Information processing device, information processing method, and program
The information processing device and method enable effective budget management and notification for temporary employment postings by integrating budget setting, job information reception, and billing amount calculation, addressing the challenge of fluctuating costs in job posting expenses.
Patent Information
- Application Number
- JP2026189947
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Filing Date
- 2026-08-19
- Publication Date
- 2026-11-19
- Estimated Expiration
- 2046-07-09
AI Technical Summary
Managing fluctuating costs for job postings is challenging when the party bearing the costs is different from the party posting the job listings, making it difficult to track and control expenses effectively.
An information processing device and method that includes a budget setting unit, job acceptance unit, billing amount calculation unit, determination unit, and notification control unit to manage temporary employment postings, allowing for budget limit setting, job information reception, billing amount calculation, condition determination, and notification output to relevant terminals.
Facilitates easy tracking of budget usage status and provides notifications for appropriate budget management, ensuring efficient use of resources and flexible responses to budget fluctuations.
Smart Images

Figure 0007953966000001_ABST
Abstract
Description
Technical Field
[0001] The present disclosure relates to an information processing apparatus, an information processing method, and a program.
Background Art
[0002] In services that manage job posting listings, technologies for managing the costs required for job postings are known. For example, the following Patent Document 1 discloses a job management technology that derives a scheduled billing amount based on an input of a recruitment plan.
Prior Art Documents
Patent Documents
[0003]
Patent Document 1
Summary of the Invention
Problems to be Solved by the Invention
[0004] The costs required for posting job listings may fluctuate depending on the posting status of the job listings or the actual performance of operations. When the party bearing the costs is different from the party posting the job listings, it may not be easy to manage the costs that fluctuate according to the posting status.
[0005] The present disclosure has been made in view of the above circumstances, and an object thereof is to provide an information processing apparatus, an information processing method, and a program that make it easy to grasp the usage status of a budget related to job postings.
Means for Solving the Problems
[0006] In a view of this disclosure, an information processing device is provided for managing the posting of temporary employment, comprising: a budget setting unit that receives the setting of a budget limit for a predetermined period for one or more locations from a first terminal; a job acceptance unit that receives job information from a second terminal; a billing amount calculation unit that calculates a billing amount based on the job information received during the predetermined period; a determination unit that determines whether the billing amount for the budget limit satisfies predetermined conditions; and a notification control unit that, if the predetermined conditions are met, outputs a notification corresponding to the conditions to at least one of the first terminal and the second terminal.
[0007] Furthermore, from another perspective of this disclosure, there is provided an information processing method performed by a computer for managing the posting of temporary employment, the method comprising: receiving from a first terminal the setting of a budget limit for a predetermined period for one or more locations; receiving job information from a second terminal; calculating a billing amount based on the job information received during the predetermined period; determining whether the billing amount for the budget limit satisfies predetermined conditions; and, if the predetermined conditions are met, outputting a notification corresponding to the conditions to at least one of the first terminal and the second terminal.
[0008] Furthermore, from another perspective of this disclosure, a program is provided for a computer used to manage the posting of temporary employment jobs, which causes a computer to execute the following processes: a process of receiving a budget allocation for a predetermined period for one or more locations from a first terminal; a process of receiving job information from a second terminal; a process of calculating the invoice amount based on the job information received during the predetermined period; a process of determining whether the invoice amount for the budget allocation meets predetermined conditions; and, if the predetermined conditions are met, a process of outputting a notification corresponding to the conditions to at least one of the first terminal and the second terminal. [Brief explanation of the drawing]
[0009] [Figure 1]This is a block diagram showing the overall configuration of an information processing system according to one embodiment of the present disclosure. [Figure 2] This is a block diagram showing an example of the functional configuration of the job advertisement server according to the same embodiment. [Figure 3] This flowchart shows an example of the budget limit setting process according to the same embodiment. [Figure 4] This flowchart shows an example of a budget usage visualization process according to the same embodiment. [Figure 5] This flowchart shows an example of the overuse detection notification process according to the same embodiment. [Figure 6] This flowchart shows an example of the process for exempting usage restrictions according to the same embodiment. [Figure 7] This flowchart shows an example of the application process for increasing the credit limit according to the same embodiment. [Figure 8] This figure shows an example of a budget setting screen displayed on the administrator terminal according to the same embodiment. [Figure 9] This figure shows an example of a budget management screen displayed on the administrator terminal according to the same embodiment. [Figure 10] This figure shows an example of a list screen of stores within a group, displayed on the administrator terminal according to the same embodiment. [Figure 11] This figure shows an example of a budget status screen displayed on a terminal according to the same embodiment. [Figure 12] This figure shows an example of a group budget distribution screen displayed on the administrator terminal according to the same embodiment. [Figure 13] This figure shows an example of a display with recommendations on the job posting creation screen shown on the terminal according to the same embodiment. [Figure 14] This is a block diagram showing an example of the hardware configuration of the information processing device according to this embodiment. [Modes for carrying out the invention]
[0010] Preferred embodiments of this disclosure will be described in detail below with reference to the attached drawings. In this specification and the drawings, components having substantially the same functional configuration are denoted by the same reference numerals, and redundant descriptions will be omitted.
[0011] Incidentally, the program for implementing the software appearing in this embodiment may be provided as a non-transitory computer-readable medium, or it may be provided so that it can be downloaded from an external server, or it may be provided so that the program is launched on an external computer and its functions are realized on a client terminal (so-called cloud computing).
[0012] Furthermore, in this embodiment, "part" may include, for example, hardware resources implemented by circuits in a broad sense, and the information processing of software that can be specifically realized by these hardware resources. In addition, various types of information are handled in this embodiment, and these types of information can be represented, for example, by the physical values of signal values representing voltage and current, the high or low values of signal values as a set of binary bits composed of 0s or 1s, or by quantum superposition (so-called qubits), and communication and calculations can be performed on circuits in a broad sense.
[0013] Further, a circuit in a broad sense is a circuit implemented by at least appropriately combining a circuit, circuitry, a processor, a memory, and the like. That is, it includes an Application Specific Integrated Circuit (ASIC), a programmable logic device (for example, a Simple Programmable Logic Device (SPLD), a Complex Programmable Logic Device (CPLD), a Field Programmable Gate Array (FPGA)), and the like.
[0014] A specific example of the hardware configuration will be described later.
[0015] (Definition of Terms) In the present embodiment, "temporary work" refers to, for example, work with a short employment period. The temporary work may be a one-off work, work performed only on a predetermined day, or work referred to as so-called spot work. A job offer related to temporary work refers to a job offer for recruiting job seekers who engage in such temporary work.
[0016] In the present embodiment, a "base" refers to, for example, an organization or a place that serves as a unit for posting job offers. The base may be a store, a sales office, a business office, or a combination thereof.
[0017] In this embodiment, "first terminal" refers to, for example, a terminal used by a person in a position to manage budget allocations. The first terminal may be a terminal used by a person in charge at the head office, or a terminal used by an area manager. Hereinafter, the first terminal may be referred to as the manager terminal. "Second terminal" refers to, for example, a terminal used by a person in a position to post job openings at a branch office. The second terminal may be a terminal used by a person in charge at a store. Hereinafter, the second terminal may be referred to as the branch office terminal.
[0018] In this embodiment, "budget limit" refers, for example, to the maximum amount of money that can be used to post job listings during a predetermined period. The budget limit may be set for each location, or for each group of locations. "Determined period" refers, for example, to the period during which the budget limit is to be managed. The predetermined period may be one month, one week, or any arbitrarily determined period.
[0019] In this embodiment, "amount used" refers to, for example, the cumulative amount calculated based on job information received during a predetermined period. As will be described later, the individual amounts calculated based on job information may be referred to as "billed amounts." That is, the amount used can be understood as the cumulative amount of billed amounts calculated during a predetermined period. "Job information" refers to, for example, the information entered in order to post a job. Job information may include the amount of compensation, the number of people to be recruited, the working days and times, or a combination of these.
[0020] In this embodiment, "budget utilization rate" refers, for example, to the ratio of the amount used to the budget allocation. The budget utilization rate may be calculated at any point during a predetermined period, or at the end of the predetermined period. The budget utilization rate may be used to output the budget allocation utilization status in a manner that can be distinguished by comparing it with a predetermined threshold.
[0021] In this embodiment, "remaining budget" refers, for example, to the amount obtained by subtracting the amount used from the budget at any point in time during a predetermined period. The remaining budget can be used as an estimate of the amount of money available for posting additional job openings.
[0022] In this embodiment, "remaining balance" refers, for example, to the amount obtained by subtracting the amount used from the budget allocation at the end of a predetermined period. The remaining balance corresponds to the amount of budget that was not used for posting job advertisements within the predetermined period and can be used as an amount to be added to the budget allocation for the next predetermined period.
[0023] In this embodiment, "peak season" refers to, for example, a period during which the demand for job postings is expected to be high. The peak season may be set based on industry-specific peak / slack information, based on past job posting records, or based on input from an administrator.
[0024] In this embodiment, "lead time" refers, for example, to the time from the time a job posting is made until the start date and time of work related to that job. Job postings with short lead times may be treated as requiring urgent labor.
[0025] In this embodiment, "urgent conditions" refer to conditions that are set in advance to determine, for example, that immediate action is required regarding the posting of a job. Urgent conditions may include a lead time being below a predetermined value, a predetermined priority designation from a base, or a combination of these.
[0026] In this embodiment, "exemption declaration" refers, for example, to a declaration from a facility requesting an exemption from usage restrictions when the budget limit is exceeded. Exemption declarations may be accepted via a designated input field or by sending a message.
[0027] In this embodiment, "remuneration rate" refers, for example, to the amount of remuneration per unit of time or per unit of labor related to the job posting. The remuneration rate may be an hourly wage, a daily wage, or a fixed amount for each job posting.
[0028] In this embodiment, "scale of the base" refers, for example, to an indicator showing the volume of business activities at the base. The scale of the base may be the number of employees belonging to the base, the number of sales or hires in a predetermined period in the past, or a combination of these.
[0029] In this embodiment, "usage record" refers, for example, to information regarding the amount used during a predetermined period in the past. The usage record may be presented as a cumulative total or trend of the amount used, aggregated for each predetermined period.
[0030] In this embodiment, "posting pattern" refers to information that represents, for example, the trend of posting job information. The posting pattern may be the distribution of the number of postings within a predetermined period, or it may be the frequency of combinations of compensation amount, number of people to be recruited, or working hours.
[0031] (Overall system configuration) Figure 1 is a block diagram showing the overall configuration of an information processing system according to one embodiment of the present disclosure. The information processing system includes a job advertisement server 100, an administrator terminal 200, a branch terminal 300, and a network NW. The information processing system may further include a job seeker terminal 400.
[0032] The job advertisement server 100 is an information processing device that manages the posting of job advertisements related to temporary work. The job advertisement server 100 manages the posting of job information and manages the budget. The administrator terminal 200 is an example of a first terminal and is used by a person in a management position for the company. The administrator terminal 200 accesses the company management screen to set budget limits and check usage status. The branch terminal 300 is an example of a second terminal and is used by a person in a position to post job advertisements at a branch. The branch terminal 300 accesses the store management screen to post job advertisements and view the budget status.
[0033] The network NW interconnects the job advertisement server 100, the administrator terminal 200, and the branch terminal 300. The network NW may be the internet, a local area network, or a mobile network. The job seeker terminal 400 is a terminal used by job seekers. The job seeker terminal 400 connects to the job advertisement server 100 via the network NW and receives the posted job advertisements. Note that the job seeker terminal 400 is shown as an example for the purpose of explaining this embodiment and is not an essential component.
[0034] (Functional configuration of the job advertisement server) Figure 2 is a block diagram showing an example of the functional configuration of the job advertisement server 100 according to the same embodiment. The job advertisement server 100 comprises a control unit 110, a storage unit 120, and a communication unit 130. Note that it is not essential for the job advertisement server 100 to include all of the functional units described below.
[0035] The control unit 110 performs various information processing for the job advertisement server 100. The control unit 110 includes a budget setting unit 111, a job application acceptance unit 112, a usage amount calculation unit 113, a billing amount calculation unit 114, an output control unit 115, a determination unit 116, a usage restriction unit 117, a limit increase processing unit 118, and a group management unit 119. The storage unit 120 stores various information. The storage unit 120 includes a company database 121, a branch database 122, a job information database 123, a budget database 124, and a credit database 125. The communication unit 130 performs communication with the administrator terminal 200 and branch terminals 300 via the network NW.
[0036] The budget setting unit 111 receives the setting of a budget limit for a predetermined period for one or more locations from the first terminal. For example, the budget setting unit 111 receives the designation of the location or group to be set, and the input of the budget limit amount and period from the administrator terminal 200. In this embodiment, the budget setting unit 111 stores the received budget limit in the budget database 124, linking it to the location.
[0037] The job posting reception unit 112 receives job information from a second terminal. For example, the job posting reception unit 112 receives job information from the base terminal 300 that includes at least one of the following: the amount of compensation, the number of people to be recruited, and the working dates and times. In this embodiment, the job posting reception unit 112 stores the received job information in the job information database 123.
[0038] The usage amount calculation unit 113 calculates the usage amount for each location based on the job information received during a predetermined period. For example, the usage amount calculation unit 113 may calculate the billing amount for each job based on the remuneration amount, the number of people to be recruited, and the working hours included in the job information. In this embodiment, the usage amount calculation unit 113 calculates the usage amount by accumulating the calculated billing amounts over a predetermined period. The usage amount calculation unit 113 may also calculate the usage amount for each budget item that includes at least one of personnel costs, transportation costs, and service fees.
[0039] The billing amount calculation unit 114 calculates the billing amount based on the received job information. The billing amount is the cost incurred in accordance with the posting or operation of the job. For example, the billing amount calculation unit 114 may calculate the billing amount by multiplying the compensation amount included in the job information by the number of people to be recruited and then adding a service fee. The usage amount calculation unit 113 and the billing amount calculation unit 114 are functional units that generate different outputs. The usage amount calculation unit 113 outputs the cumulative amount for a predetermined period, while the billing amount calculation unit 114 outputs the amount for each job or the total amount for each job. Note that the usage amount calculation unit 113 and the billing amount calculation unit 114 may be implemented using common computing resources.
[0040] The output control unit 115 outputs various types of information to the terminal. In this embodiment, the output control unit 115 outputs the budget limit and the amount spent to at least one of the first terminal and the second terminal in a manner that allows for comparison. The display control unit is an example of the output control unit 115. Furthermore, when predetermined conditions are met, the output control unit 115 outputs a notification corresponding to those conditions to at least one of the first terminal and the second terminal. The notification control unit is an example of the output control unit 115. For example, the output control unit 115 may generate a screen in which areas corresponding to the amount spent are superimposed on a bar indicating the budget limit in a manner that allows for distinction, and output this screen to the terminal.
[0041] The determination unit 116 determines whether the requested amount relative to the budget limit meets predetermined conditions. For example, the predetermined conditions may be that the requested amount exceeds a predetermined percentage of the budget limit, or that the requested amount exceeds the budget limit. In this embodiment, the determination unit 116 obtains the budget limit from the budget database 124 and makes a determination by comparing it with the requested amount calculated by the requested amount calculation unit 114.
[0042] The usage restriction unit 117 restricts the posting of new job postings from the second terminal when predetermined conditions are met. For example, the usage restriction unit 117 may restrict the posting of job postings from the base terminal 300 if the determination unit 116 determines that the budget limit has been exceeded. Note that the usage restriction unit 117 is an optional component. If the job advertisement server 100 is configured not to have a usage restriction unit 117, the output control unit 115 may only output a warning notification, and the posting of job postings may not be restricted.
[0043] The budget increase processing unit 118 receives a budget increase request from a second terminal, presents the request to the first terminal, and updates the budget in response to the approval operation from the first terminal. For example, the budget increase processing unit 118 may receive a budget increase request from a branch terminal 300, present the request to the administrator terminal 200, and update the budget in the budget database 124 in response to the approval operation from the administrator terminal 200. Note that the budget increase processing unit 118 is an optional component. If the job advertisement server 100 is configured not to have a budget increase processing unit 118, the budget may be changed by resetting it by the budget setting unit 111.
[0044] The group management unit 119 manages multiple locations as a group. For example, the group management unit 119 may associate multiple locations with a single group and store that group in the corporate database 121. In this case, the budget setting unit 111 may accept the setting of a budget limit for the group, and the output control unit 115 may output the usage status on a group basis. Note that the group management unit 119 is an optional component. If the job advertisement server 100 does not have a group management unit 119, the budget limit may be managed individually for each location.
[0045] The company database 121 stores information about companies and information about groups. For example, the company database 121 stores company identification information to identify a company, the company's name, and the locations belonging to that company. The company database 121 also stores group identification information to identify a group, the group's name, and the correspondence between the locations belonging to each group. The location database 122 stores information about locations. For example, the location database 122 stores location identification information to identify a location, the location's name, the group to which the location belongs, and the location of the location. The job posting information database 123 stores job posting information received by the job posting reception department 112. For example, the job posting information database 123 stores job posting identification information to identify a job, the amount of compensation, the number of people to be recruited, the date and time of work, the location where the job was posted, and the posting status of the job. The posting status indicates whether the job is currently posted or whether the work related to the job has been confirmed. The budget database 124 stores the budget limit and the amount used. For example, the budget database 124 stores the location identification information, the prescribed period, the budget amount, the confirmed invoice amount, and the planned invoice amount in association with each other. The credit database 125 stores the credit limits set for the administrator or location. For example, the credit database 125 stores the identification information that identifies the administrator or location in association with the amount of the credit limit. The credit limit is the amount referenced as an upper limit when setting or updating the budget.
[0046] (Budget allocation process) Figure 3 is a flowchart showing an example of the budget limit setting process according to the embodiment. First, the budget setting unit 111 receives a request to set a budget limit from the administrator terminal 200 (step S301). Next, the budget setting unit 111 receives the designation of the base or group to be set (step S302). Next, the budget setting unit 111 receives input of the amount and period of the budget limit (step S303).
[0047] Next, the budget setting unit 111 determines whether the entered budget limit exceeds the credit limit (step S304). If the entered budget limit exceeds the credit limit (step S304 / Y), the budget setting unit 111 notifies the administrator terminal 200 of the error (step S305). On the other hand, if the entered budget limit does not exceed the credit limit (step S304 / N), the budget setting unit 111 stores the budget limit in the budget database 124, linking it to the base station (step S306). Then, the output control unit 115 displays the budget limit on the base station terminal 300 (step S307).
[0048] The predetermined period may be adjusted, for example, by customizing the start and end dates. Specifically, the budget setting unit 111 may receive input of a start and end date corresponding to the closing date from the administrator terminal 200, and set the period determined by the said start and end dates as the predetermined period.
[0049] (Budget usage visualization process) Figure 4 is a flowchart showing an example of the budget usage visualization process according to the embodiment. First, the usage amount calculation unit 113 obtains job information for a predetermined period from the job information database 123 (step S401). Next, the usage amount calculation unit 113 calculates the usage amount based on the job information (step S402). Next, the usage amount calculation unit 113 calculates separately the confirmed billing amount for job information whose operation has been confirmed and the planned billing amount for job information currently posted (step S403).
[0050] Next, the output control unit 115 obtains budget limit data from the budget database 124 (step S404). Then, the output control unit 115 converts the budget limit and the amount used into a comparable format (step S405). For example, the output control unit 115 may superimpose areas corresponding to the confirmed billing amount and areas corresponding to the planned billing amount onto the bar representing the budget limit in a manner that makes them distinguishable from each other. Then, the output control unit 115 outputs the converted result to at least one of the administrator terminal 200 and the branch terminal 300 (step S406).
[0051] The usage amount calculation unit 113 may calculate the number of available job openings based on the remaining budget after subtracting the usage amount from the budget limit and the average compensation rate based on past job postings. In this case, the output control unit 115 may output the number of available job openings to the base terminal 300.
[0052] (Excessive use detection notification process) Figure 5 is a flowchart showing an example of the overuse determination notification process according to the same embodiment. First, the determination unit 116 obtains the budget limit and the billed amount from the budget database 124 (step S501). Next, the determination unit 116 determines whether the billed amount relative to the budget limit meets predetermined conditions (step S502). If the predetermined conditions are not met (step S502 / N), the process is terminated.
[0053] If a predetermined condition is met (step S502 / Y), the output control unit 115 generates a notification corresponding to that condition (step S503). For example, if the predetermined condition is that the billed amount exceeds a predetermined percentage of the budget, the output control unit 115 may generate a notification that includes a warning about the budget usage. Alternatively, if the predetermined condition is that the billed amount exceeds the budget, the output control unit 115 may generate a notification that includes a budget overrun warning. The output control unit 115 then outputs the generated notification to at least one of the administrator terminal 200 and the branch terminal 300 (step S504).
[0054] The output control unit 115 may output recommendations to the base terminal 300 regarding changes to the job posting's compensation amount, number of positions available, or working hours if predetermined conditions are met. This allows the base to be provided with information to continue posting job openings within the budget.
[0055] (Restriction Exemption Processing) Figure 6 is a flowchart showing an example of the usage restriction exemption process according to the same embodiment. First, the usage restriction unit 117 accepts the submission of a new job posting from the base terminal 300 (step S601). Next, the usage restriction unit 117 determines whether the billing amount for the job posting exceeds the remaining budget (step S602). If the billing amount does not exceed the remaining budget (step S602 / N), the usage restriction unit 117 permits the submission of the job posting (step S607).
[0056] If the amount billed exceeds the remaining limit (step S602 / Y), the usage restriction unit 117 determines whether it falls within a pre-set busy period (step S603). If it falls within a busy period (step S603 / Y), the usage restriction unit 117 waives the restriction and allows the job posting to be made (step S607). If it does not fall within a busy period (step S603 / N), the usage restriction unit 117 determines whether the lead time until the start date and time of the job posting is less than or equal to a predetermined value (step S604). If the lead time is less than or equal to a predetermined value (step S604 / Y), the usage restriction unit 117 waives the restriction and allows the job posting to be made (step S607).
[0057] If the lead time exceeds a predetermined value (step S604 / N), the usage restriction unit 117 determines whether it has received a predetermined exemption declaration from the base terminal 300 (step S605). If an exemption declaration has been received (step S605 / Y), the usage restriction unit 117 grants permission to waive the restriction and post the job advertisement (step S607). If an exemption declaration has not been received (step S605 / N), the usage restriction unit 117 restricts the posting of the job advertisement (step S606).
[0058] The usage restriction unit 117 may temporarily suspend the distribution of currently posted job postings. The billing amount calculation unit 114 may update the billing amount when recruitment for a currently posted job posting is confirmed, and the determination unit 116 may perform a re-determination based on the updated billing amount. The usage restriction unit 117 may also permit the posting of job postings from a second terminal, subject to approval by the first terminal.
[0059] (Processing of application for increased limit) Figure 7 is a flowchart showing an example of the process for requesting an increase in the budget limit according to the same embodiment. First, the budget limit increase processing unit 118 receives a request for an increase in the budget limit from the branch terminal 300 (step S701). Next, the budget limit increase processing unit 118 determines whether the request exceeds the credit limit set by the administrator or the branch (step S702). If the request exceeds the credit limit (step S702 / Y), the budget limit increase processing unit 118 notifies the branch terminal 300 that the request has been rejected (step S708).
[0060] If the credit limit is not exceeded (step S702 / N), the credit limit increase processing unit 118 determines whether it falls within a pre-set busy period or whether an emergency condition is met (step S703). If it falls within a busy period or an emergency condition is met (step S703 / Y), the credit limit increase processing unit 118 updates the budget limit without waiting for approval (step S706). If neither applies (step S703 / N), the credit limit increase processing unit 118 presents the credit limit increase request and reference information related to the site to the administrator terminal 200 (step S704). The reference information may be, for example, information indicating the difficulty of recruitment in the area.
[0061] Next, the budget increase processing unit 118 determines whether it has received an approval operation from the administrator terminal 200 (step S705). If the approval operation is not received (step S705 / N), the budget increase processing unit 118 notifies the branch terminal 300 of the denial (step S708). If the approval operation is received (step S705 / Y), the budget increase processing unit 118 updates the budget limit (step S706). Next, the determination unit 116 performs a re-determination based on the updated budget limit, and the usage restriction unit 117 removes the restriction based on the result of the re-determination (step S707). Then, the budget increase processing unit 118 notifies the branch terminal 300 of the result (step S708).
[0062] The budget increase processing unit 118 may determine an approver for the budget increase request based on predetermined conditions and execute the budget increase processing when it receives approval from the terminal used by the determined approver. For example, the budget increase processing unit 118 may determine a lower-level manager as the approver if the amount of the increase is less than or equal to a predetermined amount, and determine a higher-level manager as the approver if it exceeds the predetermined amount.
[0063] (Administrator terminal budget setting screen) Figure 8 shows an example of a budget setting screen displayed on the administrator terminal 200 according to the same embodiment. This screen can be displayed under the control of the output control unit 115. The budget setting screen includes a period selection area 211, a group selection area 212, a batch setting button 213, a total area for the entire company 214, a store list table 215, a search area 216, and pagination 217. The period selection area 211 displays a dropdown menu for selecting a predetermined period to which the budget limit applies. The group selection area 212 displays a dropdown menu for selecting the group to which the setting applies.
[0064] The batch setting button 213 displays controls for entering budget limits for multiple locations at once. The company-wide total area 214 displays the total budget limit for the entire company. The store list table 215 displays the name of each location, the group it belongs to, and an input field for the budget limit. The search area 216 displays an input field for searching for locations. The pagination area 217 displays controls for switching the page displayed in the store list table 215. Administrators can enter budget limits for each location individually through the store list table 215.
[0065] (Administrator terminal budget management screen) Figure 9 shows an example of a budget management screen displayed on the administrator terminal 200 according to the same embodiment. This screen can be displayed under the control of the output control unit 115. The budget management screen includes an alert banner 221, a company summary area 222, a utilization rate bar 223, a group list table 224, a switching tab 225, and a period selection area 226. The alert banner 221 indicates that there are locations that have exceeded their budget. The company summary area 222 displays the overall budget utilization rate for the company, the budget, the confirmed total amount, the total amount of job postings, the amount of available labor, and the predicted amount used. The amount of available labor is a value obtained by dividing the budget by a predetermined compensation rate, and is displayed, for example, as the total hours of labor that can be secured in accordance with the budget. The predicted amount used is an estimate of the amount used at the end of a predetermined period, calculated based on the current amount used and the number of days elapsed in the predetermined period.
[0066] The consumption rate bar 223 displays the percentage of the amount spent relative to the budget. The consumption rate bar 223 displays the safe state (the amount spent is less than a predetermined percentage of the budget), the caution state (the amount spent exceeds the predetermined percentage), and the state (the budget has been exceeded) in a manner that allows for differentiation between them. The group list table 224 displays the group name, number of stores, budget, confirmed total amount, total amount of job postings, and consumption rate bar for each group. The switch tab 225 displays controls for switching between group-based and location-based displays. The period selection area 226 displays a dropdown menu for selecting the target predetermined period.
[0067] (List of stores within the group) Figure 10 shows an example of a store list screen within a group displayed on the administrator terminal 200 according to the same embodiment. This screen can be displayed by the control of the output control unit 115. The store list screen includes a company summary area 231, a switching tab 232, a search area 233, a sorting area 234, and a store list table 235. The company summary area 231 displays the budget utilization rate for the entire company, the budget, the confirmed total amount, and the total amount of job postings. The switching tab 232 displays an operator for selecting the display by location. The search area 233 displays an input field for searching for locations. The sorting area 234 displays a pull-down menu for changing the display order. The store list table 235 displays, for each location, the name of the location, the group to which it belongs, the budget, the confirmed total amount, the total amount of job postings, and a utilization rate bar.
[0068] (Screen showing budget status of branch terminals) Figure 11 shows an example of a budget status screen displayed on a base terminal 300 according to the same embodiment. This screen can be displayed by the control of the output control unit 115. The budget status screen includes an alert banner 311, an information message area 312, a period selection area 313, a consumption rate bar 314, a numerical display area 315, and a store identification display area 316. The alert banner 311 displays that the budget consumption rate has exceeded a predetermined percentage. The information message area 312 displays that the budget is approaching its upper limit and the remaining amount.
[0069] The period selection area 313 displays a dropdown menu for selecting a predetermined period. The consumption rate bar 314 displays the percentage of the amount used relative to the budget. The numerical display area 315 displays the budget, the confirmed total amount, the total amount of job postings, and the number of available job postings. The number of available job postings is calculated based on the remaining budget after subtracting the amount used from the budget, and the average compensation rate based on past job posting information. The store identification display area 316 displays information that identifies the store. Personnel belonging to a store can check the budget usage status of their store through the budget status screen.
[0070] (Administrator terminal group budget distribution screen) Figure 12 shows an example of a group budget distribution screen displayed on the administrator terminal 200 according to the same embodiment. This screen can be displayed by the control of the output control unit 115. The group budget distribution screen includes a period selection area 241, a group selection area 242, a group budget input area 243, an allocation criterion selection area 244, an automatic allocation button 245, an allocation result table 246, an allocation total display area 247, and a confirmation button 248. The period selection area 241 displays a pull-down menu for selecting a predetermined period to be allocated. The group selection area 242 displays a pull-down menu for selecting the group to be allocated.
[0071] The group budget input area 243 displays input fields for the budget limit for the selected group. The allocation criteria selection area 244 displays controls for switching between allocation criteria based on the size of each location and allocation criteria based on past usage. The automatic allocation button 245 displays controls for instructing automatic allocation based on the selected allocation criteria. The allocation results table 246 displays, for each location belonging to the group, the name of the location, past usage, allocation ratio, allocated budget, and input fields for individually adjusting the allocated budget. The total allocation display area 247 displays the total budget allocated to each location and the budget entered in the group budget input area 243. The confirmation button 248 displays controls for confirming the allocation results.
[0072] (Job posting creation screen on the terminal) Figure 13 shows an example of a job posting creation screen displayed on a terminal 300 according to the same embodiment. This screen can be displayed by the control of the output control unit 115. The job posting creation screen includes a compensation amount input area 321, a recruitment number input area 322, a working hours input area 323, a working date and time input area 324, a budget status summary area 325, a recommendation area 326, a confirmation button 327, and a cancel button 328. The compensation amount input area 321 displays an input field for the compensation amount of the job posting. The recruitment number input area 322 displays an input field for the number of people to be recruited. The working hours input area 323 displays an input field for working hours. The working date and time input area 324 displays an input field for the working date and time.
[0073] The budget summary area 325 displays the budget, the remaining balance, and the invoice amount for this job based on the entered job requirements. The recommendation area 326 displays a notification that the budget may be exceeded, and one or more recommendations regarding changes to the job's compensation, number of recruits, or working hours. Recommendations may include, for example, suggestions to reduce the compensation to a predetermined level, reduce the number of recruits to a predetermined number, and shorten the working hours to a predetermined number, as adjustments necessary to post the job within the remaining budget. The confirmation button 327 displays controls for posting the job with the entered job requirements. The cancel button 328 displays controls for canceling the creation of the job.
[0074] (modified version) Modifications of this embodiment will be described below. Each of the configurations described below may be used in place of, or in addition to, the configuration of this embodiment.
[0075] The budget setting unit 111 may accept budget setting requests as long as they do not exceed the pre-set credit limits. For example, the budget setting unit 111 may obtain the credit limits corresponding to a company from the credit database 125 and accept setting requests as long as the sum of the entered budget limits does not exceed those credit limits.
[0076] The budget setting unit 111 may change the credit limit based on payment history. For example, the budget setting unit 111 may reduce the credit limit if the administrator has outstanding payments, or may restrict the budget setting for a branch if the branch has outstanding payments.
[0077] The output control unit 115 may output to the administrator terminal 200 the amount of work that can be secured by dividing the budget by a predetermined remuneration rate. This can provide the administrator with an estimate of the amount of work that can be secured in accordance with the budget.
[0078] The output control unit 115 may output the amount used during a predetermined period in the past as reference information to the administrator terminal 200. The output control unit 115 may also output the usage status based on a comparison with the amount used at the same point in time during the predetermined period in the past. This can support budget management based on past performance.
[0079] The usage amount calculation unit 113 may calculate a predicted value of the usage amount at the end of a predetermined period based on the current usage amount and the number of days elapsed in the predetermined period. For example, the usage amount calculation unit 113 may calculate the predicted value by multiplying the daily usage amount obtained by dividing the current usage amount by the number of days elapsed by the number of days in the predetermined period. The usage amount calculation unit 113 may also calculate the predicted value based on a comparison with the usage amount at the same point in time in the past predetermined period, or it may calculate the predicted value based on a database of past job posting patterns and compensation conditions. In this case, the output control unit 115 may output the predicted value.
[0080] The Group Management Unit 119 may allocate the budget for the group to each location based on the size of each location belonging to the group or its past usage record. Alternatively, the Budget Setting Unit 111 may accept budget setting for the group from a terminal used by a higher-level administrator, and accept budget setting for each location within the group from a terminal used by a lower-level administrator, within the limits of the group's budget.
[0081] The budget setting unit 111 may transfer budget allocations between locations within the same group based on operations from the first terminal. The group management unit 119 may also calculate the budget utilization rate of each location within the group and, if the difference in budget utilization rates between locations exceeds a predetermined threshold, propose a budget allocation adjustment to the administrator terminal 200. The group management unit 119 may also accept pre-configurations from the administrator terminal 200 for automatically transferring budget allocations between locations within the group. For example, the group management unit 119 may accept a setting to automatically transfer an amount equivalent to a predetermined percentage of the remaining budget allocation from a location with a low utilization rate to another location with a high utilization rate, and execute the budget allocation transfer according to that setting.
[0082] The group management unit 119 may set up groups based on input information about the organization. For example, the group management unit 119 may accept input information indicating the structure of the organization and associate multiple locations with groups based on that information.
[0083] The output control unit 115 may sort the usage status of multiple locations by predetermined items or filter it according to predetermined conditions before outputting. For example, the output control unit 115 may sort the locations in descending order of budget utilization rate before outputting, or it may filter and output only the locations that have exceeded their budget.
[0084] The budget setting unit 111 may add any remaining budget amount to the budget for the next prescribed period if there is a remaining budget at the end of a prescribed period. This can support budget management that spans across prescribed periods.
[0085] (summary) In the job advertisement server 100 according to this embodiment, the budget setting unit 111 receives the setting of a budget limit for a location from the first terminal, the job acceptance unit 112 receives job information from the second terminal, the usage amount calculation unit 113 calculates the usage amount for each location based on the job information, and the output control unit 115 outputs the budget limit and the usage amount to at least one of the first and second terminals in a manner that allows for comparison. This makes it easier for at least one of the persons in charge of managing the budget limit and the person in charge of posting job advertisements to grasp the usage status of expenses that fluctuate depending on the status of job postings. In addition, the determination unit 116 determines whether the amount billed for the budget limit meets predetermined conditions, and the output control unit 115 outputs a notification corresponding to those conditions, thereby contributing to the appropriate use of the budget limit. Furthermore, by providing a usage restriction unit 117 and a limit increase processing unit 118, flexible responses according to the status of the budget limit can be supported.
[0086] (Hardware configuration) The embodiments of this disclosure have been described above. The information processing described above is realized through the cooperation of software and hardware. Below, an example of a hardware configuration that may be applied to the job advertisement server 100 will be described.
[0087] Figure 14 is a block diagram showing an example of a hardware configuration 90. The hardware configuration 90 includes a CPU (Central Processing Unit) 901, a ROM (Read Only Memory) 902, a RAM (Random Access Memory) 903, and a host bus 904. The hardware configuration 90 also includes a bridge 905, an external bus 906, an interface 907, an input device 908, a display device 909, an audio output device 910, a storage device (HDD) 911, a drive 912, and a network interface 915.
[0088] The CPU 901 functions as both an arithmetic processing unit and a control unit, controlling the overall operation according to various programs. The CPU 901 may be a microprocessor, ASIC, FPGA, GPU, quantum computer, etc. The ROM 902 stores programs and arithmetic parameters used by the CPU 901. The RAM 903 temporarily stores programs used in the execution of the CPU 901 and parameters that change as needed during its execution. These are interconnected by a host bus 904, which consists of a CPU bus and the like. Through the cooperation of the CPU 901, ROM 902, RAM 903, and software, the processing by each functional unit of the job advertisement server 100 is executed.
[0089] The host bus 904 is connected to an external bus 906, such as a PCI (Peripheral Component Interconnect / Interface) bus, via a bridge 905. It is not necessary to configure the host bus 904, bridge 905, and external bus 906 separately; these functions may be implemented on a single bus. Furthermore, the devices used for internal communication are not limited to electrical systems; they may also utilize magnetic or optical systems.
[0090] The input device 908 consists of input means for the user to input information, such as a mouse, keyboard, touch panel, buttons, microphone, sensor, switch, and lever, and an input control circuit that generates input signals based on the user's input and outputs them to the CPU 901. By operating the input device 908, the user can input various types of data and instruct processing operations.
[0091] The display device 909 includes, for example, a liquid crystal display (LCD) device, a projector device, an OLED (Organic Light Emitting Diode) device, and a lamp. The audio output device 910 includes an audio output device such as a speaker and headphones.
[0092] The storage device 911 is a data storage device configured as an example of a storage unit according to this embodiment. The storage device 911 may include a storage medium, a recording device for recording data on the storage medium, a reading device for reading data from the storage medium, and a deletion device for deleting data recorded on the storage medium. The storage device 911 is composed of, for example, an HDD (Hard Disk Drive) or an SSD (Solid State Drive), or a memory having equivalent functionality. This storage device 911 drives the storage and stores programs executed by the CPU 901 and various data.
[0093] Drive 912 is a reader / writer for storage media and is either built into or external to the hardware configuration 90. Drive 912 reads information recorded on removable storage media 84, such as a magnetic disk, optical disk, magneto-optical disk, or semiconductor memory, and outputs it to RAM 903 or storage device 911. Drive 912 can also write information to the removable storage media 84.
[0094] The network interface 915 is a communication interface composed of, for example, a communication device for connecting to a network NW. Furthermore, the network interface 915 may be a wireless LAN (Local Area Network) compatible communication device or a wired communication device for wired communication.
[0095] As described above, according to the embodiments of this disclosure, it becomes possible to easily grasp the usage status of the budget related to job postings.
[0096] While preferred embodiments of the present disclosure have been described in detail above with reference to the attached drawings, the technical scope of the present disclosure is not limited to such examples. It is clear to any person with ordinary skill in the art of the present disclosure that various modifications or alterations may be conceived within the scope of the technical idea set forth in the claims, and these will naturally also fall within the technical scope of the present disclosure.
[0097] Furthermore, among the processes described in the embodiments of this disclosure described above, all or part of the processes described as being performed automatically may be performed manually, or all or part of the processes described as being performed manually may be performed automatically by known methods. In addition, the processing procedures, specific names, and information including various data and parameters shown in the above document and drawings may be changed at will unless otherwise specified. For example, the various information shown in each figure is not limited to the information shown.
[0098] Furthermore, each component of the illustrated device is a functional concept and does not necessarily have to be physically configured as shown. In other words, the specific form of distribution and integration of each device is not limited to that shown, and all or part of it can be functionally or physically distributed and integrated in any unit according to various loads and usage conditions. For example, the processing entity of each functional unit in the above-described embodiment is not limited to the job advertisement server 100 shown in Figure 1. The administrator terminal 200 or branch terminal 300 may be equipped with a processor such as a CPU and memory, and may be configured to execute some or all of the functions of the job advertisement server 100. By performing distributed processing on the administrator terminal 200 or branch terminal 300 side in this way, it is possible to reduce the amount of data transferred to the job advertisement server 100 and improve the response speed of the entire system. Also, the functions of the job advertisement server 100 do not need to be realized by a single physical device, but may be distributed processing by multiple server devices connected via a network.
[0099] Furthermore, the embodiments of this disclosure described above can be combined as appropriate in areas where the processing content is not contradictory. Also, the order of each step shown in the sequence diagram or flowchart of this embodiment can be changed as appropriate. For example, each step may be processed chronologically, repeatedly, or partially in parallel.
[0100] Furthermore, the effects described herein are merely descriptive or illustrative and not limiting. In other words, the technology relating to this disclosure may produce other effects that will be apparent to those skilled in the art from the description herein, in addition to or in lieu of the effects described herein.
[0101] Furthermore, the following configurations also fall within the technical scope of this disclosure.
[0102] (Item 1) An information processing device for managing the posting of job openings related to temporary work, A budget setting unit receives the setting of a budget limit for a predetermined period for one or more locations from the first terminal, The recruitment reception department receives job information from a second terminal, A usage amount calculation unit calculates the usage amount for each location based on the job information received during the aforementioned predetermined period, A display control unit that outputs the budget limit and the amount used to at least one of the first terminal and the second terminal in a manner that allows for comparison, An information processing device equipped with the following features. (Item 2) The information processing device described in item 1, The budget setting unit accepts the setting of the budget limit within the limits not exceeding the pre-set credit limit. Information processing device. (Item 3) The information processing device described in item 1, The display control unit outputs to the first terminal the amount of work that can be secured by dividing the budget by a predetermined remuneration rate. Information processing device. (Item 4) The information processing device described in item 1, The aforementioned usage amount calculation unit calculates the confirmed billing amount for job postings whose operation has been confirmed and the estimated billing amount for job postings that are currently posted, distinguishing between the two. The display control unit outputs the confirmed invoice amount and the estimated invoice amount in a manner that allows for distinction between them. Information processing device. (Item 5) The information processing device described in item 1, The aforementioned usage amount calculation unit calculates the usage amount for each budget item that includes at least one of the following: personnel expenses, transportation expenses, and service fees. The display control unit outputs the amount used in a manner that allows for the distinction of the budget items. Information processing device. (Item 6) The information processing device described in item 1, The aforementioned usage amount calculation unit calculates the number of available job openings based on the remaining budget after subtracting the usage amount from the budget limit, and the average compensation rate based on past job posting information. The display control unit outputs the number of available job openings to the second terminal. Information processing device. (Item 7) The information processing device described in item 1, The aforementioned usage amount calculation unit calculates a predicted value of the usage amount at the end of the predetermined period based on the current usage amount and the number of days elapsed in the predetermined period. The display control unit outputs the predicted value. Information processing device. (Item 8) The information processing device described in item 7, The aforementioned usage amount calculation unit calculates the predicted value based on a comparison with the usage amount at the same point in time during a predetermined period in the past. Information processing device. (Item 9) The information processing device described in item 7, The aforementioned usage amount calculation unit calculates the predicted value based on a database of past job posting patterns and compensation conditions. Information processing device. (Item 10) The information processing device described in item 1, The aforementioned information processing device further comprises a group management unit that manages multiple such locations as a group, The budget setting unit receives the setting of a budget limit for the group, The display control unit outputs the usage status for each group. Information processing device. (Item 11) The information processing device described in item 10, The budget setting department allocates the budget allocation for the group to each location based on the size of each location belonging to the group or its past usage record. Information processing device. (Item 12) The information processing device described in item 10, The budget setting unit accepts budget allocation settings for the group from terminals used by senior administrators, and accepts budget allocation settings for each location within the group from terminals used by junior administrators, within the limits of the group's budget allocation. Information processing device. (Item 13) The information processing device described in item 10, The budget setting unit transfers budget allocations between locations within the same group based on operations from the first terminal. Information processing device. (Item 14) The information processing device described in item 10, The information processing device calculates the budget utilization rate of each location within the group, and if the difference in the budget utilization rates of each location exceeds a predetermined threshold, it proposes a budget adjustment to the first terminal. Information processing device. (Item 15) The information processing device described in item 1, The display control unit outputs an alert to at least one of the first terminal and the second terminal when the amount used exceeds a predetermined percentage of the budget limit. Information processing device. (Item 16) The information processing device described in item 1, The budget setting unit, if there is a remaining balance in the budget allocation at the end of the predetermined period, adds the remaining balance to the budget allocation for the next predetermined period. Information processing device. (Item 17) A computer-based information processing method for managing the posting of temporary employment job listings, The first step involves receiving a budget allocation for a predetermined period from the first terminal, The second step involves receiving job information from a second terminal, The steps include: calculating the amount used for each location based on the job information received during the aforementioned predetermined period; The steps include outputting the budget limit and the amount used to at least one of the first terminal and the second terminal in a manner that allows for comparison, Information processing methods including (Item 18) A program to be run on a computer for managing the posting of temporary employment job listings, The first terminal processes the setting of a budget limit for a predetermined period for one or more locations, The process of receiving job information from the second terminal, A process to calculate the amount used for each location based on the job information received during the aforementioned predetermined period, A process that outputs the budget limit and the amount used to at least one of the first terminal and the second terminal in a manner that allows for comparison, A program that executes the command.
[0103] (Item 1) An information processing device for managing the posting of job openings related to temporary work, A budget setting unit receives the setting of a budget limit for a predetermined period for one or more locations from the first terminal, The recruitment reception department receives job information from a second terminal, A billing amount calculation unit that calculates the billing amount based on the job information received during the aforementioned predetermined period, A determination unit that determines whether the requested amount within the budget framework meets predetermined conditions, A notification control unit that, when the predetermined conditions are met, outputs a notification corresponding to the conditions to at least one of the first terminal and the second terminal, An information processing device equipped with the following features. (Item 2) The information processing device described in item 1, The aforementioned predetermined condition is that the claimed amount exceeds a predetermined percentage of the budget limit. The aforementioned notice includes a warning about the use of the budget allocation, Information processing device. (Item 3) The information processing device described in item 1, The aforementioned specified condition is that the claimed amount exceeds the budget limit. The aforementioned notice includes a warning of budget overruns, Information processing device. (Item 4) An information processing device described in any one of items 1 to 3, The information processing device further includes a usage restriction unit that restricts the posting of new job postings from the second terminal when the predetermined conditions are met. Information processing device. (Item 5) The information processing device described in item 4, The usage restriction unit, upon receiving a new job posting from the second terminal, determines whether it exceeds the budget limit based on the invoice amount for the job posting and the remaining budget limit, and restricts the posting if it exceeds the limit. Information processing device. (Item 6) The information processing device described in item 1, The notification control unit outputs a recommendation to the second terminal regarding changes to the job offer's compensation, number of positions available, or working hours when the predetermined conditions are met. Information processing device. (Item 7) The information processing device described in item 4, The aforementioned usage restriction section temporarily suspends the distribution of job postings that are currently listed. Information processing device. (Item 8) The information processing device described in item 1, The aforementioned billing amount calculation unit updates the final billing amount when a job posting is confirmed. The determination unit performs a re-determination based on the updated confirmed claim amount. Information processing device. (Item 9) The information processing device described in item 4, The usage restriction unit permits the posting of job postings from the second terminal, subject to approval by the first terminal. Information processing device. (Item 10) The information processing device described in item 4, The aforementioned usage restriction unit will exempt the restriction if it falls within a predetermined busy period. Information processing device. (Item 11) The information processing device described in item 4, The aforementioned usage restriction unit shall exempt the restriction if the lead time until the start date and time related to the job information is less than or equal to a predetermined value. Information processing device. (Item 12) The information processing device described in item 4, The usage restriction unit, upon receiving a prescribed exemption declaration from the second terminal, will exempt the restriction. Information processing device. (Item 13) The information processing device described in item 1, The information processing device further includes a budget increase processing unit that receives a request for an increase in the budget limit from the second terminal, presents the request for an increase to the first terminal, and updates the budget limit in response to an approval operation from the first terminal. Information processing device. (Item 14) The information processing device described in item 13, When the credit limit increase processing unit presents the credit limit increase application to the first terminal, it also displays predetermined reference information related to the base. Information processing device. (Item 15) An information processing device as described in item 13 or 14, The aforementioned budget increase processing unit updates the budget limit without waiting for the approval operation if it falls within a predetermined busy period or if an emergency condition is met. Information processing device. (Item 16) The information processing device described in item 13, The credit limit increase processing unit accepts the approval operation within the limits that do not exceed the credit limit set by the administrator corresponding to the first terminal. Information processing device. (Item 17) The information processing device described in item 13, The credit limit increase processing unit accepts the credit limit increase application within the limits that do not exceed the credit limit set at the said location. Information processing device. (Item 18) The information processing device described in item 4, The information processing device further includes a budget increase processing unit that receives a request for an increase in the budget limit from the second terminal and updates the budget limit in response to an approval operation from the first terminal. The determination unit, when the budget limit is updated, performs a re-determination based on the updated budget limit. The usage restriction unit removes the restriction based on the result of the re-evaluation. Information processing device. (Item 19) The information processing device described in item 13, The aforementioned budget increase processing unit determines an approver for the budget increase application based on predetermined conditions, and executes the budget increase processing when it receives approval from the terminal used by the determined approver. Information processing device. (Item 20) A computer-based information processing method for managing the posting of temporary employment job listings, The first step involves receiving a budget allocation for a predetermined period from the first terminal, The second step involves receiving job information from a second terminal, A step of calculating the invoice amount based on the job information received during the aforementioned predetermined period, A step of determining whether the requested amount within the budget framework meets the prescribed conditions, When the predetermined conditions are met, the process involves outputting a notification corresponding to those conditions to at least one of the first terminal and the second terminal. Information processing methods including (Item 21) A computer used to manage job postings for temporary work, The first terminal processes the setting of a budget limit for a predetermined period for one or more locations, The process of receiving job information from the second terminal, A process for calculating the invoice amount based on the job information received during the aforementioned predetermined period, A process to determine whether the requested amount within the budget framework meets the prescribed conditions, When the aforementioned predetermined conditions are met, a process is performed to output a notification corresponding to said conditions to at least one of the first terminal and the second terminal. A program that executes the command. [Explanation of symbols]
[0104] 100 Job Ad Servers 110 Control Unit 111 Budget Setting Department 112 Recruitment Department 113 Usage amount calculation department 114 Billing Amount Calculation Department 115 Output control unit 116 Judgment section 117 Restrictions on Use 118 Frame expansion processing unit 119 Group Management Department 120 Storage section 121 Company Database 122 Location Database 123 Job Information Database 124 Budget Database 125 Credit Database 130 Communications Department 200 Administrator terminals 300 terminal locations 400 Job Seeker Terminals NW Network
Claims
1. A budget setting unit that receives the setting of a budget limit for a predetermined period for one or more locations and stores the budget limit in association with the one or more locations, A recruitment reception department receives job postings for temporary work, and associates them with the location where the job posting is listed among the one or more locations mentioned above. A billing amount calculation unit that calculates the billing amount based on the job information received during the aforementioned predetermined period, A determination unit that determines whether the requested amount within the budget framework meets predetermined conditions, An information processing device equipped with the following features.
2. The predetermined condition is that the claimed amount exceeds a predetermined percentage of the budget limit. The information processing apparatus according to claim 1.
3. The predetermined condition is that the claimed amount exceeds the budget limit. The information processing apparatus according to claim 1.
4. The following is a usage restriction unit that further restricts the posting or distribution of job postings relating to at least one of the one or more locations when the predetermined conditions are met: The information processing apparatus according to claim 1.
5. The usage restriction unit restricts the posting of new job advertisements. The information processing apparatus according to claim 4.
6. The usage restriction unit temporarily suspends the distribution of the job postings that are currently posted. The information processing apparatus according to claim 4.
7. When the usage restriction unit receives a new job posting, it determines whether it exceeds the amount requested for the job posting and the remaining budget, and restricts the posting if it exceeds the amount requested. The information processing apparatus according to claim 5.
8. The system further comprises an output control unit that outputs a recommendation regarding changes to the job offer's compensation, number of recruits, or working hours when the predetermined conditions are met. The information processing apparatus according to claim 1.
9. The claim amount calculation unit updates the confirmed claim amount when a job posting is confirmed, The determination unit performs a re-determination based on the updated confirmed claim amount. The information processing apparatus according to claim 1.
10. The usage restriction unit restricts the posting of job postings based on the job postings when approval for the job postings is not accepted. The information processing apparatus according to claim 4.
11. The usage restriction unit shall exempt the restriction if it falls within a predetermined busy period. The information processing apparatus according to claim 4.
12. The usage restriction unit shall exempt the restriction if the lead time until the start date and time of the job posting is less than or equal to a predetermined value. The information processing apparatus according to claim 4.
13. The usage restriction unit, upon receiving a prescribed exemption application, exempts the restriction. The information processing apparatus according to claim 4.
14. The budget setting unit stores the budget allocation in association with each of the one or more locations, The aforementioned billing amount calculation unit calculates the billing amount for each of the aforementioned locations, The determination unit determines whether the amount claimed for each of the bases meets the predetermined conditions, The aforementioned usage restriction unit restricts the posting or distribution of job postings related to locations that meet the aforementioned predetermined conditions. The information processing apparatus according to claim 4.
15. The budget setting unit receives the setting of the budget limit based on the operation of a first user who manages the budget limit, The aforementioned job posting reception unit receives the job information based on the operation of a second user belonging to the location where the job posting is posted. The information processing apparatus according to any one of claims 1 to 14.
16. The budget setting unit receives the setting of the budget limit via the corporate management screen used by the first user, The aforementioned job application reception unit receives the job information via the store management screen used by the second user. The information processing apparatus according to claim 15.
17. A computer, The system accepts the setting of a budget limit for a predetermined period for one or more locations, and stores the said budget limit in association with the said one or more locations. To accept job postings for temporary work, and to associate them with the location where the job posting is posted among the one or more locations mentioned above, The amount to be claimed will be calculated based on the job information received during the aforementioned specified period, To determine whether the amount requested for the budget framework meets the prescribed conditions, Information processing methods, including those mentioned above.
18. A computer, The system accepts the setting of a budget limit for a predetermined period for one or more locations, and stores the said budget limit in association with the said one or more locations. To accept job postings for temporary work, and to associate them with the location where the job posting is posted among the one or more locations mentioned above, The amount to be claimed will be calculated based on the job information received during the aforementioned specified period, To determine whether the amount requested for the budget framework meets the prescribed conditions, A program that executes something.
Citation Information
Patent Citations
Job offer introduction system
JP2022036879A
Recruitment and job hunting assistance system, recruitment and job hunting assistance method, and program
JP2025067024A
Information processing method, program and information processing device
JP2025087580A
Budget formulation system, budget formulation method, and budget formulation program
WO2025100451A1
