, the first path stress value, and the second path stress value has the highest magnitude in order to generate at least one highest stress path value, The function of redistributing the fluid flow to one path selected from the group including the initial path, the first path, and the second path, in real time and based on one of the flow redistribution strategies, which effectively reduces the magnitude of at least one of the highest stress path values ​​during the aforementioned climatic event. A real-time infrastructure management system according to claim 1, programmed to implement the following:

9. The initial path stress value represents the stress value at the initial location, the first path stress value represents the sum of the stress values ​​at each of the one location and the subsequent location of the first path, and the second path stress value represents the sum of the stress values ​​at each of the one location and the subsequent location of the second path. A real-time infrastructure management system according to claim 8, wherein one or more of the flow controllers are programmed to (i) effectively modify the stress value acquired at the initial location so that it is less than a predetermined acceptable threshold attribute value assigned to the initial location if the initial path stress value is the highest stress path value; (ii) effectively modify the stress value acquired at one location of the first path so that it is less than a predetermined acceptable threshold attribute value assigned to one location of the first path if the first path stress value is the highest stress path value; and (iii) effectively modify the stress value acquired at one location of the second path so that it is less than a predetermined acceptable threshold attribute value assigned to one location of the second path if the second path stress value is the highest stress path value.

10. The real-time infrastructure management system according to claim 1, wherein the flow distribution components are integrated into one facility selected from the group including dynamic underflow control, discharge storage, offline storage, and rainwater storage tanks.

11. A real-time infrastructure management system, An initial sensor located at or near the initial location, which measures fluid condition attributes at the initial location and generates initial values; A subsequent sensor located at or near a subsequent location, which measures the fluid condition attributes at the subsequent location and generates subsequent values, the subsequent sensor being located downstream from the initial sensor, One or more intermediate sensors located at or near one location of the first path, which measure the fluid condition attribute at the one location and generate intermediate values, wherein the first path facilitates fluid communication between the initial location and the subsequent location, and the initial location, the one location of the first path and the subsequent location are constraint locations in the infrastructure when the measured values ​​of the fluid condition attribute at each of the initial location, the one location of the first path and the subsequent location may reach or exceed predetermined acceptable threshold attribute values ​​assigned to each of the initial location, the one location of the first path and the subsequent location, at least in part due to the acceptance of fluid flow from a plurality of intermediate flows during the climatic event, One or more flow controllers, which are communicably coupled to receive in real time the initial value from the initial sensor, the subsequent value from the subsequent sensor, and the intermediate value from one or more of the intermediate sensors, determine the stress value of each of the constraint locations during the climatic event and in real time based on the initial value, the subsequent value, and the intermediate value, and implement one or more flow redistribution strategies based on at least one of the stress values ​​of at least one of the constraint locations, One or more flow distribution components are located at one or more fluid flow intersections, the one or more flow distribution components are located downstream from the initial location and are in fluid communication with the initial location through the initial path, and as a result, the fluid flow leaving the initial location flows through the initial path into one or more of the flow distribution components, each of the fluid flow intersections represents the intersection of the initial path and the first path, and at least one of the flow distribution components redistributes the fluid flow between the initial path and the first path through at least one of the fluid flow intersections, based on one or more flow distribution strategies received from one or more of the flow controllers during the climatic event and in real time, in order to effectively modify at least one stress value obtained from at least one of the constraint locations such that the fluid condition attribute value obtained from at least one of the constraint locations is less than or equal to a predetermined acceptable threshold attribute value assigned to at least one of the constraint locations. A real-time infrastructure management system equipped with [features / equipment].

12. The aforementioned subsequent location includes a wastewater treatment facility that internally provides a high-quality treatment method and / or a low-quality treatment method. The real-time infrastructure management system according to claim 11, wherein, based on the stress values ​​at the initial location, the one location of the first path, and the wastewater treatment plant, one or more of the flow distribution components do not redistribute the fluid flow between the high-quality treatment method and the low-quality treatment method.

13. One or more of the aforementioned flow controllers have the following functions, namely: A function to determine the path stress values ​​of the initial path and the first path by adding the stress values ​​of the constraint locations existing along each of the initial path and the first path to generate the initial path stress value and the first path stress value, A function to identify which of the initial path stress value and the first path stress value has the highest magnitude in order to reach at least one maximum stress path value, The function modifies and redistributes the fluid flow between the initial path and the first path in real time and based on one of the flow redistribution strategies during the aforementioned climatic event, so as to effectively reduce the magnitude of at least one of the highest stress path values. A real-time infrastructure management system according to claim 11, which is programmed to implement the following:

14. The initial path stress value represents the stress value at the initial location, and the first path stress value represents the sum of the stress values ​​at each of the one location and the subsequent locations of the first path. A real-time infrastructure management system according to claim 13, wherein one or more of the flow controllers are programmed to (i) effectively modify the stress value acquired at the initial location so that it is less than a predetermined acceptable threshold attribute value assigned to the initial location if the initial path stress value is the maximum stress value, and (ii) effectively modify the stress value acquired at one location of the first path so that it is less than a predetermined acceptable threshold attribute value assigned to one location of the first path if the first path stress value is the maximum stress value.

15. A real-time infrastructure management system, A subsequent sensor located at or near a subsequent location, which measures fluid condition attributes at the subsequent location and generates subsequent values, the subsequent sensor being located downstream from the initial location, A plurality of intermediate sensors, at least one of which is located at or near one of the locations in the first path, and measures the fluid condition attribute at the location to generate an intermediate value; at least one of the plurality of intermediate sensors is located at or near one of the locations in the second path, and measures the fluid condition attribute at the location to generate an additional intermediate value; each of the first and second paths facilitates fluid communication between the initial location and the subsequent location; the second path differs from the first path in that the one location in the first path Each of the locations in the second path and each of the subsequent locations is a constraint location in the infrastructure, where the measured values ​​of the fluid condition attribute at each of the locations in the first path, the second path and each of the subsequent locations may reach or exceed predetermined acceptable threshold attribute values ​​assigned to each of the locations in the first path, the second path and each of the subsequent locations, at least in part due to the acceptance of fluid flow from multiple intermediate flows during the climatic event, and there are multiple intermediate sensors, One or more flow controllers, which are communicably coupled to receive the subsequent values ​​from the subsequent sensor, and the intermediate and additional intermediate values ​​from the plurality of intermediate sensors in real time, and to determine the stress value of each of the constraint locations during the climatic event and in real time based on the subsequent values, the intermediate and additional intermediate values, and to implement one or more flow redistribution strategies based on at least one of the stress values ​​of at least one of the constraint locations, One or more flow distribution components located at one or more fluid flow intersections, the one or more flow distribution components located downstream from the initial location and in fluid communication with the initial location through the initial path, and as a result, the fluid flow leaving the initial location flows through the initial path into one or more of the flow distribution components, each of the fluid flow intersections represents the intersection of the first path and the second path, and at least one of the flow distribution components redistributes the fluid flow between the first path and the second path through at least one of the fluid flow intersections, based on one or more flow distribution strategies received from one or more of the flow controllers during the climatic event and in real time, in order to effectively modify at least one stress value obtained from at least one of the constraint locations such that the fluid condition attribute value obtained from at least one of the constraint locations is less than or equal to a predetermined acceptable threshold attribute value assigned to at least one of the constraint locations. A real-time infrastructure management system equipped with [features / equipment].

16. The aforementioned subsequent location includes a wastewater treatment facility that internally provides a high-quality treatment method and / or a low-quality treatment method. A real-time infrastructure management system according to claim 15, wherein, based on the stress values ​​at each of the locations in the first path, the location in the second path, and the wastewater treatment plant, one or more of the flow distribution components do not redistribute the fluid flow between the high-quality treatment method and the low-quality treatment method.

17. One or more of the aforementioned flow controllers have the following functions, namely: A function to determine the path stress values ​​of the first and second paths by adding the stress values ​​of the constraint locations existing along each of the first and second paths to generate the first path stress value and the second path stress value, A function to identify which of the first path stress value and the second path stress value has the greatest magnitude in order to reach at least one maximum stress path value, The function of redistributing fluid flow between the first path and the second path in real time and based on one of the flow redistribution strategies during the aforementioned climatic event, in order to effectively reduce the magnitude of at least one of the highest stress path values. A real-time infrastructure management system according to claim 16, which is programmed to implement the following:

18. The first path stress value represents the sum of the stress values ​​at each of the one location and the subsequent location of the first path, and the second path stress value represents the sum of the stress values ​​at each of the one location and the subsequent location of the second path. A real-time infrastructure management system according to claim 17, wherein, in order to perform the redistribution function, one or more of the flow controllers are programmed to (i) effectively modify the stress value obtained at one location of the first path so that it is less than a predetermined acceptable threshold attribute value assigned to the one location of the first path if the first path stress value is the highest stress value, and (ii) effectively modify the stress value obtained at one location of the second path so that it is less than a predetermined acceptable threshold attribute value assigned to the one location of the second path if the second path stress value is the highest stress value.

19. A real-time infrastructure management system, An initial sensor, designed to be placed at or near the initial location, measures the fluid condition attributes at the initial location and generates initial values. A subsequent sensor, designed to be positioned at or near the subsequent location, for measuring the fluid condition attributes at the subsequent location and generating subsequent values, is located downstream from the initial sensor. One or more intermediate sensors, at least one of which is designed to be located at or near one of the locations in the first path, measure the fluid condition attribute at the location to generate one or more intermediate values, the first path facilitates fluid communication between the initial location and the subsequent location, and the fluid condition attribute at the location in the first path is affected by one or more intermediate flows flowing into the first path before the location in the first path, One or more intermediate-to-remote monitoring and control units ("RTUs"), each communicatively coupled to at least one of the intermediate sensors, internally store a flow model, wherein the flow model is a synchronized machine learning model designed to generate an RTU estimation range of intermediate values ​​for one location of the first path as a function of time, and one or more of the intermediate RTUs are designed to transmit one or more of the intermediate values ​​if one or more of the intermediate values ​​are not within the RTU estimation range of intermediate values ​​for one location of the first path, A server designed to communicate with one or more of the intermediate RTUs, storing in it a digital twin model of one of the flow models, wherein the digital twin of the flow model is substantially similar to the flow model stored in one of the intermediate RTUs, the server is designed to estimate the fluid condition attributes at or near one of the locations of the first path based on the forecast of the climatic event and one or more of the intermediate values, and to provide at least one server-estimated range of intermediate values ​​with respect to the climatic event, the server is designed to receive from one or more intermediate RTUs one or more of the intermediate values ​​that are not within the RTU-estimated range of intermediate values ​​for one of the locations of the first path, and the server is designed to transmit one or more of the intermediate values ​​that are not within the server-estimated range of intermediate values ​​for one of the locations of the first path, One or more flow controllers are designed to be communicatively coupled to the server to receive in real time an initial value from the initial sensor, a subsequent value from the subsequent sensor, and one or more intermediate values, or at least one of the server-estimated ranges of the intermediate values, wherein one of the flow controllers is programmed to determine in real time the stress values ​​of the initial location and the subsequent location, and the stress value or estimated stress value of one of the locations in the first path, based on the initial value, the subsequent value, the intermediate values, or at least one of the server-estimated ranges of the intermediate values, respectively. One or more flow distribution components are designed to be positioned at one or more fluid flow intersections, the one or more flow distribution components are located downstream from the initial location and are in fluid communication with the initial location through the initial path, and as a result, the fluid flow leaving the initial location flows through the initial path into one or more of the flow distribution components, the fluid flow intersection represents the intersection of the initial path and the first path, and each of the flow distribution components receives from one or more of the flow controllers the stress values ​​at each of the initial location and the subsequent location, and the stress at one of the locations in the first path. One or more flow redistribution strategies based on the value or estimated stress value are received, and during the climatic event and in real time, at least one of the flow distribution components is designed to redistribute the fluid flow between the initial path and the first path through the fluid flow intersection location, based on one of the flow redistribution strategies that effectively modifies the stress value and / or estimated stress value of at least one constraint location so that the fluid condition attribute of at least one of the constraint locations in the infrastructure is less than or equal to a predetermined acceptable threshold attribute value assigned to at least one of the constraint locations, and Equipped with, A real-time infrastructure management system wherein the constraint location is one location selected from a group including the initial location, the one location of the first path, and the subsequent locations, and the measured or estimated values ​​of the fluid condition attribute at the location may reach or exceed a predetermined acceptable threshold attribute value assigned to the location during the climatic event, at least in part due to the acceptance of fluid flow from a plurality of intermediate flows.

20. One or more of the flow controllers described above will receive the following commands, namely: To determine the path stress values ​​of the first path and the initial path, and to provide the highest stress path value, a command is provided to identify which of the initial path stress value and the first path stress value or the estimated first path stress value has the highest magnitude, by adding the stress values ​​of each of the constraint locations along the initial path to generate an initial path stress value, and adding the stress values ​​or estimated stress values ​​of each of the constraint locations along the first path to generate a first path stress value or an estimated first path stress value, and to provide the highest stress path value, Using one or more of the flow redistribution strategies, commands are given to redistribute the fluid flow between the first path and the initial path through at least one of the fluid flow intersections in order to effectively reduce the magnitude of the highest stress path value. A real-time infrastructure management system according to claim 19, which is programmed to perform the following:

21. The real-time infrastructure management system according to claim 20, wherein the estimated first path stress value represents the sum of at least the stress values ​​of the subsequent locations and the estimated stress value at one location of the first path, the first path stress value represents the sum of at least the stress values ​​of the subsequent locations and the stress values ​​at one location of the first path, and the initial path stress value includes the stress value of the initial path.

22. A plurality of intermediate sensors, at least one of which is designed to be located at or near one of the locations of the second path, to measure the fluid condition attribute at the location and generate one or more additional intermediate values, the second path facilitating fluid communication between the initial location and the subsequent location, and the fluid condition attribute at the location of the second path is affected by one or more intermediate flows flowing into the second path before the location of the second path, A plurality of intermediate RTUs, at least two of which are communicably coupled to two or more intermediate sensors, at least one of the plurality of RTUs internally stores another flow model, the flow model being a synchronized machine learning model designed to generate an additional RTU estimation range for intermediate values ​​for one location of the second path as a function of time, and one or more of the RTUs are designed to transmit one or more of the additional intermediate values ​​if one or more of the additional intermediate values ​​are not within the additional RTU estimation range for intermediate values ​​for one location of the second path. Furthermore, The server is designed to be communicatively coupled to a plurality of intermediate RTUs, and stores within it a digital twin of the other flow model, the digital twin of the other flow model being substantially similar to the other flow model stored in one of the intermediate RTUs monitoring the one location of the second path, the server generates an additional server estimation range for intermediate values ​​based on the weather event forecast and one or more of the additional intermediate values, the server is designed to receive one or more of the additional intermediate values ​​that are not within the additional RTU estimation range for the intermediate values ​​for the one location of the second path, and the server is designed to transmit one or more of the additional intermediate values ​​that are not within the additional server estimation range for the intermediate values ​​for the one location of the second path. One or more of the flow controllers are communicably coupled to receive one or more of the additional intermediate values ​​or at least one of the additional server estimation ranges of the intermediate values ​​from the server in real time, and each of the flow controllers is programmed to determine the stress values ​​of the initial location and the subsequent location, and the stress values ​​or estimated stress values ​​of the one location of the first path and the one location of the second path, based on the initial value, the subsequent value, one or more of the intermediate values ​​or at least one of the server estimation ranges of the intermediate values, and one or more of the additional intermediate values ​​or at least one of the additional server estimation ranges of the intermediate values. Based on the stress values ​​of the initial location and the subsequent location, and the stress values ​​or estimated stress values ​​of the one location in the first path and the one location in the second path, at least one of the flow distribution components redistributes the fluid flow through the fluid flow intersection between the initial path, the first path and the second path during the climatic event or in real time, in order to effectively modify the stress value and / or estimated stress value of at least one of the constraint locations in the infrastructure so that the fluid condition attribute of at least one of the constraint locations is less than or equal to a predetermined acceptable threshold attribute value assigned to at least one of the constraint locations. The constraint location is one location selected from a group including the initial location, one location on the first path, one location on the second path, and the subsequent location, wherein the measured value of the fluid condition attribute at the location may reach or exceed a predetermined acceptable threshold attribute value assigned to the location during the climatic event, at least in part due to the acceptance of fluid flow from a plurality of intermediate flows.

23. One or more of the flow controllers described above will receive the following commands, namely: Commands for determining the path stress values ​​of the initial path, the first path, and the second path by adding the stress values ​​of each of the constraint locations along the initial path to generate an initial path stress value, adding the stress values ​​or estimated stress values ​​of each of the constraint locations along the first path to generate a first path stress value or an estimated first path stress value, and adding the stress values ​​or estimated stress values ​​of each of the constraint locations along the second path to generate a second path stress value or an estimated second path stress value. A command to identify which of the initial path stress value, the first path stress value, or the estimated first path stress value, and the second path stress value or the estimated second path stress value has the highest magnitude, in order to provide the highest stress path value. Using one or more of the flow redistribution strategies, commands are given to redistribute the fluid flow between the first path, the second path and the initial path through at least one of the fluid flow intersections in order to effectively reduce the magnitude of the highest stress path value. A real-time infrastructure management system according to claim 22, which is programmed to perform the following:

24. A real-time infrastructure management system, A subsequent sensor designed to be located at or near a subsequent location, which measures the fluid condition attributes at the subsequent location and generates subsequent values, wherein the subsequent sensor is located downstream from the initial location, A plurality of intermediate sensors, at least one of which is designed to be located at or near one location of the first path and to measure the fluid condition attribute at the location and generate one or more intermediate values, at least one of the plurality of intermediate sensors is designed to be located at or near one location of the second path and to measure the fluid condition attribute at the location and generate one or more additional intermediate values, the first path and the second path facilitate fluid communication between the initial location and the subsequent location, and the fluid condition attribute at the location of the first path and the location of the second path is affected by one or more intermediate flows flowing into the first path and the second path, respectively, A plurality of intermediate-far monitoring and control units ("RTUs"), at least two of which are communicatively coupled to the plurality of intermediate sensors, at least one of the plurality of intermediate sensors internally stores one flow model, the flow model being a synchronized machine learning model designed to estimate an intermediate value for one location of the first path and generate an RTU estimation range for the intermediate value, based on a forecast of a climate event and one or more of the intermediate values ​​for one location of the first path, as a function of time, at least another of the plurality of intermediate sensors internally stores another flow model, the flow model being designed to estimate an intermediate value for one location of the first path and generate an RTU estimation range for the intermediate value, based on a forecast of a climate event and one or more of the intermediate values ​​for one location of the second path, as a function of time, A synchronized machine learning model designed to estimate a midpoint for one location of the second path based on one or more of the additional midpoints at a location, and to generate an additional RTU estimation range for the midpoint, wherein the multiple midpoint RTUs are designed to transmit one or more of the midpoints if one or more of the midpoints are not within the RTU estimation range for the midpoint for one location of the first path, and also to transmit one or more of the additional midpoints if one or more of the additional midpoints are not within the additional RTU estimation range for the midpoint for one location of the second path, comprising a plurality of intermediate remote monitoring and control units ("RTUs"), A server designed to communicate with the plurality of intermediate RTUs, wherein the server stores a digital twin model of one flow model, the digital twin of one flow model being substantially similar to one flow model stored in one of the intermediate RTUs, the server is designed to estimate the fluid condition attributes at or near one location of the first path based on the forecast of the weather event and one or more of the intermediate values, and to provide a server-estimated range of intermediate values ​​for one location of the first path, the server also stores a digital twin of another flow model, the digital twin of another flow model being substantially similar to another flow model stored in another of the plurality of intermediate RTUs monitoring one location of the second path. The server generates at least one additional server estimation range for intermediate values ​​based on the forecast of the weather storm event and one or more of the additional intermediate values, and the server is designed to receive from one or more of the plurality of intermediate RTUs one or more of the intermediate values ​​that are not within the RTU estimation range for the intermediate value for one location of the first path, and is also designed to receive one or more of the additional intermediate values ​​that are not within the additional RTU estimation range for the intermediate value for one location of the second path, and the server is designed to transmit one or more of the intermediate values ​​that are not within the server estimation range for the intermediate value for one location of the first path, and is also designed to transmit one or more of the additional intermediate values ​​that are not within the additional server estimation range for the intermediate value for one location of the second path, One or more flow controllers, each designed to be communicatively coupled to receive in real time an initial value from the initial sensor, a subsequent value from the subsequent sensor, one or more intermediate values ​​from the server, or at least one of the server-estimated ranges of the intermediate values, or one or more of the additional intermediate values, wherein one of the flow controllers is programmed to determine in real time the stress values ​​of the initial location and the subsequent location, the stress values ​​or estimated stress values ​​of the one location in the first path and the one location in the second first path, based on the initial value, the subsequent value, one or more intermediate values, or at least one of the server-estimated ranges of the intermediate values, or one or more of the additional intermediate values ​​or at least one of the additional server-estimated ranges of the intermediate values, One or more flow distribution components are designed to be positioned at one or more fluid flow intersections, the one or more flow distribution components are located downstream from the initial location and are in fluid communication with the initial location through the initial path, and as a result, the fluid flow leaving the initial location flows through the initial path into one or more of the flow distribution components, the fluid flow intersection represents the intersection of the initial path, the first path and the second path, and each of the flow distribution components receives from one or more of the flow controllers the stress values ​​at the initial location and the subsequent location, the one location in the first path and the second path One or more flow redistribution strategies are received based on the stress value or estimated stress value for each of a location, and during the climatic event and in real time, at least one of the flow distribution components is designed to redistribute the fluid flow through the fluid flow intersection locations between the initial path, the first path and the second path, based on one of the flow redistribution strategies that effectively modifies the stress value and / or estimated stress value of at least one of the constraint locations so that the fluid condition attribute of at least one of the constraint locations is less than or equal to a predetermined acceptable threshold attribute value assigned to at least one of the constraint locations, and Equipped with, A real-time infrastructure management system wherein the constraint location is one location selected from a group including the initial location, one location on the first path, one location on the second path, and the subsequent location, and the measured values ​​of the fluid condition attribute at the location may reach or exceed a predetermined acceptable threshold attribute value assigned to the location during the climatic event, at least in part due to the acceptance of fluid flow from a plurality of intermediate flows.

25. One or more of the flow controllers described above will receive the following commands, namely: Commands to determine the respective path stress values ​​of the first and second paths by adding the stress values ​​or estimated stress values ​​of each of the constraint locations along the first path to generate a first path stress value or an estimated first path stress value, and by adding the stress values ​​or estimated stress values ​​of each of the constraint locations along the second path to generate a second path stress value or an estimated second path stress value, A command to identify which of the first path stress value or the estimated first path stress value, and the second path stress value or the estimated second path stress value has the highest magnitude, in order to provide the highest stress path value, Using one or more of the flow redistribution strategies, commands are given to redistribute the fluid flow between the first path and the second path through at least one of the fluid flow intersections in order to effectively reduce the magnitude of the highest stress path value. A real-time infrastructure management system according to claim 24, which is programmed to perform the following:

26. The real-time infrastructure management system according to claim 25, wherein the estimated second path stress value represents the sum of the stress value of the subsequent location and the stress value or estimated stress value at one location in the second path.

27. A real-time infrastructure management system, An initial sensor, designed to be positioned at or near an initial location located on an initial path, which measures fluid condition attributes at the initial location and generates initial values, wherein the fluid condition attributes at the initial location are influenced by one or more intermediate flows flowing into the initial path before the initial location, and the initial sensor An initial remote monitoring and control unit ("RTU") is communicatively coupled to the initial sensor and internally stores an initial flow model, wherein the initial flow model is a synchronized machine learning model designed to estimate the fluid condition attributes at the initial location as a function of time, and for climate events, to generate an RTU estimation range of the initial value based on the forecast and initial value of the climate event, and the initial RTU is designed to transmit the initial value if the initial value is not within the RTU estimation range of the initial value, A successor sensor is designed to be located at or near a successor location, and measures the fluid condition attributes at the successor location to generate successor values, wherein the successor sensor is located downstream from the initial sensor, and the fluid condition attributes at the successor location are affected by one or more intermediate flows flowing into the successor location. A subsequent RTU is communicatively coupled to the subsequent sensor and internally stores a subsequent flow model, wherein the subsequent flow model is a synchronized machine learning model designed to estimate the fluid condition attributes at the subsequent location as a function of time, the subsequent RTU is designed to generate an RTU estimation range for the subsequent value based on the forecast and subsequent value of the climate event, and the subsequent RTU is designed to communicate the subsequent value if the subsequent value is not within the RTU estimation range for the subsequent value, One or more intermediate sensors, at least one of which is designed to be located at or near one location of the first path, measure the fluid condition attribute at the one location to generate one or more intermediate values, the first path facilitates fluid communication between the initial location and the subsequent location, and the fluid condition attribute at the one location of the first path is affected by one or more intermediate flows flowing into the first path before the one location of the first path, One or more intermediate RTUs, each of which is communicably coupled to at least one of the intermediate sensors, internally stores a flow model, the flow model being a synchronized machine learning model designed to estimate the fluid condition attributes at one location of the first path as a function of time, one or more of the intermediate RTUs being designed to generate an intermediate RTU estimation range for the climate event based on the climate event forecast and one or more of the intermediate values, and the intermediate RTUs being designed to transmit one or more of the intermediate values ​​if one or more of the intermediate values ​​are not within the intermediate RTU estimation range, A server designed to be communicatively coupled to one or more of the initial RTU, the subsequent RTU, and the plurality of intermediate RTUs, storing in the initial flow model, the subsequent flow model, and the digital twin of the one flow model, wherein the digital twin of the initial flow model, the subsequent flow model, and the one flow model are substantially similar to the initial flow model, the subsequent flow model, and the one flow model stored in one of the initial RTU, the subsequent RTU, and the intermediate RTU, respectively, and the server, with respect to the climate event, based on the forecast of the climate event and one or more of the initial value, the subsequent value, and the intermediate value, respectively, the initial location, the subsequent location, and the first flow The server is designed to estimate the fluid condition attributes at one location of the road and to provide a server-estimated range for initial values, a server-estimated range for subsequent values, and a server-estimated range for intermediate values, wherein the server receives the initial value from the initial RTU if the initial value is not within the RTU-estimated range for initial values, receives the subsequent value from the subsequent RTU if the subsequent value is not within the RTU-estimated range for subsequent values, and receives one or more of the intermediate values ​​from the intermediate RTU if the intermediate value is not within the RTU-estimated range for intermediate values, and transmits values ​​from the initial value, the subsequent value, and the intermediate value that are not within the server-estimated range for initial values, the server-estimated range for subsequent values, and the server-estimated range for intermediate values, respectively. One or more flow controllers designed to be communicatively coupled to receive the initial value or the server estimated range of the initial value, the subsequent value or the server estimated range of the subsequent value, and the intermediate value or the server estimated range of the intermediate value from the server in real time, wherein one of the flow controllers is programmed to determine in real time the stress value or estimated stress value of the initial location, the subsequent location, and the one location of the first path, based on the initial value or the server estimated range of the initial value, the subsequent value or the server estimated range of the subsequent value, and the intermediate value or the server estimated range of the intermediate value, One or more flow distribution components are designed to be positioned at one or more fluid flow intersections, the one or more flow distribution components are located downstream from the initial location and are in fluid communication with the initial location through the initial path, and as a result, the fluid flow leaving the initial location flows through the initial path into one or more of the flow distribution components, the fluid flow intersection represents the intersection of the initial path and the first path, and each of the flow distribution components receives the stress value or estimated stress value obtained at one of the locations in the first path from a predetermined allowable value assigned to that location in the first path. One or more flow distribution components implement one of the flow redistribution strategies received from one or more of the flow controllers, which, in real time during the climatic event, redistributes the fluid flow between the initial path and the first path through the fluid flow intersection location, based on the stress value or estimated stress value at each of the initial location, the subsequent location, and one of the locations of the first path, in order to effectively correct the estimated stress value obtained at the initial location to be less than an acceptable threshold attribute value, and / or to effectively correct the estimated stress value obtained at the initial location to be less than a predetermined acceptable threshold attribute value assigned to the initial location, and Equipped with, A real-time infrastructure management system in which each of the initial location, the one location of the first path, and the subsequent location is a constraint location in the infrastructure when the measured or estimated value of the fluid condition attribute at the constraint location is likely to reach or exceed a predetermined acceptable threshold attribute value assigned to the constraint location, at least in part due to excessive fluid flow from a plurality of intermediate flows.

28. One or more of the flow controllers described above will receive the following commands, namely: Commands to determine the path stress values ​​of the initial path and the first path by adding the stress values ​​or estimated stress values ​​of each of the constraint locations along the first path to generate a first path stress value or an estimated first path stress value, and by adding the stress values ​​or estimated stress values ​​of each of the constraint locations along the second path to generate a second path stress value or an estimated second path stress value, A command to identify which of the first path stress value or the estimated first path stress value, and the second path stress value or the estimated second path stress value has the highest magnitude, in order to provide the highest stress path value, Using one or more of the flow redistribution strategies, commands are given to redistribute the fluid flow between the first path and the second path through at least one of the fluid flow intersections in order to effectively reduce the magnitude of the highest stress path value. A real-time infrastructure management system according to claim 27, which is programmed to perform the following:

29. The real-time infrastructure management system according to claim 28, wherein the estimated first path stress value represents the sum of the estimated stress value of the subsequent location and the estimated stress value at one location of the first path, and the estimated initial path stress value represents the estimated stress value at the initial location.

30. A plurality of intermediate sensors, at least one of which is designed to be located at or near one location of the second path, to measure the fluid condition attribute at the one location to generate one or more additional intermediate values, the second path facilitating fluid communication between the initial location and the subsequent location, and the fluid condition attribute at the one location of the second path is affected by one or more intermediate flows flowing into the second path before the one location of the second path, A plurality of intermediate RTUs, at least two of which are communicably coupled to two or more intermediate sensors, at least one of which internally stores another flow model, the flow model being a synchronized machine learning model designed to generate an additional RTU estimation range for intermediate values ​​for one location of the second path as a function of time, and one or more of the RTUs are designed to transmit one or more of the additional intermediate values ​​if one or more of the additional intermediate values ​​are not within the additional RTU estimation range for intermediate values ​​for one location of the second path. Furthermore, The server is designed to be communicatively coupled to a plurality of intermediate RTUs, and stores within it a digital twin of the other flow model, the digital twin of the other flow model being substantially similar to the other flow model stored in one of the intermediate RTUs monitoring the one location of the second path, the server generates an additional server estimate range of intermediate values ​​based on weather event forecasts and one or more of the additional intermediate values, the server is designed to receive from one or more of the RTUs one or more of the additional intermediate values ​​that are not within the additional RTU estimate range of the intermediate values ​​for the one location of the second path, and the server is designed to transmit one or more of the additional intermediate values ​​that are not within the server estimate range of the intermediate values ​​for the one location of the second path. One or more of the flow controllers are communicably coupled to receive one or more of the additional intermediate values ​​or at least one of the additional server estimation ranges of the intermediate values ​​from the server in real time, and each of the flow controllers is programmed to determine the stress value or estimated stress value for each of the initial location and the subsequent location, the one location of the first path and the one location of the second path, based on the initial value, the subsequent value, one or more of the intermediate values ​​or at least one of the server estimation ranges of the intermediate values, and one or more of the additional intermediate values ​​or at least one of the additional server estimation ranges of the intermediate values. Based on the stress value or estimated stress value of each of the initial location, the subsequent location, one location of the first path, and one location of the second path, at least one of the flow distribution components redistributes the fluid flow through the locations of the fluid flow intersection between the initial location, the first path, and the second path, either during the climatic event or in real time, in order to effectively modify the stress value and / or estimated stress value of at least one of the constraint locations in the infrastructure so that the fluid condition attribute value of at least one of the constraint locations is less than or equal to a predetermined acceptable threshold attribute value assigned to at least one of the constraint locations. The constraint location is one location selected from the group including the initial location, one location on the first path, one location on the second path, and the subsequent location, wherein the measured value of the fluid condition attribute at the location may reach or exceed a predetermined acceptable threshold attribute value assigned to the location during the climatic event, at least in part due to the acceptance of fluid flow from a plurality of intermediate flows.

31. One or more of the flow controllers described above will receive the following commands, namely: Commands to determine the path stress values ​​of the initial path, the first path, and the second path by adding the stress values ​​or estimated stress values ​​of each of the constraint locations along the initial path to generate an initial path stress value or an estimated initial path stress value, adding the stress values ​​or estimated stress values ​​of each of the constraint locations along the first path to generate a first path stress value or an estimated first path stress value, and adding the stress values ​​or estimated stress values ​​of each of the constraint locations along the second path to generate a second path stress value or an estimated second path stress value, A command to identify which of the following has the highest magnitude in order to provide the maximum stress path value: the initial path stress value or the estimated initial path stress value, the first path stress value or the estimated first path stress value, and the second path stress value or the estimated second path stress value. Using one or more of the flow redistribution strategies, commands are given to redistribute the fluid flow between the initial path, the first path, and the second path through at least one of the fluid flow intersections in order to effectively reduce the magnitude of the highest stress path value. A real-time infrastructure management system according to claim 30, which is programmed to perform the following:

32. The real-time infrastructure management system according to claim 31, wherein the estimated second path stress value represents the sum of the estimated stress values ​​for each of the subsequent locations and the one location of the second path.

33. A real-time infrastructure management system, A subsequent sensor located at or near a subsequent location, which measures fluid condition attributes at the subsequent location and generates subsequent values, wherein the subsequent sensor is located downstream from the initial location, and the fluid condition attributes at the subsequent location are influenced by one or more intermediate flows flowing into the subsequent location. A subsequent RTU is communicatively coupled to the subsequent sensor and internally stores a subsequent flow model, wherein the subsequent flow model is a synchronized machine learning model designed to estimate the fluid condition attributes at the subsequent location as a function of time for a climate event, the subsequent RTU is designed to generate an RTU estimation range for the subsequent value based on the forecast of the climate event and the subsequent value, and the subsequent RTU is designed to transmit the subsequent value if the subsequent value is not within at least one of the RTU estimation ranges for the subsequent value, A plurality of intermediate sensors, at least one of which is located at or near one of the locations in the first path, and measures the fluid condition attribute at the location to generate an intermediate value for the first intermediate sensor; at least one of the plurality of intermediate sensors is located at or near one of the locations in the second path, and measures the fluid condition attribute at the location to generate an intermediate value for the second intermediate sensor; each of the first and second paths facilitates fluid communication between the initial location and the subsequent location; the second path differs from the first path in that it is located before the first path. Each of the aforementioned locations, the aforementioned location in the second path, and the subsequent location is a constraint location in the infrastructure, when the measured values ​​of the fluid condition attribute at each of the aforementioned locations, the aforementioned location in the first path, the aforementioned location in the second path, and the subsequent location may reach or exceed predetermined acceptable threshold attribute values ​​assigned to each of the aforementioned locations, the aforementioned location in the first path, the aforementioned location in the second path, and the subsequent location, at least in part due to the acceptance of fluid flow from multiple intermediate flows during the climatic event, a plurality of intermediate sensors, A plurality of intermediate RTUs, at least two of which are communicably coupled to two or more intermediate sensors, at least one of which internally stores one flow model, the flow model being a synchronized machine learning model designed to generate an RTU estimation range of intermediate values ​​for one location of the first path as a function of time, and at least one of the plurality of intermediate RTUs internally stores another flow model, the other flow model being an additional RTU estimation range of intermediate values ​​for one location of the second path as a function of time A synchronized machine learning model designed to generate a range, wherein at least one of the RTUs is designed to transmit one or more of the intermediate values ​​if one or more of the intermediate values ​​are not within the RTU estimation range of the intermediate values ​​for one location of the first path, and at least one of the plurality of intermediate RTUs is designed to transmit one or more of the additional intermediate values ​​if one or more of the additional intermediate values ​​are not within the additional RTU estimation range of the intermediate values ​​for one location of the second path, and a plurality of intermediate RTUs, A server designed to be communicatively coupled to one or more of the successor RTUs and intermediate RTUs, storing in it digital twins of each of the successor flow model, the first flow model, and the other flow model, wherein each digital twin of the successor flow model, the first flow model, and the other flow model is substantially similar to the successor flow model, the first flow model, and the other flow model stored in the successor RTU, one of the intermediate RTUs, and the other RTU, respectively, and the server, with respect to the climate event, based on the forecast of the climate event and the successor value, the intermediate value, and the additional intermediate value, respectively, the successor location, the one location of the first route, and the one location of the second route The server is designed to estimate the fluid condition attributes at a location and provide a server-estimated range for subsequent values, a server-estimated range for intermediate values, and an additional server-estimated range for intermediate values, wherein the server receives the subsequent value from the subsequent RTU if the subsequent value is not within the RTU-estimated range for subsequent values, receives one or more of the intermediate values ​​from the intermediate RTU if the intermediate value is not within the RTU-estimated range for intermediate values, and receives the additional intermediate value from another intermediate RTU if the additional intermediate value is not within the additional RTU-estimated range for intermediate values, and transmits values ​​of the subsequent value, intermediate value, and additional intermediate value that are not within the server-estimated range for subsequent values, the server-estimated range for intermediate values, and the additional server-estimated range for intermediate values, respectively. One or more flow controllers designed to be communicatively coupled to receive from the server in real time the following subsequent value or the server estimated range of the subsequent value, the intermediate value or the server estimated range of the intermediate value, and the additional intermediate value or the additional server estimated range of the intermediate value, one of the flow controllers is programmed to determine in real time the stress value or estimated stress value of each of the following location, the one location of the first path, and the one location of the second path, based on the following subsequent value or the server estimated range of the subsequent value, the intermediate value or the server estimated range of the intermediate value, and the additional intermediate value of the additional server estimated range of the intermediate value, One or more flow distribution components located at one or more fluid flow intersections, the one or more flow distribution components located downstream from the initial location and in fluid communication with the initial location through the initial path, and as a result, the fluid flow leaving the initial location flows through the initial path into one or more of the flow distribution components, each of the fluid flow intersections represents the intersection of the first path and the second path, and at least one of the flow distribution components redistributes the fluid flow between the first path and the second path through at least one of the fluid flow intersections, based on one or more flow distribution strategies received from one or more of the flow controllers during the climatic event and in real time, in order to effectively modify the stress value or estimated stress value obtained for at least one of the constraint locations to be less than the predetermined acceptable threshold attribute value assigned to at least one of the constraint locations. A real-time infrastructure management system equipped with [features / equipment].

34. One or more of the flow controllers described above will receive the following commands, namely: Commands to determine the respective path stress values ​​of the first and second paths by adding the stress values ​​or estimated stress values ​​of each of the constraint locations along the first path to generate a first path stress value or an estimated first path stress value, and by adding the stress values ​​or estimated stress values ​​of each of the constraint locations along the second path to generate a second path stress value or an estimated second path stress value, A command to identify which of the first path stress value or the estimated first path stress value, and the second path stress value or the estimated second path stress value has the highest magnitude, in order to provide the highest stress path value, Using one or more of the flow redistribution strategies, commands are given to redistribute the fluid flow between the first path and the second path through at least one of the fluid flow intersections in order to effectively reduce the magnitude of the highest stress path value. A real-time infrastructure management system according to claim 33, which is programmed to perform the following:

35. The real-time infrastructure management system according to claim 34, wherein the first path stress value or the estimated first path stress value represents the sum of the stress values ​​or estimated stress values ​​for each of the subsequent locations and the one location of the first path, and the second path stress value or the estimated second path stress value represents the sum of the stress values ​​or estimated stress values ​​for each of the subsequent locations and the one location of the second path.

36. A real-time method for infrastructure management, In one or more fluid flow controllers, initial values ​​are obtained using initial sensors located at or near the initial location, which measure fluid condition attributes at the initial location. In one or more of the fluid flow controllers, a successor value is obtained using a successor sensor located at or near a successor location, which measures the fluid condition attributes at the successor location, wherein the successor sensor is located downstream from the initial sensor, and the successor value is obtained using a successor sensor located at or near a successor location, In one or more of the fluid flow controllers, obtaining one or more intermediate values ​​using one or more intermediate sensors, wherein at least one of the one or more intermediate sensors is located at or near one location in a first path providing fluid communication between the initial location and the subsequent location, and measures the fluid flowing into or stored in the one location, and obtaining one or more intermediate values. To generate an initial path stress value and a first path stress value, in real time, one or more of the fluid flow controllers are used to determine the stress values ​​at the initial location, the one location on the first path, and the subsequent location, respectively, based on the initial value, one or more of the intermediate values, and the subsequent value, and to identify which of the initial path stress value and the first path stress value is the highest and reaches the highest stress path value, wherein the initial path stress value represents at least the stress value at the initial location, and the first path stress value represents at least the sum of the stress values ​​at each of the one location on the first path and the subsequent location, and to determine and identify this, To effectively reduce the magnitude of the peak stress path value, the method involves, in real time during a climatic event, redistributing the fluid flow within the initial path and the first path using one or more flow distribution components based on one or more flow redistribution strategies, wherein one or more of the flow distribution components are located at one or more fluid flow intersections, each of which is located downstream from the initial location, and as a result, the fluid flow leaving the initial location flows through the initial path into one or more of the flow distribution components, each of which intersects the initial path and the first path, and one or more of the flow distribution components are communicatively coupled to one or more of the fluid flow controllers. Real-time methods for infrastructure management, including [mention specific features / methods].

37. Real-time method of infrastructure management according to claim 36, wherein each of the initial location, the one location of the first path, and the subsequent location is a constraint location in the infrastructure when the measured value of the fluid condition attribute at the constraint location is likely to reach or exceed a predetermined acceptable threshold attribute value assigned to the constraint location, at least in part due to excessive fluid flow from a plurality of intermediate flows.

38. Real-time infrastructure management method according to claim 36, wherein the redistribution of the fluid flow includes implementing one of the flow redistribution strategies that reduces the stress value at at least one of the constraint locations to a relatively low predetermined acceptable threshold attribute value or less during a large storm event.

39. Real-time infrastructure management method according to claim 36, wherein the redistribution of the fluid flow includes implementing one of the flow redistribution strategies to reduce the stress value at at least one of the constraint locations to a relatively high predetermined acceptable threshold attribute value during a small storm event.

40. Real-time infrastructure management method according to claim 36, wherein the redistribution of the fluid flow includes replacing one flow redistribution strategy with another flow redistribution strategy during the climatic event.

41. Real-time method for infrastructure management according to claim 40, in redistributing the fluid flow, when a small storm event develops into a large storm event, one flow redistribution strategy modifies the fluid condition attributes through at least one of the constraint locations such that the stress value at at least one of the constraint locations is less than or equal to a relatively high predetermined acceptable threshold attribute value assigned to at least one of the constraint locations, and the other flow redistribution strategy modifies the fluid condition attributes through at least one of the constraint locations such that the stress value at at least one of the constraint locations is less than or equal to a relatively low predetermined acceptable threshold attribute value assigned to at least one of the constraint locations.

42. Real-time method for infrastructure management according to claim 40, wherein, in reallocating the fluid flow, when a small storm occurs instead of a large storm event, one flow redistribution strategy modifies the fluid condition attributes through at least one of the constraint locations such that the stress value at at least one of the constraint locations is less than or equal to a relatively low predetermined acceptable threshold attribute value assigned to at least one of the constraint locations, and the other flow redistribution strategy modifies the fluid condition attributes through at least one of the constraint locations such that the stress value at at least one of the constraint locations is less than or equal to a relatively high predetermined acceptable threshold attribute value assigned to at least one of the constraint locations.

43. Real-time infrastructure management method according to claim 36, wherein the redistribution of the fluid flow effectively modifies the fluid flow through one of the flow distribution components such that the stress value obtained at one location of the first path is less than a predetermined acceptable threshold attribute value assigned to one location of the first flow path, and / or the stress value obtained at the initial location is less than a predetermined acceptable threshold attribute value assigned to the initial location.

44. The real-time method for infrastructure management according to claim 36, wherein the redistribution includes reducing the combination of stress values, which represents the sum of the stress values ​​of the initial location and the one location on the first path, to a reduced combination of stress values ​​of the initial location and the first location on the first path, wherein in the reduced combination of stress values ​​of the initial location and the one location on the first path, the stress value of the initial location is reduced and the stress value of the one location on the first path is increased and within a predetermined acceptable threshold level, or the stress value of the one location on the first path is reduced and the stress value of the initial location is increased and within the predetermined acceptable threshold level.

45. Obtaining the one or more intermediate fluid condition attribute measurements includes obtaining a plurality of intermediate values ​​using a plurality of intermediate sensors that measure fluid condition attributes at the locations, at least one of which is located at or near one of the locations of a second path that provides fluid communication between the initial location and the subsequent location in order to generate additional intermediate values. The determination includes, at a minimum, generating a second path stress value representing the sum of the stress values ​​of each of the locations on the second path and the subsequent locations, the stress value of the location on the second location being determined based on the additional intermediate values, and the determination includes identifying which of the initial path stress value, the first path stress value and the second path stress value has the greatest magnitude in order to reach the maximum stress path value. A real-time method for managing the infrastructure according to claim 36, wherein the redistribution includes redistributing the fluid flow to one path selected from the group including the initial path, the first path, and the second path, based on one or more of the flow redistribution strategies, in order to effectively reduce the magnitude of the highest stress path value.

46. Real-time method of infrastructure management according to claim 45, wherein each of the initial location, the one location on the first path, the one location on the second path, and the subsequent location is a constraint location in the infrastructure when the measurement of fluid condition attributes at the constraint location may cause the stress value at the constraint location to reach or exceed a predetermined acceptable threshold attribute value assigned to the constraint location, at least in part due to excessive fluid flow from a plurality of intermediate flows during the climatic event.

47. The real-time method for infrastructure management according to claim 46, wherein the redistribution includes reducing the stress combination value, which represents the sum of the stress values ​​of each of the constraint locations, to a reduced combination of stress values ​​of the constraint locations, wherein in the reduced combination of stress values ​​of the constraint locations, the stress value of the initial location is reduced, the stress values ​​of each of the other constraint locations are increased and are within a predetermined acceptable threshold level assigned to each of the other constraint locations, or the stress value of one location in the first path is reduced, the stress values ​​of each of the other constraint locations are increased and are within a predetermined acceptable threshold level assigned to each of the other constraint locations, or the stress value of one location in the second path is reduced, the stress values ​​of each of the other constraint locations are increased and are within a predetermined acceptable threshold level assigned to each of the other constraint locations.

48. Real-time infrastructure management method according to claim 46, wherein the redistribution of the fluid flow includes replacing one flow redistribution strategy with another flow redistribution strategy during the climatic event.

49. In the aforementioned redistribution, when a small storm develops into a large storm, one flow redistribution strategy modifies the fluid condition attributes through the initial path, the first path, and the second path so that the stress values ​​at each of the initial location, the one location in the first path, and the one location in the second path are less than or equal to a relatively high predetermined acceptable threshold attribute value assigned to each of the initial location, the one location in the first path, and the one location in the second path, respectively; and the other flow redistribution strategy modifies the fluid condition attributes through at least one of the initial path, the first path, and the second path so that the stress values ​​at each of the initial location, the one location in the first path, and the one location in the second path are less than or equal to a relatively low predetermined acceptable threshold attribute value assigned to at least one of the constraint locations. In the redistribution, when a smaller storm occurs instead of a large storm, one flow redistribution strategy modifies the fluid condition attributes through the initial path, the first path, and the second path such that the stress values ​​at each of the initial location, the one location of the first path, and the one location of the second path are less than or equal to a relatively low predetermined acceptable threshold attribute value assigned to each of the initial location, the one location of the first path, and the one location of the second path, respectively; and the other flow redistribution strategy modifies the fluid condition attributes through at least one of the initial path, the first path, and the second path such that the stress values ​​at each of the initial location, the one location of the first path, and the one location of the second path are less than or equal to a relatively high predetermined acceptable threshold attribute value assigned to at least one of the constraint locations, the real-time method of infrastructure management according to claim 45.

50. A real-time method for infrastructure management, In one or more of the fluid flow controllers, a successor value is obtained using a successor sensor located at or near a successor location, which measures fluid condition attributes at the successor location, wherein the successor sensor is located downstream from the initial location, and the successor value is obtained using a successor sensor located at or near a successor location. In one or more of the fluid flow controllers, a plurality of intermediate values ​​are obtained using a plurality of intermediate sensors, wherein at least one of the plurality of intermediate sensors is located at or near one location of a first path and measures the fluid condition attribute at the location to generate one or more intermediate values, and at least another of the plurality of intermediate sensors is located on one location of a second path and measures the fluid condition attribute at the location to generate one or more additional intermediate values, and each of the first path and the second path provides fluid communication between the initial location and the subsequent location, thereby obtaining a plurality of intermediate values. In order to generate the first path stress value and the second path stress value, one or more of the fluid flow controllers are used in real time to determine the stress value at each of the locations of the first path, the location of the second path, and the subsequent location, based on one or more of the intermediate values, one or more of the additional intermediate values, and the subsequent value, respectively. Identifying which of the first path stress value and the second path stress value is the greatest, and generating the highest stress path value, wherein the first path stress value represents the sum of the stress values ​​at each of the one location and the subsequent locations on the first path, and the second path stress value represents the sum of the stress values ​​at each of the one location and the subsequent locations on the second path, and identifying and generating the highest stress path value. To effectively reduce the magnitude of the peak stress path value, the fluid flow is redistributed between the first path and the second path in real time during a climatic event, using one or more flow distribution components, based on one or more flow redistribution strategies, wherein one or more of the flow distribution components are located at one or more fluid flow intersections, each of which is located downstream from the initial location, and as a result, the fluid flow leaving the initial location flows through the initial path into one or more of the flow distribution components, each of which intersects the first path and the second path, and one or more of the flow distribution components are communicatively coupled to one or more of the fluid flow controllers. Real-time methods for infrastructure management, including [mention specific features / methods].

51. A real-time method for managing the infrastructure according to claim 50, wherein the redistribution includes reducing the fluid flow rate through the first and / or second path.

52. A real-time method for managing the infrastructure according to claim 50, wherein the fluid condition attribute value is at least one attribute selected from the group including fluid flow rate, fluid height, fluid volume, hydraulic capacity, fluid residence time, fluid strategic capacity, and fluid quality.

53. A real-time method for managing the infrastructure according to claim 50, wherein the determining and reallocating does not involve, or is not based on, determining or establishing a cost function for the flow within the infrastructure.

54. A real-time method for managing the infrastructure according to claim 50, wherein the determining and reallocation does not include, or are not based on, a cost function for realizing one or more potential consequences of the infrastructure during the climatic event.

55. A real-time method for managing the infrastructure according to claim 50, wherein the determination does not involve minimizing the difference between the cost function of realizing one or more potential outcomes of the infrastructure and the cost function of the flow inside the infrastructure.

56. A real-time method for managing the infrastructure according to claim 50, wherein the redistribution does not include the redistribution of the fluid flow at locations of fluid flow intersections between high-quality processing methods and low-quality processing methods.

57. A real-time method for managing the infrastructure according to claim 50, wherein the reallocation does not involve reallocation to minimize the difference between the cost function of realizing one or more potential outcomes of the fluid flow infrastructure and the cost function of the flow inside the fluid flow infrastructure.

58. A real-time method for managing the infrastructure according to claim 50, wherein the redistribution includes reducing the combination of stress values ​​representing the sum of the stress values ​​of each of the locations on the first path and the second path to a reduced combination of stress values, wherein in the reduced combination of stress values, the stress value of the location on the first path is reduced and the stress value of the location on the second path is increased and is within a predetermined acceptable threshold level assigned to the location on the second path, or the stress value of the location on the second path is reduced and the stress value of the location on the first path is increased and is within a predetermined acceptable threshold level assigned to the location on the first path.

59. Comparing the results obtained from implementing multiple infrastructure management strategies during the aforementioned climate event, wherein the comparison includes using one or more keypoint indicators as measures of success in reducing stress values ​​at one location on the first path and one location on the second path. Based on the comparison, determine one or more successful infrastructure management strategies that effectively reduce the stress values ​​at the one location of the first path and the one location of the second path to below a predetermined acceptable threshold level assigned to each of the locations of the first path and the second path during the climatic event. One or more of the fluid flow controllers store one or more of the successful infrastructure management strategies. A real-time method for managing the infrastructure according to claim 50, further comprising:

60. A method for implementing an infrastructure management strategy, In one or more fluid flow controllers, initial values ​​are obtained using initial sensors located at or near the initial location, which measure fluid condition attributes at the initial location. In one or more of the fluid flow controllers, a successor value is obtained using a successor sensor located at or near a successor location, which measures fluid condition attributes at the successor location, wherein the successor sensor is located downstream from the initial sensor, and the successor value is obtained using a successor sensor located at or near a successor location, A first path providing fluid communication between the first location and the subsequent location is located at or near one of the intermediate sensors, and one or more intermediate values ​​are obtained using one or more intermediate sensors that measure the fluid condition attributes at the location. Using a server operating with one or more of the intermediate sensors, to obtain a server-estimated range for one or more intermediate values ​​based on a forecast of a weather event and one or more of the intermediate values, wherein the server is designed to receive one or more of the intermediate values, the server is communicably coupled to one or more of the fluid flow controllers to transmit the one or more server-estimated intermediate values ​​or one or more intermediate values, and the server obtains a server-estimated range for one or more intermediate values, to transmit the intermediate values ​​if one or more of the intermediate values ​​are not within the server-estimated range of intermediate values. In order to generate an initial path stress value and a first path stress value or an estimated first path stress value, in real time, one or more of the fluid flow controllers are used to determine the stress values ​​of the initial location and the subsequent location based on the initial value and the subsequent value, and the stress value or estimated stress value of the one location of the first path is determined based on one or more of the intermediate values ​​and one or more of the server-estimated intermediate values, respectively. Identifying which of the initial path stress value, the first path stress value, and the estimated first path stress value is the highest and reaches the maximum stress path value, wherein the initial path stress value represents at least the stress value at the initial location, the first path stress value represents the sum of the stress values ​​at each of the one location and the subsequent locations in the first path, and the estimated first path stress value represents at least the sum of the estimated stress value at the one location and the stress value at the subsequent location in the first path. Based on the aforementioned maximum flow stress value, formulate multiple infrastructure management strategies to reduce the aforementioned maximum stress path value, Comparing the infrastructure management strategy to the results of the climate event using one or more key indicators of the success of reducing the maximum flow stress value, Based on the comparison using one or more of the key point indicators of the success of reducing the maximum flow stress value, determine one or more successful infrastructure management strategies that effectively reduce the maximum flow stress value. One or more of the fluid flow controllers store one or more of the successful infrastructure management strategies. How to implement an infrastructure management strategy, including [specific details omitted].

61. Using one or more intermediate-far monitoring and control units ("RTUs"), the RTU estimation range for the intermediate value is generated based on the forecast of the climate event and one or more of the intermediate values. If one or more of the intermediate values ​​are not within the estimated RTU range of the intermediate values, one or more of the intermediate RTUs are used to transmit one or more of the intermediate values ​​from one or more of the intermediate sensors to the server. A real-time method for implementing the infrastructure management strategy described in claim 60, further comprising:

62. A real-time method for implementing the infrastructure management strategy according to claim 60, wherein each of the initial location, the one location of the first path, and the subsequent location is a constraint location in the infrastructure when the measured value or server-estimated range of the value at the constraint location may, at least in part, cause the stress value or estimated stress value at the constraint location to reach or exceed a predetermined acceptable threshold attribute value assigned to the constraint location, due to excessive fluid flow from a plurality of intermediate flows during the climatic event.

63. During a subsequent climate event, one or more of the successful infrastructure management strategies are selected from one or more of the fluid flow controllers. To effectively reduce the magnitude of the maximum stress path value, during the climatic event, in real time, the one or more flow distribution components are used to redistribute the fluid flow between the initial path and the first path based on one or more of the successful infrastructure management strategies, wherein one or more of the flow distribution components are located at one or more fluid flow intersections, each of which is located downstream from the initial location, and as a result, the fluid flow leaving the initial location flows through the initial path into one or more of the flow distribution components, each of which intersects the initial path and the first path, and one or more of the flow distribution components are communicably coupled to one or more of the fluid flow controllers. A method for implementing the management of the infrastructure strategy described in claim 60, further comprising:

64. A real-time method for implementing the infrastructure management strategy according to claim 63, wherein the redistribution includes implementing one of the flow redistribution strategies to reduce the stress value and / or estimated stress value of at least one of the constraint locations to less than or equal to a predetermined relatively high acceptable threshold attribute value assigned to at least one of the constraint locations during a small storm.

65. A real-time method for implementing the infrastructure management strategy of claim 63, wherein the redistribution includes implementing one of the flow redistribution strategies to reduce the stress value and / or estimated stress value of at least one of the constraint locations to a relatively low predetermined acceptable threshold attribute value assigned to at least one of the constraint locations during a large storm.

66. A real-time method for implementing the infrastructure management strategy according to claim 63, wherein the redistribution includes replacing one flow redistribution strategy with another flow redistribution strategy during the climate event.

67. A real-time method for managing the infrastructure strategy according to claim 66, wherein when a small storm develops into a large storm, one flow redistribution strategy modifies the fluid condition attributes through the initial path and the first path so that the stress value and / or estimated stress value at at least one of the constraint locations is less than or equal to a predetermined relatively high acceptable threshold attribute value assigned to at least one of the constraint locations, and the other flow redistribution strategy modifies the fluid condition attributes through the initial path and the first path so that the stress value and / or estimated stress value at at least one of the constraint locations is less than or equal to a predetermined relatively low acceptable threshold attribute value assigned to at least one of the constraint locations.

68. A real-time method for managing the infrastructure strategy according to claim 66, wherein when a smaller storm occurs instead of a large storm, one flow redistribution strategy modifies the fluid condition attributes through the initial path and the first path so that the stress value and / or estimated stress value at at least one of the constraint locations is less than or equal to a relatively low predetermined acceptable threshold attribute value assigned to at least one of the constraint locations, and the other flow redistribution strategy modifies the fluid condition attributes through the initial path and / or the first path so that the stress value and / or estimated stress value at at least one of the constraint locations is less than or equal to a relatively high predetermined acceptable threshold attribute value assigned to at least one of the constraint locations.

69. A real-time method for implementing the infrastructure management strategy according to claim 63, wherein the redistribution effectively modifies the fluid flow through one of the flow distribution components such that the stress value and / or estimated stress value at one location of the first path is less than a predetermined acceptable threshold attribute value assigned to one location of the first flow path, and / or the stress value and / or estimated stress value obtained at the initial location is less than a predetermined acceptable threshold attribute value assigned to the initial location.

70. A real-time method for implementing the infrastructure management strategy according to claim 63, wherein the redistribution includes reducing the combination of stress values ​​representing the sum of the stress value of the initial location and the stress value of the one location on the first path or the estimated stress value to a reduced combination of stress values, wherein in the reduced combination of stress values, the stress value of the initial location is reduced, the stress value of the one location on the first path or the estimated stress value is increased and is within a predetermined acceptable threshold level assigned to the one location on the first path, or the stress value of the one location on the first path or the estimated stress value is reduced, the stress value of the initial location is increased and is within a predetermined acceptable threshold level assigned to the initial location.

71. Obtaining one or more intermediate values ​​using one or more intermediate sensors includes obtaining multiple intermediate values ​​using multiple sensors, wherein at least one of the one or more intermediate sensors is located at or near one location of a second path, and measures the fluid condition attribute at the location to generate one or more additional intermediate values, and the second path provides fluid communication between the first location and the subsequent location. Obtaining one or more server-estimated intermediate values ​​includes obtaining one or more additional server-estimated intermediate values ​​using the server operating with another of the intermediate sensors, the server generating an additional server-estimated range of intermediate values ​​for the climate event based on the climate event forecast and one or more additional intermediate values, the server communicating one or more of the additional server-estimated ranges of intermediate values ​​or one or more of the additional intermediate values ​​to one or more of the fluid flow controllers, the server communicating one or more of the additional intermediate values ​​if one or more of the additional intermediate values ​​are not within the server-estimated range of intermediate values, In order to generate stress values ​​or estimated stress values ​​for the second path, the fluid flow controller is used in real time to determine the stress values ​​or estimated stress values ​​for one location of the second path based on one or more of the additional intermediate values ​​or one or more of the additional server-estimated intermediate values, respectively. A real-time method for implementing the infrastructure management strategy according to claim 60, comprising: identifying which of the initial path stress value, the stress value or estimated stress value of the first path, and the stress value or estimated stress value of the second path is the greatest and reaches the maximum stress path value; wherein the initial path stress value represents at least the stress value of the initial location; the stress value or estimated stress value of the first path represents at least the sum of the stress value or estimated stress value of one location in the first path and the stress value of the subsequent location; and the stress value or estimated stress value of the second path represents at least the sum of the stress value or estimated stress value of one location in the second path and the stress value of the subsequent location.

72. Obtaining one or more of the aforementioned estimated intermediate values ​​is Using one or more additional intermediate-far-sight monitoring units ("RTUs"), and based on the forecast of the climatic event and one or more of the additional intermediate values, an additional RTU estimation range for the intermediate values ​​is generated. If one or more of the additional intermediate values ​​are not within the estimated range of the additional RTU of the intermediate values, one or more of the additional intermediate values ​​from one or more of the additional intermediate sensors are transmitted to the server using one or more of the additional intermediate RTUs. A real-time method for implementing the infrastructure management strategy according to claim 71, further comprising:

73. Based on the aforementioned maximum flow stress value, formulate multiple infrastructure management strategies to reduce the aforementioned maximum stress path value, Comparing the infrastructure management strategy to the results of the climate event using one or more key indicators of the success of reducing the maximum flow stress value, Based on one or more of the key point indicators of the success of reducing the maximum flow stress value, one or more successful infrastructure management strategies for effectively reducing the maximum flow stress value are determined. One or more of the fluid flow controllers store one or more of the successful infrastructure management strategies. A real-time method for implementing the management of the infrastructure strategy according to claim 71, further comprising:

74. A real-time method for managing the infrastructure strategy according to claim 71, wherein each of the initial location, the one location of the first path, the one location of the second path, and the subsequent location is considered a constraint location in the infrastructure if, during the climatic event, measured and / or estimated values ​​of fluid conditions at the constraint location could cause the stress value or estimated stress value at the constraint location to reach or exceed a predetermined acceptable threshold attribute value assigned to the constraint location, at least in part due to excessive fluid flow from a plurality of intermediate flows.

75. During a subsequent climate event, one or more of the successful infrastructure management strategies are selected from one or more of the fluid flow controllers. To effectively reduce the magnitude of the maximum stress path value, during the climatic event, in real time, the one or more flow distribution components are used to redistribute the fluid flow between the initial path, the first path and the second path based on one or more of the successful infrastructure management strategies, wherein one or more of the flow distribution components are located at one or more fluid flow intersections, each of which is located downstream from the initial location, and as a result, the fluid flow leaving the initial location flows through the initial path into one or more of the flow distribution components, each of which intersects the initial path, the first path and the second path, and one or more of the flow distribution components are communicatively coupled to one or more of the fluid flow controllers, thereby redistributing the fluid flow. A method for implementing the management of the infrastructure strategy according to claim 71, further comprising:

76. A real-time method for implementing the infrastructure management strategy according to claim 75, wherein the redistribution includes implementing one of the successful infrastructure management strategies for modifying the fluid condition attributes inside the initial path, the first path, and the second path during a small storm event such that at least one of the stress values ​​of the initial location, the stress value or estimated stress value of the one location of the first path, and the stress value or estimated stress value of the one location of the second path is less than or equal to a predetermined relatively high acceptable threshold attribute value assigned to each of the initial location, the one location of the first path, and the one location of the second path.

77. A real-time method for implementing the infrastructure management strategy according to claim 75, wherein the redistribution includes implementing one of the successful infrastructure management strategies for modifying the fluid condition attributes inside the initial path, the first path, and the second path during a large-scale storm event such that at least one of the stress values ​​of the initial location, the stress value or estimated stress value of the one location of the first path, and the stress value or estimated stress value of the one location of the second path is less than or equal to a predetermined relatively low acceptable threshold attribute value assigned to the initial location, the one location of the first path, and the one location of the second path.

78. A real-time method for implementing the infrastructure management strategy of claim 75, wherein the redistribution effectively modifies the fluid flow through one of the flow distribution components to generate at least one reduced stress condition selected from the group including that the stress value or estimated stress value obtained at one location of the first path is less than a predetermined acceptable threshold attribute value assigned to one location of the first flow path, the stress value or estimated stress value obtained at one location of the second path is less than a predetermined acceptable threshold attribute value assigned to one location of the second flow path, and the stress value obtained at the initial location is less than a predetermined acceptable threshold attribute value assigned to the initial location.

79. A real-time method for implementing the infrastructure management strategy according to claim 75, wherein the redistribution includes reducing one path stress value selected from the group including the initial path stress value, the stress value or estimated stress value of the first path, and the stress value or estimated stress value of the second path, based on one or more of the flow redistribution strategies.

80. Each of the initial location, the one location on the first path, the one location on the second path, and the subsequent location is a constraint location in the infrastructure when the measured and / or estimated values ​​of the fluid condition attributes at the constraint location may, at least in part, cause the stress value or estimated stress value at the constraint location to reach or exceed a predetermined acceptable threshold attribute value assigned to the constraint location, due to excessive fluid flow from multiple intermediate flows during the climatic event. The aforementioned redistribution includes reducing the combination of stress values ​​representing the stress value of the initial location and the sum of the stress values ​​or estimated stress values ​​of each of the locations on the first path and the second path to a reduced combination of stress values, wherein in the reduced combination of stress values, the stress value of the initial location is reduced, and the stress value or estimated stress value of at least one of the locations on the first path and the second path is increased, so that they are within a predetermined acceptable threshold level assigned to each of the locations on the first path and the second path, respectively, or the stress value or estimated stress value of the location on the first path is reduced, and the initial location A real-time method for implementing the infrastructure management strategy according to claim 75, wherein the stress value of the cation and at least one of the stress values ​​of at least one of the locations of the second path or the estimated stress value are increased so that they are, respectively, within a predetermined acceptable threshold level assigned to the initial location and the location of the second path, or the stress value of the location of the second path or the estimated stress value are decreased, and the stress value of the initial location and at least one of the stress values ​​of at least one of the locations of the first path or the estimated stress value are increased so that they are, respectively, within a predetermined acceptable threshold level assigned to the initial location and the location of the first path.

81. A real-time method for infrastructure management, In one or more of the fluid flow controllers, a successor value is obtained using a successor sensor located at or near a successor location, which measures fluid condition attributes at the successor location, wherein the successor sensor is located downstream from the initial location, and the successor value is obtained using a successor sensor located at or near a successor location. The method for obtaining multiple intermediate values ​​using multiple intermediate sensors, wherein at least one of the multiple intermediate sensors is located at or near one location on a first path and measures the fluid condition attribute at the location to generate one or more intermediate values, and another of the multiple intermediate sensors is located at or near one location on a second path and measures the fluid condition attribute at the location to generate one or more additional intermediate values, and each of the first and second paths provides fluid communication between the first location and the subsequent location. Using a server operating with at least one of the intermediate sensors, obtain a server-estimated range for one or more intermediate values ​​based on a weather event forecast and one or more of the intermediate values; using the server operating with at least one more of the intermediate sensors, obtain an additional server-estimated range for one or more intermediate values ​​in one or more of the fluid flow controllers based on a weather event forecast and one or more of the additional intermediate values, wherein the server is designed to receive one or more of the intermediate values ​​and one or more of the additional intermediate values. The server is communicatively coupled to one or more of the fluid flow controllers to transmit one or more of the intermediate values, or the server estimated range of one or more of the intermediate values, and one or more of the additional intermediate values, or one or more of the additional server estimated intermediate values, to one or more of the fluid flow controllers, and the server transmits one or more of the intermediate values ​​if one or more of the intermediate values ​​are not within the server estimated range of the intermediate values, and transmits one or more of the additional intermediate values ​​if one or more of the additional intermediate values ​​are not within the additional server estimated range of the intermediate values, and obtains, In real time, using one or more of the fluid flow controllers, the stress value of the subsequent location and the stress value or estimated stress value of each of the locations in the first and second paths are determined based on one or more of the subsequent values, one or more of the intermediate values, or one or more of the server estimated ranges of the intermediate values, one or more of the additional intermediate values, or one or more of the additional server estimated ranges of the intermediate values, and based on the stress value or estimated stress value of each of the locations in the first and second paths, and the stress values ​​or estimated stress values ​​of each of the first and second paths are generated. Identifying which of the stress value or estimated stress value of the first path and the stress value or estimated stress value of the second path is the highest and reaches the highest stress path value, wherein the stress value or estimated stress value of the first path represents at least the sum of the stress value or estimated stress value of one location in the first path and the stress value of the subsequent location, respectively, and the stress value or estimated stress value of the second path represents at least the sum of the stress value or estimated stress value of one location in the second path and the stress value of the subsequent location, respectively. To effectively reduce the magnitude of the maximum stress path value, the fluid flow is redistributed between the first path and the second path in real time during the climatic event, using one or more flow distribution components, based on one or more flow redistribution strategies, wherein one or more of the flow distribution components are located at one or more fluid flow intersections, each of which is located downstream from the initial location, and as a result, the fluid flow leaving the initial location flows through the initial path into one or more of the flow distribution components, each of which intersects the first path and the second path, and one or more of the flow distribution components are communicably coupled to one or more of the fluid flow controllers. Real-time methods for infrastructure management, including [mention specific features / methods].

82. Obtaining one or more of the aforementioned server-estimated intermediate values ​​and one or more of the aforementioned additional server-estimated intermediate values ​​is: Using one or more intermediate-far monitoring and control units ("RTUs") and additional intermediate RTUs, generate at least one RTU estimation range for the intermediate values ​​and at least one additional RTU estimation range for the intermediate values, respectively, based on the forecast of the climatic event, one or more of the intermediate values, and one or more of the additional intermediate values. If one or more of the intermediate values ​​are not within at least one of the RTU estimation ranges of the intermediate values, one or more of the intermediate values ​​from one or more of the intermediate sensors are transmitted to the server using one or more of the intermediate RTUs. If one or more of the additional intermediate values ​​are not within the estimated range of the additional RTU of the intermediate values, one or more of the additional intermediate values ​​from one or more of the additional intermediate sensors are transmitted to the server using one or more of the additional intermediate RTUs. A real-time method for managing the infrastructure strategy according to claim 81, further comprising:

83. A real-time method for implementing the infrastructure strategy management according to claim 81, wherein the redistribution includes reducing the fluid flow rate through the first and / or second route.

84. A method for implementing an infrastructure strategy, A server operating with one or more initial sensors to obtain a server-estimated range of initial values ​​based on initial values ​​and weather event forecasts, wherein at least one of the one or more initial sensors is located at or near the initial location and generates the initial values ​​by measuring fluid condition attributes at the location, the server is communicatively coupled to transmit the initial values ​​or the server-estimated range of initial values ​​to one or more fluid flow controllers, and the server obtains the server-estimated range of initial values, which transmits the initial values ​​if the initial values ​​are not within the server-estimated range of initial values. In one or more of the fluid flow controllers, a successor value is obtained using a successor sensor located at or near a successor location, which measures fluid condition attributes at the successor location, wherein the successor sensor is located downstream from the initial sensor, and the successor value is obtained using a successor sensor located at or near a successor location, Obtaining a server-estimated range of intermediate values ​​based on climate event forecasts and intermediate values, using a server operating with one or more intermediate sensors, wherein at least one of the one or more intermediate sensors is located at or near one location on a first path, measures fluid condition attributes at the location to generate the intermediate value, the server is communicatively coupled to transmit the intermediate value or the server-estimated range of intermediate values ​​to one or more of the fluid flow controllers, the server transmits the intermediate value if the intermediate value is not within the server-estimated range of intermediate values, and the first path provides fluid communication between the initial location and the subsequent location. In one or more of the fluid flow controllers, the stress value of the subsequent location is determined based on the subsequent value, and the stress value or estimated stress value of the initial location and the one location of the first path is determined based on the initial value or the server estimated range of the initial value and one or more of the intermediate values ​​or the server estimated range of the intermediate value, respectively. Formulating one or more infrastructure management strategies to reduce the stress value or estimated stress value at the initial location and / or the stress value or estimated stress value at the one location in the first path, based on the stress value of the subsequent location and the stress value or estimated stress value of each of the initial location and the one location in the first path, Comparing each of the infrastructure management strategies to the results of the climate event using one or more keypoint indicators of the success of reducing the stress value or estimated stress value at the initial location and / or the stress value or estimated stress value at one location along the first path, Based on the comparison using one or more of the keypoint indicators of the success of reducing the stress value or estimated stress value at the initial location and / or the stress value or estimated stress value at one location of the first path, to determine one or more successful infrastructure management strategies that effectively reduce the stress value or estimated stress value at the initial location and / or the stress value or estimated stress value at one location of the first path, One or more of the fluid flow controllers store one or more of the successful infrastructure management strategies, During a subsequent climate event, one or more of the successful infrastructure management strategies are selected from one or more of the fluid flow controllers. To effectively reduce stress at the initial location and / or at one of the locations in the first path during the subsequent climatic event, the redistribution of fluid flow between the initial path and the first path is performed using one or more of the successful infrastructure management strategies, wherein the redistribution is performed using one or more flow distribution components located at one or more flow intersections, each of which is downstream from the initial location, and as a result, the fluid flow leaving the initial location flows through the initial path into one or more of the flow distribution components, each of which is a fluid flow intersection where the initial path and the first path intersect. Methods that include...

85. A method of implementing the infrastructure strategy according to claim 84, wherein each of the initial location, the one location of the first path, and the subsequent location is a constraint location in the infrastructure when measured and / or estimated values ​​of fluid condition attributes at or near the constraint location could cause the stress value or estimated stress value at the constraint location to reach or exceed a predetermined acceptable threshold attribute value assigned to the constraint location, at least in part due to excessive fluid flow from a plurality of intermediate flows during the climatic event.

86. A method of implementing the infrastructure strategy according to claim 85, wherein the redistribution includes implementing one of the successful infrastructure management strategies for modifying the fluid condition attributes inside the initial path, the first path, and the second path during a minor storm such that at least one of the stress values ​​of the initial location, the stress value or estimated stress value of the one location of the first path, and the stress value or estimated stress value of the one location of the second path is less than or equal to a predetermined relatively high acceptable threshold attribute value assigned to each of the initial location, the one location of the first path, and the one location of the second path.

87. A real-time method for implementing the infrastructure management strategy according to claim 85, wherein the redistribution includes implementing one of the successful infrastructure management strategies for modifying the fluid condition attributes inside the initial path, the first path, and the second path during a major storm, such that at least one of the stress values ​​of the initial location, the stress value or estimated stress value of the one location of the first path, and the stress value or estimated stress value of the one location of the second path is less than or equal to a predetermined relatively low acceptable threshold attribute value assigned to the initial location, the one location of the first path, and the one location of the second path.

87. A method of implementing the infrastructure strategy according to claim 85, wherein the redistribution includes implementing one of the flow redistribution strategies to reduce the stress values ​​and / or estimated stress values ​​of fluid condition attributes in or near at least one of the constraint locations to a relatively low predetermined acceptable threshold attribute value assigned to the constraint location during a large storm.

88. A method of implementing the infrastructure strategy according to claim 84, wherein the reallocation includes replacing one successful infrastructure management strategy with another successful infrastructure management strategy during the climate event.

89. A method for implementing the infrastructure strategy of claim 88, wherein when a small storm develops into a large storm, one successful infrastructure management strategy modifies fluid condition attributes in or near at least one of the constraint locations such that the stress value and / or estimated stress value of at least one of the constraint locations is less than or equal to a relatively high predetermined acceptable threshold attribute value assigned to at least one of the constraint locations, and the other successful infrastructure management strategy modifies fluid condition attributes in or near at least one of the constraint locations such that the stress value and / or estimated stress value of at least one of the constraint locations is less than or equal to a relatively low predetermined acceptable threshold attribute value assigned to at least one of the constraint locations.

90. A method of implementing the infrastructure strategy of claim 88, wherein when a small storm occurs instead of a large storm, one successful infrastructure management strategy modifies the fluid condition attributes in or near at least one of the constraint locations such that the stress value and / or estimated stress value of at least one of the constraint locations is less than or equal to a relatively low predetermined acceptable threshold attribute value assigned to at least one of the constraint locations, and the other successful infrastructure management strategy modifies the fluid condition attributes in or near at least one of the constraint locations such that the stress value and / or estimated stress value of at least one of the constraint locations is less than or equal to a relatively high predetermined acceptable threshold attribute value assigned to at least one of the constraint locations.

91. A method of implementing the infrastructure strategy according to claim 84, wherein the redistribution effectively modifies the fluid flow through one of the flow distribution components such that the fluid condition attribute at or near the one location of the first path is less than a predetermined acceptable threshold attribute value assigned to the one location of the first flow path, and / or the fluid condition attribute at or near the initial location is less than a predetermined acceptable threshold attribute value assigned to the initial location.

92. A method for implementing the infrastructure strategy according to claim 84, wherein the redistribution includes reducing the combination of stress values ​​or estimated stress values ​​for each of the initial location and the one location on the first path to generate a reduced combination of estimated stress values ​​for the initial location and the first location on the first path, wherein in the reduced combination of estimated stress values ​​for the initial location and the one location on the first path, the stress value or estimated stress value for the initial location is reduced, the stress value or estimated stress value for the one location on the first path is increased, and the fluid condition attribute at or near the one location on the first path is within a predetermined acceptable threshold level assigned to the one location on the first path, or the estimated stress value for the one location on the first path is reduced, the stress value or estimated stress value for the initial location is increased, and the fluid condition attribute at or near the initial location is within the predetermined acceptable threshold level assigned to the initial location.

93. Acquiring one or more of the server-estimated intermediate values ​​includes acquiring an additional server-estimated range of the intermediate values ​​using one or more additional intermediate sensors, at least one of which is located at or near one location of a second path and measures the fluid condition attributes at the location to generate one or more additional intermediate values, the second path provides fluid communication between the initial location and the subsequent location, and acquiring the additional server-estimated range of the intermediate values ​​is generated using one or more of the additional intermediate sensors operating with the server based on the climatic events and the additional intermediate values, the server transmits one or more of the additional server-estimated ranges of the intermediate values ​​or the additional intermediate values ​​to one or more of the fluid flow controllers, and the server transmits the additional intermediate values ​​if one or more of the additional intermediate values ​​are within one or more of the additional server-estimated ranges of the intermediate values. The determination includes generating a stress value or estimated stress value for the one location on the second path based on one or more of the additional intermediate values ​​or one or more of the additional server estimation ranges of the intermediate values, and formulating one or more of the infrastructure management strategies based on the stress values ​​of the subsequent locations, and the stress values ​​or estimated stress values ​​for each of the initial location, the one location on the first path, and the one location on the second path. A method of implementing the infrastructure strategy according to claim 84, wherein the redistribution includes redistributing the fluid flow to at least one path selected from the group including the initial path, the first path, and the second path, based on one or more of the infrastructure management strategies, in order to effectively reduce the magnitude of the highest stress path value.

94. Obtaining one or more of the aforementioned server-estimated intermediate values ​​and one or more of the aforementioned additional server-estimated intermediate values ​​is: Using one or more intermediate-far monitoring and control units ("RTUs") and additional intermediate RTUs, the system generates an estimated RTU range for the intermediate values ​​and an estimated range for the additional intermediate values, based on the forecast of the climatic event, one or more of the intermediate values, and one or more of the additional intermediate values. If one or more of the intermediate values ​​are not within at least one of the RTU estimation ranges of the intermediate values, one or more of the intermediate values ​​from one or more of the intermediate sensors are transmitted to the server using the intermediate RTU and one or more of the additional intermediate RTUs; if one or more of the additional intermediate values ​​are not within at least one of the additional RTU estimation ranges of the intermediate values, one or more of the additional intermediate values ​​from one or more of the additional intermediate sensors are transmitted to the server using one or more of the additional intermediate RTUs. A method for implementing the infrastructure strategy described in claim 93, further comprising:

95. A method of implementing the infrastructure strategy according to claim 93, wherein the redistribution includes implementing one of the flow redistribution strategies to reduce, during a small storm, the stress value or estimated stress value of at least one of the initial location, the one location of the first path, and the one location of the second path to less than or equal to a predetermined relatively high acceptable threshold attribute value assigned to each of the initial location, the one location of the first path, and the one location of the second path.

96. A method of implementing the infrastructure strategy according to claim 93, wherein the redistribution includes implementing one of the flow redistribution strategies to reduce the stress value or estimated stress value of at least one of the initial location, the one location of the first path, and the one location of the second path, during a major storm, to less than or equal to a predetermined relatively low acceptable threshold attribute value assigned to each of the initial location, the one location of the first path, and the one location of the second path.

97. A method of implementing the infrastructure strategy according to claim 93, wherein the redistribution effectively modifies the fluid flow through one of the flow distribution components such that the stress value or estimated stress value obtained at one location of the first path is less than a predetermined acceptable threshold attribute value assigned to one location of the first flow path, and / or the stress value or estimated stress value obtained at one location of the second path is less than a predetermined acceptable threshold attribute value assigned to one location of the second flow path, and / or the estimated stress value obtained at the initial location is less than a predetermined acceptable threshold attribute value assigned to the initial location.

98. A method of implementing the infrastructure strategy according to claim 93, wherein each of the initial location, the one location on the first path, the one location on the second path, and the subsequent location is a constraint location in the infrastructure when the measured and / or estimated values ​​of fluid condition attributes at the constraint location may cause the stress value or estimated stress value to reach or exceed a predetermined acceptable threshold attribute value assigned to the constraint location, at least in part due to excessive fluid flow from a plurality of intermediate flows into the constraint location during the climatic event.

99. A method for implementing an infrastructure strategy, wherein one or more fluid flow controllers acquire subsequent values ​​using a subsequent sensor located at or near a subsequent location, which measures fluid condition attributes at the subsequent location, the subsequent sensor being located downstream from the initial location, and acquiring subsequent values. The method for obtaining multiple intermediate values ​​using multiple intermediate sensors, wherein at least one of the multiple intermediate sensors is located at or near one location on a first path and measures the fluid condition attribute at the location to generate one or more intermediate values, and another of the multiple intermediate sensors is located at or near one location on a second path and measures the fluid condition attribute at the location to generate one or more additional intermediate values, and each of the first and second paths provides fluid communication between the first location and the subsequent location. Using a server operating with at least one of the intermediate sensors, obtain a server-estimated range for one or more intermediate values ​​based on a weather event forecast and one or more of the intermediate values; using the server operating with at least one more of the intermediate sensors, obtain an additional server-estimated range for one or more intermediate values ​​in one or more of the fluid flow controllers based on a weather event forecast and one or more of the additional intermediate values, wherein the server is designed to receive one or more of the intermediate values ​​and one or more of the additional intermediate values. The server is communicatively coupled to one or more of the fluid flow controllers to transmit one or more of the intermediate values, or the server estimated range of one or more of the intermediate values, and one or more of the additional intermediate values, or one or more of the additional server estimated intermediate values, to one or more of the fluid flow controllers, and the server transmits one or more of the intermediate values ​​if one or more of the intermediate values ​​are not within the server estimated range of the intermediate values, and transmits one or more of the additional intermediate values ​​if one or more of the additional intermediate values ​​are not within the additional server estimated range of the intermediate values, and obtains, In real time, using one or more of the fluid flow controllers, the stress value of the subsequent location and the stress value or estimated stress value of each of the locations in the first and second paths are determined based on one or more of the subsequent values, one or more of the intermediate values, or one or more of the server estimated ranges of the intermediate values, one or more of the additional intermediate values, or one or more of the additional server estimated ranges of the intermediate values, and based on the stress value or estimated stress value of each of the locations in the first and second paths, and the stress values ​​or estimated stress values ​​of each of the first and second paths are generated. Identifying which of the stress value or estimated stress value of the first path and the stress value or estimated stress value of the second path is the highest and reaches the highest stress path value, wherein the stress value or estimated stress value of the first path represents at least the sum of the stress value or estimated stress value of one location in the first path and the stress value of the subsequent location, respectively, and the stress value or estimated stress value of the second path represents at least the sum of the stress value or estimated stress value of one location in the second path and the stress value of the subsequent location, respectively. To effectively reduce the magnitude of the maximum stress path value, the fluid flow is redistributed between the first path and the second path in real time during the climatic event, using one or more flow distribution components, based on one or more flow redistribution strategies, wherein one or more of the flow distribution components are located at one or more fluid flow intersections, each of which is located downstream from the initial location, and as a result, the fluid flow leaving the initial location flows through the initial path into one or more of the flow distribution components, each of which intersects the first path and the second path, and one or more of the flow distribution components are communicably coupled to one or more of the fluid flow controllers. Determining one or more successful infrastructure management strategies based on a comparison using one or more keypoint indicators of the success of reducing the stress value or estimated stress value in each of the first and second paths, or in each of the locations of the first path and / or the second path, One or more of the fluid flow controllers store one or more of the successful infrastructure management strategies. Methods that include...

100. The redistribution includes reducing the fluid flow rate through the first and / or second path, and the method is During a subsequent climate event, one or more of the successful infrastructure management strategies are selected from one or more of the fluid flow controllers. To effectively reduce stress along the first path and / or the second path, thereby reducing the stress value or estimated stress value at each of the locations in the first path and / or the second path, by redistributing fluid flow between the first path and the second path during the subsequent climatic event using one or more of the successful infrastructure management strategies. A method for implementing the infrastructure strategy according to claim 99, further including the following:

101. A method for implementing the infrastructure strategy according to claim 99, wherein the fluid condition attribute value is at least one attribute selected from the group including fluid flow rate, fluid height, fluid volume, hydraulic capacity, fluid residence time, strategic capacity, and fluid quality.

102. A method of implementing the infrastructure strategy according to claim 99, wherein the determining and reallocation does not involve, or is not based on, determining or establishing a cost function for the flow within the infrastructure.

103. A method of implementing the infrastructure strategy according to claim 99, wherein the determination and reallocation described above do not include, or are not based on, a cost function for realizing one or more potential consequences of the infrastructure during the climatic event.

104. A method for implementing the infrastructure strategy according to claim 99, wherein the determination does not involve minimizing the difference between the cost function of realizing one or more potential outcomes of the infrastructure and the cost function of the flow inside the infrastructure.

105. A method for carrying out infrastructure management according to claim 99, wherein the redistribution does not include redistribution of the fluid flow at locations of fluid flow intersections between high-quality processing methods and low-quality processing methods.

106. A method of implementing the infrastructure strategy according to claim 99, wherein the reallocation does not involve reallocation to minimize the difference between the cost function of realizing one or more potential outcomes of the fluid flow infrastructure and the cost function of the flow inside the fluid flow infrastructure.

107. A method of implementing the infrastructure strategy according to claim 99, wherein the reallocation does not involve reallocation to minimize the difference between the cost function of realizing one or more potential outcomes of the fluid flow infrastructure and the cost function of the flow inside the fluid flow infrastructure.

108. A method for implementing the infrastructure strategy according to claim 99, wherein the redistribution includes reducing the combination of stress values ​​representing each of the one location on the first path and the one location on the second path, or the sum of the respective stress values ​​or estimated stress values, to a reduced combination of stress values, wherein in the reduced combination of stress values, the stress value or estimated stress value of the one location on the first path is reduced, the stress value or estimated stress value of the one location on the second path is increased, and it is within a predetermined acceptable threshold level assigned to the one location on the second path, or the stress value or estimated stress value of the one location on the second path is reduced, the stress value or estimated stress value of the one location on the first path is increased, and it is within the predetermined acceptable threshold level assigned to the one location on the first path.

109. A method for implementing an infrastructure strategy, Obtaining a server-estimated range of initial values ​​based on initial values ​​and weather event forecasts, using a server operating with one or more initial sensors, wherein at least one of the one or more initial sensors is located at or near the initial location and generates the initial values ​​by measuring fluid condition attributes at the location, the server is communicatively coupled to one or more fluid flow controllers and transmits the initial values ​​or the server-estimated range of initial values ​​to one or more fluid flow controllers, and the server transmits the initial values ​​if the initial values ​​are not within the server-estimated range of initial values, Obtaining a server-estimated range for a successor value based on a successor value and a forecast of a weather event, using the server operating with one or more successor sensors, wherein at least one of the one or more successor sensors is located at or near the successor location and generates the successor value by measuring fluid condition attributes at the location, the server transmits the successor value or the server-estimated range for the successor value, and the server transmits the successor value if the successor value is not within the server-estimated range for the successor value, The method involves obtaining one or more server-estimated intermediate ranges of values ​​based on a forecast of the weather event and one or more intermediate values, using the server operating with one or more intermediate sensors, wherein at least one of the one or more intermediate sensors is located at or near one location on a first path providing fluid communication between the initial location and the subsequent location, at least one of the intermediate sensors measures the fluid condition attribute at the one location on the first path to generate one or more of the intermediate values, the server transmits one or more of the intermediate values ​​or one or more of the server-estimated intermediate ranges of values ​​to one or more of the fluid flow controllers, and the server transmits the intermediate value if the intermediate value is not within one or more of the server-estimated intermediate ranges of values, Determining the stress value or estimated stress value of the initial location, the one location of the first path, and the subsequent location based on the initial value or the server estimated range of the initial value, one or more of the intermediate values ​​or one or more of the server estimated ranges of the intermediate values, and the subsequent value or one or more of the server estimated ranges of the subsequent value, wherein determining is a constraint location in the infrastructure when the measured or estimated values ​​of fluid condition attributes at or near the constraint location may cause the stress value or estimated stress value of the constraint location to reach or exceed a predetermined acceptable threshold attribute value assigned to the constraint location, at least in part due to the acceptance of fluid flow from a plurality of intermediate flows during the climatic event. The stress values ​​or estimated stress values ​​of the initial path and the first path are established by adding the stress values ​​or estimated stress values ​​of the constraint locations existing along each of the initial path and the first path to generate the initial path stress value or estimated initial path stress value and the first path stress value or estimated first path stress value. In order to reach at least one maximum stress path value, it is necessary to identify which of the initial path stress value or the estimated initial path stress value and the first path stress value or the estimated first path stress value has the highest magnitude, During the aforementioned climatic event, the fluid flow is redistributed in real time and based on one of the flow redistribution strategies in the initial path and / or the first path in a manner that effectively reduces the magnitude of at least one of the highest stress path values. Methods that include...

110. Formulating a plurality of infrastructure management strategies to reduce the initial path stress value or the estimated initial path stress value, and / or the first path stress value or the estimated first path stress value, based on the stress value or estimated stress value of each of the initial location, the one location of the first path, and the subsequent location, Comparing each of the infrastructure management strategies to the results of the climate event using one or more keypoint indicators of the success of reducing the initial path stress value or the estimated initial path stress value and / or the first path stress value or the estimated first path stress value, Based on a comparison using one or more of the keypoint indicators of the success of reducing the estimated initial path stress value and / or the estimated first path stress value, one or more successful infrastructure management strategies for effectively reducing the highest stress value are determined. One or more of the fluid flow controllers store one or more of the successful infrastructure management strategies, During a subsequent climate event, one or more of the successful infrastructure management strategies are selected from one or more of the fluid flow controllers. To effectively reduce stress along the initial path and / or the first path, thereby reducing the initial path stress value or the estimated initial path stress value and / or the first path stress value or the estimated first path stress value, by redistributing fluid flow between the initial path and the first path during the subsequent climatic event using one or more of the successful infrastructure management strategies. A method for implementing the infrastructure strategy described in claim 109, including the following:

111. In the establishment described above, the initial path stress value or estimated initial path stress value includes at least the stress value or estimated stress value at the initial location, and the first path stress value or estimated first path stress value represents at least the sum of the stress value or estimated stress value at one location of the first path and the stress value or estimated stress value at the subsequent location. A method of implementing the infrastructure strategy according to claim 109, wherein the redistribution effectively reduces the stress value or estimated stress value at the initial location and / or the stress value or estimated stress value at one location of the first path.

112. A method for implementing an infrastructure strategy, comprising using a server operating with one or more successor sensors to obtain one or more server-estimated ranges of successor values ​​based on successor values ​​and weather event forecasts, wherein at least one of the one or more successor sensors is located at or near a successor location and generates the successor values ​​by measuring fluid condition attributes at the location, the server transmits the successor values ​​or the server-estimated range, and the server transmits the successor values ​​if the successor values ​​are not within the server-estimated range of successor values, and obtaining server-estimated ranges of successor values. Using the server operating with a plurality of intermediate sensors, to obtain a server-estimated range of intermediate values ​​and an additional server-estimated range of intermediate values ​​based on the forecast of the weather event and a plurality of intermediate values, wherein at least one of the plurality of intermediate sensors is located at or near one location on a first path and measures the fluid condition attributes at the location to generate one or more intermediate values, and at least another of the plurality of intermediate sensors is located at or near one location on a second path and measures the fluid condition attributes at the location to generate one or more of the additional intermediate values, and the first path and the second path are between the initial location and the subsequent location The server provides fluid communication, and the server estimates the intermediate value range based on the intermediate value, and the additional server estimates the intermediate value range based on the additional intermediate value. The server transmits one or more of the intermediate value or the server estimates range of the intermediate value and the additional intermediate value or the additional server estimates range of the intermediate value to one or more of the fluid flow controllers. If one or more of the intermediate values ​​are not within the server estimates range of the intermediate value, the server transmits one or more of the intermediate values. If one or more of the additional intermediate values ​​are not within the additional server estimates range of the intermediate value, the server transmits one or more of the additional intermediate values. The server obtains the server estimates range of the intermediate value and the additional server estimates range of the intermediate value. In one or more of the fluid flow controllers, the stress value or estimated stress value of the subsequent location, the one location on the first path, and the one location on the second path are determined based on the subsequent value or the server estimated range of the subsequent value, one or more of the intermediate values ​​or the server estimated range of the intermediate value, and one or more of the additional intermediate values ​​or the additional server estimated range of the intermediate value. Formulating a plurality of infrastructure management strategies to reduce stress along the first and / or second paths based on the stress values ​​or estimated stress values ​​of each of the following locations, the one location of the first path, and the one location of the second path, Comparing each of the infrastructure management strategies to the results of the climate event using one or more keypoint indicators of the success of reducing the stress value or estimated stress value along the first and / or second paths, The determination is made based on the comparison using one or more key point indicators of the success of reducing the stress value or estimated stress value in the first path and / or the second path. One or more of the fluid flow controllers store one or more of the successful infrastructure management strategies. Methods that include...

113. In the above formulation, the multiple infrastructure management strategies reduce the stress value or estimated stress value at one location of the first path, and / or the stress value or estimated stress value at one location of the second path. In the comparison, each of the infrastructure management strategies is compared to the results of the climatic event using one or more keypoint indicators of the success of reducing the stress value or estimated stress value at one location of the first path and / or the stress value or estimated stress value at one location of the second path. In the aforementioned decision, one or more of the aforementioned successful infrastructure management strategies is based on the comparison using one or more of the aforementioned keypoint indicators of the success of reducing the stress value or estimated stress value at one location of the first route and / or one location of the second route. A method of implementing the infrastructure strategy according to claim 112, wherein the redistribution includes reducing the fluid flow rate through the first and / or second route.

114. The above formulation includes calculating a first path stress value or an estimated first path stress value and a second path stress value or an estimated second path stress value, wherein the first path stress value or the estimated first path stress value represents the sum of the stress values ​​or estimated stress values ​​for each of the one location and the subsequent locations on the first path, and the second path stress value or the estimated second path stress value represents the sum of the stress values ​​or estimated stress values ​​for each of the one location and the subsequent locations on the second path. The aforementioned method, During a subsequent climate event, one or more of the successful infrastructure management strategies are selected from one or more of the fluid flow controllers. To effectively reduce stress along the first and / or second paths, one or more of the above successful infrastructure management strategies are used to redistribute the fluid flow between the first and second paths during the subsequent climatic event using one or more flow distribution components. A method for implementing the infrastructure strategy according to claim 112, further comprising: