Structure and construction method for suppressing ice bridge formation in ice-covered surface facilities

The ice bridge suppression structure allows water to flow while preventing continuous heat transfer and facilitates easy ice bridge removal, addressing damage risks and dynamic ice bridge formation.

JP7954396B1Active Publication Date: 2026-11-20TERRAFORMER FROST WORKS CO LTD
3 Cites 0 Cited by

Patent Information

Application Number
JP2026208814
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Filing Date
2026-09-17
Publication Date
2026-11-20
Estimated Expiration
2046-07-13

AI Technical Summary

Technical Problem

Ice bridges form between frozen surfaces and external structures due to water discharge, creating local heat transfer paths and risking damage during removal, and existing solutions fail to address dynamic changes in ice bridge formation and growth.

Method used

An ice bridge formation suppression structure with regions that allow water to flow while preventing continuous heat transfer paths, featuring separation spaces, drainage direction changes, low-wettability surfaces, and weak contact points to facilitate easy removal.

Benefits of technology

Suppresses continuous heat transfer paths and enables easy breaking of ice bridges during removal, minimizing damage to peripheral frames and mats.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007954396000001_ABST
    Figure 0007954396000001_ABST
Patent Text Reader

Abstract

While maintaining drainage, this method suppresses the formation of a continuous heat transfer path between the frozen surface and the external structure of the discharged water. [Solution] At the periphery or boundary of the frozen surface of the frozen surface facility, an ice bridge blocking area 29 is provided between the drainage section 11, water drainage section 12, or drainage guide section 30 and the frozen surface 1, peripheral frame 4, floor surface, ground, walking mat, or protective mat. The ice bridge blocking area 29 allows the discharged water to flow down while suppressing the formation of an ice bridge 20 in which the frozen body of the water is continuous on both sides. The ice bridge blocking area 29 may include a separation space, a dripping section, a drainage direction changing section, a low wettability surface, a low adhesion section, a flexible blocking section, a weak contact section 31, or a replaceable ice adhesion section. The weak contact section 31 may facilitate the breaking of the formed ice bridge 20 at a predetermined position when removing or cleaning.
Need to check novelty before this filing date? Find Prior Art

Description

TECHNICAL FIELD

[0001] The present invention relates to facilities having an ice rink or other frozen surface, and particularly relates to an ice bridge formation suppression structure and a construction method that suppress the formation of an ice bridge which connects the frozen surface side and the external structure side by water discharged from a drainage portion, a drainage guide portion, a gap portion, or a drain portion being frozen.

[0002] The present invention particularly relates to a technique that allows the flow of molten water, dew condensation water, rainwater, cleaning water, or leaked water, while suppressing the formation of a continuous heat transfer path by a frozen body of the water between the frozen surface and a peripheral frame, floor surface, ground, walking mat, protective mat, or other external structure. BACKGROUND ART

[0003] In frozen surface facilities such as ice rinks, a configuration is generally used in which a frozen surface is formed and maintained by circulating a refrigerant or brine supplied from a refrigerator. Particularly in outdoor, semi-outdoor, seasonal operation type, or limited-period operation type facilities, affected by ambient temperature, wind, solar radiation, rainfall, etc., molten water, dew condensation water, rainwater, cleaning water, or leaked water is likely to occur at the peripheral portion or boundary portion of the frozen surface.

[0004] A drainage portion, a drainage guide portion, a gap portion, or a drain portion may be provided at the peripheral portion or boundary portion of a frozen surface facility. Water discharged from these portions may flow down in the vicinity of the peripheral frame, floor surface, ground, walking mat, or protective mat.

[0005] When the discharged water freezes in a low-temperature environment, icicle-shaped or bridge-shaped ice blocks may be formed. When such ice blocks connect the frozen surface side and the external structure side, an ice bridge made of the frozen body is formed, which may become a local heat transfer path.

[0006] When an ice bridge is formed, local melting, re-freezing, or an increase in cooling load at the peripheral portion of the frozen surface may be caused. In addition, when removing the ice bridge during removal or cleaning, there is a risk of damaging the peripheral frame, mat, floor surface, or waterproof member.

[0007] On the other hand, drainage sections, drainage guide sections, gaps, or water drainage sections are responsible for discharging water to the outside, so simply blocking them to avoid ice bridge formation is not appropriate. Therefore, it is necessary to allow water to flow down while suppressing the continuity between the frozen surface and the external structure.

[0008] Furthermore, the location, growth direction, thickness, and extent of ice bridge formation can change depending on ambient temperature, wind, solar radiation, rainfall, cooling operation conditions, and the installation status of the facilities. For this reason, a configuration that allows for the addition, rearrangement, replacement, or removal of ice bridges depending on their formation status is desirable. [Overview of the project] [Problems that the invention aims to solve]

[0009] In view of the above problems, the present invention aims to provide an ice bridge formation suppression structure for an ice formation facility that allows the discharged water to flow down while suppressing the formation of a continuous heat transfer path between the ice formation surface and the external structure side of the frozen water.

[0010] Furthermore, the present invention aims to make it easier to break an ice bridge at a predetermined location during removal or cleaning, even if an ice bridge has formed, thereby suppressing damage to the peripheral frame, mat, floor surface, or waterproofing member.

[0011] Furthermore, the present invention aims to provide a configuration and construction method that allows for the addition, rearrangement, replacement, or removal of ice bridge blocking areas depending on the growth direction of the ice bridge, the thickness of the ice block, the location of icicle-shaped ice, the extent of the refreezing area, or the location of moisture accumulation. [Means for solving the problem]

[0012] The ice bridge formation suppression structure according to the present invention is used in facilities having an ice surface, and the ice surface Located at the periphery , a drainage section, drainage guide section, gap section or drainage section for discharging meltwater, condensation water, rainwater, cleaning water or leaked water, The system comprises an external structure, such as a peripheral frame, floor surface, ground, walking mat, or protective mat, located on the peripheral or outer side of the frozen surface, and an ice bridge blocking region provided between the frozen surface and the external structure. .

[0013] The ice bridge blockage area is, From the drainage section, the drainage guide section, the gap section, or the water drainage section While allowing the discharged water to flow down, the frozen body of the water Between the freezing surface and the external structure It is configured to suppress the formation of continuous heat transfer pathways.

[0014] The ice bridge blocking region may include at least one of a separation space, a dripping section, a drainage direction changing section, a low wettability surface, a low adhesion section, a flexible blocking section, a weak contact section, or a replaceable ice adhesion section.

[0015] The separation space or dripping area may be positioned at a distance or in a location that allows water to flow down while making it difficult for the grown frozen body to reach the ice surface or external structures.

[0016] The weak contact area may include at least one of a notch, a thin-walled portion, a groove, a recess, a slit, a water-repellent portion, a low-adhesion portion, or a fragile contact surface. The weak contact area may facilitate the rupture of the ice bridge at a predetermined location during removal or cleaning if an ice bridge is formed.

[0017] The ice bridge blocking areas may be added, rearranged, replaced, or removed based on the growth direction of the ice bridge formed during the operating season, the thickness of the ice blocks, the location of icicle-like ice, the extent of the refreezing area, or the location of moisture accumulation.

[0018] In one embodiment, the ice bridge blocking region may include a drainage guide portion that controls the direction of frozen water growth, and a weak contact portion that facilitates the breaking of the ice bridge at a predetermined location during removal or cleaning when an ice bridge is formed.

[0019] The construction method according to the present invention may include the steps of confirming the ice bridge formation section at the periphery or boundary of the frozen surface, and providing an ice bridge blocking area in the ice bridge formation section. It may also include the steps of adding, rearranging, replacing, or removing ice bridge blocking areas depending on the formation state. [Effects of the Invention]

[0020] According to the present invention, while allowing drainage, it is possible to suppress the frozen body of discharged water from forming a continuous heat transfer path between the freezing surface side and the external structure side.

[0021] Further, according to the present invention, when an ice bridge is formed, it can be easily broken at a weak contact portion or the like, so that damage to the peripheral frame, mat, floor surface or waterproof member during removal or cleaning can be suppressed.

[0022] Furthermore, according to the present invention, the ice bridge blocking region can be additionally arranged, rearranged, replaced or removed according to the formation state of the ice bridge. Brief Description of the Drawings

[0023] [Figure 1] It is a conceptual diagram showing an example of an ice bridge blocking region that allows drainage while suppressing ice bridge formation in a drainage part or a drainage guide part. Modes for Carrying Out the Invention

[0024] As used in the present specification, the term "freezing surface facility" refers to a facility provided with a freezing surface used for human skating, competitions, games, training, viewing, facility operation or maintenance work. The freezing surface facilities include, but are not limited to, ice skating rinks, curling rinks, ice hockey rinks, figure skating rinks, speed skating rinks, ice competition facilities, ice play facilities, seasonally installed rinks, limited-period rinks, temporary rinks, event freezing surface facilities, and pool-converted freezing surface facilities.

[0025] The following respective embodiments do not limit the present invention, and can be applied in any combination to one or a plurality of sites among a drainage part, a drainage guide part, a gap part, a drain part, a peripheral frame, a floor surface, the ground, a walking mat, a protective mat, and the like.

[0026] In this specification, "thermal bridge" means a heat transfer path formed between the frozen surface side or cooling bed side and the outside air side, floor side, ground side, frame side, or mat side via continuous contact of a solid, liquid, or frozen body, or local fluid movement, which generates a relatively large heat flux compared to the surrounding area.

[0027] In this specification, "ice bridge" means a heat transfer path created when meltwater, condensation, rainwater, cleaning water, or leak water freezes and forms a frozen body that connects the frozen surface side with the peripheral frame, floor surface, ground, walking mat, protective mat, or other external structure side.

[0028] The present invention allows the discharged water to flow down while suppressing the formation of a continuous heat transfer path in the frozen water. Furthermore, if an ice bridge is formed, the weak contact portion may facilitate the rupture of the ice bridge at a predetermined position during removal or cleaning, thereby suppressing damage to the peripheral frame, mat, floor surface, or waterproofing member.

[0029] In this specification, "external structure" means a peripheral frame, floor surface, ground, walking mat, protective mat, or any structure adjacent thereto that is located on the peripheral or outer side of the freezing surface.

[0030] As shown in Figure 1, at the periphery of the ice-forming facility, water flowing out from the drainage section 11, the drainage section 12, or the drainage guide section 30 flows down along the drainage path 26. When the discharged water freezes, an ice bridge 20, which is a bridge-like ice path, may form between the ice-forming surface 1 and the periphery frame 4 or the floor or ground.

[0031] In this embodiment, an ice bridge blocking region 29 is provided between the frozen surface 1 and the external structure. The ice bridge blocking region 29 allows water discharged from the drainage section 11, the drainage section 12, or the drainage guide section 30 to flow down, while suppressing the formation of a continuous heat transfer path between the frozen water body and the external structure. The external structure is, for example, a peripheral frame 4, a floor surface, the ground, a walking mat, or a protective mat.

[0032] The ice bridge blocking region 29 may include a separation space or a dripping section. The separation space or dripping section may form a distance or positional relationship that allows water to flow down while making it difficult for the grown frozen body to reach the ice surface 1 or external structures.

[0033] The ice bridge blocking area 29 may include a section for changing the drainage direction.

[0034] The ice bridge blocking region 29 may include a low-wetability surface or a low-adhesion area.

[0035] The ice bridge blocking region 29 may include a flexible blocking section.

[0036] The ice bridge blocking region 29 may include a weak contact portion 31. The weak contact portion 31 may include a notch, a thin-walled portion, a groove, a recess, a slit, a water-repellent portion, a low-adhesion portion, or a fragile contact surface. When an ice bridge 20 is formed, the weak contact portion 31 can be used to make it easier to break the ice bridge 20 when removing or cleaning it.

[0037] The ice bridge blocking region 29 may include a replaceable ice adhesion portion.

[0038] The ice bridge blocking area 29 may be added, rearranged, replaced, or removed based on the growth direction of the ice bridge 20 formed during the operating period, the thickness of the ice blocks, the location of the icicle-shaped ice, the extent of the refreezing area, or the location of moisture accumulation.

[0039] In one embodiment, a drainage guide section 30 and a weak contact section 31 may be provided in the ice bridge formation section to control the direction of frozen water growth. The weak contact section 31 may make it easier to break the ice bridge 20 at a predetermined position when removing or cleaning it after it has formed, thereby suppressing damage to the peripheral frame 4, mat, floor surface, or waterproofing member.

[0040] In the ice bridge formation suppression construction method, first, an ice bridge formation section may be identified at the periphery or boundary of the frozen surface 1 where water discharged from the drainage section 11, water drainage section 12, or drainage guide section 30 freezes and forms an ice bridge 20 between the frozen surface 1 and the external structure.

[0041] Next, an ice bridge blocking region 29 may be provided in the ice bridge formation section to allow the discharged water to flow down while suppressing the formation of a continuous heat transfer path by the frozen body of the water. The ice bridge blocking region 29 may include a drainage guide section 30 and a weak contact section 31 that control the direction of growth of the frozen water.

[0042] During the operating period or cleaning, the growth direction of the ice bridge 20, the thickness of the ice blocks, the location of the icicle-shaped ice, the extent of the refreezing area, or the location of moisture accumulation may be checked, and based on the results, additional ice bridge blocking areas 29 may be added, rearranged, replaced, or removed.

[0043] If an ice bridge 20 is formed, it may be broken at the weak contact portion 31 during removal or cleaning. This helps to minimize damage to the peripheral frame 4, walking mat, protective mat, floor surface, or waterproofing member.

[0044] The members forming the ice bridge barrier area 29 in this embodiment may be configured to be additional, rearranged, replaceable, or removable. In seasonal or limited-operation ice surface facilities, these members may be placed during the operating period and removed after the operating period ends during inspection, cleaning, or dismantling. They may also be reattached when the facility is reinstalled after dismantling. [Examples]

[0045] In one embodiment, in the drainage section, drainage guide section, or water drainage section, melted water or cleaning water froze to form a bridge-like ice mass, and an ice bridge was formed between the frozen surface and the external structure.

[0046] In the ice bridge formation section, drainage guide sections and weak contact sections were provided to control the direction of frozen water growth. During removal, the ice bridge was fractured at the weak contact section to minimize damage to the peripheral frame, floor surface, or mat. [Industrial applicability]

[0047] The present invention can be used for outdoor, semi-outdoor, seasonal, limited-time, temporary, or permanent ice skating rinks, curling rinks, ice hockey rinks, and other ice-surface facilities.

[0048] Furthermore, the present invention can be used to suppress ice bridge formation in drainage sections, drainage guide sections, gaps, or drainage sections of ice-forming facilities, to suppress damage during removal or cleaning, or to improve the efficiency of maintenance work. [Explanation of Symbols]

[0049] 1. Frozen surface 4 Peripheral frame 11 Drainage section 12 Drainage section 20 Ice Bridge 26 Drainage routes 29 Ice bridge blockage area 30 Drainage guide part 31 Weak contact area

Claims

1. An ice bridge formation suppression structure for a facility having an ice surface, comprising: a drainage section, drainage guide section, gap section, or drainage section arranged on the periphery of the ice surface for discharging meltwater, condensation water, rainwater, cleaning water, or leaked water; an external structure, such as a periphery frame, floor surface, ground, walking mat, or protective mat, located on the periphery side or outside of the ice surface; and an ice bridge blocking region provided between the ice surface and the external structure, wherein the ice bridge blocking region is configured to allow the flow of water discharged from the drainage section, drainage guide section, gap section, or drainage section, while suppressing the formation of a continuous heat transfer path between the ice surface side and the external structure side.

2. The ice bridge formation suppression structure according to claim 1, wherein the ice bridge blocking region includes at least one of a separation space, a dripping portion, a drainage direction changing portion, a low wettability surface, a low adhesion portion, a flexible blocking portion, a weak contact portion, or a replaceable ice adhesion portion.

3. The ice bridge blocking region includes the separation space or the dripping section, and the separation space or the dripping section forms a distance or positional relationship that makes it difficult for the grown frozen body to reach the ice surface or the external structure, as described in claim 2.

4. The ice bridge formation suppression structure according to claim 2, wherein the ice bridge blocking region includes the weak contact portion, and the weak contact portion includes at least one of a notch, a thin-walled portion, a groove, a recess, a slit, a water-repellent portion, a low-adhesion portion, or a fragile contact surface.

5. The ice bridge formation suppression structure according to claim 4, wherein the weak contact portion is configured to facilitate the rupture of the ice bridge at a predetermined position during removal or cleaning when an ice bridge is formed, thereby suppressing damage to the peripheral frame, the walking mat, the protective mat, the floor surface, or the waterproofing member.

6. The ice bridge formation suppression structure according to claim 1, wherein the member forming the ice bridge blocking region is configured to be additionally positioned, rearranged, replaced, or removed.

7. The ice bridge formation suppression structure according to claim 1, wherein the ice bridge blocking region includes a drainage guidance section that controls the direction of frozen water growth, and a weak contact section that facilitates the breaking of the ice bridge at a predetermined position during removal or cleaning when an ice bridge is formed.

8. A method for preventing ice bridge formation in an ice surface facility, comprising: a step of identifying an ice bridge formation section at the periphery of the ice surface, where water discharged from a drainage section, drainage guide section, gap section, or drainage section for discharging meltwater, condensation water, rainwater, cleaning water, or leaked water freezes and forms an ice bridge between the ice surface and the external structure; and a step of providing an ice bridge blocking area in the ice bridge formation section, while allowing the flow of water discharged from the drainage section, drainage guide section, gap section, or drainage section, to prevent the frozen body of the water from forming a continuous heat transfer path between the ice surface side and the external structure side.

9. The ice bridge formation suppression construction method according to claim 8, further comprising the steps of adding, rearranging, replacing or removing the ice bridge blocking area based on the growth direction of the ice bridge, the thickness of the ice block, the location of the icicle-shaped ice, the extent of the refreezing area, or the location of moisture accumulation.

10. The ice bridge formation suppression construction method according to claim 8, wherein the step of providing the ice bridge blocking region includes providing a drainage guidance section for controlling the growth direction of frozen water and a weak contact section for making it easier to break the formed ice bridge at a predetermined position.

11. The ice bridge formation suppression construction method according to claim 10, further comprising the step of breaking the ice bridge at the weak contact portion during removal or cleaning to suppress damage to the peripheral frame, the walking mat, the protective mat, the floor surface, or the waterproofing member.

12. The ice bridge formation suppression construction method according to claim 8, wherein the step of providing the ice bridge blocking area is to place the members forming the ice bridge blocking area during the operating period of the ice formation facility, and the ice bridge formation suppression construction method further includes the step of removing the members after the placement of the members, after the end of the operating period, during inspection, cleaning, or removal.

Citation Information

Patent Citations

  • JP1973010994U

  • Ice skating rink also used as outdoor tennis court

    JP1988284369A

  • Thickness adjustable auxiliary fence for skate rink

    KR102350806B1