Information processing device, information processing method, and computer program
Patent Information
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- KDDI CORP
- Filing Date
- 2026-04-15
- Publication Date
- 2026-07-24
AI Technical Summary
Existing communication systems fail to appropriately bill users when a primary wired line is unavailable, necessitating a solution to manage communication charges effectively using both wired and wireless lines.
An information processing device that sets and applies different usage fee conditions based on the activation status of a first wired line, enabling billing for communication charges through either a second line, such as a wireless line, before or after the activation of the first wired line, and manages contract procedures and location verification to ensure accurate billing.
Enables appropriate billing for communication charges, enhances user convenience, and optimizes fee structures by adjusting billing conditions based on line activation and usage, thereby improving service quality and compliance with usage agreements.
Smart Images

Figure 0007895021000001_ABST
Abstract
Description
Technical Field
[0004] ,
[0006] , , ,
[0005] , , , ,
[0001] The present invention relates to an information processing apparatus, an information processing method, and a computer program.
Background Art
[0002] Conventionally, a technique for enabling the use of a plurality of communication lines and providing connection to a communication network has been known (see, for example, Patent Document 1). In the technique described in Patent Document 1, when a wired line and a wireless line are available, the priority of the wired line is set higher than that of the wireless line, and the communication line to be used is changed according to the priority.
Prior Art Documents
Patent Documents
[0003]
Patent Document 1
[0007] One aspect of the present invention is, Information processing device for processing billing for communication charges of a router that can communicate with the network via a first wired line and one or more second lines different from the first wired line. An information processing method that is performed by The first Steps to obtain the status of wired line activation, Communication according to the activation status of the first wired line The setup steps for setting the usage fee conditions, Depending on the activation status of the first wired line, the router Includes a billing process step for processing communication charges, The acquisition step is characterized in that, if the activation status of the first wired line is unavailable, the acquisition step acquires usage information indicating that communication with the network is taking place through the second wired line of the second line, and the billing processing step processes the billing of the router's communication charges based on the usage fee conditions of the second wired line when the activation status of the first wired line is unavailable. It is an information processing method.
[0008] One aspect of the present invention is, This process involves billing for communication charges for a router that can communicate with the network via a first wired line and one or more second lines different from the first wired line. On the computer, The first Steps to obtain the status of wired line activation, Communication according to the activation status of the first wired line The setup steps for setting the usage fee conditions, Depending on the activation status of the first wired line, the router The billing process step, which processes the billing for communication charges, is executed. The acquisition step is characterized in that, if the activation status of the first wired line is unavailable, the acquisition step acquires usage information indicating that communication with the network is taking place through the second wired line of the second line, and the billing processing step processes the billing of the router's communication charges based on the usage fee conditions of the second wired line when the activation status of the first wired line is unavailable. It is a computer program. [Effects of the Invention]
[0009] According to the present invention, the effect is obtained that users can be billed appropriately for their communication charges. [Brief explanation of the drawing]
[0010] [Figure 1] This figure shows an example configuration of a communication system according to one embodiment. [Figure 2] This figure shows an example configuration of an information processing device according to one embodiment. [Figure 3] This is a diagram for explaining communication charges according to an embodiment. [Figure 4] This is a diagram for explaining communication charges according to an embodiment. [Figure 5] This is a diagram showing an example of the procedure of an information processing method according to an embodiment.
Embodiments for Carrying Out the Invention
[0011] Hereinafter, embodiments of the present invention will be described with reference to the drawings. FIG. 1 is a diagram showing a configuration example of a communication system according to an embodiment. In FIG. 1, router 1 communicatively connects the terminal side and the network side.
[0012] On the terminal side, router 1 communicatively connects to wireless terminal 201 such as a smartphone via a wireless communication interface LB11 such as "Wi-Fi (registered trademark)". Also, on the terminal side, router 1 communicatively connects to wired terminal 202 such as a personal computer (PC) via a wired communication interface LB12 such as RJ45. Also, on the terminal side, router 1 communicatively connects to analog telephone 203 via an analog communication interface LB13 such as RJ11.
[0013] Wireless terminal 201, wired terminal 202, and analog telephone 203 can communicate with the network side such as the Internet NW via router 1. Note that, in addition to via router 1, wireless terminal 201 can communicatively connect to base station BS2 of, for example, a fifth-generation mobile communication system (5G system) via wireless link LB2, and can communicate with the network side such as the Internet NW via wireless link LB2.
[0014] Router 1 is communicatively connected to an optical line termination device (ONU-OLT) 101 via a wired communication interface LA1 on the network side, and can perform network-side communication such as accessing the Internet NW through an optical line (hereinafter referred to as optical line L101) via the ONU-OLT 101. The optical line L101 is an example of a wired line. Also, Router 1 is communicatively connected to a base station BS1 of a 5G system via a wireless line LA2 on the network side, and can perform network-side communication such as accessing the Internet NW through the wireless line LA2. The wireless line LA2 is a wireless line using a SIM (Subscriber Identity Module). The SIM of the wireless line LA2 is provided in Router 1. Note that Router 1 can perform network-side communication only through the wireless line LA2 when the optical line L101 is unavailable, such as before the optical line L101 is opened.
[0015] Router 1 can access the communication carrier facility 300 via the wireless line LA2 or the optical line L101.
[0016] The communication carrier facility 300 manages information regarding contracts, opening status, usage status, etc. of communication lines, and information regarding users of Router 1. For example, the communication carrier facility 300 manages information regarding contracts, opening status, usage status, etc. of the optical line L101 (optical line management information) and information regarding contracts, opening status, usage status, etc. of the wireless line LA2 (wireless line management information). For example, the communication carrier facility 300 manages information regarding the subscription status of users of Router 1 to various services (user subscription service management information).
[0017] Router 1 acquires optical line management information and wireless line management information from the communication carrier facility 300. Based on information such as the optical line management information and the wireless line management information, Router 1 selects whether to perform network-side communication using the optical line L101 or to perform network-side communication using the wireless line LA2.
[0018] For example, before the optical fiber line L101 is activated, router 1 uses the wireless line LA2 for network-side communication. For example, after the optical fiber line L101 is activated, router 1 switches the communication line used for network-side communication from the wireless line LA2 to the optical fiber line L101. For example, after the optical fiber line L101 is activated, router 1 selects either the wireless line LA2 or the optical fiber line L101 as the communication line used for network-side communication. For example, after the optical fiber line L101 is activated, router 1 prioritizes selecting the optical fiber line L101 from the wireless line LA2 and the optical fiber line L101 as the communication line used for network-side communication, and selects the wireless line LA2 if the optical fiber line L101 is unavailable. For example, router 1 uses the wireless line LA2 for voice data communication. For example, Router 1 transmits voice data using the wireless line LA2 via VoLTE (Voice over LTE (Long Term Evolution)).
[0019] The information processing device 10 performs billing processing for communication charges related to router 1. The information processing device 10 can access the telecommunications carrier equipment 300 via the Internet network. The information processing device 10 obtains information such as optical line management information, wireless line management information, and user subscription service management information from the telecommunications carrier equipment 300.
[0020] Figure 2 shows an example of the configuration of an information processing device according to this embodiment. In Figure 2, the information processing device 10 includes a communication unit 11, an acquisition unit 12, a setting unit 13, a calculation unit 14, a billing processing unit 15, a procedure unit 16, a control unit 17, a user information acquisition unit 18, a determination unit 19, and a storage unit 30.
[0021] Each function of the information processing device 10 is realized by the information processing device 10 being equipped with computer hardware such as a CPU (Central Processing Unit) and memory, and the CPU executing a computer program stored in memory. The information processing device 10 may be configured using a general-purpose computer device, or it may be configured as a dedicated hardware device. For example, the information processing device 10 may be configured using a server computer connected to a communication network such as the Internet. Furthermore, each function of the information processing device 10 may be realized through cloud computing. Also, the information processing device 10 may be implemented by a single computer, or its functions may be distributed across multiple computers. Additionally, the information processing device 10 may be configured to launch a website using, for example, a WWW system.
[0022] The storage unit 30 stores various types of data. For example, the storage unit 30 stores first usage fee condition data 131, second usage fee condition data 132, third usage fee condition data 133, fourth usage fee condition data 134, user billing data 135, user refund data 136, and so on. The storage unit 30 is composed of non-volatile memory such as hard disk drives, magneto-optical disk drives, and flash memory, read-only recording media such as CD-ROMs, volatile memory such as DRAM (Dynamic Random Access Memory), or a combination thereof.
[0023] The communication unit 11 transmits and receives data to and from external devices of the information processing device 10 via the Internet network. The information processing device 10 communicates with external devices via the communication unit 11. For example, the information processing device 10 communicates with telecommunications carrier equipment 300 via the communication unit 11. Hereafter, all communication between the information processing device 10 and external devices is performed by the communication unit 11.
[0024] The acquisition unit 12 acquires the activation status of the optical line L101 in router 1. Router 1 is a router that can communicate with the network through both the optical line L101 and the wireless line LA2. The optical line L101 is an example of a wired line. The wireless line LA2 corresponds to a second line different from the optical line L101. The acquisition unit 12 acquires optical line management information from the telecommunications carrier equipment 300. The optical line management information includes information indicating the activation status of the optical line L101.
[0025] The configuration unit 13 sets a first usage fee condition before the activation of the optical fiber line L101 and a second usage fee condition after the activation of the optical fiber line L101 for each user of router 1. The first and second usage fee conditions are conditions for calculating communication charges related to router 1. For example, the first and second usage fee conditions are the monthly communication charges related to router 1. The first usage fee condition data 131 is data showing the first usage fee condition for each user. The second usage fee condition data 132 is data showing the second usage fee condition for each user.
[0026] The calculation unit 14 calculates the communication charges based on the first usage fee conditions when the optical fiber line L101 is not yet activated, and calculates the communication charges based on the second usage fee conditions from a predetermined timing after the optical fiber line L101 is activated when the optical fiber line L101 is activated.
[0027] The billing processing unit 15 performs billing processing for communication charges for users of router 1 based on the calculation results of communication charges by the calculation unit 14. The billing processing unit 15 records the results of the billing processing for each user's communication charges in user billing data 135. User billing data 135 is data that shows billing information such as the amount of communication charges billed for each user.
[0028] The procedure unit 16 performs contract procedures related to the users of router 1. The control unit 17 controls router 1.
[0029] The user information acquisition unit 18 acquires user subscription service management information regarding users of router 1 from the telecommunications carrier equipment 300. The user subscription service management information is information indicating the subscription status of router 1 users to various services. The decision unit 19 determines the amount of rebate to the user for communication charges based on the second usage fee conditions, based on the subscription status of router 1 users to various services. The decision unit 19 records the result of the decision on the rebate for each user's communication charges in user rebate data 136. The user rebate data 136 is data indicating rebate information such as the discount conditions for communication charges for each user.
[0030] Figures 3 and 4 are diagrams illustrating the communication charges according to this embodiment.
[0031] [Case 1] In the example in Figure 3 (Case 1), the user applies to use Router 1 (T0), and before the activation of the optical fiber line L101, the user powers on Router 1 and establishes a communication connection (5G connection) to the 5G system base station BS1 via the wireless line LA2 (T1). Subsequently, the installation work for the optical fiber line L101 is completed and the optical fiber line L101 is activated (T2). In this Case 1, before the activation of the optical fiber line L101 (until T2), communication charges are calculated based on the first usage fee conditions. For example, from the time of 5G connection (T1) until the activation of the optical fiber line L101 (T2), communication charges are calculated based on the first usage fee conditions. After the activation of the optical fiber line L101 (from T2 onward), communication charges are calculated based on the second usage fee conditions from a predetermined timing after the activation of the optical fiber line L101. The predetermined timing after the activation of optical fiber line L101 may be the time of activation of optical fiber line L101, or it may be a certain period of time after the activation of optical fiber line L101. If the predetermined timing after the activation of optical fiber line L101 is a certain period of time after the activation of optical fiber line L101, communication charges will be calculated based on the first usage fee conditions until that predetermined timing, and from that predetermined timing onward, communication charges will be calculated based on the second usage fee conditions.
[0032] [Case 2] In the example in Figure 4 (Case 2), the user applies to use Router 1 (T0), and does not use Router 1 (does not power on Router 1) until the optical fiber line L101 is activated (until T2). In this case, when the optical fiber line L101 is activated (T2), Router 1 is powered on and connects to the 5G system base station BS1 via the wireless line LA2 (5G connection) (T1=T2). In this Case 2, after the optical fiber line L101 is activated (from T1=T2 onwards), communication charges are calculated based on the second usage fee conditions from a predetermined timing after the activation of the optical fiber line L101. The predetermined timing after the activation of the optical fiber line L101 may be the time of activation of the optical fiber line L101, or it may be a certain period of time after the activation of the optical fiber line L101.
[0033] Furthermore, if the purpose of the wireless line LA2 is to serve as a supplementary line until the optical line L101 is activated, then communication charges for user communication via the wireless line LA2 may be waived or discounted until the optical line L101 is activated. This would provide convenience to users during the waiting period until the optical line L101 is activated.
[0034] Next, the overall flow of the information processing method according to this embodiment will be explained with reference to Figure 5. Figure 5 is a diagram showing an example of the procedure of the information processing method according to this embodiment.
[0035] (Step S1) The setting unit 13 sets the first usage fee conditions before the activation of the optical line L101 and the second usage fee conditions after the activation of the optical line L101 for each user of the router 1. As a result, the first usage fee condition data 131 and the second usage fee condition data 132 are stored in the storage unit 30.
[0036] (Step S2) The acquisition unit 12 acquires optical line management information from the telecommunications carrier equipment 300. The optical line management information includes information indicating the activation status of optical line L101. The acquisition unit 12 acquires the activation status of optical line L101 at router 1 from the optical line management information.
[0037] (Step S3) If the fiber optic line L101 has not yet been activated, proceed to Step S4. On the other hand, if the fiber optic line L101 has already been activated, proceed to Step S5.
[0038] (Step S4) The calculation unit 14 refers to the first usage fee condition data 131 in the storage unit 30 and calculates the communication fee based on the first usage fee condition.
[0039] (Step S5) The calculation unit 14 refers to the second usage fee condition data 132 in the storage unit 30 and calculates the communication fee based on the second usage fee condition.
[0040] (Step S6) The billing processing unit 15 performs billing processing for communication charges for users of Router 1 based on the calculation result of the communication charges by the calculation unit 14. This billing processing generates billing information such as the amount of communication charges for each user. The billing processing unit 15 records the billing information, which is the result of the billing processing for each user's communication charges, in user billing data 135. User billing data 135 is used to bill each user for communication charges. For example, the amount of communication charges for each user recorded in user billing data 135 is used to deduct the amount of communication charges from each user's bank account.
[0041] The following describes an example of the information processing method according to this embodiment.
[0042] (Example of information processing method 1) The acquisition unit 12 acquires activation information indicating that the wireless line LA2 has become available. For example, the activation information is detection information for communication via the wireless line LA2. For example, the activation information is information indicating that the home gateway connected to router 1 has connected to the 5G system via the wireless line LA2. The activation information regarding the wireless line LA2 is included in the wireless line management information. The acquisition unit 12 acquires the wireless line management information from the telecommunications carrier equipment 300.
[0043] The calculation unit 14 calculates the communication charges based on the usage commencement information for the wireless line LA2, according to either the first or second usage fee conditions. For example, in Case 1 of Figure 3, the calculation unit 14 calculates the communication charges based on the first usage fee conditions from the time of 5G connection (T1). Then, the calculation unit 14 calculates the communication charges based on the second usage fee conditions from a predetermined timing after the activation of the optical line L101 (T2 or later). For example, in Case 2 of Figure 4, the calculation unit 14 calculates the communication charges based on the second usage fee conditions from a predetermined timing after the 5G connection time (T1, i.e., the activation time of the optical line L101 (T2)).
[0044] The user can decide when to start using Router 1 (when to power on Router 1). Therefore, the start date for incurring communication charges related to Router 1 can be adjusted depending on when the user starts using Router 1 (when they power on Router 1).
[0045] (Example 2 of information processing methods) The procedure unit 16 initiates the contract procedure for the optical line L101 based on the usage commencement information for the wireless line LA2. For example, the procedure unit 16 initiates the contract procedure for the optical line L101 when the router 1 is started to be used. This eliminates the need for the user to initiate the contract procedure during the waiting period between when the user starts using the router 1 via the wireless line LA2 and when the optical line L101 is activated, as shown in Case 1 of Figure 3. The contract procedure for the optical line L101 is, for example, a change of telephone number.
[0046] (Example 3 of information processing methods) The acquisition unit 12 acquires router location information indicating the installation location of router 1 (such as the user's address) as specified by the contract procedure for the optical line L101, and second line location information indicating the communication location via the wireless line LA2. The router location information is included in the optical line management information. The acquisition unit 12 acquires the optical line management information from the telecommunications carrier equipment 300. The second line location information is included in the wireless line management information. The acquisition unit 12 acquires the wireless line management information from the telecommunications carrier equipment 300.
[0047] The control unit 17 stops communication via the wireless line LA2 if the communication location via the wireless line LA2 is more than a predetermined distance away from the installation location of the router 1. This restricts the use of the SIM for the wireless line LA2 to appropriate use. For example, it prevents the SIM for the wireless line LA2 installed in the router 1 from being removed from the router 1 and used in violation of the router 1 usage agreement. The SIM may be fixed inside the router 1 to prevent it from being removed.
[0048] Furthermore, if Router 1 is used appropriately, the communication charges for the wireless line LA2 and the communication charges for the optical line L101 may be combined into a single fee structure, and this combined fee structure may be cheaper than a fee structure where the two lines are charged separately. For example, this combined fee structure will be reflected in the second set of usage fee conditions.
[0049] (Example of information processing method 4) The billing processing unit 15 will not bill the user for communication charges based on the first usage fee conditions if the acquisition unit 12 does not acquire the start-up information. If the acquisition unit 12 does not acquire the start-up information, the billing processing unit 15 will not bill the user for communication charges, taking into consideration that the user may have mistakenly turned on the power to Router 1 at a location other than the official installation location of Router 1 (such as the user's address).
[0050] (Example of information processing method 5) The acquisition unit 12 acquires router location information indicating the installation location of router 1 (such as the user's address) as specified by the contract procedure for the optical line L101, and second line location information indicating the communication location via the wireless line LA2. The router location information is included in the optical line management information. The acquisition unit 12 acquires the optical line management information from the telecommunications carrier equipment 300. The second line location information is included in the wireless line management information. The acquisition unit 12 acquires the wireless line management information from the telecommunications carrier equipment 300.
[0051] The calculation unit 14 calculates the communication charges based on the distance between the communication location via the wireless line LA2 and the installation location of the router 1, according to a predetermined third usage charge condition. The third usage charge condition is shown in the third usage charge condition data 133 of the storage unit 30. The third usage charge condition data 133 is stored in the storage unit 30 in advance.
[0052] For example, if communication using the SIM card installed in Router 1 (communication via wireless line LA2) takes place at a distance greater than a predetermined distance from the installation location of Router 1, an additional fee will be charged to the user according to the third usage fee condition (amount of additional charge), in addition to the first and second usage fee conditions. This prevents the SIM card installed in Router 1 from being used in violation of the Router 1 usage agreement.
[0053] (Example 6 of information processing methods) The calculation unit 14 calculates the usage ratio of the optical line L101 and the wireless line LA2 during the communication charge calculation period, and changes the method of calculating communication charges according to the predetermined fourth usage charge conditions based on the usage ratio. The fourth usage charge conditions are shown in the fourth usage charge condition data 134 of the storage unit 30. The fourth usage charge condition data 134 is stored in the storage unit 30 in advance.
[0054] For example, if the purpose of wireless line LA2 is to serve as a supplementary line until optical line L101 is activated, it is undesirable from the standpoint of efficient use of line equipment if, after optical line L101 is activated and available, the utilization rate of wireless line LA2 is higher than that of optical line L101. Therefore, if the utilization rate of wireless line LA2 is higher than that of optical line L101, the calculation unit 14 applies a surcharge to the communication charges based on the second usage charge condition, according to the fourth usage charge condition (surcharge rate).
[0055] (Example 7 of information processing methods) The procedure unit 16 executes the cancellation procedure for the wireless line LA2 when the activation status of the optical line L101, based on the optical line management information acquired by the acquisition unit 12, indicates that activation is not possible. The acquisition unit 12 also acquires activation failure reason information indicating the reason why the optical line L101 cannot be activated. This activation failure reason information is included in the optical line management information. The calculation unit 14 calculates the contract termination fee associated with the cancellation of the wireless line LA2 based on this activation failure reason information. For example, if the reason for the inability to activate the optical line L101, as indicated in the activation failure reason information, is "user's fault," the calculation unit 14 calculates the contract termination fee associated with the cancellation of the wireless line LA2. This contract termination fee is included in the communication charges and billed to the user.
[0056] (Example of information processing method 8) The calculation unit 14 calculates the communication charges on the condition that the user wishes to continue using the wireless line LA2 if the optical line management information acquired by the acquisition unit 12 indicates that the optical line L101 is unavailable. Whether or not the user wishes to continue using the wireless line LA2 is included in the wireless line management information. The acquisition unit 12 acquires the wireless line management information from the telecommunications carrier equipment 300.
[0057] If the fiber optic line L101 is unavailable and the user wishes to continue using the wireless line LA2, Router 1 will allow a usage mode in which network communication is performed solely through the wireless line LA2, and will calculate and bill the user for the communication charges under this usage mode. This is intended to improve user convenience.
[0058] (Example of information processing method 9) The user information acquisition unit 18 acquires the user's subscription status to a service (referred to as the target service) provided by a second carrier that has a predetermined relationship with the first carrier that bills the router 1's users for communication charges. The user's subscription status to the target service is shown in the user subscription service management information. The user information acquisition unit 18 acquires the user subscription service management information concerning the router 1's users from the communication carrier equipment 300. As a result, the acquisition unit 12 acquires the user's subscription status to the target service.
[0059] The decision unit 19 determines the amount of the communication charges to be refunded to the user based on the second usage fee conditions, based on the user's subscription status to the target service of Router 1. The decision unit 19 records the result of the decision on the refund for each user's communication charges in the user refund data 136. The user refund data 136 is data that shows refund information such as the discount conditions for each user's communication charges.
[0060] For example, the target services are financial services provided by financial institutions (example of a second provider) that are affiliates or collaborating partners of a telecommunications carrier (example of a first provider) that bills users of Router 1 for communication charges. User subscription status to financial services is, for example, whether or not the user has opened an account. User rewards for communication charges include, for example, discounts on communication charges, cashback, and the awarding of reward points.
[0061] According to the embodiment described above, the first usage fee conditions before the activation of the optical fiber line L101 and the second usage fee conditions after the activation of the optical fiber line L101 are used to calculate the communication charges before the activation of the optical fiber line L101 and the communication charges after the activation of the optical fiber line L101. This has the effect of appropriately billing users for their communication charges.
[0062] The type of wireless connection used by Router 1 is not particularly limited. For example, the wireless connection may be any generation of mobile communication system, such as 4th generation (4G), 5th generation (5G), or 6th generation (6G).
[0063] Furthermore, although a wireless line was used as the second line in the above embodiment, the second line may be a wired line different from the optical line L101.
[0064] Furthermore, this will enable improvements in overall service quality, such as in communication systems, and will contribute to Goal 9 of the United Nations-led Sustainable Development Goals (SDGs): "Build resilient infrastructure, promote sustainable industrialization and foster innovation."
[0065] Although embodiments of the present invention have been described in detail above with reference to the drawings, the specific configuration is not limited to these embodiments, and design modifications and the like are also included within the scope of the gist of the present invention.
[0066] Alternatively, computer programs for realizing the functions of each of the above-mentioned devices may be recorded on a computer-readable recording medium, and the programs recorded on this recording medium may be loaded into a computer system and executed. Note that the term "computer system" here may include hardware such as an operating system and peripheral devices. Furthermore, "computer system" shall also include the homepage provisioning environment (or display environment) if a WWW system is being used. Furthermore, "computer-readable recording media" refers to writable non-volatile memory such as flexible disks, magneto-optical disks, ROMs, and flash memory, portable media such as DVDs (Digital Versatile Discs), and storage devices such as hard disks built into computer systems.
[0067] Furthermore, "computer-readable recording media" also includes volatile memory (such as DRAM (Dynamic Random Access Memory)) within computer systems that act as servers or clients when programs are transmitted via networks such as the Internet or communication lines such as telephone lines, which retain programs for a certain period of time. Furthermore, the above program may be transmitted from a computer system that stores the program in a memory device or the like to another computer system via a transmission medium or by transmission waves within the transmission medium. Here, the "transmission medium" used to transmit the program refers to a medium that has the function of transmitting information, such as a network (communication network) like the Internet or a communication line (communication line) like a telephone line. Furthermore, the above program may be intended to implement some of the functions described above. It may also be a so-called differential file (differential program) that can implement the aforementioned functions in combination with programs already recorded in the computer system. [Explanation of Symbols]
[0068] 1...Router, 10...Information processing device, 11...Communication unit, 12...Acquisition unit, 13...Setting unit, 14...Calculation unit, 15...Billing processing unit, 16...Procedure unit, 17...Control unit, 18...User information acquisition unit, 19...Decision unit, 30...Storage unit, 101...ONU-OLT, LA2...Wireless line, 300...Communication carrier equipment, NW...Internet
Claims
1. An information processing device that processes billing for communication charges of a router that can communicate with a network via a first wired line and one or more second lines different from the first wired line, An acquisition unit that acquires the activation status of the first wired line, A setting unit that sets the usage fee conditions for communication according to the activation status of the first wired line, A billing processing unit that processes the billing for the router's communication charges according to the activation status of the first wired line, Equipped with, If the activation status of the first wired line is unavailable, The acquisition unit acquires usage status information indicating that communication with the network is taking place through the second wired line of the second line, The billing processing unit performs billing for the router's communication charges based on the usage fee conditions for the second wired line when the activation status of the first wired line is unavailable. An information processing device characterized by the following:
2. The setting unit sets first usage fee conditions relating to the use of the second line before the activation of the first wired line. The information processing apparatus according to claim 1.
3. The billing processing unit performs billing processing for the communication charges of the router before the activation of the first wired line, based on the first usage fee conditions. The information processing apparatus according to claim 2.
4. The system further comprises a procedure unit that performs a procedure for canceling a wireless line among the second lines when the activation status of the first wired line is unavailable. The information processing apparatus according to claim 1.
5. An information processing method performed by an information processing device that processes billing for communication charges of a router that can communicate with a network via a first wired line and one or more second lines different from the first wired line, The acquisition step involves obtaining the activation status of the first wired line, A setting step to set the usage fee conditions for communication according to the activation status of the first wired line, A billing process step which processes a bill for the router's communication charges according to the activation status of the first wired line, Includes, If the activation status of the first wired line is unavailable, The acquisition step involves acquiring usage information indicating that communication with the network is taking place via the second wired line among the second lines. The aforementioned billing process step performs billing for the router's communication charges based on the usage fee conditions for the second wired line when the activation status of the first wired line is unavailable. An information processing method characterized by the following:
6. A computer that processes billing for communication charges of a router that can communicate with a network via a first wired line and one or more second lines different from the first wired line, The acquisition step involves obtaining the activation status of the first wired line, A setting step to set the usage fee conditions for communication according to the activation status of the first wired line, A billing process step which processes a bill for the router's communication charges according to the activation status of the first wired line, Make it run, If the activation status of the first wired line is unavailable, The acquisition step involves acquiring usage information indicating that communication with the network is taking place via the second wired line among the second lines. The aforementioned billing process step performs billing for the router's communication charges based on the usage fee conditions for the second wired line when the activation status of the first wired line is unavailable. A computer program characterized by the following features.