System and method for peak load power management for charging electric vehicle fleets and / or microgrid operation.

The sliding time window method optimizes peak power demand by predicting future values, addressing uncertainties and inefficiencies in existing power management systems, enhancing operational efficiency and reducing penalties.

JP7954821B2Active Publication Date: 2026-11-20HITACHI ENERGY LTD
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
JP2025528751
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Priority Date
2022-12-16
Filing Date
2023-11-16
Publication Date
2026-11-20
Estimated Expiration
2043-11-16

AI Technical Summary

Technical Problem

Existing methods for managing peak power demand at power infrastructure sites, such as power depots and microgrids, fail to address uncertainties and are not scalable, leading to inefficiencies and potential penalties from utilities due to unpredictable peak power demands.

Method used

A method using a sliding time window approach with real-time parameter determination to predict and manage peak power demand, incorporating past, current, and future values, and adjusting control values based on risk tolerance and predictive models.

Benefits of technology

This approach optimizes peak power demand management, reducing uncertainties and penalties while ensuring efficient and timely operations, even with unpredictable events.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007954821000017
    Figure 0007954821000017
  • Figure 0007954821000018
    Figure 0007954821000018
  • Figure 0007954821000019
    Figure 0007954821000019
Patent Text Reader

Abstract

Utilities typically utilize techno-economic means to set peak power demand at power infrastructure sites such as power depots and microgrids. However, conventional means tend to produce suboptimal values ​​for peak power demand or are computationally too expensive to perform in real time or in a scalable manner. Accordingly, disclosed embodiments utilize a sliding time window to continuously or periodically determine peak power demand for past, present, and future portions of a current time period. These embodiments can determine optimal peak power demand for a current time period while being computationally feasible for real-time performance and scalable with the complexity of the optimization.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] Background Field of the Invention Embodiments described in the present specification relate generally to energy management, and more particularly to managing peak power demand at power infrastructure sites such as power depots or microgrids.

Background Art

[0002] Description of Related Art The power flow patterns that a power grid must withstand depend on the peak power demand of grid participants. Therefore, power consumption by large loads can affect the reliable operation of the distribution grid. For example, electric vehicle (EV) depots can have a detrimental impact on the power grid when power consumption is uncontrolled, as the load of electric vehicles is significantly higher than typical residential or commercial loads and can introduce uncertainties regarding future peak power demand.

[0003] Accordingly, controlling the peak power demand of a power infrastructure site to a predictable and consistent level can support the technical operation of the power infrastructure site and the grid. On the one hand, power infrastructure sites are incentivized to limit their peak power demand. On the other hand, the power capacity for charging equipment at power infrastructure sites such as power depots (e.g., EV depots) is typically oversized to cope with seasonal variations, maintenance outages, and unplanned events.

[0004] Large amounts of commercial or industrial peak power demand may be limited by hardware or contracts. However, when utility agreements encourage grid participants to regulate their own peak power, overall socio-technical effectiveness is improved. Therefore, setting an optimal peak power demand at the common coupling point to the power grid, given future uncertainties, is generally the responsibility of the operator of the power infrastructure site.

[0005] Operators typically use technical and economic measures to set peak power demand. These technical and economic measures may include financial mechanisms (e.g., cost-to-peak kilowatt ratio) applied over a set period of time (e.g., monthly billing period) to reduce power demand at common junctions between power infrastructure sites and power grids.

[0006] If the peak power demand of a power infrastructure site affects the operation of the power grid during a billing period, the utility may consequently impose a penalty on the power infrastructure site over the billing period. The inventors recognized that the retrospective aspect of this consequence means that the relative benefit versus penalty of peak power demand changes over the billing period. Near the start of a billing period, there is a long and uncertain future where it is difficult to set the optimal peak power demand for the power infrastructure site. Underestimating the peak power demand for a billing period risks missing potential operational benefits such as faster charging, on-time performance, and more reserve capacity. Overestimating the peak power demand for a billing period may unnecessarily burden the power grid and result in disadvantages for the utility.

[0007] Controlling peak power demand has traditionally been managed using estimation (e.g., based on historical behavior), heuristics (e.g., based on expected utilization rates), ratchets (e.g., using historical peak power demand and scaling as needed), or optimization. Some non-deterministic but suboptimal solutions for controlling peak power demand include always using maximum power of equipment as early as possible, allowing manual setting (e.g., override) of power limits based on human estimation, using heuristic estimation, using historically observed peak power demand that is potentially corrected for influencing factors (e.g., using linear regression), and using on-site energy storage to mitigate potential overconsumption before increasing peak power demand for a billing period.

[0008] While optimization models are a good means of determining optimal peak power demand over a billing period, their size can be too large to solve in a timely manner. Optimization models may also require data that is not always available, such as operational schedules and price forecasts (e.g., for an EV fleet). Furthermore, disturbances and other unexpected events can occur in practice, requiring the optimization model to be solved again, potentially causing delays in scheduled operations.

[0009] Conventional methods use fixed peak power demand, fail to address uncertainty, and / or are not scalable. Examples of such methods include U.S. Patent Nos. 10,647,209, 10,320,203, 11,262,718, 9,840,156, and 8,762,189. This disclosure addresses one or more problems in these methods discovered by the inventors. [Overview of the Initiative] [Means for solving the problem]

[0010] overview Accordingly, systems, methods, and non-temporary computer-readable media for managing peak power demand at power infrastructure sites such as power depots (e.g., EV depots) or microgrids are disclosed. An object of a particular embodiment is to determine the optimal peak power demand for at least partially future time periods (e.g., fixed-billing periods). A further object of a particular embodiment is to account for uncertainties in the future portion of time periods.

[0011] In one embodiment, the method includes using at least one hardware processor to advance a sliding time window in real time from the start time to the end time of a time period, the length of which the sliding time window is shorter than the length of the time period; determining, after each of several advances of the sliding time window within the time period, the past values ​​of the parameters of the power infrastructure site that occurred in the past portion of the time period, at least from the start time to the start of the sliding time window; determining the current values ​​of the parameters in the sliding time window based on the operational configuration of the power infrastructure site output by the model for the current portion of the time period that spans the sliding time window; determining the future values ​​of the parameters in the future portion of the time period, at least from the end of the sliding time window to the end time of the time period, based on the parameter predictions; and determining the output values ​​of the parameters for the time period based on the past values, current values, and future values.

[0012] In one embodiment, the parameter is power demand, and the past value, present value, future value, and output value are each values ​​of peak power demand. The method may further include using at least one hardware processor to set the determined output value as the operating peak power demand of the power infrastructure site for the remainder of the time period after one or more of the progressions of a sliding time window within the time period.

[0013] In one embodiment, the past value is the extreme value of the parameter in the past portion of the time period, the present value is the extreme value of the parameter in the present portion of the time period, and the future value is the extreme value of the parameter in the future portion of the time period, and determining the output value involves selecting the most extreme value of the parameter from the past value, present value, and future value.

[0014] In one embodiment, the time period is a fixed billing period during which the public utility supplying electricity to the power infrastructure site charges the operator of the power infrastructure site for the electricity used by the power infrastructure site.

[0015] In one embodiment, the start of the sliding time window corresponds to the current time, and the end of the sliding time window corresponds to a future time within the time period.

[0016] In one embodiment, parameter prediction includes a probability distribution of parameter values ​​in the future portion of a time period. Determining future values ​​may include selecting parameter values ​​from the probability distribution based on the risk tolerance parameter values. The method may further include receiving user input indicating the risk tolerance parameter values ​​using at least one hardware processor.

[0017] In one embodiment, the method further includes using at least one hardware processor to run a predictive model to generate parameter predictions.

[0018] In one embodiment, the method further includes using at least one hardware processor to set a determined output value as a control value for a power infrastructure site after one or more of the progressions of a sliding time window within a time period. The method may further include using at least one hardware processor to initiate control of a power infrastructure site based on the output value determined after one or more of the progressions of a sliding time window within a time period.

[0019] It should be understood that any of the features in the methods described above may be implemented individually or in any subset of other features in any combination. Therefore, to the extent that the appended claims suggest specific dependencies between features, the disclosed embodiments are not limited to these specific dependencies. Rather, any feature described herein may be implemented in combination with any other feature described herein, or in any combination of features without any one or more other features described herein. Furthermore, any of the methods described above and elsewhere herein may be implemented individually or in any combination in executable software modules of processor-based systems such as servers, and / or executable instructions stored on non-temporary computer-readable media.

[0020] Brief explanation of the drawing Details of the present invention, both in terms of its structure and operation, can be partially derived by examining the accompanying drawings, in which similar reference numerals refer to similar parts. [Brief explanation of the drawing]

[0021] [Figure 1] This figure shows an exemplary substrate in which one or more of the processes described herein may be carried out according to one embodiment. [Figure 2] This figure shows an exemplary processing system in which one or more of the processes described herein may be performed, according to one embodiment. [Figure 3] This figure shows an example of a power distribution network at a power infrastructure site according to one embodiment. [Figure 4] This figure shows an exemplary data flow between various components of an optimization platform according to one embodiment. [Figure 5] This figure shows the operation of an exemplary process for determining the value of a parameter (e.g., peak power demand) at a power infrastructure site, according to one embodiment. [Figure 6]FIG. 3 is a diagram illustrating an exemplary process for determining a value of a parameter (e.g., peak power demand) of a power infrastructure site according to one embodiment. [Description of Embodiments]

[0022] Detailed Description In one embodiment, a system, method, and non-transitory computer-readable medium for managing peak power demand of a power infrastructure site, such as a power depot or a microgrid, are disclosed. After reading this description, it will become apparent to a person skilled in the art how to implement the present invention in various alternative embodiments and alternative applications. However, although various embodiments of the present invention are described herein, it is understood that these embodiments are presented by way of example and illustration only, and not limitation. Accordingly, this detailed description of various embodiments should not be construed as limiting the scope or breadth of the present invention as set forth in the appended claims.

[0023] The term "power infrastructure site" refers to any infrastructure having a clearly defined electrical boundary. In general, a power infrastructure site comprises a distribution grid with interconnected loads and can be independently controlled. For example, the power infrastructure site may be a power depot and / or a microgrid comprising a plurality of infrastructure assets. However, a power infrastructure site can also consist of a single infrastructure asset. The infrastructure assets may comprise a generator, an energy storage system, a load, and / or any other component of the power infrastructure site.

[0024] The term “power depot” refers to any power infrastructure site that has at least one charging station configured to be electrically connected to a flexible load for charging and / or discharging batteries of a flexible load. It should be understood that a power depot may also have non-flexible loads. As an example, a power depot may be an electric vehicle (EV) depot that provides private charging for a fleet of electric vehicles for public transport, a company, a utility, or other entity; public charging for private electric vehicles; private charging for private electric vehicles (e.g., at the home of a private electric vehicle owner), etc.

[0025] The term "microgrid" refers to any power infrastructure site that includes a local electric grid capable of operating independently of the rest of the electric grid. A microgrid may include multiple infrastructure assets (e.g., generators, energy storage systems, loads, etc.) connected via a local distribution network under the same common connection point. The infrastructure assets of a microgrid generally consist of at least several types of generators or energy storage systems, but may consist of any combination of infrastructure assets. It should be understood that power depots and microgrids are not mutually exclusive, and in some cases, a power infrastructure site may consist of both a power depot and a microgrid.

[0026] The term "flexible load" refers to any load that has flexibility in at least one characteristic that can be represented by a variable in the optimization model. One such characteristic may be the location where the flexible load is charged or discharged. A flexible load with location flexibility may be charged or discharged at any of several locations within one or more power infrastructure sites. Another such characteristic may be the timing of the charge or discharge of the flexible load. A flexible load with timing flexibility may be charged or discharged according to different timings such as start time, end time, time range, or time duration. Another such characteristic may be the power flow rate at which the flexible load is charged or discharged. A flexible load with power flow flexibility may be charged at any of several different power flow rates (e.g., any power flow rate within a certain range of power flow rates). Another such characteristic may be the operating state of the flexible load. A flexible load with operating state flexibility (e.g., water heater, air conditioner, compressor, etc.) may transition to another state (e.g., low-power mode, power off, discharge, etc.) that reduces power consumption in order to increase the amount of energy available to other loads and / or decrease the total amount of energy consumed. These are merely examples of characteristics, and it should be understood that flexible loads may be flexible with respect to other characteristics even if not specifically stated herein. A flexible load may be flexible with respect to only one characteristic, all characteristics, or any subset of characteristics. In contrast, the term "non-flexible load" refers to any load that is not flexible with respect to any characteristic.

[0027] In a hypothetical embodiment, the flexible load is an electric vehicle, and the power infrastructure site is an EV depot. The electric vehicle may be flexible, at least with respect to its location. In other words, because the electric vehicle is mobile, it can generally be charged at one of several available charging stations within any one of several EV depots. In particular, the electric vehicle has an onboard battery that can be electrically connected to one of several available charging stations within an EV depot. Similar types of flexible loads include, but are not limited to, drones, robotic systems, mobile machinery, mobility devices, and power tools.

[0028] However, the disclosed method is not limited to electric vehicles or other mobile loads. Rather, the disclosed method can be applied to any load, whether mobile or stationary, as long as the load has one or more flexible characteristics that can be defined with respect to variables in the optimization model. For example, a flexible load may consist simply of a stationary or mobile battery, or it may be a system that consumes power without having an onboard battery for storing power. A stationary flexible load generally does not have flexibility in location, but may have flexibility with respect to timing, power flow, operating state, etc. For the purposes of this disclosure, it is assumed that a flexible load generally comprises or consists of an energy storage unit. While the energy storage unit is described herein primarily as a battery, it should be understood that the energy storage unit may include or consist of any other mechanism or component for storing energy, such as a supercapacitor or compressed gas.

[0029] A power infrastructure site may also include one or more flexible generators. The term “flexible generator” refers to any generator whose output can be controlled to increase and / or decrease. Examples of flexible generators include, but are not limited to, diesel generators, hydrogen fuel cells, and distributed energy resources whose power output can be reduced. Optimization of a power infrastructure site can optimize both the variable of the flexible load and the variable of the flexible generator.

[0030] As used herein, the term “distribution network” refers to the interconnection of electrical components within a power infrastructure site that distributes power to flexible loads. These electrical components may comprise one or more intermittent and / or non-intermittent distributed energy resources, including renewable energy resources (e.g., solar power generators, wind power generators, geothermal power generators, hydroelectric power generators, fuel cells, etc.) and / or non-renewable energy resources (e.g., diesel power generators, natural gas power generators, etc.), one or more battery energy storage systems (BESS). Additionally or alternatively, if the power infrastructure site comprises a power depot, these electrical components may comprise charging stations. Notwithstanding the term “charging,” the term “charging station” includes stations that can discharge loads (e.g., draw power from the load’s onboard battery) in addition to charging loads (e.g., supplying power to the load’s onboard battery), as well as stations that can only charge loads and stations that can only discharge loads. The electrical components within a power infrastructure site can be thought of as "nodes" in a distribution network, and the electrical connections between these components can be thought of as "edges" connecting the nodes in the distribution network. The distribution network of a power infrastructure site may be connected to other distribution networks (for example, during normal operation) or it may be isolated (for example, in the case of a microgrid operating independently).

[0031] 1. Exemplary Foundation Figure 1 shows an exemplary infrastructure in which one or more of the disclosed processes may be implemented according to one embodiment. The infrastructure may comprise an energy management system (EMS) 110 (e.g., comprising one or more servers) that hosts and / or runs one or more of the various functions, processes, methods, and / or software modules described herein. The EMS 110 may comprise dedicated servers, or it may be implemented in a computing cloud where the resources of one or more servers are dynamically and flexibly allocated to multiple tenants based on demand. In either case, the servers may be co-located and / or geographically distributed. The EMS 110 may also comprise software 112 and / or one or more databases 114, or may be communicably connected to them. In addition, the EMS 110 may be communicably connected to one or more user systems 130, power infrastructure sites 140, and / or power markets 150 via one or more networks 120.

[0032] Network 120 may include the Internet, and EMS 110 may communicate with user systems 130, power infrastructure sites 140, and / or power markets 150 over the Internet using standard transmission protocols such as HyperText Transfer Protocol (HTTP), HTTPS, File Transfer Protocol (FTP), FTP Secure (FTPS), Secure Shell FTP (SFTP), eXtensible Messaging and Presence Protocol (XMPP), Open Field Message Bus (OpenFMB), IEEE Smart Energy Profile Application Protocol (IEEE2030.5), and proprietary protocols. Although EMS 110 is shown as connecting to various systems via a single network set 120, it should be understood that EMS 110 may connect to various systems via one or more different sets of networks. For example, the EMS 110 may be connected via the Internet to a subset of user systems 130, power infrastructure sites 140, and / or power markets 150, or it may be connected via an intranet to one or more other user systems 130, power infrastructure sites 140, and / or power markets 150. Furthermore, although only a small number of user systems 130 and power infrastructure sites 140, one power market 150, one instance of software 112, and one set of database 114 are shown, it should be understood that the infrastructure may have any number of user systems, power infrastructure sites, power markets, software instances, and databases.

[0033] The user system 130 may include, but is not limited to, any type of computing device capable of wired and / or wireless communication, including, desktop computers, laptop computers, tablet computers, smartphones or other mobile phones, servers, game consoles, televisions, set-top boxes, electronic kiosks, point-of-sale terminals, embedded controllers, and programmable logic controllers (PLCs). However, it is generally conceivable that the user system 130 includes a personal computer, mobile device, or workstation on which an agent of the operator of the power infrastructure site 140 can interact with the EMS 110 as a user. These interactions may include inputting data (e.g., parameters for configuring one or more of the processes described herein) and / or receiving data (e.g., outputs of one or more of the processes described herein) via a graphical user interface provided by the EMS 110 or an intervening system between the EMS 110 and the user system 130. A graphical user interface may include a screen (e.g., a web page) that includes a combination of content and elements such as text, images, videos, animations, references (e.g., hyperlinks), frames, inputs (e.g., text boxes, text areas, checkboxes, radio buttons, dropdown menus, buttons, forms, etc.), and scripts (e.g., JavaScript), where these elements include or are derived from data stored in one or more databases (e.g., database 114).

[0034] EMS110 may run software 112 comprising one or more software modules that perform one or more of the disclosed processes. Furthermore, EMS110 may have, be communicatively coupled to, or have access to one or more databases 114 that store data input to and / or output from one or more of the disclosed processes. Any suitable database may be used, including but not limited to cloud-based databases, proprietary databases, and unstructured databases (e.g., MongoDB®), including but not limited to MySQL®, Oracle®, IBM®, Microsoft® SQL®, Access®, and PostgreSQL®.

[0035] EMS110 may communicate with power infrastructure sites 140 and / or power markets 150 via an application programming interface (API). For example, EMS110 may "push" (i.e., voluntarily transmit) data to each power infrastructure site 140 via the API of the control system 142 of the power infrastructure sites 140. The control system 142 may be a Supervisory Control and Data Acquisition (SCADA) system. Alternatively or additionally, the control system 142 of the power infrastructure sites 140 may "pull" (i.e., initiate data transmission via request) data from EMS110 via the API of EMS110. Similarly, EMS110 may push data from power markets 150 to the power market interface 152 via the API of the power market interface 152, and / or the power market interface 152 may pull data from EMS110 via the API of EMS110.

[0036] 2. Exemplary Processing System Figure 2 is a block diagram illustrating an exemplary wired or wireless system 200 that may be used in connection with the various embodiments described herein. For example, system 200 may be used as one or more of the functions, processes, or methods described herein (e.g., for storing and / or running software 112), or in conjunction with them, and may represent components of the EMS 110, user system 130, power infrastructure site 140, control system 142, power market interface 152, and / or other processing devices described herein. System 200 can be a server or any conventional personal computer, or any other processor-enabled device capable of wired or wireless data communication. As will be apparent to those skilled in the art, other computer systems and / or architectures may also be used.

[0037] The system 200 preferably includes one or more processors 210. The processors 210 may include a central processing unit (CPU). Additional processors may be provided, such as a graphics processing unit (GPU), an auxiliary processor for managing inputs / outputs, an auxiliary processor for performing floating-point arithmetic, a dedicated microprocessor with an architecture suitable for high-speed execution of signal processing algorithms (e.g., a digital signal processor), a slave processor below the main processing system (e.g., a backend processor), an additional microprocessor or controller for a dual or multiprocessor system, and / or a coprocessor. Such auxiliary processors may be separate processors or may be integrated with the processors 210. Examples of processors that may be used with System 200 include, but are not limited to, any of the processors available from Intel Corporation in Santa Clara, California (e.g., Pentium®, Core i7®, Xeon®, etc.), any of the processors available from Advanced Micro Devices, Inc. (AMD) in Santa Clara, California, any of the processors available from Apple Inc. in Cupertino (e.g., A-series, M-series, etc.), any of the processors available from Samsung Electronics Company in Seoul, South Korea (e.g., Exynos®), or any of the processors available from NXP Semiconductors NV in Eindhoven, Netherlands.

[0038] The processor 210 is preferably connected to a communication bus 205. The communication bus 205 may include data channels to facilitate information transfer between storage and other peripheral components of the system 200. Furthermore, the communication bus 205 may provide a set of signals used for communication with the processor 210, including a data bus, an address bus, and / or a control bus (not shown). The communication bus 205 may include any standard or non-standard bus architecture, such as bus architectures conforming to standards published by the Institute of Electrical and Electronics Engineers (IEEE), including, for example, industry standard architecture (ISA), extended industry standard architecture (EISA), micro channel architecture (MCA), peripheral component interconnect (PCI) local bus, IEEE 488 general-purpose interface bus (GPIB), IEEE 696 / S-100, etc.

[0039] The system 200 preferably includes main memory 215 and may also include secondary memory 220. The main memory 215 provides storage for instructions and data for programs executed on the processor 210, such as one or more of the functions and / or modules (e.g., software 112) described herein. It should be understood that programs stored in memory and executed by the processor 210 may be written and / or compiled in any suitable language, including but not limited to C / C++, Java®, JavaScript®, Perl, Visual Basic, .NET, etc. The main memory 215 is typically semiconductor-based memory such as dynamic random access memory (DRAM) and / or static random access memory (SRAM). Other semiconductor-based memory types include, for example, synchronous dynamic random access memory (SDRAM), Rambus dynamic random access memory (RDRAM), ferroelectric random access memory (FRAM®), and read-only memory (ROM).

[0040] The secondary memory 220 may optionally include an internal medium 225 and / or a removable medium 230. The removable medium 230 is read and written in any known way. The removable storage medium 230 may be, for example, a magnetic tape drive, a compact disc (CD) drive, a digital versatile disc (DVD) drive, another optical drive, or a flash memory drive. The secondary memory 220 is a non-temporary computer-readable medium on which computer executable code (e.g., software 112) and / or other data is stored. The computer software or data stored in the secondary memory 220 is loaded into the main memory 215 for execution by the processor 210.

[0041] In alternative embodiments, the secondary memory 220 may include other similar means for enabling computer programs or other data or instructions to be loaded into the system 200. Such means may include, for example, a communication interface 240 that enables the transfer of software and data from an external storage medium 245 to the system 200. Examples of the external storage medium 245 may include an external hard disk drive, an external optical drive, an external magneto-optical drive, and the like. Other examples of the secondary memory 220 may include semiconductor-based memories such as programmable read-only memory (PROM), erasable programmable read-only memory (EPROM), electrically erasable read-only memory (EEPROM), and flash memory (block-oriented memory similar to EEPROM).

[0042] As described above, system 200 may include a communication interface 240. The communication interface 240 enables the transfer of software and data between system 200 and external devices (e.g., printers), networks, or other information sources. For example, computer software or executable code may be transferred from a network server (e.g., platform 110) to system 200 via the communication interface 240. Examples of the communication interface 240 include a built-in network adapter, a network interface card (NIC), a Personal Computer Memory Card International Association (PCMCIA) network card, a CardBus network adapter, a wireless network adapter, a Universal Serial Bus (USB) network adapter, a modem, a wireless data card, a communication port, an infrared interface, an IEEE 1394 FireWire, and any other devices that can interface system 200 with a network (e.g., network 120) or another computing device.The communication interface 240 preferably implements industry-published protocol standards such as Ethernet® IEEE 802 standard, Fibre Channel, digital subscriber line (DSL), asynchronous digital subscriber line (ADSL), Frame Relay, asynchronous transfer mode (ATM), integrated digital services network (ISDN), personal communications service (PCS), transmission control protocol / Internet protocol (TCP / IP), and serial line Internet protocol / point to point protocol (SLIP / PPP), but may also implement customized or non-standard interface protocols.

[0043] The software and data transmitted over the communication interface 240 are generally in the form of telecommunication signals 255. These signals 255 may be provided to the communication interface 240 via a communication channel 250. In one embodiment, the communication channel 250 may be a wired or wireless network (e.g., network 120) or any other various communication link. The communication channel 250 carries the signals 255 and can be implemented using a variety of wired or wireless communication means, including, to name just a few, wired or cable, optical fiber, conventional telephone line, cellular link, wireless data, communication link, radio frequency ("RF") link, or infrared link.

[0044] Computer executable code (e.g., computer programs such as software 112) is stored in main memory 215 and / or secondary memory 220. Computer programs can also be received via the communication interface 240 and stored in main memory 215 and / or secondary memory 220. When such computer programs are executed, they enable the system 200 to perform various functions of the embodiments disclosed elsewhere in this specification.

[0045] In this specification, the term “computer-readable medium” is used to refer to any non-temporary computer-readable storage medium used to provide computer executable code and / or other data to or within the system 200. Examples of such medium include main memory 215, secondary memory 220 (including internal memory 225 and / or removable medium 230), external storage medium 245, and any peripheral devices (including network information servers or other network devices) that are communicatively coupled to the communication interface 240. These non-temporary computer-readable media are means for providing executable code, programming instructions, software, and / or other data to the system 200.

[0046] In embodiments implemented using software, the software may be stored on a computer-readable medium and loaded into the system 200 via a removable medium 230, an I / O interface 235, or a communication interface 240. In such embodiments, the software is loaded into the system 200 in the form of telecommunication signals 255. Once executed by the processor 210, the software preferably causes the processor 210 to execute one or more of the processes and functions described elsewhere in this specification.

[0047] In one embodiment, the I / O interface 235 provides an interface between one or more components of the system 200 and one or more input and / or output devices. Examples of input devices include, but are not limited to, sensors, keyboards, touchscreens or other touch-sensing devices, cameras, biosensing devices, computer mice, trackballs, and pen-based pointing devices. Examples of output devices include, but are not limited to, other processing devices, cathode ray tubes (CRTs), plasma displays, light-emitting diode (LED) displays, liquid crystal displays (LCDs), printers, vacuum fluorescent displays (VFDs), surface-conduction electron-emitter displays (SEDs), and field emission displays (FEDs). In some cases, the input and output devices may be combined, as in the case of a touch panel display (e.g., a smartphone, tablet, or other mobile device).

[0048] System 200 may also include optional wireless communication components to facilitate wireless communication over voice and / or data networks (for example, in the case of user system 130, which is a smartphone or other mobile device). The wireless communication components comprise an antenna system 270, a radio system 265, and a baseband system 260. In system 200, radio frequency (RF) signals are transmitted and received wirelessly by the antenna system 270 under the control of the radio system 265.

[0049] In one embodiment, the antenna system 270 may include one or more antennas and one or more multiplexers (not shown) that perform a switching function to provide the antenna system 270 with a transmit signal path and a receive signal path. In the receive path, the received RF signal can be coupled from the multiplexer to a low-noise amplifier (not shown) that amplifies the received RF signal and transmits the amplified signal to the radio system 265.

[0050] In an alternative embodiment, the wireless system 265 may comprise one or more radios configured to communicate over various frequencies. In one embodiment, the wireless system 265 may combine a demodulator (not shown) and a modulator (not shown) into a single integrated circuit (IC). The demodulator and modulator may also be separate components. In the incoming path, the demodulator removes the RF carrier signal, leaving the baseband received audio signal to be transmitted from the wireless system 265 to the baseband system 260.

[0051] If the received signal contains audio information (for example, a user system 130 including a smartphone or other mobile device), the baseband system 260 decodes the signal and converts it to an analog signal. The signal is then amplified and sent to a speaker. The baseband system 260 also receives analog audio signals from a microphone. These analog audio signals are converted to digital signals and encoded by the baseband system 260. The baseband system 260 also encodes the digital signals for transmission and generates a baseband transmit audio signal that is routed to the modulator section of the radio system 265. The modulator mixes the baseband transmit audio signal with the RF carrier signal and generates an RF transmit signal that can be routed to the antenna system 270 and pass through a power amplifier (not shown). The power amplifier amplified the RF transmit signal and routed it to the antenna system 270, where the signal is switched to the antenna port for transmission.

[0052] The baseband system 260 is also communicatively coupled to the processor 210. The processor 210 may have access to data storage areas 215 and 220. The processor 210 is preferably configured to execute instructions (i.e., computer programs such as the disclosed software) which can be stored in the main memory 215 or the secondary memory 220. The computer programs are also received from the baseband processor 260 and stored in the main memory 21 5 Alternatively, it can be stored in secondary memory 220 or executed upon reception. When such a computer program is executed, it enables the system 200 to perform various functions of the disclosed embodiment.

[0053] 3. Exemplary power infrastructure sites Figure 3 shows a single-line diagram of an exemplary distribution network for an exemplary power infrastructure site 140 according to one embodiment. In a non-limiting example, the power infrastructure site 140 may be an EV depot for charging electric vehicles as a flexible load. The power infrastructure site 140 may be connected to a power grid 310 from which electricity is purchased (e.g., from the electricity market 150). The purchase price of electricity may vary daily (e.g., higher during the day than at night) and over several days (e.g., higher on summer days than on winter days) according to a time-of-use (ToU) rate. The ToU rate may assign peak rates, partial peak rates, and off-peak rates to different time periods (e.g., each hourly interval of a day) and represent the price of electricity during those time periods.

[0054] The power distribution network of the power infrastructure site 140 may include nodes representing one or more distributed energy resources within the power infrastructure site 140, including, for example, one or more battery energy storage systems 320 and / or one or more generators 330, indicated as generators 330A and 330B. The generators 330 may include renewable energy resources (e.g., solar power generators, wind power generators, geothermal power generators, hydroelectric power generators, fuel cells, etc.) and / or non-renewable energy resources (e.g., diesel power generators, natural gas power generators, etc.). For example, generator 330A may be a solar power generator that includes multiple solar cells that convert sunlight into electricity, and generator 330B may be a diesel power generator that generates electricity by burning diesel gasoline.

[0055] The power distribution network of the power infrastructure site 140 may also include nodes representing one or more charging stations 340 within the power infrastructure site 140. In the illustrated example, the power infrastructure site 140 is a power depot comprising a plurality of charging stations 340A, 340B, 340C, 340D, 340E, 340F, and 340G. Each charging station 340 may comprise one or more chargers 342. For example, charging station 340F is shown with two chargers 342. Each charger 342 is configured to be electrically connected to the flexible load 350 to supply electricity to one or more energy storage units (e.g., batteries) of the flexible load 350 and / or discharge electricity from one or more energy storage units of the flexible load 350. When supplying or charging the batteries of the flexible load 350, electricity may flow from the generator 330 and / or grid 310 through the distribution network to the batteries of the flexible load 350. Conversely, when the battery of flexible load 350 is discharged, electricity may flow from the battery of flexible load 350 to the distribution network, to the battery energy storage system 320, the grid 310, and / or to another flexible load 350. At any given time, several chargers 342 may be connected to flexible loads 350, indicated as flexible loads 350A, 350B, 350C, 350E, 350F1, and 350F2, while other chargers 342 may not be connected to flexible loads 350 and may be available to receive incoming flexible loads 350.

[0056] In one embodiment, two or more power infrastructure sites 1 40 may be connected via a transmission network (not shown) or within the same distribution network. In this case, two power infrastructure sites 1Power can be transmitted between 40. For example, the first power infrastructure site 140 may transmit power to the second power infrastructure site 140 via a network from one or more of its infrastructure assets (e.g., a battery energy storage system 320, a generator 330, and / or a flexible load 350) in order to charge one or more of its infrastructure assets (e.g., a battery energy storage system 320 and / or a flexible load 350).

[0057] One or more charging stations 340 or individual chargers 342 may be configured to initiate charging of the flexible load 350 (e.g., at a configurable power flow rate), terminate charging of the flexible load 350, initiate discharging of the flexible load 350 (e.g., at a configurable power flow rate), terminate discharging of the flexible load 350, etc., under the control of the control system 142, the EMS 110, and / or another controller. For example, a charging station 340 and / or charger 342 may include a processing system 200 that receives commands from a controller (e.g., the control system 142 and / or the EMS 110) via a communication interface 240, processes the commands using a processor 210 and main memory 215, and controls actuators (e.g., one or more switches) to initiate or terminate charging or discharging according to the processed commands.

[0058] It should be understood that the power infrastructure site 140 may have other loads in addition to the flexible load 350. For example, the power infrastructure site 140 may have auxiliary loads to operate various functions of the power infrastructure site 140. However, even these auxiliary loads may be considered as the flexible load 350 if they are flexible in at least one characteristic (e.g., operating state). It should also be understood that each battery energy storage system 320 can function as both a power source (i.e., during discharge) and a load (i.e., during charging) and can also be considered as the flexible load 350.

[0059] The parameters of each node in the distribution network of the power infrastructure site 140 (e.g., voltage, current, setpoint, etc.) may be monitored by the EMS 110 and / or simulated by the EMS 110 (e.g., during load flow analysis). Thus, the EMS 110 may monitor and / or simulate the parameters of the nodes in the distribution network and, based on those parameters, control one or more physical components of the power infrastructure site 140, such as the charging station 340, charger 342, generator 330, and battery energy storage system 320. This control may be performed periodically or in real time, and may be performed directly or indirectly (e.g., via the control system 142).

[0060] The illustrated power infrastructure site 140 comprises a specific number of charging stations 340. However, it should be understood that the power infrastructure site 140 may comprise any number of charging stations 340, including only a single charging station 340. Furthermore, each charging station 340 may comprise any number of chargers 342, including only a single charger 342. In its simplest form, the power infrastructure site 140 can consist of a single charging station 340 comprising a single charger 342, such as a charging station 340 in a residential building or public parking lot. Furthermore, although all flexible loads 350 are shown connected to a charging station, one or more flexible loads 350 may be connected to the power grid without going through a charging station 340.

[0061] A single EMS 110 may manage a single power infrastructure site 140 or multiple power infrastructure sites 140. If the EMS 110 manages multiple power infrastructure sites 140, the power infrastructure sites 140 under management may be identical, similar, or different from one another. For example, a homogeneous mix of power infrastructure sites 140 may consist of multiple power depots for one or more fleets of electric vehicles. In contrast, a heterogeneous mix of power infrastructure sites 140 may include a mix of power depots, residential charging stations 340, public charging stations 340, microgrids, etc.

[0062] 4. Exemplary Data Flow Figure 4 shows an exemplary data flow between various components of an optimization platform according to one embodiment. Software 112 hosted on platform 110 may implement an optimizer 410. The optimizer 410 may generate an optimization model that outputs a target value based on inputs including one or more variables and the schedule of one or more flexible loads 350 in one or more power infrastructure sites 140. The optimization model represents a specific software-based implementation of the optimization problem. The optimizer 410 may solve the optimization model to determine values ​​for one or more variables to optimize for the target value, subject to zero, one or more constraints (e.g., inequality and / or equality constraints representing limitations on physical and / or technical capabilities, load and / or generator flexibility, etc.). This optimization may include minimizing the target value (e.g., if the target value represents cost) or maximizing the target value (e.g., if the target value represents a performance metric). The determined values ​​of the variables may represent the operational configuration (e.g., setpoints, schedules, etc.) of one or more power infrastructure sites 140 over a certain period of time. The optimizer 410 may also initiate control of one or more physical components within one or more power infrastructure sites 140 based on the determined values ​​for one or more variables.

[0063] The optimizer 410 may periodically update and solve the optimization model based on real-time or updated data. For example, the optimizer may update and solve the optimization model for the operation of the power infrastructure site 140 in a sliding time window representing an optimization period. The sliding time window progresses continuously or sequentially to encompass the next time period in which the operation of the power infrastructure site 140 should be optimized. It should be understood that the start of the sliding time window may be the current time or some future time (e.g., 1 minute, 5 minutes, 10 minutes, 15 minutes, 30 minutes, 1 hour, 24 hours, etc.) so that the optimization is performed before the future time period encompassed by the sliding time window in which the optimization is being performed. In one embodiment, the sliding time window may progress according to time steps (e.g., every 15 minutes) and utilize the latest data available within a time range (e.g., a time range extending into the past with a size equal to the time step). The size of the sliding time window may be any appropriate duration (e.g., 15 minutes, 30 minutes, 1 hour, 24 hours, etc.).

[0064] The optimizer 410 may collect data for use for optimization (e.g., as input to an optimization model) from one or more scheduling systems 420, one or more telemetry systems 430, one or more control systems 142 of one or more power infrastructure sites 140, and / or one or more power market interfaces 152 of one or more power markets 150. These are merely examples of data flows, and it should be understood that the optimizer 410 may collect data from other systems (e.g., potentially including a site management system 440). For example, the optimizer 410 may receive solutions from other optimizers that can be incorporated into the input to the optimization model. In this case, the optimizer 410 can focus on one aspect of the overall optimization so that it does not need to integrate all the details of the optimization into the optimization model.

[0065] In one embodiment, the optimizer 410 may merge data collected from multiple power infrastructure sites 140 into a single virtual site model and perform a single overall optimization of the virtual site model to optimize the operation of the multiple power infrastructure sites 140 as a single unit. This virtual site model may represent a multi-tenant billing system of systems aggregating multiple power infrastructure sites 140 (e.g., EV depots) of multiple tenants (e.g., EV fleet operators).

[0066] The optimizer 410 may output data to one or more scheduling systems 420, one or more control systems 142 of one or more power infrastructure sites 140, one or more site management systems 440, and / or one or more power market interfaces 152 of one or more power markets 150. These are merely examples of data flows, and it should be understood that the optimizer 410 may also output data to other systems (e.g., potentially including a telemetry system 430). For example, the optimizer 410 may output its solution or other data to one or more other optimizers, each of which may incorporate this data as input to its own optimization model. In this case, the optimizer 410 can focus on one aspect of the overall optimization so that it does not need to integrate all the details of the optimization into the optimization model.

[0067] The scheduling system 420, the telemetry system 430, and / or the site management system 440 may be hosted on the EMS 110 or may be located outside the EMS 110. In either case, when collecting data, the optimizer 410 may receive data by pulling data from each system via the API of each system, or by having data pushed to the optimizer 410 by each system via the API of the optimizer 410. Similarly, the optimizer 410 may output data by pushing data to each system via the API of each system, or by having data pulled by each system via the API of the optimizer 410.

[0068] Each scheduling system 420 may manage time tables and routing of flexible loads 350 (e.g., a fleet of electric vehicles). The optimizer 410 may receive scheduling information from each scheduling system 420. The scheduling information provided by the scheduling system 420 may include a planned schedule for the flexible loads 350. For example, the planned schedule may include, for each flexible load 350, an estimated arrival time when the flexible load 350 is expected to arrive at the power infrastructure site 140, an estimated departure time when the flexible load 350 is expected to depart from the power infrastructure site 140, an auxiliary task schedule defining the time period during which the flexible load 350 is expected to perform or undergo auxiliary tasks (e.g., pre-calibrating, cleaning, maintenance, or repairing the cabin and / or battery of an electric vehicle), a power flow schedule defining the power flow or profile for charging or discharging the flexible load 350, the priority of the flexible load 350 over other flexible loads 350 (e.g., indicating the relative cost of delays when charging the flexible load 350), and preferred power infrastructure sites 140 to which the flexible load 350 is assigned. In addition, if the flexible load 350 has a route, the schedule information may include the route assigned to each flexible load 350.

[0069] After solving the optimization model, the optimizer 410 may output data associated with the scheduling system 420 to the scheduling system 420 or an intermediary system. For example, if the optimizer 410 performs optimization of multiple power infrastructure sites 140, the optimizer 410 may output, for example, a ranked list of power infrastructure sites 140 ordered from the power infrastructure site 140 with the largest capacity to the power infrastructure site 140 with the smallest capacity. Such information may be used by the scheduling system 420 or an intermediary system to update the routing for the flexible loads 350 (for example, by rerouting one or more flexible loads 350 from power infrastructure sites 140 with less capacity to power infrastructure sites 140 with greater capacity). Additionally or alternatively, the optimizer 410 may output a ranked list of flexible loads 350, ordered from the first flexible load 350 to be charged to an acceptable state of charge (SoC) to the last flexible load 350 to be charged to an acceptable state of charge (e.g., reflecting which electric vehicles can be ready first or can remain unconnected to power the longest). As another example, the optimizer 410 or an intervening system may provide recommendations for improving scheduling and / or provide data from which such recommendations can be derived. For example, if the flexible loads 350 are electric vehicles, such data may identify frequently lagging electric vehicles, which may result in changes to the electric vehicle's route (e.g., being assigned to another electric vehicle, being split with another electric vehicle, etc.).More generally, the scheduling system 420 or intervening system may analyze the data provided by the optimizer 410 to identify inefficiencies in the scheduling of the flexible load 350 (e.g., bottlenecks, electric vehicles requiring fast charging with tight schedules, etc.) and / or inaccurate parameters (e.g., actual energy consumed by pre-adjustments, etc.), and update the scheduling of the flexible load 350 (e.g., re-optimize EV route assignments) to eliminate or mitigate those inefficiencies and / or reflect more accurate parameters.

[0070] Each telemetry system 430 may collect telemetry information from one or more flexible loads 350. The telemetry system 430 may be mounted on each flexible load 350 and transmit real-time telemetry information to the optimizer 410. For example, if the flexible load 350 is an electric vehicle, the telemetry system 430 may be integrated (e.g., as software or hardware) into the electronic control unit (ECU) of the electric vehicle and communicate via a wireless communication network (e.g., a cellular communication network). Alternatively, the telemetry system 430 may be located outside the flexible load 350. In this case, the telemetry system 430 may collect real-time telemetry information from multiple flexible loads 350 and transfer or relay the collected telemetry information to the optimizer 410 in real time. Where used herein, the terms “real-time” or “real time” refer not only to events occurring simultaneously, but also to events separated by delays resulting from normal latency in processing, communication, etc., and / or delays resulting from the use of time steps (e.g., with respect to sliding time windows for optimization).

[0071] The optimizer 410 may receive telemetry information from each telemetry system 430. The telemetry information provided by the telemetry systems 430 may include one or more parameters for each flexible load 350 from which the transmitting telemetry system 430 collects data. For each flexible load 350, these parameters may include the estimated arrival time of the flexible load 350 to the scheduled power infrastructure site 140, the current charge status of the energy storage unit (e.g., battery) installed in the flexible load 350, and so on. It should be understood that these parameters may change over time, and updated telemetry information reflecting any changes may be periodically received by the optimizer 410 (e.g., and used as input to the optimization model for the current optimization period). Real-time telemetry information reduces the uncertainty of the optimization model.

[0072] Each site management system 440 may manage infrastructure assets, including flexible loads 350, and staff within one or more power infrastructure sites 140. After solving the optimization model, the optimizer 410 may output site information to each site management system 440. For example, this site information may include a ranked list of flexible loads 350, ordered from the flexible load 350 that can be disconnected from power for the longest time to the flexible load 350 that can be disconnected from power for the shortest time. Such information may be used by the site management system 440 to determine, for example, which flexible load 350 it can handle. Additionally or alternatively, this site information may include the assignment or mapping of the flexible loads 350 to charging stations 340. Such mapping can be used to automatically route the flexible loads 350 to their mapped charging stations 340 by sending routing commands, for example, the location of the mapped charging station 340, to the navigation system within each flexible load 350.

[0073] Each control system 142 may provide independent control of the power infrastructure site 140. After solving the optimization model, the optimizer 410 may output control information related to the control of the power infrastructure site 140 to the control system 142 associated with that power infrastructure site 140. Such control information may be provided to the control system 142 of each power infrastructure site 140 managed by the optimizer 410. The control information may include one or more control commands that trigger one or more control operations in the control system 142, and / or other information used during one or more control operations in the control system 142. The control commands may include, but are not limited to, commands that control setpoints associated with the physical components of the power infrastructure site 140 (e.g., power flow associated with the charging station 340), commands to charge the flexible load 350, commands to discharge the flexible load 350, and commands to perform pre-adjustments of the flexible load 350 (e.g., cooling of the electric vehicle cabin and / or battery, heating of the electric vehicle cabin, etc.). Other information may include, but is not limited to, a ranked list of charging stations 340 (e.g., ordered from the largest capacity charging station 340 to the smallest capacity charging station 340), a charging schedule for the flexible loads 350, and the assignment or mapping of the flexible loads 350 to the charging stations 340.

[0074] The optimizer 410 may also receive data from each control system 142. For example, the control system 142 may report events detected within each power infrastructure site 140 (e.g., the charger 342 of the charging station 340 plugged into the flexible load 350), the detected charging status of the charging flexible load 350, and the actual power flow or power transfer between the charging station 340 and the connected flexible load 350. This data may be periodically received by the optimizer 410 and used as input to the optimization model for the current optimization period.

[0075] The electricity market interface 152 may provide an interface to an electricity market 150 in which the utility operating the grid 310 is a participant. In particular, the electricity market 150 may enable operators of the power infrastructure site 140 to purchase electricity from utilities or other energy providers (e.g., the operating grid 310), sell electricity to energy providers (e.g., the operating grid 310), obtain service commitments from energy providers, and provide service commitments to energy providers. The optimizer 410 may receive pricing information from the electricity market interface 152. For example, this pricing information may include forecasts of electricity prices from the grid 310 for one or more future time periods (e.g., including the optimization period), uncertainty parameters of the price forecast, and applicable electricity rates. The optimizer 410 may incorporate this pricing information as input to an optimization model. For example, the target value output by the optimization model may include energy costs derived from the pricing information, in which case optimizing the target value may include minimizing the target value and, consequently, the energy costs.

[0076] The optimizer 410 may receive forecasts of DER generation from the electricity market interface 152. Alternatively, the optimizer 410 may receive weather forecasts from the electricity market interface 152 or other external systems (e.g., a weather forecasting service) and derive its own forecasts of DER generation. It should be understood that electricity generated by renewable energy resources such as solar and wind power generators can vary significantly depending on the weather. The optimizer 410 may incorporate the forecasts of DER generation into the input to the optimization model to determine, for example, how much DER generation will be available to the power infrastructure site 140 during the current optimization period.

[0077] The optimizer 410 may obtain service commitments from the electricity market 150 via the electricity market interface 152. For example, the optimizer 410 may determine the energy demand required for the optimization period based on the solution to the optimization model (e.g., including values ​​for one or more variables in the optimization model that optimize the target values ​​output by the optimization model). The optimizer 410 may send a request to the electricity market interface 152 for the service commitments for the determined energy demand for each optimization period from the electricity market 150. In response, the optimizer 410 may receive the requested service commitments for the energy demand for each optimization period from the energy supplier via the electricity market interface 152. If the energy provider in the electricity market 150 does not commit to the service, the optimizer 410 may update and rerun the optimization model (e.g., with constraints on energy demand) and / or initiate or execute any other corrective action.

[0078] The optimizer 410 may obtain other services from the electricity market 150 via the electricity market interface 152. For example, the optimizer 410 may receive service pricing for one or more services provided by energy providers on the electricity market 150 from the electricity market interface 152. The optimizer 410 may incorporate this service pricing into the input to the optimization model. Based on the solution of the optimization model, the optimizer 410 may decide to purchase one or more services and request a service commitment for the services from the electricity market 150 via the electricity market interface 152. In response, the optimizer 410 may receive the requested service commitment for the services from the electricity market interface 152. If the energy providers on the electricity market 150 do not commit to the services, the optimizer 410 may update the input to the optimization model to exclude the service pricing, rerun the optimization model, and / or initiate or execute any other corrective action. In one embodiment, the optimizer 410 may receive the requested service commitment schedule via the power market interface 152.

[0079] The optimizer 410 may provide service commitments to the power market 150 via the power market interface 152. For example, the optimizer 410 may provide flexibility information for one or more power infrastructure sites 140 under its management to the power market 150 via the power market interface 152. The flexibility information may include a curve of the price per kilowatt (kW) for flexibility at the power infrastructure sites 140. Energy providers in the power market 150 may purchase flexibility from the optimizer 410 via the power market interface 152. This flexibility can be used for reduction (e.g., demand response) as needed. In one embodiment, the optimizer 410 may receive a schedule of service commitments provided via the power market interface 152.

[0080] It should be understood that the illustrated data flow is merely an example. The optimizer 410 may interface with fewer, more, or different sets of systems than those illustrated. Each system may be used to collect data that will be incorporated into the input to the optimization model solved by the optimizer 410, and / or as a destination for the data output by the optimizer 410. Additional examples of data that may be collected and used as input to the optimization model include, but are not limited to, weather, the status of the power infrastructure site 140, financial figures related to the power infrastructure site 140, and estimates of uncertainty (e.g., for the planned schedule of the flexible load 350).

[0081] For example, the optimizer 410 may interface with a weather forecasting service to receive weather forecasts for the optimization period from the service. Incorporating weather forecasts into the optimization model can improve the estimation of energy demand. For example, as described above, weather forecasts may be used to predict DER generation, which can be incorporated into the input to the optimization model. Additionally or alternatively, the optimizer 410 may utilize weather forecasts in conjunction with the pre-adjustment model to more accurately estimate the energy demand for pre-adjusting the flexible load 350. For example, during periods of relatively high or low temperatures, more energy may be required to pre-adjust (e.g., cool or heat) the electric vehicle than during periods of mild temperatures.

[0082] It should be understood that the above examples are not limiting. The optimizer 410 may utilize other inputs and / or generate other outputs not specifically described herein. The optimizer 410 may utilize a modular “building block” architecture so that new inputs can be easily incorporated into the optimization model and / or existing inputs can be easily removed from the optimization model. Some of these inputs may represent solutions output by other optimization systems. Furthermore, as illustrated in various examples, the optimizer 410 may provide additional outputs (e.g., ranked lists) describing capacity constraints of EV supply equipment (EVSE), such as the charging station 340. These additional outputs may be used by other systems (e.g., the scheduling system 420, the site management system 440, etc.), and as a result, the optimizer 410 does not need to integrate all the details of the optimization.

[0083] 5. Optimization The optimizer 410 may solve an optimization model and implement in software the optimization problem for one or more power infrastructure sites 140. The optimization model may be generated from a model of the power infrastructure sites 140. For example, the model of each power infrastructure site 140 managed by the optimizer 410 may be stored in a data structure in memory (e.g., database 114). The optimization model may be derived from a single power infrastructure site 140 model for optimizing the operation of a single power infrastructure site 140, or from multiple power infrastructure site 140 models for optimizing the operation across multiple power infrastructure sites 140. In one embodiment, the optimization model minimizes a target value based on one or more variables and an input including the schedule of generators 330 and / or flexible loads 350 at the power infrastructure site 140 represented by the model of the power infrastructure site 140.

[0084] The variables may represent controllable parameters within the power infrastructure site 140. Examples of controllable parameters include, but are not limited to, setpoints of physical components, the amount of energy output by distributed energy resources, the power flow rate for charging or discharging the flexible load 350, the charge state for charging the flexible load 350 or the battery energy storage system 320, the time to start charging or discharging the flexible load 350, the time to end charging or discharging the flexible load 350, the duration of charging or discharging the flexible load 350, and the allocation or mapping of the flexible load 350 to the charging station 340 or the power infrastructure site 140. Generally, the optimization model includes multiple variables, which may include a mixture of potentially different types of controllable parameters. In one embodiment, the variables in the optimization model include, or relate to, at least power consumption and / or power generation at the power infrastructure site 140.

[0085] Mathematically, the optimization model may be expressed as follows:

[0086]

number

[0087] However, the following conditions apply.

[0088]

number

[0089]

number

[0090]

number

[0091]

number

[0092]

number

[0093]

number

[0094] While optimization models are expressed as minimization problems in this specification, it should be understood that they can also be expressed as maximization problems, subject to zero, one, or more constraints, as follows:

[0095]

number

[0096] However, for the sake of simplicity, we will generally assume here that the optimization model is considered a minimization problem. Those skilled in the art will understand how to convert between minimization and maximization problems, and which problem may be more appropriate in a given situation.

[0097]

number

[0098] The optimization model may be a stochastic optimization model that is robust to uncertainty. The optimization model may be solved using any suitable technique, including, but not limited to, stochastic multistage optimization, stochastic-constrained optimization, and Markowitz mean-variance optimization. Numerous commercial and open-source solvers are available for solving the optimization model.

[0099]

number

[0100] 6. Process Overview Herein, an embodiment of the process for determining the peak power demand of the power infrastructure site 140 is described in detail. It should be understood that the described process may be embodied in one or more software modules executed by one or more hardware processors, for example, as software 112 executed by the processor 210 of the EMS 110. The described process may be implemented as instructions represented by source code, object code, and / or machine code. These instructions may be executed directly by the hardware processor 210, or by a virtual machine or container operating between the object code and the hardware processor 210. Furthermore, the disclosed software may be built on one or more existing systems or interfaced with one or more existing systems.

[0101] Alternatively, the described processes may be implemented as hardware components (e.g., general-purpose processors, integrated circuits (ICs), application-specific integrated circuits (ASICs), digital signal processors (DSPs), field-programmable gate arrays (FPGAs) or other programmable logic devices, discrete gates or transistor logic, etc.), combinations of hardware components, or combinations of hardware and software components. To clearly illustrate hardware-software compatibility, various exemplary components, blocks, modules, circuits, and steps are described herein in general terms of their functions. Whether such functions are implemented as hardware or software depends on the specific application and the design constraints imposed on the overall system. A person skilled in the art may implement the described functions in various ways for each specific application, but such implementation decisions should not be construed as causing a departure from the scope of the invention. Furthermore, the grouping of functions within components, blocks, modules, circuits, or steps is for the sake of clarity. A particular function or step may be moved from one component, block, module, circuit, or step to another component without departing from the invention.

[0102] Figure 5 shows the operation of an exemplary process for determining the value of a parameter (e.g., peak power demand) at a power infrastructure site according to one embodiment. Although Figure 5 shows only a single time period 510, the process may operate for each of multiple consecutive time periods 510. Each time period 510 may be a fixed time period or interval, such as a billing period (e.g., a monthly billing period) during which the utility supplying power to the power infrastructure site 140 charges the operator of the power infrastructure site 140 for the power used by the power infrastructure site 140.

[0103] The sliding time window 520 progresses in real time from the start time of the current time period 510 to the end time of the current time period 510. It should be understood that the current time period 510 refers to a specific time period 510 that includes the current time 512. The length of the sliding time window 520, which may start from the current time 512, is shorter than the total length of the time period 510. Therefore, the sliding time window 520 may extend from the current time 512 to a future time 514 defined by the length of the sliding time window 520. In other words, the start of the sliding time window 520 corresponds to the current time 512, and the end of the sliding time window 520 corresponds to a future time 514 within the current time period 510, defined by adding the length of the sliding time window 520 to the current time 512. The sliding time window 520 may have any suitable length, for example, one hour or more hours (e.g., one hour, six hours, twelve hours, etc.), one day or more days (e.g., one day, two days, one week, etc.). In a particular embodiment, the length of the sliding time window 520 is one day (i.e., 24 hours).

[0104] The sliding time window 520 may progress continuously from the start time to the end time of the time period 510 or according to time steps. Where the sliding time window 520 is described herein as progressing in real time, it should be understood that the term “real time” may include delays resulting from time steps, as well as normal waiting times in data processing, communication, etc. In embodiments utilizing time steps, the time step may consist of any appropriate time interval, such as one second or more seconds (e.g., 1 second, 5 seconds, 10 seconds, 15 seconds, 30 seconds, etc.), one minute or more minutes (e.g., 1 minute, 5 minutes, 10 minutes, 15 minutes, 30 minutes, etc.), one hour or more hours (e.g., 1 hour, 6 hours, 12 hours, etc.), one day or more days (e.g., 1 day, 2 days, 1 week, etc.). Generally, the time step may be defined as a multiplicative coefficient based on the length of the time period 510, where the product is the length of the time period 510.

[0105] In embodiments utilizing time steps, the time step may be defined in relation to the sliding time window 520. For example, the length of the time step may be the same as the length of the sliding time window 520, a multiplier whose product is the length of the sliding time window 520, or otherwise related to the length of the sliding time window 520. Alternatively, the length of the time step may be completely independent of the length of the sliding time window 520.

[0106] The sliding time window 520 divides the current time period 510 into a past portion 530, a present portion 540, and a future portion 550. The past portion 530 extends at least from the start of the current time period 510 to before the start of the sliding time window 520. In other words, the past portion 530 is fixed at the start of the current time period 510. In a preferred embodiment, the past portion 530 extends over the entire period from the start of the current time period 510 to the start of the sliding time window 520. However, in an alternative embodiment, the past portion 530 may extend over some time, which is a specific number of time units (e.g., 30 seconds, 1 minute, 10 minutes, 15 minutes, etc.), from the start of the current time period 510 to before the start of the sliding time window 520. The present portion 540 extends over at least a portion of the sliding time window 520. In a preferred embodiment, the present portion 540 extends from beginning to end across the entire sliding time window 520, so as to have the same extent as the sliding time window 520. The future portion 550 extends at least from the end of the sliding time window 520 to the end of the present time period 510. In other words, the future portion 5 5 0 is fixed to the end time of the current time period 510.

[0107] Understand that at a first time point, where the current time 512 is the start time of the current time period 510, the past portion 530 has a length of 0. In addition, at a second time point, where the end of the sliding time window 520 is the end time of the current time period 510, the future portion 550 has a length of 0. As the sliding time window 520 progresses from the first time point to the second time point, the past portion 530 increases in length, the current portion 540 maintains a constant length (i.e., corresponding to the length of the sliding time window 520), and the future portion 550 decreases in length. As the sliding time window 520 progresses from the second time point to the end of the current time period 510, the past portion 530 continues to increase in length, while the current portion 540 decreases in length. During this time, the sliding time window 520 may decrease in length, or it may instead remain of a fixed length and extend to the next time period 510 (i.e., immediately after the current time period 510). However, in embodiments where time steps are used and the length of the time step is the same as the length of the sliding time window 520, it should be understood that the sliding time window 520 does not advance further within the current time period 510 after the second time point, but instead advances to the next time period 510 if applicable.

[0108] After each progression of the sliding time window 520 within the current time period 510, the parameter value of the power infrastructure site 140 may be determined for each of the past portion 530, the present portion 540, and the future portion 550. The value for each of the past portion 530, the present portion 540, and the future portion 550 may be the extreme value of the parameter in each portion of the current time period 510. In one embodiment, the parameter is power demand, and the value for each of the past portion 530, the present portion 540, and the future portion 550 is the value of the peak power demand for each portion. For example, the past value 535 of the peak power demand in the past portion 530 of the current time period 510 may be determined, the present value 545 of the peak power demand in the present portion 540 of the current time period 510 may be determined, and the future value 555 of the peak power demand in the future portion 550 of the current time period 510 may be determined.

[0109] As used herein, “power demand” refers to the power flow from grid 310 through a common junction to power infrastructure site 140, and “peak power demand” refers to the maximum power flow from grid 310 through a common junction to power infrastructure site 140 over a period of time. However, it should be understood that parameters other than power demand can be determined, and values ​​other than the maximum value (i.e., peak), such as minimum values ​​and average values, can be determined as the values ​​of the parameters. In general, past values ​​535, present values ​​545, and / or future values ​​555 may be determined, respectively, from the instantaneous values ​​of the parameter over each part of the time period 510, or from a smoothing function or other function applied to the values ​​of the parameter over each part of the time period 510. An example of a smoothing function is a rolling average of the parameter values ​​over a period of time (e.g., 15 minutes). For example, peak power demand for past portion 530, present portion 540, and / or future portion 550 may be defined not as the maximum instantaneous power demand over each portion of time period 510, but as the maximum rolling average of power demand over a period of time (e.g., 15 minutes).

[0110] The historical value 535 may be reliably determined based on the historical value of the parameter in the historical portion 530. For example, if the value of the parameter being determined is peak power demand, the peak power demand for the historical portion 530 of the current time period 510 can be determined simply by finding the maximum power demand by the power infrastructure site 140 over the historical portion 530 of the current time period 510 (e.g., via common connection points with grid 310).

[0111] The current value 545 may be determined based on the operational configuration of the power infrastructure site 140 output by the model. For example, the optimizer 410 may solve an optimization model of the power infrastructure site 140 to determine the values ​​of each of one or more variables that represent the operational configuration of the power infrastructure site 140 during the current portion 540 represented by a sliding time window 520. Power consumption and / or generation over the current portion 540 of the current time period 510 may be derived from this operational configuration. For example, the power demand over the current portion 540 of the current time period 510 (e.g., power consumption at each of multiple time points minus generation / discharge) may be plotted using the values ​​of variables over the current portion 540 (e.g., setpoints such as the battery energy storage system 320, the generator 330, the charging station 340). The peak power demand for the current portion 540 of the current time period 510 can then be determined by finding the maximum power demand among the plotted power demands. Generally, this peak power demand for the current portion 540 of the current time period 510 represents the known near-future demand over the optimization period. Therefore, there may be little or no uncertainty in the current value 545.

[0112] The future value 555 may be determined based on predictions of the parameters. The future value 555 may represent an uncertain estimate of the parameter values. In general, the uncertainty associated with the future value 555 decreases as the remaining time of the current time period 510 (i.e., the length of the future portion 550) decreases.

[0113] In one embodiment, the parameter prediction may include a probability distribution 560 of the parameter values ​​in the future portion 550 of the current time period 510. The probability distribution 560 may be derived by running one or more predictive models that output the probability distribution 560 based on historical data (e.g., past power demand) and / or predictive data (e.g., expected power demand, weather forecast, etc.).

[0114] The determination of the future value 555 may include selecting a parameter value from a probability distribution based on the value of the risk tolerance parameter ξ. For example, values ​​or percentiles in the probability distribution may be associated with different values ​​of the risk tolerance parameter ξ. The value of the risk tolerance parameter ξ may be received as user input via a graphical user interface provided by the EMS 110, and / or derived from the remaining time of the current time period 510 (i.e., the length of the future portion 550). The future value 555 may be derived as a single value in the probability distribution 560 defined by the risk tolerance parameter ξ, or as the mean of a portion of the probability distribution 560 defined by the risk tolerance parameter ξ.

[0115] In an alternative embodiment, estimates of power demand may be plotted over the future portion 550 of the current time period 510 based on one or more predictive models. The peak power demand for the future portion 550 of the current time period 510 can then be determined by finding the maximum power demand among the plotted power demands.

[0116] After each progression of the sliding time window 520 within the current time period 510, or after one or more progressions of the sliding time window 520, the output value of the parameter for the current time period 510 may be determined based on the past value 535, the current value 545, and the future value 555 of the current time period 510. For example, if the value of the parameter being determined is peak power demand, the output value is the value of peak power demand. In this case, the output value may be determined to be the maximum value among the past value 535, the current value 545, and the future value 555. More generally, the past value 535 may be an extremum (e.g., minimum or maximum) of the parameter in the past portion 530 of the current time period 510, the current value 545 may be an extremum of the parameter in the present portion 540 of the current time period 510, and the future value 5 5 5 may be an extremum of the parameter in the future portion 550 of the current time period 510, and the output value may be determined by selecting the most extreme value of the parameter from the past value 535, the current value 545, and the future value 555. However, it should be understood that several values ​​other than the first extremum, such as the second extremum, the third extremum, the average of all relevant values, the average of all extrema of relevant values, etc., can be used for the past value 535, the current value 545, the future value 555, and / or the output value.

[0117] After each progression of the sliding time window 520 within the current time period 510, or after one or more progressions of the sliding time window 520, the determined output value of the parameter may be used during the operation of the power infrastructure site 140. For example, if the value of the parameter is peak power demand, the determined output value may be set as the peak power demand during the operation of the power infrastructure site 140 for the remainder of the current time period 510. More generally, the determined output value of the parameter may be set as the control value of the power infrastructure site 140. In one embodiment, control of the power infrastructure site 140 may be initiated based on the determined output value.

[0118]

number

[0119] In particular, the uncertainty of the future value 555 of peak power demand affects the subsequent optimization by the optimizer 410. Specifically, if the future value 555 is lower than the actual final peak power demand in time period 510, potential consequences include the power infrastructure site 140 paying more for energy than necessary, paying more for peak power demand in subsequent time period 510 (e.g., due to an increased risk that the power infrastructure site 140 perceives that the peak power demand in future time period 510 will exceed the actual peak power demand), and / or having less operational flexibility (e.g., when responding to unexpected events). Conversely, if the future value 555 is higher than the actual final peak power demand in time period 510, potential consequences include the power infrastructure site 140 paying more for peak power demand than necessary.

[0120] Figure 6 shows an exemplary process 600 for determining the value of a parameter (e.g., peak power demand) at a power infrastructure site 140, according to one embodiment. Process 600 may be performed by the optimizer 410, by software 112 in combination with the optimizer 410, or by software 112 independently of the optimizer 410. Although process 600 is shown with a specific arrangement and order of subprocesses, process 600 may be performed with fewer, more, or different subprocesses, as well as different arrangements and / or orders of subprocesses. Furthermore, even if subprocesses are described or illustrated in a specific order, it should be understood that any subprocess that does not depend on the completion of another subprocess may be performed before, after, or in parallel with other independent subprocesses.

[0121] Process 600 operates in the current time period 510 and therefore iterates through one or more time periods 510. The current time period 510 is the time period that includes the current time 512. In a subprocess 610, when it reaches the current time period 510, it is determined whether to operate for the next time period 510. It should be understood that the next time period 510 becomes the current time period 510 as soon as it includes the current time 512. If the next time period 510 is considered (i.e., "Yes" in subprocess 610), process 600 executes one or more inner iterations of subprocesses 620-670. Otherwise, if the next time period 510 is not considered (i.e., "No" in subprocess 610), process 600 may terminate. Process 600 is generally conceivable to be repeated continuously and indefinitely over a continuous period of time 510 for one or more power infrastructure sites 140 in real time until the operator interrupts or terminates Process 600 (for example, via the graphical user interface of the EMS 110).

[0122] The iterations of the inner loop formed by subprocesses 620-670 may be executed according to time steps, as described elsewhere in this specification. In other words, the iterations of subprocesses 620-670 may be executed after each of several time steps within the current time period 510. Alternatively, the iterations of subprocesses 620-670 may be executed sequentially.

[0123] Subprocess 620 determines whether the current time period 510 has ended. If the current time period 510 has ended (i.e., "Yes" in subprocess 620), process 600 returns to subprocess 610, and when it becomes the current time period 510, it determines whether to perform another outer iteration for the next time period 510. If the current time period 510 has not ended (i.e., "No" in subprocess 620), process 600 executes the iterations of subprocesses 630-670. It should be understood that the current time period 510 is determined to have ended when the current time 512 is at the end time of the time period 510 under consideration, or within one time step of that end time if time steps are used, or following the end time of the time period 510 under consideration. Conversely, if the current time 512 is before the end time of the time period 510 under consideration, or if time steps are used, if it is multiple time steps before the end time of the time period 510 under consideration, then the current time period 510 is determined not to have ended.

[0124] In subprocess 630, the sliding time window 520 progresses continuously or by time steps, depending on the embodiment. Therefore, it should be understood that subprocesses 640-670 are executed after each of the multiple progressions of the sliding time window 520 within the current time period 510. While it is generally preferred that subprocesses 640-670 are executed after each progression of the sliding time window 520, in alternative embodiments, subprocesses 640-670 may be executed only after a certain number of progressions of the sliding time window 520 (e.g., at intervals of multiple time steps), according to any other pattern or randomly. Progression of the sliding time window 520 increases the length of the past portion 530 of the current time period 510 and decreases the length of the future portion 550 of the current time period 510. In embodiments where time steps are used, the length of the past portion 530 increases by the length of the time step, and the length of the future portion 550 decreases by the length of the time step.

[0125] In subprocess 640, historical values ​​535 of a parameter (e.g., peak power demand) for one or more power infrastructure sites 140 that occurred in the past portion 530 of the current time period 510 are determined. As described elsewhere in this specification, the past portion 530 may extend at least from the start of the current time period 510 to before the start of the sliding time window 520, preferably up to the start. The historical value 535 can be reliably determined from the historical values ​​of the parameter recorded and stored (e.g., in the database 114) for the past portion 530 of the current time period 510. For example, in an embodiment where the historical value 535 is an extremum (e.g., minimum or maximum) of the parameter, the historical value 535 can be easily determined (i.e., with very low computational cost) as an extremum of the parameter's past values. In an embodiment where the parameter is power demand, the historical value 535 may be determined as the maximum value of the historical value of power demand in the past portion 530 of the current time period 510.

[0126] In subprocess 650, the current value 545 of one or more parameters (e.g., peak power demand) of a power infrastructure site 140 occurring in the current portion 540 of the current time period 510 is determined. As described elsewhere in this specification, the current portion 540 may extend into a sliding time window 520 (i.e., from the start to the end of the sliding time window 520). The current value 545 may be determined based on the operational configuration of the power infrastructure site 140 output by Model 680 for the current portion 540 of the current time period 510. Model 680 may be an optimization model of the optimizer 410. For example, in an embodiment where the current value 545 is an extremum (e.g., minimum or maximum) of the parameter, the current value 545 may be determined as an expected extremum of the parameter if the power infrastructure site 140 operates according to the operational configuration of the power infrastructure site 140 that solves the optimization model. In embodiments where the parameter is power demand, the current value 545 may be determined as the maximum expected power demand passing through a common connection point with the grid 310 (e.g., the difference between expected power consumption and expected generation / discharge at the power infrastructure site 140) along the time span of the current portion 540 of the current time period 510.

[0127] In subprocess 660, future values ​​555 are determined for one or more parameters (e.g., peak power demand) of power infrastructure sites 140 that are predicted to occur in the future portion 550 of the current time period 510. As described elsewhere in this specification, the future portion 550 may extend at least from the end of the sliding time window 520 to the end of the current time period 510. The future values ​​555 may be determined based on parameter predictions. Parameter predictions may include the outputs of one or more prediction models. Prediction models may include prediction machine learning models, stochastic-constrained optimizations, and the like.

[0128] In one embodiment, the prediction of a parameter includes a probability distribution 560 of the parameter's value in the future portion 550 of the current time period 510. In this case, the subprocess 660 may include selecting a future value 555 of the parameter from the probability distribution 560 based on the value of a risk tolerance parameter ξ. The value of the risk tolerance parameter ξ may be received as user input via a graphical user interface provided by the EMS 110. In this case, the risk tolerance parameter ξ represents a user-adjustable bias. Alternatively or additionally, the risk tolerance parameter ξ may be based on the remaining time in the current time period 510 (i.e., the length of the future portion 550 of the current time period 510). For example, if the future value 555 is peak power demand, the risk tolerance ξ may decrease as the amount of time remaining in the current time period 510 decreases, because the potential gains lost from higher future values ​​555 of peak power demand increase. Generally, a lower risk tolerance parameter ξ results in the selection of a more likely future value of peak power demand, 555, or it can be derived from the probability distribution 560, while a higher risk tolerance parameter ξ results in the selection of a less likely future value of peak power demand, 555, or it can be derived from the probability distribution 560.

[0129] Alternatively, parameter prediction may take other forms. For example, the optimizer 410 may perform an initial optimization once per time period 510 at the start of each time period 510, based on a schedule for the entire time period 510 (e.g., a fixed billing period). This optimization may be performed by solving model 680, which may include the optimization model of the optimizer 410, as described elsewhere in this specification. The operational configuration generated by the optimization may be used to determine the parameter values ​​at multiple points in time across the current time period 510. After each advance of the sliding time window 520 across the current time period 510, the future value 555 may be determined using the parameter values ​​remaining in the future portion 550. For example, if the parameter is power demand, the maximum value of power demand in the future portion 550 may be determined as the future value 555.

[0130] Parameter predictions may be based on historical values ​​of parameters adjusted for one or more factors. These factors may include expected utilization such as infrastructure assets (e.g., flexible loads 350), forecast weather, and on-site power generation and / or energy storage. In one embodiment, the graphical user interface of the EMS 110 may include one or more inputs that allow the operator of the power infrastructure site 140 to override the predicted future value 555 of the parameter with a manually entered value. In this case, if the operator does not want to utilize the prediction function of the disclosed embodiment, the operator can simply set the future value 555 to zero. This setting may be specific to each position in the sliding time window 520, and each time window 5 2 It may be specific to 0, and / or all time windows 5 2 A global value of 0 is acceptable. However, it should be understood that manually overriding the future value of 555 often results in a suboptimal determination of peak power demand for a time period of 510.

[0131] In subprocess 670, the output value of one or more parameters (e.g., peak power demand) of a power infrastructure 140 is determined based on the parameter's past value 535, current value 545, and future value 555. If the objective is to determine the parameter's extreme value (e.g., minimum or maximum), the output value may be determined as the most extreme value of the parameter from the parameter's past value 535, current value 545, and future value 555. For example, if the parameter's value is peak power demand, the output value may be determined as the maximum value of the past value 535, current value 545, and future value 555. Similarly, if the extreme value is minimum, the output value may be determined as the minimum of the past value 535, current value 545, and future value 555. However, it should be understood that the output value may be determined in other ways (e.g., average) depending on the parameter and the intended use of the output value.

[0132]

number

[0133]

number

[0134] In one embodiment, the output value of the parameter determined in subprocess 670 is directly provided to a control process 690 for controlling the operation of the power infrastructure site 140. For example, the output value of the parameter may be set as a control value in control process 690 in at least a subset of iterations of subprocess 670. Thus, control process 690 may be initiated based on the output value determined in at least a subset of iterations of subprocess 670. However, it should be understood that control using the determined parameter output value is not required in any embodiment.

[0135]

number

[0136]

number

[0137] If the flexible load 350 is an electric vehicle, the scheduled time may be the departure time, and the target charge state may be the charge state required for the electric vehicle to complete the scheduled route. Charging may also include, or be described as, pre-adjusting the electric vehicle (e.g., cooling the electric vehicle before its departure, pre-adjusting the electric vehicle's battery), as well as charging the electric vehicle's battery. However, pre-adjustment may be a flexible operating state that can be terminated or avoided when the electric vehicle needs to be charged by its scheduled departure time, or when the optimizer 410 determines that the power can be used more effectively elsewhere.

[0138] The control process 690 may include an optimizer 410 that generates control information and transmits it to one or more control systems 142. Each control system 142 may then control the physical components within its respective power infrastructure site 140. Alternatively, the optimizer 410 may control the physical components directly (i.e., without the intervention of a control system). In either case, the control may include setting the setpoint of the physical component, activating a switch, turning the physical component on or off, or changing the physical or operating state of the physical component. The setpoint of the physical component may include values ​​such as voltage, current, output power, input power, power flow rate, charge state, and temperature. For example, the control may include controlling the setpoint (e.g., output power) of an intermittent distributed energy resource. Intermittent distributed energy resources (e.g., solar or wind power generators, or other weather-dependent generators) can be controlled in a similar manner, but it should be understood that intermittent distributed energy resources can typically only be controlled to have output power less than their potential output power, which is inherently energy-wasting.

[0139]

number

[0140] 7. Exemplary Embodiments The disclosed embodiment determines the optimal values ​​of parameters for the operation of a power infrastructure site 140 (e.g., a power depot such as an EV depot with or without power generation / storage, a microgrid, etc.) during a time period 510, in the presence of uncertainty regarding the future portion 550 of the time period 510. The optimal values ​​of the parameters for the entire time period 510 are determined based on some past values ​​535, an expected present value 545 as a result of optimization, and an uncertain future value 555 determined by prediction. This improves the efficient use of common connection points between the power infrastructure site 140 and the grid 310 (e.g., to improve the performance of the EV fleet by ensuring on-time charging) when future uncertainty exists, increases the consistency of power consumption by the power infrastructure site 140 that the grid 310 must support, reduces the total operating costs of the power infrastructure site 140, flexibly incorporates various data sources, and / or flexibly incorporates various billing rules imposed by the utility operating grid 310 (e.g., energy charges, peak power charges, etc.).

[0141] Furthermore, since the disclosed embodiments require optimization only within a sliding time window 520, the optimal values ​​of the parameters can be determined in a computationally fast, feasible, and scalable manner. To improve speed and scalability, the optimization may be formulated as a linear optimization model. In contrast, conventional systems that optimize the entire time period 510 may become computationally impractical (e.g., too slow, with insufficient data) as the number of variables that must be optimized increases (e.g., as the size of the EV fleet at power infrastructure site 140 increases).

[0142] In one embodiment, the value of the parameter to be optimized is the peak power demand. If the optimal value of the peak power demand is higher than the current set value of the peak power demand, the power infrastructure site 140 can gain a higher peak benefit over the remainder of the current time period 510 by increasing the set value of the peak power demand to a higher optimal value. For example, if the peak power demand is predicted to be higher than the current set value of the peak power demand in the future portion 550, and the predicted value of the peak power demand will affect the utility costs of the power infrastructure site 140 (e.g., through peak electricity charges), the peak power demand may be preemptively set to the predicted value of the peak power demand to utilize the higher value of the peak power demand for a longer period (i.e., by adding the time between the current time 512 and the time when the predicted peak power demand is estimated to occur) to reduce the impact on utility costs. Without the disclosed embodiment, the benefit of the peak power demand would only be obtained from the time it occurs until the end of the current time period 510. In the disclosed embodiment, the benefits of peak power demand can be obtained from the earlier of the time it occurs and the time it is predicted to occur, until the end of the current time period 510.

[0143] Embodiment 1: A method comprising using at least one hardware processor to advance a sliding time window in real time from the start time to the end time of a time period, wherein the length of the sliding time window is shorter than the length of the time period; determining, after each of a plurality of advances of the sliding time window within the time period, the past values ​​of the parameters of a power infrastructure site that occurred in the past portion of the time period, at least from the start time to before the start of the sliding time window; determining the current values ​​of the parameters in the sliding time window based on the operational configuration of the power infrastructure site output by a model for the current portion of the time period that spans the sliding time window; determining the future values ​​of the parameters in the future portion of the time period, at least from the end of the sliding time window to the end time of the time period, based on the parameter predictions; and determining the output values ​​of the parameters for the time period based on the past values, current values, and future values.

[0144] Embodiment 2: The parameter is power demand, and the values ​​are past value, present value, future value, and output value. Each represents the peak power demand value. Embodiment The method described in 1.

[0145] Embodiment 3: The method according to Embodiment 2, further comprising using at least one hardware processor to set the determined output value as the operating peak power demand of the power infrastructure site for the remainder of the time period after one or more progressions of a sliding time window within a time period.

[0146] Embodiment 4: The method according to any of the preceding embodiments, wherein the past value is an extreme value of the parameter in the past portion of the time period, the present value is an extreme value of the parameter in the present portion of the time period, the future value is an extreme value of the parameter in the future portion of the time period, and determining the output value involves selecting the most extreme value of the parameter from the past value, the present value, and the future value.

[0147] Embodiment 5: The method according to any of the preceding embodiments, wherein the time period is a fixed billing period during which a public utility supplying electricity to a power infrastructure site charges the operator of the power infrastructure site for the electricity used by the power infrastructure site.

[0148] Embodiment 6: The method according to any of the preceding embodiments, wherein the start of the sliding time window corresponds to the present time, and the end of the sliding time window corresponds to a future time within the time period.

[0149] Embodiment 7: The method according to any of the prior embodiments, wherein the prediction of a parameter includes a probability distribution of the parameter's value in the future portion of a time period.

[0150] Embodiment 8: The method according to Embodiment 7, wherein determining future values ​​includes selecting a parameter value from a probability distribution based on the value of the risk tolerance parameter.

[0151] Embodiment 9: The method according to Embodiment 8, further comprising using at least one hardware processor to receive user input indicating a value for a risk tolerance parameter.

[0152] Embodiment 10: The method of any of the prior embodiments, further comprising using at least one hardware processor to run a predictive model to generate parameter predictions.

[0153] Embodiment 11: The method according to any of the prior embodiments, further comprising using at least one hardware processor to set a determined output value as a control value for a power infrastructure site after one or more progressions of a sliding time window within a time period.

[0154] Embodiment 12: The method according to Embodiment 11, further comprising using at least one hardware processor to initiate control of a power infrastructure site based on an output value determined after one or more of a plurality of progressions of a sliding time window within a time period.

[0155] Embodiment 13: A system comprising at least one hardware processor and software, wherein the software, when executed by the at least one hardware processor, performs the method described in any of the preceding embodiments.

[0156] Embodiment 14: A non-temporary computer-readable medium in which instructions are stored, wherein, when executed by a processor, the instructions cause the processor to perform the method described in any one of Embodiments 1 to 12.

[0157] The above description of the disclosed embodiments is provided to enable those skilled in the art to construct or use the invention. Various modifications to these embodiments will be readily apparent to those skilled in the art, and the general principles described herein can be applied to other embodiments without departing from the spirit or scope of the invention. It should be understood that the descriptions and drawings presented herein represent currently preferred embodiments of the invention and, therefore, represent the subject matter broadly intended by the invention. It should be further understood that the scope of the invention fully encompasses other embodiments that may be apparent to those skilled in the art, and therefore the scope of the invention is not limited.

[0158] As used herein, the terms “comprising,” “comprise,” and “comprises” are open-ended. For example, “A contains B” means that A may contain either (i) B alone, or (ii) B in combination with one or more, and possibly any number of, other components. In contrast, the terms “consisting of,” “consist of,” and “consists of” are closed-ended. For example, “A consists of B” means that A contains only B and does not contain any other components in the same context.

[0159] The combinations described herein, such as “at least one of A, B, or C,” “one or more of A, B, or C,” “at least one of A, B, and C,” “one or more of A, B, and C,” and “A, B, C, or any combination thereof,” include any combination of A, B, and / or C, and may include multiple A's, multiple B's, or multiple C's. Specifically, combinations such as “at least one of A, B, or C,” “one or more of A, B, or C,” “at least one of A, B, and C,” “one or more of A, B, and C,” and “A, B, C, or any combination thereof” may be A only, B only, C only, A and B, A and C, B and C, or A and B and C, and any such combination may include one or more members of its constituent A, B, and / or C. For example, a combination of A and B may include one A and multiple B's, multiple A's and one B's, or multiple A's and multiple B's.

Claims

1. Using at least one hardware processor, In real time, a sliding time window is advanced from the start time to the end time of a time period, wherein the length of the sliding time window is shorter than the length of the time period. After each of the multiple progressions of the sliding time window within the aforementioned time period, Determine the past values ​​of the power infrastructure site parameters that occurred in the past portion of the time period, which extends at least from the start time of the time period to before the start of the sliding time window. Based on the operational configuration of the power infrastructure site output by the model for the current portion of the time period spanning the sliding time window, the current values ​​of the parameters in the sliding time window are determined. Based on the prediction of the parameter, the future value of the parameter is determined for the future portion of the time period, which extends at least from the end of the sliding time window to the end time of the time period. Based on the past value, the current value, and the future value, the output value of the parameter for the time period is determined. This includes, A method for predicting the parameter, comprising a probability distribution of the value of the parameter in the future portion of the time period.

2. The method according to claim 1, wherein the parameter is power demand, and each of the past value, present value, future value, and output value is a value of peak power demand.

3. The method according to claim 2, further comprising using the at least one hardware processor to set the determined output value as the peak power demand during operation of the power infrastructure site for the remainder of the time period, after one or more of the multiple progressions of the sliding time window within the time period.

4. The method according to claim 1, wherein the past value is an extreme value of the parameter in the past portion of the time period, the present value is an extreme value of the parameter in the present portion of the time period, the future value is an extreme value of the parameter in the future portion of the time period, and determining the output value includes selecting the most extreme value of the parameter from the past value, the present value, and the future value.

5. The method according to claim 1, wherein the aforementioned time period is a fixed billing period during which a public utility supplying electricity to the power infrastructure site charges the operator of the power infrastructure site for the electricity used by the power infrastructure site.

6. The method according to claim 1, wherein the start of the sliding time window corresponds to the present time, and the end of the sliding time window corresponds to a future time within the time period.

7. The method according to claim 1, wherein determining the future value includes selecting the value of the parameter from a probability distribution based on the value of the risk tolerance parameter.

8. The method according to claim 7, further comprising using at least one hardware processor to receive user input indicating the value of the risk tolerance parameter.

9. The method according to claim 1, further comprising using the at least one hardware processor to run a predictive model to generate the predictions of the parameters.

10. The method according to claim 1, further comprising using the at least one hardware processor to set the determined output value as a control value for the power infrastructure site after one or more of the progressions of the sliding time window within the time period.

11. The method according to claim 10, further comprising using the at least one hardware processor to initiate control of the power infrastructure site based on the output value determined after one or more of the progressions of the sliding time window within the time period.

12. The method according to claim 11, wherein the at least one hardware processor initiates control of the power infrastructure site in an automatic or semi-automatic manner.

13. The method according to claim 10, wherein the parameter is the peak power demand and the output value is the peak power demand.

14. The method according to claim 1, further comprising using the output values ​​of the parameters to inform an optimization model of future solutions, wherein the optimization model minimizes a target value.

15. At least one hardware processor, Software and A system comprising the above, wherein the software is executed by the at least one hardware processor, In real time, a sliding time window is advanced from the start time to the end time of a time period, the length of which the sliding time window is shorter than the length of the time period. After each of the multiple progressions of the sliding time window within the aforementioned time period, This involves determining the past values ​​of power infrastructure site parameters that occurred in the past portion of the time period, which extends at least from the start time of the time period to before the start of the sliding time window, Based on the operational configuration of the power infrastructure site output by the model for the current portion of the time period spanning the sliding time window, the current value of the parameter in the sliding time window is determined. Based on the prediction of the parameter, determine the future value of the parameter in the future portion of the time period, which extends at least from the end of the sliding time window to the end time of the time period; Based on the past value, the current value, and the future value, the output value of the parameter for the time period is determined. It is configured to do the following: The prediction of the parameter includes a probability distribution of the value of the parameter in the future portion of the time period.

16. The system according to claim 15, wherein the parameter is power demand, and each of the past value, present value, future value, and output value is a value of peak power demand.

17. The system according to claim 16, wherein the software is further configured to set the determined output value as the peak power demand during operation of the power infrastructure site for the remainder of the time period after one or more of the progressions of the sliding time window within the time period, the time period being a fixed billing period during which a utility supplying power to the power infrastructure site charges the operator of the power infrastructure site for the power used by the power infrastructure site.

18. The system according to claim 15, wherein the past value is an extreme value of the parameter in the past portion of the time period, the present value is an extreme value of the parameter in the present portion of the time period, the future value is an extreme value of the parameter in the future portion of the time period, and determining the output value includes selecting the most extreme value of the parameter from the past value, the present value, and the future value.

19. The system according to claim 15, wherein the start of the sliding time window corresponds to the present time, and the end of the sliding time window corresponds to a future time within the time period.

20. The system according to claim 15, wherein determining the future value includes selecting a value for the parameter from a probability distribution based on the value of the risk tolerance parameter.

21. The system according to claim 15, wherein the software is further configured to set the determined output value as a control value for the power infrastructure site after one or more of the progressions of the sliding time window within the time period.

22. The system according to claim 21, wherein the software is further configured to initiate control of the power infrastructure site based on the output value determined after one or more of the progressions of the sliding time window within the time period.

23. The system according to claim 22, wherein the software is further configured to initiate control of the power infrastructure site in an automatic or semi-automatic manner.

24. The system according to claim 21, wherein the parameter is the peak power demand and the output value is the peak power demand.

25. The system according to claim 15, wherein the software is further configured to use the output values ​​of the parameters to notify an optimization model of future solutions, and the optimization model minimizes a target value.

26. A non-temporary computer-readable medium on which instructions are stored, wherein the instructions, when executed by a processor, In real time, a sliding time window is advanced from the start time to the end time of a time period, the length of which the sliding time window is shorter than the length of the time period. After each of the multiple progressions of the sliding time window within the aforementioned time period, This involves determining the past values ​​of power infrastructure site parameters that occurred in the past portion of the time period, which extends at least from the start time of the time period to before the start of the sliding time window, Based on the operational configuration of the power infrastructure site output by the model for the current portion of the time period spanning the sliding time window, the current value of the parameter in the sliding time window is determined. Based on the prediction of the parameter, determine the future value of the parameter in the future portion of the time period, which extends at least from the end of the sliding time window to the end time of the time period; Based on the past value, the current value, and the future value, the output value of the parameter for the time period is determined. The processor performs the calculation, and the prediction of the parameter includes a probability distribution of the parameter's value in the future portion of the time period, in a non-temporal, computer-readable medium.

Citation Information

Patent Citations

  • Information processing method and computer system for power generation planning

    JP2005056103A

  • Load estimation and management in electric vehicle networks

    JP2014524618A

  • Stochastic demand charge management system and method

    US20180090935A1