The issue of gate clogging in injection molding due to cold slag or foreign matter leads to decreased dimensional accuracy of molded products, which is difficult to detect and can occur both continuously and temporarily.
An injection molding apparatus equipped with a flow path pressure measurement device and a determination unit that analyzes flow path pressure data to detect gate clogging, utilizing machine learning to determine the presence or absence of clogging based on feature amounts of pressure data.
The apparatus effectively detects gate clogging, stabilizing the dimensional accuracy of molded products by identifying pressure changes indicative of clogging, thereby preventing inaccuracies.
Smart Images

Figure 0007559941000001 
Figure 0007559941000002 
Figure 0007559941000003
Abstract
Description
[Technical field]
[0001] The present invention relates to an injection molding apparatus. [Background technology]
[0002] Patent Document 1 describes a method in which sensors are installed in an injection molding device and a mold, and the quality of a molded product is estimated by machine learning using detection data from the sensors. [Prior art documents] [Patent documents]
[0003] [Patent Document 1] JP 2020-49929 A Summary of the Invention [Problem to be solved by the invention]
[0004] Meanwhile, a mold used in injection molding comprises a molded product cavity as a portion for forming the molded product, and a resin flow path (runner, spool (also called sprue), and gate) between the molded product cavity and the portion that abuts against the nozzle of the injection device. For example, a malfunction may occur in which the gate of the resin flow path is temporarily clogged due to cold slug or foreign matter. When the gate is clogged, the molten resin cannot flow from the resin flow path to the molded product cavity, which may cause a decrease in dimensional accuracy of the molded product or an instability in dimensional accuracy.
[0005] When a molding cycle for molding a molded product is performed multiple times in succession, a gate may temporarily become clogged and then be cleared. Also, when molten resin is being supplied to a molded product cavity during molding of one molded product, a gate may temporarily become clogged and then be cleared during molding of the molded product. In this way, gate clogging may not only occur continuously over a long period of time, but may also occur temporarily, and may not be easy to detect.
[0006] The present invention has been made in view of the above background, and aims to provide an injection molding apparatus that can determine whether or not a gate is clogged. [Means for solving the problem]
[0007] One aspect of the present invention is an injection device including a cylinder, a screw, and a nozzle provided at a front end of the cylinder for ejecting molten resin as the screw advances; a mold including a molded product cavity and a resin flow path between the molded product cavity and a portion that contacts the nozzle; a flow channel pressure measuring device for acquiring flow channel pressure data in the resin flow channel; a determination unit that determines whether or not a gate of the resin flow path is clogged based on a feature amount of the flow path pressure data; The present invention relates to an injection molding apparatus comprising: Effect of the Invention
[0008] When molding a molded product, molten resin is supplied from an injection device to the resin flow path of the mold, and then from the resin flow path to the molded product cavity. If a gate in the resin flow path of the mold becomes clogged during molding, the molten resin will not flow from the resin flow path to the molded product cavity, or will flow with difficulty.
[0009] Focusing on the fact that gate clogging causes fluctuations in pressure data in the resin flow path, the above-mentioned injection molding device judges whether or not there is a clog at the gate based on the feature amount of the flow path pressure data in the resin flow path of the mold. By utilizing the fact that the feature amount of the flow path pressure data in the resin flow path is affected by the clogging at the gate, the judgment unit of the injection molding device can judge whether or not there is a clog at the gate. By determining whether or not there is a clog at the gate, it is possible to discover a decrease in the dimensional accuracy of the molded product, and it is possible to stabilize the dimensional accuracy. [Brief description of the drawings]
[0010] [Figure 1] FIG. 2 is a diagram showing a mechanical configuration of an injection molding device. [Diagram 2] FIG. 2 is an enlarged cross-sectional view of the mold in FIG. [Diagram 3] FIG. 3 is a diagram showing only the spatial portion of the mold (the molded product cavity and the resin flow path) as viewed from the axial direction of the spool (as viewed from the right in FIG. 2). [Figure 4] 1 is a flowchart illustrating an injection molding method. [Diagram 5] 1 is a graph showing the change in screw pressure data over time in an injection process and a pressure holding process, in which the solid line indicates the case where there is no gate clogging, and the dashed line indicates the case where there is gate clogging. [Figure 6] 1 is a graph showing a change in flow channel pressure data over time during an injection process and a pressure holding process, in which the solid line indicates a case where there is no gate clogging and the dashed line indicates a case where there is gate clogging. [Figure 7] FIG. 1 is a functional block diagram showing an injection molding apparatus according to a first embodiment. [Figure 8] FIG. 2 is a functional block diagram showing the processing of a gate clogging determination computer device constituting the injection molding apparatus of the first embodiment. [Figure 9] FIG. 11 is a diagram illustrating threshold values stored in a storage unit in a first modified example of the first embodiment. [Figure 10] FIG. 4 is a functional block diagram showing an injection molding apparatus according to a second modified example of the first embodiment. [Figure 11] 10 is a graph showing a change in flow channel pressure data over time in an injection process and a pressure holding process, in accordance with a third modified example of the first embodiment, in which the solid line indicates a case where there is no gate clogging and the dashed line indicates a case where there is gate clogging. [Figure 12] FIG. 6 is a functional block diagram showing an injection molding apparatus according to a second embodiment. [Figure 13] FIG. 11 is a functional block diagram showing the processing of a gate clogging determination computer device constituting the injection molding apparatus of the second embodiment. [Figure 14] 1 is a graph showing the change in screw pressure data over time in an injection process and a pressure holding process, in which a thick line indicates a case where the resin viscosity is high, and a thin line indicates a case where the resin viscosity is low. [Figure 15] 15 is a graph enlarging the time periods t1 to t2a and t1 to t2b in FIG. 14, in which the thick line indicates the case where the resin viscosity is high, and the thin line indicates the case where the resin viscosity is low. [Figure 16] 1 is a graph showing a change in flow channel pressure data over time during an injection process and a pressure holding process, in which a thick line indicates a case where the resin viscosity is high, and a thin line indicates a case where the resin viscosity is low. [Figure 17] 17 is an enlarged graph showing the periods from time t1 to t2a and from time t1 to t2b in FIG. 16, in which the thick line indicates the case where the resin viscosity is high, and the thin line indicates the case where the resin viscosity is low. [Figure 18] FIG. 13 is a functional block diagram showing the processing of a computer device for determining gate clogging in a first modified embodiment of the second embodiment. [Figure 19] FIG. 13 is a diagram illustrating threshold values stored in a storage unit in a second modified example of the second embodiment. [Figure 20] FIG. 11 is a functional block diagram showing an injection molding apparatus corresponding to a first specific example and a second specific example of a resin viscosity estimation method in a second embodiment. [Figure 21] FIG. 11 is a functional block diagram showing an injection molding apparatus corresponding to a third and fourth specific examples of a resin viscosity estimation method in the second embodiment. [Figure 22] FIG. 11 is a functional block diagram showing an injection molding apparatus corresponding to a fifth specific example of a resin viscosity estimation method in the second embodiment. [Diagram 23] 13 is a graph showing the change in nozzle pressure data over time in a purging process, showing the case where the resin viscosity is low. [Figure 24] 13 is a graph showing the change over time in nozzle pressure data during a purging process, in the case where the resin viscosity is high. [Diagram 25] FIG. 11 is a functional block diagram showing an injection molding apparatus corresponding to a sixth specific example of a resin viscosity estimation method in the second embodiment. [Figure 26] 1 is a graph showing the change in screw position over time in a metering process. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0011] (1. Configuration of Injection Molding Apparatus 1) An injection molding apparatus 1 will be described with reference to Fig. 1. The injection molding apparatus 1 is an apparatus for molding a resin molded product using a mold 30. The injection molding apparatus 1 mainly comprises a bed 10, an injection unit 20, a mold 30, a mold clamping unit 40, a control unit 50, and a computer device for determining gate clogging 60. The bed 10 is a member that is installed on an installation surface.
[0012] The injection device 20 is disposed on the bed 10. The injection device 20 is a device that melts resin, which is a molding material, and applies pressure to the molten resin to supply it to a molded product cavity C of a mold 30. The injection device 20 includes a hopper 21, a cylinder 22, a screw 23, a nozzle 24, a heater 25, a drive device 26, a screw pressure measuring device 27, and a nozzle pressure measuring device 28.
[0013] The hopper 21 is an inlet for resin pellets (granular molding material), which are the raw material for the molding material. The cylinder 22 stores molten resin produced by heating and melting the pellets fed into the hopper 21. The cylinder 22 is provided so as to be movable in the axial direction of the cylinder 22 relative to the bed 10. The screw 23 is disposed inside the cylinder 22 and is provided so as to be rotatable and movable in the axial direction. The nozzle 24 is an outlet provided at the front end of the cylinder 22, and discharges the molten resin inside the cylinder 22 as the screw 23 advances.
[0014] The heater 25 is provided, for example, on the outer circumferential surface of the cylinder 22 or embedded inside the cylinder 22, and heats the resin inside the cylinder 22. That is, the heater 25 melts the pellets and keeps the molten resin in a molten state. The drive device 26 moves the cylinder 22 in the axial direction (forward and backward), rotates the screw 23, and moves it in the axial direction (forward and backward).
[0015] The screw pressure measuring device 27 is provided, for example, near the base end of the screw 23, and acquires pressure data (hereinafter referred to as "screw pressure data") that the screw 23 receives from the molten resin in the cylinder 22. The screw pressure measuring device 27 corresponds to the screw pressure measuring device, the second screw pressure measuring device, and the third screw pressure measuring device in the present invention. The screw pressure data corresponds to the screw pressure data, the second screw pressure data, and the third screw pressure data in the present invention.
[0016] The nozzle pressure measuring device 28 is provided in the nozzle 24, and acquires pressure data (hereinafter referred to as "nozzle pressure data") that the nozzle 24 receives from the molten resin when the molten resin flows through the nozzle 24. In addition to the screw pressure measuring device 27 and the nozzle pressure measuring device 28, the injection device 20 also includes sensors that acquire the position of the cylinder 22, the position of the screw 23, the moving speed of the screw 23, the temperature of the heater 25, the state of the drive device 26, and the like.
[0017] The nozzle pressure measuring device 28 corresponds to the nozzle pressure measuring device, the second nozzle pressure measuring device, the third nozzle pressure measuring device, and the fourth nozzle pressure measuring device in this invention. Also, the nozzle pressure data corresponds to the nozzle pressure data, the second nozzle pressure data, the third nozzle pressure data, and the fourth nozzle pressure data in this invention.
[0018] The mold 30 includes a first mold 31 which is a fixed side, and a second mold 32 which is a movable side. The mold 30 forms a molded product cavity C between the first mold 31 and the second mold 32 by clamping the first mold 31 and the second mold 32. The first mold 31 and the second mold 32 include a resin flow path P between the molded product cavity C and a portion that abuts against the nozzle 24 of the injection device 20. The resin flow path P is a flow path (spool, runner, gate) that guides the molten material supplied from the nozzle 24 of the injection device 20 to the molded product cavity C.
[0019] Furthermore, the mold 30 includes a flow path pressure measuring device 33 that acquires pressure data (hereinafter referred to as “flow path pressure data”) in the resin flow path P. The flow path pressure data is pressure data that the inner wall surface of the resin flow path P receives from the molten resin flowing through the resin flow path P.
[0020] The mold clamping device 40 is disposed opposite the injection device 20 on the bed 10. The mold clamping device 40 opens and closes the attached mold 30, and prevents the mold 30 from opening due to the pressure of the molten material injected into the molded product cavity C when the mold 30 is clamped.
[0021] The mold clamping unit 40 includes a fixed platen 41, a movable platen 42, a diver 43, a drive unit 44, and a measurement device for the mold clamping unit 45. The first mold 31 is fixed to the fixed platen 41. The second mold 32 is fixed to the movable platen 42. The movable platen 42 can move toward and away from the fixed platen 41. The diver 43 supports the movement of the movable platen 42. The drive unit 44 is, for example, configured by a cylinder device, and moves the movable platen 42. The measurement device for the mold clamping unit 45 acquires the mold clamping force, mold temperature, the state of the drive unit 44, and the like.
[0022] The control device 50 controls the drive device 26 of the injection device 20 and the drive device 44 of the mold clamping device 40. The gate clogging determination computer device 60 determines whether or not a gate P3 (shown in FIG. 2) in the resin flow path P of the mold 30 is clogged. The gate clogging determination computer device 60 is composed of an arithmetic device, a storage device, etc., and is processed by executing a computer program. The gate clogging determination computer device 60 determines whether or not a gate is clogged using, for example, control data from the control device 50, pressure data acquired by the screw pressure measuring device 27, the nozzle pressure measuring device 28, the flow path pressure measuring device 33, etc.
[0023] (2. Detailed configuration of mold 30) The detailed configuration of the mold 30 will be described with reference to Figs. 2 and 3. The mold 30 has a molded product cavity C for molding a molded product. The molded product cavity C is formed by a first die 31 and a second die 32. In this embodiment, the molded product cavity C is formed, for example, in a circular ring shape, but it can be formed in any shape such as a C-shape or a U-shape. The molded product cavity C may be formed in only one location, or may be formed in multiple locations. In Figs. 2 and 3, one molded product cavity C is illustrated for ease of explanation.
[0024] Furthermore, the mold 30 has a resin flow path P that connects between the portion that contacts the nozzle 24 (shown in FIG. 1) and the molded product cavity C. The resin flow path P includes a spool P1 (also called a sprue), a runner P2, and a gate P3. The spool P1 is a passage through which the molten material is introduced from the nozzle 24. The spool P1 is formed, for example, in a straight line from the portion that contacts the nozzle 24.
[0025] The runner P2 is a flow path formed at an angle from the spool P1. In other words, the molten resin introduced into the spool P1 flows into the runner P2. For example, as shown in Fig. 3, in this embodiment, a plurality of runners P2 are formed branching out radially from the spool P1 toward one molded product cavity C. Note that even when a plurality of molded product cavities C are formed, a plurality of runners P2 are formed branching out from the spool P1 toward each of the plurality of molded product cavities C.
[0026] The gate P3 is located at the tip of the runner P2, and is a flow path that guides the molten resin from the runner P2 to the molded product cavity C. The flow path cross-sectional area of the gate P3 is formed smaller than the flow path cross-sectional area of the runner P2. In this embodiment, a plurality of gates P3 are formed, each connecting the plurality of runners P2 to one molded product cavity C. Therefore, even if one of the plurality of gates P3 becomes clogged, the molten resin will flow from the other gates P3 to the molded product cavity C.
[0027] 2, the mold 30 is provided with a flow path pressure measuring device 33. The flow path pressure measuring device 33 is provided at any one of the middle of the spool P1, the end of the spool P1, the middle of the runner P2, the tip of the runner P2, etc. in the resin flow path P. In other words, the flow path pressure measuring device 33 acquires pressure data at a position different from the gate P3 in the resin flow path P. The flow path pressure measuring device 33 may be provided at one location in the mold 30, or at multiple locations.
[0028] (3. Injection molding method) The injection molding method for a molded product using the injection molding apparatus 1 will be described with reference to Fig. 4. The injection molding method is executed by a control device 50 of the injection molding apparatus 1.
[0029] First, before a series of multiple molding cycles, the control device 50 executes a purging step S1 in which the nozzle 24 is separated from the mold 30 and the molten resin in the cylinder 22 is discharged from the nozzle 24. The purging step S1 is performed, for example, for the purpose of discharging thermally deteriorated resin or replacing it with a different resin material. In the purging step S1, the screw 23 is advanced to discharge the molten resin in the cylinder 22 from the nozzle 24.
[0030] Next, the control device 50 executes a metering step S2 in which the screw 23 is retracted to a predetermined position while rotating the screw 23, thereby storing a predetermined amount of molten resin on the front side of the cylinder 22. In the metering step S2, the screw 23, which is located in the forward position, is rotated to move the molten resin to the front end side of the cylinder 22, and the screw 23 is retracted to a predetermined position by a reaction force of the forward movement of the molten resin. In this way, a predetermined amount of molten resin is stored between the tip of the screw 23 and the nozzle 24 in the cylinder 22.
[0031] Next, the control device 50 executes a nozzle touch step S3 in which the cylinder 22 is advanced to bring the nozzle 24 into contact with the mold 30. At this time, the mold 30 is assumed to be clamped. However, the mold may be clamped after the nozzle touch step S3.
[0032] Next, the control device 50 executes the following molding cycles S4 to S11. The control device 50 executes the injection step S4 in which the screw 23 is advanced by controlling the speed of the screw 23, and the molten resin is injected from the nozzle 24 into the mold 30. In the injection step S4, the molten resin flows from the nozzle 24 into the resin flow path P, and from the resin flow path P into the molded product cavity C. In the injection step S4, the molten resin is supplied to most of the molded product cavity C (e.g., 90 to 95%).
[0033] Following the injection step S4, the control device 50 executes a pressure holding step S5 in which a holding pressure is applied to the molten resin in the molded product cavity C by controlling the pressure applied to the screw 23. In the pressure holding step S5, a predetermined pressure is applied to the screw 23, thereby causing the screw 23 to move further forward and supplying the molten resin from the nozzle 24 through the resin flow path P to the molded product cavity C. In the pressure holding step S5, the molded product cavity C is completely filled with the molten resin.
[0034] Next, the control device 50 stops applying pressure to the screw 23 and stops heating the mold 30, and executes a cooling step S6 in which the mold 30 is cooled to cool the molten resin in the mold 30. In the cooling step S6, the molten resin in the mold 30 is solidified. Following the cooling step S6, the control device 50 controls the mold clamping device 40 to separate the second mold 32 from the first mold 31 and executes a mold release / molded product removal step S7 in which the molded product is removed. Next, the control device 50 controls the mold clamping device 40 to execute a mold clamping step S8 in which the second mold 32 is aligned with the first mold 31 and the molds are clamped.
[0035] Furthermore, after completing the pressure holding step S5, the control device 50 executes a nozzle separating step S9 in which the nozzle 24 is separated from the die 30 by retracting the cylinder 22. Following the nozzle separating step S9, the control device 50 executes a measuring step S10 in which the control device 50 moves the molten resin to the front end side of the cylinder 22 by rotating the screw 23 located at the front position, and then retracts the screw 23 to a predetermined position due to the reaction of the forward movement of the molten resin, thereby storing a predetermined amount of molten resin on the front side of the cylinder 22.
[0036] After the mold clamping step S8 and the measurement step S10 are completed, the control device 50 executes the nozzle touch step S11 in which the cylinder 22 is advanced to bring the nozzle 24 into contact with the mold 30. However, the mold clamping step S8 may be executed after the nozzle touch step S11. Then, after the nozzle touch step S11, the above-mentioned injection step S4 is repeated again.
[0037] (4. Behavior of screw pressure data and flow path pressure data) The behavior (change over time) of the screw pressure data and the behavior (change over time) of the flow channel pressure data in the injection process S4 and the pressure holding process S5 will be described with reference to Figures 5 and 6. First, the state where there is no clogging in the gate P3 will be described with reference to the solid line in Figure 5 and the solid line in Figure 6.
[0038] 5, at time t1, the injection process S4 is started, whereby the screw 23 advances and the screw pressure data increases. After that, in this embodiment, the forward movement speed of the screw 23 is initially set to a low speed and then switched to a high speed.
[0039] As shown by the solid lines in Fig. 5 and Fig. 6, when the forward speed of the screw 23 is switched to high speed, the molten resin flows into the resin flow path P of the mold 30, causing the screw pressure data and the flow path pressure data to rise sharply. Then, as the resin flows from the gate P3 of the resin flow path P into the molded product cavity C, the screw pressure data and the flow path pressure data drop slightly and then change to rise gradually. Therefore, in the injection process S4, the screw pressure data and the flow path pressure data reach maximum values at the pressure peak time t2.
[0040] The time when the injection process S4 ends is t4, and the time between the pressure peak time t2 and the injection process end time t4 in the injection process S4 is t3. The time t3 is, for example, the intermediate time between the pressure peak time t2 and the injection process end time t4, but may be a time shifted from the intermediate time.
[0041] By switching from the injection process S4 to the dwelling process S5, the screw pressure data and the flow channel pressure data decrease to near the desired dwelling pressure by the pressure control in the dwelling process S5. Usually, the screw pressure data and the flow channel pressure data increase toward near the desired dwelling pressure immediately after decreasing to a pressure slightly lower than the desired dwelling pressure.
[0042] Then, the pressure holding step S5 continues, and when the molded product cavity C is completely filled with the molten resin, that is, at the time of filling completion t5, the screw pressure data and the flow path pressure data increase. The screw pressure data is pressure controlled, so it reaches the desired holding pressure immediately thereafter. On the other hand, the flow path pressure data gradually increases after the time of filling completion t5.
[0043] Next, the case where there is clogging at the gate P3 will be described with reference to the dashed lines in FIG. 5 and FIG. 6. In the injection process S4, the screw pressure data and the flow path pressure data are larger than when there is no clogging at the gate P3. Here, the rate of increase in the flow path pressure data is larger than the rate of increase in the screw pressure. The rate of increase is the ratio of the pressure increase when there is clogging, based on the case where there is no clogging at the gate P3. Therefore, the presence or absence of clogging at the gate P3 affects both the screw pressure data and the flow path pressure data. However, it can be seen that the flow path pressure data is more significantly affected than the screw pressure data.
[0044] (5. Overview of Each Embodiment) Regarding the determination of clogging at the gate P3, an overview of each embodiment will be described. (A) First embodiment: The presence or absence of gate clogging is determined by machine learning based on the flow path pressure data (later time period of the injection process S4) and the screw pressure data (later time period of the injection process S4). (A1) First modified embodiment of the first embodiment: The presence or absence of gate clogging is determined based on the flow path pressure data (later time period of the injection process S4) and the screw pressure data (later time period of the injection process S4) using a preset threshold value. (A2) Second modified embodiment of the first embodiment: Pressure data from a period between the peak time and the end time of the injection step S4 is used. (A3) A third variation of the first embodiment: Only flow path pressure data is used. (B) Second embodiment: The presence or absence of gate clogging is determined by machine learning based on flow path pressure data and estimated resin viscosity. (B1) First modified aspect of the second embodiment: The presence or absence of gate clogging is determined by machine learning based on the flow path pressure data for each estimated resin viscosity. (B2) Second modified aspect of the second embodiment: The presence or absence of gate clogging is determined for each estimated resin viscosity using a preset threshold value based on the flow path pressure data. (C1) First specific example of a method for estimating resin viscosity: Using flow path pressure data, the time to the pressure peak in the injection process S4 is used. (C2) A second specific example of a method for estimating resin viscosity: Using flow path pressure data, the time until the molding cavity is completely filled in the pressure holding process S5 is used. (C3) A third specific example of a method for estimating resin viscosity: Using screw pressure data, the time until the pressure peak in the injection process S4 is used. (C4) A fourth specific example of a method for estimating resin viscosity: Using screw pressure data, the time until the molding cavity is completely filled in the pressure holding step S5 is used. (C5) Fifth specific example of the resin viscosity estimation method: Nozzle pressure data and screw movement speed data in the purging process S1 are used. (C6) Sixth specific example of the resin viscosity estimation method: Nozzle pressure data and screw movement speed data in the injection process S4 are used. (C7) Seventh specific example of the resin viscosity estimation method: Using the time required for the measurement steps S2 and S10. (C8) Eighth specific example of the resin viscosity estimation method: A plurality of the above first to seventh specific examples are used in combination.
[0045] (6. Injection molding apparatus 1 of first embodiment) An injection molding apparatus 1 of a first embodiment will be described with reference to Figures 7 and 8. As shown in Figure 7, the injection molding apparatus 1 includes an injection device 20, a mold 30, a clamping device 40, a control device 50, and a computer device 60. Only some of the functional parts of the injection molding apparatus 1 are shown in Figure 7. In addition, the computer device 60 will be described below.
[0046] The computer device 60 includes a determination unit 61 and a storage unit 62. The determination unit 61 is configured by an arithmetic unit constituting the computer device 60 described above, and functions by executing a computer program. The storage unit 62 is configured by a storage device constituting the computer device 60 described above.
[0047] The judgment unit 61 judges whether or not the gate P3 of the resin flow path P is clogged. As described above, the gate P3 is located between the runner P2 and the molded product cavity C, and has a flow path cross-sectional area smaller than that of the runner P2. Therefore, the gate P3 may be clogged by, for example, cold slugs or foreign matter. The judgment unit 61 judges whether or not such a gate P3 is clogged.
[0048] In particular, the judgment unit 61 judges whether or not some of the gates P3 among the multiple gates P3 are clogged. Furthermore, when the above-mentioned molding cycle is performed multiple times in succession, a phenomenon occurs in which the gate P3 is temporarily clogged and then the clog is cleared. In this phenomenon, the judgment unit 61 judges whether or not the gate P3 is temporarily clogged.
[0049] Further, the determination unit 61 determines whether or not the gate P3 is clogged based on at least the flow path pressure data acquired by the flow path pressure measuring device 33. However, in this embodiment, the determination unit 61 determines whether or not the gate P3 is clogged by using the screw pressure data acquired by the screw pressure measuring device 27 in addition to the flow path pressure data.
[0050] Furthermore, the determination unit 61 determines whether or not the gate P3 is clogged based on the feature amount of the flow path pressure data and the feature amount of the screw pressure data, rather than on the flow path pressure data and the screw pressure data themselves. Therefore, the determination unit 61 extracts the feature amount from the acquired flow path pressure data, and also extracts the feature amount from the acquired screw pressure data.
[0051] In this embodiment, the determination unit 61 determines the presence or absence of clogging of the gate P3 using the feature amount of the channel pressure data in the injection process S4 (times t1 to t4) and the feature amount of the screw pressure data in the injection process S4. In particular, the determination unit 61 uses the feature amount of the channel pressure data and the feature amount of the screw pressure data after the pressure reaches the pressure peak in the injection process S4, that is, from time t2 to t4.
[0052] More specifically, in this embodiment, the judgment unit 61 uses the characteristic amounts of the flow path pressure data in a later time period (t3 to t4) of the injection process S4 closer to the pressure holding process S5, and the characteristic amounts of the screw pressure data in a later time period (t3 to t4) of the injection process S4 closer to the pressure holding process S5.
[0053] The characteristic amount may be, for example, a time integral value of the flow passage pressure data in the later time period (t3 to t4) and a time integral value of the screw pressure data in the later time period (t3 to t4). Note that the characteristic amount may be a maximum value, a minimum value, a median value, a mean value, a first quartile, a third quartile, a variance, a standard deviation, a kurtosis, a skewness, or the like, of the flow passage pressure data in the later time period (t3 to t4). The determination unit 61 may use a plurality of characteristic amounts.
[0054] In this embodiment, the determination unit 61 applies machine learning to determine whether the gate P3 is clogged. Therefore, the determination unit 61 uses a trained model generated in advance to determine whether the gate P3 is clogged. In particular, when the determination unit 61 applies machine learning, it is easy to apply multiple feature amounts.
[0055] The storage unit 62 stores information used by the determination unit 61 to determine whether the gate P3 is clogged. In this embodiment, the storage unit 62 stores a trained model generated by performing machine learning using a training data set. The determination unit 61 uses the trained model stored in the storage unit 62.
[0056] The function of the computer device 60 when machine learning is applied will be described with reference to Fig. 8. In the learning phase, first, a training data set 63 is prepared. The training data set 63 includes feature amounts of the flow path pressure data, feature amounts of the screw pressure data, and label data on the presence or absence of clogging in the gate P3.
[0057] In the learning phase, the machine learning processing unit 64 in the computer device 60 performs machine learning using the training data set 63 to generate one trained model. The trained model is stored in the storage unit 62. In this embodiment, the trained model uses the feature amounts of the flow path pressure data and the feature amounts of the screw pressure data as explanatory variables, and uses the presence or absence of clogging of the gate P3 as a response variable.
[0058] Next, in the estimation phase, the determination unit 61 acquires the flow path pressure data and the screw pressure data as the detection data 65. Then, the determination unit 61 calculates the feature amount of the flow path pressure data and calculates the feature amount of the screw pressure data. Next, the determination unit 61 uses the trained model stored in the storage unit 62 to input the feature amount of the flow path pressure data and the feature amount of the screw pressure data, thereby determining (outputting) the presence or absence of clogging of the gate P3.
[0059] (7. Effects of the First Embodiment) When a molded product is formed, molten resin is supplied from the injection device 20 to the resin flow path P of the mold 30, and then from the resin flow path P to the molded product cavity C. If the gate P3 of the resin flow path P of the mold 30 becomes clogged during molding, the molten resin will not flow from the resin flow path P to the molded product cavity C, or will flow with difficulty.
[0060] Then, focusing on the fact that clogging of the gate P3 causes fluctuations in the flow path pressure data in the resin flow path P, the determination unit 61 of the injection molding device 1 determines whether or not the gate P3 is clogged based on the feature amount of the flow path pressure data in the resin flow path P of the mold 30. By utilizing the fact that the feature amount of the flow path pressure data in the resin flow path P is affected by clogging at the gate P3, the determination unit 61 of the injection molding device 1 can determine whether or not the gate P3 is clogged. By determining whether or not the gate P3 is clogged, a decrease in the dimensional accuracy of the molded product can be found, and the dimensional accuracy can be stabilized.
[0061] In particular, the difference in flow path pressure data between the presence and absence of clogging at the gate P3 is large as shown in Fig. 6. Therefore, by using the feature amount of the flow path pressure data, the presence or absence of clogging at the gate P3 can be determined with high accuracy.
[0062] Furthermore, the determination unit 61 uses the feature amount of the screw pressure data in addition to the feature amount of the flow path pressure data when determining whether the gate P3 is clogged. As shown in Figures 5 and 6, in the injection process S4, not only the flow path pressure data but also the screw pressure data changes depending on whether the gate P3 is clogged. Therefore, by using the feature amount of the screw pressure data in addition to the feature amount of the flow path pressure data, the determination unit 61 can determine the presence or absence of clogging of the gate P3 with higher accuracy.
[0063] Furthermore, the determination unit 61 uses data from the injection process S4 among the flow path pressure data and the screw pressure data. Particularly in the injection process S4, the pressure changes depending on whether the gate P3 is clogged or not. Therefore, the determination unit 61 can determine with high accuracy whether the gate P3 is clogged or not by using the pressure data from the injection process S4.
[0064] Furthermore, the determination unit 61 uses the flow path pressure data and the screw pressure data in a later time period (t3 to t4) closer to the pressure holding step S5 in the injection process S4. In the later time period (t3 to t4) in the injection process S4, the pressure data is relatively stable. Therefore, the determination unit 61 can determine the presence or absence of clogging of the gate P3 with high accuracy. Furthermore, the determination unit 61 determines the presence or absence of clogging of the gate P3 by machine learning. In particular, when multiple feature amounts are used, the determination by machine learning is useful.
[0065] (8. First Modification of First Embodiment) A first modified embodiment of the injection molding apparatus 1 of the first embodiment will be described with reference to Fig. 9. In the above-described first embodiment, the memory unit 62 of the computer device 60 stores a trained model generated by machine learning, and the determination unit 61 uses the trained model to determine whether or not the gate P3 is clogged.
[0066] In this modified embodiment, the memory unit 62 stores a threshold value Th used to determine whether or not the gate P3 is clogged. The threshold value Th is set in relation to the screw pressure data and the flow path pressure data, as shown in Fig. 9. As shown in Figs. 5 and 6, both the flow path pressure data and the screw pressure data increase due to clogging of the gate P3. When clogging of the gate P3 occurs, the increase in the flow path pressure data becomes greater than the increase in the screw pressure data.
[0067] 9, the determining unit 61 determines that the gate P3 is clogged in the region above the threshold value Th shown by the solid line in the two-dimensional coordinate system representing the relationship between the screw pressure data and the channel pressure data, while the determining unit 61 determines that the gate P3 is not clogged in the region below the threshold value Th.
[0068] The threshold value Th can be set by acquiring a large number of flow path pressure data and screw pressure data for each of the presence and absence of clogging of the gate P3. Although the threshold value Th is shown as a straight line in FIG. 9, it may be set as a curved line.
[0069] (9. Second Modification of First Embodiment) A second modified embodiment of the injection molding apparatus 1 of the first embodiment will be described with reference to Fig. 10. In the above-described first embodiment, the determination unit 61 determines whether or not the gate P3 is clogged by using the screw pressure data in addition to the flow path pressure data.
[0070] In this modified embodiment, as shown in Fig. 10, the judgment unit 61 judges whether the gate P3 is clogged or not by using the flow path pressure data. The judgment unit 61 does not use the screw pressure data. As shown in Fig. 6, the flow path pressure data changes significantly depending on whether the gate P3 is clogged or not. Therefore, the judgment unit 61 can adequately judge whether the gate P3 is clogged or not.
[0071] (10. Third Modification of First Embodiment) A third modified embodiment of the injection molding apparatus 1 of the first embodiment will be described with reference to Fig. 11. In the above-described first embodiment, the determination unit 61 determines whether or not the gate P3 is clogged by using the flow path pressure data and the screw pressure data in the latter time zone (t3 to t4) of the injection process S4.
[0072] In the injection process S4, when molten resin is being supplied to the molded product cavity C in the molding of one molded product, a phenomenon may occur in which the gate P3 temporarily becomes clogged and then the clog at the gate P3 is cleared. In such a case, the flow path pressure data in the injection process S4 changes as shown by the dashed line in FIG.
[0073] In order to determine whether the gate P3 is temporarily clogged in such a case, in this modified embodiment, the determination unit 61 uses the feature amount of the flow channel pressure data and the feature amount of the screw pressure data in the early time period (t2 to t3) between the pressure peak time t2 and the end time t4 of the injection process S4. Specifically, the determination unit 61 uses the time integral value of the time period (t2 to t3) as the feature amount. In this way, the determination unit 61 can detect the pressure change as shown by the dashed line in FIG. 11 and determine whether the gate P3 is clogged.
[0074] (11. Injection molding apparatus 1 of second embodiment) An injection molding apparatus 1 of a second embodiment will be described with reference to Fig. 12. As shown in Fig. 12, a computer device 60 of the injection molding apparatus 1 includes a determination unit 61, a storage unit 62, and a viscosity estimation unit 66. The determination unit 61 and the viscosity estimation unit 66 are configured by an arithmetic unit constituting the above-mentioned computer device 60, and function by executing a computer program.
[0075] The viscosity estimation unit 66 estimates the viscosity of the molten resin flowing through the resin flow path P in the mold 30. The viscosity estimation unit 66 estimates the viscosity of the molten resin based on the flow path pressure data, the screw pressure data, the nozzle pressure data, the control data in the control device 50, and the like. Several specific examples of the viscosity estimation unit 66 will be described below.
[0076] The determination unit 61 determines whether or not the gate P3 is clogged by taking into account the flow path pressure data and the viscosity (hereinafter referred to as "estimated resin viscosity") estimated by the viscosity estimation unit 66. Note that, in addition to the flow path pressure data and the estimated resin viscosity, the determination unit 61 may use screw pressure data as in the first embodiment, and may further use nozzle pressure data and control data of the control device 50.
[0077] In addition, the determination unit 61 applies machine learning to determine whether the gate P3 is clogged. Therefore, the determination unit 61 determines whether the gate P3 is clogged using a trained model generated in advance. The storage unit 62 stores the trained model used by the determination unit 61 to determine whether the gate P3 is clogged.
[0078] The function of the computer device 60 in the case where machine learning is applied will be described with reference to Fig. 13. As a learning phase, first, a training data set 63 is prepared. The training data set 63 includes feature amounts of the flow path pressure data, an estimated resin viscosity estimated by a viscosity estimation unit 66, and label data on the presence or absence of clogging at the gate P3. The training data set 63 may further include feature amounts of the screw pressure data, feature amounts of the nozzle pressure data, and the like.
[0079] In the learning phase, the machine learning processing unit 64 in the computer device 60 generates one trained model by performing machine learning using the training data set 63. The trained model is stored in the storage unit 62. In this embodiment, the trained model uses the feature amount of the flow path pressure data and the estimated resin viscosity as explanatory variables, and uses the presence or absence of clogging of the gate P3 as a response variable.
[0080] Next, in the estimation phase, the determination unit 61 acquires at least the flow path pressure data as the detection data 65, and the estimated resin viscosity estimated by the viscosity estimation unit 66. Then, the determination unit 61 calculates a feature amount of the flow path pressure data. Next, the determination unit 61 uses a trained model stored in the storage unit 62 to input the feature amount of the flow path pressure data and the estimated resin viscosity to determine whether or not the gate P3 is clogged.
[0081] (12. Behavior of screw pressure data and flow path pressure data) The behavior (change over time) of the screw pressure data and the behavior (change over time) of the flow path pressure data in the injection process S4 and the pressure holding process S5 will be described with reference to Figures 14 to 17. In Figures 14 to 17, thick lines indicate cases where the resin viscosity in the resin flow path P is high, and thin lines indicate cases where the resin viscosity in the resin flow path P is low.
[0082] 14 and 15, the screw pressure data has different values between pressure peak times t2a, t2b and injection process end time t4 in the injection process S4. That is, during the time periods (t2a to t4, t2b to t4), if the resin viscosity is low, the screw pressure data shows a low value, and if the resin viscosity is high, the screw pressure data shows a high value.
[0083] 15, in the screw pressure data, the time (t1 to t2a, t1 to t2b) from the start time t1 of the injection process S4 to the pressure peak times t2a, t2b in the injection process S4 differs depending on the resin viscosity. That is, the time (t1 to t2b) when the resin viscosity is low is shorter than the time (t1 to t2a) when the resin viscosity is high.
[0084] As shown in Fig. 14, in the screw pressure data, the time (t4-t5a, t4-t5b) from the start time t4 of the pressure holding process S5 to the filling completion time t5a, t5b of the molded product cavity C in the pressure holding process S5 varies depending on the resin viscosity. In other words, the time (t4-t5b) when the resin viscosity is low is shorter than the time (t4-t5a) when the resin viscosity is high. The filling completion times t5a, t5b are the time when the pressure of the screw pressure data in the pressure holding process S5 rises, albeit slightly. In other words, the filling completion times t5a, t5b are the time when the pressure change of the screw pressure data in the pressure holding process S5 becomes larger than a predetermined value.
[0085] Here, the injection process S4 ends when a predetermined time has elapsed since the start, so the end time t4 of the injection process S4 is constant regardless of the resin viscosity. Therefore, the same applies even if the above times (t4 to t5a, t4 to t5b) are replaced with the times (t1 to t5a, t1 to t5b) from the start time t1 of the injection process S4 to the completion times t5a, t5b of filling the molded product cavity C in the pressure holding process S5.
[0086] 16 and 17, the flow path pressure data behaves in the same manner as the screw pressure data. The flow path pressure data has different values during the period from pressure peak times t2a, t2b to the end time t4 of the injection process S4 in the injection process S4. In other words, during the relevant time periods (t2a to t4, t2b to t4), if the resin viscosity is low, the screw pressure data shows a low value, and if the resin viscosity is high, the screw pressure data shows a high value.
[0087] 17, in the flow path pressure data, the time (t1 to t2a, t1 to t2b) from the start time t1 of the injection process S4 to the pressure peak times t2a, t2b in the injection process S4 differs depending on the resin viscosity. That is, the time (t1 to t2b) when the resin viscosity is low is shorter than the time (t1 to t2a) when the resin viscosity is high.
[0088] As shown in FIG. 16, in the flow path pressure data, the time (t4-t5a, t4-t5b) from the start time t4 of the pressure holding process S5 to the filling completion time t5a, t5b of the molded product cavity C in the pressure holding process S5 varies depending on the resin viscosity. In other words, the time (t4-t5b) when the resin viscosity is low is shorter than the time (t4-t5a) when the resin viscosity is high. The filling completion times t5a, t5b are the time when the pressure of the flow path pressure data in the pressure holding process S5 rises. In other words, the filling completion times t5a, t5b are the time when the pressure change of the flow path pressure data in the pressure holding process S5 becomes larger than a predetermined value. The pressure change of the flow path pressure data is larger than that of the screw pressure data.
[0089] Here, the same applies if the above times (t4 to t5a, t4 to t5b) are replaced with the times (t1 to t5a, t1 to t5b) from the start time t1 of the injection process S4 to the completion time t5a, t5b of filling the molded product cavity C in the pressure holding process S5.
[0090] (13. Effects of the Second Embodiment) If the resin viscosity is different, the flow path pressure data and the screw pressure data will show different values. In other words, it may not be easy to determine whether the change in the flow path pressure data and the screw pressure data is due to the clogging of the gate P3 or the resin viscosity.
[0091] In the injection molding apparatus 1 of the second embodiment, the determination unit 61 determines whether the gate P3 is clogged by taking into account the estimated resin viscosity in addition to the flow path pressure data and the screw pressure data. Therefore, the determination unit 61 can determine with high accuracy whether the gate P3 is clogged.
[0092] (14. First Modification of Second Embodiment) A first modified mode of the injection molding apparatus 1 of the second embodiment will be described with reference to FIG. 18. FIG. 18 shows the function of a computer device 60 when machine learning is applied. As a learning phase, a training data set 63 is first prepared. The training data set 63 includes feature amounts of flow path pressure data classified by the resin viscosity estimated by the viscosity estimation unit 66, and label data of the presence or absence of clogging at the gate P3. The training data set 63 may further include feature amounts of screw pressure data, feature amounts of nozzle pressure data, and the like.
[0093] In the learning phase, the machine learning processing unit 64 in the computer device 60 performs machine learning using the training data set 63 for each estimated resin viscosity to generate multiple trained models for each estimated resin viscosity. The multiple trained models for each estimated resin viscosity are stored in the storage unit 62. In this modified embodiment, each trained model uses the feature amount of the flow path pressure data as an explanatory variable and the presence or absence of clogging of the gate P3 as an objective variable.
[0094] Next, in the estimation phase, the determination unit 61 acquires at least the flow path pressure data as the detection data 65, and the estimated resin viscosity estimated by the viscosity estimation unit 66. Then, the determination unit 61 calculates the feature amount of the flow path pressure data. Next, the determination unit 61 selects one learned model corresponding to the estimated resin viscosity from among a plurality of learned models stored in the storage unit 62. Next, the determination unit 61 determines whether or not the gate P3 is clogged by inputting the feature amount of the flow path pressure data using the selected learned model. That is, the determination unit 61 classifies the estimated resin viscosity and determines whether or not the gate P3 is clogged for each classified estimated resin viscosity. In this case, the same effect as that of the second embodiment described above is also achieved.
[0095] (15. Second Modification of Second Embodiment) A second modified mode of the injection molding apparatus 1 of the second embodiment will be described with reference to Fig. 19. In the first modified mode of the second embodiment described above, a plurality of trained models generated by machine learning for each estimated resin viscosity are stored in the storage unit 62 of the computer device 60, and the determination unit 61 selects one from the plurality of trained models and determines the presence or absence of clogging of the gate P3 using the selected trained model.
[0096] In this modified embodiment, the memory unit 62 stores a threshold value Th used to determine whether or not the gate P3 is clogged. The threshold value Th is set for each estimated resin viscosity, as shown in FIG. 19. The threshold value Th is set for each estimated resin viscosity in relation to the screw pressure data and the channel pressure data. As shown in FIG. 19, the judgment unit 61 judges that the gate P3 is clogged in the region above the threshold value Th shown by the solid line in the two-dimensional coordinate system representing the relationship between the screw pressure data and the channel pressure data for each estimated resin viscosity. On the other hand, the judgment unit 61 judges that the gate P3 is not clogged in the region below the threshold value Th.
[0097] The threshold value Th can be set by acquiring a large number of flow path pressure data and screw pressure data for each of the presence and absence of clogging of the gate P3. Although the threshold value Th is shown as a straight line in Fig. 19, it may be set as a curved line.
[0098] (16. First Example of Resin Viscosity Estimation) In the second embodiment and its modified aspect, the viscosity estimation unit 66 estimates the viscosity of the molten resin in the resin flow path P. A first specific example of a method for estimating the resin viscosity by the viscosity estimation unit 66 will be described with reference to FIGS. 16 to 17 and 20.
[0099] 16 and 17, the time (t1-t2a, t1-t2b) from the start time t1 of the injection process S4 to the pressure peak times t2a, t2b of the flow path pressure data in the injection process S4 varies depending on the resin viscosity of the resin flow path P. Therefore, the viscosity estimation unit 66 estimates the resin viscosity using the time (t1-t2a, t1-t2b) from the start time t1 of the injection process S4 to the pressure peak times t2a, t2b of the flow path pressure data in the injection process S4 as a component representing the resin viscosity.
[0100] (17. Second Example of Resin Viscosity Estimation) A second specific example of a method for estimating the resin viscosity by the viscosity estimation unit 66 will be described with reference to Figures 16 to 17 and 20. As shown in Figures 16 and 17, in the flow path pressure data, the time (t1 to t5a, t1 to t5b, or t4 to t5a, t4 to t5b) from the start time t1 of the injection process S4 or the start time t4 of the pressure holding process S5 to the completion time t5a, t5b of filling the molded product cavity C in the pressure holding process S5 differs depending on the resin viscosity of the resin flow path P.
[0101] Therefore, as shown in FIG. 20, the viscosity estimation unit 66 estimates the resin viscosity using the time (t1 to t5a, t1 to t5b, or t4 to t5a, t4 to t5b) from the start time t1 of the injection process S4 or the start time t4 of the pressure holding process S5 to the completion time t5a, t5b of filling of the molded product cavity C in the pressure holding process S5 in the flow path pressure data as a component representing the resin viscosity.
[0102] (18. Third Example of Resin Viscosity Estimation) A third specific example of a method for estimating the resin viscosity by the viscosity estimation unit 66 will be described with reference to Figs. 14 to 15 and 21. As shown in Figs. 14 and 15, the time (t1-t2a, t1-t2b) from the start time t1 of the injection process S4 to the pressure peak times t2a, t2b of the screw pressure data in the injection process S4 differs depending on the resin viscosity of the resin flow path P. Therefore, the viscosity estimation unit 66 estimates the resin viscosity using the time (t1-t2a, t1-t2b) from the start time t1 of the injection process S4 to the pressure peak times t2a, t2b of the screw pressure data in the injection process S4 as a component representing the resin viscosity.
[0103] (19. Fourth Example of Resin Viscosity Estimation) A fourth specific example of a method for estimating the resin viscosity by the viscosity estimation unit 66 will be described with reference to Figures 14 to 15 and 21. As shown in Figures 14 and 15, in the screw pressure data, the time (t1 to t5a, t1 to t5b, or t4 to t5a, t4 to t5b) from the start time t1 of the injection process S4 or the start time t4 of the pressure holding process S5 to the completion time t5a, t5b of filling the molded product cavity C in the pressure holding process S5 varies depending on the resin viscosity of the resin flow path P.
[0104] Therefore, as shown in FIG. 21, the viscosity estimation unit 66 estimates the resin viscosity using the time (t1 to t5a, t1 to t5b, or t4 to t5a, t4 to t5b) from the start time t1 of the injection process S4 or the start time t4 of the pressure holding process S5 to the completion time t5a, t5b of filling of the molded product cavity C in the pressure holding process S5 as a component representing the resin viscosity in the screw pressure data.
[0105] (20. Fifth Example of Resin Viscosity Estimation) A fifth specific example of a method for estimating a resin viscosity by the viscosity estimation unit 66 will be described with reference to Fig. 22 to Fig. 24. As shown in Fig. 22, the viscosity estimation unit 66 estimates the resin viscosity using nozzle pressure data acquired by the nozzle pressure measuring device 28 and control data in the control device 50.
[0106] The behavior (change over time) of the nozzle pressure data in the purging process S1 is as shown in Figures 23 and 24. Here, the moving speed of the screw 23 is the same in Figures 23 and 24. When the moving speed of the screw 23 is the same, when the resin viscosity is low as shown in Figure 23, the average value of the nozzle pressure data in the purging process S1 is smaller than when the resin viscosity is high as shown in Figure 24. Therefore, the nozzle pressure data in the purging process S1 depends on the resin viscosity.
[0107] The nozzle pressure data increases as the movement speed of the screw 23 increases. Therefore, the viscosity estimation unit 66 estimates the resin viscosity using the relationship between the nozzle pressure data and the movement speed data of the screw 23 in the purging process S1 as a component representing the resin viscosity.
[0108] (21. Sixth Example of Resin Viscosity Estimation) In the fifth specific example, the viscosity estimation unit 66 estimated the resin viscosity using the nozzle pressure data and the movement speed data of the screw 23 in the purging process S1. Here, the nozzle pressure data changes similarly in the injection process S4. Therefore, in the sixth specific example, the viscosity estimation unit 66 estimates the resin viscosity using the relationship between the nozzle pressure data and the movement speed data of the screw 23 in the injection process S4 as a component representing the resin viscosity.
[0109] (22. Seventh Specific Example of Resin Viscosity Estimation) A seventh specific example of a method for estimating the resin viscosity by the viscosity estimation unit 66 will be described with reference to Fig. 25 and Fig. 26. As shown in Fig. 25, the viscosity estimation unit 66 estimates the resin viscosity by using control data in the control device 50.
[0110] The time required for the metering steps S2, S10 is affected by the resin viscosity. As shown in Fig. 26, when the resin viscosity is low, the time from the start of the metering steps S2, S10 to the end times t6a, t6b of the metering steps S2, S10 is longer than when the resin viscosity is high. This is because the pressure that the screw 23 receives from the molten resin decreases as the resin viscosity decreases. Therefore, the viscosity estimation unit 66 estimates the resin viscosity using the time required for the metering steps S2, S10 as a component representing the resin viscosity.
[0111] (23. Eighth Specific Example of Resin Viscosity Estimation) A description will be given of an eighth specific example of a method for estimating the resin viscosity by the viscosity estimation unit 66. In the above first to seventh specific examples, the viscosity estimation unit 66 estimates the resin viscosity by taking each element as a component representing the resin viscosity.
[0112] In addition, the viscosity estimation unit 66 estimates the resin viscosity using the elements described in the first to seventh specific examples as one of the components expressing the resin viscosity. That is, the viscosity estimation unit 66 estimates the resin viscosity using a plurality of elements, each of which is one of the components expressing the resin viscosity. Since the viscosity estimation unit 66 uses a plurality of elements, it is preferable to apply machine learning. Of course, the viscosity estimation unit 66 can also estimate the viscosity by using a database that accumulates a plurality of elements.
Claims
1. an injection device including a cylinder, a screw, and a nozzle provided at a front end of the cylinder for ejecting molten resin as the screw advances; a mold including a molded product cavity and a resin flow path between the molded product cavity and a portion that contacts the nozzle; a flow channel pressure measuring device for acquiring flow channel pressure data in the resin flow channel; a viscosity estimation unit that estimates a viscosity of the molten resin flowing through the resin flow path in the mold; a determination unit that determines whether or not a gate of the resin flow path is clogged based on a feature amount of the flow path pressure data and taking into account the viscosity estimated by the viscosity estimation unit; and An injection molding apparatus comprising:
2. A screw pressure measuring device for acquiring screw pressure data that the screw receives from the molten resin in the cylinder; A control device that controls the injection device; Further equipped with The control device includes: an injection step of injecting a molten resin from the nozzle into the mold by controlling the speed of the screw; Following the injection step, a pressure holding step is performed in which a pressure is applied to the screw to apply a holding pressure to the molten resin in the molded product cavity. Executing a molding cycle including The injection molding apparatus according to claim 1 , wherein the determination unit determines the presence or absence of clogging in the gate based on a feature amount of the flow channel pressure data in the injection process and a feature amount of the screw pressure data in the injection process.
3. The resin flow path has a plurality of gates connected to one of the molding cavities, The injection molding apparatus according to claim 1 , wherein the determining unit determines whether or not a part of the plurality of gates is clogged.
4. The injection molding apparatus according to any one of claims 1 to 3, wherein the judgment unit judges the presence or absence of temporary clogging of the gate in a phenomenon in which temporary clogging of the gate occurs and then clears when a molding cycle for molding a molded product is executed multiple times in succession.
5. 3. The injection molding apparatus according to claim 1, wherein the judgment unit judges whether or not there is a temporary blockage at the gate in a phenomenon in which the blockage at the gate temporarily occurs and then clears when molten resin is supplied to the molded product cavity during the molding of a single molded product.
6. 6. The injection molding apparatus according to claim 1, wherein the flow channel pressure data is pressure data at a position in the resin flow channel different from the gate.
7. 3. The injection molding apparatus according to claim 2, wherein the determination unit determines whether or not there is a blockage in the gate based on a characteristic amount of the flow path pressure data in a later time period of the injection process that is closer to the pressure holding process, and a characteristic amount of the screw pressure data in a later time period of the injection process that is closer to the pressure holding process.
8. A control device for controlling the injection device is further provided. The control device includes: an injection step of injecting a molten resin from the nozzle into the mold by controlling the speed of the screw; Following the injection step, a pressure holding step is performed in which a pressure is applied to the screw to apply a holding pressure to the molten resin in the molded product cavity. A molding cycle including The injection molding apparatus according to any one of claims 1 to 7, wherein the viscosity estimation unit estimates the viscosity by using a time from a start of the injection process to a pressure peak of the flow path pressure data in the injection process as one of the components representing the viscosity.
9. 9. The injection molding apparatus according to claim 8, wherein the viscosity estimation unit estimates the viscosity using a time from a start of the injection process or a start of the pressure holding process to a completion of filling of the molded product cavity in the pressure holding process as one of the components representing the viscosity.
10. The injection molding apparatus according to claim 9 , wherein the filling completion time is a time when the pressure of the flow passage pressure data rises in the pressure holding step.
11. 11. The injection molding apparatus according to claim 10, wherein the filling completion time is when a pressure change in the flow channel pressure data during the pressure holding step becomes larger than a predetermined value.
12. Further provided is a second screw pressure measuring device for acquiring second screw pressure data that the screw receives from the molten resin in the cylinder, The injection molding apparatus according to any one of claims 8 to 11, wherein the viscosity estimation unit estimates the viscosity using the second screw pressure data as one of components representing the viscosity.
13. The injection molding apparatus according to claim 12, wherein the viscosity estimation unit estimates the viscosity using a time from a start of the injection process to a pressure peak of the second screw pressure data in the injection process as one of the components representing the viscosity.
14. a nozzle pressure measuring device for acquiring nozzle pressure data that the nozzle receives from the molten resin when the molten resin flows through the nozzle; the control device executes a purging step of discharging the molten resin in the cylinder from the nozzle in a state in which the nozzle is spaced from the mold before a plurality of consecutive molding cycles; The viscosity estimation unit estimates the viscosity by using the relationship between the nozzle pressure data in the purging process and the moving speed data of the screw in the purging process as one of the components representing the viscosity. The injection molding apparatus according to any one of claims 8 to 13.
15. a second nozzle pressure measuring device for acquiring second nozzle pressure data that the nozzle receives from the molten resin when the molten resin flows through the nozzle; The viscosity estimation unit estimates the viscosity by using the relationship between the second nozzle pressure data in the injection process and the screw movement speed data in the injection process as one of the components representing the viscosity. The injection molding apparatus according to any one of claims 8 to 14.
16. The molding cycle further includes a metering step of rotating the screw located at a forward position before the injection step to move the molten resin to the front end side of the cylinder, and retracting the screw to a predetermined position by a reaction to the forward movement of the molten resin, thereby storing a predetermined amount of molten resin at the front side of the cylinder, The injection molding apparatus according to any one of claims 8 to 15, wherein the viscosity estimation unit estimates the viscosity using a time required for the metering step as one of components representing the viscosity.
17. A control device for controlling the injection device is further provided. The control device includes: an injection step of injecting a molten resin from the nozzle into the mold by controlling the speed of the screw; Following the injection step, a pressure holding step is performed in which a pressure is applied to the screw to apply a holding pressure to the molten resin in the molded product cavity. Executing a molding cycle including The injection molding apparatus according to any one of claims 1 to 16, wherein the viscosity estimation unit estimates the viscosity using the time from the start of the injection process or the start of the pressure holding process to the completion of filling of the molded product cavity in the pressure holding process as one of the components representing the viscosity.
18. The injection molding apparatus according to claim 17, wherein the filling completion time is a time when the pressure of the flow passage pressure data rises in the pressure holding step.
19. 19. The injection molding apparatus according to claim 18, wherein the time when the filling is completed is when a pressure change in the flow path pressure data during the pressure holding step becomes larger than a predetermined value.
20. Further provided is a third screw pressure measuring device for acquiring third screw pressure data that the screw receives from the molten resin in the cylinder, The injection molding apparatus according to any one of claims 1 to 19, wherein the viscosity estimation unit estimates the viscosity using the third screw pressure data as one of components representing the viscosity.
21. A control device for controlling the injection device is further provided. The control device includes: an injection step of injecting a molten resin from the nozzle into the mold by controlling the speed of the screw; Following the injection step, a pressure holding step is performed in which a pressure is applied to the screw to apply a holding pressure to the molten resin in the molded product cavity. Executing a molding cycle including The injection molding apparatus according to claim 20, wherein the viscosity estimation unit estimates the viscosity using a time from a start of the injection process to a pressure peak of the third screw pressure data in the injection process as one of the components representing the viscosity.
22. a third nozzle pressure measuring device for acquiring third nozzle pressure data that the nozzle receives from the molten resin when the molten resin flows through the nozzle; A control device that controls the injection device; Further equipped with The control device includes: an injection step of injecting a molten resin from the nozzle into the mold by controlling the speed of the screw; Following the injection step, a pressure holding step is performed in which a pressure is applied to the screw to apply a holding pressure to the molten resin in the molded product cavity. Executing a molding cycle including The control device further executes a purging step of discharging the molten resin in the cylinder from the nozzle in a state in which the nozzle is spaced from the mold before a plurality of consecutive molding cycles, The viscosity estimation unit estimates the viscosity by using the relationship between the third nozzle pressure data in the purge process and the screw movement speed data in the purge process as one of the components representing the viscosity. The injection molding apparatus according to any one of claims 1 to 21.
23. a fourth nozzle pressure measuring device that acquires fourth nozzle pressure data that the nozzle receives from the molten resin when the molten resin flows through the nozzle; A control device that controls the injection device; Further equipped with The control device includes: an injection step of injecting a molten resin from the nozzle into the mold by controlling the speed of the screw; Following the injection step, a pressure holding step is performed in which a pressure is applied to the screw to apply a holding pressure to the molten resin in the molded product cavity. Executing a molding cycle including The viscosity estimation unit estimates the viscosity by using the relationship between the fourth nozzle pressure data in the injection process and the screw movement speed data in the injection process as one of the components representing the viscosity. The injection molding apparatus according to any one of claims 1 to 22.
24. A control device for controlling the injection device is further provided. The control device includes: a metering process in which the screw located at a forward position is rotated to move the molten resin toward the front end side of the cylinder, and the screw is retracted to a predetermined position by a reaction force of the forward movement of the molten resin, thereby storing a predetermined amount of molten resin at the front side of the cylinder; Following the metering step, an injection step of injecting the molten resin from the nozzle into the mold by controlling the speed of the screw; Following the injection step, a pressure holding step is performed in which a pressure is applied to the screw to apply a holding pressure to the molten resin in the molded product cavity. Executing a molding cycle including The injection molding apparatus according to any one of claims 1 to 23, wherein the viscosity estimation unit estimates the viscosity using a time required for the metering step as one of components representing the viscosity.
25. A memory unit that stores a learned model generated by performing machine learning using a training data set including a feature amount of the flow path pressure data, a feature amount of the screw pressure data, and label data on the presence or absence of clogging in the gate, The injection molding apparatus according to claim 2 or 7, wherein the judgment unit estimates the presence or absence of clogging of the gate by inputting features of the flow path pressure data and features of the screw pressure data using the learned model.
26. The method further includes a storage unit that stores a trained model generated by performing machine learning using a training data set including a feature amount of the flow path pressure data, the estimated viscosity, and label data indicating the presence or absence of clogging in the gate, The injection molding apparatus according to any one of claims 1 to 25, wherein the judgment unit estimates the presence or absence of clogging of the gate by inputting features of the flow path pressure data and the estimated viscosity using the learned model.
27. The injection molding apparatus according to any one of claims 1 to 26, wherein the judgment unit classifies the viscosity estimated by the viscosity estimation unit and judges the presence or absence of clogging in the gate based on the classified viscosity.
28. A storage unit is further provided that stores a plurality of learned models by viscosity that are generated by performing machine learning using a training data set including, for each of the estimated viscosities, feature amounts of the flow path pressure data and label data indicating the presence or absence of clogging in the gate, and The determination unit is selecting one trained model corresponding to the viscosity estimated by the viscosity estimation unit from among the plurality of trained models; The injection molding apparatus according to claim 27, wherein the selected trained model is used to input features of the flow path pressure data to determine whether or not the gate is clogged.
29. (delete)
30. (delete)
Citation Information
Patent Citations
And defective rate is reduced
CN209955205U
Apparatus for detecting injection abnormality of injection molder
JP1984146823A
Injection controlling method of injection molding machine
JP2006341540A
Device for detecting pressure abnormality of injection molding machine
JP2009248437A
Molding conditions decision support device and injection molding machine
JP2020049929A