program

A program calculates carbon dioxide emissions from reinforced concrete buildings by using colored floor plans and pixel counting to estimate material volumes, addressing the complexity of existing systems and enabling emissions estimation without design documents.

JP7954605B2Active Publication Date: 2026-11-20TAISEI CORP
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
JP2023036158
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Filing Date
2023-03-09
Publication Date
2026-11-20
Estimated Expiration
2043-03-09

AI Technical Summary

Technical Problem

Existing systems for calculating carbon dioxide emissions from building materials, such as those used in reinforced concrete buildings, require detailed design documents and are cumbersome, making it difficult to accurately estimate emissions without them.

Method used

A program that calculates carbon dioxide emissions by inputting a standard floor plan colored with predetermined colors, using pixel counting and volume calculations to determine the amount of building materials, allowing for emissions estimation without design documents.

Benefits of technology

Enables easy and accurate calculation of carbon dioxide emissions from reinforced concrete buildings by simplifying the process through image-based input and pixel counting, eliminating the need for detailed architectural drawings.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007954605000001
    Figure 0007954605000001
  • Figure 0007954605000002
    Figure 0007954605000002
  • Figure 0007954605000003
    Figure 0007954605000003
Patent Text Reader

Abstract

To provide a program that easily and simply calculates the carbon dioxide emissions of building materials required for the construction of a ferroconcrete building without using design documents.SOLUTION: In a carbon dioxide emissions calculation system, a program causes a computer to execute: a pixel number calculation function of calculating, when images representing a reference floor plan view in which building parts are colored respectively in predetermined colors are input, the number of pixels of the predetermined colors rendered respectively in the images; a building part volume calculation function of calculating the volume of the building parts on the reference floor respectively based on the number of pixels of the predetermined colors; a building material usage calculation function of calculating weight or volume of each type of building materials on the reference floor based on the volume of the building parts; and a building carbon dioxide emissions calculation function of multiplying the weight or volume of each type of building materials by the carbon dioxide emissions unit of that type to calculate the carbon dioxide emissions of that type of building materials on the reference floor, and calculating a sum of the carbon dioxide emissions of respective types of building materials as the carbon dioxide emissions of the reference floor.SELECTED DRAWING: Figure 7
Need to check novelty before this filing date? Find Prior Art

Description

[Technical Field]

[0001] This invention relates to a program for calculating carbon dioxide emissions from building materials required for the construction of reinforced concrete buildings. [Background technology]

[0002] Environmental considerations, such as reducing carbon dioxide emissions, are becoming increasingly important. In Japan, it is said that about 40% of carbon dioxide emissions are related to construction, and the need to evaluate carbon dioxide emissions in construction is growing. For example, when constructing a new building, it is necessary to calculate the carbon dioxide emissions related to the building materials used.

[0003] In this regard, Patent Document 1 discloses a carbon dioxide emission estimation system for construction materials used in buildings. In this emission estimation system, for items selected as items for which carbon dioxide emissions are directly calculated, a coverage rate is set from the estimated weight used as a percentage of the total weight of the building. The quantity used of the directly calculated items is used as input data, and the carbon dioxide emissions for each are calculated by multiplying by the carbon dioxide emission intensity. The carbon dioxide emissions and coverage rates of the directly calculated items for which input data are available are then added together to calculate the total emissions and total coverage rate. The total emissions are then corrected based on the proportion of construction materials used in the building that are not included in the total coverage rate, thereby calculating the total carbon dioxide emissions of the construction materials used in the building. Here, for directly calculated items, the quantity used in the building to be estimated is input. In such emission estimation systems, by inputting the quantity used of major items such as concrete, rebar, and steel frames to the extent that, for example, more than 80% of the total weight of the building is covered, the accuracy of predicting the carbon dioxide emissions of the entire building is improved by the effect of correction using a correction coefficient.

[0004] In the configuration of Patent Document 1, as described above, it is necessary to input the quantities used for major items to the extent that they cover, for example, more than 80% of the total weight of the building. However, determining the types and quantities of building materials used based on the building's design documents is not easy; it is a very time-consuming and highly specialized task. Therefore, it is not easy to calculate the carbon dioxide emissions of a building using the system disclosed in Patent Document 1. Furthermore, for example, if it becomes necessary to calculate the carbon dioxide emissions generated during the construction of a building after its completion, and the design documents no longer exist, it becomes impossible to calculate the building's carbon dioxide emissions at all. Thus, there is a need for a simple way to calculate the carbon dioxide emissions from building materials used in construction without using design documents. In particular, there is a need to calculate carbon dioxide emissions for reinforced concrete buildings, which are numerous in number and will continue to be constructed in large numbers in the future. [Prior art documents] [Patent Documents]

[0005] [Patent Document 1] Japanese Patent Publication No. 2022-91900 [Overview of the Initiative] [Problems that the invention aims to solve]

[0006] The problem that this invention aims to solve is to provide a program that can easily calculate the carbon dioxide emissions from building materials required for the construction of a reinforced concrete building without using design documents. [Means for solving the problem]

[0007] To solve the above problems, the present invention employs the following means. In other words, the present invention is a program for calculating carbon dioxide emissions from building materials required for the construction of a reinforced concrete building, and is characterized by realizing the following: a pixel count calculation function which, when a standard floor plan in which the building parts using the building materials are colored with predetermined colors is input to a computer as an image, calculates the number of pixels of the predetermined color in the image; a building part volume calculation function which calculates the volume of the building parts on the standard floor based on the number of pixels of the predetermined color; a building material usage calculation function which calculates the weight or volume of each type of building material on the standard floor based on the volume of the building parts; a standard floor carbon dioxide emission calculation function which calculates the carbon dioxide emissions of each type of building material on the standard floor by multiplying the weight or volume of each type of building material by the carbon dioxide emission intensity of that type of building material, and calculates the sum of the carbon dioxide emissions of each type of building material as the carbon dioxide emissions of the standard floor; and a building carbon dioxide emission calculation function which calculates the carbon dioxide emissions of the building based on the carbon dioxide emissions of the standard floor. With this configuration, when a standard floor plan with building materials used in the building colored in a predetermined color is input as an image, the number of pixels of the predetermined color in the image is calculated, and based on this number of pixels, the volume of the building material on the standard floor is calculated. Then, based on this volume of the building material, the weight or volume of each type of building material on the standard floor is calculated. The weight or volume of the building material on the standard floor calculated in this way is multiplied by the carbon dioxide emission intensity for each type of building material to calculate the carbon dioxide emissions of that type of building material on the standard floor. Furthermore, the sum of the calculated carbon dioxide emissions for each type of building material is calculated to determine the carbon dioxide emissions for the standard floor. Finally, the carbon dioxide emissions of the building are calculated based on the carbon dioxide emissions for the standard floor. Thus, the volume of the building portion on a standard floor, which is the basis for calculating the building's carbon dioxide emissions, is calculated based on a standard floor plan in which the building portion is colored with predetermined colors. In other words, the building's carbon dioxide emissions can be calculated simply by coloring the standard floor plan and inputting it as an image into the program. Therefore, there is no need to perform complicated and specialized tasks such as reading architectural drawings. Furthermore, as mentioned above, carbon dioxide emissions can be calculated even without using design documents. Therefore, even if design documents no longer exist, it is still possible to calculate carbon dioxide emissions. In this way, it becomes possible to provide a program that can easily calculate the carbon dioxide emissions from building materials required for the construction of reinforced concrete buildings without using design documents.

[0008] In one embodiment of the present invention, the building portion includes a floor or a column, and when the pixel count calculation function receives as an image the standard floor plan in which the portion corresponding to the floor or the column is colored with the predetermined color, it calculates the number of pixels of the predetermined color in the image as the number of pixels of the portion corresponding to the floor or the column, and the building portion volume calculation function calculates the total area of ​​the floor or the column on the standard floor based on the number of pixels of the portion corresponding to the floor or the column, and if the building portion is the floor, it multiplies the total area of ​​the floor by the thickness of the floor, and if the building portion is the column, it multiplies the total area of ​​the column by the floor height of the standard floor to calculate the volume of the floor or the column on the standard floor. With this configuration, when a standard floor plan, in which the parts corresponding to the floors or columns of the building are colored with a predetermined color, is input as an image, the number of pixels of the predetermined color in the image is calculated as the number of pixels corresponding to the floors or columns. As described above, in a standard floor plan, the parts corresponding to the floors or columns are colored with a predetermined color, so the total area of ​​the floors or columns on the standard floor can be calculated from the number of pixels of these parts. Then, in the case of floors, the volume of the floors or columns on the standard floor can be easily calculated without using design drawings by multiplying the calculated total floor area by the thickness of the floor, and in the case of columns, by multiplying the calculated total column area by the floor height of the standard floor.

[0009] In another embodiment of the present invention, the building portion includes beams or walls, and when the pixel count calculation function receives as an image the floor plan of a standard floor in which lines of a predetermined color are drawn along the portion corresponding to the beam or wall, it calculates the number of pixels of the predetermined color in the image as the number of pixels of the portion corresponding to the beam or wall, and the building portion volume calculation function calculates the total length of the beam or wall on the standard floor based on the number of pixels of the portion corresponding to the beam or wall, and if the building portion is the beam, it multiplies the total length of the beam by the width and depth of the beam, and if the building portion is the wall, it multiplies the total length of the wall by the thickness and floor height of the wall to calculate the volume of the beam or wall on the standard floor. With this configuration, when a standard floor plan with lines drawn in a predetermined color along the beams or walls of the building is input as an image, the number of pixels of the predetermined color in the image is calculated as the number of pixels corresponding to the beams or walls. As described above, in the standard floor plan, lines are drawn in a predetermined color along the beams or walls, so the total length of the beams or walls on the standard floor can be calculated from the number of pixels corresponding to these beams or walls. Then, in the case of beams, the volume of the beams or walls on the standard floor can be easily calculated without using design drawings by multiplying the calculated total length of the beams by the beam width and beam depth, and in the case of walls, by multiplying the calculated total length of the walls by the wall thickness and floor height.

[0010] In another embodiment of the present invention, the type of building material constituting the building portion includes reinforcing steel and cement, and the building material usage calculation function calculates the weight of the reinforcing steel from the volume of the building portion and the amount of reinforcing steel per unit volume, calculates the weight of the reinforced concrete from the volume of the building portion and the specific gravity of the reinforced concrete, calculates the weight of the concrete by subtracting the weight of the reinforcing steel from the weight of the reinforced concrete, calculates the volume of the concrete by dividing the weight of the concrete by the specific gravity of the concrete, and calculates the weight of the cement by multiplying the volume of the concrete by the unit amount of cement used in the mix. With this configuration, the weight of the reinforcing steel can be calculated from the volume of the building portion and the amount of reinforcing steel per unit volume. The weight of the reinforced concrete can also be calculated from the volume of the building portion and the specific gravity of the reinforced concrete. Then, the weight of the concrete can be calculated by subtracting the weight of the reinforcing steel from the weight of the reinforced concrete, and the volume of the concrete can be calculated by dividing the volume of concrete by the specific gravity of the concrete. The weight of the cement can then be calculated by multiplying the calculated volume of concrete by the unit amount of cement used when mixing the concrete. In this way, the weight of the reinforcing steel and cement contained in the building materials that make up the building portion can be easily calculated without using design drawings. [Effects of the Invention]

[0011] According to the present invention, it is possible to provide a program that can easily calculate the carbon dioxide emissions of building materials required for the construction of reinforced concrete buildings without using design documents. [Brief Description of the Drawings]

[0012] [Figure 1] It is a diagram showing the functional configuration of a carbon dioxide emission calculation system that executes a program according to an embodiment of the present invention. [Figure 2] It is a diagram showing an example of a standard floor plan of a building input to the carbon dioxide emission calculation system of Figure 1. [Figure 3] It is a diagram showing an example of an image in which floors are colored with a predetermined color, based on the image of the standard floor plan. [Figure 4] It is a diagram showing an example of an image in which columns are colored with a predetermined color, based on the image of the standard floor plan. [Figure 5] It is a diagram showing an example of an image in which beams are colored with a predetermined color, based on the image of the standard floor plan. [Figure 6] It is a diagram showing an example of an image in which walls are colored with a predetermined color, based on the image of the standard floor plan. [Figure 7] It is a flowchart showing an example of the flow of carbon dioxide emission calculation processing executed by the program according to the present embodiment. [Figure 8] It is a flowchart showing the details of the flow of the step of calculating the number of pixels of the building portion and the step of calculating the volume of the building portion, for the floors constituting the building portion. [Figure 9] It is a diagram showing an example of representative values used for calculating the volume of the building portion. [Figure 10] It is a flowchart showing the detailed flow of the step of calculating the number of pixels of the building portion and the step of calculating the volume of the building portion, for the columns constituting the building portion. [Figure 11]This flowchart details the steps involved in calculating the number of pixels in a beam that constitutes a building structure, and calculating the volume of that structure. [Figure 12] This flowchart details the steps involved in calculating the number of pixels in the walls that make up the building structure, and calculating the volume of the building structure. [Figure 13] This flowchart shows the detailed steps for calculating the weight of building materials and calculating the carbon dioxide emissions per standard floor. [Figure 14] This figure shows an example of an image used to calculate the carbon dioxide emissions of the walls constituting the building portion in the first modified embodiment described above. [Figure 15] This figure shows an example of an image used to calculate the carbon dioxide emissions of the walls constituting the building portion in the second modified embodiment described above. [Figure 16] This figure shows an example of another image used to calculate the carbon dioxide emissions of the walls constituting the building portion in the second modified embodiment described above. [Figure 17] This figure shows an example of an image used to calculate the carbon dioxide emissions of the walls constituting the building portion in the third modified embodiment described above. [Figure 18] This figure shows an example of another image used to calculate the carbon dioxide emissions of the walls constituting the building portion in the third modified embodiment described above. [Figure 19] This figure shows an example of yet another image used to calculate the carbon dioxide emissions of the walls constituting the building portion in the third modified embodiment described above. [Figure 20] This figure shows the calculated values ​​of the components constituting the building part in the verification example of the above embodiment. [Figure 21] This figure shows the calculated values ​​of the components constituting the building part in the example and comparative example of the above embodiment. [Figure 22] This figure shows the calculated weights of reinforcing bars and cement for the example and comparative example in the verification example of the above embodiment. [Figure 23]This figure shows the calculated values ​​of carbon dioxide emissions for the example and comparative example in the verification example of the above embodiment. [Figure 24] This figure shows the calculated values ​​of the weight of the reinforcing bars and cement in the roof slab, and the amount of carbon dioxide emissions, in the verification example of the above embodiment. [Figure 25] This figure shows the calculated value of the total carbon dioxide emissions from the building in the verification example of the above embodiment. [Modes for carrying out the invention]

[0013] Hereinafter, with reference to the attached drawings, embodiments for implementing the program according to the present invention will be described based on the drawings. Figure 1 shows a diagram illustrating the functional configuration of a carbon dioxide emission calculation system that executes a program according to an embodiment of the present invention. Figure 2 shows an example of a standard floor plan of a building that is input into the carbon dioxide emission calculation system. The carbon dioxide emission calculation system 10 is a computer equipped with hardware such as a processor and memory, and by executing the program according to this embodiment, it functionally includes an image input unit 11, an image processing unit 12, a pixel count calculation unit 13, a building volume calculation unit 14, a building material usage calculation unit 15, a carbon dioxide emission calculation unit 16, a building carbon dioxide emission calculation unit 17, a result output unit 18, and a database 19, as shown in Figure 1.

[0014] The carbon dioxide emission calculation system 10 calculates the carbon dioxide emissions from building materials required to construct a reinforced concrete building based on the standard floor plan M. The standard floor plan M may be a design drawing included in the building's design documents, but in this embodiment, as shown in Figure 2, a so-called floor plan is used as the standard floor plan M. The standard floor plan M shows the arrangement of floors 2, columns 3, beams 4, walls 5, etc., which constitute the building portion 1k of the standard floor of building 1. Here, building portion 1k refers to the part of building 1 that is constructed using building materials.

[0015] Figure 3 shows an example of an image where the floor is colored with a predetermined color, based on an image of a standard floor plan. Figure 4 shows an example of an image where the columns are colored with a predetermined color, based on an image of a standard floor plan. Figure 5 shows an example of an image where the beams are colored with a predetermined color, based on an image of a standard floor plan. Figure 6 shows an example of an image where the walls are colored with a predetermined color, based on an image of a standard floor plan. The image input unit 11 receives an image 100 of the standard floor plan M from an external source. The standard floor plan M input to the image input unit 11 has the floors 2, columns 3, beams 4, walls 5, etc. that make up the building portion 1k pre-colored with predetermined colors. More specifically, the image 100 of the standard floor plan M is created for each of the floors 2, columns 3, beams 4, and walls 5 that make up the building portion 1k, and then input into the program. That is, the operator individually inputs an image 100a of the standard floor plan M with the floor 2 colored with predetermined colors, an image 100b of the standard floor plan M with the column 3 colored with predetermined colors, an image 100c of the standard floor plan M with the beam 4 colored with predetermined colors, and an image 100d of the standard floor plan M with the wall 5 colored with predetermined colors. In images 100a, 100b, 100c, and 100d shown in Figures 3 to 6, in order to make the drawings easier to understand, only the parts of the standard floor plan M where the floor 2, column 3, beam 4, and wall 5 are colored with predetermined colors are depicted in images 100a, 100b, 100c, and 100d, while other parts of the standard floor plan M are not depicted in images 100a, 100b, 100c, and 100d. Alternatively, images 100a, 100b, 100c, and 100d may be created by directly overlaying the floor 2, column 3, beam 4, and wall 5 of the standard floor plan M shown in Figure 2 with predetermined colors different from those of the standard floor plan M, so that both the shapes originally included in the standard floor plan M and the parts colored with predetermined colors are included. Furthermore, in the standard floor plan M, line segments Ld whose actual dimensions D are known are colored with predetermined colors. Actual dimensions D refer to the actual length and dimensions of the line segment Ld in accordance with the scale of the actual building 1. Here, the colors used to color the floor 2, columns 3, beams 4, walls 5, etc. that make up the building portion 1k are different from the colors used to color the line segment whose actual dimension D is known. For example, in this embodiment, the floor 2, columns 3, beams 4, walls 5, etc. that make up the building portion 1k are colored "red", and the line segment Ld whose actual dimension D is known is colored "blue".

[0016] For example, as shown in Figure 3, for floor 2, the worker creates an image 100a of the standard floor plan M relating to floor 2 by coloring only the portion of floor 2 in the standard floor plan M with a predetermined color (red). In the image 100a of the standard floor plan M relating to floor 2 created in this way, the entire surface of floor 2 is colored with the predetermined color. Therefore, when image 100a is input into the program, it is possible to calculate the total area of ​​floor 2 in the horizontal plane based on the number of pixels in the colored portion. In Figure 3, floor 2 is colored to include the columns and partition walls. While this allows workers to easily perform the coloring work, it goes without saying that the accuracy of the carbon dioxide emission calculation would be further improved if the coloring were limited to only the portion corresponding to floor 2, excluding the columns and partition walls.

[0017] The same applies to column 3. For example, as shown in Figure 4, an operator creates an image 100b of the standard floor plan M relating to column 3 by coloring only the portion of column 3 in the standard floor plan M with a predetermined color (red). In the image 100b of the standard floor plan M relating to column 3 created in this way, the entire cross-section of column 3 is colored with the predetermined color. Therefore, when image 100b is input into the program, it is possible to calculate the total area (total cross-sectional area) of column 3 in the horizontal plane based on the number of pixels in the colored portion. Furthermore, for wall 5, as shown in Figure 6, for example, the worker colors only one of the two contour lines representing the surface of wall 5 in the standard floor plan M with a predetermined color (red), thereby creating an image 100d of the standard floor plan M relating to wall 5. In the image 100d of the standard floor plan M relating to wall 5 created in this way, one surface of all walls 5 is colored with the predetermined color, so when image 100d is input into the program, it is possible to calculate the total length of wall 5 in the horizontal plane based on the number of pixels in the colored portion. In this embodiment, only the exterior wall 5s that is located facing the outside of building 1 is included in the calculation as wall 5.

[0018] By the way, the standard floor plan M (layout plan) does not necessarily show the beam 4 that constitutes the building portion 1k. For this reason, the beam 4 is assumed to be installed between adjacent columns 3, and the worker draws the line segment Lc of the specified color (red) between adjacent columns 3, along the long side of the beam 4, as shown in Figure 5, for example. In this case, the line segment Lc of the specified color (red) drawn between adjacent columns 3, along the long side of the beam 4, may also serve as a line segment indicating the actual dimension D of the distance between adjacent columns 3 (distance between columns). In this way, the worker creates an image 100c of the standard floor plan M relating to beam 4. In the image 100c of the standard floor plan M relating to beam 4 created in this way, all parts corresponding to beam 4 are drawn as line segments Lc in a predetermined color. Therefore, when image 100c is input, it is possible to calculate the total length of beam 4 in the horizontal plane based on the number of pixels in the colored parts.

[0019] Please note that the colors "red" and "blue" shown here are merely examples, and can be changed to other colors as needed. However, in order to analyze the input image 100 and clearly identify which parts have been colored by the operator, it is desirable that when the luminance values ​​of the luminance components R (red), G (green), and B (blue) that make up the pixels in image 100 are binarized, for example, one of the luminances is at its maximum (e.g., 255) and the others are at their minimum (e.g., 0). From this perspective, it is desirable that the above color be red, blue, or green.

[0020] Prior to inputting the image 100 into the image input unit 11, the worker may color the standard floor plan M by hand, for example, using a colorable writing instrument such as a felt-tip pen, ballpoint pen, or colored pencil on the standard floor plan M printed on paper. In this case, the manually colored standard floor plan M (on paper) is converted into an image 100 that can be input into a computer by scanning with a scanner or taking a picture with a camera. Furthermore, the coloring of the standard floor plan M may be performed on a computer using drawing software or the like on a pre-prepared image 100 showing the standard floor plan M. In this case, the computer that performs the coloring of the image 100 of the standard floor plan M may be the carbon dioxide emission calculation system 10, or it may be another external personal computer, tablet terminal, smartphone, etc. The computer that performs the coloring of the standard floor plan M may acquire the image 100 showing the standard floor plan M from an external source via a network such as a LAN, Wi-Fi, or the Internet, or via various storage media.

[0021] Database 19 stores various data necessary to calculate the carbon dioxide emissions of building materials that make up building portion 1k of building 1, which will be described in detail later. Database 19 stores various values ​​(representative values) necessary to calculate the volume of floors 2, columns 3, beams 4, walls 5, etc. that make up building portion 1k of building 1. Database 19 stores values ​​necessary to calculate the weight of building materials (reinforcement bars, cement) used from the volume of floors 2, columns 3, beams 4, walls 5, etc. that make up building portion 1k of building 1. Database 19 stores values ​​necessary to calculate the carbon dioxide emissions from the weight of building materials (reinforcement bars, cement) used in building portion 1k of building 1.

[0022] The image processing unit 12 performs preprocessing on each of the images 100 (100a to 100d) of the standard floor plan M input to the image input unit 11, prior to calculating the volume of floors 2, columns 3, beams 4, walls 5, etc. The image processing unit 12 extracts the floors 2, columns 3, beams 4, walls 5, etc. that constitute the building portion 1k from each of the images 100 (100a to 100d) of the standard floor plan M. The extraction of floors 2, columns 3, beams 4, walls 5, etc. in the image 100 of the standard floor plan M is performed, for example, by the image processing unit 12 extracting pixels that are colored with a predetermined color from the image 100 based on a pre-set image processing program. In this embodiment, the image processing unit 12 extracts pixels that are colored "red" and "blue" from the image 100. In extracting the default colors from image 100, the image processing unit 12 binarizes the luminance values ​​of pixels that are considered to be colored "red" or "blue" among the pixels that make up image 100, and adjusts each luminance value to be either the maximum value (e.g., 255) or the minimum value (e.g., 0). For example, when saving image 100, if it is compressed to a lower resolution image, some pixels may have luminance values ​​that are slightly different from the color that was set. Also, for example, if image 100 was created by a worker coloring a standard floor plan M with a writing instrument and then digitizing it, some writing instruments may have luminance values ​​that differ from the default color. In such cases, the part that should have been colored with the default color as building part 1k may not be correctly identified as the default color, and as a result, the accuracy of the carbon dioxide emissions calculated by the program may decrease. In contrast, if the brightness values ​​of pixels that are thought to be colored "red" or "blue" as described above are binarized and then compared with a default color set such that, for example, one of the brightness values ​​is the maximum (e.g., 255) and the other is the minimum (e.g., 0), then even such pixels can be correctly determined to be part of the colored area by the default color.

[0023] Furthermore, the image processing unit 12 performs a thinning process on each of the standard floor plan M images 100c relating to beam 4 and 100d relating to wall 5, for pixels corresponding to line segments colored "red" that are drawn along the outline of wall 5 or beam 4, reducing the width of those lines to 1 pixel. Similarly, for each image 100 (100a to 100d), the image processing unit 12 performs a thinning process on pixels colored "blue" that indicate a line segment Ld with known dimension D, reducing the width of that line to 1 pixel.

[0024] The pixel count calculation unit 13 has a pixel count calculation function that calculates the number of pixels of a predetermined color in the image 100 (100a to 100d). The pixel count calculation unit 13 calculates the number of pixels in the parts of the image 100 that are colored with a predetermined color (red, blue) using an image processing program. The pixel count calculation unit 13 calculates the number of pixels that are colored "red", for example, which represent the area of ​​the floor 2 and columns 3 of the building part 1k, and the length of the beams 4 and walls 5. Furthermore, the pixel count calculation unit 13 calculates the number of pixels that represent the line segment Ld whose actual dimension D is known, for example, the pixels colored in "blue". Since the line segment Ld whose actual dimension D is known is thinned to a width of 1 pixel as described above, the number of pixels colored in "blue" corresponds to the length of the line segment Ld on the image. Therefore, the value obtained by dividing the actual dimension D corresponding to this line segment Ld by the number of pixels colored in "blue" corresponds to the length of one side of a single pixel, which is the actual length on the scale of the actual building 1.

[0025] More specifically, when a standard floor plan M in which the portion corresponding to floor 2 is colored with a predetermined color (red) is input as image 100a, the pixel count calculation unit 13 calculates the number of pixels of the predetermined color in image 100a as the number of pixels of the portion corresponding to floor 2. In image 100a, the entire surface of floor 2 is colored with the predetermined color, so by multiplying the number of pixels of the portion corresponding to floor 2 by the square of the actual length of one side of a single pixel in scale of the actual building 1, the total area of ​​floor 2 in scale of the actual building 1 can be calculated. When a standard floor plan M, in which the portion corresponding to column 3 is colored with a predetermined color (red), is input as image 100b, the pixel count calculation unit 13 calculates the number of pixels of the predetermined color in image 100b as the number of pixels of the portion corresponding to column 3. In image 100b, the entire cross-section of column 3 is colored with a predetermined color, so by multiplying the number of pixels of the portion corresponding to column 3 by the square of the actual length at the scale of the actual building 1, which corresponds to the length of one side of a single pixel, the total cross-sectional area of ​​column 3 at the scale of the actual building 1 can be calculated.

[0026] When a standard floor plan M, in which line segments along the beam 4 are drawn in a predetermined color (red), is input as image 100c, the pixel count calculation unit 13 calculates the number of pixels of the predetermined color in image 100c as the number of pixels in the beam 4 portion. Since the line segments Lc drawn along the beam 4 are thinned to a width of 1 pixel as described above, the number of pixels in the beam 4 portion corresponds to the sum of the lengths of the line segments Lc on the image. Therefore, by multiplying the actual length at the scale of the actual building 1, which corresponds to the length of one side of a single pixel, by the number of pixels in the beam 4 portion, the sum of the lengths of the beam 4 at the scale of the actual building 1 can be calculated. When a standard floor plan M, in which the outline of wall 5 (which is the exterior wall 5s) is drawn in a predetermined color (red), is input as image 100d, the pixel count calculation unit 13 calculates the number of pixels of the predetermined color in image 100d as the number of pixels in the part corresponding to wall 5. As described above, the outline of wall 5 is thinned to a width of 1 pixel, so the number of pixels in the part corresponding to wall 5 corresponds to the sum of the lengths of the outline on the image. Therefore, by multiplying the actual length in scale of the actual building 1, which corresponds to the length of one side of a single pixel, by the number of pixels in the part corresponding to wall 5, the sum of the lengths of wall 5 in scale of the actual building 1 can be calculated.

[0027] The building portion volume calculation unit 14 has a building portion volume calculation function that calculates the volume of building portion 1k on a standard floor based on the number of pixels of a predetermined color calculated by the pixel count calculation unit 13. The building portion volume calculation unit 14 calculates the volume of each of the floor 2, column 3, beam 4, wall 5, etc., based on the number of pixels of the "red" parts of the floor 2, column 3, beam 4, wall 5, etc., calculated by the pixel count calculation unit 13, and the number of pixels of the line segment Ld, for which the actual dimension D is known. The building volume calculation unit 14 calculates the total area of ​​floor 2 on the standard floor in the manner described above, based on the number of pixels in the part corresponding to floor 2, and calculates the volume of floor 2 on the standard floor by multiplying the total area of ​​floor 2 by the thickness of floor 2. The building volume calculation unit 14 calculates the total area of ​​the columns 3 on the standard floor based on the number of pixels in the part corresponding to the column 3, and calculates the volume of the columns 3 on the standard floor by multiplying the total area of ​​the columns 3 by the floor height of the standard floor. The building volume calculation unit 14 calculates the total length of the beam 4 on the standard floor in the manner described above, based on the number of pixels in the portion corresponding to the beam 4. The building volume calculation unit 14 then calculates the volume of the beam 4 on the standard floor by multiplying the calculated total length of the beam 4 by the beam depth and width of the beam 4. The building volume calculation unit 14 calculates the total length of the wall 5 on the standard floor based on the number of pixels in the part corresponding to the wall 5, as described above, and calculates the volume of the wall 5 on the standard floor by multiplying the total length of the wall 5 by the thickness of the wall 5 and the floor height. Furthermore, the building portion volume calculation unit 14 calculates the volume of the building portion 1k on the standard floor by adding the calculated volumes of the floor 2, columns 3, beams 4, and walls 5 on the standard floor.

[0028] The building material usage calculation unit 15 calculates the weight or volume of each type of building material on a standard floor, based on the volume of the building portion 1k calculated by the building portion volume calculation unit 14, for each type of building material. The carbon dioxide emission calculation system 10 of this embodiment targets a reinforced concrete building 1. Therefore, the types of building materials that make up the building portion 1k include reinforcing steel and cement. As will be explained later, the carbon dioxide emission calculation system 10 calculates the amount of reinforcing steel and cement used, and based on this, calculates the carbon dioxide emissions of reinforcing steel and cement. Here, for these reinforcing steel and cement, the carbon dioxide emission intensity used when calculating carbon dioxide emissions is set as the amount of carbon dioxide emitted per unit weight. Therefore, the building material usage calculation unit 15 of this embodiment calculates the weight of reinforcing steel and cement on a standard floor, based on the volume of building portion 1k calculated by the building portion volume calculation unit 14, as the amount of reinforcing steel and cement used. To do this, the building material usage calculation unit 15 first calculates the weight of the reinforcing steel from the volume of the building portion 1k and the weight of the reinforcing steel per unit volume. Furthermore, the building material usage calculation unit 15 calculates the weight of reinforced concrete from the volume of 1 kg of the building portion and the specific gravity of reinforced concrete. The building material usage calculation unit 15 calculates the weight of the concrete by subtracting the weight of the reinforcing steel, which was calculated as described above, from the calculated weight of the reinforced concrete. The building material usage calculation unit 15 further calculates the volume of the concrete by dividing the calculated weight of the concrete by the specific gravity of the concrete. In addition, the building material usage calculation unit 15 calculates the weight of the cement by multiplying the calculated volume of concrete by the unit cement amount used when mixing the concrete. In this way, the building material usage calculation unit 15 calculates the weight of reinforcing steel and the weight of cement as building materials used to form the building portion 1k, such as the floor 2, columns 3, beams 4, and walls 5, on a standard floor.

[0029] Furthermore, the carbon dioxide emission calculation unit 16 calculates the carbon dioxide emissions of each type of building material (reinforcing steel, cement) by multiplying the weight obtained by the building material usage calculation unit 15 by the carbon dioxide emission intensity of that type of building material. The carbon dioxide emission calculation unit 16 multiplies the weight of the reinforcing steel used to form 1k of the building area on the standard floor, as calculated by the building material usage calculation unit 15, by the carbon dioxide emission intensity of the reinforcing steel. This calculates the carbon dioxide emissions from the reinforcing steel used to form 1k of the building area. The carbon dioxide emission calculation unit 16 multiplies the weight of the cement used to form 1k of the building area on the standard floor, as calculated by the building material usage calculation unit 15, by the carbon dioxide emission intensity of the cement. This calculates the carbon dioxide emissions from the cement used to form 1k of the building area. The carbon dioxide emission calculation unit 16 calculates the total carbon dioxide emissions for each type of building material as the carbon dioxide emissions for the standard floor. The carbon dioxide emission calculation unit 16 also calculates the sum of the product of the weight of the reinforcing steel and the carbon dioxide emission intensity of the reinforcing steel used to form building section 1k, and the product of the weight of the cement and the carbon dioxide emission unit of the cement as the carbon dioxide emissions for the standard floor.

[0030] The building carbon dioxide emission calculation unit 17 calculates the total carbon dioxide emissions for the entire building 1 based on the carbon dioxide emissions of a standard floor. The building carbon dioxide emission calculation unit 17 calculates the total carbon dioxide emissions for building 1 by adding, for example, the number of floors in building 1 to the carbon dioxide emissions of a standard floor. The result output unit 18 outputs the calculation result of the carbon dioxide emissions of building 1, calculated by the building carbon dioxide emission calculation unit 17, to an external device. The result output unit 18 outputs data showing the calculation result to a monitor device (not shown) provided by the carbon dioxide emission calculation system 10, a printer, or another external computer (personal computer, tablet terminal, smartphone), etc.

[0031] Figure 7 is a flowchart showing an example of the flow of the carbon dioxide emission calculation process executed by the program according to this embodiment. Next, we will explain the process for calculating carbon dioxide emissions using the carbon dioxide emission calculation system 10 described above to calculate the carbon dioxide emissions of building materials required for the construction of a reinforced concrete building. The carbon dioxide emission calculation method shown below is realized by the computer-based carbon dioxide emission calculation system 10 sequentially executing processes based on the program of this embodiment. As shown in Figure 7, the method for calculating carbon dioxide emissions includes the steps of: inputting an image in step S10; pre-processing the image in step S20; calculating the number of pixels in the building in step S30; calculating the volume of the building in step S40; calculating the total volume of the building in step S50; calculating the weight of the building materials in step S60; calculating the carbon dioxide emissions of a standard floor in step S70; calculating the carbon dioxide emissions of the building in step S80; and outputting the results in step S90.

[0032] In step S10, when an image is input, the image input unit 11 receives images 100 (100a to 100d) of the standard floor plan M from an external source. As described above, the standard floor plan M input to the image input unit 11 has the floors 2, columns 3, beams 4, walls 5, etc. that make up the building portion 1k pre-colored with predetermined colors. In addition, the line segments Ld whose actual dimensions D are known are pre-colored with predetermined colors in the standard floor plan M. If the standard floor plan M is printed on paper, in step S10, where the image is input, the standard floor plan M is scanned by a scanner or photographed by a camera to create an image 100 that can be input into a computer, and then input into the image input unit 11. The image 100 of the standard floor plan M can also be input into the image input unit 11 from an external source via a network such as LAN, Wi-Fi, or the Internet, or via various storage media.

[0033] In step S20, which involves preprocessing the image, the image processing unit 11 inputs images 100 (100a to 100d) of the standard floor plan M and performs preprocessing on them in order to calculate the volumes of floors 2, columns 3, beams 4, walls 5, etc. The image processing unit 12 extracts the floors 2, columns 3, beams 4, walls 5, etc. that constitute the building portion 1k from the image 100 of the standard floor plan M by extracting pixels that are colored with predetermined colors based on a pre-set image processing program. In this embodiment, the image processing unit 12 extracts pixels that are colored "red" and "blue" from the image 100. More specifically, the image processing unit 12 first binarizes the brightness values ​​of pixels that are considered to be colored "red" or "blue" among the pixels that make up the image 100, and adjusts each brightness value so that it becomes the maximum value (e.g., 255) or the minimum value (e.g., 0). Furthermore, the image processing unit 12 performs a thinning process on each of the standard floor plan M images 100c relating to beam 4 and 100d relating to wall 5, for pixels corresponding to line segments colored "red" that are drawn along the outline of wall 5 or beam 4, reducing the width of those lines to 1 pixel. Similarly, for each image 100 (100a to 100d), the image processing unit 12 performs a thinning process on the "blue" line segment Ld, which represents the actual dimension D, so that the width of that line is equal to one pixel.

[0034] In step S30, which calculates the number of pixels in the building portion, the number of pixels of the predetermined color in the image 100 is calculated based on the image 100 (100a to 100d) in which the building portion 1k is colored with predetermined colors. In step S30, which calculates the number of pixels in the building portion, for each of the standard floor plan M images 100a relating to floor 2, 100b relating to column 3, 100c relating to beam 4, and 100d relating to wall 5, which were adjusted in step S20, the pixel count calculation unit 13 uses an image processing program to calculate the number of pixels in the portion of the image 100 that is colored with predetermined colors (red, blue).

[0035] In step S40, which calculates the volume of the building portion, the building portion volume calculation unit 14 calculates the volume of the building portion 1k on the standard floor based on the number of pixels of a predetermined color calculated by the pixel count calculation unit 13. The building portion volume calculation unit 14 calculates the volume of each of the floor 2, column 3, beam 4, wall 5, etc., based on the number of pixels of the "red" parts that indicate the area and length of the floor 2, column 3, beam 4, wall 5, etc., and the number of pixels of the "blue" parts that indicate the length of the line segment Ld for which the actual dimension D is known, as calculated by the pixel count calculation unit 13.

[0036] In steps S30 and S40 described above, the number of pixels and the volume are calculated individually for each of the floor 2, column 3, beam 4, and wall 5 that constitute the building portion 1k. Figure 8 is a flowchart detailing the steps for calculating the number of pixels in the floor area that constitutes the building portion, and for calculating the volume of the building portion. As shown in Figure 8, in the case of a floor constituting building portion 1k, step S30, which calculates the number of pixels in building portion 1k, counts pixels colored with a predetermined color based on the image 100a of the reference floor plan M relating to floor 2, which was adjusted in step S20, and generates a histogram (step S30A). Specifically, the pixel count calculation unit 13 counts the number of pixels Pf colored with a predetermined color (red) that represents the portion of floor 2, and the number of pixels Nb colored with a predetermined color (blue) that represents the line segment Ld whose actual dimension D is known in image 100a.

[0037] Next, in step S40A, which calculates the volume of the building portion, the building portion volume calculation unit 14 first calculates the size of one pixel (the length of one side of one pixel) Z based on the number of pixels Nb of the line segment Ld, which is colored in a predetermined color (blue) and whose actual dimension D is known (step S41A). For this, the numerical value of the actual dimension D of the line segment Ld, that is, the actual length of the line segment Ld in image 100a, in scale of the actual building 1, is input from an external source using an input means such as a keyboard or touchpad. In step S20, the "blue" representing the line segment Ld, whose actual dimension D is known, is thinned to the width of one pixel, so the number of pixels Nb of the line segment Ld, whose actual dimension D is known, corresponds to the length of the line segment Ld in image 100a. Therefore, the building volume calculation unit 14 calculates the size Z of one side of a single pixel in scale of the actual building 1, based on the number of pixels Nb of the line segment Ld whose actual dimension D is known, and the numerical value of the actual dimension D of the line segment Ld, using the following formula (1). Z = D / Nb …(1) Furthermore, the building portion volume calculation unit 14 calculates the area A of one pixel in scale of the actual building 1 using the following formula (2) (step S42A). A=Z 2 …(2)

[0038] Next, the building volume calculation unit 14 calculates the total area of ​​floor 2 on the standard floor (step S43A). This is done by calculating the actual total area Af of floor 2 on the standard floor using the following formula (3), based on the number of pixels Pf, which are colored in a predetermined color (red) and represent the portion of floor 2, as counted in step S30A, and the area A calculated in step S42A. Af = Pf × A = Pf × Z 2 …(3)

[0039] Figure 9 shows an example of a representative value used in calculating the volume of the building portion. Next, the building volume calculation unit 14 obtains the thickness of the floor 2 (step S44A). If the thickness of the floor 2 can be obtained from design documents or the like, the numerical value of that thickness is input externally using an input means such as a keyboard or touchpad. Furthermore, if the thickness of floor 2 is unknown, a representative value pre-registered in database 19 is used, for example, as shown in Figure 9. In Figure 9, representative values ​​for floor height and floor 2 thickness (slab thickness) are pre-set according to the time when building 1 was constructed. Therefore, when the worker inputs the time when building 1 was constructed from an external source using the input means, the slab thickness corresponding to the input time is referenced from database 19 and obtained as a representative value for the thickness of floor 2.

[0040] Next, the building volume calculation unit 14 calculates the total volume Vf of the floor 2 in the standard floor using the following formula (4), based on the total area Af of the floor 2 calculated in step S43A and the thickness t of the floor 2 obtained in step S44A (step S45A). Vf = Af × t = Pf × Z 2 ×t …(4)

[0041] Figure 10 is a flowchart showing the detailed steps for calculating the number of pixels in the columns that make up the building structure, and for calculating the volume of the building structure. As shown in Figure 10, in the case of a column 3 that constitutes building portion 1k, step S30, which calculates the number of pixels in building portion 1k, counts pixels colored with a predetermined color based on the image 100b of the reference floor plan M relating to the column 3, which was adjusted in step S20, and generates a histogram (step S30B). Specifically, the pixel count calculation unit 13 counts the number of pixels Pc colored with a predetermined color (red) that represents the portion of the column 3, and the number of pixels Nb colored with a predetermined color (blue) that represents the line segment Ld in image 100b where the actual dimension D is known.

[0042] Next, in step S40B, which calculates the volume of the building portion, the building portion volume calculation unit 14 first calculates the size Z of one pixel based on the number of pixels Nb of the line segment Ld, which is colored in a predetermined color (blue) and whose actual dimension D is known (step S41B). For this, the numerical value of the actual dimension D of the line segment Ld is input externally using an input means such as a keyboard or touchpad. In the building portion volume calculation unit 14, similar to step S41A, the size Z of one side of one pixel in scale of the actual building 1 is calculated using the above equation (1), based on the number of pixels Nb of the line segment Ld, whose actual dimension D is known, and the numerical value of the actual dimension D of the line segment Ld. Furthermore, the building volume calculation unit 14 calculates the area A of one pixel in scale of the actual building 1 using the above formula (2) (step S42B). Note that the size Z and area A calculated in steps S41B and S42B are the same as those calculated in steps S41A and S42A, so the results of S41A and S42A may be used as is.

[0043] Next, the building volume calculation unit 14 calculates the total cross-sectional area of ​​the column 3 on the standard floor (step S43B). This is done by calculating the actual total cross-sectional area Ac of the column 3 on the standard floor using the following formula (5), based on the number of pixels Pc, which are colored in a predetermined color (red) and represent the portion of the column 3, as counted in step S30B, and the area A calculated in step S42B. Ac = Pc × A = Pc × Z 2 …(5)

[0044] Next, the building volume calculation unit 14 obtains the height of the column 3, i.e., the floor height H of the foundation floor (step S44B). If the floor height H can be obtained from design documents or the like, the numerical value of the floor height H is input externally using an input means such as a keyboard or touchpad. Furthermore, if the floor height H is unknown, a representative value pre-registered in the database 19 is used, for example, as shown in Figure 9. When the worker inputs the construction date of building 1 from an external source using the input means, the floor height corresponding to the input date is referenced from the database 19 and obtained as a representative value for the floor height.

[0045] Next, the building volume calculation unit 14 calculates the total volume Vc of the column 3 on the standard floor using the following formula (6), based on the total cross-sectional area Ac of the column 3 calculated in step S43B and the floor height H obtained in step S44B (step S45B). Vc = Ac × H = Pc × Z 2 ×H …(6)

[0046] Figure 11 is a flowchart detailing the steps for calculating the number of pixels in the beams that make up the building structure, and for calculating the volume of the building structure. As shown in Figure 11, in the case of beam 4 which constitutes building portion 1k, step S30, which calculates the number of pixels in building portion 1k, counts pixels colored with a predetermined color based on the image 100c of the reference floor plan M relating to beam 4, which was adjusted in step S20, and generates a histogram (step S30C). Specifically, the pixel count calculation unit 13 counts the number of pixels Pb colored with a predetermined color (red) that represents the line segment Lc drawn along the portion corresponding to beam 4, and the number of pixels Nb colored with a predetermined color (blue) that represents the line segment Ld in image 100c, where the actual dimension D is known.

[0047] Next, in step S40C, which calculates the volume of the building portion, the building portion volume calculation unit 14 first calculates the size Z of one pixel based on the number of pixels Nb of the line segment Ld, which is colored in a predetermined color (blue) and whose actual dimension D is known (step S41C). For this, the numerical value of the actual dimension D of the line segment Ld is input externally using an input means such as a keyboard or touchpad. In the building portion volume calculation unit 14, similar to step S41A, the size Z of one side of one pixel in scale of the actual building 1 is calculated using the above equation (1), based on the number of pixels Nb of the line segment Ld whose actual dimension D is known and the actual dimension D of the line segment Ld.

[0048] Next, the building volume calculation unit 14 calculates the total length of the beam 4 on the standard floor (step S42C). In step S20, the line segments colored "red" in the image 100c of the standard floor plan M relating to the beam 4 are thinned to a width of 1 pixel. Therefore, the number of pixels colored "red" Pb corresponds to the total length of the beam 4 in image 100c. Based on the number of pixels colored with a predetermined color (red) that represent the beam 4, which was counted in step S30C, and the size Z calculated in step S41C, the total length BL of the beam 4 on the standard floor is calculated using the following formula (7). BL = Pb × Z …(7)

[0049] Next, the building volume calculation unit 14 obtains the beam depth Bh, which is the height of the beam 4 (step S43C). If the beam depth Bh can be obtained from design documents, the value of the beam depth Bh is input externally using an input means such as a keyboard or touchpad. If the beam depth Bh is unknown, the beam depth is generally considered to be 1 / 10 of the beam length. For example, the operator can input the value of the column span (beam length) L externally using an input means, and the value obtained using the following formula (8) can be used based on this. Bh = L / 10 …(8)

[0050] Next, the building volume calculation unit 14 obtains the width Wb of the beam 4 (step S44C). If the width Wb can be obtained from design documents, the numerical value of the width Wb is input externally using an input means such as a keyboard or touchpad. If the width Wb is unknown, the beam width is generally considered to be 2 / 3 of the beam depth, so for example, the value obtained by equation (9) below is used. Wb = (2 / 3) × Bh …(9)

[0051] Next, the building volume calculation unit 14 calculates the total volume Vb of the beam 4 on the standard floor using the following formula (10) based on the total length BL of the beam 4 calculated in step S42C, the beam depth Bh obtained in step S43C, and the width Wb obtained in step S44C (step S45C). Vb = BL × Bh × Wb …(10)

[0052] Figure 12 is a flowchart detailing the steps for calculating the number of pixels in the walls that make up the building structure, and for calculating the volume of the building structure. As shown in Figure 12, in the case of wall 5 which constitutes building portion 1k, step S30, which calculates the number of pixels in building portion 1k, counts pixels colored with a predetermined color based on the image 100d of the reference floor plan M relating to wall 5, which was adjusted in step S20, and generates a histogram (step S30D). Specifically, the pixel count calculation unit 13 counts the number of pixels Pw, which are colored with a predetermined color (red) and represent the long side of the contour line of wall 5, and the number of pixels Nb, which are colored with a predetermined color (blue) and represent the line segment Ld, for which the actual dimension D is known in image 100d.

[0053] Next, in step S40D, which calculates the volume of the building portion, the building portion volume calculation unit 14 first calculates the size Z of one pixel based on the number of pixels Nb of the line segment Ld, which is colored in a predetermined color (blue) and whose actual dimension D is known (step S41D). For this, the numerical value of the actual dimension D of the line segment Ld is input externally using an input means such as a keyboard or touchpad. In the building portion volume calculation unit 14, similar to step S41A, the size Z of one side of one pixel in scale of the actual building 1 is calculated using the above equation (1), based on the number of pixels Nb of the line segment Ld whose actual dimension D is known and the actual dimension D of the line segment Ld.

[0054] Next, the building volume calculation unit 14 calculates the total length of the wall 5 on the standard floor (step S42D). In step S20, the line segments colored "red" in the image 100d of the standard floor plan M relating to the wall 5 are thinned to a width of 1 pixel. Therefore, the number of pixels colored "red" Pw corresponds to the total length of the wall 5 in image 100c. Based on the number of pixels colored with a predetermined color (red), Pw, which represents the longer side of the outline of the wall 5 and was counted in step S30D, and the size Z calculated in step S41D, the total length WL of the wall 5 on the standard floor is calculated using the following formula (11). WL = Pw × Z …(11)

[0055] Next, the building volume calculation unit 14 obtains the height of the wall 5, i.e., the floor height H of the foundation floor (step S43D). If the floor height H can be obtained from design documents, the numerical value of the floor height H is input externally using an input means such as a keyboard or touchpad. If the floor height H is unknown, a representative value pre-registered in the database 19 is used, for example, as shown in Figure 9. When the operator inputs the time when the building 1 was constructed using an input means, the floor height corresponding to the input time is referenced from the database 19 and obtained as a representative value of the floor height.

[0056] Next, the building volume calculation unit 14 calculates the area Aw of wall 5 (step S44D). First, the operator checks whether or not there is a window in wall 5. If there is no window in wall 5, the total area Aw of wall 5 is calculated using the following formula (12). Aw = WL × H …(12) Furthermore, if there is a window in wall 5, the area of ​​the window in a living room is stipulated by the Building Standards Act to be at least 1 / 7 of the floor area. Therefore, here, the total area Aw of wall 5 is simply calculated using the formula (13) below, based on the total area Af of floor 2 obtained in formula (3) above. Aw = WL × H - Af / 7 …(13)

[0057] Next, the building volume calculation unit 14 obtains the thickness Tw of the wall 5 (step S45D). If the thickness Tw of the wall 5 can be obtained from design documents or the like, the numerical value of the thickness Tw is input externally using an input means such as a keyboard or touchpad. If the thickness Tw is unknown, the thickness Tw is set to a representative value registered in the database 19 beforehand, for example, a common value of 150 mm.

[0058] Next, the building volume calculation unit 14 calculates the total volume Vw of the wall 5 on the standard floor using the following formula (14), based on the total area Aw of the wall 5 calculated in step S44D and the thickness Tw of the wall 5 obtained in step S45D (step S46D). Vw = Aw × Tw …(14)

[0059] As shown in Figure 7, in step S50, which calculates the total volume of the building portion on the standard floor, the total volume Vk of the building portion 1k on the standard floor is calculated using the following formula (15), based on the total volume Vf of the floor 2 on the standard floor calculated in step S40A, the total volume Vc of the columns 3 on the standard floor calculated in step S40B, the total volume Vb of the beams 4 on the standard floor calculated in step S40C, and the total volume Vw of the walls 5 on the standard floor calculated in step S40D. Vk = Vf + Vc + Vb + Vw …(15)

[0060] Figure 13 is a flowchart showing the detailed steps for calculating the weight of building materials, specifically the weight of reinforcing steel and cement contained in reinforced concrete, and for calculating the carbon dioxide emissions per standard floor. As shown in Figure 13, in step S60, which calculates the weight of building materials, the building material usage calculation unit 15 calculates the weight of reinforcing steel used in the building portion 1k of the standard floor based on the total volume of the building portion 1k of the standard floor obtained by the above formula (15) (step S61). For this, the worker inputs the weight of reinforcing steel per unit volume relative to the reinforced concrete that makes up the building portion 1k. If the weight of reinforcing steel per unit volume can be obtained from design documents, etc., the worker inputs that value from an external source. If the weight of reinforcing steel per unit volume is unknown, a representative value registered in the database 19 in advance is used, for example, 125 kg / m 3 The following values ​​are used. The weight Gs of the reinforcing steel used in the building portion 1k of a standard floor is calculated by the following equation (16), where Rs is the weight of the reinforcing steel per unit volume. Gs = Vk × Rs …(16)

[0061] Furthermore, the building material usage calculation unit 15 calculates the weight of reinforced concrete used in the building portion 1k of the standard floor based on the total volume of the building portion 1k of the standard floor obtained by the above formula (15) (step S62). For this, the worker inputs the specific gravity of the reinforced concrete used when forming the building portion 1k of the standard floor. If the specific gravity of the reinforced concrete can be obtained from design documents, etc., the worker inputs that value from an external source. If the specific gravity of the reinforced concrete is unknown, a representative value registered in the database 19 in advance, for example 2.45 t / m³, is used. 3 The following values ​​are used. The weight Grc of the reinforced concrete used in the building portion 1k of a standard floor is calculated by the following formula (17), where Rrc is the specific gravity of the reinforced concrete. Grc = Vk × Rrc …(17)

[0062] Next, the building material usage calculation unit 15 calculates the weight of concrete used in the building portion 1k of the foundation floor, based on the weight Gs of the reinforcing bars calculated in step S61 and the weight Grc of the reinforced concrete calculated in step S62 (step S63). The weight Gc of the concrete used in the building portion 1k of the foundation floor is obtained by subtracting the weight Gs of the reinforcing bars from the weight Grc of the reinforced concrete, as expressed in the following equation (18). Gc=Grc-Gs …(18)

[0063] Subsequently, the building material usage calculation unit 15 calculates the volume Vcon of concrete used in the building portion 1k of the foundation floor (step S64). For this, as in the following equation (19), the weight Gc of the concrete calculated in step S63 is divided by a representative value of the specific gravity Wcon of concrete registered in advance in the database 19, for example, 2.3 g / cm 3 such a value. Vcon=Gc / Wcon …(19)

[0064] Next, the building material usage calculation unit 15 calculates the weight of cement used in the building portion 1k of the foundation floor, based on the concrete volume Vcon calculated in step S64 (step S65). For this, the operator inputs the unit cement amount when mixing the concrete used in the building portion 1k of the foundation floor. If the unit cement amount can be obtained from design documents or the like, the operator inputs the numerical value from the outside. If the unit cement amount is unknown, a representative value registered in advance in the database 19, for example, 270 kg / m 3 such a value is used. The weight Gcem of cement used in the building portion 1k of the reference floor is calculated by the following equation (20), where Rcem is the unit cement amount. Gcem=Vcon×Rcem …(20) In this way, in step S60 for calculating the weight of building materials, the weight Gs of reinforcing bars and the weight Gcem of cement are calculated as the building materials used to form the floors 2, columns 3, beams 4, and walls 5 constituting the building portion 1k of the reference floor.

[0065] In step S70, which calculates the carbon dioxide emissions for the standard floor, the carbon dioxide emissions for each type of building material on the standard floor are calculated. In step S70, for each type of building material (reinforcement, cement), the weight of the building material (weight of reinforcement Gs, weight of cement Gcem), which was determined in step S60, is multiplied by the carbon dioxide emission intensity of that type of building material to calculate the carbon dioxide emissions for each type of building material on the standard floor. First, the carbon dioxide emission calculation unit 16 calculates the carbon dioxide emissions from the reinforcing steel used in the building portion 1k of the standard floor (step S71). The carbon dioxide emissions from the reinforcing steel are calculated by multiplying the weight Gs of the reinforcing steel used to form the building portion 1k of the standard floor, calculated in step S61, by the carbon dioxide emission intensity of the reinforcing steel. The carbon dioxide emission intensity of the reinforcing steel is a value of carbon dioxide emissions per unit weight, for example, 2.04 (t-CO2 / t), which is registered in the database 19 in advance. Furthermore, the carbon dioxide emission calculation unit 16 calculates the carbon dioxide emissions from the cement used in the building portion 1k of the standard floor (step S72). The carbon dioxide emissions from the cement are calculated by multiplying the weight Gcem of cement used to form the building portion 1k of the standard floor, which was calculated in step S65, by the carbon dioxide emission intensity of the cement. The carbon dioxide emission intensity of the cement is a value of carbon dioxide emissions per unit weight that has been registered in the database 19 in advance, for example, 0.758 (t-CO2 / t). Next, the carbon dioxide emission calculation unit 16 calculates the sum of the carbon dioxide emissions for each type of building material that has been calculated as the carbon dioxide emissions for the standard floor (step S73). That is, the carbon dioxide emission calculation unit 16 calculates the sum of the carbon dioxide emissions for reinforcing steel, calculated in step S71, and the carbon dioxide emissions for cement, calculated in step S72, as the carbon dioxide emissions for the standard floor.

[0066] In step S80, which calculates the carbon dioxide emissions of the building as shown in Figure 7, the building carbon dioxide emission calculation unit 17 calculates the total carbon dioxide emissions of building 1 based on the carbon dioxide emissions of the standard floor calculated in step S73. The building carbon dioxide emission calculation unit 17 calculates the carbon dioxide emissions of building 1 by multiplying the carbon dioxide emissions of the standard floor by the number of floors in building 1. The carbon dioxide emissions of building 1 obtained in this way are the sum of the carbon dioxide emissions from the reinforcing steel and the carbon dioxide emissions from the cement used in the entire building portion 1k of building 1.

[0067] In step S90, which outputs the results, the result output unit 18 outputs the calculated carbon dioxide emissions of building 1, which were calculated in step S80, to an external device. The result output unit 18 outputs the data showing the calculation results to, for example, a monitor device (not shown) provided by the carbon dioxide emission calculation system 10, a printer, or another external computer (personal computer, tablet terminal, smartphone).

[0068] According to the program described above, a program for calculating the carbon dioxide emissions of building materials required to construct a reinforced concrete building 1 is implemented, in which, when a standard floor plan M in which the building portion 1k in which building materials are used is input to the computer as an image 100 (100a~100d), the program implements a pixel count calculation function that calculates the number of pixels of the default color in the image 100, a building portion volume calculation function that calculates the volume of the building portion 1k on the standard floor based on the number of pixels of the default color, a building material usage calculation function that calculates the weight of each type of building material on the standard floor based on the volume of the building portion 1k, a standard floor carbon dioxide emission calculation function that calculates the carbon dioxide emissions of each type of building material on the standard floor by multiplying the weight of each type of building material by the carbon dioxide emission intensity of that type of building material, and calculates the sum of the carbon dioxide emissions of each type of building material as the carbon dioxide emissions of the standard floor, and a building carbon dioxide emission calculation function that calculates the carbon dioxide emissions of building 1 based on the carbon dioxide emissions of the standard floor. With this configuration, when a standard floor plan M, in which the building portion 1k using building materials is colored with a predetermined color, is input as image 100 (100a~100d), the number of pixels of the predetermined color in image 100 is calculated, and based on this number of pixels, the volume of the building portion 1k on the standard floor is calculated. Then, based on this volume of building portion 1k, the weight of each type of building material on the standard floor is calculated. The weight of the building materials on the standard floor, calculated in this way, is multiplied by the carbon dioxide emission intensity for each type of building material to calculate the carbon dioxide emissions of that type of building material on the standard floor. Furthermore, the sum of the calculated carbon dioxide emissions for each type of building material is calculated to determine the carbon dioxide emissions of the standard floor. Then, based on the carbon dioxide emissions of the standard floor, the carbon dioxide emissions of building 1 are calculated. Thus, the volume of the building portion 1k on a standard floor, which is the basis for calculating the carbon dioxide emissions of building 1, is calculated based on the standard floor plan M, in which the building portion 1k is colored with a predetermined color. In other words, the carbon dioxide emissions of building 1 can be calculated simply by coloring the standard floor plan M and inputting it into the program as image 100 (100a~100d). Therefore, there is no need to perform complicated and specialized tasks such as reading design documents. Furthermore, as mentioned above, carbon dioxide emissions can be calculated even without using design documents. Therefore, even if design documents no longer exist, it is still possible to calculate carbon dioxide emissions. In this way, it becomes possible to provide a program that can easily calculate the carbon dioxide emissions from building materials required for the construction of a reinforced concrete building 1 without using design documents.

[0069] In the case of a reinforced concrete building, the building materials that make up the entire building include concrete, rebar, precast concrete (PCa), gypsum board, steel frame, stone, light steel frame, subflooring materials, glass, gravel, flooring, system kitchen, mortar, electrical cables, unit bath, steel fittings, steel pipes, tiles, asphalt waterproofing materials, wooden fittings, sealing materials, aluminum fittings, etc. Of these building materials, the combined weight of concrete and rebar accounts for 91% of the total weight of building materials that make up the entire building. According to the Ministry of the Environment, in March 2016, in the "Q&A Collection of Frequently Asked Questions and Answers on Supply Chain Emission Calculation," it was stated that when calculating the carbon dioxide emissions of a target (building) by accumulating the carbon dioxide emissions of individual building materials, it is sufficient if the sum of the carbon dioxide amounts of individual building materials is close to 90%. Therefore, by determining the carbon dioxide emissions of rebar and cement using the method described above, it is possible to calculate the carbon dioxide emissions of Building 1 with sufficient accuracy.

[0070] Furthermore, the building portion 1k includes floor 2. When a standard floor plan M, in which the portion corresponding to floor 2 is colored with a predetermined color, is input as image 100a, the pixel count calculation function calculates the number of pixels of the predetermined color in image 100a as the number of pixels of the portion corresponding to floor 2. The building portion volume calculation function calculates the total area of ​​floor 2 on the standard floor based on the number of pixels of the portion corresponding to floor 2, and calculates the volume of floor 2 on the standard floor by multiplying the total area of ​​floor 2 by the thickness of floor 2. With this configuration, when a standard floor plan M, in which the portion corresponding to floor 2 of building section 1k is colored with a predetermined color, is input as image 100a, the number of pixels of the predetermined color in image 100 is calculated as the number of pixels of the portion corresponding to floor 2. As described above, in the standard floor plan M, the portion corresponding to floor 2 is colored with a predetermined color, so the total area of ​​floor 2 on the standard floor can be calculated from the number of pixels of this portion corresponding to floor 2. Then, by multiplying the calculated total area of ​​floor 2 by the thickness of floor 2, the volume of floor 2 on the standard floor can be easily calculated without using design documents.

[0071] Furthermore, if building portion 1k includes column 3, the pixel count calculation function, when a standard floor plan M in which the portion corresponding to column 3 is colored with a predetermined color is input as image 100b, calculates the number of pixels of the predetermined color in image 100b as the number of pixels of the portion corresponding to column 3. The building portion volume calculation function calculates the total area of ​​column 3 on the standard floor based on the number of pixels of the portion corresponding to column 3, and calculates the volume of column 3 on the standard floor by multiplying the total area of ​​column 3 by the floor height of the standard floor. With this configuration, when a standard floor plan M, in which the portion corresponding to column 3 of building section 1k is colored with a predetermined color, is input as image 100b, the number of pixels of the predetermined color in image 100 is calculated as the number of pixels of the portion corresponding to column 3. As described above, in the standard floor plan M, the portion corresponding to column 3 is colored with a predetermined color, so the total area of ​​column 3 on the standard floor can be calculated from the number of pixels of this portion corresponding to column 3. Then, by multiplying the calculated total area of ​​column 3 by the floor height of the standard floor, the volume of column 3 on the standard floor can be easily calculated without using design drawings.

[0072] Furthermore, if building portion 1k includes beam 4, and a standard floor plan M with lines drawn in a predetermined color along the portion corresponding to beam 4 is input as image 100c, the pixel count calculation function calculates the number of pixels of the predetermined color in image 100c as the number of pixels of the portion corresponding to beam 4, and the building portion volume calculation function calculates the total length of beam 4 on the standard floor based on the number of pixels of the portion corresponding to beam 4, and calculates the volume of beam 4 on the standard floor by multiplying the total length of beam 4 by the width and depth of beam 4. With this configuration, when a standard floor plan M, in which a line of a predetermined color is drawn along the part corresponding to beam 4 of building section 1k, is input as image 100c, the number of pixels of the predetermined color in image 100 is calculated as the number of pixels of the part corresponding to beam 4. As described above, in the standard floor plan M, a line of a predetermined color is drawn along the part corresponding to beam 4, so the total length of beam 4 on the standard floor can be calculated from the number of pixels of this part corresponding to beam 4. Then, by multiplying the calculated total length of beam 4 by the width and depth of beam 4, the volume of beam 4 on the standard floor can be easily calculated without using design drawings.

[0073] Furthermore, if building portion 1k includes wall 5, the pixel count calculation function, when a standard floor plan M with lines drawn in a predetermined color along the portion corresponding to wall 5 is input as image 100d, calculates the number of pixels of the predetermined color in image 100d as the number of pixels of the portion corresponding to wall 5. The building portion volume calculation function calculates the total length of wall 5 on the standard floor based on the number of pixels of the portion corresponding to wall 5, and calculates the volume of wall 5 on the standard floor by multiplying the total length of wall 5 by the thickness of wall 5 and the floor height. With this configuration, when a standard floor plan M, in which a line of a predetermined color is drawn along the portion corresponding to wall 5 of building section 1k, is input as image 100d, the number of pixels of the predetermined color in image 100 is calculated as the number of pixels of the portion corresponding to wall 5. As described above, in the standard floor plan M, a line of a predetermined color is drawn along the portion corresponding to wall 5, so the total length of wall 5 on the standard floor can be calculated from the number of pixels of this portion corresponding to wall 5. Then, by multiplying the calculated total length of wall 5 by the thickness of wall 5 and the floor height, the volume of wall 5 on the standard floor can be easily calculated without using design drawings.

[0074] Furthermore, the building materials that make up 1k of the building portion include reinforcing steel and cement. The building material usage calculation function calculates the weight of the reinforcing steel from the volume of 1k of the building portion and the amount of reinforcing steel per unit volume, calculates the weight of the reinforced concrete from the volume of 1k of the building portion and the specific gravity of reinforced concrete, calculates the weight of the concrete by subtracting the weight of the reinforcing steel from the weight of the reinforced concrete, calculates the volume of the concrete by dividing the weight of the concrete by the specific gravity of the concrete, and calculates the weight of the cement by multiplying the volume of the concrete by the unit amount of cement used in the mix. With this configuration, the weight of the reinforcing steel can be calculated from the volume of 1k of the building portion and the amount of reinforcing steel per unit volume. The weight of the reinforced concrete can also be calculated from the volume of 1k of the building portion and the specific gravity of reinforced concrete. Then, the weight of the concrete can be calculated by subtracting the weight of the reinforcing steel from the weight of the reinforced concrete, and the volume of the concrete can be calculated by dividing the volume of concrete by the specific gravity of concrete. The weight of the cement can then be calculated by multiplying the calculated volume of concrete by the unit cement amount used when mixing the concrete. In this way, the weight of the reinforcing steel and cement contained in the building materials constituting 1k of the building portion can be easily calculated without using design drawings.

[0075] Furthermore, if the thickness of floor 2 is not entered, the building volume calculation function will use a representative value for the thickness of floor 2 registered in database 19 to calculate the volume of floor 2. Furthermore, if the floor height is not entered, the building volume calculation function uses a representative value of the floor height registered in database 19 to calculate the volume of column 3 and the volume of wall 5. Furthermore, if the thickness of wall 5 is not entered, the building volume calculation function will use a representative value for the thickness of wall 5 registered in database 19 to calculate the volume of wall 5. This configuration allows for a more accurate calculation of carbon dioxide emissions.

[0076] (Modified example of Embodiment 1) It should be noted that the program of the present invention is not limited to the embodiments described above with reference to the drawings, and various modifications are conceivable within its technical scope. Figure 14 shows an example of an image used to calculate the carbon dioxide emissions of the walls constituting the building portion in the first modified embodiment described above. For example, in the above embodiment, only the exterior wall 5s facing outwards from the building 1 was targeted as wall 5, and the series of processes were performed accordingly. However, as shown in Figure 14, for example, the carbon dioxide emissions can also be calculated in the same manner for partition walls 5k located inside the building 1, which constitute the building portion 1k, as wall 5. In this case, the partition walls 5k can be considered by coloring them with a predetermined color along with the exterior wall 5s in the image 100d of the reference floor plan M relating to the input wall 5. In this case, the thickness of the partition wall 5k used in step S45D of Figure 12 will be the same as the thickness of the exterior wall 5s shown in the above embodiment.

[0077] (Second modified example of the embodiment) Figure 15 shows an example of an image used to calculate the carbon dioxide emissions of the walls constituting the building portion in the second modified embodiment described above. Figure 16 shows another example of an image used to calculate the carbon dioxide emissions of the walls constituting the building portion in the second modified embodiment described above. As in the first modified example, when calculating carbon dioxide emissions for partition walls 5k located inside building 1, the thickness wp of partition walls 5k may be different from the thickness of exterior walls 5s shown in the above embodiment. In this case, as images 100d of the standard floor plan M relating to walls 5 to be input to the image input unit 11, an image 100d1 in which only the exterior walls 5s are colored with a predetermined color, as shown in Figure 15, and an image 100d2 in which only the partition walls 5k are colored with a predetermined color, as shown in Figure 16, are prepared and input individually. Steps S30D and S40D of the above embodiment are performed individually for each of images 100d1 and 100d2 to calculate the total volume of exterior walls 5s and the total volume of partition walls 5k on the standard floor, and the total volume Vw of walls 5 on the standard floor is calculated by adding these together.

[0078] (Third modified example of the embodiment) Furthermore, in the above embodiment, the area of ​​the window formed in the wall 5 was set to 1 / 7 of the area of ​​the floor 2. However, if the specifications of the window are known, the volume of the wall 5 may be calculated more accurately by taking the size of the window into consideration. Figure 17 shows an example of an image used to calculate the carbon dioxide emissions of the walls constituting the building portion in the third modified embodiment described above. Figure 18 shows another example of an image used to calculate the carbon dioxide emissions of the walls constituting the building portion in the third modified embodiment described above. Figure 19 shows yet another example of an image used to calculate the carbon dioxide emissions of the walls constituting the building portion in the third modified embodiment described above. Here, we consider a case where there are windows 8 on the exterior walls 5s of multiple sides of a building, for example, on the first surface 1A located above and the second surface 1B located below in Figure 17, and the height dimensions of each opening of the windows 8 on each of the first surface 1A and the second surface 1B are known. In such a case, the volume of the wall 5 can be calculated by calculating the total volume of the exterior wall 5s in the parts where there are no windows 8 when viewed from above, the total volume of the exterior wall 5s (excluding the windows 8) in the parts where there are windows 8 when viewed from above on the first surface 1A, and the total volume of the exterior wall 5s (excluding the windows 8) in the parts where there are windows 8 when viewed from above on the second surface 1B, and then adding these together. For example, as shown in Figure 17, by inputting an image 100d3 showing a cross-sectional view of the exterior wall 5s at the height where the window 8 is provided, and executing steps S30D and S40D of the above embodiment, the total volume Vw1 of the exterior wall 5s in the portion where the window 8 is not provided when viewed from above is calculated. At this time, the height value multiplied by the area of ​​the exterior wall 5s when calculating the volume of the exterior wall 5s is the floor height, as in the above embodiment.

[0079] Next, an image 100d4 showing a cross-sectional view of the exterior walls 5sa arranged above and below the portion where the window 8 is provided on the first surface 1A of building 1, as shown in Figure 18, is input, and steps S30D and S40D of the above embodiment are executed to calculate the total volume Vw2 of the exterior walls 5sa arranged above and below the window 8 in the portion where the window 8 is provided when viewed from above on the first surface 1A of building 1. At this time, when calculating the volume of the exterior walls 5sa, the height value multiplied by the area of ​​the exterior walls 5sa should be the floor height minus the height of the window 8 on the first surface 1A of building 1, that is, the vertical opening dimension of the window 8. Then, by inputting an image 100d5 showing a cross-sectional view of the exterior wall 5sb positioned above and below the portion where the window 8 is located on the second surface 1B of building 1, as shown in Figure 19, and executing steps S30D and S40D of the above embodiment, the total volume Vw3 of the exterior wall 5sb positioned above and below the window 8 in the portion where the window 8 is located when viewed from above on the second surface 1B of building 1 is calculated. At this time, when calculating the volume of the exterior wall 5sb, the height value multiplied by the area of ​​the exterior wall 5sb should be the floor height minus the height of the window 8 on the second surface 1B of building 1, that is, the vertical opening dimension of the window 8. Furthermore, by adding the above total volumes Vw1, Vw2, and Vw3 and using this as the total volume Vw of wall 5, the area of ​​the outer wall 5s on which the window 8 is formed can be accurately calculated.

[0080] (Other variations of the embodiment) Furthermore, in the above embodiment, the total carbon dioxide emissions for the building 1 are calculated by multiplying the carbon dioxide emissions on the standard floor by the number of floors. In this case, the first floor of Building 1 typically has common areas such as an entrance, resulting in a different floor plan from the standard floor. In such cases, it goes without saying that the carbon dioxide emissions of Building 1 can be calculated more accurately by performing the carbon dioxide emission calculation shown in the above embodiment separately for that floor from the standard floor.

[0081] Furthermore, the configuration shown in the above embodiment is applicable not only to existing buildings 1 but also to newly constructed buildings. In the case of newly constructed buildings, since design documents exist, it is possible to calculate the accurate carbon dioxide emissions by referring to them. However, even in this case, by applying the program of the above embodiment or its modified form, it is possible to calculate the carbon dioxide emissions more easily without referring to the design documents. Furthermore, the configuration shown in the above embodiment can also be applied to cases where, for example, a structure is constructed in a new section adjacent to an existing building and connected to the existing building.

[0082] Furthermore, although the above embodiment described using reinforcing steel and cement as examples of building materials, It goes without saying that the types of building materials that make up the structure are not limited to rebar and cement. In addition to rebar and cement, other building materials required for the construction of reinforced concrete buildings may be included, such as gypsum board, stone, gravel, and mortar. In this regard, in the above embodiment, the building portion 1k was defined as the floor 2, columns 3, beams 4, and walls 5, but it is not limited to this. For example, the building portion 1k could be defined as windows, and a standard floor plan in which the portion corresponding to the window is colored with a predetermined color (red) could be used as input to calculate the total length of the portion corresponding to the window, and then multiply this by the height and thickness of the window to obtain the area and volume of the window on the standard floor. In this case, building materials include glass, the building material usage calculation function calculates the weight of the glass from the window volume and the specific gravity of the glass, and the standard floor carbon dioxide emission calculation function calculates the carbon dioxide emissions of the glass on the standard floor by multiplying the weight of the glass by the carbon dioxide emission intensity of the glass. This method allows for a more accurate calculation of carbon dioxide emissions.

[0083] Furthermore, in the above embodiment, reinforcing steel and cement were used as examples of building materials. For these reinforcing steels and cements, the carbon dioxide emission intensity is set as the amount of carbon dioxide emitted per unit weight. In contrast, for some building materials, the carbon dioxide emission intensity is set as the amount of carbon dioxide emitted per unit volume. In such cases, the building material usage calculation function should calculate the volume of each type of building material on a standard floor based on the volume of 1k of the building portion, and the standard floor carbon dioxide emission calculation function should calculate the carbon dioxide emissions for each type of building material by multiplying the volume of that type of building material calculated by the building material usage calculation function by the carbon dioxide emission intensity of that type of building material. In other words, in such cases, the building material usage calculation function calculates the volume of each type of building material on the standard floor based on the volume of 1k of the building portion, and the standard floor carbon dioxide emission calculation function calculates the carbon dioxide emission of each type of building material on the standard floor by multiplying the volume of that type of building material by the carbon dioxide emission intensity of that type of building material, and the sum of the carbon dioxide emissions of each type of building material is calculated as the carbon dioxide emission of the standard floor. Alternatively, in cases where building materials are used in combination with building materials for which the carbon dioxide emission intensity is set as the amount of carbon dioxide emitted per unit weight and building materials for which the carbon dioxide emission intensity is set as the amount of carbon dioxide emitted per unit volume, the building material usage calculation function should calculate either the weight or volume used on a standard floor for each type of building material according to the type of carbon dioxide emission intensity, and the standard floor carbon dioxide emission calculation function should multiply the value calculated by the building material usage calculation function by the carbon dioxide emission intensity. In other words, in such cases, the building material usage calculation function calculates the weight or volume of each type of building material on the standard floor based on the volume of 1k of the building portion, and the standard floor carbon dioxide emission calculation function calculates the carbon dioxide emission of each type of building material on the standard floor by multiplying the weight or volume of each type of building material by the carbon dioxide emission intensity of that type of building material, and the sum of the carbon dioxide emissions of each type of building material is calculated as the carbon dioxide emission of the standard floor.

[0084] In addition to the above, it is possible to select or replace the configurations listed in the above embodiments, or to change them to other configurations as appropriate, as long as it does not deviate from the spirit of the present invention.

[0085] (Verification example) We calculated and verified the carbon dioxide emissions from the building using a configuration that applied both the second and third modified examples to the above embodiment, and the results are shown below. The building under consideration was a mid-rise, seven-story apartment building constructed in 1980 with a reinforced concrete wall structure. The first floor of Building 1 has the entrance in the rightmost room, and the second to seventh floors have the same floor plan as the standard floors, as shown in Figure 2. The concrete used for the building portion 1k of Building 1 is a standard type with a unit cement content of 270 kg / m³. 3 ), rebar quantity 125 kg / m 3 , Specific gravity: 2.3t / m 3 The following specifications were used. Additionally, the slab thickness of floor 2 was set to 120 mm, the floor height to 2550 mm, the thickness of exterior wall 5s to 150 mm, the beam depth to 640 mm, the beam width to 450 mm, and the height of window 8 to 1800 mm on the veranda side of the first side 1A and to 1000 mm on the corridor side of the second side 1B. The carbon dioxide emission intensity was set as follows: cement: 0.758 (t-CO2 / t), reinforcing steel: 2.04 (t-CO2 / t).

[0086] For the building described above, carbon dioxide emissions were calculated using a configuration that applied the above modified example as an example, and carbon dioxide emissions were calculated based on dimensions obtained from the design documents as a comparative example, and these results were compared. As an example, the image 100a shown in Figure 3, in which the floor 2 is colored with a predetermined color, was used. In Figure 3, the staircase area was included in the area of ​​the floor 2, but the elevator area was excluded. The image 100b shown in Figure 4, in which the column 3 is colored with a predetermined color, was used. The image 100c shown in Figure 5, in which the beam 4 is colored with a predetermined color, was used. As the wall 5, the image 100d shown in Figures 17 to 19 was used, in which the calculation was performed on the exterior wall 5s excluding the window 8, with the exterior wall 5s located facing the outside of the building 1 colored with a predetermined color. Using these images 100a to 100d, and the program shown in the above embodiment, the numerical values ​​for the floor 2, columns 3, beams 4, and walls 5 that constitute the building portion 1k were calculated. The calculation results are shown in Figure 20.

[0087] As a comparative example, the numerical values ​​for floor 2, column 3, beam 4, and wall 5 were calculated based on the actual dimensions of each part obtained from the design documents, similar to Figure 20. The results are shown in Figure 21. As shown in Figure 21, the values ​​obtained using the program described in the above embodiment had an error of approximately 10% or less compared to the values ​​obtained based on the actual dimensions. In the example, the volume of reinforced concrete in the standard floor portion 1k is 115.1 m³. 3 This value was 1.096 times the volume of reinforced concrete in the building portion 1k in the comparative example, as shown in Figure 21. The volume of this reinforced concrete was converted to weight, and then the weight of the concrete and the weight of the reinforcing steel were separated. The results are shown in Figure 22. The cement content was derived from the calculated concrete weight. The carbon dioxide emissions from cement were calculated by multiplying the weight of cement by the carbon dioxide emission intensity. Similarly, the carbon dioxide emissions from reinforcing steel were calculated by multiplying the weight of reinforcing steel by the carbon dioxide emission intensity. The results are shown in Figure 23.

[0088] Incidentally, in the above embodiment, only the standard floor was considered, but in order to calculate carbon dioxide emissions more accurately for the entire building, it is preferable to calculate the carbon dioxide emissions of the building materials used to construct the roof slab of the top floor. In this case, the thickness of the roof slab was set to be the same as the thickness of the floor 2 slab, and the carbon dioxide emissions from the roof slab were calculated. The results are shown in Figure 24. Assuming that the first floor of Building 1 contains common areas such as the entrance, the building materials used to construct this area were considered to be the same as those used for a single unit. As shown in Figure 25, the total carbon dioxide emissions for the entire building were calculated. This was 1.09 times the carbon dioxide emissions in the comparative example. In reinforced concrete buildings, calculating carbon dioxide emissions based only on the reinforced concrete portion is said to account for 91% of the total carbon dioxide emissions including non-reinforced concrete portions. In the above example, the total carbon dioxide emissions of the building were 1.09 times that of the comparative example. This means that in this example, the total carbon dioxide emissions of the building could be calculated with an accuracy of 0.99 (= 0.91 × 1.09). [Explanation of Symbols]

[0089] 1 building 4 beams 1k architectural parts 5 walls 2 floors 100 (100a~100d) images 3-column M standard floor plan

Claims

1. A program for calculating the carbon dioxide emissions from building materials required for the construction of reinforced concrete buildings, On the computer, When a standard floor plan in which the building portion using the aforementioned building material is colored with a predetermined color is input as an image, a pixel count calculation function calculates the number of pixels of the predetermined color within the image. A building portion volume calculation function that calculates the volume of the building portion on a standard floor based on the number of pixels of the predetermined color, A building material usage calculation function that calculates the weight or volume of each type of building material on the standard floor, based on the volume of the aforementioned building portion, A standard floor carbon dioxide emission calculation function calculates the carbon dioxide emissions of a standard floor by multiplying the weight or volume of a standard floor building material of a given type by the carbon dioxide emission intensity of that standard floor building material, and then summing the carbon dioxide emissions of each of the standard floor building material types as the carbon dioxide emissions of the standard floor. A building carbon dioxide emission calculation function that calculates the carbon dioxide emissions of the building based on the carbon dioxide emissions of the aforementioned standard floor, A program to achieve this.

2. The aforementioned building portion includes floors or columns, When the aforementioned pixel count calculation function receives the reference floor plan in which the portion corresponding to the floor or column is colored with the predetermined color as an input image, it calculates the number of pixels of the predetermined color in the image as the number of pixels of the portion corresponding to the floor or column. The program according to claim 1, wherein the building portion volume calculation function calculates the total area of ​​the floor or column on the standard floor based on the number of pixels of the portion corresponding to the floor or column, and if the building portion is the floor, multiplies the total area of ​​the floor by the thickness of the floor, and if the building portion is the column, multiplies the total area of ​​the column by the floor height of the standard floor to calculate the volume of the floor or column on the standard floor.

3. The aforementioned building portion includes beams or walls, When the aforementioned pixel count calculation function receives the reference floor plan, in which lines of the predetermined color are drawn along the portion corresponding to the beam or wall, as input as an image, it calculates the number of pixels of the predetermined color in the image as the number of pixels of the portion corresponding to the beam or wall. The program according to claim 1, wherein the building portion volume calculation function calculates the total length of the beam or wall on the standard floor based on the number of pixels of the portion corresponding to the beam or wall, and if the building portion is the beam, multiplies the total length of the beam by the width and depth of the beam, and if the building portion is the wall, multiplies the total length of the wall by the thickness and floor height of the wall to calculate the volume of the beam or wall on the standard floor.

4. The types of building materials constituting the aforementioned building portion include reinforcing steel and cement. The aforementioned building material usage calculation function is, The weight of the reinforcing steel is calculated from the volume of the building portion and the amount of reinforcing steel per unit volume. A program according to any one of claims 1 to 3, comprising: calculating the weight of the reinforced concrete from the volume of the building portion and the specific gravity of the reinforced concrete; calculating the weight of the concrete by subtracting the weight of the reinforcing bars from the weight of the reinforced concrete; calculating the volume of the concrete by dividing the weight of the concrete by the specific gravity of the concrete; and calculating the weight of the cement by multiplying the volume of the concrete by the unit cement amount at the time of mixing.

Citation Information

Patent Citations

  • Building integration system and program

    JP2017091015A

  • Amount-of-carbon dioxide emission estimation system, and amount-of-carbon dioxide emission estimation method

    JP2022091900A

  • JPP7133700B