Installation support device and installation support method

The mounting support device optimizes path planning and component recognition in component mounting machines using bulk feeders, reducing travel distance and improving efficiency in the picking and mounting cycles.

JP7954295B2Active Publication Date: 2026-11-19FUJI CORP
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
JP2025527204
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Filing Date
2023-06-16
Publication Date
2026-11-19
Estimated Expiration
2043-06-16

AI Technical Summary

Technical Problem

Existing component mounting machines using bulk feeders face inefficiencies in the picking and mounting cycles due to the need for improved path planning and component recognition, leading to increased travel distances and processing times.

Method used

A mounting support device and method that includes a path search unit and path setting unit to optimize the movement path of the mounting head based on cavity information, using image processing to recognize component supply states and adjust the path pattern for efficient component picking and mounting.

Benefits of technology

Reduces the travel distance of the mounting head, thereby enhancing the efficiency of the sampling and mounting processes by optimizing path planning and component recognition.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007954295000001
    Figure 0007954295000001
  • Figure 0007954295000002
    Figure 0007954295000002
  • Figure 0007954295000003
    Figure 0007954295000003
Patent Text Reader

Abstract

This mounting assistance device is applied to a component mounting machine that executes a picking cycle for moving a mounting head to sequentially pick components accommodated in a plurality of cavities, and a mounting cycle for sequentially mounting a plurality of components onto a substrate. The mounting assistance device comprises: a route searching unit that searches for route patterns which are candidates for a movement path of the mounting head in the picking cycle, on the basis of accommodation information indicating the positions of a plurality of cavities which are among the plurality of cavities and which accommodate components capable of being picked; and a route setting unit that sets the sets, as the movement path, a route pattern selected on the basis of the movement distance of the mounting head calculated for each of the plurality of route patterns.
Need to check novelty before this filing date? Find Prior Art

Description

TECHNICAL FIELD

[0001] The present invention relates to a mounting support device and a mounting support method.

BACKGROUND ART

[0002] The mounting support device supports mounting processing by a component mounting machine using a bulk feeder. The bulk feeder is installed in the component mounting machine that mounts components on a substrate, and supplies components in a bulk state (see Patent Document 1). In the mounting process, the component mounting machine executes a picking cycle in which a mounting head is moved to sequentially pick components accommodated in a plurality of cavities, and a mounting cycle in which the plurality of components are sequentially mounted on the substrate.

PRIOR ART DOCUMENTS

PATENT DOCUMENTS

[0003]

PATENT DOCUMENT 1

SUMMARY OF THE INVENTION

PROBLEMS TO BE SOLVED BY THE INVENTION

[0004] Here, in the mounting process, the component mounting machine executes image processing for recognizing the component supply state by the bulk feeder, and controls the component suction operation using the suction nozzle based on the result of the image processing. For the component mounting machine, reduction of the time required for the mounting process is desired.

[0005] The present specification aims to provide a mounting support device and a mounting support method that support mounting processing by improving the efficiency of the picking cycle in accordance with the component supply state by the bulk feeder.

MEANS FOR SOLVING THE PROBLEMS

[0006] This specification discloses a component mounting machine that performs a sampling cycle in which a mounting head is moved to sequentially pick up components housed in a plurality of cavities, and a mounting cycle in which a plurality of the components are sequentially mounted onto a substrate. The mounting support device comprises: a path search unit that searches for a path pattern which is a candidate for the movement path of the mounting head in the sampling cycle, based on housing information indicating the positions of a plurality of cavities that can accommodate the components for sampling; and a path setting unit that sets the path pattern selected based on the movement distance of the mounting head calculated for each of the plurality of path patterns as the movement path.

[0007] This specification discloses a mounting support method applicable to a component mounting machine that performs a sampling cycle in which a mounting head is moved to sequentially pick up components housed in a plurality of cavities, and a mounting cycle in which a plurality of the components are sequentially mounted onto a substrate. The method comprises: a path search step of searching for a path pattern that is a candidate for the movement path of the mounting head in the sampling cycle, based on housing information indicating the positions of a plurality of cavities that can accommodate the components for sampling; and a path setting step of setting the path pattern selected based on the movement distance of the mounting head calculated for each of the plurality of path patterns as the movement path.

[0008] This specification also discloses the technical idea of ​​changing "the mounting support device described in claim 1 or 2" in claim 4 of the original application to "the mounting support device described in any one of claims 1 to 3," and the technical idea of ​​changing "the mounting support device described in claim 1 or 2" in claim 5 of the original application to "the mounting support device described in any one of claims 1 to 4." Furthermore, this specification also discloses the technical idea of ​​changing "the mounting support device described in claim 5" in claim 7 of the original application to "the mounting support device described in claim 5 or 6," and the technical idea of ​​changing "the mounting support device described in claim 1 or 2" in claim 8 of the original application to "the mounting support device described in any one of claims 1 to 7." Furthermore, this specification also discloses the technical idea behind changing "the mounting support device described in claim 1 or 2" in the original claim 9 to "the mounting support device described in any one of claims 1 to 8," and the technical idea behind changing "the mounting support device described in claim 1 or 2" in the original claim 11 to "the mounting support device described in any one of claims 1 to 10." [Effects of the Invention]

[0009] This configuration allows for a reduction in the travel distance of the attachment head during the sampling cycle, thereby improving the efficiency of both the sampling cycle and the attachment process. [Brief explanation of the drawing]

[0010] [Figure 1] This is a schematic plan view of a parts mounting machine. [Figure 2] This is a schematic side view showing a portion of the bulk feeder, including the supply area. [Figure 3] This is a plan view from direction III in Figure 2. [Figure 4] This is a block diagram showing a parts mounting machine to which a mounting support device has been applied. [Figure 5] The flowchart also shows the mounting process performed by the parts mounting machine. [Figure 6] This is a flowchart showing the process for recognizing the supply status. [Figure 7A]This figure shows image data captured from the supply area. [Figure 7B] This figure shows the result of the supply status recognition process. [Figure 8] This is a flowchart showing the process for setting the travel route. [Figure 9A] This figure shows the movement path and initial solution before the change. [Figure 9B] This diagram shows travel paths set based on route patterns. [Figure 10] This graph shows the travel distances for the initial travel path, the set travel path, and the conditionally set travel path. [Figure 11] This diagram shows the groups categorized based on the results of the supply status recognition process. [Modes for carrying out the invention]

[0011] 1. Overview of the mounting support device 50 The mounting support device 50 assists the mounting process performed by the parts mounting machine 10 using the bulk feeder 30. In this embodiment, the mounting support device 50 is incorporated into the control device 20 of the parts mounting machine 10. The mounting support device 50 aims to improve the efficiency of the sampling cycle according to the supply status of the parts supplied by the bulk feeder 30.

[0012] The component mounting machine 10 performs the mounting process of attaching components to the substrate 91 as a predetermined substrate operation. The component mounting machine 10 is installed in the transport direction of the substrate 91 together with other substrate operation machines to form a production line. Each of the multiple substrate operation machines is communicated to a host computer 60 (see Figure 4) that controls the production line as a whole. The production line includes, for example, a printing press, a component mounting machine 10, a reflow oven, and an inspection machine as multiple substrate operation machines.

[0013] 2. Configuration of the parts mounting machine 10 2-1. Substrate transport device 11 As shown in FIG. 1, the component mounting machine 10 includes a substrate transfer device 11. The substrate transfer device 11 sequentially transfers the substrate 91 in the transfer direction, and positions the substrate 91 at a predetermined position inside the machine.

[0014] 2-2. Component supply device 12 The component mounting machine 10 includes the component supply device 12. The component supply device 12 supplies components to be mounted on the substrate 91. In the component supply device 12, feeders 122 are respectively set in a plurality of slots 121. As the feeder 122, for example, a tape feeder that feeds and moves a carrier tape storing a large number of components to supply the components in a pickable manner is applied. Further, as the feeder 122, a bulk feeder 30 that supplies components stored in a bulk state in a pickable manner is applied. Details of the bulk feeder 30 will be described later.

[0015] 2-3. Component transfer device 13 The component mounting machine 10 includes the component transfer device 13. The component transfer device 13 transfers the components supplied by the component supply device 12 to predetermined mounting positions on the substrate 91. The component transfer device 13 includes a head drive device 131, a moving table 132, a mounting head 133, and a suction nozzle 134. The head drive device 131 moves the moving table 132 in the horizontal direction (X direction and Y direction) by a linear motion mechanism. The mounting head 133 is detachably fixed to the moving table 132 by a clamp member (not shown), and is provided so as to be movable in the horizontal direction inside the machine.

[0016] The mounting head 133 supports a plurality of suction nozzles 134 in a rotatable and elevatable manner. The suction nozzle 134 is a holding member that picks and holds the component supplied by the feeder 122. The suction nozzle 134 sucks the component supplied by the feeder 122 by supplied negative pressure air. As the holding member attached to the mounting head 133, a chuck or the like that holds a component by gripping it can be adopted.

[0017] 2-4. Component camera 14, substrate camera 15 The component mounting machine 10 includes a component camera 14 and a substrate camera 15. The component camera 14 and the substrate camera 15 are digital imaging devices having an image sensor such as a CMOS. The component camera 14 and the substrate camera 15 perform imaging based on control signals and transmit the image data acquired by the imaging. The component camera 14 is configured to be able to image components held by the suction nozzle 134 from below. The substrate camera 15 is mounted on a movable table 132 so as to be able to move horizontally integrally with the mounting head 133. The substrate camera 15 is configured to be able to image the substrate 91 from above.

[0018] Furthermore, in addition to imaging the surface of the substrate 91, the substrate camera 15 can also image various devices and other objects as long as they are within the movable range of the mobile platform 132. For example, in this embodiment, as shown in Figure 3, the substrate camera 15 can capture images of the supply area As where the bulk feeder 30 supplies components and the reference mark 49 provided on the upper part of the bulk feeder 30 within its camera field of view. In this way, the substrate camera 15 can be used to image different objects in order to acquire image data that can be used for various image processing tasks.

[0019] 2-5. Control device 20 The component mounting machine 10 includes a control device 20. The control device 20 mainly consists of a CPU, various memories, and control circuits. As shown in Figure 4, the control device 20 includes a storage unit 21. The storage unit 21 consists of a storage device such as a hard disk drive or flash memory. The storage unit 21 of the control device 20 stores various data such as a control program M1 used to control the mounting process, component data M2, cavity information M3, and storage information M4.

[0020] The control program M1 indicates the mounting position, mounting angle, and type of components to be mounted on the substrate 91 in the planned mounting order during the mounting process. Here, the mounting process includes a process that repeats a PP cycle (pick and place cycle), which includes a picking cycle and a mounting cycle, multiple times. The "picking cycle" mentioned above is a process that repeats the picking operation, in which components supplied by the component supply device 12 are picked up by the suction nozzle 134, multiple times.

[0021] In this case, the parts to be collected during the collection cycle may be supplied by the bulk feeder 30. If cavities 45 (see Figure 3) for individually housing parts are formed in the supply area As of the bulk feeder 30, the collection cycle will consist of moving the mounting head 133 to sequentially collect the parts housed in multiple cavities 45.

[0022] Furthermore, the "mounting cycle" described above is the process of sequentially mounting the collected components onto the substrate 91. More specifically, it is the process of repeatedly performing a mounting operation to mount the components at predetermined mounting positions on the substrate 91 at predetermined mounting angles. Thus, the control program M1 has a pre-set execution order for the PP cycle, which consists of multiple grouped sampling and mounting operations, taking into account the number of suction nozzles 134 supported by the mounting head 133 and the travel distance of the mounting head 133.

[0023] The part data M2 contains shape data for each type of part. The "shape data" mentioned above includes at least one of the part's outer edge shape, the shape of the part's characteristic parts, and the part's dimensions. The "outer edge shape" of a part corresponds to the shape of the outer edge when the inside of the part is separated from the background using the outer edge as the boundary.

[0024] The "shape of the characteristic part" of a component refers to the boundary shape of the external characteristic part resulting from the shape, pattern, color, etc., of the component. Examples of characteristic parts of a component include corners, bumps, terminals, and leads. In addition to shape data, component data M2 may also include, for example, the maximum allowable travel speed (acceleration) for each component and the sampling position (e.g., the position where it contacts the suction nozzle 134).

[0025] Cavity information M3 is information about the cavities 45 formed in the supply area As of the bulk feeder 30, associated with the identification information (ID) of the bulk feeder 30. Cavity information M3 may include the shape (including the length and depth of each side), position, orientation, and type of corresponding part of the cavity 45 in the supply area As. Storage information M4 is information indicating the positions of multiple cavities 45 that can accommodate parts from among the multiple cavities 45. Details of storage information M4 will be described later.

[0026] The control device 20 performs recognition processing of the holding state of the parts held by each of the multiple holding members (suction nozzles 134). Specifically, the control device 20 processes the image data acquired by the part camera 14 to recognize the position and angle of each part with respect to the reference position of the mounting head 133. In addition to the part camera 14, the control device 20 may also process image data acquired by, for example, a head camera unit integrally provided with the mounting head 133, which images the parts from the side, below, or above.

[0027] During the mounting process, the control device 20 controls the mounting operation by the mounting head 133 so that the component is mounted on the substrate 91 in a predetermined orientation. At this time, the control device 20 controls the mounting operation based on the recognized holding state of the component. In other words, the control device 20 corrects the position of the mounting head 133 and the angle of the suction nozzle 134 around the Q-axis to correct any positional and angular deviations of the component held by the suction nozzle 134 with respect to the Q-axis (the rotation axis of the suction nozzle 134). As a result, the component held by the suction nozzle 134 is mounted at a predetermined mounting position and angle as instructed by the control program M1.

[0028] 3. Configuration of Bulk Feeder 30 The bulk feeder 30 is set in the parts mounting machine 10 and functions as part of the parts supply device 12. The bulk feeder 30 supplies parts contained in parts cases in a bulk state (a loose state with each part in an irregular orientation) that is not packaged like a carrier tape. Therefore, unlike a tape feeder, the bulk feeder 30 does not use a carrier tape, which has the advantage of eliminating the need to load a carrier tape and collect used tapes.

[0029] One type of bulk feeder 30 supplies parts in an irregular orientation to a planar supply area As. However, if the parts are so close together in the supply area As that they are touching each other, or if they are piled up (overlapping vertically), or if they are in a horizontal orientation with their width direction being vertical, the parts mounting machine 10 cannot pick up these parts. Therefore, in order to increase the proportion of parts that can be picked up, there is a type of bulk feeder 30 that supplies parts in an aligned state in the supply area As. In this embodiment, a bulk feeder 30 of the type that aligns parts will be described as an example.

[0030] The bulk feeder 30 has a track unit 40 that is vibratable and detachable from the feeder body 31, which is formed in a flat, box shape. The front part of the feeder body 31 (the right end in Figure 2) is provided with a connector 311 and two positioning pins 312. When the feeder body 31 is set in the slot 121 of the parts supply device 12, it is powered via the connector 311 and becomes capable of communicating with the control device 20 of the parts mounting machine 10.

[0031] The track unit 40 is subjected to vibration by the vibration exciter 35. The track unit 40 forms a transport path R through which multiple parts are transported, and a supply area As that communicates with the transport path R and opens upward to allow for the collection of multiple parts. The track unit 40 is formed to extend in the front-rear direction (left-right direction in Figure 3) of the feeder body 31. A pair of side walls 46 projecting upward are formed on both edges of the track unit 40 in the width direction (up-down direction in Figure 3). The pair of side walls 46, together with the tip portion 47 of the track unit 40, surround the periphery of the transport path R and are wall members that prevent leakage of parts being transported along the transport path R.

[0032] As shown in Figure 3, a plurality of cavities 45 are formed in the supply area As of the track unit 40. Each of the plurality of cavities 45 opens upward and accommodates the part in a position where the thickness direction of the part is in the vertical direction. In this embodiment, the plurality of cavities 45 are arranged in a staggered pattern. Here, the "supply area As" of the track unit 40 is the area where parts are supplied in bulk and where parts can be picked up by the suction nozzle 134 supported by the mounting head 133. The "transport path R" of the track unit 40 is the path through which parts that have flowed from the part case side to the track unit 40 are transported to the supply area As.

[0033] Furthermore, the vibration device 35 applies vibration to the track unit 40 so that multiple parts are transported along the transport path R. When the track unit 40 vibrates, an external force is applied to the parts from the front and up, or from the back and up. As a result, multiple parts are transported to the front side or the rear side of the track unit 40. The bulk feeder 30 transports the parts by controlling the operation of the vibration device 35 with the feeder control device 36 and performs the operation of supplying parts to the supply area As. As the parts are contained in the multiple cavities 45 by the supply operation, the suction nozzle 134 becomes ready to pick up the parts.

[0034] A shutter 48 capable of closing the opening of the supply area As is provided on the upper part of the track unit 40. When the track unit 40 is attached to the feeder body 31, the shutter 48 is controlled to open and close by a shutter drive device (not shown). The bulk feeder 30 can prevent parts from flying out and foreign matter from entering the supply area As by opening and closing the shutter 48.

[0035] 4. Mounting process by component mounting machine 10 The mounting process by the component mounting machine 10 will be explained with reference to Figure 5. Here, it is assumed that a bulk feeder 30 is set in the component supply device 12. In the mounting process, first, the substrate transport device 11 of the component mounting machine 10 performs the substrate loading process (S11) as shown in Figure 5. As a result, the substrate 91 is loaded into the machine and positioned in a predetermined position inside the machine.

[0036] In parallel with the mounting process, the bulk feeder 30 will supply parts at a predetermined timing. After this parts supply operation is completed, a process will be executed to recognize the supply status of parts in the supply area As. Details of the supply status recognition process will be described later.

[0037] Next, the control device 20 executes a PP cycle. In the PP cycle, the control device 20 executes a sampling cycle in which sampling operations are repeated to pick up parts using a plurality of suction nozzles 134 (S12). At this time, the control device 20 controls the operation of the mounting head 133 in the sampling operation so as to sequentially position the mounting head 133 according to the position of the parts that can be picked up.

[0038] Furthermore, when the bulk feeder 30 is supplying the parts to be sampled, the control device 20 appropriately switches between the coordinate value of the center of the cavity 45 or the coordinate value of the reference position of the part as the position of the part that can be sampled, and positions the suction nozzle 134. The movement path of the mounting head 133 in the sampling cycle (S12) is set by the mounting support device 50. Details of the movement path setting process will be described later.

[0039] Next, the control device 20 performs a recognition process for the holding state of the parts held by each of the multiple suction nozzles 134 (S13). Specifically, the control device 20 moves the mounting head 133 above the part camera 14 and sends an imaging command to the part camera 14. The control device 20 processes the image data acquired by the part camera 14 to recognize the orientation (position and angle) of the parts held by each of the multiple suction nozzles 134.

[0040] Subsequently, the control device 20 executes a mounting cycle (S14) in which it repeatedly performs mounting operations to attach parts using multiple suction nozzles 134. During this mounting cycle (S14), the control device 20 controls the operation of the mounting head 133 to attach each part to the mounting position specified in the control program. Furthermore, the control device 20 controls the operation of the mounting head 133 so that the suction nozzles 134 are positioned and angled relative to the mounting position based on the results of the recognition process (S13).

[0041] The control device 20 determines, based on the control program, whether all PP cycles have been completed (S15). If all PP cycles have not been completed (S15: No), the PP cycles (S12-S14) are executed. If all PP cycles have been completed (S15: Yes), the control device 20 executes the substrate 91 unloading process (S16). In the substrate 91 unloading process, the substrate transport device 11 unclams the positioned substrate 91 and unloads the substrate 91 from the component mounting machine 10.

[0042] 5. Configuration of the mounting support device 50 The configuration of the mounting support device 50 will be explained with reference to Figures 4, 6-11. The mounting support device 50 assists the sampling cycle performed by the control device 20 of the component mounting machine 10 during the mounting process. In a sampling cycle that includes components supplied by the bulk feeder 30 as the sampling target, image processing is performed first to recognize the supply status of components by the bulk feeder 30, and the sampling operation of components using the suction nozzle 134 is controlled based on the results of this image processing.

[0043] Here, when the bulk feeder 30 processes the supply of parts to the supply area As, it is not guaranteed that parts will be contained in all cavities 45 in a way that allows for collection. Therefore, in the above-mentioned supply state recognition process, the movement path of the mounting head 133 is set so that the cavities 45 containing parts in a way that allows for collection are recognized, and the suction nozzles 134 are sequentially positioned to those cavities 45.

[0044] In this embodiment, the multiple cavities 45 are arranged in a row of cavities 45, each arranged along a first direction (X direction in this embodiment), in a second direction (Y direction in this embodiment) that intersects the X direction. As for the movement path, first, the starting position for the sampling operation is set to the cavity 45 located at one end in the X direction of the cavity row closest to the substrate 91, and moving toward the other end in the X direction, where the first cavity 45 from which a component can be sampled is located. Then, a meandering movement path can be set to move from the starting position cavity 45 to the other end in the X direction, then move to the adjacent cavity row in the Y direction, and then move toward the one end in the X direction (see Figure 9A).

[0045] The above-described movement path can be said to be efficient when the multiple cavities 45 that can accommodate parts are evenly distributed. However, in reality, the multiple cavities 45 that can accommodate parts may be concentrated in the supply area As, and there may be a more efficient movement path than the above-described method of setting the movement path. Therefore, the mounting support device 50 adopts a configuration that supports the mounting process by improving the efficiency of the sampling cycle according to the supply status of parts by the bulk feeder 30.

[0046] In this embodiment, the mounting support device 50 includes a state recognition unit 51, a path search unit 52, and a path setting unit 53, as shown in Figure 4. The state recognition unit 51 performs a supply state recognition process (S20) as shown in Figure 6. The path search unit 52 and the path setting unit 53 perform a movement path setting process (S30) as shown in Figure 8. The control device 20 controls the operation of the mounting head 133 in the sampling cycle according to the movement path set by the setting process.

[0047] 5-1. State recognition unit 51 The state recognition unit 51 processes image data D1 (see Figure 7A) acquired by imaging the supply area As of the bulk feeder in which multiple cavities 45 are formed, to recognize the supply status of the parts 92 in the supply area As and generate storage information M4. The supply status of the parts 92 includes the determination result of whether or not the parts 92 supplied to the supply area As of the bulk feeder 30 are suitable for the part picking operation by the part mounting machine 10.

[0048] More specifically, as shown in Figure 6, the state recognition unit 51 acquires image data D1 by imaging with a camera (in this embodiment, a substrate camera 15) (S21). The supply area As contains a large number of bulk components 92, some of which may be housed in the cavity 45 in a normal orientation, some outside the cavity 45, some in contact with or piled up on each other, and some in a horizontal orientation.

[0049] Next, the state recognition unit 51 processes the image data D1 to perform recognition processing of the component 92 within the image data D1 (S22). More specifically, the state recognition unit 51 recognizes the component 92 included in the image data D1 by, for example, blob analysis. The state recognition unit 51 binarizes the image data D1 using a predetermined threshold to generate a blob. The state recognition unit 51 recognizes the component 92 based on the size and shape of the generated blob and the component data M2.

[0050] Next, the state recognition unit 51 performs a determination process to determine whether the recognized part 92 can be picked up (S23). In other words, this determination process determines whether the recognized part 92 is suitable for pickup by the part mounting machine 10. That is, even if a part 92 is located in the supply area As, if it is not housed in the cavity 45 or is in contact with other parts 92, it is determined that it cannot be picked up (unsuitable for pickup).

[0051] The state recognition unit 51 records the recognition result of the supply state as storage information M4 (S24). In this embodiment, the state recognition unit 51 determines the state for each of the multiple cavities 45. As a result, the multiple cavities 45 are classified into storage cavities that can accommodate parts 92 in a way that allows them to be collected (shown with diagonal lines in Figure 7B, "OK"), NG cavities where parts 92 are present around them but cannot be collected (shown with X marks connecting diagonal lines in Figure 7B, "NG"), and empty cavities where no parts 92 are present around them (shown with dashed lines in Figure 7B, "EMP"). The state recognition unit 51 calculates the number (V1, V2, V3) of each state (OK, NG, EMP) for the multiple cavities 45.

[0052] This storage information M4 indicates the positions of multiple cavities 45 that can accommodate parts for collection. In addition, the state recognition unit 51 recognizes the position and angle of a part if there is a part suitable for collection during the supply state recognition process. Thus, in addition to the state of each cavity 45 (OK, NG, EMP), the storage information M4 records the position of the collectible part in the cavity 45 (e.g., the center coordinates of the part) and the angle (e.g., the inclination angle relative to the reference angle of the cavity 45).

[0053] The above-mentioned supply status recognition process (S20) is performed after the bulk feeder 30 has performed the supply operation of the component 92. The status recognition unit 51 can perform the recognition process in parallel with, for example, the substrate loading process (S11) or the PP cycle to generate storage information M4. The storage information M4 is updated according to the retrieval operation when a component 92 is retrieved from the bulk feeder 30, and is discarded when the bulk feeder 30 performs the supply operation of the component 92.

[0054] 5-2. Route search unit 52 The path search unit 52 searches for path patterns that are candidates for the movement path of the mounting head 133 in the sampling cycle, based on the storage information M4. Here, the "movement path" is the path taken when the mounting head 133 moves in the XY direction to sample parts 92 from multiple cavities 45 in the sampling cycle of the PP cycle, and indicates the position and order of the multiple cavities 45 in which the mounting head 133 is positioned.

[0055] As shown in Figures 9A and 9B, the mounting head 133 moves along the movement path Nr to a predetermined cavity 45. Specifically, when performing a sampling operation, the control device 20 adjusts the position of the mounting head 133 and the angle of the suction nozzle 134, taking into account the position and angle of the component 92 housed in the cavity 45.

[0056] A "path pattern" is a candidate for the movement path Nr that is explored before the final movement path Nr is set. For example, a route with two cavities 45 as the starting and ending points in a predetermined path pattern is explored by swapping the starting or ending points with other routes. The path search unit 52 searches for path patterns based on predetermined conditions from the viewpoint of improving the efficiency of the sampling cycle.

[0057] 5-3. Route setting unit 53 The route setting unit 53 sets the selected route pattern to the movement route Nr based on the movement distance Lm of the mounting head 133 calculated for each of the multiple route patterns. Specifically, the route setting unit 53 calculates the sum of the lengths of each route included in the route pattern as the movement distance Lm of the mounting head 133.

[0058] The travel distance Lm roughly coincides with the travel distance of the mounting head 133 moving along the travel path Nr set for that route pattern, and correlates with the time required for the sampling cycle. In other words, the evaluation using the travel distance Lm for each route pattern by the route setting unit 53 is equivalent to the evaluation using the time required for the sampling cycle calculated for each route pattern.

[0059] 6. Support for the mounting process by the mounting support device 50 (mounting support method) 6-1. Setting the travel route The process of setting the movement path (S30) by the mounting support device 50 will now be described. Here, the process of setting the movement path (S30) is performed after the supply operation of the parts 92 by the bulk feeder 30 has been executed and the supply status recognition process (S20) has been completed. For example, if the supply operation by the bulk feeder 30 is executed after the sampling cycle of the first PP cycle has been completed, then after the completion of the mounting cycle of the first PP cycle, the supply area As of the bulk feeder 30 is imaged and image data D1 is acquired.

[0060] Using the above image data D1, the supply status recognition process (S20) is performed, followed by the movement path setting process (S30). At this time, the mounting head 133 can perform the sampling operation of the parts 92 supplied by the feeder 122, which does not require the result of the movement path setting process (S30) in the sampling cycle of the second PP cycle, in parallel with the above processes (S20, S30).

[0061] In the process of setting the movement path (S30), the path search unit 52 first acquires various information (S31). This information may include, in addition to accommodation information M4 indicating the locations of multiple cavities 45 that can accommodate the component 92, a control program M1, component data M2, cavity information M3, and conditions and parameters used to set the movement path.

[0062] Next, the path search unit 52 determines the first cavity (S32, determination step). Here, the "first cavity" is the cavity 45 from which the mounting head 133 first picks up the part 92 in the path pattern Hr, among a plurality of cavities 45 that can accommodate the part 92. In other words, it is the starting point of all path patterns Hr. The path search unit 52 may also set the first cavity Cf based on the position of the mounting head 133 when the picking cycle is started.

[0063] Specifically, among the multiple cavity rows, the cavity row closest to the substrate 91 that includes at least one housing cavity is determined to be the first cavity Cf, which is the housing cavity closest to the current position of the mounting head 133. Once the path search unit 52 determines the first cavity Cf, the mounting head 133 can start moving toward the first cavity Cf. This allows the mounting head 133 to move without waiting for the completion of the movement path setting process (S30), thus preventing waiting time.

[0064] In this embodiment, the route search unit 52 and the route setting unit 53 search for a route pattern Hr and set a travel route Nr using an algorithm applicable to solving the traveling salesman problem. Specifically, the route search unit 52 and the route setting unit 53 use a plurality of cavities 45 that can accommodate parts 92 in a collectible manner as nodes, and define a route pattern Hr as a combination of routes that visit each of these once, and evaluate the sum of the lengths of the routes as the travel distance of the mounting head 133 in the route pattern Hr.

[0065] Algorithms known to be applicable to solving the Traveling Salesperson Problem described above include the Neural Network (NN) method and the 2-opt method. The choice of which algorithm to apply can be arbitrarily determined. For example, if an algorithm that is experimentally more likely to yield the optimal solution depending on the supply status of component 92 (proportion of cavity allocation, degree of bias in cavity allocation) is known in advance, the algorithm to be applied may be switched according to the recognized supply status.

[0066] When the path search unit 52 searches for a path pattern Hr using the algorithm described above, if the first cavity Cf has been determined, it uses the first cavity Cf as a reference. The path search unit 52 then sets an initial solution for the algorithm (S33). Specifically, the path search unit 52 provides the algorithm with a preliminary path Ni, which is formed by connecting the ends of the paths (paths in the X direction) along each of the adjacent cavity rows with a path along the Y direction, as an initial solution. This preliminary path Ni, which is the initial solution, corresponds to the movement path before efficiency improvements are made by the mounting support device 50, as shown in Figure 9A.

[0067] The path search unit 52 searches for a path pattern Hr obtained by changing the route from the initial solution, using the first cavity Cf as a reference (fixed starting point) (S34, path search process). At this time, if the mounting head 133 has started moving toward the first cavity Cf, the path search unit 52 will perform the search process (S34) during the period when the mounting head 133 is moving. Once the path search unit 52 generates a path pattern Hr as a search result, the path search unit 52 performs the process of setting the movement path (S35, path setting process).

[0068] In this embodiment, as shown in Figure 10, the route setting unit 53 compares the travel distance Lm (sum of route lengths) of the mounting head 133 in the initial solution, the preliminary route Ni, with the travel distance Lm of the mounting head 133 in the searched route pattern Hr. If a difference Fd1 exists and the travel distance Lm is shorter, the route setting unit 53 provisionally sets this route pattern Hr as the travel route Nr. The route setting unit 53 updates the travel route Nr by overwriting it each time the travel distance Lm of the mounting head 133 in the next generated route pattern Hr becomes shorter.

[0069] If the search for route patterns is not yet complete (S36: No), the above process (S34-S35) is repeated. If the search for route patterns is complete (S36: Yes), the finally set movement route Nr is applied to the movement of the mounting head 133 in the sampling cycle. The completion of the above search for route patterns includes not only when all route patterns (excluding obviously redundant patterns) have been searched by the algorithm, but also when the process is terminated due to the progress of the sampling cycle.

[0070] Specifically, first, through the above process (S34-S35), the movement path Nr (Figure 9A), which was initially set with the alternative path Ni as the solution, is set to the movement path Nr as shown in Figure 9B using the above algorithm. Then, if the sampling cycle is being executed in parallel with the movement path setting process (S30), the mounting head 133 is moved along the provisionally set movement path Nr. During the execution period of the sampling cycle, the path search unit 52 continues to search for the path pattern Hr (S34), and the path setting unit 53 continues to set the movement path Nr (S35), targeting the portion of the movement path Nr that the mounting head 133 has not yet reached.

[0071] In this manner, the control device 20 of the component mounting machine 10 moves the mounting head 133 along the currently best movement path Nr determined by the mounting support device 50. If a more efficient movement path Nr is established in the unreachable portion of the mounting head 133 before the end of the sampling cycle, the control device 20 moves the mounting head 133 along that movement path Nr. When the sampling cycle ends, there are no unreachable portions of the movement path Nr, and the search for a path pattern is completed.

[0072] With the configuration of the mounting support device 50 described above, the travel distance Lm of the mounting head 133 in the sampling cycle can be shortened, thereby improving the efficiency of the sampling cycle and the mounting process. Here, we will describe a configuration that further optimizes the movement path Nr set as described above and improves the efficiency of the setting process.

[0073] 6-2. Optimization of travel paths In the path search process (S34), the path search unit 52 may search for a path pattern Hr based on the storage information M4 and the required number Ra of parts 92 to be collected by the planned collection cycle. In other words, if the number V1 (hereinafter referred to as the number of collectible parts Vc) of cavities 45 (storage cavities) that can accommodate parts 92 is greater than the required number Ra in the planned collection cycle (including any uncompleted portions if they are being executed in parallel), the path search unit 52 adds a condition that the required number Ra is the number of nodes in the traveling salesman problem.

[0074] With this configuration, a movement path Nr is set to collect the required number of Ra in the most recent collection cycle, thereby improving the efficiency of the movement path Nr setting process, and the search speed is improved due to the reduction in the number of nodes, allowing for optimization of the movement path Nr. In addition, if the number of collectibles Vc is greater than the sum of the required numbers Ra1 and Ra2 of components 92 to be collected in the collection cycles to be executed in consecutive PP cycles, the path search unit 52 may add a condition to the algorithm that the number of nodes should be equal to the required numbers Ra1 and Ra2.

[0075] In the initial efficiency solution, as shown in the middle of Figure 10, the movement path Nr is set so that the root length between nodes during consecutive PP cycles (the length of the block indicated by the X mark connecting the diagonals in Figure 10) is as short as possible. However, since the mounting head 133 actually moves toward the substrate 91 side, shortening the root length between nodes during consecutive PP cycles does not contribute to overall efficiency. Therefore, by adding the required number Ra as described above, a movement path Nr is set that allows for a longer root length between consecutive PP cycles and prioritizes shortening the movement distance Lm of the mounting head 133 during the sampling cycle.

[0076] With this configuration, as shown in the lower part of Figure 10, in the conditionally efficient solution, the total travel distance Lm is longer by a difference of Fd2 compared to the initial efficient solution, but the travel distance Lm of the mounting head 133 in the sampling cycle is shorter by a difference of FdV, making it effective. In this way, by adding various conditions to the path pattern search process (S34) according to the supply status of the parts 92 and the mounting process, it is sometimes possible to set a travel path Nr that is more adapted to the current situation.

[0077] For example, the path search unit 52 may add conditions assuming that the accommodation cavities may be unevenly distributed in the supply area As of the bulk feeder 30. Specifically, as shown in Figure 11, the path search unit 52 first divides the multiple cavities 45 (accommodation cavities) that can accommodate the parts 92 shown in the accommodation information M4 into multiple groups Gr (Gr1, Gr2) based on the degree of uneven distribution of the cavities 45. As a method for setting the groups Gr, for example, it is conceivable to search for a closed region that includes a predetermined allowable number of NG cavities and empty cavities, based on a region where a predetermined number of accommodation cavities are consecutive in at least one of the X and Y directions.

[0078] Next, the path search unit 52 searches for a path pattern Hr based on the number of cavities 45 (number of accommodating cavities) included in each of the multiple groups Gr (Gr1, Gr2) and the required number Ra (Ra1, Ra2) of parts 92 to be collected by the planned collection cycle. With this configuration, the path pattern is searched within a group Gr that can secure the required number of Ra, which improves the efficiency of the process of setting the movement path Nr, and also improves the search speed due to the reduction in the number of nodes, allowing for optimization of the movement path Nr.

[0079] Furthermore, if, for example, the number of samples that can be collected Vc is greater than the number of samples Ra(Ra1,Ra2) required in the collection cycle of a series of PP cycles scheduled to be executed, the path search unit 52 may apply a path pattern search method that does not use groups Gr in the process of setting the movement path Nr for the most recent PP cycle. This makes it possible to prioritize the movement of the mounting head 133 in the collection cycle that is executed in parallel with the process of setting the movement path.

[0080] Furthermore, in the process of setting the movement path Nr for the next PP cycle, the method may be switched to apply a path pattern search method that uses group Gr as a condition. In this way, by appropriately switching algorithms and conditions, taking into account the progress of the mounting process, the supply status in the supply area As, and the planned execution of the supply operation of parts 92 by the bulk feeder 30, it is possible to improve the efficiency of the movement path Nr setting process and optimize the movement path Nr.

[0081] 7. Modified embodiments of the embodiment In this embodiment, the mounting support device 50 is configured to be integrated into the control device 20 of the component mounting machine 10. In contrast, part or all of the mounting support device 50 may be integrated into the host computer 60 and other external devices. For example, the mounting support device 50 may be integrated into the host computer 60 and also be a dedicated device installed on the production line Ln. [Explanation of Symbols]

[0082] 10: Component mounting machine, 12: Component supply device, 13: Component transfer device, 131: Head drive device, 132: Mobile platform, 133: Mounting head, 134: Suction nozzle, 14: Component camera, 15: Substrate camera, 20: Control device, 21: Memory unit, 30: Bulk feeder, 31: Feeder body, 40: Tracking unit, 45: Cavity, 50: Mounting support device, 51: State recognition unit, 52: Path search unit, 53: Path setting unit, 60: Host computer, 91: Substrate, 92: Component, As: Supply area, R: Transport path, M1: Control program, M2: Component data, M3: Cavity information, M4: Storage information, D1: Image data, Nr: Movement path, Ni: Reserve path (initial solution), Hr: Path pattern, Cf: First cavity, Ra, Ra1, Ra2: Required number, Lm: Distance traveled, V1, Vc: Number of items that can be collected, Gr, Gr1, Gr2: Group

Claims

1. This is applied to a component mounting machine that performs a sampling cycle in which a mounting head is moved to sequentially pick up components housed in multiple cavities, and a mounting cycle in which multiple such components are sequentially mounted onto a substrate. A path search unit searches for a path pattern which is a candidate for the movement path of the mounting head in the sampling cycle, based on accommodation information indicating the positions of multiple cavities that can accommodate the component for sampling, A path setting unit sets the selected path pattern as the movement path based on the movement distance of the mounting head calculated for each of the multiple path patterns, A mounting support device equipped with the following features.

2. The mounting support device according to claim 1, wherein the route search unit searches for the route pattern based on the storage information and the required number of parts to be collected by the planned collection cycle.

3. The component mounting machine executes the PP cycle, which includes the sampling cycle and the mounting cycle, multiple times. The mounting support device according to claim 1 or 2, wherein the path search unit searches for the path pattern based on the storage information and the required number of parts to be collected by the collection cycle scheduled to be executed in a successive PP cycle.

4. The mounting support device according to claim 1 or 2, wherein the path search unit divides the plurality of cavities into a plurality of groups based on the degree of bias of the plurality of cavities that can accommodate the parts shown in the accommodation information, and searches for the path pattern based on the number of cavities included in each of the plurality of groups and the required number of parts to be collected in the planned collection cycle.

5. The mounting support device according to claim 1 or 2, wherein the path search unit performs a determination step of determining a first cavity from which the mounting head will first collect the part in the path pattern, among a plurality of cavities that can accommodate the part in a manner that the part can be collected, and a search step of searching the path pattern with respect to the first cavity.

6. The mounting support device according to claim 5, wherein the path search unit is set in the first cavity based on the position of the mounting head when the sampling cycle is started.

7. The mounting support device according to claim 5, wherein the path search unit performs the search step during the period in which the mounting head moves to the first cavity determined in the determination step.

8. The mounting support device according to claim 1 or 2, wherein during the period in which the mounting head moves along the set movement path, the path search unit continues to search for the path pattern and the path setting unit continues to set the movement path, targeting the portion of the movement path that the mounting head has not yet reached.

9. The mounting support device according to claim 1 or 2, wherein the route search unit and the route setting unit search for the route pattern and set the travel route using an algorithm applicable to solving the traveling salesman problem.

10. The plurality of cavities are arranged in a row of cavities, each consisting of multiple cavities arranged along a first direction, and these cavities are arranged in a second direction intersecting the first direction. The mounting support device according to claim 9, wherein the path search unit provides the algorithm with a preliminary path formed by connecting the ends of paths along each of the adjacent cavity rows with a path along the second direction as an initial solution.

11. The mounting support device according to claim 1 or 2, further comprising a state recognition unit that processes image data obtained by imaging the supply area of ​​the component in a bulk feeder having a plurality of cavities, recognizes the supply state of the component in the supply area, and generates the storage information.

12. This is applied to a component mounting machine that performs a sampling cycle in which a mounting head is moved to sequentially pick up components housed in multiple cavities, and a mounting cycle in which multiple such components are sequentially mounted onto a substrate. A path search step of searching for a path pattern which is a candidate for the movement path of the mounting head in the sampling cycle, based on accommodation information indicating the positions of multiple cavities that can accommodate the component for sampling, A path setting step of setting the selected path pattern as the movement path based on the movement distance of the mounting head calculated for each of the multiple path patterns, A mounting support method comprising the above.

Citation Information

Patent Citations

  • Method for determining part mounting order

    JP2006173318A

  • Electronic component supplying apparatus

    JP2011114084A

  • Device for optimizing attachment processing

    JP2018064019A

  • Maintenance device and maintenance method

    JP2023070876A

  • Bulk feeder

    WO2021095220A1