Injection molding machine control device and program

The control device and program for injection molding machines optimize energy distribution by calculating heat transfer and shear energy ratios, improving energy efficiency and operational assessment.

JP7590594B2Active Publication Date: 2024-11-26FANUC LTD
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
JP2023552646
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Filing Date
2021-10-08
Publication Date
2024-11-26
Estimated Expiration
2041-10-08

AI Technical Summary

Technical Problem

Existing injection molding machines face challenges in optimally distributing the ratio of heat transfer and shearing heat for melting pellets, which affects energy efficiency and power consumption, and there is a need to understand the energy ratio of these processes more accurately.

Method used

A control device and program for injection molding machines that calculate the energy ratio by determining the amount of heat transfer energy and shear energy based on operation and characteristic information, including a power consumption calculation unit, operation information acquisition unit, and characteristic information acquisition unit, to optimize energy distribution.

Benefits of technology

The solution allows for precise monitoring and optimization of energy usage in injection molding machines, enabling better energy efficiency and easier assessment of operating states.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007590594000010
    Figure 0007590594000010
  • Figure 0007590594000011
    Figure 0007590594000011
  • Figure 0007590594000012
    Figure 0007590594000012
Patent Text Reader

Abstract

Provided are a program and a control device for an injection molding machine, both of which make it possible to recognize an energy ratio of the injection molding machine with respect to power consumption. This control device for an injection molding machine calculates an energy ratio with respect to power consumption at a specific time of the injection molding machine that has a cylinder, a heater disposed at the circumference thereof, and a screw disposed inside the cylinder. The control device comprises: a power consumption calculation unit which calculates power consumption of the injection molding machine; a motion information acquisition unit which acquires motion information including the heater operation rate of the heater and the rotation speed of the screw; a characteristic information acquisition unit which acquires characteristic information including the capacity of the heater and the torque of a motor that drives the screw; an energy amount calculation unit which, on the basis of the characteristic information and motion information, calculates both the amount of heat transfer energy transmitted at least from the heater to resin and the amount of shear energy by the screw; and an energy ratio calculation unit which calculates an energy ratio of the injection molding machine on the basis of the amount of heat transfer energy, the amount of shear energy, and the power consumption.
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present disclosure relates to a control device and a program for an injection molding machine. [Background technology]

[0002] Conventionally, there is known an injection molding machine that melts pellets (resin) placed in a hopper in a cylinder and injects the pellets into a mold. A heater is disposed on the outer periphery of the cylinder of the injection molding machine. The heater heats the cylinder, thereby melting the pellets.

[0003] Injection molding machines melt resin using heat supplied from a heater and frictional heat generated by the rotation of the screw. From the viewpoint of energy saving, it is preferable to know the power consumption of heaters and motors. As such a technique, a technique for measuring the power consumption of a heater has been proposed (see, for example, Patent Document 1). Also, a technique for calculating molding conditions that will result in a predetermined value or a minimum power consumption has been proposed (see, for example, Patent Document 2). [Prior art documents] [Patent documents]

[0004] [Patent Document 1] Patent No. 5882848 [Patent Document 2] Patent No. 5714838 Summary of the Invention [Problem to be solved by the invention]

[0005] In an injection molding machine, pellets fed from a hopper mouth are melted by heat transfer from a heater and shear heat generated by the rotation of the screw. In general, "heat transfer" is characterized by a relatively low heat supply capacity but a relatively small variation. Meanwhile, "shear" is characterized by a relatively high heat supply capacity but a relatively large variation. It is preferable to optimally allocate the ratio of "heat transfer" to "shear" according to the requirements for the molded product. It is also preferable to be able to grasp the energy ratio of the injection molding machine relative to the power consumption. [Means for solving the problem]

[0006] (1) The present disclosure relates to a control device for an injection molding machine having a cylinder, a heater arranged around the cylinder, and a screw arranged inside the cylinder, and calculating an energy ratio relative to power consumption at a predetermined time, the control device for the injection molding machine including: a power consumption calculation unit that calculates the power consumption of the injection molding machine; an operation information acquisition unit that acquires operation information including a heater operating rate of the heater and a rotation speed of the screw; a characteristic information acquisition unit that acquires characteristic information including a capacity of the heater and a motor torque that drives the screw; an energy amount calculation unit that calculates at least an amount of heat transfer energy transferred from the heater to the resin and an amount of shear energy by the screw based on the characteristic information and the operation information; and an energy ratio calculation unit that calculates an energy ratio of the injection molding machine based on the amount of heat transfer energy, the amount of shear energy, and the power consumption.

[0007] (2) The present disclosure also relates to a program for operating a computer as a control device for an injection molding machine having a cylinder, a heater arranged around the cylinder, and a screw arranged inside the cylinder, the control device calculating an energy ratio relative to power consumption at a predetermined time, the program causing the computer to function as a power consumption calculation unit that calculates the power consumption of the injection molding machine, an operation information acquisition unit that acquires operation information including a heater operating rate of the heater and a rotation speed of the screw, a characteristic information acquisition unit that acquires characteristic information including a capacity of the heater and a motor torque that drives the screw, an energy amount calculation unit that calculates at least an amount of heat transfer energy transferred from the heater to the resin and an amount of shear energy by the screw based on the characteristic information and the operation information, and an energy ratio calculation unit that calculates an energy ratio of the injection molding machine based on the amount of heat transfer energy, the amount of shear energy, and the power consumption. Effect of the Invention

[0008] According to the present disclosure, it is possible to provide a control device and program for an injection molding machine that are capable of grasping the energy ratio of the injection molding machine in relation to the power consumption. [Brief description of the drawings]

[0009] [Figure 1] 1 is a schematic diagram showing an injection molding machine including a control device according to a first embodiment of the present disclosure. [Diagram 2] FIG. 2 is a block diagram showing a control device according to the first embodiment. [Diagram 3] FIG. 2 is a schematic diagram showing the display contents of the control device of the first embodiment. [Figure 4] 4 is a flowchart showing the flow of operations of the control device of the first embodiment. [Diagram 5] FIG. 11 is a block diagram showing a control device according to a second embodiment of the present disclosure. [Figure 6] FIG. 11 is a schematic diagram illustrating an overview of the operation of an estimation unit of the control device according to the second embodiment. [Figure 7]10 is a flowchart showing the flow of operations of the control device of the second embodiment. [Figure 8] FIG. 13 is a schematic diagram showing the display content of a control device according to a third embodiment of the present disclosure. [Figure 9] FIG. 13 is a schematic diagram showing the display content of a control device according to a fourth embodiment of the present disclosure. [Figure 10] FIG. 13 is a block diagram showing a control device according to a fifth embodiment of the present disclosure. [Figure 11] 13 is a flowchart showing the flow of operations of the control device according to the fifth embodiment. [Figure 12] FIG. 13 is a schematic diagram showing the display content of a control device according to a sixth embodiment of the present disclosure. [Figure 13] FIG. 13 is a block diagram showing a control device according to a sixth embodiment. [Figure 14] 13 is a flowchart showing the flow of operations of the control device of the sixth embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0010] Hereinafter, a control device 1 and a program for an injection molding machine 10 according to an embodiment of the present disclosure will be described with reference to FIGS. First, an injection molding machine 10 controlled according to the present embodiment will be described. The injection molding machine 10 is a device that melts pellets and injects them into a mold (not shown) to perform molding. The injection molding machine 10 includes, for example, a cylinder 101, a heater 102, and a safety cover 103, as shown in FIG.

[0011] The cylinder 101 is, for example, a cylindrical body. One axial end of the cylinder 101 is tapered toward the end. The cylinder 101 has a screw (not shown) inside along the axial direction. The screw moves the molten pellets to the one end side of the cylinder 101 while stirring them.

[0012] The heater 102 is disposed around the cylinder 101. For example, a plurality of heaters 102 are disposed along the axial direction of the cylinder 101. In this embodiment, three heaters 102 are disposed along the axial direction so as to cover the outer periphery of the cylinder 101. The heaters 102 heat the cylinder 101 to, for example, 200 degrees or more.

[0013] The safety cover 103 is a concave body disposed around the heater 102. The safety cover 103 is disposed to prevent contact with the heater 102, which becomes relatively hot.

[0014] According to the above-described injection molding machine 10, pellets are melted inside the cylinder 101 heated to 200 degrees or more by the heater 102. The screw injects the molten pellets into a mold from one end of the cylinder 101. In this way, the injection molding machine 10 molds, for example, a plastic product.

[0015] The control device 1 of the injection molding machine 10 according to the following embodiment calculates the amount of heat transfer energy transferred from the heater 102 to the resin and the amount of shear energy caused by the rotation of the screw. The control device of the injection molding machine 10 according to the following embodiment also calculates the power consumption of the injection molding machine 10 and the energy ratio to the power consumption (sometimes called energy efficiency). In this way, the following embodiment aims to make it possible to easily determine whether the operating condition of the injection molding machine 10 is good or bad. In the following embodiment, "in operation" refers to the moment when the injection molding machine 10 is actually operating. In the following embodiment, "predetermined time" refers to the time at which the surface temperature of the heater 102 is to be estimated.

[0016] [First embodiment] Next, the control device 1 of the injection molding machine 10 according to the first embodiment of the present disclosure will be described with reference to FIGS. The control device 1 is a device that controls the injection molding machine 10. Specifically, the control device 1 is a device that controls the molding conditions of the injection molding machine 10. For example, as shown in FIG. 1, the control device 1 is connected to the injection molding machine 10. The control device 1 specifies and controls molding conditions such as the injection molding speed, pressure, temperature of the cylinder 101, mold temperature, and the injection amount of the molten pellets. As shown in FIG. 2, the control device 1 includes an operation information storage unit 11, an operation information acquisition unit 12, a characteristic information storage unit 20, a characteristic information acquisition unit 21, a performance information storage unit 13, a performance information acquisition unit 14, a power consumption calculation unit 15, an energy amount calculation unit 22, an energy ratio calculation unit 16, an output unit 18, and an output control unit 19.

[0017] The operation information storage unit 11 is, for example, a recording medium such as a hard disk. The operation information storage unit 11 stores the setting values ​​and measurement values ​​of the injection molding machine 10. The operation information storage unit 11 also stores measurement values ​​from sensors. For example, the operation information storage unit 11 stores the screw rotation rate R per unit time, the load current rate r during molding, and the like. M , the operating rate r of the heater 102 i , flow rate Q, cooling water outlet temperature T OUT , and cooling water inlet temperature T IN is stored as operation information.

[0018] The operation information acquiring unit 12 is realized, for example, by the operation of a CPU. The operation information acquiring unit 12 acquires operation information including the heater operation rate of the heater 102 and the rotation speed of the screw. In this embodiment, the operation information acquiring unit 12 acquires the operation information from the operation information storage unit 11.

[0019] The characteristic information storage unit 20 is, for example, a recording medium such as a hard disk. The characteristic information storage unit 20 stores constants related to the injection molding machine 10 as characteristic information. For example, the characteristic information storage unit 20 stores motor torque T including mechanical efficiency and reduction ratio, load current rate r M0 , the capacity W of the heater 102 i , density of water ρ, and specific heat of water C W is stored as characteristic information.

[0020] The characteristic information acquisition unit 21 is realized, for example, by the operation of a CPU. The characteristic information acquisition unit 21 acquires characteristic information including the capacity of the heater 102 and the motor torque that drives the screw.

[0021] The performance information storage unit 13 is, for example, a recording medium such as a hard disk. The performance information storage unit 13 stores, as performance information, performance information on the operation of the injection molding machine 10. For example, the performance information storage unit 13 stores, as performance information, a performance of a ratio of the amount of heat transfer energy transferred from the heater 102 to the cylinder 101 with respect to the amount of heat generated by the heater.

[0022] The performance information acquisition unit 14 is realized, for example, by the operation of a CPU. The performance information acquisition unit 14 acquires performance information from the performance information storage unit 13. In this embodiment, the performance information acquisition unit 14 acquires, as performance information, a ratio between the amount of heat generated by the heater 102 and the amount of energy transferred from the heater 102 to the cylinder 101. The performance information acquisition unit 14 acquires the ratio between the amount of heat generated by the heater 102 and the amount of energy transferred from the heater 102 to the cylinder 101. Hi The amount of heat energy transferred from the heater 102 to the cylinder 101 is E Ei Then, the performance of the ratio β shown in the following formula 1 is obtained. Here, i (i=1, 2, . . . , k) is a natural number and represents a number for identifying the k heaters 102.

[0023]

number

[0024] The power consumption calculation unit 15 is realized, for example, by the operation of a CPU. The power consumption calculation unit 15 calculates at least the power consumption of the entire injection molding machine 10. For example, the power consumption calculation unit 15 calculates the power consumption of the entire injection molding machine 10 for each sampling period. The power consumption calculation unit 15 performs calculations by measuring the voltage value and current value of the power flowing through the injection molding machine 10. The power consumption calculation unit 15 calculates the power consumption integrated for each arbitrary timing (for example, shot). The calculated power consumption is displayed on the output unit 18 for each arbitrary timing (for example, shot).

[0025] The energy amount calculation unit 22 is realized, for example, by the operation of a CPU. The energy amount calculation unit 22 calculates at least the amount of heat transfer energy transferred from the heater 102 to the resin and the amount of shear energy by the screw based on the characteristic information and the operation information. For example, the energy amount calculation unit 22 calculates the amount of shear energy (J) by the screw rotation as E S , motor torque (N m) including mechanical efficiency and reduction ratio is T, screw rotation amount per unit time (rad / s) is R, and load current rate during molding is r M , the load current rate during idling is r M0 As a result, the energy amount calculation unit 22 calculates the shear energy amount (J)E S The work load of the screw rotating motor is calculated as follows: The motor torque may be a rated torque or a maximum torque. The load current rate is a command value from a controller that controls the screw rotating motor, and indicates the ratio of the load torque to the motor torque.

[0026]

number

[0027] The energy amount calculation unit 22 calculates the amount of heat transfer energy (J) as E T , the heat generation amount (J) of the heater 102 is E Hi , the heat generation amount E of the heater 102 Hi The amount of heat energy E transferred from the heater 102 to the cylinder 101 without being released into the atmosphere Ei The ratio β (0<β≦1), the amount of heat (J) absorbed by the cooling water is E W , the amount of heat transferred to the machine body (hopper side) (J) is E0, and the capacity of the heater 102 (W) is W i , the heater operation rate of the heater 102 is r i , density of water (g / cm 3 ) is ρ, and the specific heat of water (J / g K) is C W , water flow rate (cm 3 / s) is Q, cooling water outlet temperature (K) is T OUT, the cooling water inlet temperature (K) is T IN As a result, the energy amount calculation unit 22 calculates the amount of heat transfer energy E T The heater availability is explained as a command value indicating the amount of operation of the heater 102 from a controller (not shown) that controls the heater 102. In addition, the controller determines the command value based on a detection value at a temperature control point, for example.

[0028]

number

[0029] The energy ratio calculation unit 16 is realized by, for example, the operation of a CPU. The energy ratio calculation unit 16 calculates a ratio with the power consumption as the denominator and the sum of the amount of heat transfer energy and the amount of shear energy as the numerator. The energy ratio calculation unit 16 calculates the amount of heat transfer energy E T , shear energy amount E S , and power consumption E P Based on this, the energy ratio η of the injection molding machine 10 E The energy ratio calculation unit 16 calculates, for example, the power consumption of the entire injection molding machine 10 as E P and the amount of heat energy E transferred from the heater 102 to the resin. T and the amount of shear energy due to screw rotation E S The amount of energy used to melt the resin is E M The energy ratio η E is calculated by the following formula 4.

[0030]

number

[0031] The output unit 18 is, for example, a display unit such as a display. The output unit 18 outputs the calculated amount of heat radiation to the outside. For example, as shown in FIG. 3, the output unit 18 outputs the power consumption E P , the melting energy of the resin EM , and the energy ratio η E Output.

[0032] The output control unit 19 is realized, for example, by the operation of a CPU. The output control unit 19 outputs the calculated power consumption E P , the melting energy of the resin E M , and the energy ratio η Eη Output the following.

[0033] Next, the flow of processing by the control device 1 will be described with reference to FIG. First, the characteristic information acquisition unit 21 acquires characteristic information (step S1). The characteristic information acquisition unit 21 acquires the characteristic information from the characteristic information storage unit 20, for example.

[0034] Next, the power consumption calculation unit 15 calculates the power consumption (step S2). Next, the operation information acquisition unit 12 acquires the operation information (step S3). The operation information acquisition unit 12 acquires the operation information stored in the operation information storage unit 11 in advance, for example.

[0035] Next, the energy amount calculation unit 22 calculates the energy amount (step S4). Next, the energy ratio calculation unit 16 calculates the energy ratio (step S5). Next, the output unit 18 outputs the power consumption, the energy amount, and the energy ratio (step S6).

[0036] Next, it is determined whether or not to repeat the calculation of the energy amount and the energy ratio (step S7). If the calculation is to be repeated (step S7: YES), the process returns to step S2. On the other hand, if the calculation is to be ended (step S7: NO), the process according to this flow ends.

[0037] Next, the program of this embodiment will be described. Each component included in the control device 1 of the injection molding machine 10 can be realized by hardware, software, or a combination of these. Here, being realized by software means being realized by a computer reading and executing a program.

[0038] The program can be stored and provided to the computer using various types of non-transitory computer readable media. The non-transitory computer readable media includes various types of tangible storage media. Examples of the non-transitory computer readable media include magnetic recording media (e.g., flexible disks, magnetic tapes, hard disk drives), magneto-optical recording media (e.g., magneto-optical disks), CD-ROM (Read Only Memory), CD-R, CD-R / W, and semiconductor memory (e.g., mask ROM, PROM (Programmable ROM), EPROM (Erasable PROM), flash ROM, RAM (random access memory)). The display program may also be provided to the computer by various types of transitory computer readable media. Examples of the transitory computer readable media include electric signals, optical signals, and electromagnetic waves. The transitory computer readable media can provide the program to the computer via a wired communication path such as an electric wire and an optical fiber, or via a wireless communication path.

[0039] As described above, the control device 1 and the program for the injection molding machine 10 according to the first embodiment provide the following advantages. (1) A control device 1 for an injection molding machine 10 having a cylinder 101, a heater 102 disposed around the cylinder 101, and a screw disposed inside the cylinder 101, which calculates an energy ratio to power consumption at a predetermined time, includes a power consumption calculation unit 15 for calculating the power consumption of the injection molding machine 10, an operation information acquisition unit 12 for acquiring operation information including a heater operating rate of the heater 102 and a rotation speed of the screw, a characteristic information acquisition unit 21 for acquiring characteristic information including a capacity of the heater 102 and a motor torque for driving the screw, an energy amount calculation unit 22 for calculating at least an amount of heat transfer energy transferred from the heater 102 to a resin and an amount of shear energy by the screw based on the characteristic information and the operation information, and an energy ratio calculation unit 16 for calculating an energy ratio of the injection molding machine 10 based on the amount of heat transfer energy, the amount of shear energy, and the power consumption. This makes it possible to obtain the energy amount and the energy ratio together with the power consumption. Therefore, it is possible to easily judge whether the energy ratio to the power consumption is good or not.

[0040] (2) The control device 1 of the injection molding machine 10 further includes a performance information acquisition unit 14 that acquires the ratio between the amount of heat generated by the heater 102 and the amount of energy transferred from the heater 102 to the cylinder 101 as performance information, and the energy amount calculation unit 22 calculates at least the amount of heat transfer energy transferred from the heater 102 to the resin and the amount of shear energy by the screw based on the operation information, characteristic information, and performance information. This makes it possible to easily calculate the amount of heat transfer energy and the amount of shear energy from the amount of heat generated by the heater 102 and the amount of energy transferred to the cylinder 101.

[0041] [Second embodiment] Next, a control device 1 of an injection molding machine 10 according to a second embodiment of the present disclosure will be described with reference to Fig. 5 to Fig. 8. In describing the second embodiment, the same components are denoted by the same reference numerals, and the description thereof will be omitted or simplified.

[0042] The control device 1 of the injection molding machine 10 according to the second embodiment uses the surface temperature of the heater 102 to more accurately calculate the amount of heat transfer energy E T The control device 1 of the injection molding machine 10 according to the second embodiment estimates the surface temperature at a predetermined time by using a correlation among the actual surface temperature of the heater 102, the set temperature set for the heater 102, and the heater operation rate of the heater 102.

[0043] The control device 1 of the injection molding machine 10 according to the second embodiment differs from that of the first embodiment in the contents acquired by the operation information acquisition unit 12, the characteristic information acquisition unit 21, and the performance information acquisition unit 14. Also, the control device 1 of the injection molding machine 10 according to the second embodiment differs from that of the first embodiment in that it includes a surface temperature acquisition unit 23, an estimation unit 25, and a transition calculation unit 24, as shown in Fig. 5.

[0044] The operation information acquisition unit 12 further acquires, as the operation information, the heater operation rate of the heater 102 during a predetermined period and the set temperature of the heater 102. For example, the operation information acquisition unit 12 acquires the set temperature T Si and the air temperature T near the heater 102 R and get more.

[0045] The characteristic information acquisition unit 21 further acquires the heat dissipation characteristics of the heater 102 as the characteristic information. i We further obtain the heat transfer coefficient h, the emissivity ε, and the Stefan-Boltzmann coefficient σ.

[0046] The performance information acquisition unit 14 acquires, as performance information, the performance of the transition of the ratio between the surface temperature of the heater 102 and the set temperature with respect to the transition of the heater operation rate r jk The surface temperature T of the heater 102 with respect to the transition Hjk and the set temperature T of the heater 102 Sjk Ratio to α jkSpecifically, the performance information acquisition unit 14 further acquires the past heater operation rate r jk For each time, the ratio α between the past setting temperature of the heater 102 and the past surface temperature of the heater 102 is jk (Surface temperature / Set temperature) is obtained. Here, j (j=1, 2..., m) is a natural number that represents the number used to identify m measurement results. Here, k (k=0, 1..., n) is an integer that represents the number used to identify each time up to n.

[0047] The surface temperature acquisition unit 23 is realized, for example, by the operation of a CPU. The surface temperature acquisition unit 23 acquires the surface temperature of the heater 102 for a predetermined period immediately before a predetermined time. For example, the surface temperature acquisition unit 23 acquires the surface temperature T H is obtained every sampling period.

[0048] The estimation unit 25 is realized, for example, by the operation of a CPU. The estimation unit 25 estimates the surface temperature of the heater 102 at a predetermined time. The estimation unit 25 estimates the surface temperature at the predetermined time by using the results included in the result information that are similar to or match the operation information and the transition of the ratio of the calculated surface temperature to the set temperature. The estimation unit 25 estimates the surface temperature T of the heater 102 at the predetermined time based on, for example, the operation information, the result information, and the acquired surface temperature. HC For example, as shown in FIG. 6, the estimation unit 25 estimates the heater availability rate r k and the set temperature T of the heater 102 Sk and the surface temperature T of the heater 102 Hk Ratio of α k The estimation unit 25 identifies a result that is similar to or coincides with the transition of the heater operation rate r C The set temperature T of the heater 102 at a given time corresponding to SC and the surface temperature T of the heater 102 HC Ratio to α C The estimation unit 25 obtains the obtained ratio α Cand the set temperature T of the heater 102 included in the operation information. SC By multiplying this by , the surface temperature T HC The estimation unit 25 uses, for example, a result having the highest coincidence rate (such as a kappa coefficient) with the transition as a result similar to the transition. The estimation unit 25 estimates the surface temperature at a predetermined time using a result similar to or matching the transition of the ratio of the operation information and the acquired surface temperature of the heater 102 among the results included in the result information.

[0049] The transition calculation unit 24 is realized, for example, by the operation of a CPU. The transition calculation unit 24 calculates the transition of the ratio of the surface temperature to the set temperature with respect to the transition of the heater operation rate included in the operation information, based on the acquired operation information and the acquired surface temperature. The transition calculation unit 24 calculates, for example, the heater operation rate r k The ratio α between the surface temperature of the heater 102 and the set temperature of the heater 102 with respect to the change in k The transition calculation unit 24 calculates the transition of the heater operation rate r k The surface temperature T Hk / Heater 102 set temperature T Sk Calculate the value of

[0050] The energy amount calculation unit 22 calculates the amount of heat radiation from the surface of the heater 102 to the atmosphere based on the estimated surface temperature, the characteristic information, and the operation information. The energy amount calculation unit 22 also calculates at least the amount of heat transfer energy transmitted from the heater 102 to the resin and the amount of shear energy by the screw. For example, the energy amount calculation unit 22 calculates the amount of heat radiation (J) from the heater 102 to the atmosphere as E Ai , convection heat loss (J) is E Ci , radiative heat loss (J) is E Ri , the surface temperature (K) of the heater 102 is T H , the air temperature (K) near the heater 102 is T R , the surface area of ​​the heater 102 (m 2 ) to A i , heat transfer coefficient (W / m 2 K) is h, emissivity is ε, and the Stefan-Boltzmann coefficient (W / m2 K 4 ) is σ, the number of heaters 102 to be identified is i=1, 2...k, and the heat dissipation amount E Ai Calculate.

[0051]

number

[0052] In addition, the energy amount calculation unit 22 calculates the convection heat radiation amount E as the heat transfer coefficient h using a function of the temperature difference between the surface temperature of the heater 102 and the ambient temperature. Ci In this manner, the energy amount calculation unit 22 calculates the amount of heat transfer energy and the amount of shear energy by using the parameters calculated from the surface temperature as part of the characteristic information.

[0053] The energy amount calculation unit 22 calculates the amount of heat transfer energy (J) as E T , the heat generation amount (J) of the heater 102 is E Hi The amount of heat dissipated by convection (J) from the heater 102 and a part of the cylinder 101 is E Ci ', the amount of radiative heat (J) from the heater 102 and a part of the cylinder 101 is E Ri ', the amount of heat (J) absorbed by the cooling water is E W The amount of heat transferred to the hopper side (J) is E0, and the capacity of the heater 102 (W) is W i , the heater operation rate of the heater 102 is r i The amount of heat dissipated by convection (J) from the area where the heater 102 is not wrapped is E CNi The amount of radiative heat (J) from the area where the heater 102 is not wound is E RNi , density of water (g / cm 3 ) is ρ, and the specific heat of water (J / g K) is C W , water flow rate (cm 3 / s) is Q, cooling water outlet temperature (K) is T OUT , the cooling water inlet temperature (K) is T IN The amount of heat transfer energy E is calculated using the following formula 6. T Calculate.

[0054]

number

[0055] Next, the flow of processing by the control device 1 will be described with reference to FIG. First, the characteristic information acquisition unit 21 acquires characteristic information (step S11). The characteristic information acquisition unit 21 acquires the characteristic information from the characteristic information storage unit 20, for example.

[0056] Next, the power consumption calculation unit 15 calculates the power consumption (step S12). Next, the operation information acquisition unit 12 acquires the operation information (step S13). The operation information acquisition unit 12 acquires, for example, the operation information stored in the operation information storage unit 11 in advance.

[0057] Next, the surface temperature acquisition unit 23 acquires the surface temperature of the injection molding machine 10 during operation (step S14). Next, the performance information acquisition unit 14 acquires performance information (step S15). Next, the transition calculation unit 24 calculates the transition of the ratio between the surface temperature and the set temperature (step S16). Next, the estimation unit 25 estimates the surface temperature of the injection molding machine 10 at a predetermined time (step S17).

[0058] Next, the energy amount calculation unit 22 calculates the amount of energy (step S18). Also, the energy ratio calculation unit 16 calculates the energy ratio (step S19). Next, the output unit 18 outputs the power consumption, the amount of energy, and the energy ratio (step S20).

[0059] Next, it is determined whether or not to repeat the calculation of the energy amount and the energy ratio (step S21). If the calculation is to be repeated (step S21: YES), the process returns to step S12. On the other hand, if the calculation is to be ended (step S21: NO), the process according to this flow ends.

[0060] As described above, the control device 1 and the program for the injection molding machine 10 according to the second embodiment provide the following advantages. (3) The control device 1 of the injection molding machine 10 further includes a surface temperature acquisition unit 23 that acquires the surface temperature of the heater 102 for a predetermined period immediately before the predetermined time, and an estimation unit 25 that estimates the surface temperature of the heater 102 at the predetermined time, the operation information acquisition unit 12 further acquires, as operation information, a heater availability rate of the heater 102 and a set temperature of the heater 102 for the predetermined period, the characteristic information acquisition unit 21 further acquires, as characteristic information, the heat dissipation characteristics of the heater 102, and the performance information acquisition unit 14 further acquires, as characteristic information, a heater availability rate of the heater 102 for the predetermined period and a set temperature of the heater 102. The actual transition of the ratio of the surface temperature of the heater 102 to the set temperature with respect to the transition of the heater operation rate is acquired as actual information, and the estimation unit 25 estimates the surface temperature of the heater 102 at a predetermined time based on the operation information, actual information, and the acquired surface temperature, and the energy amount calculation unit 22 calculates the amount of heat dissipation from the surface of the heater 102 to the atmosphere based on the estimated surface temperature, characteristic information, and operation information, and calculates at least the amount of heat transfer energy transferred from the heater 102 to the resin and the amount of shear energy by the screw. By calculating the amount of heat dissipation from the estimated surface temperature of the heater 102, the amount of heat transfer energy transferred from the heater 102 to the resin can be calculated with high accuracy. Also, the energy ratio can be calculated with high accuracy.

[0061] (4) The control device 1 of the injection molding machine 10 further includes a transition calculation unit 24 that calculates the transition of the ratio of the surface temperature to the set temperature relative to the transition of the heater operation rate included in the operation information based on the acquired operation information and the acquired surface temperature, and the estimation unit 25 estimates the surface temperature at a predetermined time using the results included in the result information that are similar to or match the transition of the operation information and the calculated ratio of the surface temperature to the set temperature. This makes it possible to calculate the amount of heat transfer energy and the energy ratio with higher accuracy.

[0062] [Third embodiment] Next, a control device 1 of an injection molding machine 10 according to a third embodiment of the present disclosure will be described with reference to Fig. 8. In describing the third embodiment, the same components are denoted by the same reference numerals, and the description thereof will be omitted or simplified.

[0063] The control device 1 of the injection molding machine 10 according to the third embodiment differs from the first and second embodiments in that the energy amount calculation unit 22 calculates the ratio between the amount of heat transfer energy and the amount of shear energy, as shown in Fig. 8. Moreover, the output unit 18 outputs the energy ratio, as shown in Fig. 8.

[0064] As described above, the control device 1 and the program for the injection molding machine 10 according to the third embodiment provide the following advantages. (5) The energy amount calculation unit 22 calculates the ratio between the amount of heat transfer energy transferred from the heater 102 to the resin and the amount of shear energy by the screw. This makes it possible to easily confirm the ratio between the amount of heat transfer energy and the amount of shear energy.

[0065] [Fourth embodiment] Next, a control device 1 of an injection molding machine 10 according to a fourth embodiment of the present disclosure will be described with reference to Fig. 9. In describing the fourth embodiment, the same components are denoted by the same reference numerals, and the description thereof will be omitted or simplified.

[0066] The control device 1 of the injection molding machine 10 according to the fourth embodiment differs from the first to third embodiments in that the power consumption calculation unit 15 calculates the power consumption by the heater 102. Also, in the control device 1 of the injection molding machine 10 according to the fourth embodiment, the energy ratio calculation unit 16 calculates the heat generation amount E Hi and the amount of heat energy E transferred from the heater 102 to the resin. T Heater efficiency η H This embodiment differs from the first to third embodiments in that is calculated by the following formula 7. Furthermore, the output unit 18 outputs the heater efficiency as shown in FIG.

[0067]

number

[0068] As described above, the control device 1 and the program for the injection molding machine 10 according to the fourth embodiment provide the following advantages. (6) The power consumption calculation unit 15 calculates the power consumption by the heater 102, and the energy amount calculation unit 22 calculates the ratio between the power consumption by the heater 102 and the amount of heat transfer energy. This makes it possible to easily grasp the efficiency of the heater 102. Therefore, it is possible to easily confirm to what extent heat dissipation from the heater 102 to the atmosphere, the cooling water, and the machine body is suppressed.

[0069] [Fifth embodiment] Next, a control device 1 of an injection molding machine 10 according to a fifth embodiment of the present disclosure will be described with reference to Fig. 10 and Fig. 11. In describing the fifth embodiment, the same components are denoted by the same reference numerals, and the description thereof will be omitted or simplified.

[0070] The control device 1 of the injection molding machine 10 according to the fifth embodiment further calculates a plasticization capacity. The control device 1 of the injection molding machine 10 according to the fifth embodiment differs from the first to fourth embodiments in the contents acquired by the operation information acquisition unit 12, the characteristic information acquisition unit 21, and the performance information acquisition unit 14. Also, the control device 1 of the injection molding machine 10 according to the fifth embodiment differs from the first to fourth embodiments in that it further includes a plasticization capacity calculation unit 26, as shown in FIG.

[0071] The operation information acquisition unit 12 acquires the resin pressure and the resin temperature during the metering process as the operation information. In addition, the operation information acquisition unit 12 acquires the metering stroke S and the metering time T M Get more. The characteristic information acquiring unit 21 further acquires the screw diameter as the characteristic information.

[0072] The performance information acquiring unit 14 further acquires, as performance information, performance information regarding the resin pressure and the resin temperature during the measurement process.

[0073] The plasticizing capacity calculation unit 26 is realized, for example, by the operation of a CPU. The plasticizing capacity calculation unit 26 calculates the density of the resin based on the operation information and the performance information, and calculates the amount of resin that can be melted by the injection molding machine 10 per unit time as the plasticizing capacity using the calculated resin density. The plasticizing capacity calculation unit 26 calculates the plasticizing capacity P for each number of shots. That is, the plasticizing capacity calculation unit 26 calculates the weight of the plastic material that the injection molding machine 10 can melt within unit time for each number of shots. The plasticizing capacity calculation unit 26 calculates the mass flow rate of the resin that is measured and accumulated in the front part of the cylinder 101 during the metering process. That is, the plasticizing capacity calculation unit 26 calculates the plasticizing capacity (g / s) P, the screw diameter (mm) D, the density of the resin (g / mm 3 ) to ρ R , S is the measurement stroke (mm), and T is the measurement time (s). M The plasticizing ability is calculated using the following formula 8.

[0074]

number

[0075] Next, the flow of processing by the control device 1 will be described with reference to FIG. First, the characteristic information acquisition unit 21 acquires characteristic information (step S101). The characteristic information acquisition unit 21 acquires the characteristic information from the characteristic information storage unit 20, for example.

[0076] Next, the power consumption calculation unit 15 calculates the power consumption (step S102). Next, the motion information acquisition unit 12 acquires the motion information (step S103). The motion information acquisition unit 12 acquires, for example, the motion information stored in the motion information storage unit 11 in advance.

[0077] Next, the surface temperature acquisition unit 23 acquires the surface temperature of the injection molding machine 10 during operation (step S104). Next, the performance information acquisition unit 14 acquires performance information (step S105).

[0078] Next, the energy amount calculation unit 22 calculates the energy amount (step S106). Also, the energy ratio calculation unit 16 calculates the energy ratio (step S107). Next, the plasticization capacity calculation unit 26 calculates the plasticization capacity (step S108). Next, the output unit 18 outputs the power consumption, the energy amount, the energy ratio, and the plasticization capacity (step S109).

[0079] Next, it is determined whether or not to repeat the calculation of the energy amount, the energy ratio, and the plasticizing capacity (step S110). If the calculation is to be repeated (step S110: YES), the process returns to step S102. On the other hand, if the calculation is to be ended (step S110: NO), the process according to this flow ends.

[0080] As described above, the control device 1 and the program for the injection molding machine 10 according to the fifth embodiment provide the following advantages. (7) The operation information acquisition unit 12 acquires the resin pressure and resin temperature during the metering process as operation information, the performance information acquisition unit 14 acquires the performance of the resin pressure and resin temperature during the metering process as performance information, and the plasticization capacity calculation unit 26 calculates the density of the resin based on the operation information and the performance information, and calculates the amount of resin that can be melted per unit time of the injection molding machine 10 as the plasticization capacity using the calculated resin density. This makes it possible to check the status of the plasticization capacity with respect to the energy ratio. Therefore, molding can be performed with a balance between the energy ratio and the plasticization capacity.

[0081] [Sixth embodiment] Next, a control device 1 of an injection molding machine 10 according to a sixth embodiment of the present disclosure will be described with reference to Fig. 12 to Fig. 14. In describing the sixth embodiment, the same components are denoted by the same reference numerals, and the description thereof will be omitted or simplified.

[0082] The control device 1 of the injection molding machine 10 according to the sixth embodiment is capable of displaying changes in the energy ratio and plasticizing capacity using a chart, as shown in Fig. 12. Furthermore, the control device 1 of the injection molding machine 10 according to the sixth embodiment is capable of accepting selection of the displayed energy ratio and plasticizing capacity, and setting the selected energy ratio and plasticizing capacity in the injection molding machine 10 as molding conditions.

[0083] The control device 1 of the injection molding machine 10 according to the sixth embodiment differs from the first to fourth embodiments in that the output unit 18 can display the energy ratio and the plasticizing capacity. Also, the control device 1 of the injection molding machine 10 according to the sixth embodiment differs from the first to fifth embodiments in that it further includes a molding condition storage unit 27, an input acquisition unit 28, a molding condition acquisition unit 29, and a setting unit 30, as shown in Fig. 13.

[0084] The output unit 18 displays molding information corresponding to the specified energy ratio and plasticization capacity. The output unit 18 displays a table showing the energy ratio and plasticization capacity, for example, as shown in FIG. 12. The output unit 18 displays, for example, the energy ratio and the plasticization capacity for each number of shots. The output unit 18 is also configured to be capable of displaying a cursor for selecting the energy ratio and the plasticization capacity. The output unit 18 is configured to be capable of displaying details of molding conditions related to the energy ratio and the plasticization capacity that overlap the displayed cursor.

[0085] The molding condition storage unit 27 is, for example, a recording medium such as a hard disk. The molding condition storage unit 27 stores molding conditions set in the injection molding machine 10. For example, the molding condition storage unit 27 stores, for each different molding condition, a start shot of the condition, an end shot of the condition, a metering position, and an injection speed. For example, the molding condition storage unit 27 stores the molding conditions during the cycle after the cycle starts.

[0086] The input acquisition unit 28 is realized, for example, by the operation of a CPU. The input acquisition unit 28 acquires a specified energy ratio and plasticization capacity from among the displayed energy ratios and plasticization capacities. The input acquisition unit 28 acquires, for example, an input indicating that a molding condition overlapping the cursor position has been selected.

[0087] The molding condition acquisition unit 29 is realized, for example, by the operation of a CPU. The molding condition acquisition unit 29 acquires the molding conditions of the injection molding machine 10 and the period during which the injection molding machine 10 operated using the molding conditions as molding information. The molding condition acquisition unit 29 acquires the period during which the injection molding machine 10 operated as the number of shots, for example.

[0088] The setting unit 30 is realized, for example, by the operation of a CPU. The setting unit 30 sets molding conditions corresponding to the designated energy ratio and plasticization capacity in the injection molding machine 10. The setting unit 30 sets the molding conditions at the position overlapped by the cursor in the injection molding machine 10 by, for example, acquiring an instruction to be set in the injection molding machine 10 in the input acquisition unit 28.

[0089] Next, the flow of processing by the control device 1 will be described with reference to FIG. First, the characteristic information acquisition unit 21 acquires characteristic information (step S201). The characteristic information acquisition unit 21 acquires the characteristic information from the characteristic information storage unit 20, for example.

[0090] Next, the power consumption calculation unit 15 calculates the power consumption (step S202). Next, the motion information acquisition unit 12 acquires the motion information (step S203). The motion information acquisition unit 12 acquires, for example, the motion information stored in the motion information storage unit 11 in advance.

[0091] Next, the surface temperature acquisition unit 23 acquires the surface temperature of the injection molding machine 10 during operation (step S204). Next, the performance information acquisition unit 14 acquires performance information (step S205).

[0092] Next, the energy amount calculation unit 22 calculates the energy amount (step S206). Also, the energy ratio calculation unit 16 calculates the energy ratio (step S207). Next, the plasticization capacity calculation unit 26 calculates the plasticization capacity (step S208). Next, the output unit 18 outputs the power consumption, the energy amount, the energy ratio, and the plasticization capacity (step S209).

[0093] Next, it is determined whether the molding conditions have been changed (Step S210). If the molding conditions have not been changed (Step S210: YES), the process proceeds to Step S211. On the other hand, if the molding conditions have been changed (Step S210: NO), the process proceeds to Step S212.

[0094] In step S211, it is determined whether or not to repeat the calculation of the energy amount, the energy ratio, and the plasticizing ability. If the calculation is to be repeated (step S211: YES), the process returns to step S202. On the other hand, if the calculation is to be ended (step S211: NO), the process according to this flow ends.

[0095] In step S212, the molding condition storage unit 27 stores the changed molding conditions. Next, the process proceeds to step S211.

[0096] As described above, the control device 1 and the program for the injection molding machine 10 according to the sixth embodiment provide the following advantages. (8) The control device 1 of the injection molding machine 10 further includes an output unit 18 capable of displaying the energy ratio and plasticization capacity, an input acquisition unit 28 for acquiring a specified energy ratio and plasticization capacity from the displayed energy ratios and plasticization capacities, and a molding condition acquisition unit 29 for acquiring the molding conditions of the injection molding machine 10 and the period during which the injection molding machine 10 operated using the molding conditions as molding information, and the output unit 18 displays the molding information corresponding to the specified energy ratio and plasticization capacity. This makes it easy to check the transition of the energy ratio and plasticization capacity for the injection molding machine 10 during operation. In addition, it is easy to check the molding conditions for the specified energy ratio and plasticization capacity.

[0097] (9) When molding conditions are changed, for example, the molding conditions are stored during a cycle after the cycle starts in the molding condition storage unit 27. This makes it possible to store molding conditions using the minimum necessary memory area compared to storing all molding conditions related to molding.

[0098] (10) The control device 1 of the injection molding machine 10 further includes a setting unit 30 that sets molding conditions corresponding to a designated energy ratio and plasticizing capacity in the injection molding machine 10. This makes it possible to easily set molding conditions that have demonstrated a past energy ratio and plasticizing capacity again in the injection molding machine 10.

[0099] Although preferred embodiments of the control device and program for an injection molding machine according to the present disclosure have been described above, the present disclosure is not limited to the above-described embodiments and can be modified as appropriate. For example, in the above embodiment, the injection molding machine 10 may be either an in-line screw type or a plunger type.

[0100] In the above embodiment, the measurement data on the surface temperature included in the performance information may be measured by a temperature sensor, which is a direct method, or may be measured by a thermograph (a radiation thermometer), which is an indirect method.

[0101] In the above embodiment, the measurement data on the surface temperature included in the performance information needs to be at least one point for each heater 102, and the more measurement points there are, the higher the accuracy of the energy amount calculation can be.

[0102] In the above embodiment, the operation information acquiring unit 12 may acquire a set value of the screw rotation amount R in the injection molding machine 10. The operation information acquiring unit 12 may acquire a value from a detector such as an encoder provided in the screw rotation motor.

[0103] In the above embodiment, the energy amount calculation section 22 and the power consumption calculation section 15 may perform calculations for any interval, such as per unit time or per cycle time.

[0104] In the above embodiment, the energy amount calculation unit 22 and the power consumption calculation unit 15 may calculate the total energy amount and the total power consumption. In addition, the energy amount calculation unit 22 and the power consumption calculation unit 15 may calculate the energy amount and the power consumption per unit time in any calculation interval.

[0105] In the above embodiment, the energy amount calculation section 22 may use the motor work amount as the amount of shear energy, which is a value displayed on a power meter attached to the screw rotation motor.

[0106] In the above embodiment, the energy amount calculation unit 22 may calculate the amount of shear energy by a method other than calculating the work load of the motor. For example, the energy amount calculation unit 22 may calculate the amount of shear energy from the temperature rise of the resin caused by frictional heat between the screw and the resin. For example, the energy amount calculation unit 22 may calculate the amount of shear energy from the viscosity and strain rate of the resin.

[0107] In the above embodiment, the energy amount calculation unit 22 or the power consumption calculation unit 15 calculates the heat generation amount E H may be calculated from the value of the current flowing through the heater 102 and the resistance value of the heater 102.

[0108] In the above embodiment, the output unit 18 may output average values ​​of the energy amount, the energy ratio, and the plasticizing ability at regular intervals. The output unit 18 may also output the energy amount and the energy ratio at a specific timing.

[0109] In the above embodiment, the output unit 18 may be a PC or the like located away from the injection molding machine 10, instead of the screen of the injection molding machine 10. The output unit 18 may be a centralized management device that manages a plurality of injection molding machines 10.

[0110] In the above embodiment, the output unit 18 may display all calculated parameters in addition to those described above.

[0111] In the above embodiment, the surface temperature acquisition unit 23 may acquire the surface temperature of the heater 102 as a ratio to the set temperature. That is, the surface temperature acquisition unit 23 may acquire the ratio α k In this case, the control device 1 of the injection molding machine 10 may not include the transition calculation unit 24. The estimation unit 25 may estimate the surface temperature at a predetermined time by using a result similar to or matching the transition of the ratio of the operation information and the acquired surface temperature of the heater 102, among the results included in the result information.

[0112] In the above embodiment, the power consumption calculation unit 15 may calculate the power consumption by distinguishing at least the power used to drive the injection molding machine 10, the power used for the heater 102, and the power used for other components such as the control device 1 of the injection molding machine 10. The power consumption calculation unit 15 may further detect the power used to drive the injection molding machine 10 by distinguishing between each of the driving motors. The power consumption calculation unit 15 may calculate the power consumption by the motor from the mechanical efficiency, motor torque, motor rotation speed, and motor load current rate. The power consumption calculation unit 15 may also calculate the power consumption by the heater 102 from the heater capacity and heater operation rate. The power consumption calculation unit 15 may calculate the heat generation amount E of the heater 102. Hi may be calculated.

[0113] In the above embodiment, the energy ratio calculation unit 16 calculates the energy ratio η E Regarding the total power consumption of the injection molding machine 10, PInstead of the above, the calculation may be performed using the power consumption in the injection unit. That is, the energy ratio calculation unit 16 may calculate the energy ratio by using the sum of the power used in the heater 102 and the power used for screw drive (rotation + forward and backward movement) as the power consumption. The output unit 18 displays the calculated energy amount and energy ratio for each arbitrary timing (for example, the number of shots). In this case, the energy amount calculation unit 22 may calculate the integrated energy amount and energy ratio for each arbitrary timing.

[0114] In the above embodiment, the estimation unit 25 estimates the set temperature T S and the surface temperature T of the heater 102 Hk Ratio of α k Alternatively, the estimation unit 25 may obtain a ratio calculated externally.

[0115] In the above embodiment, the surface temperature acquisition unit 23 may use an actual measurement value by a sensor or a value provided from an external source as the surface temperature. The surface temperature acquisition unit 23 may acquire the surface temperature estimated by the estimation unit 25.

[0116] In the first embodiment, the performance information acquisition unit 14 acquires the heater heat generation amount E Hi The amount of heat energy E transferred from the heater 102 to the cylinder 101 without being released into the atmosphere is Ei The ratio β is acquired. The ratio β may be a constant (e.g., 0.7). The ratio β may also be a variable. The ratio β may be, for example, 0.95 when a thermal cover is used. The ratio β may be, for example, 0.6 when a normal cover is used. When the set temperature is 250 degrees or higher, the ratio β may be, for example, 1.05 times the above value. The ratio β may also be calculated by a regression equation using the following formula 9. When the ratio β is input from outside, the control device 1 of the injection molding machine 10 does not need to be equipped with the performance information acquisition unit 14.

[0117]

number

[0118] In the above embodiment, the density ρ of the resin R may be inputted from the outside as a constant. In addition, the density ρ R may be acquired by the characteristic information acquisition unit 21. In addition, the plasticization capacity calculation unit may calculate the density ρ R may be calculated as a variable that changes depending on the resin pressure and the resin temperature. In this case, the relationship between the change in the resin pressure caused by the resin density and the resin temperature may be acquired in advance as actual information. The resin pressure may be acquired by installing a pressure sensor in the nozzle or the cylinder 101 and acquiring the measured value. The resin pressure may be acquired as the value of a pressure detection sensor (load cell) attached for screw control. The resin temperature may be acquired as the measured value from a temperature sensor installed in the nozzle or the cylinder 101. The resin temperature may be a value set for heater control. The resin density may be calculated for each sampling period. The resin density may be calculated as an average value for any timing (for example, the number of shots).

[0119] All the embodiments may be implemented not only alone but also in combination, for example, embodiment 1 and embodiment 3 may be implemented in combination. [Explanation of symbols]

[0120] 1 Control device 10 injection molding machine 12 Operation information acquisition section 14. Performance Information Acquisition Department 15 Power consumption calculation section 16 Energy ratio calculation section 21 Characteristics information acquisition unit 22 Energy amount calculation unit 23 Surface temperature acquisition section 24 Transition calculation section 25 Estimation part 26 Plasticization capacity calculation section 28 Input Acquisition Unit 29 Molding condition acquisition section 30 Setting section 101 Cylinder 102 Heater 103 Safety Cover

Claims

1. A control device for an injection molding machine having a cylinder, a heater disposed around the cylinder, and a screw disposed inside the cylinder, the control device calculating an energy ratio relative to power consumption at a predetermined time, a power consumption calculation unit that calculates the power consumption of the injection molding machine; an operation information acquisition unit that acquires operation information including a heater operation rate of the heater and a rotation speed of the screw; a characteristic information acquisition unit that acquires characteristic information including a capacity of the heater and a motor torque that drives the screw; an energy amount calculation unit that calculates at least an amount of heat transfer energy transferred from the heater to the resin and an amount of shear energy by the screw based on the characteristic information and the operation information; an energy ratio calculation unit that calculates an energy ratio of the injection molding machine based on the amount of heat transfer energy, the amount of shear energy, and the power consumption; A control device for an injection molding machine comprising:

2. a performance information acquisition unit that acquires a ratio between a heat generation amount of the heater and an amount of energy transferred from the heater to the cylinder as performance information, 2. The control device for an injection molding machine according to claim 1, wherein the energy amount calculation unit calculates at least an amount of heat transfer energy transferred from the heater to the resin and an amount of shear energy by the screw based on the operation information, the characteristic information, and the performance information.

3. a surface temperature acquisition unit that acquires a surface temperature of the heater for a predetermined period immediately before the predetermined time; an estimation unit that estimates a surface temperature of the heater at the predetermined time; Further equipped with the operation information acquisition unit further acquires, as the operation information, a heater operation rate of the heater during the predetermined period and a set temperature of the heater; the characteristic information acquisition unit further acquires a heat dissipation characteristic of the heater as the characteristic information, the performance information acquisition unit acquires, as performance information, a performance of a transition in a ratio between a surface temperature of the heater and a set temperature of the heater in response to a transition in a heater operation rate of the heater during the predetermined period; The estimation unit estimates a surface temperature of the heater at the predetermined time based on the operation information, the performance information, and the acquired surface temperature; 3. The control device for an injection molding machine according to claim 2, wherein the energy amount calculation unit calculates an amount of heat dissipation from a surface of the heater to an atmosphere based on the estimated surface temperature, the characteristic information, and the operation information, and calculates at least an amount of heat transfer energy transferred from the heater to the resin and an amount of shear energy by the screw.

4. a transition calculation unit that calculates a transition of a ratio of the surface temperature to the set temperature with respect to a transition of a heater operation rate included in the operation information based on the acquired operation information and the acquired surface temperature, 4. The control device for an injection molding machine according to claim 3, wherein the estimation unit estimates the surface temperature at the specified time using actual results included in the actual result information that are similar to or match the operation information and the change in the ratio of the calculated surface temperature to the set temperature.

5. the surface temperature acquisition unit acquires a surface temperature of the heater in the form of a ratio to the set temperature; 4. The control device for an injection molding machine according to claim 3, wherein the estimation unit estimates the surface temperature at the specified time by using, from among the results included in the performance information, results that are similar or coincident with the operation information and the transition of the surface temperature of the heater in the form of an acquired ratio.

6. 6. The control device for an injection molding machine according to claim 4 or 5, wherein the estimation unit estimates the surface temperature at the specified time from a ratio of a surface temperature at a time indicated by a performance similar to or matching a change in the surface temperature of the heater to a set temperature.

7. 7. The control device for an injection molding machine according to claim 3, wherein the energy amount calculation unit calculates the amount of heat transfer energy and the amount of shear energy by using a parameter calculated from the surface temperature as part of the characteristic information.

8. The method further includes a plasticization capacity calculation unit that calculates an amount of resin that can be melted per unit time of the injection molding machine as a plasticization capacity, The operation information acquisition unit acquires a resin pressure and a resin temperature during a metering process as the operation information, The performance information acquisition unit acquires performance information of a resin pressure and a resin temperature during a metering process as the performance information, A control device for an injection molding machine as described in any one of claims 2 to 7, wherein the plasticization capacity calculation unit calculates a density of the resin based on the operation information and the performance information, and uses the calculated density of the resin to calculate the amount of resin that can be melted per unit time of the injection molding machine as the plasticization capacity.

9. An output unit capable of displaying the energy ratio and the plasticizing capacity; An input acquisition unit that acquires the energy ratio and the plasticizing capacity designated from the displayed energy ratio and the plasticizing capacity; a molding condition acquisition unit that acquires, as molding information, molding conditions of the injection molding machine and a period during which the injection molding machine operates under the molding conditions; Further equipped with The control device for an injection molding machine according to claim 8 , wherein the output section displays the molding information corresponding to the designated energy ratio and the designated plasticizing capacity.

10. 10. The control device for an injection molding machine according to claim 9, further comprising a setting unit that sets, in the injection molding machine, the molding conditions corresponding to the designated energy ratio and the designated plasticizing capacity.

11. 11. The control device for an injection molding machine according to claim 1, wherein the energy ratio calculation unit calculates a ratio in which the power consumption is used as a denominator and the sum of the amount of heat transfer energy and the amount of shear energy is used as a numerator.

12. The control device for an injection molding machine according to claim 1 , wherein the energy amount calculation unit calculates a ratio between an amount of heat transfer energy transferred from the heater to the resin and an amount of shear energy caused by the screw.

13. The power consumption calculation unit calculates the power consumption by the heater, The control device for an injection molding machine according to claim 1 , wherein the energy ratio calculation unit calculates a ratio between the power consumption by the heater and the amount of heat transfer energy.

14. A program for operating a computer as a control device for an injection molding machine having a cylinder, a heater disposed around the cylinder, and a screw disposed inside the cylinder, the control device calculating an energy ratio relative to power consumption at a predetermined time, the program comprising: The computer, a power consumption calculation unit that calculates the power consumption of the injection molding machine; an operation information acquiring unit that acquires operation information including a heater operating rate of the heater and a rotation speed of the screw; a characteristic information acquisition unit that acquires characteristic information including a capacity of the heater and a motor torque that drives the screw; an energy amount calculation unit that calculates at least an amount of heat transfer energy transferred from the heater to the resin and an amount of shear energy by the screw based on the characteristic information and the operation information; an energy ratio calculation unit that calculates an energy ratio of the injection molding machine based on the amount of heat transfer energy, the amount of shear energy, and the power consumption; A program that functions as a

Citation Information

Patent Citations

  • Formation of dye image

    JP1982014838A

  • Both bottom bag with blowing port

    JP1983082848A

  • Method for controlling injection molding machine

    JP2001225372A

  • Molding machine and plasticization condition monitoring method

    JP2007076328A

  • Injection molding machine

    JP2012091424A