Technical Problem

Constructing temporary platforms on soft ground using long support piles is costly and time-consuming, and conventional structures lack sufficient horizontal rigidity and overturning resistance against large cranes, necessitating labor-intensive pile removal or leaving piles in the ground.

Method used

A method involving ground improvement with a solidifying agent to create a rectangular or cylindrical ground improvement body, within which steel platform piles are erected, forming a unified structure that resists vertical and horizontal loads, using methods like medium- and deep-layer mixing to secure stability without reaching the supporting layer.

🎯Benefits of technology

Reduces construction costs and time, enhances stability by dispersing horizontal loads and resisting overturning moments, while allowing easy pile removal post-construction.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007873948000001_ABST
    Figure 0007873948000001_ABST
Patent Text Reader

Abstract

This invention provides a temporary platform structure and its construction method that can secure sufficient vertical and horizontal bearing capacity without using long support piles by performing surface-level ground improvement at relatively shallow depths using methods such as the mid-layer mixing treatment method. [Solution] A method for constructing a temporary platform on the ground comprises: a ground improvement step of supplying a solidifying agent to a region of the ground 1 up to a predetermined depth and mixing and stirring it with the in-situ soil to create a rectangular prism-shaped or cylindrical ground improvement body 2 that has a planar extent; a pile driving step of driving steel platform piles 3 into the region of the ground improvement body 2; and a frame installation step of connecting the heads of a plurality of platform piles 3 and installing a frame that supports the work platform. The ground improvement body 2 is made strong enough to support the load acting on the temporary platform.