Methods for constructing embankments and embankment structures
The method using bag-shaped formworks, perforated bag-filled materials, and anchoring materials stabilizes fluidized soil for rapid, durable embankment construction, addressing durability and labor-saving needs in railway and road construction.
Patent Information
- Application Number
- JP2023047019
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Filing Date
- 2023-03-23
- Publication Date
- 2026-11-19
- Estimated Expiration
- 2043-03-23
AI Technical Summary
Fluidized soil deteriorates due to external factors such as water retention and drying, and existing methods do not adequately address the need for rapid, labor-saving construction of railway embankments, especially in narrow spaces or under time constraints, while ensuring durability and resistance to external factors.
A method involving the use of bag-shaped formworks, perforated bag-filled materials, and anchoring materials with protrusions to stabilize fluidized soil, allowing high-volume pouring and subsequent protection with a protective layer.
Enables rapid, labor-saving construction of durable embankments by resisting liquid and inertial forces, while protecting against water retention and drying, suitable for railway and road applications.
Smart Images

Figure 0007954106000001 
Figure 0007954106000002 
Figure 0007954106000003
Abstract
Description
Technical Field
[0001] The present invention relates to a method for constructing embankment using fluidized treated soil and an embankment structure.
Background Art
[0002] In railway embankment construction, there are many cases of construction in locations where sufficient construction space cannot be secured such as narrow areas leading to low work efficiency, or construction within limited time such as nighttime, and the demand for speeding up construction and saving labor is high.
[0003] In general embankment construction, compaction work of the embankment material is involved, but in narrow locations, construction is carried out using small construction machines or manual work, so labor saving is particularly required. In recent years, damage to railway soil structures caused by concentrated heavy rain has been increasing, and demand for early recovery in locations where heavy machinery and the like are difficult to carry in is also growing.
[0004] By the way, fluidized treated soil has high fluidity and filling properties during construction (at the time of placing), and has the property of solidifying afterwards, so the compaction work of embankment materials peculiar to soil structures becomes unnecessary, and speeding up and labor saving can be achieved compared with the case where conventional soil materials are used. For example, Patent Document 1 discloses an embankment construction method in which fluidized treated soil is placed in a dam body formed by filling a plurality of boxes or bags with filling material.
Prior Art Documents
Patent Documents
[0005]
Patent Document 1
Summary of the Invention
Problems to be Solved by the Invention
[0006] However, fluidized soil has the characteristic of deteriorating due to external factors such as water retention from rainwater or drying by the outside air. For example, in order to ensure the ability to support train loads over the long term as a railway embankment, measures are needed to protect it from these external factors and improve its durability. Also, in order to carry out construction in a short time, it is desirable to be able to pour the fluidized soil as high as possible in one go.
[0007] Therefore, the present invention aims to provide a method for constructing an embankment and an embankment structure that use fluidized soil, enable simple and rapid construction, and have durability against external factors such as water retention from rainwater and drying. [Means for solving the problem]
[0008] To achieve the above objective, the present invention provides a method for constructing an embankment using fluidized soil, comprising the steps of: placing a bag at a position that will be the outer edge of the embankment and filling the inside of the bag with a filling material to form a bag formwork; placing a bag-filled material, which is a perforated bag that allows fluidized soil to pass through and is filled with a filling material, on the embankment side of the bag formwork, regardless of the order in which the bag formwork is formed; installing an anchoring material having a protruding portion that can be attached to each, straddling the upper surfaces of the bag formwork and the bag-filled material; repeating the formation of the bag formwork, the placement of the bag-filled material, and the installation of the anchoring material a predetermined number of times in an upward direction; pouring fluidized soil into the space on the embankment side where the bag-filled material is placed; and covering the upper surface of the fluidized soil with a protective layer.
[0009] Here, the anchoring material can be configured to consist of a rod-shaped shaft and protrusions that project perpendicular to the axis at at least both ends of the shaft. Furthermore, the filling material is preferably gravel. In addition, the bagged material can be placed between the bag-shaped formwork frames that are spaced apart in the width direction of the embankment, and the fluidized soil can be poured between the bag-shaped formwork frames.
[0010] Furthermore, the invention of the embankment structure is an embankment structure using fluidized soil, characterized by comprising: a bag formwork in which a filling material is filled inside a bag body provided at a position that will be the outer edge of the embankment; a bag-filled material in which a filling material is filled inside a perforated bag body located on the interior side of the embankment from the bag formwork; an anchoring material installed with protrusions hooked onto the upper surfaces of the bag formwork and the bag-filled material, respectively; fluidized soil filled in the space in the interior of the embankment where the bag-filled material is located; and a protective layer covering the upper surface of the fluidized soil. [Effects of the Invention]
[0011] In the embankment construction method of the present invention configured as described above, first, a bag-shaped formwork is formed at the outer edge of the embankment, and the bag-filled material placed further inside the embankment is connected to it by anchoring material with protruding parts that act as hooks.
[0012] Therefore, the liquid pressure of the fluidized soil poured into the embankment inside the bag-shaped formwork can be resisted not only by the weight of the bag-shaped formwork itself, but also by the reaction force from the bagged material obtained through the anchoring material.
[0013] As a result, it becomes possible to place fluidized soil to a high position in one go, enabling simple and rapid construction of embankments. In addition, covering the surface of the fluidized soil with a bag-type formwork and protective layer improves its durability against external factors such as water retention from rainwater and drying.
[0014] Furthermore, in the invention of the embankment structure, a bag-shaped formwork installed at the outer edge of the embankment and the bag-filled material placed further inside the embankment are connected by an anchoring material with a protruding portion that acts as a catch.
[0015] If the bag-shaped formwork positioned on the outer edge of the embankment is supported by the filling material and the surrounding fluidized soil via anchoring material, then the embankment structure can be made equipped with a reaction force mechanism that resists the inertial forces acting on the bag-shaped formwork during an earthquake. [Brief explanation of the drawing]
[0016] [Figure 1] This is an explanatory view schematically showing the configuration of the embankment structure of the present embodiment. [Figure 2] This is a diagram for explaining the positional relationship among the bag-shaped formwork, the bagged material, and the anchoring material, wherein (a) is an explanatory view of a configuration in which protruding portions are provided only at both ends of the anchoring material, and (b) is an explanatory view of a configuration in which protruding portions are provided at both ends and the middle of the anchoring material. [Figure 3] This is a diagram illustrating the protruding portions of the anchoring material, wherein (a) is an explanatory view of a cross-shaped protruding portion, (b) is an explanatory view of an X-shaped protruding portion, and (c) is an explanatory view of a rectangular protruding portion. [Figure 4] This is an explanatory view schematically showing the step of arranging the bag-shaped formwork and the bagged material in the embankment construction method of the present embodiment. [Figure 5] This is an explanatory view showing the step of spanning the first-stage anchoring material. [Figure 6] This is an explanatory view showing the step of arranging the second-stage bag-shaped formwork and bagged material and spanning the anchoring material. [Figure 7] This is an explanatory view showing a state where a predetermined number of stages of the bag-shaped formwork, bagged material, and anchoring material are arranged. [Figure 8] This is an explanatory view showing a state where fluidized treated soil is placed. [Figure 9] This is an explanatory view showing a state where the topmost surface of the embankment is covered with a protective layer. [Mode for Carrying Out the Invention]
[0017] Hereinafter, embodiments of the present invention will be described with reference to the drawings. Figure 1 is an explanatory view schematically showing the configuration of the embankment structure of the present embodiment.
[0018] The embankment 1 in Figure 1 shows a cross section of a railway embankment that serves as the subgrade for a track on which trains and the like run, for example. The application of this embankment 1 is not limited to railway embankments, and may be a road embankment on which automobiles run, but it is constructed as a structure that can withstand repeated loading.
[0019] The embankment 1 of this embodiment comprises a bag-shaped formwork 2 provided at the outer edge, a bagged material 3 positioned inside the embankment beyond the bag-shaped formwork 2, a fixing material 5 positioned across the upper surfaces of the bag-shaped formwork 2 and the bagged material 3, a fluidized soil 4 filled inside the embankment, and a protective layer 6 covering the uppermost surface of the fluidized soil 4.
[0020] The bag-shaped formwork 2, positioned on the outer edge of the embankment 1, is formed into a rectangular parallelepiped, for example, by filling the inside of the bag with a filler material. The bag-shaped formwork 2 is made from a material such as synthetic fiber, which has excellent weather resistance and strength, and has an injection port for filling with a filler material such as concrete or fluidized soil.
[0021] Preferably, the bag before being filled with the filler material is of a weight and size that can be folded and transported or installed by hand. In short, if the empty bag is placed at the outer edge of the embankment 1 and then the filler material is filled through the injection port, there is no need to move the heavy bag formwork 2, and the bag formwork 2 can be installed quickly and easily at the predetermined location.
[0022] The bag-shaped formwork 2 is stacked up to the height of the embankment 1, excluding the protective layer 6. For example, by stacking 2 to 10 layers of bag-shaped formwork 2, each about 50 cm high, an embankment 1 with a height of 1 m to 5 m can be constructed.
[0023] The longitudinal dimensions of the bag-shaped formwork 2 (the direction perpendicular to the plane of the paper in Figure 1) are not particularly limited, but if it is a long shape positioned along the longitudinal direction of the embankment 1, it can be, for example, several meters to about 50 meters in length.
[0024] The bagged material 3 is formed by filling a perforated bag with a filling material. The perforated bag is a bag made of a net or the like that can allow the fluidized soil to pass through while preventing the filling material from flowing out. The perforated bag may be a mesh bag or a bag made of a sheet with many holes perforated in it.
[0025] For the filling material of bag 3, gravel materials such as crushed stone or boulders can be used. For example, coarse gravel with a particle size of 50 mm or more can be used as the filling material. When coarse gravel is filled into a perforated bag, highly fluid materials such as fluidized soil will permeate through the holes of the perforated bag and enter the interior, and then fill the voids between the coarse gravel.
[0026] Figure 2 is a schematic diagram illustrating the arrangement of the bag formwork 2, the bagging material 3, and the fixing material 5. The fixing material 5 comprises a rod-shaped shaft 51 and protruding portions 52 that project in a direction perpendicular to the axis at at least both ends of the shaft 51.
[0027] The axial member 51 of the anchoring material 5 is formed from a rigid axial force member such as deformed reinforcing bars or round steel bars. The protruding portion 52 only needs to be able to hook onto the bag formwork 2 and the bagged material 3, so it may be a shape that protrudes only downwards, for example. Figure 2(a) is an explanatory diagram of a configuration in which the anchoring material 5 has protruding portions 52 that protrude both upwards and downwards at both ends, as seen from the side. If the protruding portions 52 protrude both upwards and downwards, they can be hooked not only onto the lower bag formwork 2 and bagged material 3, but also onto the upper bag formwork 2 and bagged material 3 (see Figure 1).
[0028] On the other hand, Figure 2(b) is an explanatory diagram of a configuration in which the anchoring member 5 has protrusions 52 at both ends and in the middle. When multiple bagged materials 3 are arranged on the inside of the embankment of the bag-shaped formwork 2, protrusions 52 can also be provided at the middle of the shaft member 51 in order to ensure that each bagged material 3 is engaged with the shaft member 51.
[0029] Figure 3 illustrates an example of a protruding portion 52 of the fixing material 5. The protruding portion 52 only needs to protrude upward or downward in the direction perpendicular to the axis of the shaft material 51, and various shapes can be applied.
[0030] Figure 3(a) is an explanatory diagram of the cross-shaped projection 52A. This projection 52A has rod-shaped projections extending straight up and straight down, as well as projections extending to the left and right. In Figure 3(a), the left and right projections do not appear to be catching on the bagged material 3, but when the freely deformable bagged material 3 is stacked, they function as catches.
[0031] Figure 3(b) is an explanatory diagram of the X-shaped projection 52B. This projection 52B is arranged by rotating the projection 52A in Figure 3(a) by 45° around the shaft member 51, which ensures a more reliable engagement with the bagging material 3 positioned above and below it.
[0032] Figure 3(c) is an explanatory diagram of a square (rectangular) projection 52C. The projection 52C may be a surface material such as a plate, and its shape can be arbitrarily selected, such as a vertically elongated rectangle, ellipse, or circle.
[0033] The fluidized soil 4 that fills the space where the bagged material 3 is placed can be a general type made by mixing construction waste soil with a solidifying agent such as water or cement. When a protective layer 6 is provided on the embankment 1 using the fluidized soil, if the unconfined compressive strength of the fluidized soil is set to about 600 kPa or more, an embankment structure that can withstand the repeated action of train loads can be created. For example, in the embankment 1 of this embodiment, fluidized soil 4 with a mix that has a 28-day strength of 1200 kPa is used.
[0034] The protective layer 6 covering the top surface of the fluidized soil 4 is not particularly limited as long as it can suppress the deterioration of the fluidized soil 4. In the case of railway embankments, the protective layer 6 can also be made of graded crushed stone that is laid as a roadbed on the top surface of the roadbed.
[0035] Furthermore, the protective layer 6 can also be formed by layering two layers with different water permeability. For example, the lower layer directly above the fluidized soil 4 can be made of a highly permeable material, such as a coarse gravel layer, and the upper layer can be made of a fine-grained sand layer. By lowering the water permeability of the upper layer in this way, drainage is promoted in the upper layer and at the boundary between the upper and lower layers, preventing rainwater from soaking into the fluidized soil 4 through the lower layer. The total thickness of the protective layer 6 can be, for example, about 30 cm.
[0036] By providing a protective layer 6, it is possible to prevent excessive drying of the fluidized soil 4 and to distribute the load of trains, etc. The protective layer 6 is provided in an area that covers at least the uppermost surface of the fluidized soil 4, and may also cover the uppermost surface of the bag-shaped formwork 2 as shown in Figure 1.
[0037] Next, the steps of the embankment construction method according to this embodiment will be explained with reference to Figures 4-9. First, in the initial step, as shown in Figure 4, the first layer of the bag mold 2 is formed and the first layer of the bag material 3 is placed. The formation of the bag mold 2 and the placement of the bag material 3 can be done in either order or in parallel.
[0038] To explain the formation of the first stage of the bag-shaped formwork 2, first, empty bags are placed at the position that will become the outer edge of the embankment 1. For example, folded bags are carried by hand and placed at the positions that will become both sides of the embankment 1. Then, a filler material such as fluidized soil or mortar is filled into the inside of the bag through the injection port, causing it to expand into a rectangular parallelepiped shape.
[0039] On the other hand, the first layer of bagged material 3 is placed between the bag-shaped formwork 2, which are formed at intervals in the width direction of the embankment (on the inside side of the embankment). The bagged material 3 can be manufactured in advance to a weight that can be transported by hand. This reduces the working time at the embankment construction site.
[0040] After the first layer of bag-shaped formwork 2 and bagged material 3 is placed, the anchoring material 5 is installed so as to straddle the upper surface of them. The anchoring material 5 is installed at intervals in the direction of extension of the embankment 1. Since the shaft portion of the anchoring material 5 rests on top of the bag-shaped formwork 2 and bagged material 3, it can be installed stably simply by placing it down.
[0041] Since protrusions 52 are formed at least at both ends of the shaft member 51 of the fixing material 5, one protrusion 52 is brought into contact with the outer surface of the bag formwork 2, and the other protrusion 52 is brought into contact with the end of the bagged material 3, etc. (see Figure 2(a)).
[0042] Next, as shown in Figure 6, the second-stage bag formwork 2 is formed, the bag filling material 3 is placed, and the fixing material 5 is installed. Similar to the first stage, the folded bags for the second-stage bag formwork 2 are carried manually and placed on top of the first-stage bag formwork 2, and the filling material is filled inside the bags to expand them into a rectangular parallelepiped shape.
[0043] Furthermore, the second layer of bagged material 3, which is positioned inside the embankment beyond the bag-shaped formwork 2, is placed on top of the first layer of anchoring material 5. As a result, the first layer of anchoring material 5, sandwiched between the upper and lower layers of bagged material 3, becomes fixed in place. Here, the portion of the first layer of anchoring material 5 that protrudes above the protruding portion 52 comes into contact with the second layer of bag-shaped formwork 2 and the bagged material 3, respectively.
[0044] Then, after the second-stage bag formwork 2 and the bagging material 3 are placed, the second-stage fixing material 5 is installed so as to straddle the upper surface of them. The protruding parts 52 at both ends of the second-stage fixing material 5 are also brought into contact with the outer surface of the second-stage bag formwork 2 and the ends of the bagging material 3.
[0045] Figure 7 shows the state after the formation of the bag formwork 2, placement of the bag material 3, and installation of the fixing material 5 have been repeated up to the sixth stage, which is the predetermined number of times in this example, and then the formation of the seventh stage of the bag formwork 2 has been completed. For the top stage, in order to ensure the flatness of the top surface of the fluidized soil 4, the placement of the bag material 3 and installation of the fixing material 5 are not performed.
[0046] In the next step, fluidized soil 4 is poured into the space where the bagged material 3 is stacked on the inside of the embankment. Figure 8 is an explanatory diagram showing the state after the fluidized soil 4 has been poured. In other words, in the embankment construction method of this embodiment, instead of pouring the fluidized soil 4 into each layer of the bag formwork 2, the fluidized soil 4 can be poured all at once into the inside of the bag formwork 2 that is stacked in multiple layers.
[0047] The fluidized soil 4 is a fluid before it solidifies, and the resulting liquid pressure acts as lateral pressure from the inside of the bag-shaped formwork 2. This lateral pressure increases downwards as the height of the stacked bag-shaped formwork 2 increases, but the anchoring material 5 installed at each level can resist this lateral pressure.
[0048] In other words, while the weight of the bag-type formwork 2 can resist the lateral pressure when the fluidized soil 4 is placed, the presence of the anchoring material 5, whose protruding portion 52 is hooked onto the bag-filled material 3, contributes to resistance against the outward movement of the bag-type formwork 2.
[0049] The fluidized soil 4, placed between multiple layers of bag-shaped formwork 2 that are spaced apart in the width direction of the embankment, fills the spaces between the stacked bagged materials 3, and also permeates into the interior of the bagged materials 3 through the holes in the perforated bags, filling the voids in the filling material.
[0050] In the next step, the uppermost surface of the fluidized soil 4 is covered with a protective layer 6. Figure 9 is an explanatory diagram showing the state in which the uppermost surface of the embankment 1 is covered with the protective layer 6. The protective layer 6 is provided so as to cover not only the uppermost surface of the fluidized soil 4 but also the uppermost surface of the bag-shaped formwork 2.
[0051] Next, the method for constructing the embankment according to this embodiment, and the operation of the embankment structure constructed thereby will be described.
[0052] In this embodiment of the embankment construction method, a bag-shaped formwork 2 is first formed at the outer edge of the embankment 1, and the bag-filled material 3, which is positioned further inside the embankment, is connected to it by an anchoring material 5 with a protruding portion 52 that acts as a hook.
[0053] Therefore, the liquid pressure of the fluidized soil 4 poured into the embankment inside the bag-shaped formwork 2 can be resisted not only by the weight of the bag-shaped formwork 2 itself, but also by the reaction force from the bagged material 3 obtained via the anchoring material 5.
[0054] As a result, it becomes possible to continuously pour the fluidized soil 4 to a high position in one go, enabling simple and rapid construction of embankments. In railway embankment construction, work is often carried out in narrow areas or other places where work efficiency is low, or during limited hours such as at night, but the embankment construction method of this embodiment can contribute to accelerating and saving labor in construction.
[0055] Furthermore, since the bagged material 3, which is placed on the inside of the embankment side of the bag-shaped formwork 2, can be manufactured in advance at a work yard adjacent to the embankment construction site, it becomes possible to shorten the working time at the embankment construction site. In railway construction, work is often carried out in short intervals of a few hours at night, and this makes it possible to construct the embankment 1 efficiently even in such short construction time.
[0056] Furthermore, in the embankment structure constructed in this manner, the bag-shaped formwork 2, which is located at the outer edge of the embankment 1, and the bag-filled material 3, which is located further inside the embankment, are connected by anchoring material 5, the protruding portion 52 of which acts as a hook.
[0057] In this way, if the bag-shaped formwork 2, positioned on the outer edge of the embankment 1, is supported by the bag-filling material 3 and the surrounding fluidized soil 4 via the anchoring material 5, it can not only resist the lateral pressure of the fluidized soil 4 during construction, but also serve as a reaction force mechanism that resists the inertial force acting on the bag-shaped formwork 2 during an earthquake after construction.
[0058] Furthermore, by covering the sides and top surface of the fluidized soil 4 with the bag-shaped formwork 2 and protective layer 6, contact with external factors such as water retention from rainwater and drying is reduced, resulting in a durable embankment 1.
[0059] While embodiments of the present invention have been described in detail above with reference to the drawings, the specific configuration is not limited to these embodiments, and any design modifications that do not depart from the spirit of the present invention are included in the present invention.
[0060] For example, the above embodiment was described using the case of constructing a new embankment 1 as an example, but it is not limited to this. For example, the present invention can also be applied to the restoration of the slope on the collapsed side when the slope of an embankment collapses due to an earthquake or heavy rain. [Explanation of Symbols]
[0061] 1: Embankment 2: Bag-shaped frame 3: Packaging material 4: Fluidized soil 5: Fixing agent 51: Shaft material 52,52A-52C: Protrusion 6:Protective layer
Claims
1. A method for constructing an embankment using fluidized soil, The process involves placing a bag at the outer edge of the embankment and filling the inside of the bag with a filling material to form a bag formwork, Regardless of the order in which the bag formwork is formed, the process involves placing a bag-filled material, which is a perforated bag through which the fluidized soil can pass, filled with gravel as the filling material, on the inside of the embankment side of the bag formwork, A step of installing a steel fixing member having a protruding portion that can be secured to catch on, spanning across the upper surface of the bag formwork and the bagging material, The process of forming the bag formwork, arranging the bagging material, and installing the fixing material is repeated upwards for a predetermined number of times. The process involves pouring fluidized soil into the space on the inside of the embankment where the bagged material is placed, A method for constructing an embankment, characterized by comprising the step of covering the upper surface of the fluidized soil with a protective layer.
2. The method for constructing an embankment according to claim 1, characterized in that the anchoring material is formed by a rod-shaped shaft made of deformed reinforcing bars or round steel, and protruding portions that protrude in a direction perpendicular to the axis at at least both ends of the shaft.
3. The method for constructing an embankment according to claim 1 or 2, characterized in that the bagged material is placed between the bag-shaped formwork frames that are formed at intervals in the width direction of the embankment, and the fluidized soil is poured between the bag-shaped formwork frames.
4. An embankment structure using fluidized soil, A bag-shaped formwork, in which a filling material is filled inside a bag-shaped body, is installed at the outer edge of the embankment, A bagged material is a perforated bag placed on the interior side of the embankment from the aforementioned bag-shaped formwork, in which gravel material is filled as a filling material, A steel fixing member is installed across the upper surface of the bag formwork and the bagging material, with its protruding portion hooked onto each. The fluidized soil is filled into the space on the inside of the embankment where the bagged material is placed, An embankment structure characterized by comprising a protective layer that covers the upper surface of the fluidized soil.
5. The embankment structure according to claim 4, characterized in that the anchoring material is formed by a rod-shaped shaft made of deformed reinforcing bars or round steel, and protruding portions that protrude in a direction perpendicular to the axis at at least both ends of the shaft.
Citation Information
Patent Citations
Lightweight civil engineering method
JP1990229316A
Construction method for wall face material
JP1994220860A
Ground stabilizing construction method
JP2000273870A
Fill and construction method therefor
JP2002021083A
Reinforcing soil structure and wall surface block
JP2004060220A