Power conversion systems, power conversion devices, distributed power systems

The power conversion system addresses the challenge of inaccurate energy measurement by employing independent hardware systems for voltage and current detection, achieving precise and robust energy calculation.

JP7954375B2Active Publication Date: 2026-11-20PANASONIC INTELLECTUAL PROPERTY MANAGEMENT CO LTD
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
JP2023001971
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Filing Date
2023-01-10
Publication Date
2026-11-20
Estimated Expiration
2043-01-10

AI Technical Summary

Technical Problem

Existing power conversion systems struggle to accurately and robustly measure electrical energy due to shared current and voltage detection units, which complicates precise calculation of energy values in specified measurement systems.

Method used

A power conversion system with independent hardware systems for detecting voltage and current, and calculating energy, includes first and second power converters, control units, and specific metering calculation units to ensure accurate and robust energy measurement.

Benefits of technology

The system enables precise and robust measurement of electricity, ensuring high accuracy in energy calculations.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007954375000001
    Figure 0007954375000001
  • Figure 0007954375000002
    Figure 0007954375000002
  • Figure 0007954375000003
    Figure 0007954375000003
Patent Text Reader

Abstract

To measure electric energy with high precision and robustness.SOLUTION: A first power conversion control unit (121) generates a first command value for controlling a first power conversion unit (12) based on current and voltage of an intermediate bus (Bd). A first specific metric calculation unit (161a) calculates electric energy for specific metric of the intermediate bus (Bd) based on the current and voltage of the intermediate bus (Bd). Parts of or all hardware system until the first power conversion control unit (121) detects the voltage and current and calculates the first command value and a hardware system until the first specific metric calculation unit (161a) detects the voltage and current and calculates electric energy for specific metric of the intermediate bus (Bd) are independently provided.SELECTED DRAWING: Figure 1
Need to check novelty before this filing date? Find Prior Art

Description

TECHNICAL FIELD

[0001] The present disclosure relates to a power conversion system, a power conversion apparatus, and a distributed power supply system for converting power supplied from a distributed power source. BACKGROUND ART

[0002] Against the backdrop of growing attention to renewable energy, the adoption of solar power generation systems and power storage systems is expanding. In Japan, the Energy Supply Resilience Enhancement Act was enacted in June 2020. The Energy Supply Resilience Enhancement Act incorporates a specified measurement system to develop an environment that promotes the utilization of distributed resources.

[0003] The specified measurement system is a system that exceptionally permits the use of measuring instruments that have not undergone verification under the Measurement Act under certain conditions. Business operators (such as aggregators) that have submitted notifications in advance can be exempted from the application of the provisions of the Measurement Act for the notified transactions, limited to new transactions that utilize distributed resources (e.g., solar power generation, EVs) at households and the like. From the perspective of ensuring proper measurement implementation and protecting consumers (households and the like), business operators are required to ensure the accuracy of the measuring instruments they use and fulfill their accountability to consumers.

[0004] Furthermore, on April 1, 2020, the "Guidelines Concerning the Specified Measurement System" issued by the Ministry of Economy, Trade and Industry stipulates that as an example of measurement that may fall under the specified measurement system, cases where the measurement target can be identified in units of resources or the like, and the amount of electric power to be measured can be generally identified by proportional allocation measurement or the like, may also be covered by this system (provided that the impact of proportional allocation or the like can be identified).

[0005] Power conditioners are eligible to be designated as special-case measuring instruments. For power conditioners interconnected with a commercial power system (see, for example, Patent Document 1), since current detection and voltage detection are already performed, it is conceivable to share the current detection unit, the voltage detection unit, and the microcontroller for both power conversion control and power amount calculation for specified measurement. PRIOR ART DOCUMENTS [Patent Documents]

[0006] [Patent Document 1] Japanese Patent Publication No. 2017-158338 [Overview of the Initiative] [Problems that the invention aims to solve]

[0007] When the current detection unit, voltage detection unit, and microcontroller are shared, it is difficult to recognize discrepancies in the detected voltage and current values. In the specified measurement system, the calculated value of electrical energy is used in monetary transactions, so highly accurate and robust calculated values ​​of electrical energy are required.

[0008] This disclosure is made in view of these circumstances, and its purpose is to provide a power conversion system, power conversion device, and distributed power supply system that can measure electricity with high accuracy and robustness. [Means for solving the problem]

[0009] To solve the above problems, a power conversion system in one aspect of the present disclosure is connected between an intermediate bus and a distribution board, converts AC power supplied from a power system connected to the distribution board into DC power, and supplies the converted DC power to the intermediate bus, or converts the DC power supplied from the intermediate bus into AC power, and exchangeThe power converter includes: a first power converter that supplies power to the power system or load connected to the distribution board; a second power converter connected between the intermediate bus and the distributed power source, which converts the DC power supplied from the distributed power source into another DC power with a different voltage or current, and supplies the converted DC power to the intermediate bus; a first power converter control unit that generates a first command value for controlling the first power converter based on the current and voltage of the intermediate bus; a first specific metering calculation unit that calculates the amount of energy for specific measurement of the intermediate bus based on the current and voltage of the intermediate bus; a second power converter control unit that generates a second command value for controlling the second power converter based on the current and voltage of the distributed power source; and a second specific metering calculation unit that calculates the amount of energy for specific measurement of the distributed power source based on the current and voltage of the distributed power source. A hardware system comprising the first power conversion control unit detecting voltage and current and calculating the first command value, and a hardware system comprising the first specific metering calculation unit detecting voltage and current and calculating the amount of energy for specific metering of the intermediate bus, is provided independently of the other hardware system comprising the second power conversion control unit detecting voltage and current and calculating the second command value, and a hardware system comprising the second specific metering calculation unit detecting voltage and current and calculating the amount of energy for specific metering of the distributed power supply, is provided independently of the other hardware system comprising first power conversion control unit detecting voltage and current and calculating the second command value, and a hardware system comprising the second specific metering calculation unit detecting voltage and current and calculating the amount of energy for specific metering of the distributed power supply, is provided independently of the other hardware system comprising the first power conversion control unit detecting voltage and current and calculating the first command value and the first specific metering calculation unit, is provided independently of the other hardware system comprising the second power conversion control unit detecting voltage and current and calculating the amount of energy for specific metering of the distributed power supply, is provided independently of the other hardware system comprising the first power conversion control unit detecting voltage and current and calculating the first command value and the first specific metering calculation unit, is provided independently of the other hardware system comprising the first specific metering calculation unit, is provided independently of the other hardware system comprising the first specific metering calculation unit [Effects of the Invention]

[0010] According to this disclosure, the power conversion system can measure the amount of electricity with high precision and robustness. [Brief explanation of the drawing]

[0011] [Figure 1] This is a diagram illustrating an example configuration of a power conversion system according to an embodiment. [Figure 2] This is a diagram illustrating an example configuration of a power conversion system according to an embodiment. [Figure 3] This is a diagram illustrating a configuration example 3 of a power conversion system according to an embodiment. [Figure 4]Figure 4(a) shows an example configuration of the AC power meter and the first DC power meter installed before and after the inverter. Figure 4(b) shows an example configuration of the second DC power meter and the fifth DC power meter installed before and after the first DC / DC converter. [Figure 5] Figure 5(a) shows an example configuration of the third DC power meter and the sixth DC power meter installed before and after the second DC / DC converter. Figure 5(b) shows an example configuration of the fourth DC power meter and the seventh DC power meter installed before and after the third DC / DC converter. [Figure 6] Figure 6(a) shows an example configuration of the first power conversion control unit, the AC specific metering calculation unit, and the first specific metering calculation unit. Figure 6(b) shows an example configuration of the second power conversion control unit, the second specific metering calculation unit, and the fifth specific metering calculation unit. [Figure 7] Figure 7(a) shows an example configuration of the third power conversion control unit, the third specific metering calculation unit, and the sixth specific metering calculation unit. Figure 7(b) shows an example configuration of the fourth power conversion control unit, the fourth specific metering calculation unit, and the seventh specific metering calculation unit. [Figure 8] This flowchart shows the flow of the measurement accuracy determination process for specific energy consumption by the system control unit. [Modes for carrying out the invention]

[0012] Figure 1 is a diagram illustrating Configuration Example 1 of a power conversion system 1 according to an embodiment. In Configuration Example 1, a solar cell 6, a stationary battery 7, and an on-board battery 8 are connected to the power conversion system 1 as multiple distributed power sources.

[0013] The power conversion system 1 includes a first power converter 1a, a second power converter 1b, and a third power converter 1c. The first power converter 1a is a power conditioner for a solar cell 6, the second power converter 1b is a charge / discharge converter for a stationary battery 7, and the third power converter 1c is a V2H (Vehicle to Home) converter for an on-board battery 8. The power conversion system 1 comprises, as its main components, a first DC / DC converter 11a, a second DC / DC converter 11b, a third DC / DC converter 11c, an inverter 12, and a system control unit 13.

[0014] Solar cell 6 utilizes the photovoltaic effect to directly convert light energy into DC power. As solar cell 6, heterojunction solar cells, polycrystalline silicon solar cells, monocrystalline silicon solar cells, thin-film silicon solar cells, compound semiconductor solar cells, etc., can be used.

[0015] The solar cell 6 is connected to the first DC / DC converter 11a and outputs the generated power to the first DC / DC converter 11a. The first DC / DC converter 11a is connected between the solar cell 6 and the intermediate bus Bd and is a converter that can adjust the voltage of the DC power output from the solar cell 6. The first DC / DC converter 11a can be configured, for example, as a boost chopper.

[0016] The second power conversion control unit 111a of the first DC / DC converter 11a (see FIG. 4(b) described later) performs MPPT (Maximum Power Point Tracking) control of the solar cell 6 by controlling the first DC / DC converter 11a. Specifically, the second power conversion control unit 111a measures the input voltage and input current of the first DC / DC converter 11a, which are the output voltage and output current of the solar cell 6, to estimate the generated power of the solar cell 6. The second power conversion control unit 111a generates a voltage command value for setting the generated power of the solar cell 6 to the maximum power point (optimal operating point) based on the measured output voltage of the solar cell 6 and the estimated generated power. For example, the second power conversion control unit 111a searches for the maximum power point by varying the operating point voltage at a predetermined step width according to the hill-climbing method, and generates the voltage command value so as to maintain the maximum power point. The first DC / DC converter 11a performs a switching operation in response to a drive signal based on the generated voltage command value.

[0017] The stationary storage battery 7 is capable of charging and discharging electric power, and is constituted by a lithium ion storage battery, a nickel-metal hydride storage battery, or the like. The stationary storage battery 7 is connected to the second DC / DC converter 11b, and charging and discharging thereof are controlled by the second DC / DC converter 11b. The second DC / DC converter 11b is a bidirectional DC / DC converter that is connected between the stationary storage battery 7 and the intermediate bus Bd, and charges and discharges the stationary storage battery 7. That is, the second DC / DC converter 11b can convert DC power supplied from the stationary storage battery 7 into another DC power having a different voltage or current, and supply the converted DC power to the intermediate bus Bd. Further, the second DC / DC converter 11b can convert DC power supplied from the intermediate bus Bd into another DC power having a different voltage or current, and charge the converted DC power into the stationary storage battery 7.

[0018] The third power conversion control unit 111b (see FIG. 5(a) described later) of the second DC / DC converter 11b controls the second DC / DC converter 11b to perform charge and discharge control of the stationary storage battery 7. The third power conversion control unit 111b controls the second DC / DC converter 11b based on a current command value or a voltage command value set from the system control unit 13, to perform constant current (CC) discharge, constant voltage (CV) discharge, constant current charge, or constant voltage charge of the stationary storage battery 7. When operating the stationary storage battery 7 to follow at least one of the power generation amount of the solar cell 6 and the consumption amount of the in-house load 4, the third power conversion control unit 111b generates a current command value for the second DC / DC converter 11b according to the voltage of the intermediate bus Bd.

[0019] The on-vehicle storage battery 8 is a drive storage battery mounted on an electric vehicle, and is configured by a lithium ion storage battery, a nickel-metal hydride storage battery, or the like. The electric vehicle and the third power conversion device 1c are connected by a charging cable. The on-vehicle storage battery 8 is connected to the third DC / DC converter 11c when the electric vehicle is parked at home, and is subjected to charge and discharge control by the third DC / DC converter 11c. The third DC / DC converter 11c is a bidirectional DC / DC converter that is connected between the on-vehicle storage battery 8 and the intermediate bus Bd, and charges and discharges the on-vehicle storage battery 8 when the electric vehicle is parked at home.

[0020] The fourth power conversion control unit 111c of the third DC / DC converter 11c (see Figure 5(b) described later) can control the charging and discharging of the on-board battery 8 by controlling the third DC / DC converter 11c. The fourth power conversion control unit 111c can communicate with the BMU (Battery Management Unit) of the on-board battery 8 via the communication line in the charging cable. In the case of CHAdeMO®, it is connected via CAN (Controller Area Network). Based on the current command value or voltage command value set by the system control unit 13 or the BMU of the on-board battery 8, the fourth power conversion control unit 111c controls the third DC / DC converter 11c to perform constant current discharge, constant voltage discharge, constant current charge, or constant voltage charge of the on-board battery 8. That is, the third DC / DC converter 11c can convert the DC power supplied from the on-board battery 8 into another DC power with a different voltage or current, and supply the converted DC power to the intermediate bus Bd. Furthermore, the third DC / DC converter 11c can convert the DC power supplied from the intermediate bus Bd into another DC power with a different voltage or current, and charge the onboard battery 8 with the converted DC power.

[0021] Stationary or vehicle-mounted batteries can be substituted with capacitors such as electric double-layer capacitors and lithium-ion capacitors. In this specification, batteries and capacitors are collectively referred to as energy storage devices.

[0022] The inverter 12 is connected between the intermediate bus Bd and the distribution board 3. The first DC / DC converter 11a and the third DC / DC converter 11c are connected in parallel to the intermediate bus Bd. The inverter 12 converts the DC power supplied via the intermediate bus Bd from at least one of the first DC / DC converter 11a, the second DC / DC converter 11b, and the third DC / DC converter 11c into AC power, and supplies the converted AC power to the commercial power system 2 or the in-house load 4 connected to the distribution board 3. In this process, the inverter 12 can control the voltage or current of the output AC power. The in-house load 4 is a general term for loads installed inside the house. The inverter 12 can also convert the AC power supplied from the commercial power system 2 via the distribution board 3 into DC power and supply the converted DC power to the intermediate bus Bd.

[0023] The first power conversion control unit 121 of the inverter 12 (see Figure 4(a) described later) controls the inverter 12 so that the voltage of the intermediate bus Bd maintains a target value. Specifically, the first power conversion control unit 121 measures the voltage of the intermediate bus Bd and generates a current command value to match the measured bus voltage to the target value. If the voltage of the intermediate bus Bd is higher than the target value, the first power conversion control unit 121 generates a current command value to increase the output power of the inverter 12, and if the voltage of the intermediate bus Bd is lower than the target value, it generates a current command value to decrease the output power of the inverter 12. The inverter 12 switches according to the drive signal based on the generated current command value.

[0024] It is desirable to use first DC / DC converter 11a, third DC / DC converter 11c, and inverter 12 that have the same or as close conversion efficiency as possible.

[0025] The system control unit 13 controls the entire power conversion system 1. The system control unit 13 can be realized through the collaboration of hardware and software resources, or solely through hardware resources. Hardware resources that can be used include analog elements, microcontrollers, DSPs, ROMs, RAMs, ASICs, FPGAs, and other LSIs. Software resources that can be used include programs such as firmware.

[0026] The power supply circuit 14 converts the AC power supplied to the AC distribution line between the inverter 12 and the distribution board 3 into DC power, and steps it down to a predetermined voltage value to generate a control power supply voltage. For example, the power supply circuit 14 converts the 202±20V AC voltage of the commercial power system 2 into a 24V DC voltage (control power supply voltage). The power supply circuit 14 supplies the generated control power supply voltage to various loads in the first power converter 1a (for example, the drive circuits included in the first DC / DC converter 11a and the inverter 12, respectively). The power supply circuit 14 further steps down the control power supply voltage to generate the power supply voltage (for example, 5V) for various control circuits (such as microcontrollers), and supplies it to the various control circuits.

[0027] The external connection management device 17 may be a power detection unit, a remote control setting device, or a HEMS (Home Energy Management System) controller. The external connection management device 17 and the main unit of the power conversion system 1 may be connected by a wired connection (e.g., a cable conforming to the RS-485 standard) or by a wireless connection (e.g., Wi-Fi®, low-power wireless). The external connection management device 17 is connected to the router device 20. The external connection management device 17 and the router device 20 are connected by a wired connection (e.g., a LAN cable) or a wireless connection (e.g., Wi-Fi).

[0028] A monitor (not shown) can be connected to the external connection management device 17. The external connection management device 17 and the monitor may be connected directly or via the router device 20. The monitor can display the amount of electricity generated, purchased electricity, sold electricity, electricity usage, electricity rates by time of day, and operating mode of the solar power generation system. This information can also be displayed on the screen of an information terminal (e.g., smartphone, tablet, PC, etc.) owned by a user connected to the router device 20 wirelessly or via a wired connection.

[0029] The external connection management device 17 or monitor may include a recording medium. In that case, the power consumption measurement data can be saved as log data on the recording medium. The recording medium may be built-in or a removable recording medium.

[0030] The external connection management device 17 functions as a gateway for connecting to the external network 9. Network 9 is a general term for communication paths such as the Internet, dedicated lines, and VPNs (Virtual Private Networks), and is not limited to any particular communication medium or protocol. Examples of communication mediums that can be used include fiber optic networks, ADSL networks, CATV networks, mobile communication networks, wireless LANs, and wired LANs. Examples of communication protocols that can be used include TCP (Transmission Control Protocol) / IP (Internet Protocol), UDP (User Datagram Protocol) / IP, and Ethernet (registered trademark).

[0031] A smart meter 5, acting as an AC power meter, is connected between the commercial power grid 2 and the distribution board 3. The smart meter 5 is equipped with a voltage sensor and a current sensor, and measures power by multiplying the grid voltage measured by the voltage sensor by the current measured by the current sensor. The smart meter 5 can measure the cumulative amount of power at predetermined intervals (for example, every 30 minutes). It can measure both forward and reverse power flow. The smart meter 5 is equipped with a communication function and can transmit the cumulative amount of power at predetermined intervals to the retail electricity provider server 40 via the network 9. The smart meter 5 can also transmit the measured power to the external connection management device 17 in real time.

[0032] An AC power meter 15 is connected between the inverter 12 and the distribution board 3. More specifically, the AC power meter 15 is installed on the AC distribution line between the inverter 12 and the distribution board 3, on the distribution board 3 side of the branching point N2 of the power circuit 14. A first DC power meter 16a is connected between the branching point N1 of the intermediate bus Bd and the inverter 12.

[0033] A second DC power meter 16b is connected between the solar cell 6 and the first DC / DC converter 11a. A third DC power meter 16c is connected between the stationary battery 7 and the second DC / DC converter 11b. A fourth DC power meter 16d is connected between the on-board battery 8 and the third DC / DC converter 11c. A fifth DC power meter 16e is connected between the first DC / DC converter 11a and the branching point N1 of the intermediate bus Bd. A sixth DC power meter 16f is connected between the second DC / DC converter 11b and the branching point N1 of the intermediate bus Bd. A seventh DC power meter 16g is connected between the third DC / DC converter 11c and the branching point N1 of the intermediate bus Bd.

[0034] AC power meter 15 and DC power meters 16a-16g are power meters that meet the requirements for measuring instruments used for specific measurements (hereinafter referred to as "specific measuring instruments"). Details of AC power meter 15 and DC power meters 16a-16g will be described later.

[0035] During the output period of the power conversion system 1 in which current flows from the inverter 12 to the distribution board 3, if the stationary battery 7 and the vehicle battery 8 are not being charged or discharged, the system control unit 13 uses the power measured by the AC power meter 15 as the power generated by the solar cell 6, and calculates the amount of power generated by the solar cell 6 by integrating the power generated by the solar cell 6 for a predetermined period.

[0036] During the power conversion system 1's output period, if the stationary battery 7 and the vehicle-mounted battery 8 are charging, the system control unit 13 uses the power measured by the AC power meter 15 as the power generated by the solar cell 6 (excluding the amount stored), and calculates the amount of power generated by the solar cell 6 (excluding the amount stored) by accumulating the power generated by the solar cell 6 (excluding the amount stored) over a predetermined period. As will be described later, the portion of the power generated by the solar cell 6 that is stored in the stationary battery 7 or the vehicle-mounted battery 8 becomes apparent as power generated when it is discharged from the stationary battery 7 or the vehicle-mounted battery 8.

[0037] During the power conversion system 1's output period, if at least one of the stationary battery 7 or the vehicle-mounted battery 8 is discharging, the system control unit 13 calculates the apportionment ratio of the power generated by the solar cell 6, the discharged power of the stationary battery 7, and the discharged power of the vehicle-mounted battery 8 based on the power measured by the fifth DC wattmeter 16e, the sixth DC wattmeter 16f, the seventh DC wattmeter 16g, and the first DC wattmeter 16a. The system control unit 13 calculates the power generated by the solar cell 6 based on the apportionment ratio of the power generated by the solar cell 6 and the power measured by the AC wattmeter 15.

[0038] For example, if the ratio of power generated by solar cell 6, discharged power by stationary battery 7, and discharged power by vehicle battery 8 is 1:1:0, the system control unit 13 multiplies the power measured by the AC power meter 15 by 1 / 2 to calculate the power generated by solar cell 6 (excluding power via the energy storage device). The system control unit 13 then calculates the amount of power generated by solar cell 6 (excluding power via the energy storage device) by accumulating the power generated by solar cell 6 (excluding power via the energy storage device) over a predetermined period.

[0039] The system control unit 13 calculates the amount of electricity consumed by the household load 4 from the amount of electricity generated by the solar cells 6, based on the amount of electricity obtained from the smart meter 5 via the external connection management device 17 and the amount of electricity generated by the solar cells 6. During the electricity purchase period (forward power flow period), the entire amount of electricity generated by the solar cells 6 is considered self-consumption. During the electricity sales period (reverse power flow period), the system control unit 13 calculates the self-consumption of the amount of electricity generated by the solar cells 6 by subtracting the reverse power flow amount obtained from the smart meter 5 from the amount of electricity generated by the solar cells 6. If the stationary battery 7 or the vehicle battery 8 is discharging, the system control unit 13 needs to subtract from the amount of electricity generated by the solar cells 6 a corrected reverse power flow amount obtained by multiplying the reverse power flow amount obtained from the smart meter 5 by the apportionment ratio of the amount of electricity generated by the solar cells 6 (excluding that via the energy storage device).

[0040] During the charging period of the stationary battery 7, the system control unit 13 records the cumulative amount of power measured by the third DC power meter 16c as grid-derived energy during periods when the power measured by the second DC power meter 16b is zero. During the charging period of the stationary battery 7, the system control unit 13 records the cumulative amount of power measured by the third DC power meter 16c as solar-derived energy during periods when the power measured by the AC power meter 15 is zero or is output from the power conversion system 1 to the distribution board 3.

[0041] The system control unit 13 calculates the apportionment ratio of the power measured by the fifth DC power meter 16e and the power measured by the first DC power meter 16a during the charging period of the stationary battery 7, when the power measured by the second DC power meter 16b is not zero and the power measured by the AC power meter 15 is in the direction of input from the distribution board 3 to the power conversion system 1. The system control unit 13 calculates and records the amount of power originating from the solar cell by multiplying the cumulative amount of power measured by the third DC power meter 16c by the ratio of the power measured by the fifth DC power meter 16e. The system control unit 13 calculates and records the amount of power originating from the grid by multiplying the cumulative amount of power measured by the third DC power meter 16c by the ratio of the power measured by the first DC power meter 16a.

[0042] In this way, the system control unit 13 records the capacity of the stationary battery 7 during its charging period, classifying it into the capacity derived from the solar cells and the capacity derived from the grid.

[0043] When the stationary battery 7 is discharging during the power conversion system 1's output period, the system control unit 13 calculates the apportionment ratio of the power generated by the solar cell 6, the power discharged by the stationary battery 7, and the power discharged by the vehicle battery 8 based on the power measured by the fifth DC wattmeter 16e, the sixth DC wattmeter 16f, the seventh DC wattmeter 16g, and the first DC wattmeter 16a. The system control unit 13 calculates the power discharged by the stationary battery 7 based on the apportionment ratio of the power discharged by the stationary battery 7 and the power measured by the AC wattmeter 15 during the power conversion system 1's output period. The system control unit 13 calculates the discharge amount of the stationary battery 7 by integrating the power discharged by the stationary battery 7 over a predetermined period.

[0044] The system control unit 13 calculates the total capacity derived from solar cells and the capacity derived from the grid that was charged to the stationary battery 7 during a predetermined period, and calculates the ratio of the capacity derived from solar cells to the total capacity charged during the predetermined period based on the calculated total capacity and the capacity derived from solar cells. The system control unit 13 multiplies the amount of discharge from the stationary battery 7 during the discharge period by this ratio of the capacity derived from solar cells to measure the amount of discharge from the stationary battery 7 during the discharge period.

[0045] The system control unit 13 calculates the amount of electricity consumed by the in-house load 4 from the discharge amount originating from the solar cells, based on the amount of electricity obtained from the smart meter 5 via the external connection management device 17 and the discharge amount originating from the solar cells of the stationary battery 7. During the electricity purchase period (forward power flow period), the entire amount of electricity discharged from the solar cells becomes the amount of electricity consumed by the household. During the electricity sales period (reverse power flow period), the system control unit 13 calculates the amount of electricity consumed by the electricity discharged from the solar cells by subtracting the reverse power flow amount obtained from the smart meter 5 from the amount of electricity discharged from the solar cells. If the solar cells 6 are generating electricity, the system control unit 13 needs to subtract from the amount of electricity discharged from the solar cells the reverse power flow amount obtained from the smart meter 5, which has been corrected by multiplying the reverse power flow amount obtained from the smart meter 5 by the apportionment ratio of the discharge amount of the stationary battery 7.

[0046] The system control unit 13 can calculate the amount of discharge from the on-board battery 8 originating from the solar cells and the amount of self-consumption within that discharge over a predetermined period, using the same calculation method as for the stationary battery 7. Note that the capacity of the on-board battery 8 decreases due to discharge associated with the operation of the electric vehicle and increases due to charging from an external charging facility.

[0047] The BMU of the on-board battery 8 records the amount of power consumed by the on-board battery 8 and the amount of power charged from an external charging facility during the period from when the connection with the power conversion system 1 via the charging cable is disconnected until the next time it is connected to the power conversion system 1 via the charging cable (hereinafter referred to as the isolation period). When the isolation period ends and the on-board battery 8 is connected to the power conversion system 1 via the charging cable, the BMU of the on-board battery 8 transmits the amount of power consumed and charged during the isolation period to the system control unit 13 via the communication line in the charging cable.

[0048] The system control unit 13 compares the amount of consumption and the amount of charge during the isolation period, and if the amount of charge is greater, it subtracts the amount of consumption from the amount of charge during the isolation period to calculate the net charge. The system control unit 13 calculates the total of the capacity from the home solar panels, the capacity from the grid, and the net charge from external charging equipment that was charged to the on-board battery 8 during a predetermined period, and calculates the ratio of the capacity from the solar panels to the total capacity charged to the on-board battery 8 during the predetermined period based on the calculated total capacity and the capacity from the solar panels.

[0049] The system control unit 13 outputs to the external connection management device 17 the amount of self-consumption of the power generated by the solar cell 6, the amount of self-consumption of the discharge amount originating from the solar cell of the stationary battery 7, and the amount of self-consumption of the discharge amount originating from the solar cell of the on-board battery 8 at predetermined intervals. The system control unit 13 may also output to the external connection management device 17 the reverse power flow rate of the power generated by the solar cell 6, the reverse power flow of the discharge amount originating from the solar cell of the stationary battery 7, and the reverse power flow of the discharge amount originating from the solar cell of the on-board battery 8.

[0050] The external connection management device 17 transmits to the data server 30 via the network 9 the amount of electricity consumed by the solar cell 6, the amount of electricity consumed by the stationary battery 7 due to solar cell discharge, and the amount of electricity consumed by the vehicle battery 8 due to solar cell discharge, which were received from the main unit of the power conversion system 1.

[0051] The data server 30 is, for example, a server operated by the manufacturer of the power conversion system 1. The data server 30 may be a proprietary server installed in a data center or the company's own facilities, or it may be a cloud server based on a cloud service contract. The manufacturer or partner company of the power conversion system 1 can, for example, collect the amount of self-consumption (including that via the energy storage device) derived from the amount of electricity generated by the solar cells 6 stored in the data server 30 and apply to the J-Credit Certification Committee. If the application is approved, J-Credits will be issued. This makes the amount of self-consumption derived from the amount of electricity generated by the solar cells 6 tangible as environmental value.

[0052] Figure 2 is a diagram illustrating an example configuration of the power conversion system 1 according to an embodiment. Example configuration 2 is a power conversion system 1 for a photovoltaic power generation system in which only solar cells 6 are installed as distributed power sources. In the power conversion system 1, only the first power converter 1a is used. Since the intermediate bus Bd does not branch, there is no need to install a fifth DC power meter 16e.

[0053] Figure 3 is a diagram illustrating Configuration Example 3 of the power conversion system 1 according to an embodiment. Configuration Example 3 is a power conversion system 1 for a hybrid energy storage system (also called a power generation and storage integrated system) in which solar cells 6 and stationary storage batteries 7 are installed as distributed power sources. In Figure 3, an example is shown in which the second DC / DC converter 11b is also housed in the same enclosure as the first power converter 1a, but as shown in Figure 1, the system configuration in which the first power converter 1a and the second power converter 1b are separated into different enclosures is also possible.

[0054] Furthermore, the power conversion system 1 relating to this disclosure is not limited to the system configuration shown in Figures 1-3, and may be a power conversion system 1 for an energy storage system in which only a stationary battery 7 or an on-board battery 8 is installed as a distributed power source. In addition, the power conversion system 1 relating to this disclosure may be a power conversion system 1 for a hybrid energy storage system using an on-board battery 8, in which solar cells 6 and an on-board battery 8 are installed as distributed power sources.

[0055] Figure 4(a) shows an example configuration of AC power meter 15 and first DC power meter 16a installed before and after the inverter 12. Figure 4(b) shows an example configuration of second DC power meter 16b and fifth DC power meter 16e installed before and after the first DC / DC converter 11a. Figure 5(a) shows an example configuration of third DC power meter 16c and sixth DC power meter 16f installed before and after the second DC / DC converter 11b. Figure 5(b) shows an example configuration of fourth DC power meter 16d and seventh DC power meter 16g installed before and after the third DC / DC converter 11c.

[0056] The AC power meter 15 includes a first CT sensor CT1, a second CT sensor CT2, a first current detection unit A1, a second current detection unit A2, a first voltage detection unit V1, a second voltage detection unit V2, and an AC specific metering calculation unit 151. The first DC power meter 16a includes a third CT sensor CT3, a fourth CT sensor CT4, a third current detection unit A3, a fourth current detection unit A4, a third voltage detection unit V3, a fourth voltage detection unit V4, and a first specific metering calculation unit 161a.

[0057] In Figure 4(a), the first CT sensor CT1 and the second CT sensor CT2 are installed in the AC distribution line between the inverter 12 and the distribution board 3. The first CT sensor CT1 and the second CT sensor CT2 may be of the same specifications, or they may be of different specifications. If they are of different specifications, the second CT sensor CT2 should be of higher precision than the first CT sensor CT1. The response time of the second CT sensor CT2 may be lower than that of the first CT sensor CT1.

[0058] The first current detection unit A1 generates a value indicating the current flowing through the AC power distribution line based on the secondary current generated by the first CT sensor CT1, and outputs it as an analog value to the first power conversion control unit 121. For example, the first current detection unit A1 includes a shunt resistor connected to a coil wound around the magnetic core of the first CT sensor CT1, and outputs the voltage across the shunt resistor to the first power conversion control unit 121 as a value indicating the current flowing through the AC power distribution line. Note that a Hall element method, a Rogowski coil method, etc., may be used instead of the CT method. Alternatively, a shunt resistor may be directly connected to the AC power distribution line instead of the first CT sensor CT1, and a value indicating the current flowing through the AC power distribution line may be generated based on the voltage across the shunt resistor.

[0059] The second current detection unit A2 generates a value indicating the current flowing through the AC power distribution line based on the secondary current generated by the second CT sensor CT2, and outputs it as an analog value to the AC specific metering calculation unit 151. The first current detection unit A1 and the second current detection unit A2 may be of the same specifications, or they may be of different specifications. If different specifications are used, the second current detection unit A2 should be of higher accuracy than the first current detection unit A1. The responsiveness of the second current detection unit A2 may be lower than that of the first current detection unit A1.

[0060] The first voltage detection unit V1 generates a value indicating the voltage of the AC distribution line and outputs it as an analog value to the first power conversion control unit 121. For example, the first voltage detection unit V1 includes a voltage divider resistor and an error amplifier, and outputs a value obtained by converting the voltage of the AC distribution line (usually around 200V) into a smaller voltage using the voltage divider resistor and error amplifier to the first power conversion control unit 121.

[0061] The second voltage detection unit V2 generates a value indicating the voltage of the AC distribution line and outputs it as an analog value to the AC specific metering calculation unit 151. The first voltage detection unit V1 and the second voltage detection unit V2 may use the same specifications or may use different specifications. If different specifications are used, the second voltage detection unit V2 should be more accurate than the first voltage detection unit V1. The responsiveness of the second voltage detection unit V2 may be lower than that of the first voltage detection unit V1.

[0062] The first power conversion control unit 121 can generate a command value for controlling the inverter 12 based on at least one of the values ​​indicating the current flowing through the AC distribution line input from the first current detection unit A1 and the values ​​indicating the voltage of the AC distribution line input from the first voltage detection unit V1. The AC specific metering calculation unit 151 calculates the amount of power for specific metering of the AC distribution line based on the values ​​indicating the current flowing through the AC distribution line input from the second current detection unit A2 and the values ​​indicating the voltage of the AC distribution line input from the second voltage detection unit V2.

[0063] The third CT sensor CT3 and the fourth CT sensor CT4 are installed on the intermediate bus Bd on the inverter 12 side from branch point N1. The relationship between the third CT sensor CT3 and the fourth CT sensor CT4 is the same as the relationship between the first CT sensor CT1 and the second CT sensor CT2.

[0064] The third current detection unit A3 generates a value indicating the current flowing through the intermediate bus Bd based on the secondary current generated by the third CT sensor CT3, and outputs it as an analog value to the first power conversion control unit 121. The fourth current detection unit A4 generates a value indicating the current flowing through the intermediate bus Bd based on the secondary current generated by the fourth CT sensor CT4, and outputs it as an analog value to the first specific metering calculation unit 161a. The relationship between the third current detection unit A3 and the fourth current detection unit A4 is the same as the relationship between the first current detection unit A1 and the second current detection unit A2.

[0065] The third voltage detection unit V3 generates a value indicating the voltage of the intermediate bus Bd and outputs it as an analog value to the first power conversion control unit 121. The fourth voltage detection unit V4 generates a value indicating the voltage of the intermediate bus Bd and outputs it as an analog value to the first specific metering calculation unit 161a. The relationship between the third voltage detection unit V3 and the fourth voltage detection unit V4 is the same as the relationship between the first voltage detection unit V1 and the second voltage detection unit V2.

[0066] The first power conversion control unit 121 can generate a command value for controlling the inverter 12 based on at least one of the value indicating the current flowing through the intermediate bus Bd, which is input from the third current detection unit A3, and the value indicating the voltage of the intermediate bus Bd, which is input from the third voltage detection unit V3. The first specific metering calculation unit 161a calculates the amount of energy for specific metering of the intermediate bus Bd based on the value indicating the current flowing through the intermediate bus Bd, which is input from the fourth current detection unit A4, and the value indicating the voltage of the intermediate bus Bd, which is input from the fourth voltage detection unit V4.

[0067] The second DC power meter 16b includes a fifth CT sensor CT5, a sixth CT sensor CT6, a fifth current detection unit A5, a sixth current detection unit A6, a fifth voltage detection unit V5, a sixth voltage detection unit V6, and a second specific metering calculation unit 161b. The fifth DC power meter 16e includes a seventh CT sensor CT7, an eighth CT sensor CT8, a seventh current detection unit A7, an eighth current detection unit A8, a seventh voltage detection unit V7, an eighth voltage detection unit V8, and a fifth specific metering calculation unit 161e.

[0068] In Figure 4(b), the fifth CT sensor CT5 and the sixth CT sensor CT6 are installed in the solar cell wiring between the first DC / DC converter 11a and the solar cell 6. The relationship between the fifth CT sensor CT5 and the sixth CT sensor CT6 is the same as the relationship between the first CT sensor CT1 and the second CT sensor CT2.

[0069] The fifth current detection unit A5 generates a value indicating the current flowing through the solar cell wiring based on the secondary current generated by the fifth CT sensor CT5, and outputs it as an analog value to the second power conversion control unit 111a. The sixth current detection unit A6 generates a value indicating the current flowing through the solar cell wiring based on the secondary current generated by the sixth CT sensor CT6, and outputs it as an analog value to the second specific metering calculation unit 161b. The relationship between the fifth current detection unit A5 and the sixth current detection unit A6 is the same as the relationship between the first current detection unit A1 and the second current detection unit A2.

[0070] The fifth voltage detection unit V5 generates a value indicating the voltage of the solar cell wiring and outputs it as an analog value to the second power conversion control unit 111a. The sixth voltage detection unit V6 generates a value indicating the voltage of the solar cell wiring and outputs it as an analog value to the second specific metering calculation unit 161b. The relationship between the fifth voltage detection unit V5 and the sixth voltage detection unit V6 is the same as the relationship between the first voltage detection unit V1 and the second voltage detection unit V2.

[0071] The second power conversion control unit 111a can cause the first DC / DC converter 11a to perform MPPT control of the solar cell 6 based on a value indicating the current flowing through the solar cell wiring input from the fifth current detection unit A5 and a value indicating the voltage of the solar cell wiring input from the fifth voltage detection unit V5. The second specific metering calculation unit 161b calculates the amount of energy for specific metering of the solar cell 6 based on a value indicating the current flowing through the solar cell wiring input from the sixth current detection unit A6 and a value indicating the voltage of the solar cell wiring input from the sixth voltage detection unit V6.

[0072] The 7th CT sensor CT7 and the 8th CT sensor CT8 are installed on the first branch wiring W1 that connects the 1st DC / DC converter 11a and the intermediate bus Bd. The relationship between the 7th CT sensor CT7 and the 8th CT sensor CT8 is the same as the relationship between the 1st CT sensor CT1 and the 2nd CT sensor CT2.

[0073] The seventh current detection unit A7 generates a value indicating the current flowing through the first branch wiring W1 based on the secondary current generated by the seventh CT sensor CT7, and outputs it as an analog value to the second power conversion control unit 111a. The eighth current detection unit A8 generates a value indicating the current flowing through the first branch wiring W1 based on the secondary current generated by the eighth CT sensor CT8, and outputs it as an analog value to the fifth specific metering calculation unit 161e. The relationship between the seventh current detection unit A7 and the eighth current detection unit A8 is the same as the relationship between the first current detection unit A1 and the second current detection unit A2.

[0074] The seventh voltage detection unit V7 generates a value indicating the voltage of the first branch wiring W1 and outputs it as an analog value to the second power conversion control unit 111a. The eighth voltage detection unit V8 generates a value indicating the voltage of the first branch wiring W1 and outputs it as an analog value to the fifth specific metering calculation unit 161e. The relationship between the seventh voltage detection unit V7 and the eighth voltage detection unit V8 is the same as the relationship between the first voltage detection unit V1 and the second voltage detection unit V2.

[0075] The second power conversion control unit 111a can control the boost rate of the first DC / DC converter 11a based on at least one of the values ​​indicating the current flowing through the first branch wiring W1, which is input from the seventh current detection unit A7, and the value indicating the voltage of the first branch wiring W1, which is input from the seventh voltage detection unit V7. The fifth specific metering calculation unit 161e calculates the amount of energy for specific metering of the first branch wiring W1 based on the value indicating the current flowing through the first branch wiring W1, which is input from the eighth current detection unit A8, and the value indicating the voltage of the first branch wiring W1, which is input from the eighth voltage detection unit V8.

[0076] The third DC power meter 16c includes the ninth CT sensor CT9, the tenth CT sensor CT10, the ninth current detection unit A9, the tenth current detection unit A10, the ninth voltage detection unit V9, the tenth voltage detection unit V10, and the third specific metering calculation unit 161c. The sixth DC power meter 16f includes the eleventh CT sensor CT11, the twelfth CT sensor CT12, the eleventh current detection unit A11, the twelfth current detection unit A12, the eleventh voltage detection unit V11, the twelfth voltage detection unit V12, and the sixth specific metering calculation unit 161f.

[0077] In Figure 5(a), the 9th CT sensor CT9 and the 10th CT sensor CT10 are installed in the stationary battery wiring between the 2nd DC / DC converter 11b and the stationary battery 7. The relationship between the 9th CT sensor CT9 and the 10th CT sensor CT10 is the same as the relationship between the 1st CT sensor CT1 and the 2nd CT sensor CT2.

[0078] The ninth current detection unit A9 generates a value indicating the current flowing through the stationary battery wiring based on the secondary current generated by the ninth CT sensor CT9, and outputs it as an analog value to the third power conversion control unit 111b. The tenth current detection unit A10 generates a value indicating the current flowing through the stationary battery wiring based on the secondary current generated by the tenth CT sensor CT10, and outputs it as an analog value to the third specific metering calculation unit 161c. The relationship between the ninth current detection unit A9 and the tenth current detection unit A10 is the same as the relationship between the first current detection unit A1 and the second current detection unit A2.

[0079] The ninth voltage detection unit V9 generates a value indicating the voltage of the stationary battery wiring and outputs it as an analog value to the third power conversion control unit 111b. The tenth voltage detection unit V10 generates a value indicating the voltage of the stationary battery wiring and outputs it as an analog value to the third specific metering calculation unit 161c. The relationship between the ninth voltage detection unit V9 and the tenth voltage detection unit V10 is the same as the relationship between the first voltage detection unit V1 and the second voltage detection unit V2.

[0080] The third power conversion control unit 111b controls the second DC / DC converter 11b to control the charge / discharge current or charge / discharge voltage of the stationary battery 7 based on at least one of the value indicating the current flowing through the stationary battery wiring input from the ninth current detection unit A9 and the value indicating the voltage of the stationary battery wiring input from the ninth voltage detection unit V9. The third specific metering calculation unit 161c calculates the amount of energy for specific metering of the stationary battery 7 based on the value indicating the current flowing through the stationary battery wiring input from the tenth current detection unit A10 and the value indicating the voltage of the stationary battery wiring input from the tenth voltage detection unit V10.

[0081] The 11th CT sensor CT11 and the 12th CT sensor CT12 are installed on the second branch wiring W2 that connects the second DC / DC converter 11b and the intermediate bus Bd. The relationship between the 11th CT sensor CT11 and the 12th CT sensor CT12 is the same as the relationship between the first CT sensor CT1 and the second CT sensor CT2.

[0082] The 11th current detection unit A11 generates a value indicating the current flowing through the 2nd branch wiring W2 based on the secondary current generated by the 11th CT sensor CT11, and outputs it as an analog value to the 3rd power conversion control unit 111b. The 12th current detection unit A12 generates a value indicating the current flowing through the 2nd branch wiring W2 based on the secondary current generated by the 12th CT sensor CT12, and outputs it as an analog value to the 6th specific metering calculation unit 161f. The relationship between the 11th current detection unit A11 and the 12th current detection unit A12 is the same as the relationship between the 1st current detection unit A1 and the 2nd current detection unit A2.

[0083] The 11th voltage detection unit V11 generates a value indicating the voltage of the second branch wiring W2 and outputs it as an analog value to the third power conversion control unit 111b. The 12th voltage detection unit V12 generates a value indicating the voltage of the second branch wiring W2 and outputs it as an analog value to the 6th specific metering calculation unit 161f. The relationship between the 11th voltage detection unit V11 and the 12th voltage detection unit V12 is the same as the relationship between the first voltage detection unit V1 and the second voltage detection unit V2.

[0084] The third power conversion control unit 111b can control the step-up / step-down ratio of the second DC / DC converter 11b based on at least one of the values ​​indicating the current flowing through the second branch wiring W2, which is input from the 11th current detection unit A11, and the value indicating the voltage of the second branch wiring W2, which is input from the 11th voltage detection unit V11. The sixth specific metering calculation unit 161f calculates the amount of energy for specific metering of the second branch wiring W2 based on the value indicating the current flowing through the second branch wiring W2, which is input from the 12th current detection unit A12, and the value indicating the voltage of the second branch wiring W2, which is input from the 12th voltage detection unit V12.

[0085] In Figure 5(b), the 13th CT sensor CT13 and the 14th CT sensor CT14 are installed in the vehicle battery wiring between the 3rd DC / DC converter 11c and the vehicle battery 8. The relationship between the 13th CT sensor CT13 and the 14th CT sensor CT14 is the same as the relationship between the 1st CT sensor CT1 and the 2nd CT sensor CT2.

[0086] The 13th current detection unit A13 generates a value indicating the current flowing through the vehicle's battery wiring based on the secondary current generated by the 13th CT sensor CT13, and outputs it as an analog value to the 4th power conversion control unit 111c. The 14th current detection unit A14 generates a value indicating the current flowing through the vehicle's battery wiring based on the secondary current generated by the 14th CT sensor CT14, and outputs it as an analog value to the 4th specific metering calculation unit 161d. The relationship between the 13th current detection unit A13 and the 14th current detection unit A14 is the same as the relationship between the 1st current detection unit A1 and the 2nd current detection unit A2.

[0087] The 13th voltage detection unit V13 generates a value indicating the voltage of the stationary battery wiring and outputs it as an analog value to the 4th power conversion control unit 111c. The 14th voltage detection unit V14 generates a value indicating the voltage of the on-board battery wiring and outputs it as an analog value to the 4th specific metering calculation unit 161d. The relationship between the 13th voltage detection unit V13 and the 14th voltage detection unit V14 is the same as the relationship between the 1st voltage detection unit V1 and the 2nd voltage detection unit V2.

[0088] The fourth power conversion control unit 111c controls the third DC / DC converter 11c to control the charge / discharge current or charge / discharge voltage of the on-board battery 8 based on at least one of the value indicating the current flowing through the on-board battery wiring input from the 13th current detection unit A13 and the value indicating the voltage of the on-board battery wiring input from the 13th voltage detection unit V13. The fourth specific metering calculation unit 161d calculates the amount of energy for specific metering of the on-board battery 8 based on the value indicating the current flowing through the on-board battery wiring input from the 14th current detection unit A14 and the value indicating the voltage of the on-board battery wiring input from the 14th voltage detection unit V14.

[0089] The 15th CT sensor CT15 and the 16th CT sensor CT16 are installed on the 3rd branch wiring W3, which connects the 3rd DC / DC converter 11c and the intermediate bus Bd. The relationship between the 15th CT sensor CT15 and the 16th CT sensor CT16 is the same as the relationship between the 1st CT sensor CT1 and the 2nd CT sensor CT2.

[0090] The 15th current detection unit A15 generates a value indicating the current flowing through the 3rd branch wiring W3 based on the secondary current generated by the 15th CT sensor CT15, and outputs it as an analog value to the 4th power conversion control unit 111c. The 16th current detection unit A16 generates a value indicating the current flowing through the 3rd branch wiring W3 based on the secondary current generated by the 16th CT sensor CT16, and outputs it as an analog value to the 7th specific metering calculation unit 161g. The relationship between the 15th current detection unit A15 and the 16th current detection unit A16 is the same as the relationship between the 1st current detection unit A1 and the 2nd current detection unit A2.

[0091] The 15th voltage detection unit V15 generates a value indicating the voltage of the 3rd branch wiring W3 and outputs it as an analog value to the 4th power conversion control unit 111c. The 16th voltage detection unit V16 generates a value indicating the voltage of the 3rd branch wiring W3 and outputs it as an analog value to the 7th specific metering calculation unit 161g. The relationship between the 15th voltage detection unit V15 and the 16th voltage detection unit V16 is the same as the relationship between the 1st voltage detection unit V1 and the 2nd voltage detection unit V2.

[0092] The fourth power conversion control unit 111c can control the step-up / step-down ratio of the third DC / DC converter 11c based on at least one of the values ​​indicating the current flowing through the third branch wiring W3, which is input from the 15th current detection unit A15, and the value indicating the voltage of the third branch wiring W3, which is input from the 15th voltage detection unit V15. The seventh specific metering calculation unit 161g calculates the amount of energy for specific metering of the third branch wiring W3 based on the value indicating the current flowing through the third branch wiring W3, which is input from the 16th current detection unit A16, and the value indicating the voltage of the third branch wiring W3, which is input from the 16th voltage detection unit V16.

[0093] Figure 6(a) shows an example configuration of the first power conversion control unit 121, the AC specific metering calculation unit 151, and the first specific metering calculation unit 161a. Figure 6(b) shows an example configuration of the second power conversion control unit 111a, the second specific metering calculation unit 161b, and the fifth specific metering calculation unit 161e. Figure 7(a) shows an example configuration of the third power conversion control unit 111b, the third specific metering calculation unit 161c, and the sixth specific metering calculation unit 161f. Figure 7(b) shows an example configuration of the fourth power conversion control unit 111c, the fourth specific metering calculation unit 161d, and the seventh specific metering calculation unit 161g.

[0094] In Figure 6(a), the first power conversion control unit 121 includes a first AD conversion unit 1211, a first conversion unit 1212, a first energy calculation unit 1213, a command value generation unit 1214, a first AD conversion unit 1215, a first conversion unit 1216, and a first energy calculation unit 1217.

[0095] The first AD conversion unit 1211 converts the value indicating the current flowing through the AC distribution line, input from the first current detection unit A1, from an analog value to a digital value and outputs it to the first conversion unit 1212. The first AD conversion unit 1211 converts the value indicating the voltage of the AC distribution line, input from the first voltage detection unit V1, from an analog value to a digital value and outputs it to the first conversion unit 1212.

[0096] The first AD conversion unit 1211 may be provided with an AD converter that converts a value indicating the current flowing through the AC distribution line from an analog value to a digital value, and an AD converter that converts a value indicating the voltage of the AC distribution line from an analog value to a digital value, independently of each other, or a single AD converter may be shared in a time-division multiplexer.

[0097] The first conversion unit 1212 converts a value indicating the current flowing through the AC distribution line input from the first AD conversion unit 1211 into the output current value of the inverter 12 and outputs it to the command value generation unit 1214 and the first energy calculation unit 1213. The first conversion unit 1212 converts a value indicating the voltage of the AC distribution line input from the first AD conversion unit 1211 into the output voltage value of the inverter 12 and outputs it to the command value generation unit 1214 and the first energy calculation unit 1213.

[0098] The first energy calculation unit 1213 calculates the output power of the inverter 12 by multiplying the output current value and output voltage value of the inverter 12. The first energy calculation unit 1213 calculates the amount of energy for a predetermined period by accumulating the power values ​​calculated at each time point. The first energy calculation unit 1213 outputs the calculated amount of energy to the system control unit 13.

[0099] The first AD conversion unit 1215 converts the value indicating the current flowing through the intermediate bus Bd, which is input from the third current detection unit A3, from an analog value to a digital value and outputs it to the first conversion unit 1216. The first AD conversion unit 1215 converts the value indicating the voltage of the intermediate bus Bd, which is input from the third voltage detection unit V3, from an analog value to a digital value and outputs it to the first conversion unit 1216.

[0100] The first AD conversion unit 1215 may independently provide an AD converter that converts a value indicating the current flowing through the intermediate bus Bd from an analog value to a digital value, and an AD converter that converts a value indicating the voltage of the intermediate bus Bd from an analog value to a digital value, or a single AD converter may be shared in a time-division multiplexer.

[0101] The first conversion unit 1216 converts a value indicating the current flowing through the intermediate bus Bd, input from the first AD conversion unit 1215, into an input current value for the inverter 12, and outputs it to the command value generation unit 1214 and the first energy calculation unit 1217. The first conversion unit 1216 converts a value indicating the voltage of the intermediate bus Bd, input from the first AD conversion unit 1215, into a bus voltage value, and outputs it to the command value generation unit 1214 and the first energy calculation unit 1217.

[0102] The first energy calculation unit 1217 calculates the input power of the inverter 12 by multiplying the input current value and the bus voltage value of the inverter 12. The first energy calculation unit 1217 calculates the amount of energy for a predetermined period by accumulating the power values ​​calculated at each time point. The first energy calculation unit 1217 outputs the calculated amount of energy to the system control unit 13.

[0103] The command value generation unit 1214 can generate a command value for controlling the inverter 12 based on at least one of the inverter 12's output current value, output voltage value, and bus voltage value. In grid-connected mode, when the power conversion system 1 outputs a constant current, the command value generation unit 1214 generates a current command value to bring the difference between the measured output current value of the inverter 12 and the target current value closer to zero.

[0104] In grid-connected mode, when the power conversion system 1 outputs constant power, the command value generation unit 1214 calculates the output power value of the inverter 12 by multiplying the output current value and output voltage value of the inverter 12. The command value generation unit 1214 generates a power command value that brings the difference between the calculated output power value of the inverter 12 and the target power value closer to zero.

[0105] In grid-connected mode, when the power conversion system 1 continuously outputs the maximum power of the solar cell 6, the command value generation unit 1214 generates a voltage command value to bring the difference between the bus voltage value and the target voltage value closer to zero.

[0106] In standalone operation mode, the command value generation unit 1214 generates a voltage command value to bring the difference between the output voltage value of the inverter 12 and the target voltage value closer to zero. In standalone operation mode, the target voltage value is usually set to the grid voltage value.

[0107] The AC specific metering calculation unit 151 includes a second AD conversion unit 1511, a second conversion unit 1512, and a second energy calculation unit 1513. The second AD conversion unit 1511 converts the value indicating the output current of the inverter 12, input from the second current detection unit A2, from an analog value to a digital value and outputs it to the second conversion unit 1512. The second AD conversion unit 1511 converts the value indicating the output voltage of the inverter 12, input from the second voltage detection unit V2, from an analog value to a digital value and outputs it to the second conversion unit 1512.

[0108] The second AD conversion unit 1511 may be provided with two separate AD converters: one that converts the value indicating the output current of the inverter 12 from an analog value to a digital value, and another that converts the value indicating the output voltage of the inverter 12 from an analog value to a digital value. Alternatively, a single AD converter may be shared using a time-division multiplexing system.

[0109] The second conversion unit 1512 converts the value indicating the output current of the inverter 12, which is input from the second AD conversion unit 1511, into the output current value of the inverter 12 and outputs it to the second energy calculation unit 1513. The second conversion unit 1512 converts the value indicating the output voltage of the inverter 12, which is input from the second AD conversion unit 1511, into the output voltage value of the inverter 12 and outputs it to the second energy calculation unit 1513.

[0110] The second energy calculation unit 1513 calculates the output power value of the inverter 12 by multiplying the output current value and output voltage value of the inverter 12. The second energy calculation unit 1513 calculates the amount of energy for a predetermined period by accumulating the power values ​​calculated at each time point. The second energy calculation unit 1513 outputs the calculated amount of energy to the system control unit 13.

[0111] The first specific metering calculation unit 161a includes a second AD conversion unit 1611a, a second conversion unit 1612a, and a second energy calculation unit 1613a. The second AD conversion unit 1611a converts a value indicating the current flowing through the intermediate bus Bd, input from the fourth current detection unit A4, from an analog value to a digital value and outputs it to the second conversion unit 1612a. The second AD conversion unit 1611a converts a value indicating the voltage of the intermediate bus Bd, input from the fourth voltage detection unit V4, from an analog value to a digital value and outputs it to the second conversion unit 1612a.

[0112] The second AD conversion unit 1611a may independently provide an AD converter that converts a value indicating the current flowing through the intermediate bus Bd from an analog value to a digital value, and an AD converter that converts a value indicating the voltage of the intermediate bus Bd from an analog value to a digital value, or a single AD converter may be shared in a time-division multiplexer.

[0113] The second conversion unit 1612a converts a value indicating the current flowing through the intermediate bus Bd, which is input from the second AD conversion unit 1611a, into the input current value of the inverter 12 and outputs it to the second energy calculation unit 1613a. The second conversion unit 1612a converts a value indicating the voltage of the intermediate bus Bd, which is input from the second AD conversion unit 1611a, into the bus voltage value and outputs it to the second energy calculation unit 1613a.

[0114] The second energy calculation unit 1613a calculates the input power value of the inverter 12 by multiplying the input current value and the bus voltage value of the inverter 12. The second energy calculation unit 1613a calculates the amount of energy for a predetermined period by accumulating the power values ​​calculated at each time point. The second energy calculation unit 1613a outputs the calculated amount of energy to the system control unit 13.

[0115] In Figure 6(b), the second power conversion control unit 111a includes a first AD conversion unit 1111a, a first conversion unit 1112a, a first energy calculation unit 1113a, a command value generation unit 1114a, a first AD conversion unit 1115a, a first conversion unit 1116a, and a first energy calculation unit 1117a.

[0116] The first AD conversion unit 1111a converts the value indicating the current flowing through the solar cell wiring, input from the fifth current detection unit A5, from an analog value to a digital value and outputs it to the first conversion unit 1112a. The first AD conversion unit 1111a converts the value indicating the voltage of the solar cell wiring, input from the fifth voltage detection unit V5, from an analog value to a digital value and outputs it to the first conversion unit 1112a.

[0117] The first AD conversion unit 1111a may be provided with an AD converter that converts a value indicating the current flowing through the solar cell wiring from an analog value to a digital value, and an AD converter that converts a value indicating the voltage of the solar cell wiring from an analog value to a digital value, independently of each other, or a single AD converter may be shared in a time-division multiplexer.

[0118] The first conversion unit 1112a converts a value indicating the current flowing through the solar cell wiring, input from the first AD conversion unit 1111a, into the output current value of the solar cell 6, and outputs it to the command value generation unit 1114a and the first energy calculation unit 1113a. The first conversion unit 1112a converts a value indicating the voltage of the solar cell wiring, input from the first AD conversion unit 1111a, into the output voltage value of the solar cell 6, and outputs it to the command value generation unit 1114a and the first energy calculation unit 1113a.

[0119] The first energy calculation unit 1113a calculates the output power of the solar cell 6 by multiplying the output current value and output voltage value of the solar cell 6. The first energy calculation unit 1113a calculates the amount of power generated over a predetermined period by integrating the power values ​​calculated at each time point. The first energy calculation unit 1113a outputs the calculated amount of power generated to the system control unit 13.

[0120] The first AD conversion unit 1115a converts the value indicating the current flowing through the first branch wiring W1, which is input from the seventh current detection unit A7, from an analog value to a digital value and outputs it to the first conversion unit 1116a. The first AD conversion unit 1115a converts the value indicating the voltage of the first branch wiring W1, which is input from the seventh voltage detection unit V7, from an analog value to a digital value and outputs it to the first conversion unit 1116a.

[0121] The first AD conversion unit 1115a may be provided with an AD converter that converts the value indicating the current flowing through the first branch wiring W1 from an analog value to a digital value, and an AD converter that converts the value indicating the voltage of the first branch wiring W1 from an analog value to a digital value, independently of each other, or a single AD converter may be shared in a time-division manner.

[0122] The first conversion unit 1116a converts a value indicating the current flowing through the first branch wiring W1, input from the first AD conversion unit 1115a, into the output current value of the first DC / DC converter 11a, and outputs it to the command value generation unit 1114a and the first energy calculation unit 1117a. The first conversion unit 1116a converts a value indicating the voltage of the first branch wiring W1, input from the first AD conversion unit 1115a, into the output voltage value of the first DC / DC converter 11a, and outputs it to the command value generation unit 1114a and the first energy calculation unit 1117a.

[0123] The first energy calculation unit 1117a calculates the output power of the first DC / DC converter 11a by multiplying the output current value and output voltage value of the first DC / DC converter 11a. The first energy calculation unit 1117a calculates the amount of energy for a predetermined period by integrating the power values ​​calculated at each time point. The first energy calculation unit 1117a outputs the calculated amount of energy to the system control unit 13.

[0124] The command value generation unit 1114a can generate a voltage command value to cause the first DC / DC converter 11a to perform MPPT control of the solar cell 6, based on the output current value and output voltage value of the solar cell 6. The command value generation unit 1114a can also generate a voltage command value to suppress the bus voltage value to a predetermined value or less, based on the output voltage value of the first DC / DC converter 11a.

[0125] The seventh voltage detection unit V7 may be shared with the third voltage detection unit V3, and the eighth voltage detection unit V8 may be shared with the fourth voltage detection unit V4. Also, if the second power conversion control unit 111a and the system control unit 13 are connected by a high-speed communication line, the command value generation unit 1114a may obtain the bus voltage value from the system control unit 13. In this case, the seventh voltage detection unit V7 and the eighth voltage detection unit V8 may be omitted. The output voltage value of the first DC / DC converter 11a is replaced by the bus voltage value obtained by communication.

[0126] The second specific metering calculation unit 161b includes a second AD conversion unit 1611b, a second conversion unit 1612b, and a second energy calculation unit 1613b. The second AD conversion unit 1611b converts a value indicating the current flowing through the solar cell wiring, input from the sixth current detection unit A6, from an analog value to a digital value and outputs it to the second conversion unit 1612b. The second AD conversion unit 1611b converts a value indicating the voltage of the solar cell wiring, input from the sixth voltage detection unit V6, from an analog value to a digital value and outputs it to the second conversion unit 1612b.

[0127] The second AD conversion unit 1611b may be provided with an AD converter that converts a value indicating the current flowing through the solar cell wiring from an analog value to a digital value, and an AD converter that converts a value indicating the voltage of the solar cell wiring from an analog value to a digital value, independently of each other, or a single AD converter may be shared in a time-division multiplexer.

[0128] The second conversion unit 1612b converts a value indicating the current flowing through the solar cell wiring, input from the second AD conversion unit 1611b, into the output current value of the solar cell 6 and outputs it to the second energy calculation unit 1613b. The second conversion unit 1612b converts a value indicating the voltage of the solar cell wiring, input from the second AD conversion unit 1611b, into the output voltage value of the solar cell 6 and outputs it to the second energy calculation unit 1613b.

[0129] The second energy calculation unit 1613b calculates the output power value of the solar cell 6 by multiplying the output current value and output voltage value of the solar cell 6. The second energy calculation unit 1613b calculates the amount of power generated over a predetermined period by accumulating the power values ​​calculated at each time point. The second energy calculation unit 1613b outputs the calculated amount of power generated to the system control unit 13.

[0130] The fifth specific metering calculation unit 161e includes a second AD conversion unit 1611e, a second conversion unit 1612e, and a second energy calculation unit 1613e. The second AD conversion unit 1611e converts a value indicating the current flowing through the first branch wiring W1, input from the eighth current detection unit A8, from an analog value to a digital value and outputs it to the second conversion unit 1612e. The second AD conversion unit 1611e converts a value indicating the voltage of the first branch wiring W1, input from the eighth voltage detection unit V8, from an analog value to a digital value and outputs it to the second conversion unit 1612e.

[0131] The second AD conversion unit 1611e may be provided with an AD converter that converts the value indicating the current flowing through the first branch wiring W1 from an analog value to a digital value, and an AD converter that converts the value indicating the voltage of the first branch wiring W1 from an analog value to a digital value, independently of each other, or a single AD converter may be shared in a time-division manner.

[0132] The second conversion unit 1612e converts a value indicating the current flowing through the first branch wiring W1, input from the second AD conversion unit 1611e, into the output current value of the first DC / DC converter 11a and outputs it to the second energy calculation unit 1613e. The second conversion unit 1612e converts a value indicating the voltage of the first branch wiring W1, input from the second AD conversion unit 1611e, into the output voltage value of the first DC / DC converter 11a and outputs it to the second energy calculation unit 1613e.

[0133] The second energy calculation unit 1613e calculates the output power value of the first DC / DC converter 11a by multiplying the output current value and output voltage value of the first DC / DC converter 11a. The second energy calculation unit 1613e calculates the amount of energy for a predetermined period by accumulating the power values ​​calculated at each time point. The second energy calculation unit 1613e outputs the calculated amount of energy to the system control unit 13.

[0134] In Figure 7(a), the third power conversion control unit 111b includes a first AD conversion unit 1111b, a first conversion unit 1112b, a first energy calculation unit 1113b, a command value generation unit 1114b, a first AD conversion unit 1115b, a first conversion unit 1116b, and a first energy calculation unit 1117b.

[0135] The first AD conversion unit 1111b converts the value indicating the current flowing through the stationary battery wiring, input from the ninth current detection unit A9, from an analog value to a digital value and outputs it to the first conversion unit 1112b. The first AD conversion unit 1111b converts the value indicating the voltage of the stationary battery wiring, input from the ninth voltage detection unit V9, from an analog value to a digital value and outputs it to the first conversion unit 1112b.

[0136] The first AD conversion unit 1111b may be provided with an AD converter that converts a value indicating the current flowing through the stationary battery wiring from an analog value to a digital value, and an AD converter that converts a value indicating the voltage of the stationary battery wiring from an analog value to a digital value, independently of each other, or a single AD converter may be shared in a time-division manner.

[0137] The first conversion unit 1112b converts a value indicating the current flowing through the stationary battery wiring, input from the first AD conversion unit 1111b, into the charge / discharge current value of the stationary battery 7, and outputs it to the command value generation unit 1114b and the first energy calculation unit 1113b. The first conversion unit 1112b converts a value indicating the voltage of the stationary battery wiring, input from the first AD conversion unit 1111b, into the charge / discharge voltage value of the stationary battery 7, and outputs it to the command value generation unit 1114b and the first energy calculation unit 1113b.

[0138] The first energy calculation unit 1113b calculates the charge and discharge power of the stationary battery 7 by multiplying the charge and discharge current value and the charge and discharge voltage value of the stationary battery 7. The first energy calculation unit 1113b calculates the charge and discharge amount for a predetermined period by integrating the power values ​​calculated at each time point. The first energy calculation unit 1113b outputs the calculated charge and discharge amount to the system control unit 13.

[0139] The first AD conversion unit 1115b converts the value indicating the current flowing through the second branch wiring W2, which is input from the 11th current detection unit A11, from an analog value to a digital value and outputs it to the first conversion unit 1116b. The first AD conversion unit 1115b converts the value indicating the voltage of the second branch wiring W2, which is input from the 11th voltage detection unit V11, from an analog value to a digital value and outputs it to the first conversion unit 1116b.

[0140] The first AD conversion unit 1115b may independently provide an AD converter that converts the value indicating the current flowing through the second branch wiring W2 from an analog value to a digital value, and an AD converter that converts the value indicating the voltage of the second branch wiring W2 from an analog value to a digital value, or a single AD converter may be shared in a time-division manner.

[0141] The first conversion unit 1116b converts a value indicating the current flowing through the second branch wiring W2, input from the first AD conversion unit 1115b, into the output current value of the second DC / DC converter 11b, and outputs it to the command value generation unit 1114b and the first energy calculation unit 1117b. The first conversion unit 1116b converts a value indicating the voltage of the second branch wiring W2, input from the first AD conversion unit 1115b, into the output voltage value of the second DC / DC converter 11b, and outputs it to the command value generation unit 1114b and the first energy calculation unit 1117b.

[0142] The first energy calculation unit 1117b calculates the output power of the second DC / DC converter 11b by multiplying the output current value and output voltage value of the second DC / DC converter 11b. The first energy calculation unit 1117b calculates the amount of energy for a predetermined period by integrating the power values ​​calculated at each time point. The first energy calculation unit 1117b outputs the calculated amount of energy to the system control unit 13.

[0143] The command value generation unit 1114b can generate a current command value or a voltage command value for charging or discharging the stationary battery 7 based on the charge / discharge current value or charge / discharge voltage value of the stationary battery 7. The command value generation unit 1114b can also generate a voltage command value for suppressing the bus voltage value to a predetermined value or less based on the output voltage value of the second DC / DC converter 11b.

[0144] The 11th voltage detection unit V11 may be shared with the 3rd voltage detection unit V3, and the 12th voltage detection unit V12 may be shared with the 4th voltage detection unit V4. Also, if the 3rd power conversion control unit 111b and the system control unit 13 are connected by a high-speed communication line, the command value generation unit 1114b may obtain the bus voltage value from the system control unit 13. In this case, the 11th voltage detection unit V11 and the 12th voltage detection unit V12 may be omitted. The output voltage value of the 2nd DC / DC converter 11b is replaced by the bus voltage value obtained by communication.

[0145] The third specific metering calculation unit 161c includes a second AD conversion unit 1611c, a second conversion unit 1612c, and a second energy calculation unit 1613c. The second AD conversion unit 1611c converts a value indicating the current flowing through the stationary battery wiring, input from the tenth current detection unit A10, from an analog value to a digital value and outputs it to the second conversion unit 1612c. The second AD conversion unit 1611c converts a value indicating the voltage of the stationary battery wiring, input from the tenth voltage detection unit V10, from an analog value to a digital value and outputs it to the second conversion unit 1612c.

[0146] The second AD conversion unit 1611c may be provided with an AD converter that converts a value indicating the current flowing through the stationary battery wiring from an analog value to a digital value, and an AD converter that converts a value indicating the voltage of the stationary battery wiring from an analog value to a digital value, independently of each other, or a single AD converter may be shared in a time-division manner.

[0147] The second conversion unit 1612c converts the value indicating the current flowing through the stationary battery wiring, input from the second AD conversion unit 1611c, into the charge / discharge current value of the stationary battery 7 and outputs it to the second energy calculation unit 1613c. The second conversion unit 1612c converts the value indicating the voltage of the stationary battery wiring, input from the second AD conversion unit 1611c, into the charge / discharge voltage value of the stationary battery 7 and outputs it to the second energy calculation unit 1613c.

[0148] The second energy calculation unit 1613c calculates the charge / discharge power value of the stationary battery 7 by multiplying the charge / discharge current value and the charge / discharge voltage value of the stationary battery 7. The second energy calculation unit 1613c calculates the charge / discharge amount for a predetermined period by accumulating the power values ​​calculated at each time point. The second energy calculation unit 1613c outputs the calculated charge / discharge amount to the system control unit 13.

[0149] The sixth specific metering calculation unit 161f includes a second AD conversion unit 1611f, a second conversion unit 1612f, and a second energy calculation unit 1613f. The second AD conversion unit 1611f converts the value indicating the current flowing through the second branch wiring W2, input from the 12th current detection unit A12, from an analog value to a digital value and outputs it to the second conversion unit 1612f. The second AD conversion unit 1611f converts the value indicating the voltage of the second branch wiring W2, input from the 12th voltage detection unit V12, from an analog value to a digital value and outputs it to the second conversion unit 1612f.

[0150] The second AD conversion unit 1611f may be provided with an AD converter that converts the value indicating the current flowing through the second branch wiring W2 from an analog value to a digital value, and an AD converter that converts the value indicating the voltage of the second branch wiring W2 from an analog value to a digital value, independently of each other, or a single AD converter may be shared in a time-division manner.

[0151] The second conversion unit 1612f converts a value indicating the current flowing through the second branch wiring W2, which is input from the second AD conversion unit 1611f, into the output current value of the second DC / DC converter 11b and outputs it to the second energy calculation unit 1613f. The second conversion unit 1612f converts a value indicating the voltage of the second branch wiring W2, which is input from the second AD conversion unit 1611f, into the output voltage value of the second DC / DC converter 11b and outputs it to the second energy calculation unit 1613f.

[0152] The second energy calculation unit 1613f calculates the output power value of the second DC / DC converter 11b by multiplying the output current value and output voltage value of the second DC / DC converter 11b. The second energy calculation unit 1613f calculates the energy amount for a predetermined period by accumulating the power values ​​calculated at each time point. The second energy calculation unit 1613f outputs the calculated energy amount to the system control unit 13.

[0153] In Figure 7(b), the fourth power conversion control unit 111c includes a first AD conversion unit 1111c, a first conversion unit 1112c, a first energy calculation unit 1113c, a command value generation unit 1114c, a first AD conversion unit 1115c, a first conversion unit 1116c, and a first energy calculation unit 1117c.

[0154] The first AD conversion unit 1111c converts the value indicating the current flowing through the vehicle battery wiring, input from the 13th current detection unit A13, from an analog value to a digital value and outputs it to the first conversion unit 1112c. The first AD conversion unit 1111c converts the value indicating the voltage of the vehicle battery wiring, input from the 13th voltage detection unit V13, from an analog value to a digital value and outputs it to the first conversion unit 1112c.

[0155] The first AD conversion unit 1111c may independently provide an AD converter that converts a value indicating the current flowing through the vehicle's battery wiring from an analog value to a digital value, and an AD converter that converts a value indicating the voltage of the vehicle's battery wiring from an analog value to a digital value, or a single AD converter may be shared in a time-division manner.

[0156] The first conversion unit 1112c converts a value indicating the current flowing through the vehicle battery wiring, input from the first AD conversion unit 1111c, into the charge / discharge current value of the vehicle battery 8, and outputs it to the command value generation unit 1114c and the first energy calculation unit 1113c. The first conversion unit 1112c converts a value indicating the voltage of the vehicle battery wiring, input from the first AD conversion unit 1111c, into the charge / discharge voltage value of the vehicle battery 8, and outputs it to the command value generation unit 1114c and the first energy calculation unit 1113c.

[0157] The first energy calculation unit 1113c calculates the charge / discharge power of the on-board battery 8 by multiplying the charge / discharge current value and the charge / discharge voltage value of the on-board battery 8. The first energy calculation unit 1113c calculates the charge / discharge amount for a predetermined period by accumulating the power values ​​calculated at each time point. The first energy calculation unit 1113c outputs the calculated charge / discharge amount to the system control unit 13.

[0158] The first AD conversion unit 1115c converts the value indicating the current flowing through the third branch wiring W3, which is input from the 15th current detection unit A15, from an analog value to a digital value and outputs it to the first conversion unit 1116c. The first AD conversion unit 1115c converts the value indicating the voltage of the third branch wiring W3, which is input from the 15th voltage detection unit V15, from an analog value to a digital value and outputs it to the first conversion unit 1116c.

[0159] The first AD conversion unit 1115c may be provided with an AD converter that converts the value indicating the current flowing through the third branch wiring W3 from an analog value to a digital value, and an AD converter that converts the value indicating the voltage of the third branch wiring W3 from an analog value to a digital value, independently of each other, or a single AD converter may be shared in a time-division manner.

[0160] The first conversion unit 1116c converts a value indicating the current flowing through the third branch wiring W3, input from the first AD conversion unit 1115c, into the output current value of the third DC / DC converter 11c, and outputs it to the command value generation unit 1114c and the first energy calculation unit 1117c. The first conversion unit 1116c converts a value indicating the voltage of the third branch wiring W3, input from the first AD conversion unit 1115c, into the output voltage value of the third DC / DC converter 11c, and outputs it to the command value generation unit 1114c and the first energy calculation unit 1117c.

[0161] The first energy calculation unit 1117c calculates the output power of the third DC / DC converter 11c by multiplying the output current value and output voltage value of the third DC / DC converter 11c. The first energy calculation unit 1117c calculates the energy amount for a predetermined period by integrating the energy values ​​calculated at each time point. The first energy calculation unit 1117c outputs the calculated energy amount to the system control unit 13.

[0162] The command value generation unit 1114c can generate a current command value or a voltage command value for charging or discharging the on-board battery 8 based on the charge / discharge current value or charge / discharge voltage value of the on-board battery 8. The command value generation unit 1114c can also generate a voltage command value for suppressing the bus voltage value to a predetermined value or less based on the output voltage value of the third DC / DC converter 11c.

[0163] The 15th voltage detection unit V15 may be shared with the 3rd voltage detection unit V3, and the 16th voltage detection unit V16 may be shared with the 4th voltage detection unit V4. Also, if the 4th power conversion control unit 111c and the system control unit 13 are connected by a high-speed communication line, the command value generation unit 1114c may obtain the bus voltage value from the system control unit 13. In this case, the 15th voltage detection unit V15 and the 16th voltage detection unit V16 may be omitted. The output voltage value of the 3rd DC / DC converter 11c is replaced by the bus voltage value obtained by communication.

[0164] The fourth specific metering calculation unit 161d includes a second AD conversion unit 1611d, a second conversion unit 1612d, and a second energy calculation unit 1613d. The second AD conversion unit 1611d converts a value indicating the current flowing through the vehicle battery wiring, input from the 14th current detection unit A14, from an analog value to a digital value and outputs it to the second conversion unit 1612d. The second AD conversion unit 1611d converts a value indicating the voltage of the vehicle battery wiring, input from the 14th voltage detection unit V14, from an analog value to a digital value and outputs it to the second conversion unit 1612d.

[0165] The second AD conversion unit 1611d may be provided with two separate AD converters: one that converts a value indicating the current flowing through the vehicle's battery wiring from an analog value to a digital value, and another that converts a value indicating the voltage of the vehicle's battery wiring from an analog value to a digital value. Alternatively, a single AD converter may be shared using time-division multiplexing.

[0166] The second conversion unit 1612d converts a value indicating the current flowing through the vehicle battery wiring, input from the second AD conversion unit 1611d, into the charge / discharge current value of the vehicle battery 8 and outputs it to the second energy calculation unit 1613d. The second conversion unit 1612d converts a value indicating the voltage of the vehicle battery wiring, input from the second AD conversion unit 1611d, into the charge / discharge voltage value of the vehicle battery 8 and outputs it to the second energy calculation unit 1613d.

[0167] The second energy calculation unit 1613d calculates the charge / discharge power value of the on-board battery 8 by multiplying the charge / discharge current value and the charge / discharge voltage value of the on-board battery 8. The second energy calculation unit 1613d calculates the charge / discharge amount for a predetermined period by accumulating the power values ​​calculated at each time point. The second energy calculation unit 1613d outputs the calculated charge / discharge amount to the system control unit 13.

[0168] The seventh specific metering calculation unit 161g includes a second AD conversion unit 1611g, a second conversion unit 1612g, and a second energy calculation unit 1613g. The second AD conversion unit 1611g converts the value indicating the current flowing through the third branch wiring W3, which is input from the 16th current detection unit A16, from an analog value to a digital value and outputs it to the second conversion unit 1612g. The second AD conversion unit 1611g converts the value indicating the voltage of the third branch wiring W3, which is input from the 16th voltage detection unit V16, from an analog value to a digital value and outputs it to the second conversion unit 1612g.

[0169] The second AD conversion unit 1611g may be provided with an AD converter that converts the value indicating the current flowing through the third branch wiring W3 from an analog value to a digital value, and an AD converter that converts the value indicating the voltage of the third branch wiring W3 from an analog value to a digital value, independently of each other, or a single AD converter may be shared in a time-division division.

[0170] The second conversion unit 1612g converts a value indicating the current flowing through the third branch wiring W3, which is input from the second AD conversion unit 1611g, into the output current value of the third DC / DC converter 11c and outputs it to the second energy calculation unit 1613g. The second conversion unit 1612g converts a value indicating the voltage of the third branch wiring W3, which is input from the second AD conversion unit 1611g, into the output voltage value of the third DC / DC converter 11c and outputs it to the second energy calculation unit 1613g.

[0171] The second energy calculation unit 1613g calculates the output power value of the third DC / DC converter 11c by multiplying the output current value and output voltage value of the third DC / DC converter 11c. The second energy calculation unit 1613g calculates the energy amount for a predetermined period by accumulating the power values ​​calculated at each time point. The second energy calculation unit 1613g outputs the calculated energy amount to the system control unit 13.

[0172] The first and second AD conversion units, which form a pair, use components with different specifications. The second AD conversion unit uses a component with higher precision than the first AD conversion unit. The second AD conversion unit uses a component with higher resolution than the first AD conversion unit. For example, the first AD conversion unit may use a component with a resolution of 10 to 12 bits, while the second AD conversion unit may use a component with a resolution of 20 to 24 bits.

[0173] Furthermore, compared to the feedback control of the inverter 12 and the first DC / DC converter 11a-third DC / DC converter 11c, the calculation of the amount of energy for specific metering has less real-time capability, so the second AD conversion unit may be one with lower responsiveness than the first AD conversion unit.

[0174] From the above perspective, in this embodiment, a successive approximation type AD converter is used in the first AD conversion unit, and a delta-sigma type AD converter is used in the second AD conversion unit. The delta-sigma type AD converter has higher conversion accuracy than the successive approximation type AD converter. The successive approximation type AD converter can operate at a higher speed than the delta-sigma type AD converter.

[0175] In the above description, the first CT sensor CT1, the first current detection unit A1, the first voltage detection unit V1, the third CT sensor CT3, the third current detection unit A3, the third voltage detection unit V3, the fifth CT sensor CT5, the fifth current detection unit A5, the fifth voltage detection unit V5, the seventh CT sensor CT7, the seventh current detection unit A7, the seventh voltage detection unit V7, the ninth CT sensor CT9, the ninth current detection unit A9, the ninth voltage detection unit V9, the eleventh CT sensor CT11, the eleventh current detection unit A11, the eleventh voltage detection unit V11, the first power conversion control unit 121, the second power conversion control unit 111a, the third power conversion control unit 111b, and the fourth power conversion control unit 111c are components of a power conversion control system.

[0176] The second CT sensor CT2, second current detection unit A2, second voltage detection unit V2, fourth CT sensor CT4, fourth current detection unit A4, fourth voltage detection unit V4, sixth CT sensor CT6, sixth current detection unit A6, sixth voltage detection unit V6, eighth CT sensor CT8, eighth current detection unit A8, eighth voltage detection unit V8, tenth CT sensor CT10, tenth current detection unit A10, tenth voltage detection unit V10, twelfth CT sensor CT12, twelfth current detection unit A12, twelfth voltage detection unit V12, AC specific metering calculation unit 151, first specific metering calculation unit 161a to seventh specific metering calculation unit 161g are components of the system for specific metering.

[0177] In the configuration examples shown in Figures 4(a), 4(b), 5(a), 5(b), 6(a), 6(b), 7(a), and 7(b), the hardware systems for power conversion control and the hardware systems for specific metering are all provided independently.

[0178] The system control unit 13 compares the amount of energy calculated by the power conversion control unit with the amount of energy for specific measurement calculated by the specific measurement calculation unit. If the error between the two exceeds a predetermined range, the system control unit 13 determines that an abnormality has occurred.

[0179] Figure 8 is a flowchart showing the flow of the measurement accuracy determination process for specific energy consumption by the system control unit 13. When the power conversion system 1 is in operation (Y in S10), the first power conversion control unit 121 calculates the amount of energy P1 output by the inverter 12 (S11), and the AC specific energy consumption calculation unit 151 calculates the amount of energy P2 output by the inverter 12 (S12). The system control unit 13 calculates the error between the amount of energy P1 calculated by the first power conversion control unit 121 and the amount of energy P2 calculated by the AC specific energy consumption calculation unit 151 (S13).

[0180] The system control unit 13 determines whether the error is within the acceptable range (S14). In Japan, the Measurement Expert Committee of the Agency for Natural Resources and Energy has stipulated that for measuring instruments used in specific measurements, applicants intending to conduct new electricity transactions can flexibly select the tolerance during use from seven levels ranging from 0.9% to 10%, taking into account the needs of the trading parties, the scale of the transaction, and the intended use. Tolerance refers to the permissible difference expressed as the absolute value of the ratio of the value obtained by subtracting the true value from the measured value to the true value. For example, if the n3 class is selected, the tolerance at the time of inspection is set at 2.0%, and the tolerance during use is set at 3.0%. The n3 class is a class in which transactions can be conducted via the transmission network of general transmission and distribution operators without incurring accountability to the trading partner, regardless of the scale of the transaction.

[0181] For example, if the maximum tolerance of the energy quantity P1 calculated by the first power conversion control unit 121 is 8%, and the tolerance of the energy quantity P2 calculated by the AC specific metering calculation unit 151 is within 3%, then the ratio of energy quantity P1 to energy quantity P2 will be in the range of approximately 0.893 to approximately 1.119. In this example, if a discrepancy of approximately 12% or more occurs between energy quantity P1 and energy quantity P2, it can be estimated that an abnormality has occurred in at least one of the power conversion control system and the specific metering system. The designer can set the allowable error range between energy quantity P1 and energy quantity P2 based on the maximum tolerance of the energy quantity P1 calculated by the first power conversion control unit 121 and the target tolerance of the energy quantity P2 calculated by the AC specific metering calculation unit 151.

[0182] In step S14, if the error between energy quantity P1 and energy quantity P2 is within the acceptable range (Y in S14), the system control unit 13 notifies the external connection management device 17 of the energy quantity P2 calculated by the AC specific metering calculation unit 151 (S15). If the error between energy quantity P1 and energy quantity P2 is outside the acceptable range (N in S14), the system control unit 13 performs error processing (S16).

[0183] For example, the system control unit 13 automatically restarts the power conversion system 1 and checks whether the error between energy amounts P1 and P2 falls within an acceptable range. If the error between energy amounts P1 and P2 does not fall within an acceptable range after a predetermined number of restarts, the system control unit 13 displays a measurement function error on the monitor or an information terminal held by the user. The user, upon viewing the monitor or information terminal, contacts the maintenance personnel to request repairs. Alternatively, the system control unit 13 may directly send a repair request to a terminal device installed at the service center of the power conversion system 1 manufacturer via the network 9.

[0184] The processes described in steps S11-S16 above are executed continuously until the power conversion system 1 stops (N in S10). Note that the comparison and determination process between energy amounts P1 and P2 may be executed periodically rather than continuously. The system control unit 13 also executes the comparison and determination process for the other pair, between energy amount P1 calculated by the power conversion control unit and energy amount P2 calculated by the specific metering calculation unit.

[0185] In the configuration examples shown in Figures 4(a), 4(b), 5(a), and 5(b), the first CT sensor CT1 and the second CT sensor CT2 may be shared. The third CT sensor CT3 and the fourth CT sensor CT4 may be shared. The fifth CT sensor CT5 and the sixth CT sensor CT6 may be shared. The seventh CT sensor CT7 and the eighth CT sensor CT8 may be shared. The ninth CT sensor CT9 and the tenth CT sensor CT10 may be shared. The eleventh CT sensor CT11 and the twelfth CT sensor CT12 may be shared. The thirteenth CT sensor CT13 and the fourteenth CT sensor CT14 may be shared. The fifteenth CT sensor CT15 and the sixteenth CT sensor CT16 may be shared. When CT sensors are shared, the redundancy of the CT sensors decreases, but costs can be reduced.

[0186] With the standardization of CT sensors, the first current detection unit A1 and the second current detection unit A2 may be standardized. The third current detection unit A3 and the fourth current detection unit A4 may be standardized. The fifth current detection unit A5 and the sixth current detection unit A6 may be standardized. The seventh current detection unit A7 and the eighth current detection unit A8 may be standardized. The ninth current detection unit A9 and the tenth current detection unit A10 may be standardized. The eleventh current detection unit A11 and the twelfth current detection unit A12 may be standardized. The thirteenth current detection unit A13 and the fourteenth current detection unit A14 may be standardized. The fifteenth current detection unit A15 and the sixteenth current detection unit A16 may be standardized. When the CT sensor and current detection unit are standardized, the redundancy of the CT sensor and current detection unit is reduced, but costs can be reduced.

[0187] The first voltage detection unit V1 and the second voltage detection unit V2 may be shared. The third voltage detection unit V3 and the fourth voltage detection unit V4 may be shared. The fifth voltage detection unit V5 and the sixth voltage detection unit V6 may be shared. The seventh voltage detection unit V7 and the eighth voltage detection unit V8 may be shared. The ninth voltage detection unit V9 and the tenth voltage detection unit V10 may be shared. The eleventh voltage detection unit V11 and the twelfth voltage detection unit V12 may be shared. The thirteenth voltage detection unit V13 and the fourteenth voltage detection unit V14 may be shared. The fifteenth voltage detection unit V15 and the sixteenth voltage detection unit V16 may be shared. When voltage detection units are shared, the redundancy of the voltage detection units is reduced, but costs can be reduced.

[0188] The first power conversion control unit 121, the AC specific metering calculation unit 151, the first specific metering calculation unit 161a, and the system control unit 13 are basically each composed of one microcontroller, but they may be integrated into up to three microcontrollers. The second power conversion control unit 111a, the second specific metering calculation unit 161b, and the fifth specific metering calculation unit 161e are basically each composed of one microcontroller, but they may be integrated into one or two microcontrollers. The third power conversion control unit 111b, the third specific metering calculation unit 161c, and the sixth specific metering calculation unit 161f are basically each composed of one microcontroller, but they may be integrated into one or two microcontrollers. The fourth power conversion control unit 111c, the fourth specific metering calculation unit 161d, and the seventh specific metering calculation unit 161g are basically each composed of one microcontroller, but they may be integrated into one or two microcontrollers.

[0189] Thus, the hardware system for power conversion control and a portion of the hardware system for specific metering may be shared, while the rest may be provided independently.

[0190] As described above, according to this embodiment, by independently providing a hardware system for power conversion control and a part or all of the hardware system for specific measurement, it is possible to measure the amount of electricity with high accuracy and robustness. By separating the hardware system for power conversion control and the hardware system for specific measurement, it becomes possible to compare the amount of electricity calculated in each system, enabling robust and reliable measurement of the amount of electricity.

[0191] The present disclosure has been described above based on embodiments. The embodiments are illustrative, and it will be readily apparent to those skilled in the art that various modifications are possible in combinations of their components and processing processes, and that such modifications are also within the scope of the present disclosure.

[0192] For example, the system control unit 13 may compare the sum of the energy for specific measurement calculated by the fifth DC wattmeter 16e, the energy for specific measurement calculated by the sixth DC wattmeter 16f, and the energy for specific measurement calculated by the seventh DC wattmeter 16g with the energy for specific measurement calculated by the first DC wattmeter 16a, and if the error between the two exceeds a predetermined range, the power conversion system 1 may determine that there is an abnormality.

[0193] Furthermore, fuel cells may be included as one of the distributed power sources.

[0194] The embodiments may be specified by the following items.

[0195] [Item 1] It is connected between the intermediate bus (Bd) and the distribution board (3), and converts the AC power supplied from the power system (2) connected to the distribution board (3) into DC power, and supplies the converted DC power to the intermediate bus (Bd), or converts the DC power supplied from the intermediate bus (Bd) into AC power, and the converted exchange A first power conversion unit (12) supplies power to the power system (2) or load (4) connected to the distribution board (3), A second power conversion unit (11a) is connected between the intermediate bus (Bd) and the distributed power supply (6), and converts the DC power supplied from the distributed power supply (6) into another DC power with a different voltage or current, and supplies the converted DC power to the intermediate bus (Bd). A first power conversion control unit (121) generates a first command value for controlling the first power conversion unit (12) based on the current and voltage of the intermediate bus (Bd), A first specific metering calculation unit (161a) calculates the amount of energy for specific metering of the intermediate bus (Bd) based on the current and voltage of the intermediate bus (Bd), A second power conversion control unit (111a) generates a second command value for controlling the second power conversion unit (11a) based on the current and voltage of the distributed power supply (6), The system includes a second specific metering calculation unit (161b) that calculates the amount of energy for specific metering of the distributed power supply (6) based on the current and voltage of the distributed power supply (6), The hardware system from the first power conversion control unit (121) detecting voltage and current to calculate the first command value, and part or all of the hardware system from the first specific metering calculation unit (161a) detecting voltage and current to calculate the amount of energy for specific metering of the intermediate bus (Bd), are provided independently. The hardware system from the second power conversion control unit (111a) detecting voltage and current to calculating the second command value, and part or all of the hardware system from the second specific metering calculation unit (161b) detecting voltage and current to calculating the amount of energy for specific metering of the distributed power supply (6), are provided independently. Power conversion system (1). This method enables highly accurate and robust measurement of electrical energy. [Item 2] The distributed power source (6) is a solar cell (6), The second power conversion unit (11a) converts the DC power generated by the solar cell into another DC power with a different voltage, and supplies the converted DC power to the intermediate bus (Bd). The power conversion system described in item 1 (1). According to this, highly accurate and robust measurement of electricity consumption can be achieved in solar power generation systems. [Item 3] The distributed power source (7) is an energy storage device (7), The second power conversion unit (11b) converts the DC power discharged from the energy storage device (7) into another DC power with a different voltage or current, and supplies the converted DC power to the intermediate bus (Bd), or converts the DC power supplied from the intermediate bus (Bd) into another DC power with a different voltage or current, and charges the energy storage device (7) with the converted DC power. The power conversion system described in item 1 (1). According to this, highly accurate and robust measurement of electricity can be achieved in energy storage systems. [Item 4] A third power conversion unit (11b) is connected between the intermediate bus (Bd) and the energy storage device (7), and converts the DC power discharged from the energy storage device (7) into another DC power with a different voltage or current, and supplies the converted DC power to the intermediate bus (Bd), or converts the DC power supplied from the intermediate bus (Bd) into another DC power with a different voltage or current, and charges the energy storage device (7) with the converted DC power. A third power conversion control unit (111b) generates a third command value for controlling the third power conversion unit (11b) based on the current and voltage of the energy storage device (7), The system further comprises a third specific metering calculation unit (161c) that calculates the amount of energy for specific measurement of the energy storage device (7) based on the current and voltage of the energy storage device (7), The hardware system from the third power conversion control unit (111b) detecting voltage and current to calculating the third command value, and part or all of the hardware system from the third specific metering calculation unit (161c) detecting voltage and current to calculating the amount of energy for specific metering of the energy storage device (7), are provided independently. The power conversion system described in item 1 (1). According to this, in a system in which multiple distributed power sources, including an energy storage device (7), are connected in parallel via DC, highly accurate and robust measurement of energy can be achieved. [Item 5] A third power conversion unit (11b) is connected between the intermediate bus (Bd) and the stationary energy storage device (7), and converts the DC power discharged from the stationary energy storage device (7) into another DC power with a different voltage or current, and supplies the converted DC power to the intermediate bus (Bd), or converts the DC power supplied from the intermediate bus (Bd) into another DC power with a different voltage or current, and charges the stationary energy storage device (7) with the converted DC power. A fourth power conversion unit (11c) is connected between the intermediate bus (Bd) and the on-board energy storage device (8), and converts the DC power discharged from the on-board energy storage device (8) into another DC power with a different voltage or current, and supplies the converted DC power to the intermediate bus (Bd), or converts the DC power supplied from the intermediate bus (Bd) into another DC power with a different voltage or current, and charges the on-board energy storage device (8) with the converted DC power. A third power conversion control unit (111b) generates a third command value for controlling the third power conversion unit (11b) based on the current and voltage of the stationary energy storage device (7), A third specific metering calculation unit (161c) calculates the amount of electricity for specific measurement of the stationary energy storage device (7) based on the current and voltage of the stationary energy storage device (7), A fourth power conversion control unit (111c) generates a fourth command value for controlling the fourth power conversion unit (11c) based on the current and voltage of the onboard power storage device (8), The vehicle further comprises a fourth specific metering calculation unit (161d) that calculates the amount of energy for specific measurement of the vehicle-mounted energy storage device (8) based on the current and voltage of the vehicle-mounted energy storage device (8), The hardware system from the third power conversion control unit (111b) detecting voltage and current to calculating the third command value, and part or all of the hardware system from the third specific metering calculation unit (161c) detecting voltage and current to calculating the amount of energy for the stationary energy storage device (7), are provided independently. The hardware system from the fourth power conversion control unit (111c) detecting voltage and current to calculating the fourth command value, and part or all of the hardware system from the fourth specific metering calculation unit (161d) detecting voltage and current to calculating the amount of energy for specific metering of the on-board energy storage device (8), are provided independently. The power conversion system described in item 1 (1). According to this, in a system in which multiple distributed power sources, including an energy storage device (7) and an on-board energy storage device (8), are connected in parallel via DC, highly accurate and robust measurement of power can be achieved. [Item 6] The distributed power source (6) is a solar cell (6), The aforementioned power conversion system (1) is A fifth specific metering calculation unit (161e) calculates the amount of energy for specific measurement of the first branch wiring (W1) based on the current and voltage of the first branch wiring (W1) between the branching point of the intermediate bus (Bd) and the second power conversion unit (11a), The system further comprises a sixth specific metering calculation unit (161f) that calculates the amount of energy for specific measurement of the second branch wiring (W2) based on the current and voltage of the second branch wiring (W2) between the branch point of the intermediate bus (Bd) and the third power conversion unit (11b), The second power conversion control unit (111a) generates the second command value for controlling the second power conversion unit (11a) based on the current and voltage of the first branch wiring (W1), The third power conversion control unit (111b) generates the third command value for controlling the third power conversion unit (11b) based on the current and voltage of the second branch wiring (W2), The hardware system from the second power conversion control unit (111a) detecting voltage and current to calculating the second command value, and part or all of the hardware system from the fifth specific metering calculation unit (161e) detecting voltage and current to calculating the amount of energy for specific metering of the first branch wiring (W1), are provided independently. The hardware system from the third power conversion control unit (111b) detecting voltage and current to calculating the third command value, and part or all of the hardware system from the sixth specific metering calculation unit (161f) detecting voltage and current to calculating the amount of energy for specific metering of the second branch wiring (W2), are provided independently. The power conversion system described in item 4 (1). According to this, it is possible to achieve highly accurate and robust measurement of electricity in hybrid energy storage systems. [Item 7] The distributed power source (6) is a solar cell (6), The aforementioned power conversion system (1) is Based on the current and voltage of the first branch wiring (W1) between the branching point of the intermediate bus (Bd) and the second power conversion unit (11a), The A fifth specific metering calculation unit (161e) calculates the amount of electricity for specific metering of a single branch wiring, A sixth specific metering calculation unit (161f) calculates the amount of energy for specific measurement of the second branch wiring (W2) based on the current and voltage of the second branch wiring (W2) between the branch point of the intermediate bus (Bd) and the third power conversion unit (11b), The system further comprises a seventh specific metering calculation unit (161g) that calculates the amount of energy for specific measurement of the third branch wiring (W3) based on the current and voltage of the third branch wiring (W3) between the branch point of the intermediate bus (Bd) and the fourth power conversion unit (11c), The second power conversion control unit (111a) generates the second command value for controlling the second power conversion unit (11a) based on the current and voltage of the first branch wiring (W1), The third power conversion control unit (111b) generates the third command value for controlling the third power conversion unit (11b) based on the current and voltage of the second branch wiring (W2), The fourth power conversion control unit (111c) generates the fourth command value for controlling the fourth power conversion unit (11c) based on the current and voltage of the third branch wiring (W3), The hardware system from the second power conversion control unit (111a) detecting voltage and current to calculating the second command value, and part or all of the hardware system from the fifth specific metering calculation unit (161e) detecting voltage and current to calculating the amount of energy for specific metering of the first branch wiring (W1), are provided independently. The hardware system from the third power conversion control unit (111b) detecting voltage and current to calculating the third command value, and part or all of the hardware system from the sixth specific metering calculation unit (161f) detecting voltage and current to calculating the amount of energy for specific metering of the second branch wiring (W2), are provided independently. The hardware system from the point where the fourth power conversion control unit (111c) detects voltage and current and calculates the fourth command value, and part or all of the hardware system from the point where the seventh specific metering calculation unit (161g) detects voltage and current and calculates the amount of energy for specific metering of the third branch wiring (W3), are provided independently. The power conversion system described in item 5 (1). According to this, high-precision and robust measurement of electricity can be achieved in a hybrid energy storage system including an on-board energy storage device (8). [Item 8] The paired power conversion control unit (121) and the specific metering calculation unit (161a) are, Voltages are acquired from separate, independent voltage detection units (V3, V4). Current is obtained from separate, independent current detection units (A4, A4). A power conversion system (1) as described in any one of items 1 through 7. According to this, a robust system can be constructed by making the voltage detection unit and current detection unit redundant. [Item 9] The system further includes a system control unit (13) that compares the amount of energy calculated by the power conversion control unit (121) with the amount of energy for specific measurement calculated by the specific measurement calculation unit (161a), and determines that an abnormality exists if the error between the two exceeds a predetermined range. A power conversion system (1) as described in any one of items 1 through 7. This allows us to determine whether or not there is a discrepancy between the actual value of the electricity used for specific measurements and the actual value. [Item 10] The power conversion control unit (121) includes a first AD conversion unit (1215), The specific metering calculation unit (161a), which is paired with the power conversion control unit (121), includes a second AD conversion unit (1611a), The second AD conversion unit (1611a) has a higher resolution than the first AD conversion unit (1215). A power conversion system (1) as described in any one of items 1 through 7. According to this, it is possible to improve the accuracy of measuring electricity for specific purposes while keeping costs down. [Item 11] A power conversion device (1b) comprising a third power conversion unit (11b) connected between the intermediate bus (Bd) and the energy storage device (7) of the power conversion system (1) described in item 1, which converts the DC power discharged from the energy storage device (7) into another DC power with a different voltage or current and supplies the converted DC power to the intermediate bus (Bd), or converts the DC power supplied from the intermediate bus (Bd) into another DC power with a different voltage or current and charges the energy storage device (7) with the converted DC power, A third power conversion control unit (111b) generates a third command value for controlling the third power conversion unit (11b) based on the current and voltage of the energy storage device (7), The system includes a third specific metering calculation unit (161c) that calculates the amount of energy for specific measurement of the energy storage device (7) based on the current and voltage of the energy storage device (7), The hardware system from the third power conversion control unit (111b) detecting voltage and current to calculating the third command value, and part or all of the hardware system from the third specific metering calculation unit (161c) detecting voltage and current to calculating the amount of energy for specific metering of the energy storage device (7), are provided independently. Power converter (1b). This method enables highly accurate and robust measurement of electrical energy. [Item 12] One or more distributed power sources (6), A power conversion system (1) described in any one of items 1 to 7, A distributed power system characterized by having the following features. This method enables highly accurate and robust measurement of electrical energy. [Explanation of Symbols]

[0196] 1 Power conversion system, 1a First power converter, 1b Second power converter, 1c Third power converter, 2 Commercial power grid, 3 Distribution board, 4 In-house load, 5 Smart meter, 6 Solar cell, 7 Stationary battery, 8 Vehicle battery, 9 Network, 11a First DC / DC converter, 11b Second DC / DC converter, 11c Third DC / DC converter, 12 Inverter, 13 System control unit, 14 Power circuit, 15 AC power meter, 16a First DC power meter, 16b Second DC power meter, 16c Third DC power meter, 16d Fourth DC power meter, 16e Fifth DC power meter, 16f Sixth DC power meter, 16g Seventh DC power meter, 17 External connection management device, 20 Router device, 30 Data server 40 Retail electricity provider server, Bd Intermediate bus, W1 First branch wiring, W2 Second branch wiring, W3 Third branch wiring, CT1-CT16 CT sensors, A1-A16 Current detection unit, V1-V16 Voltage detection unit, 121,111a-111c Power conversion control unit, 151 AC specific metering calculation unit, 161a-161g Specific metering calculation unit, 1111a First AD conversion unit, 1112a First conversion unit, 1113a First energy calculation unit, 1114a Command value generation unit, 1115a First AD conversion unit, 1116a First conversion unit, 1117a First energy calculation unit, 1211 First AD conversion unit, 1212 First conversion unit, 1213 First energy calculation unit, 1214 Command value generation unit, 1215 First AD conversion unit, 1216 First conversion unit, 1217 First energy calculation unit, 1511 Second AD conversion unit, 1512 Second conversion unit, 1513 Second energy calculation unit, 1611a Second AD conversion unit, 1612a Second conversion unit, 1613a Second energy calculation unit.

Claims

1. A first power conversion unit connected between the intermediate bus and the distribution board, which converts AC power supplied from the power system connected to the distribution board into DC power and supplies the converted DC power to the intermediate bus, or converts DC power supplied from the intermediate bus into AC power and supplies the converted AC power to the power system or load connected to the distribution board, A second power conversion unit is connected between the intermediate bus and the distributed power supply, and converts the DC power supplied from the distributed power supply into another DC power with a different voltage or current, and supplies the converted DC power to the intermediate bus. A first power conversion control unit generates a first command value for controlling the first power conversion unit based on the current and voltage of the intermediate bus, A first specific metering calculation unit calculates the amount of energy for specific metering of the intermediate bus based on the current and voltage of the intermediate bus, A second power conversion control unit generates a second command value for controlling the second power conversion unit based on the current and voltage of the distributed power supply, A second specific metering calculation unit calculates the amount of energy for specific measurement of the distributed power supply based on the current and voltage of the distributed power supply, The system includes a system control unit that compares a pair of energy amounts calculated by the first power conversion control unit and the energy amount for the specified measurement calculated by the first specified measurement calculation unit, or an energy amount calculated by the second power conversion control unit and the energy amount for the specified measurement calculated by the second specified measurement calculation unit, and determines that an abnormality exists if the error between the two exceeds a predetermined range. The hardware system from the first power conversion control unit detecting voltage and current to calculating the first command value, and part or all of the hardware system from the first specific metering calculation unit detecting voltage and current to calculating the amount of energy for specific metering of the intermediate bus, are provided independently. The hardware system from the second power conversion control unit's detection of voltage and current to the calculation of the second command value, and part or all of the hardware system from the second specific metering calculation unit's detection of voltage and current to the calculation of the amount of energy for specific metering of the distributed power supply, are provided independently. Power conversion system.

2. A first power conversion unit connected between the intermediate bus and the distribution board, which converts AC power supplied from the power system connected to the distribution board into DC power and supplies the converted DC power to the intermediate bus, or converts DC power supplied from the intermediate bus into AC power and supplies the converted AC power to the power system or load connected to the distribution board, A second power conversion unit is connected between the intermediate bus and the distributed power supply, and converts the DC power supplied from the distributed power supply into another DC power with a different voltage or current, and supplies the converted DC power to the intermediate bus. A first power conversion control unit generates a first command value for controlling the first power conversion unit based on the current and voltage of the intermediate bus, A first specific metering calculation unit calculates the amount of energy for specific metering of the intermediate bus based on the current and voltage of the intermediate bus, A second power conversion control unit generates a second command value for controlling the second power conversion unit based on the current and voltage of the distributed power supply, The system includes a second specific metering calculation unit that calculates the amount of energy for specific measurement of the distributed power supply based on the current and voltage of the distributed power supply, The hardware system from the first power conversion control unit detecting voltage and current to calculating the first command value, and part or all of the hardware system from the first specific metering calculation unit detecting voltage and current to calculating the amount of energy for specific metering of the intermediate bus, are provided independently. The hardware system from the second power conversion control unit's detection of voltage and current to the calculation of the second command value, and part or all of the hardware system from the second specific metering calculation unit's detection of voltage and current to the calculation of the amount of energy for specific metering of the distributed power supply, are provided independently. The first power conversion control unit and the second power conversion control unit each include a first AD conversion unit, The first specific measurement calculation unit and the second specific measurement calculation unit, which are paired with these, each include a second AD conversion unit. The second AD conversion unit has a higher resolution than the first AD conversion unit. Power conversion system.

3. The aforementioned distributed power source is a solar cell, The second power conversion unit converts the DC power generated by the solar cell into another DC power with a different voltage, and supplies the converted DC power to the intermediate bus. The power conversion system according to claim 1 or 2.

4. The aforementioned distributed power source is an energy storage device, The second power conversion unit converts the DC power discharged from the energy storage device into another DC power with a different voltage or current, and supplies the converted DC power to the intermediate bus, or converts the DC power supplied from the intermediate bus into another DC power with a different voltage or current, and charges the energy storage device with the converted DC power. The power conversion system according to claim 1 or 2.

5. A third power conversion unit is connected between the intermediate bus and the energy storage device, and converts the DC power discharged from the energy storage device into another DC power with a different voltage or current, and supplies the converted DC power to the intermediate bus, or converts the DC power supplied from the intermediate bus into another DC power with a different voltage or current, and charges the energy storage device with the converted DC power. A third power conversion control unit generates a third command value for controlling the third power conversion unit based on the current and voltage of the energy storage device, The system further comprises a third specific metering calculation unit that calculates the amount of energy for specific measurement of the energy storage device based on the current and voltage of the energy storage device, The hardware system from the third power conversion control unit's detection of voltage and current to the calculation of the third command value, and part or all of the hardware system from the third specific metering calculation unit's detection of voltage and current to the calculation of the specific metering amount of the energy storage device, are provided independently. The power conversion system according to claim 1 or 2.

6. A third power conversion unit is connected between the intermediate bus and the stationary energy storage device, and converts the DC power discharged from the stationary energy storage device into another DC power with a different voltage or current, and supplies the converted DC power to the intermediate bus, or converts the DC power supplied from the intermediate bus into another DC power with a different voltage or current, and charges the stationary energy storage device with the converted DC power. A fourth power conversion unit is connected between the intermediate bus and the on-board energy storage device, and converts the DC power discharged from the on-board energy storage device into another DC power with a different voltage or current, and supplies the converted DC power to the intermediate bus, or converts the DC power supplied from the intermediate bus into another DC power with a different voltage or current, and charges the on-board energy storage device with the converted DC power. A third power conversion control unit generates a third command value for controlling the third power conversion unit based on the current and voltage of the stationary energy storage device, A third specific metering calculation unit calculates the amount of electricity for specific measurement of the stationary energy storage device based on the current and voltage of the stationary energy storage device, A fourth power conversion control unit generates a fourth command value for controlling the fourth power conversion unit based on the current and voltage of the on-board energy storage device, The vehicle further comprises a fourth specific metering calculation unit that calculates the amount of energy for specific measurement of the vehicle-mounted energy storage device based on the current and voltage of the vehicle-mounted energy storage device, The hardware system from the third power conversion control unit detecting voltage and current to the calculation of the third command value, and part or all of the hardware system from the third specific metering calculation unit detecting voltage and current to the calculation of the amount of energy for the stationary energy storage device, are provided independently. The hardware system from the point where the fourth power conversion control unit detects voltage and current and calculates the fourth command value, and part or all of the hardware system from the point where the fourth specific metering calculation unit detects voltage and current and calculates the amount of energy for specific metering of the on-board energy storage device, are provided independently. The power conversion system according to claim 1 or 2.

7. The aforementioned distributed power source is a solar cell, The aforementioned power conversion system, A fifth specific metering calculation unit calculates the amount of energy for specific measurement of the first branch wiring based on the current and voltage of the first branch wiring between the branching point of the intermediate bus and the second power conversion unit, The system further comprises a sixth specific metering calculation unit that calculates the amount of energy for specific measurement of the second branch wiring based on the current and voltage of the second branch wiring between the branch point of the intermediate bus and the third power conversion unit, The second power conversion control unit generates the second command value for controlling the second power conversion unit based on the current and voltage of the first branch wiring. The third power conversion control unit generates the third command value for controlling the third power conversion unit based on the current and voltage of the second branch wiring. The hardware system from the second power conversion control unit detecting voltage and current to the calculation of the second command value, and part or all of the hardware system from the fifth specific metering calculation unit detecting voltage and current to the calculation of the specific metering amount of the first branch wiring, are provided independently. The hardware system from the third power conversion control unit detecting voltage and current to the calculation of the third command value, and part or all of the hardware system from the sixth specific metering calculation unit detecting voltage and current to the calculation of the amount of energy for specific metering of the second branch wiring, are provided independently. The power conversion system according to claim 5.

8. The aforementioned distributed power source is a solar cell, The aforementioned power conversion system, A fifth specific metering calculation unit calculates the amount of energy for specific measurement of the first branch wiring based on the current and voltage of the first branch wiring between the branching point of the intermediate bus and the second power conversion unit, A sixth specific metering calculation unit calculates the amount of energy for specific measurement of the second branch wiring based on the current and voltage of the second branch wiring between the branch point of the intermediate bus and the third power conversion unit, The system further comprises a seventh specific metering calculation unit that calculates the amount of energy for specific measurement of the third branch wiring based on the current and voltage of the third branch wiring between the branch point of the intermediate bus and the fourth power conversion unit, The second power conversion control unit generates the second command value for controlling the second power conversion unit based on the current and voltage of the first branch wiring, The third power conversion control unit generates the third command value for controlling the third power conversion unit based on the current and voltage of the second branch wiring, The fourth power conversion control unit generates the fourth command value for controlling the fourth power conversion unit based on the current and voltage of the third branch wiring, The hardware system from the second power conversion control unit detecting voltage and current to the calculation of the second command value, and part or all of the hardware system from the fifth specific metering calculation unit detecting voltage and current to the calculation of the specific metering amount of the first branch wiring, are provided independently. The hardware system from the third power conversion control unit's detection of voltage and current to the calculation of the third command value, and part or all of the hardware system from the sixth specific metering calculation unit's detection of voltage and current to the calculation of the specific metering amount of the second branch wiring, are provided independently. The hardware system from the point where the fourth power conversion control unit detects voltage and current and calculates the fourth command value, and part or all of the hardware system from the point where the seventh specific metering calculation unit detects voltage and current and calculates the amount of energy for specific metering of the third branch wiring, are provided independently. The power conversion system according to claim 6.

9. The paired power conversion control unit and the specific metering calculation unit are, The voltage is obtained from each of the independent and separate voltage detection units. Current is obtained from separate, independent current detection units. The power conversion system according to claim 1 or 2.

10. A power conversion device comprising a third power conversion unit connected between an intermediate bus and a power storage device, the power conversion device according to claim 1 or 2, which converts DC power discharged from the power storage device into another DC power with a different voltage or current, and supplies the converted DC power to the intermediate bus, or converts DC power supplied from the intermediate bus into another DC power with a different voltage or current, and charges the power storage device with the converted DC power, A third power conversion control unit generates a third command value for controlling the third power conversion unit based on the current and voltage of the energy storage device, The system includes a third specific metering calculation unit that calculates the amount of energy for specific measurement of the energy storage device based on the current and voltage of the energy storage device, The hardware system from the third power conversion control unit's detection of voltage and current to the calculation of the third command value, and part or all of the hardware system from the third specific metering calculation unit's detection of voltage and current to the calculation of the specific metering amount of the energy storage device, are provided independently. Power converter.

11. One or more distributed power sources, A power conversion system according to claim 1 or 2, A distributed power system characterized by having the following features.

Citation Information

Patent Citations

  • Power management device for storage battery, power management program, and recording medium

    JP2013176182A

  • Electric power conversion system and electric power conversion method

    JP2015192549A

  • Power conversion system and power control method

    JP2017158338A

  • Measuring device

    JP2020046258A

  • Electric power management system and integrated management system

    JP2022133064A