Management systems, management methods, and management programs
Patent Information
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- RVSTA INC
- Filing Date
- 2026-01-21
- Publication Date
- 2026-07-30
AI Technical Summary
【0023】 本発明によれば、ユーザに対して適切に電子ツールを設定する新たな技術を提供することができる。
Smart Images

Figure 0007897582000001_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to a management system, a management method, and a management program.
Background Art
[0002] Conventionally, there has been a technology that enables the use of a plurality of applications.
[0003] Patent Document 1 discloses a system that can automatically select and access an application service provider that meets the requirements by simply inputting the desired requirements.
Prior Art Documents
Patent Documents
[0004]
Patent Document 1
Summary of the Invention
Problems to be Solved by the Invention
[0005] By the way, at a complex construction site, there may be a need to set the use permission of a specific electronic tool for a specific person belonging to a specific company. However, with the technology of Patent Document 1, it is not possible to set an electronic tool for a specific user at a complex construction site.
[0006] The present invention has been made in view of the above circumstances, and an object thereof is to provide a new technology for appropriately setting an electronic tool for a user.
Means for Solving the Problems
[0007] [1] A management system for managing an electronic tool, The management system includes a storage unit, an extraction unit, a specification unit, and a setting unit. The aforementioned memory unit stores organizational information of the general contractor linked to site information of the construction site, the construction system linked to said site information, and user information linked to the company to which the user belongs. The extraction unit receives the organizational group of the prime contractor and, based on the organizational information, extracts candidate construction sites related to the organizational group. The aforementioned identification unit receives a selection input from the extracted list of construction site candidates and identifies the construction site. The extraction unit further extracts candidate companies for the identified construction site based on the identified construction site and the identified construction system. The aforementioned identification unit accepts selection input from the extracted company candidates and identifies the company to be managed by the electronic tool. The extraction unit further extracts candidate users belonging to the identified company based on the identified company and the user information. The setting unit sets the electronic tool for the extracted user candidates. Management system.
[0008] [8] A management method performed by a management system for managing electronic tools, The aforementioned management system comprises a storage unit, an extraction unit, an identification unit, and a setting unit. The memory unit stores organizational information of the general contractor linked to site information of the construction site, the construction system linked to the site information, and user information linked to the company to which the user belongs. The extraction unit receives the organizational group of the prime contractor and extracts candidate construction sites related to the organizational group based on the organizational information. The aforementioned identification unit receives a selection input from the extracted list of construction site candidates and identifies the construction site. The extraction unit further performs the step of extracting candidate companies for the identified construction site based on the identified construction site and the identified construction system. The aforementioned identification unit receives a selection input from the extracted company candidates and identifies the company to be managed by the electronic tool. The extraction unit further performs the step of extracting user candidates belonging to the identified company based on the identified company and the user information, The setting unit includes the step of setting the electronic tool for the extracted user candidates, Management method.
[0009] [9] A management program for managing electronic tools, The computer functions as a storage unit, an extraction unit, an identification unit, and a setting unit. The aforementioned memory unit stores organizational information of the general contractor linked to site information of the construction site, the construction system linked to said site information, and user information linked to the company to which the user belongs. The extraction unit receives the organizational group of the prime contractor and, based on the organizational information, extracts candidate construction sites related to the organizational group. The aforementioned identification unit receives a selection input from the extracted list of construction site candidates and identifies the construction site. The extraction unit further extracts candidate companies for the identified construction site based on the identified construction site and the identified construction system. The aforementioned identification unit accepts selection input from the extracted company candidates and identifies the company to be managed by the electronic tool. The extraction unit further extracts candidate users belonging to the identified company based on the identified company and the user information. The setting unit sets the electronic tool for the extracted user candidates. Management program.
[0010] This configuration allows for the extraction of potential construction sites, acceptance of selection input from among them, further extraction of potential construction company candidates, acceptance of selection input from among them, and further extraction of potential users belonging to those companies, enabling the configuration of electronic tools for those users. By performing multiple selections as appropriate in this way, it becomes possible to more appropriately configure electronic tools for specific users in complex construction sites.
[0011] [2] The organizational information includes information on electronic tools that can be used for each of the organizational groups. The setting unit receives a selection input from among the extracted user candidates, and sets, for each electronic tool that can be used by the organizational group, a usage permission for the received user candidates based on the organizational information. The management system according to [1].
[0012] With such a configuration, it is possible to set, for each user, the usage permission for the electronic tools that can be used for each organizational group. Since the electronic tools that a user can use may differ for each construction site, it can be set more appropriately. Furthermore, since an organizational group may be able to use a plurality of electronic tools, it can be set more appropriately.
[0013] [(3)] The construction system includes the subordinate relationship between the main contractor company and the cooperating companies. The organizational group includes a branch of the main contractor company that manages the construction site. The extraction unit accepts the branch as the organizational group, and extracts construction site candidates related to the branch based on the organizational information. The specifying unit receives a selection input from among the extracted construction site candidates, and specifies the construction site. The extraction unit further extracts, based on the specified construction site and the construction system, the main contractor company and the cooperating companies as company candidates for the specified construction site. The specifying unit receives a selection input from among the extracted company candidates, and specifies the main contractor company and / or the cooperating companies that are the management targets of the electronic tools. The extraction unit further extracts, based on the specified company and the user information, all user candidates belonging to the specified company. The setting unit sets a usage permission for each of the electronic tools for the extracted user candidates. The management system according to [1] or [2].
[0014] By adopting such a configuration, it is possible to set usage permissions for each electronic tool for users belonging to the main contractor and / or cooperating companies related to the specified construction site.
[0015] [4] The management system includes an acquisition unit, The acquisition unit acquires the type of authority determined for each of the electronic tools from the electronic tools, The setting unit sets the authority determined for each of the electronic tools for the user candidates based on the type, [1] The management system according to any one of [1] to [3].
[0016] By adopting such a configuration, when setting usage permissions for electronic tools for users, it is possible to perform settings including the authority determined for each electronic tool.
[0017] [5] The management system includes a display processing unit and an acquisition unit, When receiving a selection input from among the extracted company candidates, the display processing unit performs display processing on the number of user candidates belonging to the extracted company candidates and the subordinate relationship in the construction system of the company candidates based on the construction system, The acquisition unit acquires information on all user candidates belonging to the selected company candidate, [1] The management system according to any one of [1] to [4].
[0018] By adopting such a configuration, it is possible to select a company that sets electronic tools while checking the construction system at the construction site.
[0019] [6] The management system includes a calculation unit and a display processing unit, The calculation unit calculates the number of all user candidates belonging to the company candidates at the construction site based on the construction system, and calculates the usage status of each of the electronic tools for each construction site based on the calculated number of user candidates and information on users for whom the electronic tool settings have been made, The display processing unit performs display processing on the usage status. A management system as described in any of [1] to [5].
[0020] This configuration makes it possible to visualize the usage status of electronic tools at each construction site.
[0021] [7] The management system includes a display processing unit, The display processing unit displays, on the same screen, the usage status of each electronic tool for each user at the construction site and the type of permission for each electronic tool, based on the construction system and information about the user for whom the electronic tool has been configured. A management system as described in any of [1] to [6].
[0022] This configuration makes it possible to visualize the usage status of each electronic tool for users who have configured the electronic tools. [Effects of the Invention]
[0023] According to the present invention, it is possible to provide a new technology for appropriately setting up electronic tools for the user. [Brief explanation of the drawing]
[0024] [Figure 1] A block diagram of the configuration of the management system in this embodiment. [Figure 2] Hardware configuration diagram in this embodiment. [Figure 3] A block diagram showing the functional components in this embodiment. [Figure 4] An example of the data structure stored in the memory unit in this embodiment. [Figure 5] An example of the data structure stored in the memory unit in this embodiment. [Figure 6] A flowchart of the process for setting up the electronic tool in this embodiment. [Figure 7] An example of a selection screen for selecting the extracted company candidates in this embodiment. [Figure 8] An example of a selection settings screen when selecting extracted user candidates and setting usage permissions in this embodiment. [Figure 9] An example of a display screen showing the usage status of electronic tools at each construction site in this embodiment. [Figure 10] An example of a display screen showing the usage status of electronic tools for each user in this embodiment. [Modes for carrying out the invention]
[0025] The management system of the present invention will be described below with reference to the drawings. Preferred embodiments are shown in the drawings. However, the present invention can be carried out in many different forms and is not limited to the embodiments described herein.
[0026] For example, while this embodiment describes the configuration and operation of the management system, similar effects can be achieved by the execution method (steps), device, computer program, etc. The program in this embodiment may be provided as a non-transient recording medium readable by a computer, or it may be provided as a downloadable service from an external server, or the program may be launched on an external computer to perform its functions on a client terminal (so-called cloud computing).
[0027] Furthermore, in this embodiment, "part" may include, for example, hardware resources implemented by a circuit in a broad sense, and information processing of software that can be specifically realized by these hardware resources. In this embodiment, "information" can be represented, for example, by the physical value of a signal value representing voltage or current, the high or low value of a signal value as a set of binary bits composed of 0s or 1s, or by a quantum superposition (so-called qubit), and communication and calculations can be performed on a circuit in a broad sense.
[0028] In a broad sense, a circuit is a circuit realized by appropriately combining circuits, circuits (including processors and memory). Specifically, it includes CPUs (Central Processing Units), GPUs (Graphics Processing Units), LSIs (Large Scale Integration), ASICs (Application Specific Integrated Circuits), FPGAs (Field-Programmable Gate Arrays), SoCs (System on a Chip), and so on.
[0029] <System Overview> Figure 1 is a block diagram showing the configuration of the management system in this embodiment. As shown in Figure 1, the management system 0 comprises a management device 1 and a user terminal 2. The management device 1 is configured to communicate with the user terminal 2 via a network NW. The management device 1 operates as a server, and the user terminal 2 operates as a client terminal.
[0030] Management device 1 extracts construction sites, companies, and users based on selection inputs received from the setter. Based on the extracted information, management device 1 configures multiple electronic tools for the user. The electronic tools are services provided externally, and management device 1 may acquire information for configuring these electronic tools.
[0031] As the management device 1, a general-purpose server computer or personal computer can be used. Furthermore, it is possible to configure management system 0 by implementing the functional components described later on multiple computers.
[0032] The configurator terminal 2 is a terminal used by configurators who wish to configure electronic tools for users. The configurator selects users to configure the electronic tools for via the configurator terminal 2.
[0033] The configurator terminal 2 can be a smartphone, tablet, personal computer, or other terminal device. There may be one or more configurator terminals 2.
[0034] In this embodiment, the network NW is an IP (Internet Protocol) network, but there are no restrictions on the type of communication protocol, nor on the type or size of the network.
[0035] <Hardware Configuration> Figure 2 is a hardware configuration diagram. As shown in Figure 2(a), the information processing device 10 (management device 1) has a control unit 101, a storage unit 102, and a communication unit 103, which are used to enable the operation of each unit and each process.
[0036] The control unit 101 includes one or more processors such as a CPU (Central Processing Unit), and controls the entire operation of the information processing device 10 by executing the generation program, OS (Operating System), browser software, middleware, and other applications according to the present invention.
[0037] The storage unit 102 is an HDD (Hard Disk Drive), SSD (Solid State Drive), ROM (Read Only Memory), RAM (Random Access Memory), etc., and stores the management program according to the present invention and data used by the control unit 101 when executing processing based on the program. The control unit 101 executes processing based on the management program stored in the storage unit 102, thereby realizing the functional configuration described later.
[0038] The communication unit 103 performs communication control with the network NW and provides inputs necessary for operating the information processing device 10, as well as outputs related to the operation results.
[0039] As shown in Figure 2(b), the terminal device 9 (configurator terminal 2) has a control unit 91, a storage unit 92, a communication unit 93, an input unit 94, and an output unit 95, which are used to perform the functions of each unit and each process.
[0040] The control unit 91 of the terminal device 9 includes one or more processors such as a CPU and controls the entire operation process of the terminal device 9. The storage unit 92 of the terminal device 9 is an HDD, SSD, ROM, RAM, etc., and stores the above-mentioned application and data used by the control unit 91 when it executes processing based on the program.
[0041] The communication unit 93 of the terminal device 9 controls communication with the network NW. The input unit 94 of the terminal device 9 is a mouse, keyboard, etc., which inputs operation requests from the user / provider to the control unit 91. The output unit 95 of the terminal device 9 is a display, etc., which displays the results of processing by the control unit 91.
[0042] <Functional Components> As shown in Figure 3, the management device 1 comprises a registration unit 11, an extraction unit 12, a specific unit 13, a setting unit 14, a display processing unit 15, an acquisition unit 16, a calculation unit 17, and a storage unit 18.
[0043] The arrangement of these functional components is just one example; it is also possible to implement these functional components on multiple computers to constitute the management system 0. For example, some of the functional configurations of the management device 1 may be arranged on the user terminal 2 and one or more devices configured to communicate with the management device 1. Similarly, some of the functional configurations of the user terminal 2 may be arranged on one or more devices configured to communicate with the management device 1 and the user terminal 2.
[0044] <Data Structure> Figures 4 and 5 show an example of the data structure stored in the storage unit in this embodiment. The storage unit 18 stores company information, site information, construction system, user information, electronic tool information, organizational information, etc.
[0045] The arrangement of each data is merely an example; some or all of the data stored in the storage unit of the management device 1 may be stored in one or more devices configured to communicate with the user terminal 2 and the management device 1. Similarly, some or all of the data stored in the storage unit of the user terminal 2 may be stored in one or more devices configured to communicate with the management device 1 and the user terminal 2.
[0046] Company information is information about a company, and as shown in Figure 4(a), it includes the company name such as Company A or Construction D, the company's contact information, the company's address, and its type, such as whether it is a general contractor or a subcontractor, and is managed by a company ID. This company information may also include information about, for example, sole proprietors.
[0047] Site information refers to information about the construction site, including the site (project) name, site address, etc., as shown in Figure 4(b), and is managed by a site ID. Furthermore, site information may also include the construction period, etc.
[0048] The construction structure includes information about the subordinate relationships between the general contractor and subcontractors at the construction site, and as shown in Figure 4(c), it includes information about the subordinate relationships between the general contractor, primary contractors, secondary contractors, etc., and is managed by the site ID.
[0049] User information refers to information about users belonging to a company, and as shown in Figure 4(d), it includes the user's last name and first name, email address, company information (company ID), etc., and is managed by the user ID.
[0050] Electronic tool information is information about electronic tools for which users can set usage permissions, and as shown in Figure 5(e), it includes the tool name, etc., and is managed by a tool ID.
[0051] Organizational information refers to information about the main contractor and, as shown in Figure 5(f), includes the group ID, group name, address, contact information, site ID managed by the organizational group, tool ID usable by the organizational group, etc., for the organizational groups (branches) that make up the organization, and is managed by the company ID. The tools usable by organizational groups may differ for each organizational group.
[0052] <Processing flowchart> Figure 6 is a flowchart of the process for setting up the electronic tool in this embodiment.
[0053] <Register various types of information> In step S1, various types of information related to the site (project), such as site information, are registered in advance. The registration unit 11 receives organizational information of the general contractor linked to the site information of the construction site, construction system linked to the site information, user information linked to the company to which the user belongs, etc., and registers (stores) them in the storage unit 18.
[0054] <Selection of potential construction sites> In step S2, the extraction unit 12 receives the general contractor's organizational group via the user terminal 2 and extracts candidate construction sites related to the organizational group based on the organizational information. For example, the extraction unit 12 receives a branch office (a branch office of the general contractor that manages the construction site) as the organizational group and extracts candidate construction sites related to the branch office based on the organizational information.
[0055] The extraction unit 12 extracts construction sites managed by organizational groups received via the setting terminal 2 as candidate construction sites. The extraction unit 12 extracts candidate construction sites from site IDs managed by organizational groups.
[0056] <Identification of the construction site> In step S3, the identification unit 13 receives a selection input from the construction site candidates extracted by the extraction unit 12 via the user terminal 2 and identifies the construction site. By the user selecting the construction site candidate for which they wish to configure the electronic tool via the user terminal 2, the identification unit 13 can identify the construction site for which the user wishes to configure the electronic tool.
[0057] <Selecting potential companies> In step S4, the extraction unit 12 extracts candidate companies for the identified construction site based on the construction site identified by the identification unit 13 and the construction system stored in the storage unit 18. For example, the extraction unit 12 extracts general contractors and / or subcontractors, etc., included in the construction system associated with the identified construction site as candidate companies.
[0058] <Identifying the company> In step S5, the identification unit 13 receives a selection input from the company candidates extracted by the extraction unit 12 via the user terminal 2 and identifies the companies to be managed by the electronic tool (for example, prime contractors and / or subcontractors). By the user selecting the company candidates for which they wish to configure the electronic tool via the user terminal 2, the identification unit 13 can identify the companies for which the user wishes to configure the electronic tool.
[0059] <Extracting potential users> In step S6, the extraction unit 12 extracts user candidates belonging to the identified company based on the company identified by the identification unit 13 and the user information. For example, the extraction unit 12 extracts all users associated with the identified company as user candidates.
[0060] <Settings for electronic tools> In step S7, the setting unit 14 sets electronic tools (for example, permission to use each electronic tool) for the user candidates extracted by the extraction unit 12. The setting unit 14 accepts selection input from the extracted user candidates and, based on organizational information, sets permission to use each electronic tool that can be used by the organizational group for the accepted user candidates.
[0061] The configuration unit 14 identifies the site based on the company ID associated with the accepted user candidate and the construction system, and then sets usage permissions for each electronic tool available to the organizational group for the accepted user candidate based on the identified site and organizational information.
[0062] <Selecting a company candidate> Figure 7 shows an example of a selection screen used when selecting the extracted company candidates in this embodiment.
[0063] When the display processing unit 15 receives a selection input from the extracted company candidates, it displays the number of user candidates belonging to the extracted company candidates and the dependency relationships of the company candidates in the construction system, based on the construction system. The identification unit 13 receives company candidates via a selection screen as shown in Figure 7.
[0064] The display processing unit 15 displays the dependency relationships of the extracted company candidates in the construction structure based on the construction structure, as shown in W71 in Figure 7. For example, the display processing unit 15 displays the Nth-order and N+1-order (N=1,2,...) companies in a shifted manner as shown in W71 so that the hierarchical structure in the construction structure can be identified.
[0065] The display processing unit 15 identifies the construction system from the construction site identified by the identification unit 13, extracts the general contractor and subcontractors corresponding to the identified construction system as company candidates, and displays them as shown in W71 in Figure 7.
[0066] Furthermore, the display processing unit 15 identifies the construction system from the construction site identified by the identification unit 13, extracts candidate companies corresponding to the identified construction system, and displays the number of candidate users belonging to each candidate company, as shown in W72 of Figure 7, based on the extracted candidate companies and the user information associated with the companies they belong to.
[0067] The acquisition unit 16 acquires information about all user candidates belonging to the selected company candidate (the selection input accepted by the identification unit 13). The identification unit 13 may accept selection inputs for multiple cooperating companies, including the prime contractor, as shown in W73 in Figure 7. Based on the selected company candidate and the user information associated with the company to which the user belongs, the acquisition unit 16 acquires information such as the name and email address of all user candidates belonging to the selected company candidate.
[0068] <User Suggestion Selection Settings> Figure 8 shows an example of a selection screen for selecting extracted user candidates and setting usage permissions in this embodiment. Figure 8(a) shows an example of a selection screen for selecting user candidates to set usage permissions for a specific electronic tool at a specific site. Figure 8(b) shows an example of a settings screen for setting usage permissions for a specific electronic tool at a specific site.
[0069] The identification unit 13 accepts selection input from the extracted user candidates via a settings screen as shown in Figure 8. The display processing unit 15 can display information about all user candidates belonging to the company candidate selected on the selection screen as shown in Figure 7. The user can then select a user candidate extracted by the extraction unit 12 and set permission for the selected user candidate to use electronic tools.
[0070] The display processing unit 15 may receive information about user candidates (for example, last name, first name, email address, etc.) through an input field such as W81 in Figure 8(a), and display only the user candidates corresponding to the received information.
[0071] The acquisition unit 16 acquires the type of permission determined for each electronic tool from the electronic tool. Since the types and number of permissions that can be set for a user differ for each electronic tool, the acquisition unit 16 acquires the type of permission.
[0072] The setting unit 14 sets the permissions for each electronic tool for the user candidate based on the type of permission acquired by the acquisition unit 16. The setter sets the permissions for each electronic tool, such as W82, acquired by the acquisition unit 16, via a setting screen like the one shown in Figure 8(b).
[0073] <Display of electronic tool usage status for each construction site> Figure 9 is an example of a display screen showing the usage status of electronic tools at each construction site in this embodiment.
[0074] The calculation unit 17 calculates the total number of user candidates belonging to the company candidates at the construction site based on the construction system, and calculates the usage status of each electronic tool at each construction site based on the calculated number of user candidates and information on users for whom electronic tools have been configured.
[0075] The calculation unit 17 identifies the companies included in the construction system based on the construction site and the construction system corresponding to that site, and calculates the total number of users belonging to the identified companies. Furthermore, the calculation unit 17 identifies the users among the identified companies who have configured the electronic tools, and calculates the usage status of each electronic tool for each construction site based on the total number of users calculated and the users who have configured the electronic tools.
[0076] The display processing unit 15 displays the usage status of each electronic tool at each construction site based on the usage status calculated by the calculation unit 17. The display processing unit 15 may also display the number of uses and the usage rate as the usage status of each electronic tool at each construction site, as shown in W92 of Figure 9.
[0077] The display processing unit 15 may accept the organizational group (branch) name, site name, etc., through an input field such as W91 in Figure 9, and display only the usage status corresponding to the received information.
[0078] <Display of electronic tool usage status for each user> Figure 10 is an example of a display screen showing the usage status of electronic tools for each user in this embodiment.
[0079] The display processing unit 15 displays the usage status of each electronic tool for each user at the construction site, as well as the type of permissions for each electronic tool, on the same screen, based on the construction system and information about the users for whom the electronic tools have been configured.
[0080] The display processing unit 15 identifies users belonging to a company based on the construction system corresponding to a specific construction site and the companies included in the construction system, and displays the usage status of each electronic tool for each user at the construction site based on the electronic tool usage permissions of the identified users. Furthermore, if the display processing unit 15 has set up permission to use an electronic tool for the identified user, it displays the type of permission for that electronic tool.
[0081] The display processing unit 15 may display the usage status of electronic tools at the construction site, as shown in W101 of Figure 10, the usage status of each electronic tool for each user at that construction site, and the type of permissions for each electronic tool, as shown in W102, all on the same screen.
[0082] The display processing unit 15 may accept information such as the category of the setter and the name of the cooperating company through an input field like W103 in Figure 10, and display only the information corresponding to the information received at the construction site. Based on the information received through the input field, the display processing unit 15 identifies the user corresponding to the information received at the construction site, and based on the identified user, it displays the usage status of each electronic tool for each user at that construction site, as well as the type of permission for each electronic tool, on the same screen, as shown in W102 in Figure 10.
[0083] As described above, the configuration of the present invention provides a new technology for appropriately setting up electronic tools for the user. [Explanation of Symbols]
[0084] 0 Management System 1 Management device 11. Registration Department 12 Extraction part 13 Specific section 14. Settings section 15 Display Processing Unit 16 Acquisition Department 17 Calculation Section 18 Memory section 2. User terminal NW Network
Claims
1. A management system for managing electronic tools, The aforementioned management system comprises a storage unit, an extraction unit, an identification unit, and a setting unit. The aforementioned memory unit stores organizational information of the general contractor linked to site information of the construction site, the construction system linked to said site information, and user information linked to the company to which the user belongs. The aforementioned construction structure includes the subordinate relationship between the general contractor and the subcontractors, The extraction unit receives the branch of the general contractor as the organizational group of the general contractor, and extracts candidate construction sites related to the branch of the general contractor based on the organizational information. The aforementioned identification unit receives a selection input from the extracted list of construction site candidates and identifies the construction site. The extraction unit further extracts the general contractor and the subcontractors as candidate companies for the identified construction site, based on the identified construction site and the construction system. The aforementioned identification unit accepts selection input from the extracted company candidates and identifies the prime contractor and / or the cooperating company as companies to be managed by the electronic tool. The extraction unit further identifies the identified company based on the identified company and the user information. Extract candidate users belonging to [group name], The setting unit sets the electronic tool for the extracted user candidates. Management system.
2. The aforementioned organizational information includes information on electronic tools available for use at each branch of the main contractor, The setting unit accepts selection input from the extracted user candidates and, based on the organizational information, sets usage permissions for each electronic tool available to the branch office of the main contractor for the accepted user candidates. The management system according to claim 1.
3. The aforementioned construction structure includes the subordinate relationship between the general contractor and the subcontractors, The aforementioned organizational group includes a branch office of the general contractor that manages the construction site, The extraction unit receives a branch as the organizational group, and extracts candidate construction sites related to the branch based on the organizational information. The aforementioned identification unit receives a selection input from the extracted list of construction site candidates and identifies the construction site. The extraction unit further extracts general contractors and subcontractors as potential companies for the identified construction site, based on the identified construction site and the identified construction system. The aforementioned identification unit accepts selection input from the extracted company candidates and identifies the prime contractor and / or subcontractor to be managed by the electronic tool. The extraction unit further extracts all potential users belonging to the identified company based on the identified company and the user information. The setting unit sets usage permissions for each electronic tool for the extracted user candidates. The management system according to claim 1.
4. The aforementioned management system includes an acquisition unit, The acquisition unit acquires the type of authority determined for each electronic tool from the electronic tool, The setting unit sets the user candidates according to the type, with the permissions determined for each electronic tool. The management system according to claim 1.
5. The management system comprises a display processing unit and an acquisition unit, The display processing unit, upon receiving a selection input from the extracted company candidates, displays the subordinate relationships within the construction system of the company candidates based on the construction system, and further displays the number of user candidates belonging to the extracted company candidates based on the user information linked to the company to which they belong. The acquisition unit acquires information about user candidates belonging to the selected company candidates, based on the selected company candidates and user information linked to the company to which they belong. The management system according to claim 1.
6. The aforementioned management system comprises a calculation unit and a display processing unit, The calculation unit calculates the number of user candidates belonging to the construction site candidate company based on the construction site candidate company and user information linked to the construction system, and calculates the usage status of each electronic tool for each construction site based on the calculated number of user candidates and information about the user for whom the electronic tool has been configured. The display processing unit processes the usage status to display it. The management system according to claim 1.
7. The aforementioned management system includes a display processing unit, The display processing unit displays, on the same screen, the usage status of each electronic tool for each user at the construction site and the type of permission for each electronic tool, based on the construction system and information about the user for whom the electronic tool has been configured. The management system according to claim 1.
8. A management method performed by a management system for managing electronic tools, The aforementioned management system comprises a storage unit, an extraction unit, an identification unit, and a setting unit. The memory unit stores organizational information of the general contractor linked to site information of the construction site, the construction system linked to the site information, and user information linked to the company to which the user belongs. The aforementioned construction structure includes the subordinate relationship between the general contractor and the subcontractors, The extraction unit receives the branch of the general contractor as the organizational group of the general contractor, and extracts candidate construction sites related to the branch of the general contractor based on the organizational information. The aforementioned identification unit receives a selection input from the extracted list of construction site candidates and identifies the construction site. The extraction unit further extracts the general contractor and the subcontractors as candidate companies for the identified construction site, based on the identified construction site and the construction system. The aforementioned identification unit accepts selection input from the extracted company candidates and identifies the prime contractor and / or the cooperating company as companies to be managed by the electronic tool, The extraction unit further performs the step of extracting user candidates belonging to the identified company based on the identified company and the user information, The setting unit includes the step of setting the electronic tool for the extracted user candidates, Management method.
9. A management program for managing electronic tools, The computer functions as a storage unit, an extraction unit, an identification unit, and a setting unit. The aforementioned memory unit contains organizational information of the general contractor linked to site information of the construction site, and linked to the site information. It stores the construction system based on that system and user information linked to the company to which the user belongs. The aforementioned construction structure includes the subordinate relationship between the general contractor and the subcontractors, The extraction unit receives the branch of the general contractor as the organizational group of the general contractor, and extracts candidate construction sites related to the branch of the general contractor based on the organizational information. The aforementioned identification unit accepts selection input from the extracted construction site candidates and identifies the construction site. Determined, The extraction unit further extracts the identified construction site and the identified construction system based on the identified construction The aforementioned general contractor and subcontractors were selected as potential companies for the construction site. The aforementioned special unit accepts selection input from the extracted company candidates and manages the electronic tool. The aforementioned prime contractor and / or cooperating company are identified as the companies that will be involved. The extraction unit further identifies the identified company based on the identified company and the user information. Extract candidate users belonging to [group name], The setting unit sets the electronic tool for the extracted user candidates. Management program.