Line-off inspection system and method for wireless communication data collection equipment
The line-off inspection system for wireless communication data collection devices addresses inefficiencies in network construction and flexibility by using a host unit and wireless relay box to control power-on sequences and network establishment, ensuring efficient and safe testing of data collection devices.
Patent Information
- Application Number
- JP2026528943
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Priority Date
- 2023-11-22
- Filing Date
- 2023-12-27
- Publication Date
- 2026-11-24
AI Technical Summary
Conventional wireless communication data collection devices face issues with low network construction efficiency, poor versatility, and flexibility, leading to reduced line-off inspection efficiency and safety concerns due to the use of wired connections and slow wireless network construction processes.
A line-off inspection system and method that includes a host unit, wireless communication relay box, and data collection devices, utilizing a predetermined wireless network construction strategy to control the power-on sequence and network establishment of data collection devices, incorporating a CAN communication conversion unit, main chip control unit, power switch matrix, wireless communication transceiver, and system power management unit to ensure efficient and reliable network construction and testing.
The system improves network construction efficiency, ensures versatility and flexibility, avoids safety issues, and enhances the line-off inspection efficiency of production lines by ensuring reliable network establishment and testing of wireless communication data collection devices.
Smart Images

Figure 2026539358000001_ABST
Abstract
Description
TECHNICAL FIELD
[0001] The present application relates to the technical field of wireless communication battery management, and in particular, to a line-off inspection system and method for a wireless communication collection device.
[0002] This application claims priority to the Chinese Patent Application filed with the National Intellectual Property Administration of China on November 22, 2023, with application number 202311574613.1 and titled "Line-off inspection system and method for wireless communication collection device", the entire content of which is incorporated herein by reference. BACKGROUND ART
[0003] The power battery communication collection device is a device that collects operation data of the battery and the main board and connects it with the battery management system, providing real-time and reliable data support for the effective management of the battery management system, and is also an important communication device for ensuring the normal operation of the power battery, which can only be put into use after completing a reliable line-off inspection.
[0004] The line-off inspection for the traditional power battery communication collection device mainly adopts a wired test method. That is, the power battery is connected through a wire harness for inspection. However, when the power battery is placed on the flow line conveying equipment for circulation, the existence of the wire harness makes the circulation difficult, and the connected wire harness is prone to falling off or breaking, which greatly impairs the versatility and flexibility of the line-off test line, and further causes safety problems. Although improvements have been made to the wired test technology based on the wireless communication method, the current inspection method based on wireless communication has a slow network construction process between the wireless communication collection device and the corresponding monitoring device, resulting in low efficiency, which reduces the inspection efficiency of the wireless communication collection device, seriously affects the line-off inspection efficiency of the production line, and still cannot meet the application requirements of the actual line-off inspection. SUMMARY OF THE INVENTION [Problems that the invention aims to solve]
[0005] The purpose of this invention is to provide a line-off inspection system for wireless communication data collection devices, overcoming the application drawbacks of conventional wireless communication data collection devices, such as low network construction efficiency and poor versatility and flexibility of testing. By effectively improving the network construction efficiency of wireless communication data collection devices and ensuring the versatility and flexibility of line-off testing, the invention aims to avoid the occurrence of safety problems, improve the line-off inspection efficiency of production lines, and truly meet the actual application requirements of line-off inspection. [Means for solving the problem]
[0006] To achieve the above objectives, it is necessary to provide a line-off inspection system and method for wireless communication data collection equipment to address the aforementioned technical challenges.
[0007] In a first embodiment, the embodiment of the present application provides a line-off inspection system for wireless communication data collection devices, the system comprising a host unit, a wireless communication relay box, and a plurality of wireless communication data collection devices under test.
[0008] The aforementioned higher-level unit is configured to transmit power supply commands and test commands to the wireless communication relay box based on a predetermined wireless network construction strategy and predetermined test logic.
[0009] The wireless communication relay box is configured to control the power-on sequence of the wireless communication collecting devices under test based on the power supply command for the collecting devices, and after establishing a network with all the wireless communication collecting devices under test, to control the wireless communication collecting devices under test to complete the production line-off test of all the wireless communication collecting devices under test based on the test command.
[0010] The wireless communication data collection device under test is configured to broadcast a wireless network construction request after power-up is complete to establish a network with the wireless communication relay box, and after the network construction is complete, to execute a production line-off test based on the test command and predetermined test logic received by the wireless communication relay box.
[0011] Furthermore, the predetermined test logic includes voltage acquisition accuracy test logic, temperature acquisition accuracy test logic, equalization function test logic, and individual acquisition channel leakage current test logic.
[0012] Furthermore, the wireless communication relay box includes a CAN communication conversion unit, a main chip control unit, a power switch matrix unit, a wireless communication transceiver unit, and a system power management unit.
[0013] The CAN communication conversion unit is configured to facilitate communication between the host device and the main chip control unit, and to receive power supply commands and test commands for the data acquisition device transmitted from the host device.
[0014] The main chip control unit is configured to identify a wireless communication data collection device currently awaiting network construction based on the data collection device power supply command, generate a corresponding control command and transmit it to the power switch matrix unit, and further to complete wireless network construction with the wireless communication data collection device currently awaiting network construction based on a predetermined network construction flow and a wireless network construction request broadcast by the wireless communication data collection device currently awaiting network construction.
[0015] The power switch matrix unit is configured to perform a power supply operation (operation) to the wireless communication data collection device currently awaiting network construction, based on the control commands of the main chip control unit.
[0016] The wireless communication transceiver unit is configured to transmit and receive wireless data for establishing a wireless network and exchanging information (information interaction) between the wireless communication relay box and each wireless communication collection device under test.
[0017] The system power management unit is configured to supply power to the CAN communication conversion unit, the main chip control unit, the power switch matrix unit, and the wireless communication transceiver unit.
[0018] Furthermore, the wireless communication relay box is configured to set a network construction flag corresponding to the wireless communication collection device currently awaiting network construction to network construction success after a wireless network construction is established between the wireless communication relay box and the wireless communication collection device currently awaiting network construction, generate corresponding network construction success information based on the network construction flag, and transmit it to the higher-level device. The network construction success information includes the MAC address information and network construction flag of the wireless communication collection device currently awaiting network construction.
[0019] The higher-level unit is further configured to determine whether the network construction of all wireless communication data collection devices under test has been completed, based on the network construction success information and the predetermined wireless network construction strategy. If it determines that the network construction is not yet complete, it transmits the next data collection device power supply command to the wireless communication relay box based on the predetermined network construction strategy.
[0020] Furthermore, the wireless communication relay box is configured to activate a network construction request monitoring timer when it performs a power supply operation to the wireless communication collection device currently waiting to build a network, and if the network construction request monitoring timer times out and no wireless network construction requests have been received, it will perform a power cut-off operation to the wireless communication collection device currently waiting to build a network, set the network construction flag corresponding to the wireless communication collection device currently waiting to build a network to abnormal, and generate and transmit corresponding network construction failure information to the host device, the network construction failure information including the network construction flag.
[0021] The higher-level unit is further configured to update the number of network construction failures for the corresponding device based on the network construction failure information, determine whether the updated number of network construction failures for the device exceeds a predetermined failure limit, and if it determines that it does not exceed the limit, resend the corresponding power supply command for the collection device to the wireless communication relay box.
[0022] In a second embodiment, the present invention provides a line-off inspection method for a wireless communication data collection device, which is applied to a line-off inspection system for a wireless communication data collection device, and the method is Steps include: transmitting a power supply command for a collection device to the wireless communication relay box via the host unit, based on a predetermined wireless network construction strategy, in response to the establishment of communication between the host unit and the wireless communication relay box, wherein the power supply command for the collection device includes the number of one wireless communication collection device to be measured; Based on the power supply command for the collection device, the steps include identifying the wireless communication collection device currently awaiting network construction via the wireless communication relay box and performing a power supply operation to the wireless communication collection device currently awaiting network construction, Steps include: when the wireless communication data collection device currently awaiting network construction is powered on, broadcasting a wireless network construction request via the wireless communication data collection device currently awaiting network construction, wherein the wireless network construction request includes the MAC address information of the wireless communication data collection device currently awaiting network construction; The steps include completing the construction of a wireless network with the currently awaiting wireless communication collection device via the wireless communication relay box based on the wireless network construction request and a predetermined network construction flow, The process includes the step of, once the network construction of all wireless communication data collection devices under test is complete, sending a test command to the wireless communication relay box via the host device based on predetermined test logic, and initiating a production line-off test for each wireless communication data collection device under test.
[0023] Furthermore, the steps of identifying a wireless communication collection device currently awaiting network construction via the wireless communication relay box and performing a power supply operation on the wireless communication collection device currently awaiting network construction are as follows: Based on the power supply command for the collection device, the main chip control unit of the wireless communication relay box identifies the wireless communication collection device currently awaiting network construction, generates a corresponding control command, and transmits it to the power switch matrix unit of the wireless communication relay box. The procedure includes the step of performing a power supply operation to the currently network-awaiting wireless communication collection device via the power switch matrix unit based on the control command.
[0024] Furthermore, the step of completing the construction of a wireless network with the currently awaiting network construction wireless communication collection device via the wireless communication relay box, based on the wireless network construction request and a predetermined network construction flow, including a step of controlling, based on the wireless network construction request and a predetermined network construction flow, the wireless communication relay box via a main chip control unit thereof to complete wireless network construction with the current wireless communication collection device waiting for network construction.
[0025] furthermore, after the step of controlling, via the main chip control unit of the wireless communication relay box, the wireless communication relay box to complete wireless network construction with the current wireless communication collection device waiting for network construction, the method further comprises: setting, via the wireless communication relay box, a network construction flag corresponding to the current wireless communication collection device waiting for network construction to network construction success, generating corresponding network construction success information based on the network construction flag, and sending the network construction success information to the upper computer, wherein the network construction success information includes MAC address information of the current wireless communication collection device waiting for network construction and the network construction flag; and determining, based on the network construction success information and a predetermined wireless network construction strategy, via the upper computer whether network construction of all wireless communication collection devices to be tested is completed, and if it is determined that the network construction is not completed, sending a next collection device power supply instruction to the wireless communication relay box based on the predetermined network construction strategy.
[0026] furthermore, the method further comprises: starting a network construction request monitoring timer when power is supplied to the current wireless communication collection device waiting for network construction via a power switch matrix unit of the wireless communication relay box. If the network construction request monitoring timer times out and the wireless communication relay box has not received any wireless network construction requests, the following steps are taken: a power cut-off operation is performed on the currently waiting wireless communication collection device via the power switch matrix unit of the wireless communication relay box; the network construction flag corresponding to the currently waiting wireless communication collection device is set to network construction abnormal; and the corresponding network construction failure information is generated and transmitted to the host device, wherein the network construction failure information includes the network construction flag. The system includes the steps of updating the number of network construction failures for the corresponding device via the higher-level device based on the network construction failure information, determining whether the updated number of network construction failures for the device exceeds a predetermined failure limit, and, if it is determined that the limit has not been exceeded, resending the corresponding power supply command for the collection device to the wireless communication relay box. [Effects of the Invention]
[0027] The line-off inspection system and method for wireless communication data collectors provided in this application, described above, realizes a technical solution in which a host machine transmits a power supply command and a test command to a wireless communication relay box based on a predetermined wireless network construction strategy, the wireless communication relay box controls the power-on sequence of the wireless communication data collectors under test based on the power supply command, and after the power-on of the wireless communication data collectors under test is complete, the wireless communication data collectors under test broadcast a wireless network construction request to establish a network with the wireless communication relay box, and after the network construction is complete, the wireless communication relay box controls the wireless communication data collectors under test to complete the production line-off test of all wireless communication data collectors under test based on the test command and predetermined test logic transmitted from the host machine. Compared to conventional technology, this line-off inspection system for wireless communication data collectors effectively improves the network construction efficiency of wireless communication data collectors in line-off inspection, provides reliable assurance of inspection efficiency and product quality of wireless communication data collectors, ensures the versatility and flexibility of line-off testing, avoids the occurrence of safety problems, improves the line-off inspection efficiency of the production line, and truly meets the requirements of actual line-off inspection applications. [Brief explanation of the drawing]
[0028] [Figure 1] This is a schematic diagram of the configuration of the line-off inspection system for a wireless communication data acquisition device in an embodiment of the present invention. [Figure 2] This is a schematic diagram of the configuration of a wireless communication relay box in a line-off inspection system for a wireless communication data collection device according to an embodiment of the present invention. [Figure 3] This is a schematic flowchart of the line-off inspection method for a wireless communication data acquisition device in an embodiment of the present invention. [Figure 4] This is an internal structure diagram of the computer equipment in an embodiment of the present invention. [Modes for carrying out the invention]
[0029] To further clarify the purpose, technical solution, and beneficial effects of this application, the application will be described in more detail below with reference to the drawings and embodiments. The embodiments described below are only a part of the embodiments of this application and are used solely for illustrative purposes; they do not limit the scope of this application. All other embodiments that can be obtained based on the embodiments of this application, without the need for creative work by a person skilled in the art, are all within the scope of protection of this application.
[0030] In one embodiment, as shown in Figure 1, a line-off inspection system for wireless communication data acquisition devices is provided. The system includes a host computer 1, a wireless communication relay box 2, and multiple wireless communication data acquisition devices 3 under test. The host computer 1 and the wireless communication relay box 2 are capable of mutual communication, and the wireless communication relay box 2 can simultaneously communicate with multiple wireless communication data acquisition devices 3 under test based on a wireless network. The specific number of wireless communication data acquisition devices under test can be selected according to production demand and is not particularly limited here.
[0031] The host unit 1 is configured to transmit power supply commands and test commands to the wireless communication relay box 2 based on a predetermined (pre-configured) wireless network construction strategy and predetermined test logic. The predetermined wireless network construction strategy can be understood to include the network construction order (power-on order) of each wireless communication data collector 3 under test, the timeout period for the network construction request monitoring timer, a predetermined failure limit (maximum number of acceptable network construction failures), and other related network construction parameters, etc. The relevant settings must be completed on the host unit 1 in advance, and the specific setting method and selection of related parameter values are not particularly limited here. Accordingly, the power supply command for the data collector includes the number of one wireless communication data collector under test, and the number of the wireless communication data collector under test is used to instruct the wireless communication relay box to which wireless communication data collector under test is powered on and permitted to build a network in the current system. The host unit 1 can be understood to ensure, through the power supply command for the data collector based on the predetermined wireless network construction strategy, that only one wireless communication data collector under test functions as a wireless communication data collector currently waiting to build a network in each system network construction. This eliminates the need for excessive processing to detect each wireless communication collection device when a wireless communication relay box simultaneously establishes a network with multiple wireless communication collection devices, thereby improving network construction efficiency.
[0032] The aforementioned predetermined test logic is a functional or performance test execution logic formulated according to the actual test requirements, and specifically includes voltage acquisition accuracy test logic, temperature acquisition accuracy test logic, equalization function test logic, and individual acquisition channel leakage current test logic, and can be added or removed depending on changes in the test content of the actual situation (scenario).
[0033] In actual applications, once a communication connection is established between the host device and the wireless communication relay box, and the necessary test environment has been set up, the host device can be configured with a predetermined wireless network construction strategy, predetermined test logic, and other related parameters to initiate an automated test flow that includes two phases: automated network construction and execution of the test logic.
[0034] The wireless communication relay box 2 is configured to control the power-on sequence of the wireless communication collecting devices 3 under test based on the power supply command for the collecting devices, and after establishing a network with all the wireless communication collecting devices under test, to control all the wireless communication collecting devices 3 under test to complete the production line-off test based on the test command.
[0035] The design of the wireless communication relay box 2 only needs to satisfy the above functions in principle. However, in order to ensure that the requirements for building a highly efficient and reliable communication network are met with a low-cost and simple configuration, in this embodiment, the wireless communication relay box 2 is preferably realized with the system configuration shown in Figure 2. Specifically, the wireless communication relay box 2 includes a CAN communication conversion unit 21, a main chip control unit 22, a power switch matrix unit 23, a wireless communication transceiver unit 24, and a system power management unit 25.
[0036] Of these, the CAN communication conversion unit 21 is configured to facilitate communication between the host device 1 and the main chip control unit 22, and to receive the data acquisition device power supply command and test command transmitted from the host device 1. In other words, the CAN communication conversion unit 21 is responsible for communication between the host device and the main chip control unit inside the wireless communication relay box, as well as for sending and receiving related information and logic control processing.
[0037] The main chip control unit 22 is configured to identify wireless communication data collection devices currently awaiting network construction based on the data collection device power supply command, generate a corresponding control command, and transmit it to the power switch matrix unit 23. Furthermore, it is configured to complete wireless network construction with the wireless communication data collection devices currently awaiting network construction based on a predetermined network construction flow and a wireless network construction request broadcast by the wireless communication data collection devices currently awaiting network construction. The predetermined network construction flow can be determined according to the actual application requirements and is not particularly limited here.
[0038] The power switch matrix unit 23 is configured to perform power supply operations to the wireless communication data acquisition devices currently awaiting network construction based on control commands from the main chip control unit 22. In other words, the power switch matrix unit 23, under the control of the main chip control unit 22, plays a role in controlling the power supply to the designated wireless communication data acquisition devices and can control the power-on time of each wireless communication data acquisition device under test in accordance with a predetermined (pre-set) line-off test wireless network construction strategy. The number of channels in the power switch matrix unit 23 can be determined according to the number of wireless communication data acquisition devices under test within the system, supporting the requirement for effective testing of all wireless communication data acquisition devices under test.
[0039] The wireless communication transceiver unit 24 is configured to transmit and receive wireless data for establishing a wireless network and exchanging information between the wireless communication relay box 2 and each wireless communication collection device 3 under measurement.
[0040] The system power management unit 25 is configured to supply power to the CAN communication conversion unit 21, the main chip control unit 22, the power switch matrix unit 23, and the wireless communication transceiver unit 24.
[0041] The wireless communication data collection device 3 under test is configured to broadcast a wireless network construction request after power-up is complete to establish a network with the wireless communication relay box 2, and after the network construction is complete, to execute a production line-off test based on the test command and predetermined test logic received by the wireless communication relay box 2. The wireless network construction request includes the MAC address information of the wireless communication data collection device currently waiting to establish a network.
[0042] The network construction process of the system described above is merely an example of powering up one wireless communication data collection device under test. However, in actual applications, the individual network construction processes of each wireless communication data collection device under test (the network construction process of the system each time) are all the same. The only difference is the number of the wireless communication data collection device under test included in the data collection device power supply command transmitted by the host unit 1. Accordingly, the wireless communication relay box 2 controls the wireless communication data collection devices currently waiting to be powered up to be different via the main chip control unit 22 and the power switch matrix unit 23. To ensure that all wireless communication data collection devices under test can complete network construction quickly and efficiently, in this embodiment, it is preferable to set a network construction flag corresponding to each wireless communication data collection device 3 under test so that the host unit 1 can track and manage its network construction process and control all wireless communication data collection devices 3 under test in the system to be powered up and perform network construction in an orderly manner. In this embodiment, it is preferable that after wireless network construction is established between the wireless communication relay box 2 and the wireless communication data collection device 3 currently waiting to be networked, the wireless communication relay box 2 sets a network construction success flag and provides feedback to the host unit 1. Specifically, the wireless communication relay box 2 is configured to set a network construction flag corresponding to the wireless communication collection device currently awaiting network construction to network construction success after a wireless network construction is established between the wireless communication relay box 2 and the wireless communication collection device currently awaiting network construction, and to generate and transmit network construction success information based on the network construction flag to the host device 1. The network construction success information includes the MAC address information and network construction flag of the wireless communication collection device currently awaiting network construction.
[0043] The higher-level unit 1 further determines, based on the network construction success information and the predetermined wireless network construction strategy, whether or not network construction has been completed for all wireless communication collection devices under test. If it determines that it has not been completed, it transmits the next collection device power supply command to the wireless communication relay box 2 based on the predetermined network construction strategy, and continues until it determines that all wireless communication collection devices 3 under test have completed network construction with the wireless communication relay box 2.
[0044] In this embodiment, the wireless communication relay box sequentially powers up each wireless communication data collection device under test within the line-off test system to establish a network, and the system ensures that only one wireless communication data collection device under test that has not yet established a network transmits a wireless network construction request containing MAC address information at the same time. This not only ensures that each wireless communication data collection device under test can successfully establish a network with its corresponding wireless communication relay box, but also effectively avoids the reduction in network construction speed caused by system overhead and resource occupation resulting from multiple wireless communication data collection devices simultaneously submitting network construction requests at the same time, thereby effectively improving the network construction efficiency of wireless communication data collection devices. Furthermore, based on a simple and low-cost wireless network construction architecture, the system ensures the versatility and flexibility of line-off testing, avoids the occurrence of safety problems, and improves the line-off inspection efficiency of the production line.
[0045] In actual network construction scenarios, external factors such as network delays and interruptions may cause delays or losses in information exchanged during wireless network construction requests or the network construction process. To avoid a decrease in network construction efficiency due to such factors, this embodiment preferably employs a fault tolerance mechanism that combines a time limit for each network construction attempt with permission to perform a certain number of network construction attempts. This ensures that each wireless communication data collection device under test, functioning normally, can complete the network construction test quickly and smoothly while guaranteeing the network construction efficiency of the system.
[0046] Specifically, the wireless communication relay box 2 is configured to further activate a network construction request monitoring timer when it performs a power supply operation to the wireless communication data collection device currently waiting to build a network. If the network construction request monitoring timer times out and no wireless network construction requests have been received, it will perform a power cut-off operation to the wireless communication data collection device currently waiting to build a network, set the network construction flag corresponding to the wireless communication data collection device currently waiting to build a network to abnormal, and generate and transmit corresponding network construction failure information to the higher-level unit. The network construction failure information includes the network construction flag. The timeout time for the network construction request monitoring timer can be set according to the actual application requirements and is not particularly limited here. For example, if the timeout time for the network construction request monitoring timer is set to 1S, if a corresponding network construction request message cannot be received within 1S of performing a power supply operation to the wireless communication data collection device currently waiting to build a network, it will be considered that there is an abnormality in the wireless communication data collection device currently waiting to build a network or an abnormality in the communication environment, and it will be necessary to power it back on after the power cut-off and perform network construction.
[0047] The higher-level unit 1 is configured to further update the number of network construction failures for the corresponding device based on the network construction failure information, determine whether the updated number of network construction failures for the device exceeds a predetermined failure limit, and if it determines that it does not exceed the limit, resend the corresponding power supply command for the collection device to the wireless communication relay box 2. Of these, the number of network construction failures for each device corresponds to each wireless communication collection device under test, that is, the number of abnormal network constructions for each wireless communication collection device under test is statistically recorded. Accordingly, the predetermined failure limit is the number of allowable network construction failures common to the entire system for managing and controlling the number of abnormal network constructions for all wireless communication collection devices under test, and can be set according to the actual application requirements, in order to provide as many network construction opportunities as possible while guaranteeing the network construction efficiency of the entire system.
[0048] In the embodiment of the present invention, a higher-level unit transmits a power supply command and a test command to a wireless communication relay box based on a predetermined wireless network construction strategy. The wireless communication relay box controls the power supply sequence of the wireless communication collector under test based on the power supply command. After the wireless communication collector under test is powered on, the wireless communication collector broadcasts a wireless network construction request to establish a network with the wireless communication relay box. If no wireless network construction requests are received within a predetermined time after the power supply operation for the wireless communication collector currently awaiting network construction, the power cut-off operation is performed on the wireless communication collector currently awaiting network construction, the network construction flag corresponding to the wireless communication collector currently awaiting network construction is set to network construction abnormal, and the corresponding network construction failure information is generated and transmitted to the higher-level unit. If the higher-level unit determines that the number of network construction failures for the device has not exceeded a predetermined failure limit, the corresponding power supply command for the collector is resent to the wireless communication relay box and continues until network construction is successful or the predetermined failure limit is reached. Furthermore, when a wireless network is established between the wireless communication relay box and the wireless communication data collection device currently awaiting network construction, the network construction flag corresponding to the wireless communication data collection device currently awaiting network construction is set to network construction success, and network construction success information including the MAC address information and network construction flag of the wireless communication data collection device currently awaiting network construction is generated and transmitted to the higher-level unit. The higher-level unit then transmits a power supply command to the next data collection device to the wireless communication relay box based on a predetermined network construction strategy. After the network construction of all wireless communication data collection devices under test is completed, the higher-level unit transmits a test command to the wireless communication relay box based on a predetermined test logic, and the production line-off test of each wireless communication data collection device under test begins.The above technical solution effectively overcomes the shortcomings of conventional wireless communication data acquisition equipment line-off inspection systems, not only effectively improving the network construction efficiency of wireless communication data acquisition equipment in line-off inspection, but also providing reliable assurance of inspection efficiency and product quality of wireless communication data acquisition equipment, further ensuring the versatility and flexibility of line-off testing, avoiding the occurrence of safety problems, improving the line-off inspection efficiency of production lines, and truly meeting the actual application requirements of line-off inspection.
[0049] Furthermore, each module in the line-off inspection system of the wireless communication data acquisition device described above can be implemented in whole or in part by software, hardware, or a combination thereof. Each of the above modules may be incorporated into a processor in a computer system in hardware form or provided independently, or they may be stored in the memory of a computer system in software form, allowing the processor to call and execute operations corresponding to each of the above modules.
[0050] In one embodiment, as shown in Figure 3, a line-off inspection method for a wireless communication data collection device is provided, which is applied to the line-off inspection system for the wireless communication data collection device described above, and includes the following steps.
[0051] In S11, upon establishing communication between the host unit and the wireless communication relay box, a power supply command for the collection device is transmitted to the wireless communication relay box via the host unit based on a predetermined wireless network construction strategy. The predetermined wireless network construction strategy can be understood to include the network construction order (power-on order) for each wireless communication collection device under test, the timeout period for the network construction request monitoring timer, a predetermined failure limit (maximum number of acceptable network construction failures), and other related network construction parameters, etc. The relevant settings must be completed in advance on the host unit, and the specific setting method and selection of related parameter values are not particularly limited here. Accordingly, the power supply command for the collection device includes the number of one wireless communication collection device under test, and the number of the wireless communication collection device under test is used to instruct the wireless communication relay box to use the wireless communication collection device under test that is currently powered on and permitted to build a network in the current system. The host unit can be understood to ensure, through the power supply command for the collection device based on the predetermined wireless network construction strategy, that only one wireless communication collection device under test functions as a wireless communication collection device currently waiting to build a network in each system network construction. This eliminates the need for excessive processing to detect each wireless communication collection device when a wireless communication relay box simultaneously establishes a network with multiple wireless communication collection devices, thereby improving network construction efficiency.
[0052] The aforementioned predetermined test logic is a functional or performance test execution logic formulated in accordance with actual test requirements, and specifically includes voltage acquisition accuracy test logic, temperature acquisition accuracy test logic, equalization function test logic, and individual acquisition channel leakage current test logic, and can be added or removed depending on changes in the actual test content.
[0053] In actual applications, after a communication connection is established between the host device and the wireless communication relay box, and the necessary test environment has been set up, the host device can be configured with a predetermined wireless network construction strategy, predetermined test logic, and other related parameters. This allows for the activation of an automated test flow that includes two phases: automated network construction and execution of the test logic, following the method steps below.
[0054] S12, Based on the power supply command for the collection device, the wireless communication collection device currently awaiting network construction is identified via the wireless communication relay box, and a power supply operation is performed on the wireless communication collection device currently awaiting network construction. Specifically, the steps of identifying the wireless communication collection device currently awaiting network construction via the wireless communication relay box and performing a power supply operation on the wireless communication collection device currently awaiting network construction are as follows: Based on the power supply command for the collection device, the main chip control unit of the wireless communication relay box identifies the wireless communication collection device currently awaiting network construction, generates a corresponding control command, and transmits it to the power switch matrix unit of the wireless communication relay box. The procedure includes the step of performing a power supply operation to the currently network-awaiting wireless communication collection device via the power switch matrix unit based on the control command.
[0055] S13. When the wireless communication data collection device currently awaiting network construction is powered on, a wireless network construction request is broadcast via the wireless communication data collection device. The wireless network construction request includes the MAC address information of the wireless communication data collection device currently awaiting network construction, and is used by the wireless communication relay box to perform network construction communication according to the corresponding network construction flow based on the MAC address information.
[0056] S14. Based on the wireless network construction request and a predetermined network construction flow, the wireless network construction with the currently awaiting network construction wireless communication collection device is completed via the wireless communication relay box. The predetermined network construction flow can be determined according to the actual application requirements and is not particularly limited here. Specifically, the step of completing the wireless network construction with the currently awaiting network construction wireless communication collection device via the wireless communication relay box based on the wireless network construction request and a predetermined network construction flow is: The procedure includes controlling the main chip control unit of the wireless communication relay box to complete the wireless network construction with the wireless communication data collection device currently awaiting network construction, based on the wireless network construction request and a predetermined network construction flow. The specific network construction process must be completed through cooperation with a wireless communication transceiver unit that transmits and receives wireless data for information exchange between the wireless communication relay box and each wireless communication data collection device under test. The specific wireless data transmitted and received will vary depending on the actual network construction flow, and is not particularly limited here.
[0057] Accordingly, after the step of controlling the main chip control unit of the wireless communication relay box to complete the wireless network construction with the wireless communication collection device currently awaiting network construction, the method further: The steps include setting the network construction flag corresponding to the currently network-building-awaiting wireless communication collection device to network construction success via the wireless communication relay box, generating corresponding network construction success information based on the network construction flag, and transmitting it to the higher-level device, wherein the network construction success information includes the MAC address information and network construction flag of the currently network-building-awaiting wireless communication collection device; The system includes the step of determining whether the network construction of all wireless communication collection devices to be measured has been completed via the host device based on the network construction success information and the predetermined wireless network construction strategy, and if it is determined that the network construction has not been completed, transmitting the next collection device power supply command to the wireless communication relay box based on the predetermined network construction strategy.
[0058] S15. When the network construction of all wireless communication data collection devices under test is complete, a test command is sent to the wireless communication relay box via the host device based on predetermined test logic, and the production line-off test of each wireless communication data collection device under test is started.
[0059] Furthermore, considering that in actual network construction scenarios, external factors such as network delays and interruptions may cause delays or losses in information exchanged during wireless network construction requests or the network construction process, this embodiment preferably employs a fault tolerance mechanism that combines a time limit for each network construction attempt with permission for a certain number of network construction attempts, thereby ensuring the network construction efficiency of the system while guaranteeing that each wireless communication data collection device under test, functioning normally, can complete the network construction test quickly and smoothly. In other words, the above method further includes: When supplying power to the currently network-building-awaiting wireless communication data collection device via the power switch matrix unit of the wireless communication relay box, the step of starting the network-building request monitoring timer, If the network construction request monitoring timer times out and the wireless communication relay box has not received any wireless network construction requests, the following steps are taken: a power cut-off operation is performed on the currently waiting wireless communication collection device via the power switch matrix unit of the wireless communication relay box; the network construction flag corresponding to the currently waiting wireless communication collection device is set to network construction abnormal; and the corresponding network construction failure information is generated and transmitted to the host device, wherein the network construction failure information includes the network construction flag. The system includes the steps of updating the number of network construction failures for the corresponding device via the higher-level device based on the network construction failure information, determining whether the updated number of network construction failures for the device exceeds a predetermined failure limit, and, if it is determined that the limit has not been exceeded, resending the corresponding power supply command for the collection device to the wireless communication relay box.
[0060] Furthermore, the network construction method provided in this application is not limited to network construction management for wireless communication data collection devices; other similar products involving wireless communication can also be used to construct networks efficiently and quickly using the above method. Regarding the specific limitations of the line-off inspection method for wireless communication data collection devices, please refer to the limitations of the line-off inspection system for wireless communication data collection devices described above. The corresponding technical effects are similarly obtained, and therefore, they will not be repeated here. Also, although each step in the above flowchart is shown sequentially according to the arrows, these steps are not necessarily executed sequentially in the order indicated by the arrows. Unless explicitly stated in the text, there are no strict order restrictions on the execution of these steps, and they can be executed in other orders.
[0061] Figure 4 shows an internal structure diagram of a computer system in one embodiment, which can specifically be a terminal or a server. As shown in Figure 4, the computer system includes a processor, memory, network interface, display, camera, and input devices connected via a system bus. Of these, the processor of the computer system is used to provide arithmetic and control capabilities. The memory of the computer system includes a non-volatile storage medium and internal memory. The non-volatile storage medium stores the operating system and computer programs. The internal memory provides an execution environment for the operating system and computer programs in the non-volatile storage medium. The network interface of the computer system is used to connect to and communicate with an external terminal via a network. The execution of the computer program by the processor realizes a line-off inspection method for a wireless communication data collection device. The display of the computer system can be a liquid crystal display or an electronic ink display, and the input devices of the computer system can be a touch layer covered on the display, or buttons, a trackball, or a touchpad provided on the computer system's casing, or an external keyboard, touchpad, or mouse.
[0062] As a person skilled in the art will understand, the configuration shown in Figure 4 is merely a block diagram of some of the configurations related to the present invention, and does not limit the computer equipment to which the present invention applies. The specific computer equipment may contain more or fewer components than those shown, or may be a combination of some components, or may have a different component arrangement.
[0063] In one embodiment, a computer system is provided that includes memory, a processor, and a computer program stored in memory and executable on the processor, and the steps of the above method are realized by the processor executing the computer program.
[0064] In one embodiment, a computer-readable storage medium is provided on which a computer program is stored, and the steps of the above method are realized by executing the computer program by a processor.
[0065] In summary, the line-off inspection system and method for wireless communication data collection devices provided in the embodiment of the present application are implemented by a higher-level unit transmitting a data collection device power supply command and a test command to a wireless communication relay box based on a predetermined wireless network construction strategy, the wireless communication relay box controlling the power supply sequence of the wireless communication data collection device under test based on the data collection device power supply command, and, after the power supply to the wireless communication data collection device under test is complete, the wireless communication data collection device under test broadcasts a wireless network construction request to establish a network with the wireless communication relay box. If no wireless network construction requests are received within a predetermined time after the power supply operation for the wireless communication data collection device currently awaiting network construction, a power cut-off operation is performed on the wireless communication data collection device currently awaiting network construction, the network construction flag corresponding to the wireless communication data collection device currently awaiting network construction is set to network construction abnormal, and corresponding network construction failure information is generated and transmitted to the higher-level unit. If the higher-level unit determines that the number of network construction failures of the device has not exceeded a predetermined failure limit, it resends the corresponding data collection device power supply command to the wireless communication relay box and continues until network construction is successful or the predetermined failure limit is reached. Furthermore, when a wireless network is established between the wireless communication relay box and the wireless communication data collection device currently awaiting network construction, the network construction flag corresponding to the wireless communication data collection device currently awaiting network construction is set to network construction success, and network construction success information including the MAC address information and network construction flag of the wireless communication data collection device currently awaiting network construction is generated and transmitted to the higher-level unit. The higher-level unit then transmits a power supply command to the next data collection device to the wireless communication relay box based on a predetermined network construction strategy. After the network construction of all wireless communication data collection devices under test is completed, the higher-level unit transmits a test command to the wireless communication relay box based on a predetermined test logic, and the production line-off test of each wireless communication data collection device under test begins.The above technical solution effectively overcomes the shortcomings of conventional wireless communication data acquisition equipment line-off inspection systems, not only effectively improving the network construction efficiency of wireless communication data acquisition equipment in line-off inspection, but also providing reliable assurance of inspection efficiency and product quality of wireless communication data acquisition equipment, further ensuring the versatility and flexibility of line-off testing, avoiding the occurrence of safety problems, improving the line-off inspection efficiency of production lines, and truly meeting the actual application requirements of line-off inspection.
[0066] Each embodiment in this specification is described in an incremental manner, and parts that are identical or similar in each embodiment may be referred to from one another. Each embodiment focuses on explaining the differences from the other embodiments. In particular, the system embodiments are fundamentally similar to the method embodiments and are therefore relatively easy to explain; for relevant parts, please refer to the description of some parts of the method embodiments. The technical features of the above embodiments can be combined arbitrarily, and for the sake of brevity, not all possible combinations of the technical features in the above embodiments are described. However, as long as these combinations of technical features are not contradictory, they should all be considered to fall within the scope described herein.
[0067] The embodiments described above merely illustrate some preferred embodiments of the present application, and although the descriptions are relatively specific and detailed, this should not be interpreted as limiting the scope of the claims. Those skilled in the art should note that several improvements and modifications can be made without departing from the technical principles of the present application, and these improvements and modifications should also be considered to fall within the scope of protection of the present application. Therefore, the scope of protection of the patent of the present application should be based on the scope of protection of the claims.
Claims
1. This includes a higher-level unit, a wireless communication relay box, and multiple wireless communication data collection devices under test. The aforementioned higher-level unit is configured to transmit a power supply command for the collection device and a test command to the wireless communication relay box based on a predetermined wireless network construction strategy and predetermined test logic. The wireless communication relay box is configured to control the power-on sequence of the wireless communication data collection devices under test based on the power supply command for the data collection devices, establish a network with all the wireless communication data collection devices under test, and then control the wireless communication data collection devices under test to complete the production line-off test of all the wireless communication data collection devices under test based on the test command. The wireless communication data collection device under test is configured to broadcast a wireless network construction request after power-up is complete to establish a network with the wireless communication relay box, and after the network construction is complete, to execute a production line off test based on the test command and predetermined test logic received by the wireless communication relay box. A line-off inspection system for wireless communication data collection devices, characterized by the following features.
2. The predetermined test logic includes voltage acquisition accuracy test logic, temperature acquisition accuracy test logic, equalization function test logic, and individual acquisition channel leakage current test logic. Line-off inspection system for wireless communication data collection device according to feature 1.
3. The wireless communication relay box includes a CAN communication conversion unit, a main chip control unit, a power switch matrix unit, a wireless communication transceiver unit, and a system power management unit. The CAN communication conversion unit is configured to enable communication between the host device and the main chip control unit, and to receive power supply commands and test commands for the data acquisition device transmitted from the host device. The main chip control unit is configured to identify a wireless communication data collection device currently awaiting network construction based on the data collection device power supply command, generate a corresponding control command, and transmit it to the power switch matrix unit. Furthermore, it is configured to complete wireless network construction with the wireless communication data collection device currently awaiting network construction based on a predetermined network construction flow and a wireless network construction request broadcast by the wireless communication data collection device currently awaiting network construction. The power switch matrix unit is configured to perform power supply operations to the wireless communication data collection device currently awaiting network construction based on the control commands of the main chip control unit. The wireless communication transceiver unit is configured to transmit and receive wireless data for establishing a wireless network and exchanging information between the wireless communication relay box and each wireless communication collection device under test. The system power management unit is configured to supply power to the CAN communication conversion unit, the main chip control unit, the power switch matrix unit, and the wireless communication transceiver unit. Line-off inspection system for wireless communication data collection device according to feature 1.
4. The wireless communication relay box is further configured to set a network construction flag corresponding to the wireless communication collection device currently awaiting network construction to network construction success after a wireless network construction is established between the wireless communication relay box and the wireless communication collection device currently awaiting network construction, generate corresponding network construction success information based on the network construction flag, and transmit it to the higher-level device, the network construction success information including the MAC address information and network construction flag of the wireless communication collection device currently awaiting network construction, The higher-level unit is further configured to determine whether the network construction of all wireless communication data collection devices has been completed based on the network construction success information and the predetermined wireless network construction strategy, and if it determines that it has not been completed, it transmits the next data collection device power supply command to the wireless communication relay box based on the predetermined network construction strategy. Line-off inspection system for wireless communication data collection device according to feature 3.
5. The wireless communication relay box is further configured to activate a network construction request monitoring timer when it performs a power supply operation to the wireless communication collection device currently waiting to build a network, and if the network construction request monitoring timer times out and no wireless network construction requests have been received, it will perform a power cut-off operation to the wireless communication collection device currently waiting to build a network, set the network construction flag corresponding to the wireless communication collection device currently waiting to build a network to abnormal, and generate and transmit corresponding network construction failure information to the higher-level unit, the network construction failure information including the network construction flag, The aforementioned higher-level unit is further configured to update the number of network construction failures for the corresponding device based on the network construction failure information, determine whether the updated number of network construction failures for the device exceeds a predetermined failure limit, and, if it determines that it does not exceed the limit, resend the corresponding power supply command for the collection device to the wireless communication relay box. Line-off inspection system for wireless communication data collection device according to feature 3.
6. Steps include: transmitting a power supply command for a collection device to the wireless communication relay box via the higher-level unit, based on a predetermined wireless network construction strategy, in response to the establishment of communication between the higher-level unit and the wireless communication relay box, wherein the power supply command for the collection device includes the number of one wireless communication collection device to be measured; Based on the power supply command for the collection device, the steps include identifying the wireless communication collection device currently awaiting network construction via the wireless communication relay box and performing a power supply operation to the wireless communication collection device currently awaiting network construction, Steps include: when the power supply to the wireless communication data collection device currently awaiting network construction is completed, broadcasting a wireless network construction request via the wireless communication data collection device currently awaiting network construction, wherein the wireless network construction request includes the MAC address information of the wireless communication data collection device currently awaiting network construction; The steps include completing the construction of a wireless network with the currently awaiting wireless communication collection device via the wireless communication relay box based on the wireless network construction request and a predetermined network construction flow, Once the network construction of all wireless communication data acquisition devices under test is complete, a test command is transmitted to the wireless communication relay box via the host device based on predetermined test logic, and a production line-off test of each wireless communication data acquisition device under test is initiated. A method for inspecting a wireless communication data collection device line off, which is applied to the line off inspection system for a wireless communication data collection device according to claim 1, characterized by including the above.
7. The steps of identifying a wireless communication data collection device currently awaiting network construction via the wireless communication relay box and performing a power supply operation on the wireless communication data collection device currently awaiting network construction are: Based on the power supply command for the collection device, the main chip control unit of the wireless communication relay box identifies the wireless communication collection device currently awaiting network construction, generates a corresponding control command, and transmits it to the power switch matrix unit of the wireless communication relay box. The steps include: performing a power supply operation to the currently network-building-awaiting wireless communication data collection device via the power switch matrix unit based on the control command; A line-off inspection method for a wireless communication data collection device according to claim 6, characterized by including the following:
8. The step of completing the construction of a wireless network with the currently waiting-to-construct-network-collection-device via the wireless communication relay box, based on the wireless network construction request and a predetermined network construction flow, is: A step of controlling the main chip control unit of the wireless communication relay box to complete the wireless network construction with the currently waiting wireless communication collection device, based on the wireless network construction request and a predetermined network construction flow, A line-off inspection method for a wireless communication data collection device according to claim 7, characterized by including the following:
9. After the step of controlling the main chip control unit of the wireless communication relay box to complete the wireless network construction with the wireless communication collection device currently awaiting network construction, the method further: The steps include setting the network construction flag corresponding to the currently network-awaiting wireless communication data collection device to network construction success via the wireless communication relay box, generating corresponding network construction success information based on the network construction flag, and transmitting it to the higher-level device, wherein the network construction success information includes the MAC address information and network construction flag of the currently network-awaiting wireless communication data collection device. Based on the network construction success information and the predetermined wireless network construction strategy, the system determines whether the network construction of all wireless communication collection devices to be measured has been completed via the higher-level unit, and if it is determined that it has not been completed, it transmits the next collection device power supply command to the wireless communication relay box based on the predetermined network construction strategy. A line-off inspection method for a wireless communication data collection device according to claim 8, characterized by including the following:
10. When supplying power to the currently network-building-awaiting wireless communication data collection device via the power switch matrix unit of the wireless communication relay box, the step of starting the network-building request monitoring timer, If the network construction request monitoring timer times out and the wireless communication relay box has not received any wireless network construction requests, the following steps are taken: a power cut-off operation is performed on the currently waiting wireless communication collection device via the power switch matrix unit of the wireless communication relay box; the network construction flag corresponding to the currently waiting wireless communication collection device is set to network construction abnormal; and corresponding network construction failure information is generated and transmitted to the host device, wherein the network construction failure information includes the network construction flag; Based on the network construction failure information, the number of network construction failures for the corresponding device is updated via the higher-level device, and it is determined whether the updated number of network construction failures for the device exceeds a predetermined failure limit. If it is determined that the limit has not been exceeded, the corresponding power supply command for the collection device is resent to the wireless communication relay box. A line-off inspection method for a wireless communication collection device according to claim 9, characterized by including the following:
