Temporary fence safety walkway
The rectangular pipe frame with rigidly connected corners and swivel clamps enhances the wind resistance of temporary enclosure safety walkways, enabling safe passage under 18 m/s wind speeds using standard materials.
Patent Information
- Application Number
- JP2023014376
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Filing Date
- 2023-02-02
- Publication Date
- 2026-11-20
- Estimated Expiration
- 2043-02-02
AI Technical Summary
Conventional temporary enclosure safety walkways cannot withstand standard wind speeds of 18 m/s or higher due to the inability of their components to resist moments.
A temporary enclosure safety walkway composed of rectangular pipes with rigidly connected corners, using STK500 single pipes and swivel clamps to form a stable frame that can withstand high wind speeds.
The walkway design allows for safe passage under standard wind speeds of 18 m/s or higher while maintaining structural integrity using conventional materials.
Smart Images

Figure 0007954444000003 
Figure 0007954444000004 
Figure 0007954444000005
Abstract
Description
[Technical Field]
[0001] This invention relates to a temporary enclosure safety walkway, and more particularly to a temporary enclosure safety walkway having a predetermined wind load resistance. [Background technology]
[0002] Conventional temporary enclosure safety walkways are disclosed, for example, in Japanese Patent Publication No. 2011-144613 (Patent Document 1). According to this publication, an arch-shaped temporary enclosure safety walkway is constructed at a construction site by inserting and fixing two roughly inverted J-shaped safety walkway frames into the ground. [Prior art documents] [Patent Documents]
[0003] [Patent Document 1] Japanese Patent Publication No. 2011-144613 (Abstract, etc.) [Overview of the project] [Problems that the invention aims to solve]
[0004] Conventional temporary fences and safety walkways at construction sites were configured as described above.
[0005] However, conventional temporary enclosure safety walkways, as described above, have the problem that the components constituting the safety walkway cannot withstand the moment, and therefore cannot withstand a predetermined standard wind speed (18 m / s or higher).
[0006] This invention was made in view of the above-mentioned problems, and aims to provide a temporary enclosure safety walkway that can withstand a standard wind speed (18 m / s or more) while using the same materials as in the conventional invention. [Means for solving the problem]
[0007] The temporary enclosure safety walkway according to this invention is composed of rectangular pipes and is a temporary enclosure safety walkway that workers can pass through. The four corners of the rectangular pipes are rigid structures.
[0008] Preferably, the rectangular pipe includes a support pipe extending in the vertical direction, and an inverted C-shaped C-type pipe provided to be connected to the support pipe.
[0009] More preferably, a fixing member for fixing the support pipe and the C-type pipe to the ground is included.
[0010] According to one embodiment of the present invention, the height of the safety passage is 3 m, the interval between the supports of the safety passage is 1.8 m, the maintenance space enclosed by the safety passage has a width of 0.8 m or more and a height of 1.8 m or more, and the rectangular pipe used in the safety passage is made of STK500 single pipe φ48.6 (t=2.4). ADVANTAGEOUS EFFECTS OF INVENTION
[0011] According to the present invention, the temporary enclosure safety passage has a rectangular frame, and the four corners thereof are of rigid structure. As a result, it can withstand the reference wind speed while using the same members as in the conventional art. BRIEF DESCRIPTION OF THE DRAWINGS
[0012] [Figure 1] It is a diagram showing the temporary enclosure safety passage according to the embodiment of the present invention. [Figure 2] It is a model diagram showing wind load. [Figure 3] It is a diagram showing the load calculation applied to the temporary enclosure passage. [Figure 4] It is a diagram showing the frame calculation of the C-type pipe. [Figure 5] It is a diagram showing the frame calculation of the C-type pipe. [Figure 6] It is a diagram showing the frame calculation of the C-type pipe. [Figure 7] It is a diagram that specifies the grid points No. 1 to 7 of the grid point DATA in the frame calculation of Fig. 4 to Fig. 6. [Figure 8] It is a diagram showing the bending moment applied to the frame in Case 1. [Figure 9]This diagram shows the shear force acting on the frame in Case 1. [Figure 10] This diagram shows the axial force acting on the frame in Case 1. [Figure 11] This is a displacement diagram of the frame in Case 1. [Figure 12] This figure shows the bending moment acting on the frame in Case 2. [Figure 13] This diagram shows the shear force acting on the frame in Case 2. [Figure 14] This diagram shows the axial force acting on the frame in Case 2. [Figure 15] This is a displacement diagram of the frame in Case 2. [Figure 16] This diagram shows a fixed connection using a flexible clamp. [Modes for carrying out the invention]
[0013] The embodiments of this invention will now be described with reference to the drawings. Figure 1 is a diagram showing a safety passage for workers provided next to a temporary enclosure board according to one embodiment of this invention. Figure 1(A) is a view of the safety passage 10 from the passage side, and Figure 1(B) is a view from the side perpendicular to Figure 1(A), and is a view of the part indicated by arrow 1B-1B in Figure 1(A). Referring to Figures 1(A) and 1(B), the safety passage 10 includes a support pipe 12 extending vertically to the ground and an inverted C-shaped C-type pipe 11 attached to the support pipe 12, and the support pipe 12 holds the temporary enclosure board 13 with furring strips 17a to 17c. The support pipe 12 and the C-type pipe 11 have straight sections at the upper and lower parts of their inverted C shape, and these sections are connected to the support pipe 12 with clamps 19a, 19b and clamps 20a, 20b.
[0014] In other words, the C-shaped pipe 11 and the support pipe 12 are integrated with clamps 19a, 19b and clamps 20a, 20b, so that the safety passage 10 formed by the C-shaped pipe 11 and the support pipe 12 forms a rectangular frame, and its four corners are rigidly connected. Since rigid connections can transmit moments, the load on the frame members can be spread out. As a result, it is possible to withstand a predetermined standard wind speed while using the same members as in the conventional method.
[0015] For reference, the dimensions of safety passage 10 are given as 800mm wide x 1800mm high (indicated by a dashed line in the diagram) to allow workers to pass through safely. However, these dimensions are merely an example and are not the only dimensions that may be used.
[0016] The support pipe 12 and the C-shaped pipe 11 are connected to a connecting pipe 14 that extends horizontally near the clamps 20a and 20b. Here, the connecting pipe 14 is connected to the lower end of the C-shaped pipe 11 and the support pipe 12, and the connecting pipe 14 is connected to the discard pipes 15a and 15b at both of its horizontal ends, and the discard pipes 15a and 15b are inserted into the ground 22 to fix the safety passage 10. In addition, a stepping board 16 for workers to pass over is provided on top of the connecting pipe 14. The distance B between the support pipe 12 and the C-shaped pipe 11 in the direction in which the safety passage of the support pipe 12 extends is 1.8m, and the distance l0 from the upper and lower furring strips to the end of the temporary enclosure board (distance between the furring strip 17c and the ground 22) is 0.15m.
[0017] Next, the design conditions for the safety passage 10 in this embodiment will be described. Figure 2 shows the basic structure and wind load of the safety passage 10. Referring to Figure 2, the structural dimensions of the temporary enclosure that will become the safety passage 10 are as follows: The height H of the temporary enclosure is 3m, the height h of the C-shaped pipe 11 is 2.35m, the spacing l between the furring strips 17a to 17c is 1.35m, the width dimension of the C-shaped pipe 11 is 0.89m, and wind loads P1 to P3 are applied to three points on the furring strips 17a to 17c (referred to as support points P1 to P3 from the top).
[0018] Note that the temporary enclosure boards 13, the purlin pipes 17, and the discarded pipes 15 are not included in the calculations here.
[0019] Next, the materials used for the safety walkway 10 will be described. The safety walkway 10 uses single pipes with a diameter of φ = 4.86 cm and a plate thickness of t = 2.4 mm. The material of the single pipes is STK500, with a cross-sectional area A = 3.48 cm² and a section modulus Z = 3.83 cm². 3 Radius of gyration i = 1.64 cm, allowable compressive stress fc = 237 N / mm, allowable bending stress fb = 237 N / mm 2 Allowable shear stress fs = 135 N / mm 2 That is the case.
[0020] Furthermore, the fastening fittings (clamps) 19a, 19b, and 20a, 20b are swivel clamps with a load-bearing capacity of 3.43 kN / piece. Note that when considering wind loads, the above allowable values should be multiplied by 1.3.
[0021] Next, we will explain wind load. Wind load is calculated according to the following conditions.
[0022] Standard wind speed 18m / s Typhoon surcharge 1.0 Target areas: Large urban areas, general urban areas, suburbs, and forests. Installation location: A place other than cliffs or slopes. For reference, we used the "Design Guidelines for Scaffolding and Formwork Support" (Japan Temporary Construction Industry Association) and the "Safety Technical Guidelines for Scaffolding Against Wind Loads" (Japan Temporary Construction Industry Association).
[0023] Furthermore, the "Design Guidelines for Scaffolding and Formwork Support" specifies the allowable stress, allowable buckling stress, allowable tensile stress of steel materials, the allowable load-bearing capacity of fastening fittings, and combinations of vertical loads.
[0024] Furthermore, the "Safety Technical Guidelines for Scaffolding Against Wind Loads" stipulates the allowable stress of materials and components, the increase in allowable stress against wind loads, and the calculation of components.
[0025] Next, the design results will be described. Here, the calculation of the design conditions was performed using arbitrary-shaped planar frame analysis software (trade name "Frame G") called "TITLE C-type pipe frame calculation".
[0026] Table 1 is a table showing the results when calculated using the above software.
[0027]
Table 1
[0028] The stress is as shown in Figure 6, and the stress level will be described later.
[0029] Here, for example, in the case of bending, since σb (generated stress level) is equal to or less than σba (allowable stress level), and all generated stress levels for shear and axial force are equal to or less than the allowable stress levels, it is determined to be OK.
[0030] Next, the calculation of wind load will be described.
[0031] Wp=qz·C =369.1×1.2=442.9N / m 2 =0.44kN / m 2 Here, Wp is the wind load (N / m 2 ), qz is the design velocity pressure, which is 369.1N / m as follows 2 , and C is the wind force coefficient, which is 1.2.
[0032] The calculation of the design velocity pressure is as follows.
[0033] qz=5×Vz 2 / 8 =5×24.3 2 / 8=369.1N / m 2 Here, Vz is the design wind speed at ground level, which is 24.3 m / s.
[0034] The design wind speed is obtained by the following calculation.
[0035] Vz = V0 × Ke × S × Eb = 18 × 1.0 × 1.35 × 1.0 = 24.3 m / s Here, V0 is the standard wind speed (m / s) of 18 m / s. Ke is a typhoon surcharge factor of 1.0 (excluding Kyushu, Okinawa, and Yamaguchi). S is the instantaneous wind speed distribution coefficient at ground level Z, which is 1.35 (regional classification III or higher, Z < 5m). Eb is a surcharge factor for nearby tall buildings, which is 1.0 (if not nearby).
[0036] Next, we will explain how to calculate the wind pressure coefficient C. The wind pressure coefficient C can be calculated using the following formula.
[0037] C = (0.11 + 0.09γ + 0.945C0·R)·F =(0.11+0.09×0+0.945×2×0.6)×1 =1.2 Here, γ is the wind force reduction coefficient for the second structural element, which is 0 (γ=0 only for the first structural element). C0 is the basic wind pressure coefficient for soundproof panels, which is 2 (completion rate φ=1). R is a shape correction coefficient based on the aspect ratio of the soundproofing panel, and is 0.6 (for extensions B=6m or more). F is a correction factor based on the installation location, set to 1.0 (independent installation).
[0038] Next, we will explain how to calculate the sectional forces. The model diagram for this case is shown in Figure 2.
[0039] The cross-sectional properties are as follows:
[0040] Single-pipe scaffolding, φ48.6mm (t=2.4mm) A = 3.48 cm 2 =3.48E-04m 2 = 348mm 2 I = 9.32 cm 4 =9.32E-08m 4 = 93200mm 4 Z = 3.83 cm3 =3.83E-06m 3 = 3830mm 3 E = 210 × 10 6 kN / m 2 = 210 × 10 3 N / m 2 Yield strength F=355N / m 2
[0041] Next, we will explain the load calculation. Figure 3 is similar to Figure 2 and is used to illustrate the load calculation. Referring to Figure 3, the distance between the support columns is 1.8m. Also, the wind load Wp is 0.44kN / m as mentioned above. 2 That is the case.
[0042] Anchors P1 and P3 are, P1,3=0.44×1.80×(1.35 / 2+0.15)=0.65kN The anchor point P2 is, P2=0.44×1.80×(1.35 / 2+1.35 / 2)=1.07kN
[0043] Next, we will explain the calculation of the C-type frame. For reference, Figures 4 to 6 show a part of the C-type frame calculation. Here, "TITLE C-type pipe frame calculation" is a display showing the output when this calculation is performed using arbitrary-shaped planar frame analysis software (product name "Frame G").
[0044] Here, Figure 7 shows the identification of point numbers 1 to 7 in the point data for frame calculations in Figures 4 to 6. Here, point numbers 1 to 7 correspond to a to g in Figure 7.
[0045] The results obtained from the frame calculations are explained below. Since the C-shaped frame receives wind from both sides, the case where the wind load acts on the right side of the C-shaped frame is called CASE 1, and the case where the wind load acts on the left side of the C-shaped frame is called CASE 2. First, we will explain CASE 1.
[0046] Figure 8 shows the bending moments obtained from the frame calculation in CASE 1. Referring to Figure 8, the bending moments acting on the four rigidly connected frames in the top, bottom, left, and right directions are shown. The moments shown outside the four frames are the external moments, and the moments shown inside the four frames are the internal moments. Here, if the position and magnitude of the applied force are the same, the position where the maximum moment occurs is determined by the shape of the frame, and if the shape of the frame is the same, the maximum moment changes depending on the position of the applied force, the length of the members, and the method of fixing the members.
[0047] Furthermore, the calculation data in this case is shown in Figure 6. Note that in Figure 6, the M (bending) and S (shear) of member 5, and the N (axial force) of member 6, which are enclosed in a frame, are the most dangerous and are therefore shown in the "Stress" column of Table 1.
[0048] Figure 9 is a diagram showing shear stress. Here again, the shear stress shown on the outside of the four frames is the external shear stress, and the shear stress shown on the inside of the four frames is the internal shear stress.
[0049] Figure 10 is an axial force diagram. It shows the forces acting on the four axes that make up the frame. The positive values shown in the figure indicate tension, and the negative values indicate compression.
[0050] Figure 11 is a displacement diagram. It shows the displacement acting on the frame.
[0051] Next, we will explain CASE 2. Figures 12 to 15 are diagrams in CASE 2 that correspond to Figures 8 to 11 in CASE 1.
[0052] Figure 12 shows the bending moments obtained from the frame calculation of a C-shaped pipe. Referring to Figure 12, the bending moments acting on the four rigidly connected frames in the top, bottom, left, and right directions are shown. The moments shown outside the four frames are the external moments, and the moments shown inside the four frames are the internal moments.
[0053] Figure 13 is a diagram showing shear stress. Here again, the shear stress shown on the outside of the four frames is the external shear stress, and the shear stress shown on the inside of the four frames is the internal shear stress.
[0054] Figure 14 is an axial force diagram. It shows the forces acting on the four axes that make up the frame. In the figures, positive values indicate tension, and negative values indicate compression.
[0055] Figure 15 is a displacement diagram showing the displacement acting on the frame.
[0056] Next, I will explain the allowable stress.
[0057] The single-pipe is φ48.6mm (t=2.4mm).
[0058] A = 3.48 cm 2 =3.48E-04m 2 = 348mm 2 I = 9.32 cm 4 =9.32E-08m 4 = 93200mm 4 Z = 3.83 cm 3 =3.83E-06m 3 = 3830mm 3 E = 210 × 10 6 kN / m 2 = 210 × 10 3 N / m 2 Yield strength F=355N / m 2
[0059] The allowable buckling stress is as follows:
[0060] Effective buckling length of the member: l = 2350 mm Radius of gyration of the cross-section of the member: r = 1.64 cm = 16.4 mm
[0061] The critical slenderness ratio A can be calculated using the following formula.
[0062] A = √(π² × E / (0.6 × F)) =√(π² × 210 × 10³ / (0.6 × 355F)) =98.6 l / r = 2350 / 16.4 = 143.29 > 98.6 In the case of l / rA fk = 0.29 × F / ((l / r) / A))² = 49 N / mm 2 Allowable bending stress fb = 237 N / mm 2 Allowable shear stress fs = 135 N / mm 2
[0063] The maximum sectional force is as follows:
[0064] [Table 2]
[0065] Next, we will explain the calculation of stress.
[0066] The axial compressive stress is as follows:
[0067] σc = N / A = 1.50 × 10³ / 348 = 4.3 N / mm 2 <49 × 1.3 = 64 N / mm 2 (OK)
[0068] The bending compressive stress is as follows:
[0069] σb=M / Z=1.13×106 / 3830=295N / mm2<237×1.3 308 N / mm 2 (OK)
[0070] The shear stress is as follows:
[0071] τ=2S / A=2×2.49×103 / 348=14.3N / mm 2 <135 × 1.3 = 176 N / mm2 (OK)
[0072] Next, we will explain the clamps 19a, 19b and 20a, 20b that connect the C-shaped pipe 11 and the support pipe 12 shown in Figure 1. The clamps 19a, 19b and 20a, 20b used here are called adjustable clamps, and we will explain the fixed connection (rigid connection) using them. Figure 16 is a diagram to illustrate this. Generally, a connection fixed with a clamp is considered a pin connection. This is because the clamp itself is not designed to resist bending.
[0073] Even with a swivel clamp, the structure rotates, resulting in zero bending resistance. Therefore, by using two clamps, a fixed connection can be made as shown in Figure 16.
[0074] In Figure 16, the vertically extending support column represents the support pipe 12, the horizontal structure represents the upper part of the C-shaped pipe 11, and the two clamps represent the clamps 19a and 19b and clamps 20a and 20b shown in Figure 1.
[0075] In this case, when considering a fixed connection, the clamping distance is important, and the necessary distance for a fixed connection is calculated.
[0076] In both cases, the clamp is supported by the shear force of the two frames it connects to.
[0077] Referring to Figure 16, the bending transmission equation is as follows. M = P × L Here, M is the moment generated at the fixed joint, P is the tensile force generated at the clamp, and L is the clamping distance.
[0078] The bending strength of a single pipe is, M0 = fc × Z = 237 × 3830 = 0.91 × 10 6 N / mm = 0.91 kN / m Here, M0 is the bending strength of the single pipe. fc is the allowable stress of a single pipe (237 N / mm²). 2 ) and Z is the section modulus of the single-pipe (3830mm) 3 )
[0079] The allowable tensile force of the adjustable clamp is P0 = 3.43 kN.
[0080] As a result, the required clamping distance is, L≧M0 / P0=0.91 / 3.43=0.27m=270mm In other words, if L is 270 mm or more, the C-shaped pipe 11 and the support pipe 12 will be fixedly connected, and in this embodiment, such dimensions are used.
[0081] In the above embodiment, a case using a C-shaped frame was described, but the invention is not limited to this; any shape is acceptable as long as the four corners of the frame constituting the safety passage are rigid.
[0082] Although embodiments of this invention have been described above with reference to the drawings, this invention is not limited to the embodiments shown. Various modifications and variations can be made to the illustrated embodiments within the same scope as this invention, or within the equivalent scope. [Explanation of Symbols]
[0083] 10 Safety passage 11 C-type pipe 12 support pipes 13 Temporary fencing boards 14 connecting pipes 15 Disposal pipes 16 Stepping boards 17. Furringbone pipes 19,20 clamps 22 Ground
Claims
1. A temporary enclosure safety walkway composed of rectangular pipes, The temporary enclosure safety walkway includes a support pipe extending vertically to the ground and an inverted C-shaped C-pipe attached to the support pipe, the support pipe holds the temporary enclosure board with a furring strip, and the support pipe and the C-shaped pipe have straight sections at the upper and lower parts of their inverted C shape, the straight sections being connected to the support pipe with clamps. The four corners of the aforementioned rectangular pipe are rigid structures, forming a temporary enclosure and safety walkway.
2. The height of the aforementioned safety walkway is 3m. The spacing between the support columns of the aforementioned safety passage is 1.8 m. The maintenance space enclosed by the safety passage is at least 0.8 m wide and at least 1.8 m high, and the rectangular pipes used in the safety passage are made of STK500 single pipes with a diameter of φ48.6 (t=2.4). The temporary enclosure safety passage according to claim 1, wherein when the dimensions of the safety passage and the pipe material are input into the arbitrary-shaped planar frame analysis software, the wind resistance of the safety passage satisfies a standard wind speed of 18 m / s.
Citation Information
Patent Citations
JP1974021942U
Structure and method of installing covering body for external curing
JP1994212808A
Rain shielding installation
JP1995026733A
Temporary roof
JP1996086094A
Temporary enclosure safety passage frame and usage thereof
JP2011144613A