Test control device, test control system, test control program, and test control method
The test management system addresses inconsistencies in audits by associating audit items with reference and supplementary environments, using machine learning to provide supplementary methods, ensuring fairness and reliability across varied test formats and environments.
Patent Information
- Application Number
- JP2026198044
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Filing Date
- 2026-08-31
- Publication Date
- 2026-11-24
- Estimated Expiration
- 2046-08-31
AI Technical Summary
Conventional test management systems fail to account for variations in test formats and environments, leading to inconsistencies in audits and unfairness among test-takers, particularly in cases where test venues and formats differ significantly.
A test management system that utilizes a storage unit to associate audit items with reference and supplementary environments, and a control unit to identify and compare these environments, providing supplementary methods to ensure fairness by addressing discrepancies through machine learning and large-scale language models.
Ensures fairness among test-takers by identifying and supplementing audit methods to accommodate variations in test environments, thereby ensuring reliability and consistency across different test formats.
Smart Images

Figure 0007954923000001_ABST
Abstract
Description
[Technical Field]
[0001] The present invention relates to a test management apparatus, a test management system, a test management program, and a test management method for managing various tests. [Background Art]
[0002] In recent years, test formats for various qualification tests, certification tests, and the like have been diversified. For example, there are formats in which the test is conducted for multiple people at a predetermined venue, and formats in which the test is conducted individually at the examinee's home, a private booth, or the like. Tests include tests using terminals such as PCs (Personal Computers), written tests, practical skills tests, and the like. Among these, tests using terminals are broadly classified into CBT (Computer Based Testing), which is a method of taking a test using a terminal such as a PC at a predetermined venue, and IBT (Internet Based Testing), which is a method of taking a test using a terminal such as a PC at the examinee's home or the like. On the other hand, a method of taking a test using answer sheets is also called PBT (Paper Based Testing).
[0003] In such tests, in order to ensure fairness, audits are conducted to monitor the examination status during the test and confirm the presence or absence of fraudulent behavior. There has also been proposed a system configured to manage examinee information from test preparation to test implementation and use the information for audits (see, for example, Patent Document 1). Patent Document 1 exemplifies a screen for allowing the user to select a test format (venue, test method, etc.). On this screen, in addition to the region and venue where the examinee takes the test, the test method can also be selected. [Prior Art Documents] [Patent Documents]
[0004] [Patent Document 1] Japanese Patent No. 7769353 [Summary of Invention] [Problem to be Solved by the Invention]
[0005] In recent years, there has been an increase in cases where test-takers can choose their test venue and format, as described above. Furthermore, in some nationwide tests, test venues and formats are allocated according to the test-taker's place of residence. However, facilities and environments often differ between test venues, for example, between venues in rural areas and those in urban areas, and differences in the test environment lead to differences in the scope of audits that can be conducted. Conventional systems do not take into account the impact of these differences in test format and environment on audits, making it difficult to ensure fairness among test-takers.
[0006] The present invention was made to solve the above-mentioned problems and aims to provide a test management device, test management system, test management program, and test management method that absorb variability in audits due to differences in test format and testing environment, and ensure fairness among test takers. [Means for solving the problem]
[0007] A test management device according to one aspect of the present invention includes a storage unit that associates, for each of a plurality of test forms, one or more audit items for ensuring the reliability of the test and a reference environment which is a test environment in which the audit related to the audit item can be performed, and a control unit that refers to the storage unit and identifies a reference environment associated with one or more audit items corresponding to a target test form, and further associates, for each of the plurality of audit items, a supplementary environment which is a test environment different from the reference environment in which all or part of the audit related to the audit item can be performed and a supplementary method which is an audit method using the supplementary environment, and the control unit refers to the storage unit and compares the identified reference environment with the target test environment, and if an audit item that does not satisfy the reference environment is detected in the target environment, the control unit obtains the supplementary method associated with the supplementary environment if there is a supplementary environment that corresponds to the audit item and can be satisfied by the target environment.
[0008] A test management device according to one aspect of the present invention includes a storage unit to which one or more audit items for ensuring the reliability of a test are associated for each of a plurality of test forms, and a control unit that refers to the storage unit to identify one or more audit items corresponding to the target test form. The control unit takes the identified one or more audit items and the target environment as input to a method model constructed by machine learning based on a plurality of audit items, a plurality of test environments corresponding to each audit item, and an audit method for each test environment, to acquire the audit method for the identified one or more audit items in the target environment. The plurality of test environments corresponding to the audit items include a base environment capable of performing the audit related to the audit item and a supplementary environment different from the base environment capable of performing all or part of the audit related to the audit item. The method model is configured to output a supplementary method, which is an audit method in the supplementary environment that can be satisfied by the target environment, to the control unit when there are audit items in the target environment that are not satisfied by the base environment.
[0009] A test management device according to one aspect of the present invention has a control unit that takes as input a method model constructed by machine learning based on a plurality of test forms, one or more audit items associated with each test form, a plurality of test environments corresponding to each audit item, and an audit method for each test environment, one or more audit items for ensuring reliability in a test having a target form, and an audit method for the target environment for said audit item. The plurality of test environments corresponding to an audit item include a base environment capable of performing the audit related to the audit item and a supplementary environment different from the base environment capable of performing all or part of the audit related to the audit item. The method model is configured to output to the control unit a supplementary method, which is an audit method in the supplementary environment that can be satisfied by the target environment, when there is an audit item in the target environment that is not satisfied in the base environment.
[0010] A test management device according to one aspect of the present invention has a control unit that takes a target test form as input to an item model constructed by machine learning based on a plurality of test forms and one or more audit items associated with each test form, and acquires one or more audit items for ensuring reliability in a test having a target test form. The control unit takes one or more audit items acquired from the item model and the target environment as input to a method model constructed by machine learning based on a plurality of audit items, a plurality of test environments corresponding to each audit item, and an audit method for each test environment, and acquires the audit method for the acquired one or more audit items by the target environment. The plurality of test environments corresponding to the audit items include a base environment capable of performing the audit related to the audit item and a supplementary environment different from the base environment capable of performing all or part of the audit related to the audit item, and the method model is configured to output a supplementary method, which is an audit method in the supplementary environment that can be satisfied by the target environment, to the control unit when there are audit items in the target environment that are not satisfied in the base environment.
[0011] A test management device according to one aspect of the present invention includes a control unit that generates an audit prompt containing instruction information that instructs the generation of one or more audit items and audit methods for the audit items to ensure the reliability of the test corresponding to the target test form and the target test environment, and inputs this into a large-scale language model to obtain audit items and audit methods suitable for the test from the large-scale language model; and a storage unit that is a knowledge source for improving the response performance of the large-scale language model, and stores an extended information source in which one or more audit items for ensuring the reliability of the test and a plurality of test environments corresponding to the audit items are associated for each of the plurality of test forms, wherein the plurality of test environments corresponding to the audit items include a base environment capable of performing the audit related to the audit item and a complementary environment different from the base environment that is capable of performing all or part of the audit related to the audit item. The control unit may generate an audit prompt by inserting predetermined information from the extended information source, along with the target form and target environment, into a template containing instruction information. If there are audit items in the target environment that do not satisfy the standard environment, the control unit may obtain a supplementary method from the large-scale language model, which is an audit method for a complementary environment that can be satisfied by the target environment. Alternatively, the control unit may generate an audit prompt by inserting the target form and target environment into a template containing reference information that instructs the system to refer to instruction information and extended information sources, and if there are audit items in the target environment that do not satisfy the base environment, it may obtain a supplementary method from a large-scale language model, which is an audit method in a complementary environment that can be satisfied by the target environment.
[0012] A test management system according to one aspect of the present invention includes an information terminal equipped with a display unit, and a test management device equipped with a storage unit that associates one or more audit items for ensuring the reliability of a test with each of a plurality of test forms, and a reference environment which is a test environment in which the audit related to the audit item can be performed. The test management device has a control unit that refers to the storage unit and identifies a reference environment associated with one or more audit items corresponding to a target test form. The storage unit further associates each of the plurality of audit items with a supplementary environment which is a test environment different from the reference environment in which all or part of the audit related to the audit item can be performed, and a supplementary method which is an audit method using the supplementary environment. The control unit refers to the storage unit and compares the identified reference environment with the target test environment. If an audit item that does not satisfy the reference environment is detected in the target environment, and there is a supplementary environment that corresponds to the audit item and can be satisfied by the target environment, the control unit acquires the supplementary method associated with the supplementary environment.
[0013] A test management program according to one aspect of the present invention involves a memory unit that, for each of a plurality of test forms, associates one or more audit items for ensuring the reliability of the test with a reference environment, which is a test environment in which the audit related to the audit item can be performed, and for each of the plurality of audit items, associates a supplementary environment, which is a test environment different from the reference environment in which all or part of the audit related to the audit item can be performed, with a supplementary method, which is an audit method performed by the supplementary environment. The program then refers to a memory unit to identify the reference environment associated with one or more audit items corresponding to the target test form, and compares the identified reference environment with the target test environment. If an audit item that does not satisfy the reference environment is detected in the target environment, the program causes one or more processors to perform the following actions: identify the reference environment associated with one or more audit items corresponding to the target test form, which is the target test environment; and if an audit item that does not satisfy the reference environment is detected in the target environment, if there is a supplementary environment that corresponds to the audit item and can be satisfied by the target environment, obtain the supplementary method associated with the supplementary environment.
[0014] A test management method according to one aspect of the present invention involves one or more processors performing the following steps: for each of a plurality of test forms, one or more audit items for ensuring the reliability of the test are associated with a reference environment, which is a test environment in which audits related to the audit items can be performed; and for each of the plurality of audit items, a supplementary environment, which is a test environment different from the reference environment in which all or part of the audit related to the audit item can be performed, and a supplementary method, which is an audit method performed by the supplementary environment, by referring to a memory unit, and identifying a reference environment associated with one or more audit items corresponding to a target test form; and comparing the identified reference environment with the target test environment, which is the test environment, and if an audit item that does not satisfy the reference environment is detected in the target environment, if there is a supplementary environment that corresponds to the audit item and can be satisfied by the target environment, acquiring a supplementary method associated with the supplementary environment. [Effects of the Invention]
[0015] According to the present invention, even if there is an audit item that does not satisfy the reference environment in the target environment, if all or part of the audit related to the audit item can be supplemented in the target environment, the method can be acquired and presented as necessary. Therefore, it is possible to absorb variations in audits due to differences in test formats and inspection environments, and to ensure fairness among examinees. [Brief Description of Drawings]
[0016] [Figure 1] 1 is a schematic configuration diagram illustrating an examination management system according to an embodiment of the present invention. [Figure 2] FIG. 2 is an explanatory diagram illustrating a schematic example of an examination management database (audit method database) stored in a storage unit of the examination management apparatus of FIG. 1 and a processing example of a control unit using the database. [Figure 3A] FIG. 2 is a table schematically showing an example of a reference database stored in a storage unit of the examination management apparatus of FIG. 1. [Figure 3B] FIG. 3 is a table schematically showing a configuration example following FIG. 3A in the reference database stored in the storage unit of the examination management apparatus of FIG. 1. [Figure 3C] FIG. 4 is a table schematically showing a configuration example following FIG. 3B in the reference database stored in the storage unit of the examination management apparatus of FIG. 1. [Figure 4A] FIG. 2 is a table schematically showing an example of a complementary database stored in a storage unit of the examination management apparatus of FIG. 1. [Figure 4B] FIG. 5 is a table schematically showing a configuration example following FIG. 4A in the complementary database stored in the storage unit of the examination management apparatus of FIG. 1. [Figure 5] FIG. 6 is a table schematically showing another example of the complementary database stored in the storage unit of the examination management apparatus of FIG. 1. [Figure 6] FIG. 2 is a table schematically showing an example of a form item database stored in a storage unit of the examination management apparatus of FIG. 1. [Figure 7A] FIG. 2 is a table schematically showing an example of an item reference database stored in a storage unit of the examination management apparatus of FIG. 1. [Figure 7B]This is a table schematically showing a configuration example following FIG. 7A of the item standard database stored in the storage unit of the test management device of FIG. 1. [Figure 8] This is a table schematically showing another example of the audit method database stored in the storage unit of the test management device of FIG. 1. [Figure 9A] This is a table schematically illustrating the test management database stored in the storage unit of the test management device of FIG. 1. [Figure 9B] This is a table schematically showing a configuration example following FIG. 9A of the test management database stored in the storage unit of the test management device of FIG. 1. [Figure 10] FIG. 1 is an explanatory diagram showing an example of a basic information screen displayed on the display unit of the information terminal of FIG. 1. [Figure 11] FIG. 1 is an explanatory diagram showing an example of a venue information screen displayed on the display unit of the information terminal of FIG. 1. [Figure 12] FIG. 1 is an explanatory diagram showing an example of an examinee environment screen displayed on the display unit of the information terminal of FIG. 1. [Figure 13] FIG. 1 is an explanatory diagram showing an example of an audit-related screen displayed on the display unit of the information terminal of FIG. 1. [Figure 14] FIG. 1 is a sequence chart illustrating an outline of a cooperative operation between a test management device and an information terminal regarding the test management method according to the embodiment of the present invention. [Figure 15] FIG. 1 is a flowchart illustrating an operation related to an acquisition process of an audit method by a test management device regarding the test management method according to the embodiment of the present invention. [Figure 16] FIG. 1 is a block diagram illustrating a functional configuration of a test management device according to a modification A of the embodiment of the present invention. [Figure 17] FIG. 1 is a flowchart illustrating an operation related to an acquisition process of an audit method by the test management device of FIG. 16 regarding the test management method according to the modification A of the embodiment of the present invention. [Figure 18] FIG. 1 is a block diagram illustrating a functional configuration of a test management device according to a modification B of the embodiment of the present invention. [Figure 19]Figure 18 is a flowchart illustrating the operation of the test management device used to acquire audit data, relating to a modified example B of the present invention. [Figure 20] This is a block diagram illustrating the functional configuration of a test control device according to modified example C of the present invention. [Figure 21] Figure 20 is a flowchart illustrating the operation of the test management device used to acquire audit data, relating to a modified example C of the present invention. [Figure 22] This is a schematic diagram illustrating a test management system according to modified example D of the present invention. [Figure 23] Figure 22 is a flowchart illustrating the operation of the test management device used to acquire audit data for a test management method according to modified embodiment D of the present invention. [Modes for carrying out the invention]
[0017] Embodiment. Based on Figures 1 to 15, an example of the overall configuration, functional configuration, and operation of the test management system 100 in the embodiment will be described. The same reference numerals are used for components common to each figure, and their explanations will be omitted or simplified as appropriate. In each figure, some reference numerals will be omitted as appropriate to avoid making the drawings unnecessarily complex.
[0018] The examination management system 100 manages various types of examinations. In this specification, "examination" is not limited to examinations in the narrow sense that evaluate the knowledge, skills, and abilities of examinees, such as qualification examinations, certification examinations, entrance examinations, and employment examinations, but also includes the concept of inspections and certifications conducted to confirm, judge, and certify the status, abilities, quality, suitability, etc., of subjects. In other words, "examination" includes not only so-called examinations but also various inspections and certifications. Furthermore, in this specification, "taking an examination" means taking the above-mentioned "examination". "Taking an examination" includes taking inspections or certifications, as well as taking so-called examinations such as qualification examinations and entrance examinations.
[0019] As illustrated in Figure 1, the examination management system 100 includes at least an examination management device 10 and one or more information terminals 20. The examination includes examinations using terminals such as PCs, written examinations, and practical examinations. The examination management system 100 may also have an operation terminal 50. The examination management device 10, one or more information terminals 20, and the operation terminal 50 are able to communicate with each other via a network N such as the Internet, either by wire or wireless connection.
[0020] The test management device 10 manages information related to various tests. For example, the test management device 10 manages one or more audit items necessary to ensure the reliability of the tests, and audit methods related to the audit items (information indicating how to perform audits related to the audit items). Audit items are set for each test type. In this embodiment, one or more audit items are set for each test type. The test management device 10 is composed of a cloud server based on cloud computing, an on-premise physical server, or a server system combining these. The functional configuration of the test management device 10 will be described later.
[0021] The information terminal 20 is a PC or similar device used by the test organizer or intermediary (hereinafter referred to as the user). The PC includes desktop PCs, notebook PCs, tablet PCs, and smartphones. The user inputs and configures test-related information via the information terminal 20. For example, by using the information terminal 20 to input information about the test format and environment, the user can confirm appropriate audit methods for the test, as presented by the test management device 10. The functional configuration of the information terminal 20 will be described later.
[0022] The operating terminal 50 is a PC or similar device used by the operators of the system that manages information related to the examination (hereinafter referred to as "this system"). This system is provided via the examination management device 10. Operators on the operating side use the operating terminal 50 to add and edit information such as software and database information managed by the examination management device 10, and to perform maintenance on this system.
[0023] The test management device 10 includes a communication unit 11, a control unit 12, and a storage unit 13. The communication unit 11 is an interface for the control unit 12 to communicate with external devices such as an information terminal 20 and an operation terminal 50 via wired or wireless means. The storage unit 13 is composed of RAM (Random Access Memory), ROM (Read Only Memory), flash memory, eMMC (embedded Multi Media Card), SSD (Solid State Drive), or HDD (Hard Disk Drive). The storage unit 13 stores various information, including the operation program of the control unit 12, which includes the test management program 13p. The test management program 13p is software that works in cooperation with a computing device such as a CPU (Central Processing Unit), MPU (Micro Processing Unit), or GPU (Graphics Processing Unit) to realize various functions. The test management program 13p causes one or more processors to function as information processing means 12a, acquisition processing means 12b, and input / output processing means 12c.
[0024] The memory unit 13 stores information for displaying and operating various screens on the information terminal 20. In this embodiment, "screen" is a concept that includes not only the entire display area of the display unit or an independent display unit such as a web page, but also a portion of the display area that is partially generated, updated, and expanded within a single display screen or web page. In other words, in this specification, "screen" refers to a collection of information displayed on the display unit, and includes not only modes in which the entire display area is switched (such as page transitions), but also modes in which a portion of the display area is dynamically generated, updated, and expanded within the same display screen.
[0025] In the memory unit 13, for each of the multiple test formats, one or more audit items for ensuring the reliability of the test and a reference environment, which is a test environment in which the audit related to the audit item can be performed, are associated. The reference environment basically consists of multiple elements. Furthermore, in the memory unit 13, for each of the multiple audit items, a supplementary environment, which is a test environment different from the reference environment in which all or part of the audit related to the audit item can be performed, and a supplementary method, which is the audit method used in the supplementary environment, are associated. The memory unit 13 may also store a registration database (registration DB) in which information related to the test is registered in advance.
[0026] The control unit 12 is composed of one or more processors. More specifically, the control unit 12 is composed of a processing unit such as a CPU, MPU, or GPU, and the various functions of the control unit 12 are realized by the processing unit and an operation program such as the test management program 13p. Some of the various functions of the control unit 12 may be realized by hardware. The control unit 12 provides various information in response to requests from external devices. The control unit 12 appropriately stores information transmitted from external devices such as the information terminal 20 and the operation terminal 50 in the storage unit 13.
[0027] For example, the control unit 12 refers to the memory unit 13 to identify a reference environment associated with one or more audit items corresponding to the target test configuration (hereinafter also referred to as the target configuration). Furthermore, the control unit 12 refers to the memory unit 13 to compare the identified reference environment with the target test environment (hereinafter also referred to as the target environment) with respect to one or more audit items corresponding to the target configuration. If an audit item is detected in the target environment that does not satisfy the reference environment, and there is a supplementary environment that corresponds to that audit item and can be satisfied by the target environment, the control unit 12 acquires the supplementary method associated with that supplementary environment.
[0028] In this specification, "covered" includes not only cases where the matter is actually implemented, but also cases where it is virtually set up through simulations, etc. Furthermore, this system can be used not only in the pre-test stage (the stage where implementation is planned or being considered), but also for purposes such as confirming the status after the test has been conducted. Therefore, the expression "covered" is used to include not only matters related to pre-tests, but also matters related to post-tests.
[0029] The target test format may be entirely configured by the user, or the entire format may be constructed through referencing a registration database (including external references) based on some of the configured elements. The control unit 12 may construct the entire format by referencing a registration database after receiving the configuration of related information. Similarly, the target test environment may be entirely configured by the user, or the entire format may be constructed through external references based on some of the configured elements. The control unit 12 may construct the entire environment by referencing a registration database after receiving the configuration of related information.
[0030] In this embodiment (main text), the test format, audit items, reference environment, supplementary environment, and audit method are associated in a database. Hereinafter, the database that the control unit 12 refers to when acquiring audit methods, etc., will be referred to as the test management database 13d (test management DB). The test management DB may consist of multiple databases. The schematic database configurations in Figures 2 to 9 are examples of several variations of the test management DB.
[0031] The audit methodology database (Audit Methodology DB) illustrated in Figures 2 and 8 is an example of a configuration in which the test format, audit items, base environment, base audit methodology, supplementary environment, and audit methodology are linked within a single database. Using the Audit Methodology DB, it is possible to obtain the audit items required for a test with a target format and target environment, as well as the audit methodology related to those audit items.
[0032] The standard database (standard DB) illustrated in Figures 3A to 3C (also referred to as Figure 3) is an example of a configuration in which test types, audit items, standard environments, and standard audit methods are linked. Using the standard DB, it is possible to obtain the audit items required for a test with a target type. It is also possible to perform a comparison process between the target environment and the standard environment. The supplementary database (supplementary DB) illustrated in Figures 4A and 4B (also referred to as Figure 4) and Figure 5 is an example of a configuration in which audit items, supplementary environments, and supplementary methods are linked. Using the supplementary DB, it is possible to perform a comparison process between the target environment and the supplementary environment, and to obtain supplementary methods. In the supplementary DB, as shown in Figures 4 and 5, each supplementary method may be associated with an audit level that represents the relative level of audit performed by that method.
[0033] The morphology item database (morphology item DB) illustrated in Figure 6 is an example of a configuration in which test morphologies and audit items are linked. The item criteria database (item criteria DB) illustrated in Figures 7A and 7B (also referred to as Figure 7) is an example of a configuration in which audit items, a standard environment, and a standard audit method are linked. The morphology item DB is used in combination with, for example, the item criteria DB and the supplementary DB. The above database configurations are merely examples, and various databases as test management databases can be constructed by arbitrarily selecting and combining multiple pieces of information.
[0034] For example, the standard database in Figure 3 and the format item database in Figure 6 show examples where the test format includes venue type and test method. The venue type classifications shown in each figure are merely examples, and these classifications should be adjusted as appropriate to meet the needs. In each figure, the test methods are broadly classified into CBT, PBT, and Web tests (including IBT), but these classifications should also be adjusted as appropriate to meet the needs. The contents of the audit items shown in Figures 3 to 7 are merely examples and may be further subdivided.
[0035] Figure 3 (Standard Database), Figure 4 (Supplementary Database), and Figure 7 (Item Standard Database) show examples where the standard or supplementary environment includes equipment-related information and stakeholder information. Equipment-related information may include equipment at the test site, communication environment, remote management equipment, etc. Equipment-related information may also include information on functions and components necessary for auditing. Stakeholder information may broadly include those involved in auditing the test.
[0036] The smartphone camera included in the equipment-related information corresponds to the camera on the examinee's portable device, and the PC camera corresponds to the built-in or external camera on the device the examinee uses for the exam. The examinee's PC included in the equipment-related information corresponds to the device the examinee uses for the exam. The administrator included in the related party information is a person who remotely monitors the examinees. The administrator monitors multiple examinees using a management terminal (PC, etc.) at a monitoring center, for example, and manages the status of the exam. The reception staff and the invigilators during the exam may share the role of administrator. Invigilators may include not only those in charge of the venue and those who patrol the venue (patrol staff), but also those who simply attend the exam (attendants). Invigilators may also assume the role of reception staff. For example, the number of invigilators may be set, and they may be subdivided according to their roles. However, the way each piece of information is represented in each diagram is merely an example, and consistency is required throughout.
[0037] Examples of audit levels illustrated in Figure 4 include, for instance, standard sufficiency, supplementary sufficiency, partial sufficiency, consideration sufficiency, non-sufficiency, and additional verification required. Standard sufficiency means that an audit using standard audit methods (standard audit) is possible, supplementary sufficiency means that a standard audit can be substituted with an audit using supplementary methods. Partial sufficiency means that a portion of the standard audit is not actually performed, but a minimum audit is possible using supplementary methods. Consideration sufficiency means that an audit equivalent to a standard audit is possible using supplementary methods under a considerate auditing environment. Non-sufficiency means that even auditing using supplementary methods is not possible, meaning that auditing the item in question is impossible. Additional verification required refers to cases where supplementary methods are reactive measures. The classification of audit levels is not limited to the examples above; it can be further subdivided or simplified. For example, additional verification required can be a supplementary item to supplementary sufficiency or partial sufficiency, or it may not be required at all.
[0038] Figure 5 shows that even for the same audit item, differences in the testing environment can lead to differences in supplementary methods and audit levels. As shown in Figure 6, if the test management database includes basic risks, it becomes possible to display basic risks on the audit-related screen Gk. Presenting basic risks is effective for raising user awareness, etc.
[0039] The test management database in Figure 8 represents an example where the test format is determined according to the test and audit needs of the user. In this example, the test format is set based on a combination of eight test center operating environments and four audit operation services (audit OS). Table 1 shows examples of the eight test center operating environments, and Table 2 shows examples of the four audit OSs.
[0040] [Table 1]
[0041] [Table 2]
[0042] In the case of the test management system 100 using the test management DB shown in Figure 8, for example, the test format is automatically set when the user selects the test venue operating environment and the audit OS on the settings screen. Some combinations of test venue operating environments and audit OSs are incompatible, and Figure 8 shows an example of 19 different test formats. For example, when a pair of test venue operating environments and audit OSs is set via the settings screen, the control unit 12 obtains information on the target format corresponding to that pair from the test management DB, etc. The target environment may be set separately, or the control unit 12 may obtain it from a registration DB, etc.
[0043] The test management databases in Figures 2-8 are merely examples, and the test management database should be adjusted and rearranged as appropriate to suit the required audit level and the scope of the test format. Note that the standard database (see Figure 3) and the supplementary database (see Figure 4 or Figure 5) are used in combination, and the format item database (see Figure 6), item standard database (see Figure 7), and supplementary database (see Figure 4 or Figure 5) are used in combination, but each figure is intended to show diversity in representation, and there is no relationship between the databases (they do not correspond perfectly). As shown in Figures 9A and 9B (also called Figure 9), the standard environment and the supplementary environment do not need to be clearly distinguished in the test management database. In the test management database of Figure 9, for each of the multiple test environments, the audit methods that can be performed in that test environment and the relative level of audit by that audit method (audit level) are associated.
[0044] The control unit 12 includes an information processing means 12a, an acquisition processing means 12b, and an input / output processing means 12c. The information processing means 12a performs basic processing of the system, such as processing related to accessing and logging into the system from the information terminal 20. The processing content of the acquisition processing means 12b will be explained with reference to Figure 2. Figure 2 is an explanatory diagram illustrating an overview of the process for extracting audit methods from the target form and target environment, along with a schematic example of the test management DB stored in the storage unit 13.
[0045] The acquisition processing means 12b refers to the test management DB to acquire an audit method suitable for the target form and target environment. More specifically, the acquisition processing means 12b refers to the test management DB to identify a reference environment associated with one or more audit items corresponding to the target form. That is, the acquisition processing means 12b compares the target form with multiple test forms in the test management DB and selects a test form that matches the target form (see (1) in Figure 2). Then, the acquisition processing means 12b identifies a reference environment corresponding to the audit items associated with the selected test form. If there are multiple audit items associated with the selected test form, the acquisition processing means 12b identifies a reference environment corresponding to each of them (see (2) in Figure 2).
[0046] Next, the acquisition processing means 12b refers to the test management DB and compares the identified reference environment with the target environment (see (3) in Figure 2). Then, the acquisition processing means 12b refers to the test management DB and, if an audit item is detected in the target environment that does not satisfy the reference environment, if there is a complementary environment that corresponds to that audit item and can be satisfied by the target environment, it acquires the complementary method associated with that complementary environment. In other words, the acquisition processing means 12b detects if there is one or more audit items corresponding to the target form in the target environment that does not satisfy the reference environment associated with that audit item (see (4) in Figure 2).
[0047] The acquisition processing means 12b compares the target environment with one or more complementary environments corresponding to the detected audit items (see (5) in Figure 2), and if there are complementary environments that can satisfy the target environment, it acquires the complementary method corresponding to that complementary environment (see (6) in Figure 2). The acquisition processing means 12b registers method-related information, which is information about audit methods, linked to the test. The method-related information substantially includes information on the acquisition status of audit methods. Even when using multiple databases, the acquisition processing means 12b appropriately refers to any of the databases and performs the same processing as described above.
[0048] When the information to be matched is set by manual or voice input, there is a possibility of inconsistencies or errors in the notation. Therefore, the acquisition processing means 12b may be configured to perform various matching processes after executing a process to align the notation of the input data with the notation of the reference data (such as notation correction or normalization). This makes it possible to suppress a decrease in matching accuracy caused by the input method.
[0049] The input / output processing means 12c transmits screen display data to the information terminal 20, thereby displaying the login screen, settings screen, and audit-related screen Gk on the display unit 24. For example, the input / output processing means 12c transmits setting data to the information terminal 20, thereby displaying the settings screen as illustrated in Figures 10 to 12 on the display unit 24. The input / output processing means 12c also transmits audit-related data to the information terminal 20, thereby displaying the audit-related screen Gk as illustrated in Figure 13 on the display unit 24. The audit-related data is generated based on method-related information. The audit-related data may include content set via the settings screen, or it may include information stored in the registration DB.
[0050] The information terminal 20 includes a communication unit 21, an information processing unit 22, a storage unit 23, a display unit 24, and an input unit 25. The communication unit 21 is an interface for the information processing unit 22 to communicate with external devices such as the test management device 10 via wired or wireless means. The display unit 24 consists of, for example, a liquid crystal display (LCD) and displays various information according to instructions from the information processing unit 22. The input unit 25 accepts user input operations and outputs operation signals to the information processing unit 22 according to the operation content. The input unit 25 consists of, for example, a keyboard and a pointing device such as a mouse or trackball.
[0051] The information processing unit 22, in cooperation with the test management device 10, displays the settings screen, audit-related screen Gk, and related information and subwindows on the display unit 24 in response to operation signals from the input unit 25. The information processing unit 22 receives operations from the target person, etc., via each screen and executes processing according to the content of the operation.
[0052] The information processing unit 22 is composed of a processing unit such as a CPU, MPU, or GPU, and the various functions of the information processing unit 22 are realized by the processing unit and the operation program. Some of the functions of the information processing unit 22 may be realized by hardware. The storage unit 23 stores various information in addition to the operation program of the information processing unit 22. The operation program of the information processing unit 22 also includes a segmented program that is transmitted from the test management device 10 in a timely manner. The segmented program constitutes the test management program 13p. The information processing unit 22 can perform some processes, such as switching the display of various elements on the screen, without communicating with the test management device 10, through operations based on the segmented program. The operation program of the information processing unit 22 is software that works in cooperation with a processing unit such as a CPU, MPU, or GPU to realize various functions. The storage unit 23 is composed of RAM and ROM, flash memory, eMMC, SSD, or HDD.
[0053] Figure 10 shows an example of the basic information screen Ga as a settings screen, Figure 11 shows an example of the venue information screen Gb as a settings screen, and Figure 12 shows an example of the examination environment screen Gc as a settings screen. In the examples in Figures 10 to 12, when a screen transition is instructed, such as by pressing the next button Bn on the basic information screen Ga, the venue information screen Gb is displayed, and when a screen transition is instructed on the venue information screen Gb, the examination environment screen Gc is displayed. The settings shown in Figures 10 to 12 are merely examples, and users should select and discard information as appropriate according to their needs.
[0054] The examination environment screen Gc illustrated in Figure 12 has a registration button Bs for confirming the settings. In this example, pressing the registration button Bs instructs the user to register the input content on the settings screen and also requests information about the audit method. This request operation may be performed separately by another operation. The settings screen may also have a confirmation button for confirming the settings.
[0055] The audit-related screen Gk may include information on audit methods, and may display audit items in association with audit methods so that the purpose of the audit can be grasped at a glance. If the audit-related screen Gk is configured to display the audit level for each audit item, the user can understand whether the audit method is standard or not, and whether there are any omissions in the audit. The control unit 12 may determine the overall audit level of the test and display it on the audit-related screen Gk.
[0056] The audit-related screen Gk may display improvement information suggesting improvements to the examination environment, etc. This improvement information should, for example, include proposed improvements to the examination environment and the audit methods that would become possible as a result of these improvements. In Figure 13, the audit-related screen Gk is designed so that when the confirmation button Bk is pressed, the improvement information is displayed in a sub-window or similar. However, the improvement information may also be displayed on the audit-related screen Gk by default. For example, if the audit level for all audit items is standard-compliant, or standard-compliant or supplementally compliant, the confirmation button Bk or the improvement information may not be displayed. When the exit button Bz is pressed, the audit-related screen Gk switches back to the initial screen or similar. Other information on the audit-related screen Gk can be changed as needed.
[0057] Next, referring to the sequence chart in Figure 14, an example of the operation of the test management system 100, focusing on the interaction between the test management device 10 and the information terminal 20, will be described. When a user accesses the system using the information terminal 20 and completes the login process, the test management device 10 (control unit 12) displays a settings screen on the display unit 24 of the information terminal 20, which allows the user to set at least a part of the test format and the test environment, or related information. That is, when the control unit 12 of the test management device 10 receives a login request from the information terminal 20 (step S101), it compares the user identification information included in the login request with the identification information in the user DB (step S102), and if the match is successful, it sends setting data to the information terminal 20 (step S103). The information terminal 20 displays a settings screen based on the setting data on the display unit 24 (step S104).
[0058] When the information processing unit 22 receives an operation on the settings screen (step S105), it executes a process corresponding to that operation (step S106). The information processing unit 22 executes a process corresponding to each operation it receives on the settings screen (see the dashed arrow in Figure 14). For example, when a selection area such as a checkbox is selected by a mouse click, the information processing unit 22 switches the state of the selection area, and when characters or numbers are entered into an input field, it displays the characters or numbers entered into the input field. Also, for example, when a screen transition is instructed, the information processing unit 22 displays the next screen and changes the displayed area according to a scroll operation, etc.
[0059] When the information processing unit 22 is instructed to execute the audit method acquisition process (step S107), it sends processing request data to the information terminal 20. The processing request data includes setting data, which is information set on the setting screen (step S108). The control unit 12 executes the audit method acquisition process based on the processing request data (step S109) and sends audit-related data, including the result of the process, to the information terminal 20 (step S110). The information terminal 20 displays the audit-related screen Gk based on the audit-related data on the display unit 24 (step S111). The above processes have been described in the order of the step numbers shown in Figure 14, but the order of the processes is not limited to this example, and it is also possible to omit some of the processes.
[0060] Next, referring to the flowchart in Figure 15, we will explain the process of acquiring audit methods performed by the test management device 10. The flowchart in Figure 15 corresponds to the process in step S109 of Figure 14.
[0061] The control unit 12 receives processing request data from the information terminal 20 (step S201). If the setting data in the processing request data includes the target form, the control unit 12 retrieves the target form from the setting data. If the setting data includes only a part of the target form, the control unit 12 retrieves the remaining part of the target form from the registration DB, etc., based on the information of that part. For example, if the venue type and test method are associated in the registration DB, the control unit 12 retrieves the test method from the registration DB based on the venue type. If the setting data does not include the target form but includes information related to the target form (hereinafter also referred to as target-related information), the control unit 12 retrieves the target form from the registration DB based on that information. This method is suitable when a setting screen is used that does not require input of the target form. For example, if the venue ID and / or venue name are associated with the target form in the registration DB, the control unit 12 retrieves the target form from the registration DB based on the venue ID or venue name entered by the user (step S202).
[0062] The control unit 12 refers to the test management DB and identifies the reference environment associated with one or more audit items corresponding to the target configuration (step S203). The control unit 12 also retrieves the target environment from the configuration data if the configuration data in the processing request data includes the target environment. If the configuration data includes only a part of the target environment, the control unit 12 retrieves the rest of the target environment from the registration DB or the like based on the information of that part. For example, if equipment-related information and personnel information are associated in the registration DB, the control unit 12 retrieves the personnel information or equipment-related information from the registration DB based on the equipment-related information or personnel information. If the configuration data does not include the target environment but includes information related to the target environment, the control unit 12 retrieves the target environment from the registration DB based on that information. For example, if the venue ID and / or venue name are associated with the target environment in the registration DB, the control unit 12 retrieves the target environment from the registration DB based on the venue ID or venue name entered by the user (step S204).
[0063] The control unit 12 refers to the test management DB and compares the target environment with the reference environment associated with one or more audit items corresponding to the target configuration. If there are multiple audit items corresponding to the target configuration, the control unit 12 compares the target environment with the reference environment associated with each of the multiple audit items (step S205). If there are audit items in the target environment that do not satisfy the corresponding reference environment (step S206 / Yes), the control unit 12 compares the target environment with one or more supplementary environments corresponding to those audit items. If there are multiple audit items in the target environment that do not satisfy the corresponding reference environment (step S206 / Yes), the control unit 12 compares the target environment with one or more supplementary environments corresponding to each of the multiple audit items. If there are multiple supplementary environments corresponding to those audit items, the control unit 12 compares the target environment with each of the multiple supplementary environments (step S207).
[0064] If there is a complementary environment that can satisfy the target environment (step S208 / Yes), the control unit 12 acquires a complementary method corresponding to that complementary environment (step S209). If there are multiple complementary environments that can satisfy the target environment (step S208 / Yes), the control unit 12 may acquire a complementary method associated with the one with the relatively higher priority among the multiple complementary environments (step S209). Priority is basically determined by the level of audit provided by the complementary method associated with the complementary environment. For audit items where there are multiple complementary methods with the same audit level, priority is determined based on criteria such as ease of work / processing or the number of devices used. If there is no complementary environment that can satisfy the target environment (step S208 / No), the control unit 12 proceeds to the process in step S210 without acquiring a complementary method.
[0065] In this embodiment, if the control unit 12 finds an audit item that satisfies the standard environment for the target environment (step S210 / Yes), it retrieves the standard audit method associated with that audit item from the test management DB (step S211). This is the process when multiple audit items corresponding to the target form include audit items that can satisfy the standard environment for the target environment and audit items that cannot satisfy the standard environment for the target environment. On the other hand, if the control unit 12 finds no audit items that satisfy the standard environment for the target environment (step S210 / No), it proceeds to the process in step S213.
[0066] Furthermore, in this embodiment, if the base environment associated with all audit items corresponding to the target form can be satisfied by the target environment (step S206 / No), the control unit 12 acquires the base audit method associated with all of those audit items (step S212). If, for all audit items corresponding to the target form, there is neither a base environment nor a supplementary environment that can be satisfied by the target environment (step S208 / No, step S210 / No), the control unit 12 proceeds to the process in step S213 without acquiring any audit method.
[0067] Next, the control unit 12 registers information related to the audit method (method-related information) linked to the set test (test identification information, etc.). The method-related information includes, for example, audit items corresponding to the target form, and standard audit methods or supplementary methods corresponding to those audit items. The method-related information may also include the audit level related to the audit method. If the audit method could not be obtained for some or all of the audit items corresponding to the target form, the control unit 12 may include information to that effect in the method-related information. In the same case, the control unit 12 may generate improvement information that proposes improvements to the testing environment. The improvement information may be, for example, information indicating methods for adjusting the testing environment (information on how to adjust the testing environment to enable appropriate auditing), and specifically, it may include information on additional equipment or personnel, and audit methods (audit methods) that become possible as a result of such additions (step S213).
[0068] The control unit 12 generates audit-related data in response to a request from the information terminal 20, or automatically, and transmits it to the information terminal 20, thereby displaying the audit-related screen Gk on the display unit 24 of the information terminal 20. The control unit 12 generates audit-related data using method-related information. The control unit 12 may include in the audit-related data the content set via the settings screen, or information stored in the registration DB (step S214).
[0069] The above processes have been explained in the order of the step numbers shown in Figure 15, but the order of the processes is not limited to this example, and some processes may be omitted. For example, the process of acquiring the target environment (step S204) may be performed before or at the same time as the process of step S203, or it may be performed together with the process of acquiring the target form (step S202). Also, the control unit 12 may acquire the standard audit method before the complementary method. The control unit 12 may be configured to acquire only the complementary method as the audit method and not the standard audit method.
[0070] As described above, the test management device 10 has a storage unit 13 that associates one or more audit items for each of the multiple test types, which are used to ensure the reliability of the test, with a reference environment, which is a test environment in which the audit related to the audit item can be performed. The test management device 10 also has a control unit 12 that refers to the storage unit 13 and identifies the reference environment associated with one or more audit items corresponding to the target test type. The storage unit 13 further associates each of the multiple audit items with a supplementary environment, which is a test environment different from the reference environment in which all or part of the audit related to the audit item can be performed, and a supplementary method, which is the audit method used in the supplementary environment. The control unit 12 then refers to the storage unit 13 and compares the identified reference environment with the target environment, which is the test environment in question. If an audit item that does not satisfy the reference environment is detected in the target environment, the control unit 12 is configured to acquire the supplementary method associated with the supplementary environment if there is a supplementary environment that corresponds to the audit item and can be satisfied by the target environment. Therefore, according to the test management device 10, even if there are audit items in the target environment that do not satisfy the standard environment, if it is possible to supplement all or part of the audit related to the audit item using the target environment, the device can acquire the method and present it as needed. Thus, it is possible to absorb variations in audits due to differences in test format and testing environment, and to ensure fairness among test takers. In the storage unit 13, an audit level representing the degree of audit by the supplementary method may be associated with it. The control unit 12 may be configured to acquire the audit level associated with the supplementary method when acquiring it.
[0071] <Variation A> In the main text described above, an example was shown of obtaining method-related information by applying the test format and examination environment to the test management DB. However, the test management system 100 in this modified example 1 is configured to obtain method-related information by using the test management DB and a pre-trained method model in combination. The overall configuration and operation overview of the test management system 100 in this modified example A is the same as in the main text described above. Therefore, the configuration and operation examples of the test management system 100 will be explained below, with reference to Figures 1 to 15 as appropriate, along with Figures 16 and 17. Explanations that overlap with the main text will be omitted or simplified as appropriate.
[0072] In the modified example A, the memory unit 13 stores a test management database, which is a form item database in which audit items and / or their identification information are associated with each of the multiple test forms, as illustrated in Figure 6. In addition, the memory unit 13 in Figure 16 stores a method model 13m constructed by machine learning based on multiple audit items, multiple test environments corresponding to each audit item, and audit methods used in each test environment.
[0073] The control unit 12 (acquisition processing means 12b) refers to the test management DB in the storage unit 13 to identify one or more audit items corresponding to the target form. The control unit 12 (acquisition processing means 12b) also takes the identified one or more audit items and target environment as input to the method model 13m and acquires the audit method for the identified one or more audit items based on the target environment from the method model 13m. Here, the multiple test environments corresponding to each of the multiple audit items include a base environment in which the audit related to the audit item can be performed, and a supplementary environment different from the base environment in which all or part of the audit related to the audit item can be performed. The method model 13m is configured to output a supplementary method, which is the audit method in the supplementary environment that can be performed by the target environment, to the control unit 12 if there are audit items in the target environment that do not satisfy the base environment. When the method model 13m outputs the supplementary method, it may also output the audit level associated with it.
[0074] The method model 13m may be constructed using supervised learning, semi-supervised learning, unsupervised learning, or other machine learning methods. Machine learning here includes deep learning. In the case of supervised learning, the auditing method for each examination environment becomes the correct label. The acquisition processing means 12b may have a learning processing function for constructing the method model 13m, and this learning processing function may include a function for updating the method model 13m. The method model 13m may be generated externally and stored in the memory unit 13; in this case, the acquisition processing means 12b does not need to have a learning processing function. The method model 13m may be stored in the memory unit 13 (see Figure 16), but it may also be stored in a storage device of an external device capable of communicating with the examination management device 10. Other configurations are the same as described in the main text above.
[0075] Next, referring to the flowchart in Figure 17, the process of acquiring audit methods performed by the test management device 10 will be explained. In Figure 17, the same steps as in Figure 15 are assigned the same step numbers. The explanations of these processes will be omitted or simplified.
[0076] The control unit 12 executes the processes in steps S201 and S202 in the same manner as in Figure 15. Next, the control unit 12 applies the target form to the test management DB and extracts one or more audit items corresponding to the target form from the test management DB (step S301). The control unit 12 also acquires the target environment in the same manner as in Figure 15 (step S204). Then, the control unit 12 inputs the one or more audit items extracted from the test management DB and the target environment into the method model 13m (step S302) and acquires method-related information from the method model 13m. The method-related information may include information such as audit items, audit methods, and audit levels, as described in the main text above (step S303). The control unit 12 executes the processes in steps S213 and S214 in the same manner as in Figure 15. The above processes have been described in the order shown in Figure 17, but the order of the processes is not limited to this example.
[0077] As described above, even with the test management device 10 of this modified example A, if there are audit items in the target environment that do not meet the standard environment requirements, it is possible to acquire and, if necessary, present a method that can supplement all or part of the audit related to those audit items with the target environment. Therefore, it is possible to absorb variations in audits due to differences in test format and testing environment, and to ensure fairness among test takers.
[0078] <Variation B> The test management system 100 in this modified example B is configured to acquire method-related information primarily using a pre-trained method model. The overall configuration and operation overview of the test management system 100 in this modified example B is the same as in the main text, modified example A, described above. Therefore, the configuration and operation examples of the test management system 100 will be explained below, with reference to Figures 18 and 19, and Figures 1 to 17 as appropriate. Explanations that overlap with the main text will be omitted or simplified as appropriate.
[0079] The memory unit 13 of this modified example B stores a method model 113m constructed by machine learning based on multiple test configurations, one or more audit items associated with each test configuration, multiple test environments corresponding to each audit item, and audit methods for each test environment. The control unit 12 (acquisition processing means 12b) takes the target configuration and target environment as input to the method model 113m and acquires one or more audit items for ensuring reliability in tests having the target configuration, and the audit methods for the target environment for those audit items. Similar to modified example A, the multiple test environments corresponding to each of the multiple audit items include a base environment and a supplementary environment. The method model 113m is configured to output a supplementary method, which is an audit method in a supplementary environment that can be satisfied by the target environment, to the control unit 12 if there are audit items in the target environment that do not satisfy the base environment. When the method model 113m outputs a supplementary method, it may also output the audit level associated with it.
[0080] The method model 113m may be constructed using supervised learning, semi-supervised learning, unsupervised learning, or other machine learning methods (including deep learning). The acquisition processing means 12b may have a learning processing function for constructing the method model 113m, and the learning processing function may include a function for updating the method model 113m. The method model 113m may be generated externally and stored in the storage unit 13, in which case the acquisition processing means 12b does not need to have a learning processing function. The method model 113m may be stored in the storage unit 13 (see Figure 18), but may also be stored in the storage device of an external device that can communicate with the test management device 10. The other configurations are the same as in the main text and modified example A described above.
[0081] Next, referring to the flowchart in Figure 19, the process of acquiring audit methods performed by the test management device 10 will be explained. In Figure 19, the same steps as in Figures 15 and 17 are assigned the same step numbers. The explanations of these processes will be omitted or simplified.
[0082] The control unit 12 receives processing request data from the information terminal 20 (step S201) and acquires the target form and target environment through the same processing as in steps S202 and S204 (step S401). Then, the control unit 12 inputs the acquired target form and target environment into the method model 113m (step S402) and acquires method-related information from the method model 113m. The method-related information may include information such as audit items, audit methods, and audit levels, as described in the main body above (step S303). The control unit 12 executes the processing in steps S213 and S214 in the same way as in Figure 15. The above processing has been explained in the order shown in Figure 19, but the order of processing is not limited to this example.
[0083] As described above, even with the test management device 10 of this modified example B, if there are audit items in the target environment that do not meet the standard environment requirements, it is possible to acquire and, if necessary, present a method that can supplement all or part of the audit related to those audit items with the target environment. Therefore, it is possible to absorb variations in audits due to differences in test format and testing environment, and to ensure fairness among test takers.
[0084] <Variation C> The test management system 100 in this modified example C is configured to acquire method-related information using two trained models (item model and method model). The overall configuration and operation overview of the test management system 100 in modified example C are the same as those described in the main text, modified examples A and B. Therefore, the configuration and operation examples of the test management system 100 will be explained below, with reference to Figures 20 and 21, and Figures 1 to 19 as appropriate. Explanations that overlap with the main text will be omitted or simplified as appropriate.
[0085] The memory unit 13 of this modified example C stores an item model 213m constructed by machine learning based on multiple test configurations and one or more audit items associated with each test configuration. The memory unit 13 of this modified example C also stores a method model 13m constructed by machine learning based on multiple audit items, multiple testing environments corresponding to each audit item, and audit methods used in each testing environment.
[0086] The control unit 12 (acquisition processing means 12b) takes the target form as input to the item model 213m and acquires one or more audit items for ensuring reliability in tests having the target form. The control unit 12 (acquisition processing means 12b) also takes the one or more audit items acquired from the item model 213m and the target environment, which is the target test environment, as input to the method model 13m and acquires the audit method for the acquired one or more audit items using the target environment. Each of the multiple test environments corresponding to the multiple audit items includes a reference environment and a supplementary environment.
[0087] The item model 213m may be constructed using supervised learning, semi-supervised learning, unsupervised learning, or other machine learning methods (including deep learning). In the case of supervised learning, one or more audit items associated with each of the multiple test formats become the correct labels. The acquisition processing means 12b may have a learning processing function for constructing the item model 213m, and the learning processing function may include a function for updating the item model 213m. The item model 213m may be generated externally and stored in the storage unit 13, in which case the acquisition processing means 12b does not need to have a learning processing function. The item model 213m may be stored in the storage unit 13 (see Figure 20), but it may also be stored in the storage device of an external device that can communicate with the test management device 10. The method model 13m is as described in Modification A. The other configurations are the same as in the main text and each of the modifications described above.
[0088] Next, referring to the flowchart in Figure 21, we will explain the process of acquiring audit methods performed by the test management device 10. In Figure 21, the same steps as in Figures 15, 17, and 19 are assigned the same step numbers. The explanations of these processes will be omitted or simplified.
[0089] The control unit 12 executes the processes in steps S201 and S202 in the same manner as in Figure 15. Next, the control unit 12 inputs the acquired target form into the item model 213m (step S501) and acquires one or more audit items corresponding to the target form from the item model 213m (step S502). The control unit 12 also acquires the target environment in the same manner as in Figure 15 (step S204). Then, the control unit 12 inputs the one or more audit items acquired from the item model 213m and the target environment into the method model 13m (step S302) and acquires method-related information from the method model 13m. The method-related information may include information such as audit items, audit methods, and audit levels, as described in the main text above (step S303). The control unit 12 executes the processes in steps S213 and S214 in the same manner as in Figure 15. The above processes have been described in the order shown in Figure 21, but the order of the processes is not limited to this example.
[0090] As described above, even with the test management device 10 of this modified example C, if there are audit items in the target environment that do not meet the standard environment requirements, it is possible to acquire and, if necessary, present a method that can supplement all or part of the audit related to those audit items with the target environment. Therefore, it is possible to absorb variations in audits due to differences in test format and testing environment, and to ensure fairness among test takers.
[0091] <Variation D> The test management system 100 in this modified example D is configured to acquire method-related information or audit-related data using a language model. The overall configuration and operation overview of the test management system 100 in modified example D are the same as those described in the main text, modified examples A, B, and C. Therefore, the configuration and operation examples of the test management system 100 will be explained below, with reference to Figures 1 to 21 as appropriate, along with Figures 22 and 23. Explanations that overlap with the main text will be omitted or simplified as appropriate.
[0092] In the test management system 100, the test management device 10 is capable of communicating information with the model server 80. The model server 80 is a server that stores and manages language models 80m, for example, consisting of large language models (LLMs). The language models 80m are stored in a storage device (not shown) within the model server 80. The model server 80 has a model processing unit 82 that manages input and output from external devices to the language models 80m and controls the operation of the language models 80m. The model server 80 is composed of a cloud server based on cloud computing, an on-premise physical server, or a server system combining these.
[0093] The memory unit 13 of this modified example D stores an augmented information source 13D, which is a knowledge source that improves the response performance of the language model 80m. The augmented information source 13D functions to improve the response performance of the language model 80m, for example, through processing based on RAG (Retrieval-Augmented Generation). The augmented information source 13D consists of, for example, one or more databases. The augmented information source 13D includes, for example, information similar to that of an exam management DB. The information stored in the augmented information source 13D can be modified, added, replaced, or deleted as appropriate.
[0094] More specifically, in the extended information source 13D, for each of the multiple test formats, one or more audit items to ensure the reliability of the test and multiple test environments corresponding to those audit items are associated. In the extended information source 13D, the multiple test environments corresponding to the audit items include a base environment capable of performing the audit related to the audit item, and a supplementary environment different from the base environment that is capable of performing all or part of the audit related to the audit item. The storage unit 13 may store audit prompt templates (hereinafter simply referred to as "templates"). Several pieces of information are pre-built into the templates.
[0095] The control unit 12 of this modified example D is configured to generate an audit prompt that includes instruction information instructing the system to generate one or more audit items and audit methods for the audit items, using the target test format (target format) and the target test environment (target environment) to ensure the reliability of the corresponding test, and to input this prompt into the language model 80m to obtain audit items and audit methods suitable for the test from the language model 80m.
[0096] An audit prompt is prompt data that causes the language model 80m to output audit-related information. Prompt data refers to input information that causes an information processing device to generate a desired output, and includes any of the following: instructions, requests, or constraints expressed in the form of text, audio, images, or program code. The audit-related information may be information related to audit methodologies (methodology-related information) or audit-related data.
[0097] The control unit 12 may generate an audit prompt by inserting predetermined information from the extended information source 13D, along with the target form and target environment, into a template containing instruction information. If there are audit items in the target environment that do not satisfy the standard environment, the control unit 12 may be configured to obtain an audit method (supplementary method) for a complementary environment that can be satisfied by the target environment from the language model 80m. The information from the extended information source 13D inserted into the audit prompt is, for example, similar to the information stored in the test management DB.
[0098] Alternatively, the control unit 12 may generate an audit prompt by inserting the target form and target environment into a template containing instruction information and reference information that instructs to refer to the extended information source 13D, and if there are audit items in the target environment that do not satisfy the standard environment, it may be configured to obtain an audit method (supplementary method) in a supplementary environment that can be satisfied by the target environment from the language model 80m. The reference information includes information about the extended information source 13D as the reference destination (such as URLs and database information). The database information consists of, for example, connection information indicating the location of the extended information source 13D, authentication information regarding access rights, and operation information regarding the acquisition of the extended information source 13D. Other configurations are the same as in the main text and each of the modifications described above.
[0099] Next, referring to the flowchart in Figure 23, we will explain the process of acquiring audit methods performed by the test management device 10. In Figure 23, the same steps as in Figures 15, 17, 19, and 21 are assigned the same step numbers. The explanations of these processes will be omitted or simplified.
[0100] The control unit 12 receives processing request data from the information terminal 20 (step S201) and acquires the target form and target environment through the same processing as in steps S202 and S204 (step S401). The control unit 12 applies the target form and target environment to a template to generate an audit prompt (step S601), sends it to the model server 80, and causes the language model 80m to input the audit prompt (step S602). Then, the control unit 12 acquires the method-related information generated in the language model 80m from the model server 80. The method-related information may include information such as audit items, audit methods, and audit levels, as described in the main body above (step S603). The control unit 12 executes the processing in steps S213 and S214 in the same way as in Figure 15.
[0101] The above flow shows an example where the instruction information of the audit prompt is configured to instruct the generation of method-related information, but it is not limited to this. The instruction information may also be configured to instruct the generation of audit-related data for displaying the audit-related screen Gk (see the dashed line operation in Figure 23). In this way, audit-related data can be directly obtained from the language model 80m (step S701) and transferred to the information terminal 20, thereby displaying the audit-related screen Gk on the display unit 24, and thus simplifying the series of processes. The above processes have been explained in the order shown in Figure 23, but the order of the processes is not limited to this example.
[0102] As described above, even with the test management device 10 of this modified example D, if there are audit items in the target environment that do not meet the standard environment requirements, it is possible to acquire and, if necessary, present a method that can supplement all or part of the audit related to those audit items with the target environment. Therefore, it is possible to absorb variations in audits due to differences in test format and testing environment, and to ensure fairness among test takers.
[0103] The embodiments described above are examples of test management devices, test management systems, test management programs, and test management methods, and the technical scope of the present invention is not limited to these embodiments. For example, the various screens illustrated in each figure are merely examples, and the arrangement of each element displayed on each screen, as well as the shapes, fonts, and expressions, can be changed as appropriate, and each element can be freely selected or omitted. For example, the appearance and text configuration of various virtual buttons are not limited to the examples in each figure and can be changed arbitrarily. Although each figure is formally illustrated in grayscale, in actual screens, colors are used as appropriate for characters, figures, etc. Figures 10 to 12 illustrate a settings screen consisting of three consecutive screens, but are not limited to this. The settings screen may consist of one or two screens, or four screens. The settings screen may consist of a scrollable web page. Regarding the RAG-based processing in modified example D, methods such as vectorization may be incorporated as appropriate. Regarding prompt generation, fine-tuning methods may be used in conjunction with RAG-based processing, or fine-tuning methods may be used instead of RAG-based processing. In this specification, information that is self-evident is not explicitly stated. [Explanation of Symbols]
[0104] 10 Test management device, 11 Communication unit, 12 Control unit, 12a Information processing means, 12b Acquisition processing means, 12c Input / output processing means, 13 Storage unit, 13d Test management database (Test Management DB), 13D Extended information source, 13m, 113m Method model, 13p Test management program, 20 Information terminal, 21 Communication unit, 22 Information processing unit, 23 Storage unit, 24 Display unit, 25 Input unit, 50 Operation terminal, 80 Model server, 80m Language model, 82 Model processing unit, 100 Test management system, 213m Item model, Bk Confirmation button, Bn Next button, Bs Registration button, Bz Exit button, Ga Basic information screen, Gb Venue information screen, Gc Examination environment screen, Gk Audit-related screen.
Claims
1. For each of the multiple test formats, a memory unit is provided which associates one or more audit items to ensure the reliability of the test with a reference environment that is a test environment in which the audit related to said audit item can be performed. The system includes a control unit that acquires a target test configuration, and, by referring to the storage unit, identifies the reference environment associated with one or more audit items corresponding to the target configuration, The aforementioned storage unit further, For each of the multiple audit items, a complementary environment is associated with which all or part of the audit related to that audit item can be performed, and which is a different auditing environment from the aforementioned base environment, and a complementary method is associated with which the audit method is performed in that complementary environment. The control unit, Obtain the target environment, which is the target testing environment. A test management device that, by referring to the memory unit, compares the identified reference environment with the target environment, and if an audit item that does not satisfy the reference environment is detected in the target environment, compares the target environment with a complementary environment corresponding to that audit item, and if there is a complementary environment that can satisfy the target environment, obtains the complementary method associated with that complementary environment.
2. A memory unit associated with each of the multiple test formats to ensure the reliability of the test, The system includes a control unit which acquires a target test configuration and, by referring to the storage unit, identifies one or more audit items corresponding to the target configuration, The control unit, The identified one or more audit items and the target environment are used as input to a method model constructed by machine learning based on multiple audit items, multiple target environments corresponding to each audit item, and audit methods used in each target environment, thereby obtaining the audit method for the identified one or more audit items in the target environment. Multiple testing environments corresponding to the audit items are: The standard environment under which the audit related to the audit item can be performed, This includes a complementary environment, different from the aforementioned base environment, in which all or part of the audit related to the audit item can be performed, The method model is configured to output to the control unit a supplementary method, which is an audit method for a supplementary environment that can be satisfied by the target environment, when there are audit items in the target environment that do not satisfy the standard environment.
3. The system has a control unit that takes as input to a method model constructed by machine learning based on multiple test formats, one or more audit items associated with each test format, multiple test environments corresponding to each audit item, and audit methods for each test environment, one or more audit items for ensuring reliability in tests having the aforementioned test formats, and audit methods for said audit items in the aforementioned test environments, and the target test format and target test environment as the target test format and target test environment. Multiple testing environments corresponding to the audit items are: The standard environment under which the audit related to the audit item can be performed, This includes a complementary environment, different from the aforementioned base environment, in which all or part of the audit related to the audit item can be performed, The method model is configured to output to the control unit a supplementary method, which is an audit method for a supplementary environment that can be satisfied by the target environment, when there are audit items in the target environment that do not satisfy the standard environment.
4. The system includes a control unit that takes the target test format as input to an item model constructed by machine learning based on multiple test formats and one or more audit items associated with each test format, and acquires one or more audit items for ensuring reliability in a test having the said target format. The control unit, The audit method for the target environment of the acquired audit item is obtained by using the one or more audit items and the target environment obtained from the aforementioned item model as input to a method model constructed by machine learning based on multiple audit items, multiple target environments corresponding to each audit item, and audit methods for each target environment. Multiple testing environments corresponding to the audit items are: The standard environment under which the audit related to the audit item can be performed, This includes a complementary environment, different from the aforementioned base environment, in which all or part of the audit related to the audit item can be performed, The method model is configured to output to the control unit a supplementary method, which is an audit method for a supplementary environment that can be satisfied by the target environment, when there are audit items in the target environment that do not satisfy the standard environment.
5. A control unit generates an audit prompt containing instruction information that instructs the generation of one or more audit items and audit methods for those audit items to ensure the reliability of the test corresponding to the target test format and the target test environment, inputs this into a large-scale language model, and obtains audit items and audit methods suitable for the test from the large-scale language model. A knowledge source for improving the response performance of the aforementioned large-scale language model, comprising a storage unit that stores an extended information source associated with one or more audit items for ensuring the reliability of the test for each of the multiple test formats, and multiple test environments corresponding to said audit items, In the aforementioned extended information source, the multiple testing environments corresponding to the audit items are: The standard environment under which the audit related to the audit item can be performed, This includes a complementary environment, different from the aforementioned base environment, in which all or part of the audit related to the audit item can be performed, The control unit, A test management device that generates an audit prompt by inserting predetermined information from the extended information source, along with the target form and the target environment, into a template containing the instruction information, and if there are audit items in the target environment that do not satisfy the standard environment, obtains a supplementary method from the large-scale language model, which is an audit method in the supplementary environment that can be satisfied by the target environment.
6. A control unit generates an audit prompt containing instruction information that instructs the generation of one or more audit items and audit methods for those audit items to ensure the reliability of the test corresponding to the target test format and the target test environment, inputs this into a large-scale language model, and obtains audit items and audit methods suitable for the test from the large-scale language model. A knowledge source for improving the response performance of the aforementioned large-scale language model, comprising a storage unit that stores an extended information source associated with one or more audit items for ensuring the reliability of the test for each of the multiple test formats, and multiple test environments corresponding to said audit items, In the aforementioned extended information source, the multiple testing environments corresponding to the audit items are: The standard environment under which the audit related to the audit item can be performed, This includes a complementary environment, different from the aforementioned base environment, in which all or part of the audit related to the audit item can be performed, The control unit, A test management device that generates the audit prompt by inserting the target form and the target environment into a template that includes the instruction information and reference information that instructs to refer to the extended information source, and if there are audit items in the target environment that do not satisfy the standard environment, obtains a supplementary method from the large-scale language model which is an audit method in the supplementary environment that can be satisfied by the target environment.
7. In the memory unit, an audit level representing the degree of auditing performed by the aforementioned supplementation method is associated with the aforementioned supplementation method. The control unit, The test management device according to claim 1, wherein when acquiring the aforementioned complementary method, the associated audit level is also acquired.
8. An information terminal equipped with a display unit, The test management device has a memory unit that associates one or more audit items for each of the multiple test formats with a standard environment, which is a test environment in which the audit related to the audit item can be performed. The aforementioned test management device is The system has a control unit that acquires the target test configuration, and, by referring to the storage unit, identifies the reference environment associated with one or more audit items corresponding to the target configuration. The aforementioned storage unit further, For each of the multiple audit items, a complementary environment is associated with which all or part of the audit related to that audit item can be performed, and which is a different auditing environment from the aforementioned base environment, and a complementary method is associated with which the audit method is performed in that complementary environment. The control unit, Obtain the target environment, which is the target testing environment. A test management system that, by referring to the memory unit, compares the identified reference environment with the target environment, and if an audit item that does not satisfy the reference environment is detected in the target environment, compares the target environment with a complementary environment corresponding to the audit item, and if there is a complementary environment that can satisfy the target environment, obtains the complementary method associated with that complementary environment and displays it on the display unit.
9. To obtain the target form which is the target test form, To obtain the target environment, which is the target testing environment. For each of the multiple test formats, one or more audit items for ensuring the reliability of the test are associated with a standard environment, which is a test environment in which the audit related to said audit item can be performed, and for each of the multiple audit items, a supplementary environment, which is a test environment different from the standard environment in which all or part of the audit related to said audit item can be performed, and a supplementary method, which is the audit method used in the supplementary environment, are associated with a memory unit, Identifying the baseline environment associated with one or more audit items corresponding to the aforementioned target form, A test management program that causes one or more processors to perform the following actions: compare the identified reference environment with the target environment; if an audit item is detected in the target environment that does not satisfy the reference environment, compare the target environment with a complementary environment corresponding to that audit item; and if there is a complementary environment that can satisfy the target environment, obtain the complementary method associated with that complementary environment.
10. A step of obtaining a target form which is the target test form, Steps to obtain the target environment, which is the target testing environment, For each of the multiple test formats, one or more audit items for ensuring the reliability of the test are associated with a standard environment, which is a test environment in which the audit related to said audit item can be performed, and for each of the multiple audit items, a supplementary environment, which is a test environment different from the standard environment in which all or part of the audit related to said audit item can be performed, and a supplementary method, which is the audit method used in the supplementary environment, are associated with a memory unit, A step of identifying the base environment associated with one or more audit items corresponding to the aforementioned target form, A test management method in which one or more processors perform the following steps: compare the identified reference environment with the target environment; if an audit item is detected in the target environment that does not satisfy the reference environment, compare the target environment with a complementary environment corresponding to the audit item; and if there is a complementary environment that can satisfy the target environment, acquire the complementary method associated with that complementary environment.
Citation Information
Patent Citations
Test system
JP2022162517A
Test management device, test management system, test management program, and test management method
JP7769353B1
Real time monitoring of candidate in examinations
US20260018078A1
