Apparatus and control method for an air conditioning system

By measuring waste hot water and chilled water inlet temperatures, the processing device and control method optimize the number of power generation devices to operate, addressing inefficiencies in air conditioning systems using waste heat from power generation devices.

JP7954388B2Active Publication Date: 2026-11-20PANASONIC INTELLECTUAL PROPERTY MANAGEMENT CO LTD
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
JP2023123212
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Filing Date
2023-07-28
Publication Date
2026-11-20
Estimated Expiration
2043-07-28

AI Technical Summary

Technical Problem

Conventional air conditioning systems utilizing waste heat from power generation devices face inefficiencies due to fluctuating waste heat supply based on the operating state of the power generation devices, making it difficult to optimize the operation of absorption chillers.

Method used

A processing device and control method that includes an acquisition unit to measure waste hot water and chilled water inlet temperatures, determining the number of power generation devices to operate based on these temperatures, ensuring efficient waste heat utilization in absorption chillers.

Benefits of technology

This approach allows for efficient operation of air conditioning systems by adjusting the waste heat supply to absorption chillers according to their operating state, enhancing overall system efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007954388000001
    Figure 0007954388000001
  • Figure 0007954388000002
    Figure 0007954388000002
  • Figure 0007954388000003
    Figure 0007954388000003
Patent Text Reader

Abstract

To provide a processing device capable of efficiently operating an air conditioning system using waste heat of a power generator in an absorption type refrigerator, and a method of controlling the air conditioning system.SOLUTION: A processing device according to an embodiment is provided in an air conditioning system including at least a plurality of power generators, and an absorption type refrigerator using waste hot water warmed by waste heat of the power generator as a heat source. The processing device includes an acquiring unit for acquiring a temperature of the waste hot water and a cold water inlet temperature of the absorption type refrigerator, and a processing unit for determining the number of the power generators to be operated on the basis of the temperature of the waste hot water and the cold water inlet temperature when the temperature of the waste hot water is equal to or lower than a first threshold.SELECTED DRAWING: Figure 1
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present disclosure relates to a processing device and a control method for an air conditioning system.

Background Art

[0002] Patent Document 1 discloses an absorption chiller that utilizes waste heat from a power generation device.

Prior Art Documents

Patent Documents

[0003]

Patent Document 1

Summary of the Invention

Problem to be Solved by the Invention

[0004] The present disclosure provides a processing device and a control method for an air conditioning system, which efficiently operate the air conditioning system that utilizes waste heat from a power generation device in an absorption chiller.

Means for Solving the Problem

[0005] The processing device according to the present disclosure is provided in an air conditioning system that at least includes a plurality of power generation devices and an absorption chiller that uses waste hot water heated by waste heat of the power generation devices as a heat source, and includes an acquisition unit that acquires the temperature of the waste hot water and the chilled water inlet temperature of the absorption chiller, and a processing unit that determines the number of the power generation devices to operate based on the temperature of the waste hot water and the chilled water inlet temperature when the temperature of the waste hot water is equal to or lower than a first threshold value.

[0006] The control method for an air conditioning system in this disclosure includes at least a plurality of power generation devices and an absorption chiller that uses waste hot water heated by the waste heat of the power generation devices as a heat source, wherein the control method obtains the temperature of the waste hot water and the temperature of the chilled water inlet of the absorption chiller, and when the temperature of the waste hot water is below a first threshold, determines the number of power generation devices to operate based on the temperature of the waste hot water and the chilled water inlet temperature. [Effects of the Invention]

[0007] The processing device and control method for the air conditioning system in this disclosure make it possible to change the waste heat supplied from the power generation device to the absorption chiller according to the operating state of the absorption chiller. Therefore, the air conditioning system that utilizes the waste heat of the power generation device in the absorption chiller can be operated efficiently. [Brief explanation of the drawing]

[0008] [Figure 1] Schematic diagram of the air conditioning system in Embodiment 1 [Figure 2] Configuration diagram of the absorption chiller in Embodiment 1 [Figure 3] Flowchart showing the operation of the air conditioning control device in Embodiment 1 [Figure 4] Flowchart showing the operation of the air conditioning control device in Embodiment 1 [Figure 5] Flowchart showing the operation of the air conditioning control device in Embodiment 1 [Figure 6] An explanatory diagram showing an example of operation of the air conditioning control device in Embodiment 1. [Figure 7] An explanatory diagram showing an example of operation of the air conditioning control device in Embodiment 1. [Modes for carrying out the invention]

[0009] (Knowledge and other information that formed the basis of this disclosure) At the time the inventors conceived of this disclosure, there was a technology that utilized the waste heat of a power generation device, which drives a generator using an engine or the like, in an absorption chiller. However, the inventors discovered that with the conventional technology, the amount of waste heat supplied to the absorption chiller fluctuated depending on the operating state of the power generation device, making it difficult to efficiently operate the absorption chiller using waste heat. To solve this problem, they came to form the subject matter of this disclosure. Therefore, this disclosure provides a processing device and a control method for an air conditioning system that utilizes waste heat from a power generation device in an absorption chiller, enabling efficient operation of the air conditioning system.

[0010] The embodiments will be described in detail below with reference to the drawings. However, some unnecessarily detailed explanations may be omitted. For example, detailed explanations of already well-known matters or redundant explanations of substantially identical configurations may be omitted. The attached drawings and the following description are provided to enable those skilled in the art to fully understand this disclosure and are not intended to limit the subject matter described in the claims.

[0011] (Embodiment 1) [1-1. Structure] [1-1-1. Air Conditioning System Configuration] Figure 1 is a schematic diagram of the air conditioning system 1 in Embodiment 1. The air conditioning system 1 is configured by connecting a power generation device 4 and a device that utilizes the waste heat from the power generation device 4 via a waste heat supply path 7. Figure 1 shows a heating heat exchanger 5, a hot water heat exchanger 6, and an absorption chiller 10 as devices that utilize waste heat. The number of power generation devices 4 and absorption chillers 10 in the air conditioning system 1 is arbitrary. The configuration and number of devices that utilize waste heat are also arbitrary. In this embodiment, as an example, a configuration in which the air conditioning system 1 comprises three power generation devices 4, heating heat exchangers 5, hot water heat exchangers 6, and two absorption chillers 10 will be described.

[0012] The power generation device 4 is a device that generates power by driving a generator 41 with a drive source. As the drive source, for example, a gas engine or a diesel engine can be used, and the type thereof is not particularly limited. The present embodiment shows an example in which an engine 42 is used as the drive source.

[0013] The air conditioning system 1 recovers waste heat of the engine 42 of the power generation device 4 by a heat medium flowing through a waste heat supply passage 7. For example, the power generation device 4 includes a radiator 43 that dissipates heat from the engine 42. The heat medium flowing through the waste heat supply passage 7 is supplied to the radiator 43 by a pump 71. The radiator 43 causes heat exchange between the waste heat of the engine 42 and the heat medium flowing through the waste heat supply passage 7. The heat medium flowing through the waste heat supply passage 7 is, for example, water, and may contain an antifreeze solution, a rust inhibitor, or other additives. The water flowing through the waste heat supply passage 7 is heated by the waste heat of the engine 42 in the radiator 43, becomes hot water, and is supplied to the heating heat exchanger 5, the hot water supply heat exchanger 6, and the absorption chiller 10. The hot water flowing through the waste heat supply passage 7 is referred to as waste hot water.

[0014] The radiator 43 may be configured to directly exchange heat between the water flowing through the waste heat supply passage 7 and the engine 42. Further, the radiator 43 may be configured to exchange heat between the water flowing through the waste heat supply passage 7 and the cooling water of the engine 42.

[0015] The power generation device 4 may be a cogeneration system that utilizes waste heat of the engine 42 for, for example, a water heater. In this case, the radiator 43 causes heat exchange between the heat medium that has supplied the waste heat of the engine 42 to the waste heat utilization equipment and the water flowing through the waste heat supply passage 7. Thereby, of the waste heat of the engine 42, the waste heat after being utilized in the power generation device 4 is supplied through the waste heat supply passage 7.

[0016] The air conditioning system 1 includes a plurality of power generation devices 4. Each of the power generation devices 4 is connected in parallel to the waste heat supply passage 7. With this configuration, the waste heat of each power generation device 4 is supplied through the waste heat supply passage 7 to the heating heat exchanger 5, the hot water supply heat exchanger 6, and the absorption chiller 10.

[0017] The heat exchanger 5 for heating is connected to the absorption chiller 10, and performs auxiliary heating during the heating operation of the absorption chiller 10 by utilizing the waste heat of the power generation device 4. The waste heat supply passage 7 is provided with a three-way valve 72 for heating that switches between supply and cutoff of hot water from the waste heat supply passage 7 to the heat exchanger 5 for heating.

[0018] The heat exchanger 6 for hot water supply heats water for hot water supply using the waste heat of the power generation device 4. Waste hot water is supplied to the heat exchanger 6 for hot water supply through the waste heat supply passage 7, while the hot water supply pump 61 supplies water through the hot water supply pipe 6A. The heat exchanger 6 for hot water supply heats the water flowing through the hot water supply pipe 6A with the waste heat of the power generation device 4 by causing heat exchange between the waste hot water in the waste heat supply passage 7 and the water flowing through the hot water supply pipe 6A. The water heated in the heat exchanger 6 for hot water supply is supplied to a hot water supply device (not shown) connected to the hot water supply pipe 6A. The hot water supply pump 61 operates in conjunction with the operating state of the hot water supply device connected to the hot water supply pipe 6A. For example, when the temperature of the hot water in the hot water storage tank included in the hot water supply device decreases, the hot water supply pump 61 operates to supply the hot water heated by the heat exchanger 6 for hot water supply to the hot water supply device. The waste heat supply passage 7 is provided with a three-way valve 76 for hot water supply that switches between supply and cutoff of waste hot water from the waste heat supply passage 7 to the heat exchanger 6 for hot water supply.

[0019] The absorption chiller 10 is a device that supplies cold water and hot water for air conditioning by utilizing the waste heat of the power generation device 4. The absorption chiller 10 may also be referred to as an absorption chiller-heater. The absorption chiller 10 is connected to a hot water supply pipe 73 branched from the waste heat supply passage 7, and waste hot water is supplied to the regenerator 15 of the absorption chiller 10 through the hot water supply pipe 73. The hot water supply pipe 73 is provided with a three-way valve 74 that switches between supply and cutoff of waste hot water from the hot water supply pipe 73 to the absorption chiller 10.

[0020] In the air conditioning system 1 shown in Figure 1, the symbols T1, T2, T4, T5, T6, T7, T8, T9, and T10 represent temperature sensors. In the following description, the temperature detected by temperature sensor T1 will be referred to as temperature T1. The same applies to temperature sensors T2, T5, T6, T9, and T10. Temperature sensor T1 is located downstream of the power generator 4 and upstream of the heating heat exchanger 5 in the direction of waste hot water flow in the waste heat supply passage 7. Temperature sensor T1 can detect the temperature of waste hot water heated by the waste heat of the power generator 4. Temperature sensor T4 is located between the heating heat exchanger 5 and the absorption chiller 10 and detects the temperature of waste hot water just before it flows from the waste heat supply passage 7 into the absorption chiller 10. In the control of the absorption chiller 10, the temperature detected by temperature sensor T4 is considered to be the temperature of the waste hot water supplied from the power generator 4 to the absorption chiller 10. The temperature sensor T5 is located between the absorption chiller 10 and the hot water heat exchanger 6 in the flow direction of the waste heat supply path 7. The temperature detected by the temperature sensor T5 is the temperature of the waste hot water supplied to the hot water heat exchanger 6.

[0021] [1-1-2. Configuration of the control system for the air conditioning system] The air conditioning system 1 includes an air conditioning control device 2 that controls the absorption chiller 10, and a power generation control device 3 that controls the power generation device 4.

[0022] Multiple power generators 4 of the air conditioning system 1 are each connected to a power generation control device 3 by a communication line 1C. The power generation control device 3 performs control of the power generators 4. Control by the power generation control device 3 includes, for example, starting, operating, and stopping the power generators 4. There is no limit to the number of power generators 4 that the power generation control device 3 controls. The power generation control device 3 can operate all of the power generators 4 that it controls, operate only some of them, or stop all of the power generators 4.

[0023] The power generation control device 3 determines the number of power generation units 4 to operate, for example, according to the utilization status of waste heat in the heating heat exchanger 5, the hot water heat exchanger 6, and the absorption chiller 10.

[0024] The power generation control device 3 is connected to the pump 71 by a communication line (not shown). The power generation control device 3 operates the pump 71 corresponding to the power generation device 4 that is being operated, which is connected to the power generation control device 3. This is just one example; for example, the pump 71 may start and stop operating in conjunction with the start and stop of the power generation device 4.

[0025] The air conditioning control device 2 is connected to each absorption chiller 10 that constitutes the air conditioning system 1 by a communication line 1B.

[0026] As shown in Figure 1, the air conditioning control device 2 comprises a control unit 201 and a storage unit 202. The control unit 201 is a computer equipped with a CPU (Central Processing Unit), MPU (Micro Processor Unit), microcontroller, or other processor. The control unit 201 includes the above-mentioned processors, ROM (Read Only Memory), and RAM (Random Access Memory), and controls the absorption chiller 10 by executing programs using the processor. The storage unit 202 has a non-volatile storage area and stores programs executed by the processor and data processed by the processor.

[0027] The control unit 201 is connected to a communication unit 221, an input unit 222, and a display unit 223. The communication unit 221 is a communication device having a transmitter and a receiver. The communication unit 221 is connected to the power generation control device 3 via a communication line 1A. The communication unit 221 sends and receives various signals and data to and from the power generation control device 3 in accordance with the control of the control unit 201. The communication unit 221 is connected to each absorption chiller 10 via a communication line 1B. The communication unit 221 transmits various signals and data related to the control of the absorption chiller 10 to the absorption chiller 10 in accordance with the control of the control unit 201.

[0028] The communication unit 221 is connected to the heating three-way valve 72, three-way valve 74, hot water supply three-way valve 76, pump 51, and hot water supply pump 61 via a communication line (not shown). The communication unit 221 operates each of these heating three-way valves 72, three-way valve 74, and hot water supply three-way valve 76 according to the control of the control unit 201.

[0029] For example, when the heating heat exchanger 5 becomes operational, the communication unit 221 operates the heating three-way valve 72 to enable the supply of waste hot water from the waste heat supply passage 7 to the heating heat exchanger 5. This makes the waste heat from the power generation device 4 available for use in the heating heat exchanger 5. The communication unit 221 can also operate the heating three-way valve 72 to shut off the supply of waste hot water from the waste heat supply passage 7 to the heating heat exchanger 5, in which case the heating heat exchanger 5 will not be able to use the waste heat from the power generation device 4. Similarly, for example, when the hot water heat exchanger 6 becomes operational, the communication unit 221 operates the hot water three-way valve 76 to enable the supply of waste hot water from the waste heat supply passage 7 to the hot water heat exchanger 6. This makes the waste heat from the power generation device 4 available for use in the hot water heat exchanger 6. Furthermore, the communication unit 221 can also operate the hot water supply three-way valve 76 to shut off the supply of waste hot water from the waste heat supply path 7 to the hot water heat exchanger 6. In this case, the hot water heat exchanger 6 will be unable to utilize the waste heat from the power generation device 4.

[0030] The input unit 222 receives input operations from an operator managing the air conditioning control device 2. The input unit 222 outputs an operation signal indicating the input content to the control unit 201. The input unit 222 may also be configured to receive input from another computer installed in a different location from the air conditioning control device 2.

[0031] The display unit 223 displays information related to the control performed by the air conditioning control device 2. The display unit 223 includes a display device such as a liquid crystal display, an LED (Light Emitting Diode) indicator, or other display device. The display unit 223 displays information corresponding to the operating status of the air conditioning control device 2 and the operating status of the absorption chiller 10.

[0032] The control unit 201 includes an acquisition unit 211 and a processing unit 212. The acquisition unit 211 and the processing unit 212 may be functional units configured by the processor executing a program.

[0033] The acquisition unit 211 acquires the detected temperatures from temperature sensors T1, T2, T4, T5, T6, T7, T8, T9, and T10. The processing unit 212 controls the air conditioning system 1 based on the information acquired by the communication unit 221 via communication, the input received by the input unit 222, and the detected temperatures acquired by the acquisition unit 211. For example, the processing unit 212 controls the operation of the absorption chiller 10 based on temperatures T1, T4, T13, T14, etc., which indicate the temperature of the waste hot water supplied to the absorption chiller 10 from the waste heat supply line 7. The processing unit 212 also transmits information regarding the number of operating power generators 4 to the power generation control device 3 based on the temperature of the waste hot water supplied to the absorption chiller 10. Details of the operation of the control unit 201 will be described later with reference to the flowchart.

[0034] [1-1-3. Configuration of an absorption chiller] Figure 2 is a diagram showing the configuration of the absorption chiller 10 in Embodiment 1. The absorption chiller 10 is a chiller / heater that supplies chilled and hot water by using water as the refrigerant and an aqueous lithium bromide (LiBr) solution as the absorbent.

[0035] The absorption chiller 10 comprises an evaporator 11, an absorber 12 arranged in parallel with the evaporator 11, an evaporator-absorber shell 13 housing the evaporator 11 and the absorber 12, a regenerator 15, and a condenser 16. The absorption chiller 10 also comprises an indoor unit 17, a cooler 18, a gas burner 20, a dilute absorbent pump 31, a refrigerant pump 32, a concentrated absorbent pump 33, and a cooling water pump 35. In the absorption chiller 10, each of the above components is connected by piping via concentrated absorbent pipes 21, dilute absorbent pipes 22, refrigerant pipes 23, 24, 25, cooling water pipes 26, chilled water pipes 27, etc., to form a circulation path. In addition, a heating heat exchanger 5 shown in Figure 2 may be included in the configuration of the absorption chiller 10.

[0036] The pressure inside the evaporator-absorber shell 13 is maintained at a high vacuum. In the evaporator 11, the refrigerant water evaporates and moves to the absorber 12 inside the evaporator-absorber shell 13. Water forms a liquid reservoir 11A at the bottom of the evaporator 11. The evaporator-absorber shell 13 is provided with a refrigerant pipe 25 that opens to the bottom of the evaporator 11, and the end of the refrigerant pipe 25 is connected to a sprayer located at the top of the evaporator 11. A refrigerant pump 32 is provided on the refrigerant pipe 25. The refrigerant pump 32 transports the water from the liquid reservoir 11A to the top of the evaporator 11, thereby spraying the water inside the evaporator 11.

[0037] The indoor unit 17 is connected to the evaporator 11 via a chilled water pipe 27. Chilled water flowing through the chilled water pipe 27 and air undergo heat exchange in the heat exchanger (not shown) of the indoor unit 17, and the cooled air is supplied to the room, thereby achieving cooling operation. The indoor unit 17 acts as a heat load for the absorption chiller 10.

[0038] Chilled water (brine) is circulated and supplied between the evaporator 11 and the indoor unit 17 through chilled water pipes 27. Inside the evaporator 11, a heat transfer tube 27A, formed in part of the chilled water pipes 27, is arranged. During cooling operation of the absorption chiller 10, the brine flowing through the heat transfer tubes 27A is cooled by heat exchange with the refrigerant. During heating operation of the absorption chiller 10, the brine is heated in the heat transfer tubes 27A and sent to the indoor unit 17 through the chilled water pipes 27. A pump 51 for transporting the brine is provided in the chilled water pipes 27.

[0039] In the chilled water pipe 27, a heating heat exchanger 5 is connected via a hot water pipe 5A to the path that circulates brine from the indoor unit 17 to the evaporator 11. The heating heat exchanger 5 exchanges heat between the brine returning from the indoor unit 17 to the evaporator 11 and the waste hot water flowing through the waste heat supply path 7.

[0040] As shown in Figure 2, the chilled water pipe 27 is equipped with temperature sensors T7, T8, T13, and T14. Hereafter, the temperature detected by temperature sensor T7 will be referred to as temperature T7, and the same will apply to temperature sensors T8, T13, and T14. Temperature sensor T8 is located in the path through which water flows from the indoor unit 17 to the heating heat exchanger 5, and temperature sensor T7 is located in the path through which water flows from the heating heat exchanger 5 to the evaporator 11. Temperature sensor T13 is positioned between the heating heat exchanger 5 and the evaporator 11 and detects the temperature of the brine flowing into the heat transfer tube 27A. The temperature detected by temperature sensor T13 is defined as the inlet water temperature T13. Temperature sensor T14 is positioned between the evaporator 11 and the indoor unit 17 and detects the temperature of the brine flowing from the heat transfer tube 27A to the indoor unit 17. The temperature detected by temperature sensor T14 is defined as the outlet water temperature T14. Inlet water temperature T13 corresponds to an example of the "chilled water inlet temperature," and outlet water temperature T14 corresponds to an example of the "chilled water outlet temperature."

[0041] The absorber 12 has the function of absorbing the refrigerant vapor evaporated in the evaporator 11 into the absorbent liquid, thereby maintaining a high vacuum pressure inside the evaporator-absorber cylinder 13. A dilute absorbent liquid reservoir 12A is formed at the bottom of the absorber 12, where the dilute absorbent liquid, which has been diluted by absorbing the refrigerant vapor, accumulates. One end of a dilute absorbent liquid pipe 22, which has a dilute absorbent liquid pump 31, is connected to the dilute absorbent liquid reservoir 12A. The dilute absorbent liquid pump 31 is an inverter-controllable pump, and is configured so that the amount of drive of the dilute absorbent liquid pump 31 can be varied by controlling the inverter frequency.

[0042] The dilute absorbent pipe 22 is located between the absorber 12 and the regenerator 15 and opens into the interior of the regenerator 15. A hot water supply pipe 73, branched from the waste heat supply passage 7, is connected to the regenerator 15, and a heat transfer pipe 73A formed in part of the hot water supply pipe 73 is located inside the regenerator 15.

[0043] The regenerator 15 utilizes waste heat from the power generator 4 and the gas burner 20 as heat sources for heating and regenerating the absorbent liquid. Inside the regenerator 15, the dilute absorbent liquid sent through the dilute absorbent liquid pipe 22 forms an absorbent liquid reservoir 15A. The heat transfer pipe 73A heats the absorbent liquid reservoir 15A with waste hot water sent through the hot water supply pipe 73, thereby heating and regenerating the absorbent liquid. The gas burner 20 is housed in a shell (not shown) attached to the regenerator 15. The gas burner 20 heats the absorbent liquid reservoir 15A with a flame, thereby heating and regenerating the absorbent liquid. The ignition and extinguishing of the gas burner 20, and the flow rate of fuel gas supplied to the gas burner 20 are controlled by the air conditioning control device 2. For example, if there is insufficient heat from the heat transfer pipe 73A, the air conditioning control device 2 will use the gas burner 20 to accelerate the heating and regeneration of the absorbent liquid. The heat transfer tube 73A is a first heat source that heats the absorbent liquid using waste heat from the power generation device 4, and the gas burner 20 is a second heat source. The absorption chiller 10 can be operated using only the heat transfer tube 73A as a heat source, or using both the heat transfer tube 73A and the gas burner 20 as heat sources, under the control of the air conditioning control device 2.

[0044] One end of the concentrated absorbent liquid tube 21 is connected to the regenerator 15. The other end of the concentrated absorbent liquid tube 21 is connected to a sprayer located at the top of the absorber 12. A concentrated absorbent liquid pump 33 is provided on the concentrated absorbent liquid tube 21. The concentrated absorbent liquid pump 33 sends the concentrated absorbent liquid from the regenerator 15 to the absorber 12, and the sent concentrated absorbent liquid is sprayed inside the absorber 12 by the sprayer.

[0045] One end of the refrigerant pipe 23 opens at the top of the regenerator 15. The other end of the refrigerant pipe 23 opens into the condenser 16, and the refrigerant separated from the dilute absorbent liquid in the regenerator 15 is sent to the condenser 16 through the refrigerant pipe 23.

[0046] The absorber 12 and condenser 16 are provided with cooling water pipes 26 for sequentially circulating cooling water between them. The cooling water pipes 26 are connected to a cooler 18. The cooler 18 is, for example, a cooling tower, which cools the cooling water flowing through the cooling water pipes 26. A cooling water pump 35 is provided in the cooling water pipes 26. The cooling water cooled by the cooler 18 is transported to the absorber 12 by the cooling water pump 35, and cools the concentrated absorbent solution sprayed inside the absorber 12. The cooling water pipes 26 are located inside the condenser 16 and cool the water vapor in the condenser 16.

[0047] The above describes the flow of absorbent liquid and refrigerant when the absorption chiller 10 is operating in cooling mode. When the absorption chiller 10 is operating in heating mode, the shut-off valve 37 provided in the cooling water pipe 26 is closed. In this case, the steam heated in the regenerator 15 flows into the evaporator 11 without condensing in the condenser 16, heating the heat transfer tube 27A. As a result, the brine flowing through the heat transfer tube 27A becomes hot, and this brine flows to the indoor unit 17, supplying hot water for heating.

[0048] During heating operation of the absorption chiller 10, the heating three-way valve 72 (Figure 1) is opened by the control of the air conditioning control device 2. With the heating three-way valve 72 open, waste hot water is supplied to the heating heat exchanger 5 from the waste heat supply passage 7, and heat exchange occurs between the waste hot water and the brine. In this way, the heating heat exchanger 5 improves the heating efficiency of the absorption chiller 10 by heating the brine returning from the indoor unit 17 to the evaporator 11 with the waste heat of the power generation device 4.

[0049] The dilute absorbent pump 31, refrigerant pump 32, concentrated absorbent pump 33, cooling water pump 35, and on-off valve 37 are connected to the air conditioning control device 2 via control wires (not shown). The air conditioning control device 2 controls each of the above components to perform cooling and heating operations of the absorption chiller 10.

[0050] As shown in Figure 1, the air conditioning control device 2 is connected to each absorption chiller 10 of the air conditioning system 1 via a communication line 1B. The air conditioning control device 2 individually controls the multiple absorption chillers 10 to perform cooling and heating operations. For example, when the air conditioning control device 2 receives an instruction from the input unit 222 to start the absorption chiller 10, it starts operating the absorption chiller 10. Also, while the absorption chiller 10 is operating, the air conditioning control device 2 determines the air conditioning load based on the inlet water temperature T13 and outlet water temperature T14, and controls the operating state of the absorption chiller 10 in accordance with the determined air conditioning load. Furthermore, for example, the air conditioning control device 2 controls the cooling water pump 35 and the on-off valve 37 to switch between cooling operation and heating operation of the absorption chiller 10.

[0051] [1-2. Operation of the Air Conditioning System] Next, we will explain the operation of the air conditioning control device 2. The operation of the air conditioning control device 2 described here relates to the process of changing the number of power generators 4 that are operated when the absorption chiller 10 utilizes a large amount of waste heat from the power generators 4. The air conditioning control device 2 corresponds to an example of a "processing device," and the engine 42 corresponds to an example of a "driving source."

[0052] As described above, while the air conditioning system 1 is operating, the power generation control device 3 operates the power generation device 4 according to, for example, the power generation demand. If the operation of the power generation control device 3 reduces the number of operating power generation devices 4, or if the heat load of the absorption chiller 10 increases the amount of waste heat used by the absorption chiller 10, the amount of waste heat supplied from the power generation device 4 will become insufficient, and the temperature of the waste hot water will drop. In this case, the air conditioning control device 2 will increase the number of operating power generation devices 4 in order to secure the waste heat used by the absorption chiller 10. This operation will be explained below with reference to Figures 3 to 7.

[0053] In this embodiment, the processing unit 212 transmits change information to the power generation control device 3 indicating an increase in the number of operating power generation devices 4 when the waste heat supplied to the absorption chiller 10 from the power generation device 4 is insufficient. In this operation, the processing unit 212 determines the amount of change in the number of operating power generation devices 4 based on the temperature acquired by the acquisition unit 211. The processing unit 212 generates change information indicating the determined amount of change and has the communication unit 221 transmit the change information to the power generation control device 3. The content and format of the change information are not particularly limited. For example, the change information may be information that specifies the number of power generation devices 4 to be operated by the power generation control device 3, or information that specifies the lower limit of the number of power generation devices 4 to be operated by the power generation control device 3. Alternatively, the operation information may be information that specifies the amount by which to increase or decrease the number of power generation devices 4 to be operated by the power generation control device 3.

[0054] The amount of change determined by the processing unit 212 is, for example, the minimum number of power generators 4 to be operated among the power generators 4 provided in the air conditioning system 1. The amount of change also indicates that the maximum number of power generators 4 that can be operated among the power generators 4 provided in the air conditioning system 1 will be operated.

[0055] Based on temperature T1, inlet water temperature T13, and outlet water temperature T14, the processing unit 212 increases the number of power generators 4 operated by the power generation control device 3 if the waste heat supplied from the waste heat supply passage 7 is insufficient for the waste heat utilized by the absorption chiller 10. To perform this control, the processing unit 212 generates operating information indicating the lower limit of the number of power generators 4 to be operated and transmits it to the power generation control device 3. When the power generation control device 3 receives the operating information transmitted by the air conditioning control device 2, it increases the number of power generators 4 to be operated, for example, based on the operating information.

[0056] Figures 3, 4, and 5 are flowcharts showing the operation of the air conditioning control device 2 in Embodiment 1. In Figure 3, steps S11 to S13 are performed by the acquisition unit 211, and steps S14 to S15 are performed by the processing unit 212. The operation in Figure 3 is repeatedly performed at predetermined time intervals while the air conditioning system 1 is in operation. The operation shown in Figures 3-5 can be performed both while the air conditioning control device 2 is operating all of the absorption chillers 10 that constitute the air conditioning system 1, and while some of the absorption chillers 10 are stopped.

[0057] The air conditioning control device 2 obtains the number of power generators 4 currently operating in the air conditioning system 1 by communicating with the power generation control device 3 via the communication unit 221 (step S11). The air conditioning control device 2 performs the operation in step S11, for example, at a 1-minute cycle. The air conditioning control device 2 acquires the temperature T1, which is the value detected by the temperature sensor T1 installed in the waste heat supply passage 7 (step S12). Furthermore, the air conditioning control device 2 acquires the inlet water temperature T13, which is the value detected by the temperature sensor T13, and the outlet water temperature T14, which is the value detected by the temperature sensor T14 (step S13).

[0058] The air conditioning control device 2 performs a change amount calculation process to determine the change amount in the number of power generators 4 operated in the air conditioning system 1 (step S14). The change amount calculation process in step S14 will be described later.

[0059] The air conditioning control device 2 transmits the change information generated in the change amount calculation process to the power generation control device 3 (step S15). As described above, the content of the change information is not limited. For example, the air conditioning control device 2 may compare the number of operating power generation devices 4 obtained in step S11 with the change amount determined in the change amount calculation process and generate change information instructing a change in the number of operating power generation devices 4. Alternatively, the air conditioning control device 2 may omit step S11. In this case, the air conditioning control device 2 may generate change information indicating the change amount determined in the change amount calculation process and transmit it to the power generation control device 3.

[0060] Figures 4 and 5 show in detail the change amount calculation process shown in step S14 of Figure 3. The operations in Figures 4 and 5 are performed by the processing unit 212.

[0061] In the operation shown in Figures 4 and 5, the air conditioning control device 2 uses a first threshold, a second threshold, and a third threshold that are pre-set for the temperature T1. In the following description, each threshold satisfies the following equation (1). Second threshold < Third threshold < First threshold ... (1) The first threshold, second threshold, and third threshold are stored, for example, in the storage unit 202. For example, the first threshold is 78°C, the second threshold is 68°C, and the third threshold is 75°C.

[0062] In the operation shown in Figures 4 and 5, the air conditioning control device 2 uses a first set value, a second set value, and a third set value with respect to the inlet water temperature T13. In the following description, the first set value, the second set value, and the third set value satisfy the following equation (2). Third setting value < Second setting value < First setting value …(2)

[0063] The first set value is, for example, the set value of the outlet water temperature T14. The set value of the outlet water temperature T14 is the target temperature of the chilled water flowing out of the evaporator 11 to the indoor unit 17, and the air conditioning control device 2 operates the absorption chiller 10 so that the outlet water temperature T14 becomes the set value. The air conditioning control device 2 may refer to the set value of the outlet water temperature T14 stored in the memory unit 202 as the first set value, or the set value of the outlet water temperature T14 and the first set value may each be stored in the memory unit 202. The second set value is a value determined based on the set value of the outlet water temperature T14, for example, a temperature 0.5°C lower than the set value of the outlet water temperature T14. The third set value is a value determined based on the set value of the outlet water temperature T14, for example, a temperature 1.0°C lower than the set value of the outlet water temperature T14. The air conditioning control device 2 may calculate the second and third set values ​​from the set value of the outlet water temperature T14, or the second and third set values ​​may be stored separately in the storage unit 202 from the set value of the outlet water temperature T14. For example, the first set value is 7.0°C, the second set value is 6.5°C, and the third set value is 6.0°C.

[0064] The air conditioning control device 2 compares the temperature T1 of the waste hot water with a first threshold and determines whether the temperature T1 is below the first threshold (step S21). If the temperature T1 is higher than the first threshold (step S21: NO), the air conditioning control device 2 terminates the process shown in Figure 3. If the temperature T1 is higher than the first threshold, it can be said that there is a sufficient amount of waste heat supplied to the absorption chiller 10 via the waste heat supply path 7. Therefore, the air conditioning control device 2 does not need to increase the number of power generation devices 4 in operation, and thus terminates the process.

[0065] If the temperature T1 is below the first threshold (step S21: YES), the air conditioning control device 2 compares the inlet water temperature T13 with the first set value and determines whether the inlet water temperature T13 is equal to or greater than the first set value (step S22). If the inlet water temperature T13 is equal to or greater than the first set value (step S22: YES), the air conditioning control device 2 sets the lower limit of the number of operating power generators 4 to the maximum number and determines the first change amount that indicates the maximum number (step S23).

[0066] The maximum number refers to all of the power generators 4 provided by the air conditioning system 1, or the maximum number of power generators 4 provided by the air conditioning system 1 that can satisfy the waste heat demand. For example, when the power generation control device 3 receives change information indicating the maximum number, it executes control to operate all of the power generators 4 provided by the air conditioning system 1. In the example configuration of the air conditioning system 1 shown in Figure 1, the power generation control device 3 operates 3 power generators 4. Here, if the number of power generators 4 provided by the air conditioning system 1 is greater than the number that can supply sufficient waste heat to the absorption chiller 10, the power generation control device 3 does not need to operate all of its units. For example, if 6 power generators 4 can supply sufficient waste heat to the absorption chiller 10, and the air conditioning system 1 is equipped with 10 power generators 4, the power generation control device 3 will operate at least 6 power generators 4 in response to receiving change information indicating the maximum number. For example, the power generation control device 3 may have information regarding the number of power generators 4 to operate according to the maximum number. In the above example, if the power generation control device 3 is set to have 6 power generation units 4 capable of supplying sufficient waste heat to the absorption chiller 10, the power generation control device 3 will set the number of power generation units 4 to operate to 6 or more when it receives change information indicating the maximum number. Alternatively, for example, the air conditioning control device 2 may have information regarding the number of operating power generation units 4 corresponding to the maximum number. In the above example, if the air conditioning control device 2 is set to have 6 power generation units 4 capable of supplying sufficient waste heat to the absorption chiller 10, the air conditioning control device 2 will set the lower limit of the number of operating power generation units 4 to 6 in step S23. As a result, operating information indicating 6 as the lower limit of the number of operating power generation units 4 is transmitted to the power generation control device 3. After step S23, the air conditioning control device 2 proceeds to step S31 in Figure 5.

[0067] If the inlet water temperature T13 is lower than the first set value (step S22: NO), the air conditioning control device 2 determines whether the inlet water temperature T13 satisfies the condition that it is at or above the second set value and lower than the first set value (step S24). If the inlet water temperature T13 satisfies the condition (step S24: YES), the air conditioning control device 2 sets the lower limit of the number of operating power generators 4 to 66% and determines the first change amount that represents 66% (step S25). 66% is the ratio to the total number of power generators 4 provided by the air conditioning system 1. After step S25, the air conditioning control device 2 proceeds to step S31 in Figure 5.

[0068] If the inlet water temperature T13 does not satisfy the conditions of step S24 (step S24: NO), the air conditioning control device 2 determines whether the inlet water temperature T13 satisfies the conditions that it is equal to or greater than the third set value and lower than the second set value (step S26). If the inlet water temperature T13 satisfies the conditions (step S26: YES), the air conditioning control device 2 sets the lower limit of the number of operating power generators 4 to 33% and determines the first change amount that represents 33% (step S27). 33% is the ratio to the total number of power generators 4 provided by the air conditioning system 1. After step S27, the air conditioning control device 2 proceeds to step S31 in Figure 5.

[0069] If the inlet water temperature T13 does not satisfy the conditions of step S26 (step S26: NO), that is, if the inlet water temperature T13 is lower than the third set value, the air conditioning control device 2 determines a first change amount so as not to change the number of operating power generators 4 (step S28). Specifically, the air conditioning control device 2 determines a value as the first change amount that does not mean a change in the number of operating power generators 4. After step S28, the air conditioning control device 2 proceeds to step S31 in Figure 5.

[0070] In step S31 of Figure 5, the air conditioning control device 2 compares the temperature T1 with the second threshold and determines whether the temperature T1 is below the second threshold (step S31). If the temperature T1 is below the second threshold (step S31: YES), the air conditioning control device 2 sets the lower limit of the number of operating power generators 4 to the maximum number and determines the second change amount that indicates the maximum number (step S32). After step S32, the air conditioning control device 2 proceeds to step S35, which will be described later.

[0071] If the temperature T1 is higher than the second threshold (step S31: NO), the air conditioning control device 2 determines whether the temperature T1 satisfies the condition that it is above the second threshold and below the third threshold (step S33). If the temperature T1 satisfies the condition (step S33: YES), the air conditioning control device 2 sets the lower limit of the number of operating power generators 4 to 33% and determines the second change amount that represents 33% (step S34). After step S34, the air conditioning control device 2 proceeds to step S35. If the temperature T1 does not satisfy the condition in step S33 (step S33: NO), the air conditioning control device 2 proceeds to step S35.

[0072] In step S35, the air conditioning control device 2 compares the first change amount determined in one of steps S23, S25, S27, or S28 with the second change amount determined in one of steps S32 or S34. In step S35, the air conditioning control device 2 uses the larger of the first and second change amounts, which represents the lower limit of the number of operating power generators 4, as the change amount (step S35). The air conditioning control device 2 generates change information indicating the change amount determined in step S35 (step S36) and proceeds to step S15 in Figure 3.

[0073] Figures 6 and 7 are explanatory diagrams showing examples of operation of the air conditioning control device 2. Figure 6 shows an example of changes in inlet water temperature T13 and outlet water temperature T14. In Figure 6, the vertical axis represents temperature and the horizontal axis represents time, with (a) showing the inlet water temperature T13 and (b) showing the outlet water temperature T14. SV1 is the first setpoint, SV2 is the second setpoint, and SV3 is the third setpoint.

[0074] In the example shown in Figure 6, the inlet water temperature T13 is lower than the third set value before time P1. Therefore, the lower limit for the number of operating power generators 4 is not specified before time P1.

[0075] In the example shown in Figure 6, the inlet water temperature T13 rises over time, reaching the third setpoint temperature at time P1, the second setpoint temperature at time P2, and the first setpoint temperature at time P3.

[0076] As shown in Figure 4, the air conditioning control device 2 determines a first adjustment amount that sets the minimum number of operating power generators 4 to 33% during the period from time P1 to time P2. Furthermore, the air conditioning control device 2 determines a first adjustment amount that sets the minimum number of operating power generators 4 to 66% during the period from time P2 to time P3. Finally, the air conditioning control device 2 determines a first adjustment amount that sets the number of operating power generators 4 to the maximum number after time P3.

[0077] Figure 7 shows an example of the change in temperature T1. In Figure 7, the vertical axis represents temperature, the horizontal axis represents time, and (a) represents temperature T1. TH1 is the third threshold value, and TH2 is the second threshold value.

[0078] In the example in Figure 7, the temperature T1 is higher than the third threshold before time P11. Therefore, the lower limit for the number of operating power generators 4 is not specified before time P11. In the example shown in Figure 7, the temperature T1 decreases over time, reaching the first threshold temperature at time P11 and the second threshold temperature at time P12.

[0079] As shown in Figure 5, the air conditioning control device 2 determines a second adjustment amount that sets the lower limit of the number of operating power generators 4 to 33% during the period from time P11 to time P12. Furthermore, the air conditioning control device 2 determines a second adjustment amount that sets the number of operating power generators 4 to the maximum number after time P12.

[0080] [1-3. Effects, etc.] As described above, the air conditioning control device 2, as a processing device, is installed in an air conditioning system 1 that includes a plurality of power generators 4 and an absorption chiller 10 that uses waste hot water heated by the waste heat of the power generators 4 as a heat source. The air conditioning control device 2 comprises an acquisition unit 211 and a processing unit 212. The acquisition unit 211 acquires the temperature of the waste hot water supplied from the power generators 4 to the absorption chiller 10, and the inlet water temperature T13 of the absorption chiller 10. When the waste hot water temperature T1 is below a first threshold, the processing unit 212 determines the amount to change the number of power generators 4 to operate based on the waste hot water temperature T1 and the inlet water temperature T13.

[0081] This makes it possible to change the waste heat supplied from the power generator 4 to the absorption chiller 10 according to the operating state of the absorption chiller 10. Therefore, the air conditioning system 1, which utilizes the waste heat from the power generator 4 in the absorption chiller 10, can be operated efficiently.

[0082] The power generation device 4 includes a generator 41 and an engine 42 as a drive source for driving the generator 41. The air conditioning system 1 has a waste heat supply passage 7 that circulates and supplies waste hot water heated by the waste heat of the engine 42 to the regenerator 15 of the absorption chiller 10. The acquisition unit 211 acquires the temperature T1 of the waste hot water flowing from the waste heat supply passage 7 into the regenerator 15.

[0083] According to this, efficient control can be performed by utilizing the temperature T1 of the waste hot water supplied from the power generation device 4 to the absorption chiller 10.

[0084] The processing unit 212 has a first threshold value for temperature T1 and a first set value as the set value for the inlet water temperature T13. The processing unit 212 determines the amount of change that maximizes the number of power generation units 4 to operate when temperature T1 is less than or equal to the first threshold and inlet water temperature T13 is greater than or equal to the first set value, or when temperature T1 is less than or equal to a second threshold which is lower than the first threshold.

[0085] According to this, based on the waste hot water temperature T1, the number of power generation devices 4 required to operate the absorption chiller 10 can be appropriately determined.

[0086] The processing unit 212 has a first threshold value for temperature T1, and has a first set value and a second set value lower than the first set value as set values ​​for the inlet water temperature T13. When temperature T1 is less than or equal to the first threshold value and inlet water temperature T13 is lower than the first set value and greater than or equal to the second set value, the processing unit 212 determines an amount of change to set the lower limit of the number of power generation units 4 to operate to a predetermined number greater than half of the total number of power generation units 4. Here, the predetermined number is, for example, 66% of the total number of power generation units 4.

[0087] According to this, based on the temperature T1 and the inlet water temperature T13, the number of power generators 4 to operate in order to obtain the waste heat necessary for operating the absorption chiller 10 can be appropriately determined, and the waste heat necessary for operating the absorption chiller 10 can be obtained. In addition, it is possible to prevent an excessive increase in the number of power generators 4 to operate, and the air conditioning system 1 can be operated efficiently.

[0088] The processing unit 212 has a first threshold value for temperature T1, and has a first set value, a second set value lower than the first set value, and a third set value lower than the second set value as set values ​​for the inlet water temperature T13. When the temperature T1 is less than or equal to the first threshold value, and the inlet water temperature T13 is lower than the second set value and greater than or equal to the third set value, the processing unit 212 determines an amount of change to set the lower limit of the number of power generation units 4 to be operated to a predetermined number less than half of the total number of power generation units. Here, the predetermined number is, for example, 33% of the total number of power generation units 4.

[0089] According to this, based on the temperature T1 and the inlet water temperature T13, the number of power generators 4 required to operate the absorption chiller 10 can be appropriately determined, and the waste heat necessary for operating the absorption chiller 10 can be obtained. In addition, it is possible to prevent an excessive increase in the number of power generators 4 in operation, and the air conditioning system 1 can be operated efficiently.

[0090] The processing unit 212 has a first threshold value for temperature T1, and has a first set value, a second set value lower than the first set value, and a third set value lower than the second set value as set values ​​for the inlet water temperature T13. The processing unit 212 does not change the number of power generation units 4 to be operated when the temperature T1 is less than or equal to the first threshold value and the inlet water temperature T13 is lower than the third set value.

[0091] According to this, it is possible to appropriately determine whether or not it is necessary to increase the number of operating power generators 4, and if it is not necessary to increase the number of operating power generators 4, unnecessary control can be omitted. Therefore, the air conditioning system 1 can be operated more efficiently.

[0092] The first set value is, for example, the target value for the outlet water temperature T14.

[0093] According to this, the number of operating power generation units 4 can be appropriately determined based on the temperature specified as the target value for the outlet water temperature T14.

[0094] The processing unit 212 does not perform the process to determine the amount of change if the temperature T1 is higher than the first threshold.

[0095] According to this, unnecessary control can be omitted when there is no need to increase the number of operating power generators 4. Therefore, the air conditioning system 1 can be operated more efficiently.

[0096] The processing unit 212 determines the amount of change to increase the number of power generation units 4 to be operated.

[0097] According to this, if there is insufficient waste heat supplied to the absorption chiller 10, the number of operating power generators 4 can be increased, and the air conditioning system 1 can be operated more efficiently.

[0098] The air conditioning control device 2 includes a communication unit 221 that communicates with the power generation control device that operates the power generation device 4, and the communication unit 221 transmits information indicating the amount of change to the power generation control device.

[0099] According to this, the power generation control device 3 can control the operation of the power generation device 4 based on the result of the air conditioning control device 2's determination of whether or not it is necessary to increase the number of operating power generation devices 4. Therefore, the air conditioning system 1 can be operated more efficiently.

[0100] (Other embodiments) As described above, the above embodiments have been explained as examples disclosed in this application. However, the technology in this disclosure is not limited to these embodiments and can be applied to embodiments that have been modified, replaced, added, or omitted. Furthermore, it is possible to create new embodiments by combining the components described in the above embodiments. Therefore, other embodiments are illustrated below.

[0101] In the above-described embodiment, an example was explained in which the air conditioning control device 2 detects and processes temperature T1 as the temperature of the waste heat supplied from the power generation device 4 to the absorption chiller 10. This is just one example; for example, the air conditioning control device 2 may also detect temperature T4 as the temperature of the waste heat supplied from the power generation device 4 to the absorption chiller 10. The temperature T4 detected by the temperature sensor T4 is the temperature of the waste hot water just before it flows into the absorption chiller 10 from the waste heat supply passage 7, and accurately reflects the heat supplied to the absorption chiller 10. In this case, the same effect can be obtained by replacing temperature T1 with temperature T4 in the operation of the air conditioning control device 2 shown in Figures 3-5. In the embodiment described above, the air conditioning control device 2 may perform the determination in step S21 of Figure 4 before step S13, after obtaining the temperature T1 in step S12 of Figure 3. In this case, if the determination in step S21 is positive, the process can be returned to step S13 and continued. This allows for the omission of unnecessary processing when the temperature T1 is higher than the first threshold, thereby achieving even greater efficiency.

[0102] In the embodiments described above, for example, the processing device that performs the processing shown in Figures 3-5 may be a device other than the air conditioning control device 2. That is, in an air conditioning system 1 equipped with an air conditioning control device 2 that controls the operation of the absorption chiller 10, the processing shown in Figures 3-5 may be performed by a device different from the air conditioning control device 2.

[0103] The above-described embodiment illustrates an example in which the power generation control device 3, which controls the operation of the power generation device 4, and the air conditioning control device 2 are configured as separate devices. For example, in the above-described embodiment, the air conditioning system 1 may have the functions of the power generation control device 3 in the air conditioning control device 2, and the power generation control device 3 may be omitted. In this case, the air conditioning control device 2 may be configured to perform, for example, control of air conditioning by the absorption chiller 10 and control of the number of operating power generation devices 4.

[0104] The configuration of the absorption chiller 10 described in the above-described embodiment is just one example. For example, it is not necessary to place the heat transfer tubes 73A and the gas burner 20 in the same location in the regenerator 15. The configuration may include separate sections for heating the absorbent liquid with the heat transfer tubes 73A and heating the absorbent liquid with the gas burner 20. Alternatively, the regenerator 15 may be divided into a first regenerator that heats and regenerates the absorbent liquid with the heat transfer tubes 73A and a second regenerator that heats and regenerates the absorbent liquid with the gas burner 20. The absorption chiller 10 may also be a double-effect chiller having a low-temperature regenerator and a high-temperature regenerator.

[0105] The operation of the air conditioning control device 2 in the above-described embodiment can be realized as a program executed by a processor. This program can also be realized by storing it on a non-temporary computer-readable storage medium. Alternatively, this program can be stored on a server device or the like, and the air conditioning control device 2 can realize the above-described operation by downloading the program from the server device. Furthermore, the processor of the control unit 201 may consist of a single processor or multiple processors. The processor of the control unit 201 may also be hardware programmed to realize the corresponding functional unit. For example, the processor of the control unit 201 may consist of an ASIC (Application Specific Integrated Circuit) or an FPGA (Field Programmable Gate Array).

[0106] The configuration of the air conditioning control device 2 shown in Figure 1 is merely an example, and the specific implementation is not particularly limited. In other words, it is not necessarily required that hardware corresponding to each part be implemented individually; it is also possible to have a configuration in which a single processor executes a program to realize the functions of each part. Furthermore, some of the functions realized by software in the above-described embodiment may be implemented as hardware, or conversely, some of the functions realized by hardware may be realized by software.

[0107] The operational step units shown in Figures 3-5 are divided according to the main processing content to facilitate understanding of the operation, and the operation is not limited by the way the processing units are divided or the names of the processing units. Depending on the processing content, it may be further divided into more step units. Alternatively, it may be divided so that one step unit includes even more processing. Furthermore, the order of the steps may be changed as appropriate, as long as it does not impede the intent of this disclosure.

[0108] Since the embodiments described above are for illustrative purposes of the technology described herein, various modifications, substitutions, additions, omissions, etc., can be made within the claims or their equivalents.

[0109] (Note) Based on the above description of embodiments, the following technologies are disclosed.

[0110] (Technology 1) An apparatus provided in an air conditioning system including at least a plurality of power generation devices and an absorption chiller that uses waste hot water heated by the waste heat of the power generation devices as a heat source, comprising: an acquisition unit that acquires the temperature of the waste hot water and the chilled water inlet temperature of the absorption chiller; and a processing unit that, when the temperature of the waste hot water is below a first threshold, determines the number of power generation devices to operate based on the temperature of the waste hot water and the chilled water inlet temperature. This makes it possible to change the waste heat supplied from the power generation device to the absorption chiller according to the operating conditions of the absorption chiller. Therefore, an air conditioning system that utilizes waste heat from the power generation device in the absorption chiller can be operated efficiently.

[0111] (Technology 2) The apparatus according to Technology 1, wherein the power generation apparatus comprises a generator and a drive source for driving the generator, the air conditioning system comprises a waste heat supply path for circulating and supplying the waste hot water heated by the waste heat of the drive source to the regenerator of the absorption chiller, and the acquisition unit acquires the temperature of the waste hot water flowing from the waste heat supply path to the regenerator. According to this, efficient control can be achieved by utilizing the temperature of the waste hot water supplied from the power generation device to the absorption chiller.

[0112] (Technical 3) The processing unit according to Technical 1 or Technical 2, wherein the processing unit has a first threshold value for the temperature of the waste hot water, a first set value as a set value for the chilled water inlet temperature, and determines the number of power generation units to be operated to the maximum number when the temperature of the waste hot water is less than or equal to the first threshold value and the chilled water inlet temperature is greater than or equal to the first set value, or when the temperature of the waste hot water is less than or equal to a second threshold value which is lower than the first threshold. According to this method, the number of power generation units required to obtain the waste heat necessary for operating the absorption chiller can be appropriately determined based on the temperature of the waste hot water.

[0113] (Technical 4) The processing unit according to any one of Technical 1 to Technical 3, wherein the processing unit has a first threshold value for the temperature of the waste hot water, and has a first set value and a second set value that is lower than the first set value as set values ​​for the chilled water inlet temperature, and determines the lower limit of the number of power generation units to be operated to a predetermined number that is greater than half of the total number of power generation units. According to this method, based on the temperature of the waste hot water and the chilled water inlet temperature, the number of power generation units required to obtain the waste heat necessary for operating the absorption chiller can be appropriately determined, thereby obtaining the waste heat necessary for operating the absorption chiller. Furthermore, it is possible to prevent an excessive increase in the number of power generation units, and to operate the air conditioning system efficiently.

[0114] (Technical 5) The processing unit according to any one of Technical 1 to Technical 4, wherein the processing unit has a first threshold value for the temperature of the waste hot water, and has a first setting value, a second setting value lower than the first setting value, and a third setting value lower than the second setting value as set values ​​for the chilled water inlet temperature, and when the temperature of the waste hot water is less than or equal to the first threshold value and the chilled water inlet temperature is lower than the second setting value and greater than or equal to the third setting value, the lower limit of the number of power generation units to be operated is determined to be a predetermined number less than half of the total number of power generation units. According to this method, based on the temperature of the waste hot water and the chilled water inlet temperature, the number of power generation units required to obtain the waste heat necessary for operating the absorption chiller can be appropriately determined, thereby obtaining the waste heat necessary for operating the absorption chiller. Furthermore, it is possible to prevent an excessive increase in the number of power generation units, and to operate the air conditioning system efficiently.

[0115] (Technical 6) The processing unit has a first threshold value for the temperature of the waste hot water, and has a first setting value, a second setting value lower than the first setting value, and a third setting value lower than the second setting value as set values ​​for the chilled water inlet temperature, and does not change the number of power generation units to be operated when the temperature of the waste hot water is less than or equal to the first threshold value and the chilled water inlet temperature is lower than the third setting value, the processing unit according to any one of Technical 1 to Technical 5. According to this, unnecessary control can be omitted when there is no need to increase the number of operating power generators. Therefore, the air conditioning system can be operated more efficiently.

[0116] (Technical 7) The apparatus according to any one of Technical 3 to Technical 6, wherein the first set value is a target value for the chilled water outlet temperature of the absorption chiller. According to this, the number of power generation units to be operated can be appropriately determined based on the temperature specified as the target value for the chilled water outlet temperature.

[0117] (Technical 8) The processing apparatus according to any one of Technical 3 to Technical 7, wherein the processing unit does not perform the process of determining the number of power generation devices to operate when the temperature of the waste hot water is higher than the first threshold. According to this, unnecessary control can be omitted when there is no need to increase the number of operating power generators. Therefore, the air conditioning system can be operated more efficiently.

[0118] (Technical 9) The processing unit is the processing unit according to any one of Technical 1 to Technical 8, wherein the processing unit increases the number of power generation devices to be operated. According to this, if there is insufficient waste heat supplied to the absorption chiller, the number of operating power generators can be increased, allowing the air conditioning system to operate more efficiently.

[0119] (Technical 10) The processing apparatus according to any one of Technical 1 to Technical 10, comprising a communication unit that communicates with a power generation control device that operates the power generation device, wherein the communication unit transmits information indicating the number of power generation devices to be operated to the power generation control device. According to this, the power generation control device can control the operation of the power generation devices based on the result of the air conditioning control device's determination of whether or not it is necessary to increase the number of operating power generation devices. Therefore, the air conditioning system 1 can be operated more efficiently.

[0120] (Technical 11) A control method for an air conditioning system comprising at least a plurality of power generation devices and an absorption chiller that uses waste hot water heated by the waste heat of the power generation devices as a heat source, wherein the control method for an air conditioning system obtains the temperature of the waste hot water and the temperature of the chilled water inlet of the absorption chiller, and when the temperature of the waste hot water is below a first threshold, determines the number of power generation devices to operate based on the temperature of the waste hot water and the chilled water inlet temperature. This makes it possible to change the waste heat supplied from the power generation device to the absorption chiller according to the operating conditions of the absorption chiller. Therefore, an air conditioning system that utilizes waste heat from the power generation device in the absorption chiller can be operated efficiently. [Industrial applicability]

[0121] As described above, the processing apparatus and the control method for the air conditioning system according to the present invention can be used in waste heat utilization air conditioning systems that utilize waste heat from a power generation device in an absorption chiller. [Explanation of symbols]

[0122] 1. Air conditioning system 1A, 1B, 1C communication lines 2. Air conditioning control device (processing device) 3. Power generation control device 4. Power generation equipment 5 Heat exchanger for heating 5A hot water pipe 6. Heat exchanger for hot water supply 6A Hot water pipe 7. Waste heat supply line 10 Absorption chillers 11 Evaporator 11A Liquid reservoir 12 Absorbers 12A Low absorbent liquid reservoir 13 Evaporator absorber shell 15 Regenerator 15A Absorbent liquid reservoir 16 Condenser 17 Indoor unit 18 Cooler 20 Gas Burners 21 Concentrated Absorbent Liquid Tube 22 Dilute Absorption Tube 23, 24, 25 Refrigerant pipes 26 Cooling water pipe 27 Cold water pipe 27A heat transfer tube 31. Dilute absorption pump 32 Refrigerant pump 33. Concentrated absorbent pump 35 Cooling water pump 37. Shut-off valve 41 Generator 42 Engine (power source) 43 Radiator 51, 71 pumps 61 Hot water supply pump 72 Three-way valve for heating 74 Three-way valve 76 Three-way valve for hot water supply 73 Hot water supply pipe 73A heat transfer tube 201 Control Unit 202 Storage section 211 Acquisition Department 212 Processing Unit 221 Communications Department 222 Input section T13 Inlet water temperature (cold water inlet temperature) T14 Outlet water temperature (chilled water outlet temperature)

Claims

1. An air conditioning system comprising at least multiple power generation devices and an absorption chiller that utilizes waste hot water heated by the waste heat of the power generation devices as a heat source, is provided with: An acquisition unit that acquires the temperature of the waste hot water and the temperature of the chilled water inlet of the absorption chiller, A processing device comprising: a processing unit that determines the number of power generation devices to be operated based on the temperature of the waste hot water and the chilled water inlet temperature when the temperature of the waste hot water is below a first threshold.

2. The power generation device comprises a generator and a drive source that drives the generator. The air conditioning system has a waste heat supply path that circulates and supplies the waste hot water, heated by the waste heat of the drive source, to the regenerator of the absorption chiller. The apparatus according to claim 1, wherein the acquisition unit acquires the temperature of the waste hot water flowing from the waste heat supply passage to the regenerator.

3. The aforementioned processing unit, The waste hot water has a first threshold value relating to its temperature, The chilled water inlet temperature has a first set value, The apparatus according to claim 1, wherein the number of power generation devices to be operated is determined to be the maximum number when the temperature of the waste hot water is below a first threshold and the chilled water inlet temperature is above a first set value, or when the temperature of the waste hot water is below a second threshold that is lower than the first threshold.

4. The aforementioned processing unit, The waste hot water has a first threshold value relating to its temperature, The set value for the chilled water inlet temperature includes a first set value and a second set value that is lower than the first set value. The apparatus according to claim 1, wherein, when the temperature of the waste hot water is below the first threshold and the chilled water inlet temperature is lower than the first set value and above the second set value, the lower limit of the number of power generation devices to be operated is determined to be a predetermined number greater than half of the total number of power generation devices.

5. The aforementioned processing unit, The waste hot water has a first threshold value relating to its temperature, The set values ​​for the chilled water inlet temperature include a first set value, a second set value lower than the first set value, and a third set value lower than the second set value. The apparatus according to claim 1, wherein, when the temperature of the waste hot water is below the first threshold and the chilled water inlet temperature is below the second set value and above the third set value, the lower limit of the number of power generation devices to be operated is determined to be a predetermined number less than half of the total number of power generation devices.

6. The aforementioned processing unit, The waste hot water has a first threshold value relating to its temperature, The set values ​​for the chilled water inlet temperature include a first set value, a second set value lower than the first set value, and a third set value lower than the second set value. The apparatus according to claim 1, wherein the number of power generation devices to be operated is not changed when the temperature of the waste hot water is below the first threshold and the chilled water inlet temperature is lower than the third set value.

7. The apparatus according to any one of claims 3 to 6, wherein the first set value is a target value for the chilled water outlet temperature of the absorption chiller.

8. The processing apparatus according to any one of claims 3 to 6, wherein the processing unit does not perform the process of determining the number of power generation devices to operate when the temperature of the waste hot water is higher than the first threshold.

9. The processing apparatus according to claim 1, wherein the processing unit increases the number of power generation devices to be operated.

10. It includes a communication unit that communicates with a power generation control device that operates the aforementioned power generation device, The processing apparatus according to claim 1, wherein the communication unit transmits information indicating the number of power generation devices to be operated to the power generation control device.

11. A control method for an air conditioning system comprising at least multiple power generation devices and an absorption chiller that utilizes waste hot water heated by the waste heat of the power generation devices as a heat source, The temperature of the waste hot water and the temperature of the chilled water inlet of the absorption chiller are obtained. A control method for an air conditioning system, which determines the number of power generation devices to operate based on the temperature of the waste hot water and the chilled water inlet temperature when the temperature of the waste hot water is below a first threshold.

Citation Information

Patent Citations

  • Device in which engine and absorption refrigerator are combined

    JP1984225264A

  • Water cooling and heating system

    JP2007183026A

  • Cooling system using absorption type chiller-heater using exhaust heat

    JP2007263519A

  • Electrical power*heat medium production system and its control method

    JP2018003598A

  • Waste heat utilization absorption type refrigeration system and absorption type refrigerator

    JP2018141564A