Foundation, wind power generation equipment equipped with said foundation, method for manufacturing said foundation, and use of said foundation

The integration of flow-blocking sections in wind power generation foundations addresses the challenge of creating high inclines with fluid concrete, enhancing construction efficiency and reducing concrete volume.

JP2026539240APending Publication Date: 2026-11-20WOBBEN PROPERTIES GMBH
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
JP2026529025
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Priority Date
2023-11-14
Filing Date
2024-11-14
Publication Date
2026-11-20

AI Technical Summary

Technical Problem

Conventional techniques face difficulties in creating high inclines in wind power generation facility foundations due to the radial flow of concrete, requiring high viscosity concrete and increased effort in processing and pumping, which complicates the construction process.

Method used

Incorporating a flow blockage inside the foundation to obstruct the radial flow of concrete, allowing for the creation of inclines exceeding 12° using more fluid concrete, facilitated by reinforcing members with integrated flow-blocking sections such as rings and notches.

Benefits of technology

Enables efficient construction of foundations with higher slopes using less manual labor and equipment, allowing for faster fabrication with fluid concrete, reducing concrete volume and effort.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2026539240000001_ABST
    Figure 2026539240000001_ABST
Patent Text Reader

Abstract

The present invention relates to a foundation (1) for a wind power generation facility (100), which is formed from concrete (F) reinforced by a reinforcing material (10), and has a foundation portion (3) having an upward slope (α) that slopes downward toward the outside. It is proposed that a flow-blocking portion (9) is arranged inside the foundation portion (3), and that the flow-blocking portion is configured to obstruct the flow of concrete (F) in the radial direction.
Need to check novelty before this filing date? Find Prior Art

Description

TECHNICAL FIELD

[0001] The present invention relates to a foundation for a wind power generation facility, which is formed of concrete reinforced with reinforcing members, in particular ready-mixed concrete, and has a foundation portion, preferably a foundation plate, with an upper slope that descends toward the outside. BACKGROUND ART

[0002] Foundations of the type described above are generally known. These foundations are used to immovably fix a wind power generation facility or its tower to the soil.

[0003] Basically, it is possible to configure the foundation from a plurality of prefabricated molded parts that are manufactured at a location remote from the construction site and then transported to the construction site. However, at many installation sites, it has been found to be preferable to manufacture the foundation portion from ready-mixed concrete that is mixed and transported at the installation site or a nearby concrete plant.

[0004] On the one hand, the trend toward more efficient and larger wind power generation facilities, as well as the desire to keep the amount of concrete left in the soil as small as possible, has created a need to more efficiently fix wind power generation facilities to the soil, which places corresponding demands on the foundation.

[0005] The larger the wind power generation facility, and the larger the outer dimension of the foundation, for example the outer diameter in the case of a rotationally symmetric component, the greater the volume of concrete that is normally required. Efforts are being made to ensure the best possible fixing of the wind power generation facility in the soil, while keeping the concrete volume as small as possible.

[0006] Conventional techniques have been known to improve the relative effectiveness of a foundation relative to the required amount of concrete used, i.e., to relatively reduce the amount of concrete used, by increasing the inclination of the foundation portion, that is, the inclination of the surface of the foundation portion that extends downward outward from the base area. According to the present invention, an inclination of 12° or more is referred to as a high inclination or an increased inclination.

[0007] The processing of concrete in foundation sections with such heightened slopes becomes extremely difficult. During the concrete finishing of the foundation, the concrete, due to its fluidity, tends to flow radially outward towards the outer formwork, and therefore, creating the particularly desired heightened slope requires considerable effort. To ensure a high slope, conventional techniques necessitate mixing concrete with extremely high viscosity, i.e., a slight spreading degree. The need for high concrete rigidity increases the effort required in concrete processing, particularly in spreading and densification, and also in pumping the concrete into the formwork, making the overall construction of the foundation difficult. [Overview of the Initiative] [Problems that the invention aims to solve]

[0008] Therefore, the fundamental problem of the present invention is to provide a foundation that overcomes the aforementioned drawbacks as much as possible. In particular, the fundamental problem of the present invention is to improve upon the above-described type of foundation so that an economically reasonable increase in slope can also be achieved without compromising the quality of the foundation portion. [Means for solving the problem]

[0009] The aforementioned problem is solved by forming a foundation having the features of claim 1, according to the present invention. In particular, the foundation has a flow blockage, which is located inside the region of the foundation where the upper slope is located, and which is configured to obstruct the flow of concrete in the radial direction. The present invention is based on the recognition that the natural slope of concrete that spreads radially due to gravity inside the outer formwork can be intentionally made difficult by the flow blockage inside the foundation. The more strongly the radial flow of concrete is obstructed, especially outward, the more concrete damming occurs, particularly in the radially inner region of the formwork, before each flow blockage, so that an upper slope of concrete in the descending region of the foundation is already naturally created, at least partially.

[0010] In a preferred embodiment, the foundation portion is a foundation plate and / or a reinforcing rib of a ribbed foundation and / or a section of a cruciate foundation.

[0011] In this case as well, the necessary task of forming the desired slope on the outer surface of the foundation can be achieved with significantly more time efficiency and less manual labor compared to conventional techniques.

[0012] Compared to conventional techniques, the flow-blocking section allows for the creation of inclines at angles significantly exceeding 12°, and this can be achieved with concrete that is significantly more fluid than conventional techniques. Preferably, for this purpose, concrete with a spread degree F3-F4 and / or slump flow S3-S4 in accordance with the DIN EN 206-1 standard is used.

[0013] The base portion preferably has a base region, to which a protruding region is extended radially outward and has an upward slope that descends outward, and the flow blocking portion is located inside this protruding region.

[0014] The present invention is advantageously further improved by the inclination being in the range of 12° or more, more preferably in the range of 12° to 45°, even more preferably in the range of 12° to 18°, and particularly preferably in the range of 12° to 16°.

[0015] Alternatively or additionally, preferably according to the present invention, the reinforcing member has an upper slope extending at an angle substantially equal to the slope of the foundation portion. A deviation of + / - 2° is considered substantially equal. By forming the upper slope of the reinforcing member with a slope equal to the desired slope, the fabrication of the final contour of the foundation portion is facilitated.

[0016] In another preferred embodiment, the flow blocker has at least one ring arranged annularly inside the reinforcing member. This ring may be formed from one or more parts and may have a plurality of blocking members arranged along a pitch circle, in which case these blocking members may be spaced apart from each other, in contact with each other, and / or overlapping with each other. In other words, the ring does not need to be mathematically exact and may have a circular shape, such as a polygon. If the ring is formed from multiple parts, in other words, the individual members of the ring are preferably located on substantially the same pitch circle so that obstruction of flow motion by the flow blocker is achieved in all circumferential directions of the base portion.

[0017] In another preferred embodiment, the base portion has a central axis, and the flow-blocking portion is oriented concentrically with respect to the central axis. The central axis of the base portion preferably corresponds to the central axis of the tower of the wind turbine to be placed on the base portion.

[0018] In another preferred embodiment, the flow block is coupled to a reinforcing member, preferably having a vertical shear reinforcement, and the flow block is positioned within the region of the vertical shear reinforcement. Fixing the flow block to the reinforcing member facilitates the pouring of concrete into the region of the reinforcing member inside the formwork and prevents undesirable relative movement of the flow block with respect to the reinforcing member. The vertical shear reinforcement is suitable for coupling the flow block and is already provided in the structural construction of the reinforcing member anyway; therefore, from this viewpoint, there is no need to attach additional structural elements for fixing the flow block to the reinforcing member. Alternatively, the incorporation of structural vertical reinforcement as an auxiliary means for coupling the flow block is also possible and preferred.

[0019] In another preferred embodiment, the reinforcing member has an upper main reinforcing member, and the flow-blocking portion extends downward below the upper main reinforcing member, preferably extending directly from the upper main reinforcing member.

[0020] In another preferred embodiment, the reinforcing member has a lower main reinforcing member, and the flow-blocking portion preferably extends to the lower main reinforcing member without being fixed to it, or extends above the lower main reinforcing member, where the flow-blocking portion has a predetermined distance from the lower main reinforcing member, preferably 5 cm or more, and particularly preferably 20 cm to 40 cm.

[0021] In a preferred embodiment, the foundation portion has an outer wall of a predetermined height in the sloping region, where this height h of the outer wall is at least a predetermined distance l from the lower main reinforcing member.

[0022] In another preferred embodiment, the flow barrier is provided with a plurality of radial notches, for example in the form of holes and / or gaps, through which concrete can permeate. The notches help to improve the bonding of the flow barrier to the concrete. The notches prevent the formation of vertical joints that might occur along the flow barrier during hardening if the notches are not provided.

[0023] In another preferred embodiment, the flow blocking part is formed from one or more grid bodies or perforated bodies, preferably made of plastic, or from thin metal sheets, more preferably from expanded metal, particularly preferably from ribbed expanded metal.

[0024] In another preferred embodiment, the ring is a first ring, and the base portion further comprises one or more further rings, preferably one, a plurality, or all of the further rings are formed like at least one ring of the foundation according to any one of the preferred embodiments described above.

[0025] In another preferred embodiment, the base region has a base outer wall, and the (inner) ring of the flow blocking part is arranged at a radial interval of 0 cm to 100 cm around the base outer wall. Alternatively or additionally, the flow blocking part preferably has three or more rings, which three or more rings are preferably arranged at equal intervals from each other, or are arranged at intervals that increase radially outward, and / or The relatively inner ring has a height in the direction of the central axis in the range of 40 cm to 80 cm, preferably 55 cm to 65 cm, and each of the further rings has a height in the direction of the central axis in the range of 15 cm to 40 cm, preferably 25 cm to 35 cm, and / or The spacing between the rings is selected such that the upper edge of each ring is arranged at the height of the lower edge of the radially adjacent inner ring.

[0026] The present invention has been described above in the first aspect with reference to the foundation. In a second aspect, the present invention further relates to a method for manufacturing a foundation for a wind power installation, in particular a foundation according to any one of the preferred embodiments described above, the foundation having a reinforcing material and having a foundation portion with an upper slope that descends outward.

[0027] This method, in order to solve the problem mentioned at the beginning, involves the following steps: - A step of fabricating and / or preparing reinforcing materials at a construction site for a wind power generation facility, wherein the reinforcing materials are preferably formed as reinforcing cages and have flow-blocking sections. - The process of fabricating and / or preparing formwork around the reinforcing material, - A process of finishing the foundation by pouring concrete into formwork, thereby embedding reinforcing materials within the concrete, and the flow-blocking section preventing the radial spread of the concrete. Includes.

[0028] The present invention utilizes the same advantages and considerations as the foundation according to the first embodiment with respect to this method. Since preferred embodiments of the foundation are also preferred embodiments of this method, and vice versa, please refer to the above description in advance to avoid repetition.

[0029] In the method of the present invention, the base portion is preferably formed by any one of the preferred embodiments described above of the first embodiment.

[0030] In the method according to the present invention, concrete is preferably poured in layers, each layer being no more than 40 cm high, preferably no more than 30 cm high, and most preferably no more than 25 cm high. This ensures good spreading and densification of the concrete and continuous hardening, resulting in a uniform overall structure of the foundation.

[0031] In another preferred embodiment, the concrete used in the method according to the present invention has a spreadability class F3-F4 and / or slump flow class S3-S4. According to the present invention, spreadability and slump flow are understood to be viscosity classes in accordance with the DIN EN 206-1 standard. This allows for a reduction in the use of personnel and equipment during concrete finishing, even with high inclines.

[0032] In a further embodiment, the present invention further relates to a wind turbine having a tower mounted on a foundation. The present invention solves the underlying problems relating to this wind turbine by having the foundation formed by any one of the preferred embodiments described above in the first embodiment.

[0033] The wind power generation equipment utilizes the same considerations as the foundation according to the first embodiment. A preferred embodiment of the foundation according to the first embodiment is also a preferred embodiment of the wind power generation equipment, and vice versa; therefore, to avoid repetition, please refer to the above description.

[0034] In yet another aspect, the present invention relates to the use of at least one ring arranged annularly within a reinforcing member for manufacturing a foundation for a wind turbine, particularly a foundation according to any one of the preferred embodiments described above in the first aspect, and / or a method according to any one of the preferred embodiments described above in the second aspect, in which case the foundation is formed from concrete reinforced by the reinforcing member and has a foundation plate having an upper slope that slopes downward toward the outside.

[0035] This use allows at least one ring to flow radially for concrete. By forming a blocking section, the problem mentioned at the beginning is solved.

[0036] This use utilizes the same advantages and considerations as the basis and methods of the embodiments described above. Since preferred embodiments of the first two embodiments are simultaneously preferred embodiments of the use of the third embodiment, and vice versa, please refer to the above description to avoid repetition in this scope.

[0037] The present invention will be described in detail below with reference to the attached drawings, with regard to preferred embodiments. [Brief explanation of the drawing]

[0038] [Figure 1] This is a diagram showing wind power generation equipment. [Figure 2] Figure 1 is a schematic cross-sectional view showing the foundation for a wind power generation facility. [Figure 3] Figure 2 is a plan view of the foundation. [Figure 4] Figures 2 and 3 are schematic cross-sectional views showing the details of the foundation. [Figure 5] This is a flowchart illustrating a schematic method according to a preferred embodiment. [Modes for carrying out the invention]

[0039] Figure 1 shows a schematic three-dimensional diagram of a wind turbine 100. The wind turbine 100 has a tower 102 and a nacelle 104 on the tower 102. The tower 102 may consist of tower segments stacked on top of each other. The nacelle 104 houses an aerodynamic rotor 106 with three rotor blades 108 and one spinner 110. The aerodynamic rotor 106 is rotated by wind force during the operation of the wind turbine 100, which in turn rotates the electrodynamic rotor or rotor of a generator that is directly or indirectly connected to the aerodynamic rotor 106. The generator is located inside the nacelle 104 and generates electrical energy.

[0040] Tower 102 is fixed in the soil 200 by a foundation, which will be explained in detail in Figures 2 to 4 below.

[0041] In this example, the foundation 1 has a foundation portion 3, which is an exemplary foundation plate. This foundation portion has a base region 5 in the region of its central axis L, and a protruding region 7 extends radially outward from this base region. In the foundation plate, the protruding region 7 is called the overhang region. In the protruding region 7, the foundation portion 3 has an upward slope α that slopes downward toward the outside, and in a preferred embodiment, this slope is in the range of 12° or more. In the foundation plate, this slope is also called the overhang slope.

[0042] Figure 3, which shows the foundation 1 from above, shows the flow blocking section 9, which in this embodiment consists of multiple rings 9a, 9b, and 9c. Basically, the flow blocking section 9 can already be realized with a single ring, for example, ring 9a.

[0043] One, multiple, or all of the rings 9a, 9b, and 9c are penetrated by multiple through-openings 11. The flow-blocking section 9 is arranged concentrically with respect to the central axis L.

[0044] As shown here, when multiple rings 9a, 9b, and 9c are used, adjacent rings 9a, 9b and 9b, 9c are spaced apart radially due to their different diameters. In this case, the radial spacing r1 between adjacent rings 9a, 9b and r2 between rings 9b, 9c increases outward.

[0045] Figure 4 shows the area 7 of the foundation 1 in detail. Inside the formwork 300, the reinforcing members 10 of the foundation 1 are arranged, and these reinforcing members consist of an upper main reinforcing member 13 and a lower main reinforcing member 15. Between the upper main reinforcing member 13 and the lower main reinforcing member 15, a vertical shear reinforcement member 14 is formed, consisting of a plurality of vertical structural elements.

[0046] In regions 12a, 12b, and 12c, one of the rings 9a, 9b, and 9c is connected to the vertical shear reinforcement 14, and is preferably fixed to this shear reinforcement. The reinforcement 10 has an inclination β on its upper surface, and the angle of this inclination with respect to the horizontal line preferably corresponds to the angle of inclination α, that is, for example, 12° or more in the illustrated embodiment.

[0047] The rings 9a, 9b, and 9c of the flow-blocking section 9 have a dual function inside the reinforcing material 10 of the foundation 1. On the other hand, during concrete finishing, they function to prevent the radial spreading of the concrete F, as schematically shown in Figure 4.

[0048] When concrete is filled into the formwork 300 from above in the inner region of the reinforcing member 10 on the left side of Figure 4, for example, the concrete will be in the lower region of the reinforcing member 10 indicated by arrow P. 1a ,P 1b ,P 1c It can flow along the lower main reinforcing member 15, and across the entire radial width of the foundation 1.

[0049] However, since the rings 9a, 9b, and 9c do not extend completely to the lower main reinforcing member 15, but maintain a distance l from the lower main reinforcing member 15, the flow blocking function of the rings 9a, 9b, and 9c only begins when the filling height of the concrete F inside the formwork 300 exceeds the value of the distance l. l is preferably in the range of 5 cm to 45 cm, for example, in the range of about 30 cm. The foundation portion 3 has a height h on its outer circumferential surface that corresponds to at least the distance l.

[0050] In alternative embodiments, the ring may extend directly beyond the main reinforcing member and below it; however, preferably, the ring remains unconnected to the lower main reinforcing member.

[0051] Once this filling level is reached, the filled concrete F can no longer freely spread radially within the formwork 300, and its radial spreading is at least restricted, if not prevented, as indicated by arrow P2. Even when relatively fluid concrete conforming to the DIN EN 206-1 standard, for example having a spreading degree class of F3 or F4 and / or a slump flow class of S3 or S4, is used during concrete finishing, the notches provided in the rings 9a, 9b, and 9c make it difficult for the concrete to pass through to such an extent that the creation of high inclines α of 12° or more, especially 15° or more, is significantly easier than in the prior art.

[0052] The use of more fluid concrete also contributes to better bonding of the flow-blocking section 9 inside the foundation 1, and the notch 11 improves the fixation of the flow-blocking section in the concrete compared to a closed ring of holes without a notch. The notch 11 can also serve as an air vent during filling.

[0053] The construction of the foundation according to the present invention is carried out in the following manner, as illustrated in Figure 5 in a preferred embodiment. In the first step 401, the reinforcing members 10 are manufactured and / or prepared, i.e., prepared at the construction site for the wind power generation facility 100, in which case the reinforcing members 10 are preferably formed as a reinforcing cage as shown in Figure 4. According to the present invention, the reinforcing members 10 have flow-blocking sections 9.

[0054] In the next step 403, the formwork 300 is prepared or fabricated around the reinforcing member 10. The order of steps 401 and 403 can also be reversed.

[0055] As soon as the formwork and reinforcing materials are prepared, the concrete finishing of the foundation 3 is performed in the next step 405 by pouring concrete F into the formwork 300. In this case, the reinforcing materials 10 are at least partially, preferably completely, embedded in the concrete F, and the flow-blocking sections 9 prevent the radial spreading of the concrete F. It may be preferable to start the concrete finishing process radially inward in the base area of ​​the foundation 1 and then work outward. However, the flow-blocking sections basically allow work in other directions as well.

[0056] Therefore, preferably, in the method of the present invention, the base 1 is formed by any one of the preferred embodiments described above.

[0057] In a preferred modification of the present invention, the concrete finishing process is carried out in multiple stages, in which case the concrete F is partially finished for each concrete finishing passage, to a height of 40 cm or less, preferably to a height of 30 cm or less, and particularly preferably to a height of 25 cm or less.

[0058] The concrete F used preferably has a spreading class F3 or F4 and / or slump flow class S3 or S4, respectively, in accordance with the DIN EN 206-1 standard.

[0059] In short, by using one or more rings 9a, 9b, and 9c inside the reinforcing material 10 as described above for the fabrication of the foundation 1 of the wind power generation equipment 100, it is possible to use concrete with significantly higher fluidity compared to conventional techniques, thereby providing a higher slope with relatively little effort, and thus offering the great advantage of faster fabrication. [Explanation of Symbols]

[0060] 1 Basics 3. Foundation, especially the foundation plate 5 Area for base 7. Protruding regions, especially overhanging regions 9 Flow blocking section 9a, 9b, 9c rings 10 Reinforcement material 11 Through-opening 12a,12b,12c area 13. Main reinforcing member, upper side 14 Shear reinforcement, vertical 15. Main reinforcing material, lower side 100 Wind power generation facilities 102 Tower 104 Nacelle 106 Rotor 108 rotor blades 110 Spina 200 soil 300 formwork 400 ways 401 Method Step 403 Method Step 405 Method Step L center axis F Concrete l spacing P 1a ,P 1b,P 1c arrow P2 arrow r1, r2 radial spacing α slope, protruding areas, especially overhanging areas β Upper inclination, reinforcing material

Claims

1. In a foundation (1) of a wind power generation facility (100), which is formed from concrete (F) reinforced with reinforcing material (10) and has a foundation portion (3) having an upward slope (α) that slopes downward toward the outside, A foundation (1) is provided, wherein a flow-blocking section (9) is positioned inside the foundation (3), and the flow-blocking section is configured to obstruct the flow of the concrete (F) in the radial direction.

2. The foundation (1) according to claim 1, wherein the foundation portion (3) has a base area (5), the base area is extended to a protruding area (7) radially outward and having an upward slope (α) that slopes downward toward the outward direction, and the flow blocking portion (9) is located inside the protruding area (7).

3. The inclination (α) is in the range of 12° or more, more preferably in the range of 12° to 45°, even more preferably in the range of 12° to 18°, particularly preferably in the range of 12° to 16°, and / or The reinforcing member (10) has an upper inclination (β) that is substantially equal to the inclination (α) of the foundation portion (3). The basis (1) according to claim 1 or 2.

4. The foundation (1) according to any one of claims 1 to 3, wherein the flow blocking portion (9) has at least one ring (9a, 9b, 9c) arranged in an annular manner inside the reinforcing material (10).

5. The foundation (1) according to any one of claims 1 to 4, wherein the foundation portion (3) has a central axis (L), and the flow blocking portion (9) is oriented concentrically with respect to the central axis (L).

6. The foundation (1) according to any one of claims 1 to 5, wherein the flow-blocking portion (9) is coupled to the reinforcing member (10), preferably the reinforcing member (10) has a vertical shear reinforcing member (14), and the flow-blocking portion (9) is positioned in the region of the vertical shear reinforcing member (14).

7. The foundation (1) according to any one of claims 1 to 6, wherein the reinforcing member (10) has an upper main reinforcing member (13), and the flow blocking portion (9) extends downward below the upper main reinforcing member (13), preferably extending directly from the upper main reinforcing member (13).

8. The foundation (1) according to any one of claims 1 to 7, wherein the reinforcing member (10) has a lower main reinforcing member (15), and the flow blocking portion (9) extends to the lower main reinforcing member without being fixed to the lower main reinforcing member, or extends above the lower main reinforcing member (15), in which case the flow blocking portion (9) has a predetermined distance (l) from the lower main reinforcing member (15), preferably 5 cm or more, and particularly preferably 20 cm to 40 cm.

9. The foundation according to claim 8, wherein the foundation portion has an outer wall of a predetermined height (h) in the inclined region, and the height (h) of the outer wall is greater than or equal to the predetermined distance (l) from the lower main reinforcing member (15).

10. The flow-blocking portion (9) is provided with a plurality of radial notches, such as holes and / or gaps, through which concrete can pass, and preferably the flow-blocking portion (9) is formed from one or more grids or perforated bodies, preferably from plastic, or from a thin metal sheet, more preferably from expanded metal, and particularly preferably from ribbed expanded metal, according to any one of claims 1 to 9.

11. The base (1) according to any one of claims 4 to 10, wherein the ring (9a, 9b, 9c) is a first ring (9a), and the base portion (3) further has one or more other rings (9b, 9c), preferably one, more, or all of the other rings (9b, 9c) are formed in the same way as the at least one ring (9a, 9b, 9c) of the base (1) according to any one of claims 1 to 10.

12. The base region has a base outer wall, and one ring (9a) of the flow blocking portion (9) is arranged around the base outer wall at radial intervals of 0 cm to 100 cm, and / or The flow blocking section has three or more rings (9a, 9b, 9c), and these three or more rings are spaced equally apart (r 1 ,r 2 They are arranged with a gap between them, or the gaps (r) increase towards the radially outward direction. 1 ,r 2 ) are arranged with each other and / or The relatively inner ring (9a) has a height in the range of 40 cm to 80 cm, preferably 55 cm to 65 cm, in the direction of the central axis (L), and each of the other rings has a height in the range of 15 to 40 cm, preferably 25 to 35 cm, in the direction of the central axis (L), and / or The spacing between the rings is selected such that the upper edges of each ring are positioned at the same height as the lower edge of the adjacent ring, radially inward. The basis (1) according to claim 11.

13. In a wind power generation facility (100) having a tower (102) attached to a foundation (1), The aforementioned foundation is formed according to any one of claims 1 to 12, a wind power generation facility (100).

14. A method (400) for manufacturing a foundation (1) for a wind power generation facility (100), particularly a foundation (1) according to any one of claims 1 to 12, the foundation (1) having a reinforcing member (10) and a foundation portion (3) having an upper slope (α) that slopes downward toward the outside, The following steps, namely, - A step (401) of manufacturing and / or preparing a reinforcing member (10) at a construction site for a wind power generation facility (100), wherein the reinforcing member (10) is preferably formed as a reinforcing cage and has a flow-blocking section (9), - A step (403) of manufacturing and / or preparing a formwork (300) around the reinforcing material (10), - A step (405) to finish the foundation portion (3) with concrete by pouring concrete (F) into the formwork (300), wherein the reinforcing material (10) is embedded in the concrete (F), and the flow blocking portion (9) prevents the radial spreading of the concrete (F), Method (400), including the method (400).

15. The method according to claim 14, wherein the concrete (F) is finished in layers, each to a height of 40 cm or less, preferably 30 cm or less, and more preferably 25 cm or less.

16. The method according to claim 14 or 15, wherein the concrete (F) has a spreading class F3 or F4 and / or a slump flow class S3 or S4.

17. In particular, in the use of at least one ring provided annularly within a reinforcing member (10) in the method for manufacturing a foundation for a wind power generation facility (100) as described in any one of claims 1 to 12 and / or the method as described in any one of claims 14 to 16, The foundation (1) is formed from concrete (F) reinforced by the reinforcing material (10), and has a foundation portion (3) having an upper slope (α) that slopes downward toward the outside. The at least one ring is used to form a flow-blocking section (9) for the concrete (F) in the radial direction.