Method for lifting and restoring the foundation of a deep-sea plant facility that has settled.
The method addresses inefficiencies in deep-sea foundation stabilization by forming a composite ground support structure with stress diffusion angles, reducing material use and achieving permanent stability.
Patent Information
- Application Number
- JP2025551581
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Priority Date
- 2023-03-02
- Filing Date
- 2023-04-04
- Publication Date
- 2026-11-19
- Estimated Expiration
- 2043-04-04
AI Technical Summary
Existing methods for lifting and stabilizing deep-sea plant equipment foundations are inefficient in material usage and do not effectively prevent long-term settlement and displacement.
A method involving slurry injection to form a composite ground support structure with determined stress diffusion angles, using inclined channels and intersections to create a stable triangular support, reducing material usage and ensuring uniform load distribution.
The method effectively stabilizes deep-sea plant equipment foundations by minimizing slurry material consumption and ensuring permanent stability against settlement and displacement.
Smart Images

Figure 0007953949000002 
Figure 0007953949000003 
Figure 0007953949000001
Abstract
Description
TECHNICAL FIELD
[0001] The present application relates to the technical field of foundation settlement prevention and deviation correction, and in particular relates to a lifting and restoring method for settlement of deep-layer plant equipment foundations. BACKGROUND ART
[0002] In recent years, with the rapid development of China's construction engineering industry, equipment foundations have been more and more widely applied as an indispensable component of engineering. Some equipment foundations have a series of characteristics such as large diameter, large volume and large additional stress on the ground. In addition, if the selected ground is relatively weak or backfill problems occur, the equipment foundations are prone to uneven settlement. When such a situation occurs, it will not only significantly delay the progress of the project, but also easily lead to property loss, even casualties.
[0003] There are many reasons for the uneven settlement of equipment foundations, which can be simply divided into external factors and internal factors. The external factors are mainly caused by the ground at the construction site. A series of ground problems, such as the selected ground being too weak, the soil property of the ground being uneven, or the compaction of the backfill soil of the ground being insufficient, may cause uneven settlement of the equipment foundations. In addition, due to reasons such as rainfall, earthquakes, and changes in groundwater level, the equipment foundations may also undergo uneven settlement. From the perspective of internal factors, if the load on the equipment itself is too large and exceeds the design calculation value, or the arrangement between the equipment foundations is too dense, the uneven settlement of the equipment foundations is prone to occur.
[0004] Currently, commonly used countermeasures for the problem of plant equipment foundation settlement include static pile driving with anchor rods and reinforcement by slurry injection. A Chinese patent, currently available as reference publication number CN112343078A, discloses a precise method for lifting plant equipment foundations. This patent describes how to lift plant equipment foundations in three steps. S1. In forming the curtain wall, holes are drilled vertically downward on both sides where the equipment needs to be lifted to form curtain holes, and slurry is injected into the curtain holes to form two mutually parallel curtain walls. S2. In forming the reinforcing body, slurry injection holes are placed diagonally downward along the outer edge of the equipment in the longitudinal direction of the curtain wall, and slurry is injected into the slurry injection holes. Slurry is injected between the two curtain walls at the bottom of the base plate of the equipment foundation to form a reinforcing body attached to the underside of the base plate. The reinforcing body is connected to the two curtain walls to form a U-shaped structure. S3. In lifting, the slurry injection holes are used as lifting holes, and holes are drilled at a downward inclination. Excavation is carried out below the reinforcing body and between the two curtain walls. Slurry is injected under pressure into the bottom of the lifting holes to fill and reinforce the surrounding backfill layer. Subsequently, slurry is injected under pressure, and the equipment is lifted to the set lifting height using a retreat-type slurry injection method.
[0005] Compared to the above-mentioned conventional technology, the inventor believes that this technology has a clear advantage in lifting shallow settlement of the ground beneath the facility, but has the disadvantage of requiring a large amount of slurry injection material for deep reinforcement and lifting of the facility foundation, resulting in wasted material. [Overview of the Initiative] [Problems that the invention aims to solve]
[0006] To ensure that deep reinforcement of a foundation saves materials and achieves the requirements for permanently stabilizing the foundation and correcting displacement, this application provides a method for lifting and returning a deep plant facility foundation to its original position. [Means for solving the problem]
[0007] The method for lifting and restoring the foundation of a deep-sea plant facility according to this application employs the following technical proposal.
[0008] The ratio of the compressive modulus of the supporting layer to the soft base layer, i.e., E S1 / E S2 S1 determines the ground pressure diffusion angle based on the values of Z / b, S2 determines the load diffusion range based on the ground pressure diffusion angle, Based on the load diffusion range, S3 is formed by reinforcing the unstable soil mass within the soft base layer by slurry injection, thereby creating a slurry injection reinforced body. S4 involves reinforcing the support layer by slurry injection according to the load diffusion range, and arranging slurry injection holes distributed on both sides of the equipment foundation along two triangular regions of the stress diffusion angle direction line. S5 involves reinforcing and lifting the structure by slurry injection within the intermediate range of the supporting layer, It includes S6, which forms an irregular composite ground support at the bottom of the soft base layer.
[0009] By adopting the above technical proposal, the slurry injection range is determined based on the load force transmission mechanism. Determining the slurry injection range requires first determining the stress diffusion angle. When the foundation receives a load from above and transmits the load to the ground bearing layer, the ground bearing layer is responsible for receiving the load and distributing it gradually and uniformly into the crust. This distribution method is diffusion, and according to the discipline of diffusion, the range gradually expands downward at a certain angle. This diffusion angle is the stress diffusion angle, and the magnitude of the stress diffusion angle is determined in step S1. Once the slurry injection range is determined, the slurry injection material is greatly reduced, and an irregular composite ground support is created at the bottom of the bearing layer, playing a role in support and preventing settlement. In step S5, lifting by slurry injection is performed within the middle range of the bearing layer, playing a role in preventing settlement and lifting and correcting the ground position. Ultimately, the entire technology achieves deep reinforcement of the foundation, saves material, and ensures that the foundation is permanently stable against settlement and achieves the effect of achieving displacement correction.
[0010] Selectively, the composite ground support in step S6 is a combination of two inclined slurry injection channels, and the two inclined slurry injection channels have an intersection.
[0011] By adopting the above technical proposal, the composite ground support is formed using a cross-slice injection method, which is easy to operate and meets the construction requirements. Next, the two slurry injection channels form an intersection, which is then combined with the reinforcing body formed in step S3 to finally form a stable triangular support structure, effectively providing stable support to the upper supporting layer.
[0012] Selectively, multiple sets of the composite ground support are installed at intervals.
[0013] By adopting the above technical proposal, multiple sets of composite ground supports are installed, thereby reinforcing the support effect on the upper supporting layer, and the method of installing them at intervals reduces disturbances between the composite ground supports during construction, as well as disturbances to the upper foundation.
[0014] Selectively, in step S6, after slurry injection is completed in all inclined passages, secondary reinforcing slurry injection is performed at the intersections of the slurry injection passages.
[0015] By adopting the above technical proposal, secondary slurry injection is performed at the intersection of the slurry injection passages, thereby ensuring stable force transmission at the intersection point.
[0016] Selectively, in step S6, secondary reinforcing slurry is injected at the intersections of all slurry injection passages, and the secondary slurry injection areas at the intersections of adjacent slurry injection passages overlap and interlock with each other.
[0017] By adopting the above technical solution, the reinforcements formed by secondary slurry injection overlap and intermesh with each other, so that all composite ground supports are integrated, avoiding the phenomenon that some composite ground supports settle independently, and after integration, the supporting effect on the upper foundation and the anti-settling effect on the upper foundation are further enhanced.
[0018] Alternatively, in step S4, an integrated excavation and injection retreat-type slurry injection process is adopted, which retreats one stage each time it is lifted, and injects slurry one stage at a time.
[0019] By adopting the above technical solution, the adoption of the retreat-type slurry injection process can reduce disturbance to the strata outside the triangular area, and the retreat mode facilitates the withdrawal of the drill rod.
[0020] Alternatively, the reinforcements formed by the intermeshing and overlapping of secondary slurry injections at the intersections of adjacent slurry injection passages are entirely in a horizontal state.
[0021] By adopting the above technical solution, the horizontally arranged reinforcements present the maximum load-bearing surface state, and can exert the maximum effect of the presence of the reinforcements.
[0022] Alternatively, Z / b in step S1 can be used as a difference value between 0.25 and 0.5.
[0023] Alternatively, in step S4, adjacent slurry injection holes are distributed at intervals.
[0024] By adopting the above technical solution, the slurry injection holes being distributed at intervals is intended to reduce disturbance to areas other than the ground triangle.
[0025] Alternatively, the vertical projection of the slurry injection reinforcement formed in the bearing layer is completely located on the slurry injection reinforcement formed in the soft foundation layer.
[0026] By adopting the above technical proposal, the limitation on the projection of slurry-injected reinforcement formed within the supporting layer is, in fact, a limitation on the area of slurry-injected reinforcement formed within the soft base layer, and the slurry-injected reinforcement formed within the soft base layer can exert the effect of sufficiently supporting the supporting layer above it. [Effects of the Invention]
[0027] As described above, this application includes at least one beneficial technical effect. 1. By determining the slurry injection range based on the load force transmission mechanism, the amount of slurry injection material is significantly reduced. By creating an irregular composite ground support at the bottom of the bearing layer, the settlement problem of the deep plant equipment foundation is solved. 2. The intersecting composite ground support, combined with slurry injection reinforcement formed within the soft base layer, creates a stable triangular support structure, providing settlement prevention and stable support for the equipment foundation. [Brief explanation of the drawing]
[0028] [Figure 1] This is a schematic diagram of the structure of the embodiment of this application. [Figure 2] This diagram shows the state in which the supporting layer and the reinforcing body within the soft base layer are formed. [Modes for carrying out the invention]
[0029] The present application will be described in more detail below, in conjunction with Figures 1 and 2.
[0030] The embodiments of this application disclose a method for lifting and returning a foundation that has settled during deep-sea plant equipment development.
[0031] Referring to Figures 1 and 2, the method for lifting and restoring the foundation settlement of a deep plant facility includes the following steps.
[0032] In S1, the ratio of the compressive modulus of the support layer 4 and the soft base layer 5, i.e., E S1 / E S2Based on the values of Z / b, the ground pressure diffusion angle, i.e., θ, is determined. To determine the slurry injection range, it is first necessary to determine the stress diffusion angle. When the foundation 3 receives a load from above and transmits the load to the ground bearing layer 4, the ground bearing layer 4 is responsible for receiving the load, gradually distributing it, and transmitting it uniformly to the crust. This gradual distribution method is diffusion, and the discipline of diffusion is to gradually expand the range downward at a certain angle. The ground pressure diffusion angle is determined based on the "Design Guidelines for Ground and Foundations".
[0033] Ground pressure diffusion angle: JPEG0007953949000001.jpg35169 Here, E S1 This is the compressive modulus of the upper soil layer, and E S2 is the compressive modulus of the subsoil, Z is the depth from the calculation point to the base, and b is the width of the foundation base.
[0034] If Z / b < 0.25, θ = 0° and, if necessary, should be determined by testing. If Z / b > 0.50, the θ value remains unchanged.
[0035] Z / b can be used as a difference value between 0.25 and 0.50. If ES1 / ES2 is 3, and Z / b is calculated to be 0.375, then the corresponding θ is set to 14.5°.
[0036] In S2, the load diffusion range is determined based on the ground pressure diffusion angle, and based on the value of θ, the region that extends downward to the soft base layer 5 and spans the entire supporting layer 4 is the range of load transmission and diffusion.
[0037] In S3, based on the load diffusion range, the unstable soil mass within the soft base layer 5 is reinforced by slurry injection to form a slurry-injection reinforced body.
[0038] In S4, reinforcement is performed on the support layer 4 by slurry injection according to the load diffusion range, and slurry injection holes are arranged at intervals on both sides of the equipment foundation 3 along the two triangular regions of the stress diffusion angle direction line. When injecting the slurry, a recessed slurry injection process that is integrated with excavation and injection is adopted, and the structure is recessed one step at a time with each lift, injecting one step of slurry. After the slurry injection is completed, it is necessary to ensure that the vertical projection of the slurry injection reinforcement formed in the support layer 4 is perfectly positioned on the slurry injection reinforcement formed in the soft base layer 5.
[0039] In S5, the slurry is injected into the middle range of the support layer 4 to reinforce and lift it.
[0040] In S6, an irregular composite ground support 6 is created at the bottom of the soft base layer 5. The composite ground support 6 is a combination of two inclined slurry injection passages, and there is an intersection between the two inclined slurry injection passages. The two inclined slurry injection passages intersect to form a pair, and multiple pairs of composite ground support 6 are installed at intervals. After slurry injection is completed in all the inclined passages, secondary reinforcing slurry injection is performed at the intersections of the slurry injection passages, and the secondary slurry injection areas at the intersections of adjacent slurry injection passages interlock and overlap, ensuring that the reinforced body formed by the interlocking and overlapping secondary slurry injections at the intersections of adjacent slurry injection passages is horizontal overall.
[0041] This method allows for the reinforcement and lifting of deep settlement in isolated foundations and strip foundations. Compared to conventional composite piles, the force transmission of the composite ground support 6 becomes more uniform, allowing the upper load to be transmitted more uniformly to deeper soil layers. After the slurry injection of the inclined passage is completed, secondary reinforcing slurry injection is performed at the intersection of the slurry injection passages, ensuring the stability of force transmission at the intersection. This achieves the requirement for permanent settlement stabilization relative to the equipment foundation 3, while simultaneously achieving the objective of correcting displacement relative to the equipment foundation 3.
[0042] The embodiments described herein are all preferred embodiments of the present application and do not limit the scope of protection of this application. Therefore, any equivalent modifications made based on the structure, shape, and principle of this application should be included within the scope of protection of this application. [Explanation of Symbols]
[0043] 1...ground, 2...slurry injection pipe, 3...foundation, 4...support layer, 5...soft base layer, 6...composite ground support.
Claims
1. A method for lifting and correcting the displacement of the foundation settlement of a deep plant facility, S1 determines the ground pressure diffusion angle based on the compressive modulus ratio of the supporting layer (4) and the soft base layer (5), i.e., ES1 / ES2 and the value of Z / b. S2 determines the load diffusion range based on the ground pressure diffusion angle, Based on the load diffusion range, S3 reinforces the unstable soil mass within the soft base layer (5) by slurry injection, forming a slurry injection reinforced body. S4 involves reinforcing the support layer (4) by slurry injection according to the load diffusion range, and arranging slurry injection holes distributed on both sides of the equipment foundation (3) along two triangular regions of the stress diffusion angle direction line. S5 involves reinforcing the equipment foundation (3) by injecting slurry within the intermediate range of the supporting layer (4), thereby lifting the equipment foundation (3) and correcting the displacement of the equipment foundation (3). S6 creates an irregular composite ground support (6) at the bottom of the soft base layer (5), A method for lifting and correcting the displacement of a deep plant facility foundation, characterized by including the above.
2. The method for lifting and correcting the displacement of a deep plant equipment foundation according to claim 1, characterized in that the composite ground support (6) in step S6 is a combination of two inclined slurry injection passages, and there is an intersection between the two inclined slurry injection passages.
3. The method for lifting and correcting the displacement of a deep plant facility foundation, characterized in that multiple sets of the composite ground support (6) are installed at intervals from each other.
4. The method for lifting and correcting the displacement of a deep plant equipment foundation settlement according to claim 3, characterized in that, in step S6, after slurry injection is completed in all inclined passages, secondary reinforcing slurry injection is performed at the intersections of the slurry injection passages.
5. The method for lifting and correcting the displacement of a deep plant equipment foundation settlement according to claim 4, characterized in that, in step S6, secondary reinforcing slurry is injected at the intersections of all slurry injection passages, and the secondary slurry injection areas at the intersections of adjacent slurry injection passages overlap and interlock with each other.
6. The method for lifting and correcting the displacement of a deep plant equipment foundation settlement according to claim 1, characterized in that in step S4, a recessed slurry injection process that is integrated with drilling and injection is adopted, and the foundation is recessed one step each time it is lifted, and slurry is injected one step at a time.
7. The method for lifting and correcting the displacement of a deep plant equipment foundation according to claim 5, characterized in that the reinforcing body formed by the interlocking and overlapping secondary slurry injections at the intersection of adjacent slurry injection passages is in a horizontal state overall.
8. The method for lifting and correcting the displacement of a deep plant equipment foundation settlement according to claim 1, characterized in that Z / b in step S1 can be used as a difference value between 0.25 and 0.
5.
9. The method for lifting and correcting the displacement of a deep plant equipment foundation settlement according to claim 1, characterized in that, in step S4, the adjacent slurry injection holes are distributed at intervals.
10. The method for lifting and correcting the displacement of a deep plant equipment foundation settlement according to claim 1, characterized in that the vertical projection of the slurry injection reinforcement formed in the support layer (4) is perfectly positioned on the slurry injection reinforcement formed in the soft base layer (5).
Citation Information
Patent Citations
Large-area soft foundation soil bag and foundation trench composite consolidation method
CN101041954A
Method for reinforcing foundation under existing viaduct
CN113863275A
Soil improving method
JP2004346636A
Height adjustment method for structure
JP2005188118A
Plastic grout and grouting technique
JP2006056909A
