Injection device
The injection device addresses air entry and cost issues by controlling resin flow with a plunger and pushing member system, ensuring stable resin injection and pressure without additional sensors, thus preventing molding defects and reducing costs.
Patent Information
- Application Number
- JP2023527175
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Filing Date
- 2021-06-07
- Publication Date
- 2024-12-03
- Estimated Expiration
- 2041-06-07
AI Technical Summary
Conventional injection methods for resin materials face issues such as air entry into the barrel leading to molding defects, especially with low viscosity materials like silicone, and require additional parts for pressure sensing, increasing costs.
An injection device with a plunger and pushing member system that controls resin flow using a drive unit and control section, adjusting the flow based on load detection to maintain constant material pressure without additional sensors, preventing air entry and reducing part count.
The device ensures stable resin injection by preventing air entry and minimizing part count, maintaining consistent material pressure and injection amount while reducing costs.
Smart Images

Figure 0007594105000001 
Figure 0007594105000002 
Figure 0007594105000003
Abstract
Description
[Technical field]
[0001] The present invention relates to an injection device. [Background technology]
[0002] An injection device is a device that continuously supplies a constant amount of resin material. Injection devices are used, for example, to inject resin material into a mold. In order for an injection device to continuously inject resin material, a metering process in which a constant amount of resin material is supplied into the barrel after the injection process is important. This is because even if the same volume of resin material is injected from the injection device, if the density of the resin material inside the barrel is not stable, the amount of resin material injected will not be stable. In order to accurately inject a constant amount of resin material in one injection process, it is necessary to keep the material pressure (internal pressure of the barrel) constant in the metering process.
[0003] Conventionally, in order to keep the material pressure constant in the metering process, for example, the following metering methods have been proposed. One is a method in which the plunger is retracted at a constant speed while the resin material is being supplied, and the supply of the resin material is stopped when the plunger reaches a predetermined position (hereinafter also referred to as "conventional method 1"). The other is a method in which the plunger is retracted while the resin material is being supplied so that the material pressure in the barrel is constant, and the supply of the resin material is stopped when the plunger reaches a predetermined position (hereinafter also referred to as "conventional method 2") (see Patent Document 1). [Prior art documents] [Patent documents]
[0004] [Patent Document 1] Japanese Patent Application Publication No. 02-120020 Summary of the Invention [Problem to be solved by the invention]
[0005] In the above-mentioned conventional method 1, the plunger retracts at a constant speed regardless of the supply speed of the resin material, so depending on the supply speed of the resin material, air may get into the barrel, causing molding defects. In particular, when using a low-viscosity liquid resin material such as silicone resin, air is likely to get into the barrel, which is likely to cause molding defects. In addition, conventional method 2 can keep the material pressure constant from the start to the end of the supply of the resin material into the barrel. However, conventional method 2 requires parts such as a pressure sensor to measure the material pressure in the barrel, so there is a concern that the increase in the number of parts will increase costs.
[0006] An object of the present invention is to provide an injection device that can inject a constant amount of resin material for each injection process while suppressing the infiltration of air into the barrel and the increase in costs due to an increase in the number of parts. [Means for solving the problem]
[0007] One aspect of the present invention is an injection device that injects a resin material from an injection port provided at the tip side of a barrel, the injection device comprising: a resin material inlet for flowing resin material into the barrel; a drive unit that generates a driving force for injecting the resin material filled in the barrel from the injection port; a plunger that is arranged to be able to advance and retreat in the axial direction of the barrel, the plunger retracting as resin material flows into the barrel from the resin material inlet and advancing within the barrel, thereby injecting the resin material filled in the barrel toward the injection port; a pushing member that pushes the plunger toward the injection port of the barrel; a driving force transmission unit that transmits the driving force generated by the drive unit to the pushing member; and a control unit that controls each unit to start the flow of resin material into the barrel from the resin material inlet, and complete the metering of the resin material when the load received by the drive unit from the pushing member located at a specified position reaches a specified value. Effect of the Invention
[0008] According to the injection device of the present invention, it is possible to inject a constant amount of resin material for each injection process while suppressing the infiltration of air into the barrel and the increase in costs due to an increase in the number of parts. [Brief description of the drawings]
[0009] [Figure 1] 1A and 1B are diagrams illustrating a configuration of an injection device 1 according to a first embodiment. [Figure 2A] 4A to 4C are diagrams illustrating an injection process and a pressure holding process in the first embodiment. [Figure 2B] 4A to 4C are diagrams illustrating an injection process and a pressure holding process in the first embodiment. [Figure 3A] 3A to 3C are diagrams illustrating a measurement process of the injection device 1 of the first embodiment. [Figure 3B] 3A to 3C are diagrams illustrating a measurement process of the injection device 1 of the first embodiment. [Figure 3C] 3A to 3C are diagrams illustrating a measurement process of the injection device 1 of the first embodiment. [Figure 4] 11A and 11B are diagrams illustrating control for adjusting the material pressure of a resin material. [Diagram 5] 11A and 11B are diagrams illustrating control for changing a switching position. [Figure 6A] 5 is a flowchart showing the processing steps of a measurement control program executed by a control unit 25 in the first embodiment. [Figure 6B] 5 is a flowchart showing the processing steps of a measurement control program executed by a control unit 25 in the first embodiment. [Figure 7A] 11A to 11C are diagrams illustrating a measurement process of an injection unit 1A according to a second embodiment. [Figure 7B] 11A to 11C are diagrams illustrating a measurement process of an injection unit 1A according to a second embodiment. [Figure 8A] 10 is a flowchart showing the processing steps of a measurement control program executed by a control unit 25 of the second embodiment. [Figure 8B] 10 is a flowchart showing the processing steps of a measurement control program executed by a control unit 25 of the second embodiment. [Figure 9] 1A to 1C are diagrams illustrating the configuration of an injection device 1 in a modified embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0010] Hereinafter, an embodiment of an injection device according to the present invention will be described. All of the drawings attached to this specification are schematic drawings, and the shape, scale, aspect ratio, and the like of each part are modified or exaggerated from the actual product in consideration of ease of understanding, etc. In addition, in the drawings attached to this specification, the front-to-rear (horizontal) direction of the injection device 1 shown in FIG. 1 is defined as the X direction. In the X direction, the rear (right) direction is defined as the X1 direction, and the front (left) direction is defined as the X2 direction. In this specification, the "direction" is also referred to as the "side" as appropriate.
[0011] (First embodiment) The injection device 1 of the first embodiment constitutes an injection molding machine together with a mold clamping device (both not shown). The injection molding machine includes a base (not shown), and an injection device 1 and a mold clamping device that are installed on the base. The injection device 1 is a device that supplies a resin material to the mold clamping device. In the injection device 1, a molding cycle for injecting the resin material filled in a barrel 11 (described later) into the mold clamping device includes a metering process, an injection process, and a pressure holding process. The mold clamping device includes a mold that can be opened and closed, and produces a molded product by pressurizing and heating the resin material filled between the molds. The injection device 1 and the mold clamping device of the first embodiment are arranged side by side in the horizontal direction (X direction).
[0012] Fig. 1 is a diagram for explaining the configuration of an injection device 1 of the first embodiment. As shown in Fig. 1, the injection device 1 includes a barrel holding unit 10 (barrel 11), a nozzle 12, a resin material inlet 13, a material flow path 14, a flow path valve 15, and a material supply unit 16. Note that Fig. 1 shows only the configuration of the injection device 1, and does not show a base and a mold clamping device.
[0013] The barrel holding unit 10 is a housing having therein a barrel 11. The barrel 11 is a space filled with a resin material. A plunger 17 (described later) is inserted into the barrel 11. A nozzle (injection port) 12 is provided at the end on the front side (X2 side) of the barrel holding part 10. The nozzle 12 is a part through which the resin material filled in the barrel 11 is injected, and is in communication with the barrel 11. The tip of the nozzle 12 is connected to a sprue hole (not shown) of a mold clamping device.
[0014] Furthermore, a resin material inlet (hereinafter also referred to as "inlet") 13 is provided on the front side surface of the barrel holding section 10. The inlet 13 is an opening for allowing the resin material to flow into the barrel 11. The inlet 13 communicates with the barrel 11 via a flow path valve 15 (described later). One end of a material flow path 14 is connected to the inlet 13. The material flow path 14 is a flow path that communicates between a material supply section 16 and the barrel 11. The other end of the material flow path 14 is connected to the material supply section 16.
[0015] The flow passage valve 15 is an electric valve provided in the barrel 11. The flow passage valve 15 is, for example, an electric three-way valve. When the flow passage valve 15 is opened, the material flow passage 14 and the barrel 11 communicate with each other, so that the resin material can be supplied from the material flow passage 14 to the barrel 11 through the inlet 13. On the other hand, when the flow passage valve 15 is closed, the material flow passage 14 and the barrel 11 are not communicated with each other, so that the resin material can be injected from the nozzle 12. The opening and closing operation of the flow passage valve 15 is controlled by a control unit. Note that the flow passage valve 15 is not limited to a three-way valve, and may be, for example, one or two two-way valves. That is, the flow passage valve 15 may have any configuration as long as it can control the communication / non-communication between the material flow passage 14 and the barrel 11.
[0016] The material supply unit 16 is a device that supplies a resin material (e.g., silicone resin) to the barrel 11. The resin material is supplied from the material supply unit 16 to the barrel 11 via the material flow path 14 and the inlet 13. The material supply unit 16 generates a supply pressure using a driving force such as hydraulic pressure or a servo motor, and supplies the resin material toward the barrel 11. In the material supply unit 16, the operation of supplying and stopping the resin material is controlled by the control unit 25. The supply pressure is a pressure required for the material supply unit 16 to supply the resin material to the barrel 11. Specifically, the supply pressure is the sum of the material pressure (barrel internal pressure) and the pressure loss generated between the material supply unit 16 and the barrel 11.
[0017] The injection device 1 also includes a plunger 17, a pushing member 18, a linear guide 19, a drive unit 20, a drive force transmission unit 21, and a control unit 25. The plunger 17 is a rod-shaped member provided inside the barrel 11 so as to be movable forward and backward along the axial direction (X direction) of the barrel 11. The plunger 17 is inserted into the barrel 11 except for the rear end (X1 side). When the barrel 11 is filled with resin material, the plunger 17 advances, causing the resin material filled in the barrel 11 to be injected from the nozzle 12. In the injection device 1 of the first embodiment, the rear end (X1 side) of the plunger 17 is always exposed to the outside of the barrel 11. This has the advantage that an operator can easily check the position of the rear end of the plunger 17 during an injection process or the like.
[0018] The pushing member 18 is a member that pushes the plunger 17 toward the nozzle 12 of the barrel 11. The pushing member 18 has a hole that penetrates in the thickness direction (X direction) and has an internal thread (not shown) formed on the inner peripheral surface of the hole. The internal thread of the pushing member 18 engages with a ball screw 22 (external thread) of the driving force transmission unit 21. In the injection device 1 of the first embodiment, the plunger 17 and the pushing member 18 are not connected (hereinafter, also referred to as "unconnected"). Therefore, the pushing member 18 abuts against the plunger 17 when it advances, and separates from the plunger 17 when it retreats. The pushing member 18 is configured to be movable in the front-rear direction (X direction) along a linear guide 19. In the first and second embodiments (described later), the positions (P1 to P3) of the pushing member 18 will be described based on the center of the pushing member 18 in the thickness direction (X direction).
[0019] The driving unit 20 is a device that generates a driving force for injecting the resin material filled in the barrel 11 from the nozzle 12. The driving unit 20 in this embodiment is configured by a servo motor (including a servo amplifier, etc.). The driving force generated by the driving unit 20 is transmitted to the pushing member 18 via a driving force transmission unit 21 (described later). The pushing member 18 moves backward in the X1 direction and forward in the X2 direction by the driving force generated by the driving unit 20.
[0020] The driving unit 20 can be switched to a state in which it generates a driving force by itself, and also to a state in which it freely rotates due to an external force. When the driving unit 20 is switched to a state in which it freely rotates due to an external force, the driving unit 20 rotates according to the external force transmitted via the ball screw 22. In this case, the number of rotations when the servo motor rotates is detected by a pulse coder (not shown) and output to the control unit 25 (described later). Therefore, the control unit 25 can detect the position of the pushing member 18 based on the number of rotations of the servo motor not only when the driving unit 20 is actively driven, but also when the driving unit 20 is passively rotated due to an external force.
[0021] Even when the push-in member 18 is stopped at a specified position P1 (described later), the driving unit 20, which is constituted by a servo motor, supplies a current to generate a torque to maintain the position of the push-in member 18. On the other hand, when the position of the push-in member 18 is displaced by an external force, the driving unit 20 supplies a current to generate a torque to correct the amount of the displacement, thereby causing the servo motor to generate a torque that opposes the external force, thereby maintaining the position of the push-in member 18. These operations in the driving unit 20 are controlled by the control unit 25.
[0022] The driving force transmission unit 21 is a device that transmits the driving force of the driving unit 20 to the pushing member 18. The driving force transmission unit 21 includes a ball screw 22, a gear mechanism (not shown), and the like. The ball screw 22 is a rod-shaped member that rotates by the driving force of the driving unit 20, and has a male screw (not shown) formed on its outer circumferential surface. The driving force transmission unit 21 of this embodiment is configured by a single-shaft ball screw 22.
[0023] The male thread of the ball screw 22 engages with the female thread (not shown) of the push-in member 18. The gear mechanism is a device that transmits the driving force of the drive unit 20 to the ball screw 22. When the ball screw 22 rotates forward (normal rotation) due to the driving force of the drive unit 20, the push-in member 18, for example, retreats (moves in the X1 direction). On the other hand, when the ball screw 22 rotates backward (reverses), the push-in member 18 advances (moves in the X2 direction).
[0024] In the driving force transmission unit 21, in addition to a state in which the ball screw 22 is rotated by the driving force of the drive unit 20, it is possible to switch the ball screw 22 to a state in which it freely rotates by an external force. When the ball screw 22 is switched to the state in which it freely rotates, the ball screw 22 rotates according to the external force applied from the pushing member 18. The rotation of the ball screw 22 is transmitted to the drive unit 20 via a gear mechanism. The switching of the driving force transmission unit 21 is controlled by the control unit 25.
[0025] The control unit 25 is electrically connected to the flow passage valve 15, the material supply unit 16, the drive unit 20, and the drive force transmission unit 21 (gear mechanism), and is a device that controls the operation of each of these units. The control unit 25 is configured, for example, by a microprocessor unit including a CPU (central processing unit), a memory, etc. The control unit 25 controls the operation of each piece of hardware based on an application program (for example, a measurement control program described later) for controlling the operation of the injection device 1, and executes a molding cycle consisting of an injection process, a pressure holding process, and a measurement process. The position control of the push-in member 18 executed by the control unit 25 in the injection process and the pressure holding process will be described below.
[0026] The control unit 25 executes an injection process and a pressure holding process during the injection of the resin material. The control unit 25 executes speed control in the injection process and executes pressure control in the pressure holding process. As shown in FIG. 1, in the injection process, the control unit 25 advances the pushing member 18 from a specified position P1 (described later) to a switching position P2 (described later). When the pushing member 18 advances, the plunger 17 pressed by the pushing member 18 also advances. At this time, the control unit 25 controls the drive unit 20 so that the plunger 17 pressed by the pushing member 18 advances at a uniform speed (speed control).
[0027] When the pushing member 18 reaches a predetermined position, the control unit 25 shifts from speed control to pressure control (pressure holding process). In this specification and drawings, the predetermined position at which the speed control shifts to pressure control is described as "switching position P2". FIG. 1 shows a state in which the pushing member 18 advances from a specified position P1 to a switching position P2. When the pushing member 18 advances to the switching position P2, the control unit 25 controls the drive unit 20 so that a certain pressure is applied to the resin material injected into the mold (pressure control). In this pressure control, the pushing member 18 advances to a filling completion position P3. In general, the switching position P2 is not equal to the filling completion position P3. By performing the above pressure control for a predetermined time, the injection of the resin material is completed.
[0028] After the injection of the resin material is completed, the control unit 25 executes the metering process. The control unit 25 controls the drive unit 20 so that the push-in member 18 retreats to the specified position P1 at the start of the metering process. Alternatively, the control unit 25 may start the metering process at the time when the push-in member 18 starts to retreat, and supply the resin material to the barrel 11. As described above, since the plunger 17 and the push-in member 18 are not connected, even if the push-in member 18 retreats, the plunger 17 hardly retreats. Note that the "specified position P1" indicates a position where the amount of the resin material filled in the barrel 11 becomes a predetermined injection amount determined in one molding cycle. That is, when the plunger 17 retreats by supplying the resin material to the barrel 11, and the plunger 17 abuts against the push-in member 18 and the drive unit 20 receives a load, the barrel 11 is filled with the predetermined injection amount of the resin material determined in at least one molding cycle.
[0029] The position of the specified position P1 can be calculated by the stop position (origin position) of the push-in member 18+the rotation speed of the ball screw 22+the pitch of the ball screw 22. As described above, the rotation speed of the ball screw (the rotation speed of the servo motor) is detected by the pulse coder and output to the control unit 25. Therefore, the control unit 25 can detect the position of the moving push-in member 18 based on the position of the push-in member 18 before it moves and the actual rotation speed of the servo motor.
[0030] When the control unit 25 causes the pushing member 18 to retract to the specified position P1, it opens the flow path valve 15 and controls the material supply unit 16 to supply the resin material to the barrel 11. This causes the resin material to be supplied from the material supply unit 16 to the barrel 11, and metering of the resin material begins. When the resin material is supplied to the barrel 11, the plunger 17 retracts in the X1 direction due to the material pressure of the resin material and comes into contact with the pushing member 18 that has retracted to the specified position P1. Since the resin material continues to be supplied to the barrel 11 even after the plunger 17 comes into contact with the pushing member 18, the material pressure of the resin material acts on the drive unit 20 via the plunger 17, the pushing member 18, and the ball screw 22 (driving force transmission unit 21).
[0031] The control unit 25 increases or decreases the value of the current flowing through the servo motor in order to obtain the torque required to hold the position of the push-in member 18 against the external force received from the ball screw 22. The control unit 25 determines whether or not the load received by the drive unit 20 has reached a specified value based on the increased or decreased current value. When the load received by the drive unit 20 due to the material pressure of the resin material reaches a specified value, the control unit 25 closes the flow path valve 15 and stops the supply of the resin material from the material supply unit 16 to the barrel 11. This completes the metering of the resin material to the barrel 11.
[0032] In the measurement process, when the load received by the drive unit 20 is outside the allowable range, the control unit 25 executes control to change the stop position of the push-in member 18 from the specified position P1 so that the load received by the drive unit 20 falls within the allowable range. When the control unit 25 changes the specified position, the control unit 25 executes control to change the switching position P2 when transitioning from the injection process to the pressure holding process. Here, the control unit 25 may change the switching position P2 by the same amount as the correction amount of the specified position P1, or may calculate the correction amount based on the correction amount of the specified position P1 and a correction coefficient, and change the switching position P2 by the calculated value. The control unit 25 executes control to change the supply pressure of the resin material supplied from the material supply unit 16 to the barrel 11 in the metering process based on the correction amount of the specified position P1. The above-mentioned control executed by the control unit 25 in the measurement process will be described in detail later.
[0033] Next, a molding cycle (measurement process, injection process, and pressure holding process) executed in the injection device 1 of the first embodiment will be described. In an actual molding cycle, the operations proceed in the order of a metering process, an injection process, and a pressure-holding process, but here, the injection process and the pressure-holding process will be described first. Figures 2A and 2B are diagrams for explaining the injection process and the pressure-holding process in the first embodiment.
[0034] FIG. 2A shows a state in which the pushing member 18 is moving forward in the injection process. Prior to the start of the injection process, the barrel 11 is filled with resin material. The resin material is filled into the barrel 11 in a metering process described below. In the injection process, the control unit 25 closes the flow path valve 15 and controls the drive unit 20 so that the ball screw 22 (driving force transmission unit 21) rotates in the reverse direction (speed control). As a result, as shown in FIG. 2A, the pushing member 18 moves forward together with the plunger 17. When the plunger 17 moves forward, the resin material filled in the barrel 11 is injected from the nozzle 12 toward the mold.
[0035] 2B shows a state where the injection process has been switched to the pressure holding process and the pushing member 18 has advanced to the switching position P2. After the control unit 25 has advanced the pushing member 18 to the switching position P2 to complete the injection process, the control unit 25 further advances the pushing member 18 to the filling completion position P3 and executes pressure control. By executing this pressure control for a predetermined time, the filling of the resin material is completed.
[0036] Next, the measurement process will be described. Figures 3A to 3C are diagrams illustrating the measurement process of the injection device 1 of the first embodiment. 3A shows a state in which the pushing member 18 has retreated to a specified position P1 in the metering process. After the filling of the resin material is completed, the control unit 25 controls the drive unit 20 so that the pushing member 18 retreats to the specified position P1 as shown in FIG 3A. Note that since the plunger 17 and the pushing member 18 are not connected to each other, the plunger 17 hardly retreats even if the pushing member 18 retreats.
[0037] 3B shows a state in which the plunger 17 has retracted due to the material pressure of the resin material in the metering process. After the controller 25 retracts the pusher 18 to the specified position P1, the controller 25 opens the flow passage valve 15 and controls the material supply unit 16 to supply the resin material to the barrel 11. This causes the resin material to be supplied from the material supply unit 16 to the barrel 11, and metering of the resin material begins. When the resin material is supplied to the barrel 11, the plunger 17 retracts due to the material pressure of the resin material, as shown in FIG. 3B.
[0038] FIG. 3C shows a state where the plunger 17 is in contact with the push-in member 18 in the metering process. As described above, when the resin material is supplied from the material supply unit 16 to the barrel 11, the plunger 17 retreats due to the material pressure of the resin material, and as shown in FIG. 3C, the plunger 17 comes into contact with the push-in member 18, which has retreated to the specified position P1. Since the resin material continues to be supplied to the barrel 11 even after the plunger 17 comes into contact with the push-in member 18, the material pressure of the resin material acts on the drive unit 20 via the ball screw 22. When the load received by the drive unit 20 due to the material pressure of the resin material reaches a specified value, the control unit 25 closes the flow passage valve 15 and stops the supply of the resin material from the material supply unit 16 to the barrel 11. This completes the metering of the resin material to the barrel 11.
[0039] Next, other controls executed in the above-mentioned measuring process will be described. (Adjusting the material pressure of resin material) FIG. 4 is a diagram for explaining the control of adjusting the material pressure of the resin material. When the flow passage valve 15 is closed during metering to stop the supply of the resin material to the barrel 11, if the load received by the drive unit 20 falls outside the allowable range, the internal pressure of the barrel 11 may be excessively high or excessively low. In this way, when the load received by the drive unit 20 falls outside the allowable range, it becomes difficult to keep the material pressure of the resin material constant in the barrel 11. Therefore, in this embodiment, when the flow passage valve 15 is closed during metering to stop the supply of the resin material to the barrel 11, if the load received by the drive unit 20 falls outside the allowable range, the control unit 25 executes control to move the stop position of the push-in member 18 during metering backward or forward from the specified position P1.
[0040] Specifically, when the load on the drive unit 20 exceeds the upper limit of the allowable range after the flow passage valve 15 is closed to stop the supply of the resin material to the barrel 11 during metering, the stop position of the push-in member 18 is changed to a position P1+a on the X1 side of the specified position P1 as shown in FIG. 4. This makes it possible to lower the material pressure of the resin material filled into the barrel 11. On the other hand, when the flow passage valve 15 is closed to stop the supply of the resin material to the barrel 11 during metering, if the load on the drive unit 20 does not reach the lower limit of the allowable range, the stop position of the push-in member 18 is changed to a position P1-b on the X2 side of the specified position P1 as shown in FIG. 4. This makes it possible to increase the material pressure of the resin material filled into the barrel 11.
[0041] The stop position of the push-in member 18 may be changed stepwise or steplessly based on a preset correction amount. If the load on the drive unit 20 during metering falls outside the allowable range, the control unit 25 executes the above control until the load on the drive unit 20 falls within the allowable range, thereby making it possible to keep the material pressure of the resin material constant for each molding cycle. When the control unit 25 changes the stop position of the push-in member 18, it stores the correction amount in memory (not shown), and in the next molding cycle, adjusts the stop position of the push-in member 18 based on the stored correction amount.
[0042] (Change the switch position) Fig. 5 is a diagram for explaining the control for changing the switching position. When the stop position of the push-in member 18 is changed in the metering process, it is desirable to change the switching position P2 at which the control shifts from speed control to pressure control in order to keep the injection amount of the resin material constant. Therefore, when the stop position of the push-in member 18 is changed during metering (see Fig. 4), the control unit 25 executes control for changing the switching position P2.
[0043] Specifically, when the stop position of the pushing-in member 18 during metering is changed to a position P1+a on the X1 side from the specified position P1 (see Fig. 4), the switching position P2 is changed to a position P2+a on the X1 side as shown in Fig. 5. On the other hand, when the stop position of the pushing-in member 18 during metering is changed to a position P1-b on the X2 side from the specified position P1 (see Fig. 4), the switching position P2 is changed to a position P2-b on the X2 side as shown in Fig. 5. By executing such control in the control unit 25, the injection amount of the resin material can be kept constant in the injection process for each molding cycle.
[0044] In this embodiment, when the stop position of the push-in member 18 is changed, as shown in FIG. 5, the same amount as the amount by which the stop position of the push-in member 18 is changed (+a or -b) is set as the correction amount of the switching position P2, so that the change of the switching position P2 can be performed more quickly. On the other hand, as another embodiment, the switching position P2 may be changed based on a value obtained by multiplying the amount by which the stop position of the push-in member 18 is changed (+a or -b) by a preset correction coefficient β. For example, when the stop position after the change of the push-in member 18 is P1+α, if the correction coefficient β is 0.8, the correction amount of the switching position P2 is +α×0.8. According to this control, the correction coefficient is changed according to the injection amount of the resin material for each molding cycle, so that the switching position P2 can be adjusted more finely. In this control, the correction coefficient β may be changed according to the direction in which the switching position P2 is moved. When the injection device 1 is applied to a sealant applicator or the like that does not require a pressure holding process, the change in the switching position for transitioning from speed control to pressure control described above is controlled as a change in the injection completion position.
[0045] (Change in resin material supply pressure) When it is necessary to move the stop position of the pushing member 18 backward or forward from the specified position P1 during metering, the supply pressure of the resin material supplied from the material supply unit 16 to the barrel 11 may be excessively high or low. Therefore, in this embodiment, when the stop position of the pushing member 18 during metering is changed from the specified position P1, the control unit 25 executes control to change the supply pressure of the resin material supplied from the material supply unit 16 to the barrel 11.
[0046] Specifically, when the stop position of the pushing-in member 18 is moved backward from the specified position P1 during metering, the supply pressure of the resin material supplied from the material supply unit 16 to the barrel 11 in the next molding cycle is lowered. On the other hand, when the stop position of the pushing-in member 18 is moved forward from the specified position P1 during metering, the supply pressure of the resin material supplied from the material supply unit 16 to the barrel 11 in the next molding cycle is increased. By performing such control, the material pressure of the resin material for each molding cycle can be kept constant. The above-mentioned adjustment of the material pressure of the resin material, change of the switching position, and control of change of the supply pressure of the resin material can also be similarly applied to an injection device 1A of a second embodiment described later.
[0047] Next, the processing contents of the weighing control program executed by the control unit 25 of the first embodiment will be described with reference to the flowcharts shown in Figures 6A and 6B. Figures 6A and 6B are flowcharts showing the processing steps of the weighing control program executed by the control unit 25 of the first embodiment.
[0048] In step S101 shown in FIG. 6A, the control unit 25 (see FIG. 1) controls the driving unit 20 so that the pushing member 18 retreats to a specified position P1.
[0049] In step S102, the control unit 25 opens the flow path valve 15 and controls the material supply unit 16 to supply the resin material to the barrel 11. This causes the resin material to be supplied from the material supply unit 16 to the barrel 11, and metering of the resin material is started. When the resin material is supplied to the barrel 11, the plunger 17 retracts due to the material pressure of the resin material (see FIG. 3B).
[0050] In step S103, the control unit 25 determines whether or not the load received by the drive unit 20 has reached a specified value. If the control unit 25 determines in step S103 that the load received by the drive unit 20 has reached the specified value, the process proceeds to step S104. On the other hand, if the control unit 25 determines in step S103 that the load received by the drive unit 20 has not reached the specified value, the process proceeds (returns) to step S103.
[0051] In step S104 (step S103: YES), the control unit 25 closes the flow path valve 15 and stops the supply of the resin material from the material supply unit 16 to the barrel 11. This completes the metering of the resin material to the barrel 11.
[0052] In step S105, the control unit 25 determines whether or not the load received by the drive unit 20 is within the allowable range. If the control unit 25 determines in step S105 that the load received by the drive unit 20 is within the allowable range, the process proceeds to step S107 (FIG. 6B). On the other hand, if the control unit 25 determines in step S105 that the load received by the drive unit 20 is outside the allowable range, the process proceeds to step S106.
[0053] In step S106 (step S105: NO), the control unit 25 advances or retreats the stop position of the pushing member 18 from the specified position P1. The control unit 25 executes the control of step S106 until it is determined in step S105 that the load received by the drive unit 20 is within the allowable range.
[0054] In step S107 shown in FIG. 6B (step S105: YES), the control unit 25 determines whether or not the stop position of the push-in member 18 has not changed. If the control unit 25 determines in step S107 that the stop position of the push-in member 18 has not changed, the process of this flowchart ends. On the other hand, if the control unit 25 determines in step S107 that the stop position of the push-in member 18 has changed, the process proceeds to step S108.
[0055] In step S108 (step S107: NO), the control unit 25 changes the switching position P2 based on the changed stop position of the push-in member 18. Furthermore, the control unit 25 changes the supply pressure of the resin material supplied from the material supply unit 16 to the barrel 11 based on the changed stop position of the push-in member 18. After the process of step S108 ends, the process of this flowchart ends.
[0056] According to the injection device 1 of the above-described first embodiment, for example, the following effects are achieved. In the injection device 1 of the first embodiment, the control unit 25 executes control to make the plunger 17 retreat by the material pressure of the resin material, and complete the metering of the resin material when the load received by the drive unit 20 by the material pressure of the resin material reaches a specified value. Therefore, compared with a method in which the plunger is forcibly retreated by the plunger drive device, it is possible to suppress the intrusion of air into the barrel 11. In particular, in a liquid resin material with low viscosity such as silicone, it is possible to more effectively suppress the intrusion of air into the barrel 11. In addition, since it is not necessary to control the position of the plunger while measuring the material pressure in the barrel 11 using a pressure sensor, not only the pressure sensor but also a connecting member connecting the plunger and the plunger drive device is not required. Therefore, according to the injection device 1 of the first embodiment, it is possible to inject a constant amount of resin material for each injection process while suppressing the intrusion of air into the barrel 11 and the increase in cost due to the increase in the number of parts.
[0057] In the injection device 1 of the first embodiment, when the load received by the drive unit 20 is outside the allowable range, the control unit 25 executes control to move the stop position of the push-in member 18 backward or forward from the specified position P1 so that the load received by the drive unit 20 falls within the allowable range. According to this control, the material pressure of the resin material filled in the barrel 11 is adjusted according to the amount by which the load received by the drive unit 20 is outside the allowable range, so that the material pressure of the resin material for each molding cycle can be kept constant.
[0058] In the injection device 1 of the first embodiment, when the control unit 25 executes control to move the stop position of the pushing member 18 backward or forward from the specified position P1, it executes control to change the switching position P2 where the control shifts from speed control to pressure control, so that the injection amount of the resin material can be kept constant in the injection process for each molding cycle.
[0059] In the above control, the switching position P2 can be changed more quickly by setting the same amount as the change in the stop position of the push-in member 18 as the correction amount for the switching position P2. Also, in the above control, the switching position P2 may be changed based on a value obtained by multiplying the amount by which the stop position of the push-in member 18 is changed by a preset correction coefficient β. In this case, the correction coefficient β can be changed according to the injection amount of the resin material for each molding cycle, thereby making it possible to adjust the switching position P2 more finely.
[0060] In the injection device 1 of the first embodiment, when the stopping position of the pushing member 18 during metering is changed from the specified position P1, the control unit 25 executes control to change the supply pressure of the resin material supplied from the material supply unit 16 to the barrel 11, so that the material pressure of the resin material for each molding cycle can be kept constant.
[0061] Second embodiment The injection apparatus 1A of the second embodiment differs from the first embodiment in that the plunger 17 and the pushing member 18 are connected. In the injection apparatus 1A of the second embodiment, the other configurations are the same as those of the first embodiment. Therefore, in the description and drawings of the second embodiment, the same reference numerals as those of the first embodiment are used for the equivalent members, etc., to omit redundant description. The basic configuration of the injection apparatus 1A of the second embodiment is the same as that of FIG. 1. In the injection apparatus 1A of the second embodiment, the injection process and the pressure holding process (see FIG. 2A and FIG. 2B) of the molding cycle are the same as those of the first embodiment, so only the metering process will be described.
[0062] 7A and 7B are diagrams illustrating the measurement process of the injection unit 1A of the second embodiment. 7A shows the state immediately after the start of the metering process. After the injection of the resin material is completed, the control unit 25 switches the drive unit 20 and the ball screw 22 to a state in which they can freely rotate by an external force while maintaining the positions of the plunger 17 and the pushing member 18.
[0063] Next, the control unit 25 opens the flow passage valve 15 and controls the material supply unit 16 so that the resin material is supplied to the barrel 11. This causes the resin material to be supplied from the material supply unit 16 to the barrel 11, and metering of the resin material begins. When the resin material is supplied to the barrel 11, as shown in FIG. 7A, the plunger 17 and the pushing member 18 move backward due to the material pressure of the resin material. At this time, the drive unit 20 and the ball screw 22 rotate as the plunger 17 and the pushing member 18 move backward. In the following description, the plunger 17 and the pushing member 18 are also collectively referred to as the "pushing member 18."
[0064] Fig. 7B shows a state in which the pusher 18 has retreated to a specified position together with the plunger 17 in the metering process. As shown in Fig. 7B, whether or not the pusher 18 has retreated to a specified position P1 is determined based on the material pressure of the resin material. As described above, the rotation speed of the ball screw is detected by a pulse coder (not shown) as the rotation speed of the servo motor, so that the control unit 25 can detect the position of the moved pusher member 18 based on the position of the pusher member 18 before it was moved and the actual rotation speed of the servo motor.
[0065] When the pushing member 18 retreats to the specified position P1, the control unit 25 releases the driving unit 20 and the ball screw 22 from a state in which they rotate freely under external force. Then, the control unit 25 supplies a current to the driving unit 20 to hold the position of the pushing member 18, and holds the pushing member 18 at the specified position P1. Since the resin material continues to be supplied to the barrel 11 even after the pushing member 18 retreats to the specified position P1, the material pressure of the resin material acts on the driving unit 20 via the ball screw 22. When the load received by the driving unit 20 due to the material pressure of the resin material reaches a specified value, the control unit 25 closes the flow passage valve 15 and stops the supply of the resin material from the material supply unit 16 to the barrel 11. This completes the metering of the resin material to the barrel 11.
[0066] Next, the processing contents of the measurement control program executed by the control unit 25 of the second embodiment will be described with reference to the flowcharts shown in Figures 8A and 8B. Figures 8A and 8B are flowcharts showing the processing procedure of the measurement control program executed by the control unit 25 of the second embodiment.
[0067] In step S201 shown in FIG. 8A, the control unit 25 (see FIG. 1) switches the drive unit 20 and the ball screw 22 to a state in which they can freely rotate by an external force.
[0068] In step S202, the control unit 25 opens the flow path valve 15 and controls the material supply unit 16 to supply the resin material to the barrel 11. This causes the resin material to be supplied from the material supply unit 16 to the barrel 11, and metering of the resin material is started. When the resin material is supplied to the barrel 11, the pushing member 18 retreats due to the material pressure of the resin material (see FIG. 7A).
[0069] In step S203, the control unit 25 determines whether the push-in member 18 has retreated to the specified position P1. If the control unit 25 determines in step S203 that the push-in member 18 has retreated to the specified position P1, the process proceeds to step S204. On the other hand, if the control unit 25 determines in step S203 that the push-in member 18 has not retreated to the specified position P1, the process proceeds (returns) to step S203.
[0070] In step S204 (step S203: YES), the control unit 25 releases the drive unit 20 and the ball screw 22 from the state in which they are freely rotating due to the external force.
[0071] In step S205, the control unit 25 determines whether or not the load received by the drive unit 20 has reached a specified value. If the control unit 25 determines in step S205 that the load received by the drive unit 20 has reached the specified value, the process proceeds to step S206 (FIG. 8B). On the other hand, if the control unit 25 determines in step S205 that the load received by the drive unit 20 has not reached the allowable value, the process proceeds (returns) to step S205.
[0072] 8B (Step S205: YES), the control unit 25 closes the flow path valve 15 and stops the supply of the resin material from the material supply unit 16 to the barrel 11. This completes the metering of the resin material to the barrel 11.
[0073] In step S207, the control unit 25 determines whether or not the load received by the drive unit 20 is within the allowable range. If the control unit 25 determines in step S207 that the load received by the drive unit 20 is within the allowable range, the process proceeds to step S209. On the other hand, if the control unit 25 determines in step S207 that the load received by the drive unit 20 is outside the allowable range, the process proceeds to step S208.
[0074] In step S208 (step S207: NO), the control unit 25 advances or retreats the stop position of the push-in member 18 from the specified position P1.
[0075] In step S209 (step S207: YES), the control unit 25 determines whether or not the stop position of the push-in member 18 has not changed. If the control unit 25 determines in step S209 that the stop position of the push-in member 18 has not changed, the process of this flowchart ends. On the other hand, if the control unit 25 determines in step S209 that the stop position of the push-in member 18 has changed, the process proceeds to step S210.
[0076] In step S210 (step S209: NO), the control unit 25 changes the switching position P2 based on the changed stop position of the push-in member 18. Furthermore, the control unit 25 changes the supply pressure of the resin material supplied from the material supply unit 16 to the barrel 11 based on the changed stop position of the push-in member 18. After the process of step S210 ends, the process of this flowchart ends. The injection device 1A of the second embodiment described above can also provide the same effects as the injection device 1 of the first embodiment.
[0077] Although the embodiment of the present invention has been described above, the present invention is not limited to the above-mentioned embodiment, and various modifications and changes are possible, such as the modified form described below, which are also included in the technical scope of the present invention. In addition, the effects described in the embodiment are merely a list of the most preferable effects resulting from the present invention, and are not limited to those described in the embodiment. The above-mentioned embodiment and the modified form described below can be used in appropriate combination, but detailed description will be omitted. In the following description, the first and second embodiments are also collectively referred to as "embodiments".
[0078] (Variations) In the embodiment, it is not necessary to execute all of the control for adjusting the material pressure of the resin material, the control for changing the switching position P2, and the control for changing the supply pressure of the resin material. One or more of the controls may be executed in combination, or these controls may not be executed. In the embodiment, the control unit 25 executes the control for starting / stopping the supply of the resin material (hereinafter also referred to as "material supply control"), the control of the drive unit 20, the opening / closing of the flow path valve 15, and the control of the drive force transmission unit 21 (hereinafter also referred to as "drive control") in the injection device, but the present invention is not limited to this. In the injection device, the material supply control and the drive control may be executed by different control units. In that case, for example, the timing of the material supply control and the timing of the drive control can be synchronized by outputting a control signal from the control unit that executes the drive control to the control unit that executes the material supply control.
[0079] In the embodiment, the plunger 17 retreats due to the material pressure of the resin material supplied to the barrel 11. Therefore, when the diameter of the plunger 17 is larger than a certain value, it is necessary to shorten the plunger 17. FIG. 9 is a diagram for explaining the configuration of the injection device 1 in a modified embodiment. As shown in FIG. 9, when the diameter of the plunger 17 is larger than a certain value, the plunger 17 may be shortened and the pushing member 18 may be composed of a plate-shaped first pushing member 18a and a cylindrical second pushing member 18b. In the pushing member 18 shown in FIG. 9, the first pushing member 18a and the second pushing member 18b may be unconnected or connected. In addition, the plunger 17 and the pushing member 18 may be unconnected as in the first embodiment, or may be connected as in the second embodiment.
[0080] In the embodiment, a configuration has been described in which the driving force transmission unit 21 transmits the driving force of the drive unit 20 to the ball screw 22 via a gear mechanism, but the driving force of the drive unit 20 may also be transmitted to the ball screw 22 without via a gear mechanism. In the embodiment, an example in which the driving unit 20 is configured by a servo motor has been described, but the driving unit 20 may be configured by, for example, a hydraulic mechanism. In the embodiment, an example in which the injection device is applied to an injection molding machine has been described, but the injection device can also be applied to, for example, a robot equipped with a dispenser that dispenses resin material toward an object.
[0081] In the embodiment, an example has been described in which the position of the pushing member 18 is detected based on the rotation speed of the servo motor that constitutes the drive unit 20, but the position of the pushing member 18 may also be detected using an external sensor such as a photoelectric sensor, a camera, etc. In the embodiment, an example has been described in which the driving force transmission unit 21 is configured with a single-axis ball screw, but the driving force transmission unit 21 may also be configured with a two-axis ball screw, or a three or more axis ball screw. In the embodiment, an example in which the injection unit and the mold clamping unit are arranged in a horizontal direction has been described, but the injection unit and the mold clamping unit may be arranged in a vertical direction. [Explanation of symbols]
[0082] 1, 1A: injection device, 10: barrel holding section, 11: barrel, 12: nozzle, 13: resin material inlet, 14: material flow path, 15: flow path valve, 16: material supply section, 17: plunger, 18: pushing member, 19: linear guide, 20: drive section, 21: drive force transmission section, 22: ball screw, 25: control section
Claims
1. An injection device that injects a resin material from an injection port provided at a tip side of a barrel, a resin material inlet for injecting a resin material into the barrel; a drive unit that generates a drive force for injecting the resin material filled in the barrel through the injection port; a plunger that is provided to be movable forward and backward in an axial direction of the barrel, the plunger retracting when a resin material flows into the barrel from the resin material inlet and advancing within the barrel to inject the resin material filled in the barrel toward the injection port; a pushing member that pushes the plunger toward the injection port of the barrel; a driving force transmission unit that transmits the driving force generated by the driving unit to the pushing member; a control unit that controls each unit so as to start the flow of resin material into the barrel from the resin material inlet and completes the metering of the resin material when the load received by the drive unit from the push-in member located at a specified position reaches a specified value, and that changes a stop position of the push-in member from the specified position so that the load falls within an allowable range if the load received by the drive unit falls outside the allowable range; An injection device comprising:
2. the pusher member is uncoupled from the plunger; the control unit controls each unit so as to start flowing the resin material into the barrel from the resin material inlet, and completes metering of the resin material when the drive unit causes the push-in member to retreat to a specified position and a load applied to the drive unit reaches a specified value. The injection device according to claim 1 .
3. The pushing member is coupled to the plunger, the control unit controls each unit so as to start flowing the resin material into the barrel from the resin material inlet, cause the plunger to move the pushing member back to a specified position, and complete the metering of the resin material when the load received by the drive unit reaches a specified value. The injection device according to claim 1 .
4. When the control unit changes the stop position of the pushing member, the control unit changes an injection completion position or a switching position when transitioning from the injection process to the pressure holding process.
4. The injection device according to claim 3.
5. The control unit changes the injection completion position or the switching position by an amount equal to an amount by which the stop position of the pushing member is changed from the specified position.
5. The injection device according to claim 4.
6. the control unit calculates a correction amount of the injection completion position or the switching position based on an amount by which the stop position of the pushing member is changed from the specified position and a correction coefficient.
5. The injection device according to claim 4.
7. a resin material supply unit that supplies a resin material to the barrel, the control unit changes a supply pressure of the resin material supplied from the resin material supply unit to the barrel in a next metering step based on the correction amount of the specified position. The injection device according to any one of claims 3 to 6.
Citation Information
Patent Citations
JP02‐120020A
Preplasticating type injection molding machine and its control method
JP1992173314A
Method for controlling preplastication type injection molding machine
JP2004255588A
Preplasticating injection molding machine
JP2009255452A
Plasticization device, injection device, molding device, and molding manufacturing method
JP2016060206A