Device and dissolution equipment for determining the timing of additional charging, and method for determining the timing of additional charging
The melting apparatus and method accurately determine the timing for additional metal raw material charging using a bucket, power supply, and determination device with a mathematical model, addressing inaccuracies in existing methods to prevent overflow and enhance productivity.
Patent Information
- Application Number
- JP2022180875
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Filing Date
- 2022-11-11
- Publication Date
- 2026-11-24
- Estimated Expiration
- 2042-11-11
AI Technical Summary
The timing of additional metal raw material charging in melting facilities is inaccurately determined, leading to potential overflow and reduced productivity due to improper furnace lid closure, increased energy consumption, and extended working times.
A melting apparatus and method that includes a bucket for transporting metal raw materials, a power supply device to measure voltage and current, and a determination device to calculate the timing of additional charging based on measured values, using a mathematical model to determine the loadable bulk volume and compare it with the actual volume in the bucket.
Accurately determines the timing for additional charging, reducing energy input and working time, preventing overflow, and improving productivity by enhancing the accuracy of the mathematical model for calculating the maximum loading volume.
Smart Images

Figure 0007955028000001 
Figure 0007955028000002 
Figure 0007955028000003
Abstract
Description
[Technical Field]
[0001] The present invention relates to a melting apparatus that includes at least a furnace body for melting metal raw materials by arc and a bucket for transporting and charging the metal raw materials into the furnace body, and to a device for determining the timing of additional charging for determining when to charge additional metal raw materials into the furnace body, and to a melting apparatus and a method for determining the timing of additional charging. [Background technology]
[0002] Patent Document 1 discloses that in a melting facility that melts metal raw materials by arc, when the facility is operated continuously, additional metal raw materials are added to the furnace body once a certain amount of the metal raw materials have melted. [Prior art documents] [Patent Documents]
[0003] [Patent Document 1] Japanese Patent Publication No. 2018-70926 [Overview of the Initiative] [Problems that the invention aims to solve]
[0004] Incidentally, the timing for adding additional metal raw materials is determined by the operator (worker) based, for example, on the melting (progress) rate of the metal raw materials charged into the furnace body. This melting rate of the metal raw materials can be estimated from the ratio of the amount of energy already supplied to the melting equipment to the amount of energy required to completely melt the metal raw materials. Here, the amount of energy required to completely melt the metal raw materials is calculated, for example, from the mixed weight of the metal raw materials charged into the furnace body and its standard energy intensity, and the amount of energy already supplied to the melting equipment is calculated, for example, from the energy efficiency of the electricity supplied to the furnace body and the combustion heat of the burner.
[0005] From a thermal efficiency standpoint, it is desirable to add metal raw materials as quickly as possible, as long as they do not overflow from the furnace body. On the other hand, if the additional materials are added too early and overflow from the furnace body, the furnace lid will not close properly, which significantly reduces productivity as a result of having to deal with the problem.
[0006] This invention has been made in view of the above problems, and its purpose is to accurately determine the timing of additional metal raw material charging in a melting facility. [Means for solving the problem]
[0007] The main invention for achieving the above objective is a melting apparatus comprising: a furnace body into which metal raw materials are loaded and which melt the metal raw materials by an arc generated from electrodes inserted from above; a bucket for transporting the metal raw materials and loading them into the furnace body; and a power supply device configured to measure the voltage and current values applied to the electrodes, wherein the determination device is for determining when to load additional metal raw materials into the furnace body, comprising: a bucket raw material height measuring device for measuring the height of the metal raw materials in the bucket; and a bucket raw material bulk volume which is the bulk volume of the metal raw materials in the bucket based on the measurement result by the bucket raw material height measuring device. The device for determining the timing of additional charging is characterized by comprising: a calculation device configured to determine the timing of additional charging, which includes a mathematical model that calculates the product, calculates the amount of energy put into the furnace body to melt the metal raw material using at least the measured voltage and the measured current, calculates the theoretical dissolution volume which is the theoretical value of the bulk volume of the metal raw material melted by the amount of energy, and calculates the loadable bulk volume which is an estimated value of the bulk volume of the metal raw material that can be loaded into the furnace body using the theoretical dissolution volume; and a calculation device configured to determine the timing of additional charging of the metal raw material based on the result of comparing the loadable bulk volume with the bucket material bulk volume, and outputs the determination result.
[0008] The main invention for achieving the above objective is a melting apparatus characterized by comprising: a furnace body into which a metal raw material is charged and which melts the metal raw material by an arc generated from an electrode inserted from above; a bucket for transporting the metal raw material and charging it into the furnace body; a power supply device configured to measure the voltage and current values applied to the electrode; and the device for determining the timing of additional charging as described above.
[0009] The main invention for achieving the above objective is a melting apparatus comprising: a furnace body into which metal raw materials are loaded and which melt the metal raw materials by an arc generated from electrodes inserted from above; a bucket for transporting the metal raw materials and loading them into the furnace body; and a power supply device configured to measure the voltage and current values applied to the electrodes, wherein the method for determining when to load additional metal raw materials into the furnace body comprises: measuring the height of the metal raw materials in the bucket; and calculating the bucket material bulk volume, which is the bulk volume of the metal raw materials in the bucket, based on the result of the height measurement. The method for determining the timing of additional charging is characterized by including: calculating the amount of energy introduced to melt the metal raw material in the furnace body using at least the measured voltage and the measured current; calculating the theoretical dissolution volume, which is the theoretical value of the bulk volume of the metal raw material melted by the amount of energy; calculating the loadable bulk volume, which is an estimated value of the bulk volume of the metal raw material that can be loaded into the furnace body using the theoretical dissolution volume; and determining the timing for additional charging of the metal raw material based on the comparison result of the loadable bulk volume and the bucket material bulk volume, and outputting the determination result.
[0010] Other features of the present invention will be made clearer by description in this specification and the accompanying drawings. [Effects of the Invention]
[0011] According to the present invention, the timing for adding metal raw materials to a melting facility can be determined with high accuracy. [Brief explanation of the drawing]
[0012] [Figure 1] This is an explanatory diagram of one embodiment of the dissolution equipment of the present invention. [Figure 2] This is a flowchart of one embodiment of the operating procedure in the dissolution equipment of this embodiment. [Figure 3] This is a flowchart of the process for calculating the loadable bulk volume in the melting equipment of this embodiment. [Figure 4] This is a flowchart of the process for modifying the mathematical model in the dissolution equipment of this embodiment. [Figure 5] This is an explanatory diagram of the various parameters in the mathematical model of the dissolution equipment of this embodiment. [Modes for carrying out the invention]
[0013] The following information will become clear from the description in the specification and drawings described later.
[0014] Disclosed is an additional charging timing determination device for melting equipment that includes a furnace body into which a metal raw material is charged and which melts the metal raw material by an arc generated from an electrode inserted from above, a bucket for transporting the metal raw material and charging it into the furnace body, and a power supply device configured to be able to measure respective values of a voltage and a current applied to the electrode, the determination device determining timing for additionally charging the metal raw material into the furnace body. The additional charging timing determination device includes: a bucket raw material height measuring device for measuring the height of the metal raw material in the bucket; and an arithmetic device including a mathematical model configured to calculate, based on a result of measurement by the bucket raw material height measuring device, a bulk volume of the metal raw material in the bucket as a bucket raw material bulk volume, calculate an amount of energy input to melt the metal raw material in the furnace body, using at least the measured value of the voltage and the measured value of the current, calculate a theoretical melting bulk volume as a theoretical value of the bulk volume of the metal raw material melted by the amount of energy, and calculate a chargeable bulk volume as an estimated value of the bulk volume of the metal raw material that can be charged into the furnace body using the theoretical melting bulk volume, the arithmetic device being configured to determine the timing for additionally charging the metal raw material based on a result of comparison between the chargeable bulk volume and the bucket raw material bulk volume, and to output a determination result.
[0015] According to such an additional charging timing determination device, it is possible to accurately determine the timing for additional charging of the metal raw material in the melting equipment.
[0016] In the additional charging timing determination device, it is desirable that the bucket raw material height measuring device includes a three-dimensional measuring device capable of measuring a three-dimensional shape of a surface of the metal raw material in the bucket.
[0017] According to such an additional charging timing determination device, the height of the metal raw material in the bucket can be easily measured.
[0018] It is desirable that the device for determining the timing of additional charging is configured such that the calculation device calculates the actual dissolved volume, which is an estimate of the volume of the metal raw material melted in the furnace body during the period between the first charging and the second charging, based on the first raw material volume, which is the bulk volume of the metal raw material in the furnace body after the first charging of the metal raw material in the furnace body, and the second raw material volume, which is the bulk volume of the metal raw material in the furnace body after the second charging, which is the charging of the metal raw material following the first charging, and modifies the mathematical model based on the actual dissolved volume.
[0019] Such a device for determining the timing of additional loading can improve the accuracy of the mathematical model used to calculate the maximum possible loading volume.
[0020] The device for determining the timing of additional charging further comprises a furnace body material height measuring device for measuring the height of the metal material inside the furnace body, and the calculation device is configured to calculate at least the second material volume of the first material volume and the second material volume based on the measurement results of the furnace body material height measuring device.
[0021] Such a device for determining the timing of additional charges allows for the calculation of the actual dissolution volume with high accuracy, enabling more efficient modification of mathematical models.
[0022] In such a device for determining the timing of additional charging, it is desirable that the furnace body raw material height measuring device is equipped with a three-dimensional measuring device capable of measuring the three-dimensional shape of the surface of the metal raw material inside the furnace body.
[0023] Such a device for determining the timing of additional charges allows for easy measurement of the height of the metal raw material inside the furnace body.
[0024] In such a device for determining the timing of additional charging, it is desirable that the furnace body raw material height measuring device is equipped with an electrode position measuring device for measuring the vertical position of the lower end of the electrode.
[0025] Such a device for determining the timing of additional charges allows for easy measurement of the height of the metal raw material inside the furnace body.
[0026] A melting apparatus is revealed that comprises a furnace body into which metal raw materials are charged and which melt the metal raw materials by an arc generated from electrodes inserted from above; a bucket for transporting the metal raw materials and charging them into the furnace body; a power supply device configured to measure the voltage and current values applied to the electrodes; and a device for determining the timing of additional charging as described in any of the above embodiments.
[0027] Such melting equipment allows for accurate determination of the timing for adding metal raw materials.
[0028] A melting apparatus comprising: a furnace body into which metal raw materials are charged and which melt the metal raw materials by an arc generated from electrodes inserted from above; a bucket for transporting the metal raw materials and charging them into the furnace body; and a power supply device configured to measure the voltage and current values applied to the electrodes, wherein a determination method for determining when to add the metal raw materials to the furnace body comprises: measuring the height of the metal raw materials in the bucket; calculating the bulk volume of the metal raw materials in the bucket, which is the bulk volume of the metal raw materials in the bucket, based on the result of the height measurement; and measuring at least the voltage A method for determining the timing of additional charging is revealed, characterized by including: calculating the amount of energy introduced to melt the metal raw material in the furnace body using the measured values of the current and the current; calculating the theoretical dissolution volume, which is the theoretical value of the bulk volume of the metal raw material melted by the amount of energy; calculating the loadable bulk volume, which is an estimated value of the bulk volume of the metal raw material that can be loaded into the furnace body using the theoretical dissolution volume; and determining the timing for additional charging of the metal raw material based on the comparison result of the loadable bulk volume and the bulk volume of the bucket material, and outputting the determination result.
[0029] This method for determining the timing of additional charges allows for accurate determination of the timing of additional metal raw material charges in a melting facility.
[0030] A method for determining the timing of such additional charging, comprising: calculating the actual melted volume, which is an estimated value of the volume of the metal raw material melted in the furnace body during the period between the first charging and the second charging, based on the first raw material volume, which is the bulk volume of the metal raw material in the furnace body after the first charging of the metal raw material, and the second raw material volume, which is the bulk volume of the metal raw material in the furnace body after the second charging, which is the charging of the metal raw material following the first charging; and based on the actual melted volume Mathematical model for calculating the loadable bulk volume It is desirable to modify and further include
[0031] This method for determining the timing of additional loading can improve the accuracy of the mathematical model used to calculate the maximum possible loading volume.
[0032] ===Execution=== <<Overview>> Figure 1 is an explanatory diagram of one embodiment of the melting equipment of the present invention. Figure 1 shows the furnace body 11 (described later) in an open state.
[0033] In the following explanation, we may follow the directions shown in Figure 1. The direction in which the metal raw material 1 is transported by the bucket 12 (described later) is defined as the "forward-backward direction," the side of the furnace body 11 (described later) relative to the bucket 12 is defined as the "front side (forward direction)," and the opposite side of the front side (the side of the bucket 12 relative to the furnace body 11) is defined as the "rear side (rear direction)." The vertical direction is defined as the "up and down direction."
[0034] The melting equipment 10 is equipment for melting the metal raw material 1. In this embodiment, the metal raw material 1 is, for example, iron scrap. However, the metal raw material 1 is not limited to iron scrap, and may be reduced iron (DRI), hot briquetted iron (HBI), cold pig iron (molten pig iron), etc. In the following description, the molten metal obtained by melting the metal raw material 1 may be referred to as "molten metal" or "molten metal."
[0035] The melting equipment 10 is an arc melting equipment. In the arc melting equipment, an arc is generated from the electrodes 14 (described later) placed inside the furnace body 11 by passing an electric current through them. The metal raw material 1 is then heated and melted by the heat of the arc generated from the electrodes 14 (arc heat).
[0036] The melting equipment 10 includes a furnace body 11, a bucket 12, a power supply unit 13, and a determination device 40.
[0037] <Furnace body 11> The furnace body 11 is the main body of a melting furnace into which the metal raw material 1 is charged and melted by arc heat. As shown in Figure 1, the metal raw material 1 is heated and melted in the furnace body 11, forming molten metal 2 and slag 3. The molten metal 2 is refined by decarburization or other processes as necessary and is discharged as molten metal (tapped) from a tapping port (not shown). The slag 3 is removed prior to the discharge of the molten metal. Of the metal raw material 1 charged into the furnace body 11, any components that have not yet melted remain in the furnace body 11 as unmelted material 4, as shown in Figure 1.
[0038] The furnace body 11 includes electrodes 14, a furnace lid 16, an outer shell 17, and a lining 18.
[0039] Electrode 14 is an electrode that generates an arc (arc electrode). When the metal raw material 1 is melted, the opening at the top of the furnace body 11 is closed (closed state), and the electrode 14 is inserted into the inside of the furnace body 11 from above the furnace lid 16, passing through the furnace lid 16. In this embodiment, the electrode 14 is a graphite electrode, and three electrodes 14 are inserted into the inside of the furnace body 11. Therefore, the furnace body 11 is a so-called three-phase AC arc furnace. The electrode 14 is energized by applying an AC voltage from the power supply 13. As a result, the furnace body 11 generates an arc from the electrode 14, and the metal raw material 1 is heated and melted by the arc heat (i.e., molten metal 2 is obtained). However, the furnace body 11 is not limited to a three-phase AC arc furnace, and may also be a so-called DC arc furnace, in which case the furnace body 11 has one electrode 14 and another electrode at the bottom of the furnace body 11.
[0040] The furnace cover 16 is a cover member provided on the upper part of the furnace body 11. The furnace cover 16 can be moved vertically and rotated by a drive device (not shown). This allows the opening at the top of the furnace body 11 to be opened and closed. The three electrodes 14 described above are inserted through the insertion holes in the furnace cover 16 and are arranged to form an arc inside the furnace body 11.
[0041] The outer shell 17 is a component that constitutes the exterior of the furnace body 11, excluding the furnace lid 16. The outer shell 17 is made of iron and has a water-cooling structure (not shown). The water-cooling structure is, for example, a water-cooling panel and is composed of a plurality of block-shaped water-cooling boxes.
[0042] The lining 18 is a component that forms the bottom of the furnace body 11, which is the storage area for the molten metal 2. The lining 18 is made of refractory material and can store the molten metal 2 obtained by melting the metal raw material 1.
[0043] In addition to the above-described configuration, the furnace body 11 may further include at least one of a burner, an oxygen gas injection lance, and a carbon material injection lance. The burner, oxygen gas injection lance, and carbon material injection lance may be installed so as to penetrate the outer shell 17 at an angle and move at an angle inside the furnace body 11. The burner promotes the melting of the metal raw material 1 by the heat of combustion of the fuel gas. Oxygen gas for decarburization is injected into the furnace body 11 from the oxygen gas injection lance. Carbon material such as coke, char, coal, charcoal, or graphite is injected into the furnace body 11 from the carbon material injection lance, using air or nitrogen gas as a transport gas, to promote the melting of the metal raw material 1 by the heat of combustion and to carburize the molten metal.
[0044] Furthermore, the furnace body 11 is provided with a tilting mechanism 19. The tilting mechanism 19 is a mechanism that tilts the furnace body 11. This makes it easier to pour out the molten metal 2 and remove the slag 3.
[0045] <Bucket 12> The bucket 12 is a device for transporting the metal raw material 1 and loading it into the furnace body 11. In this embodiment, the bucket 12 has a storage section 21 and wheels 22. The storage section 21 is a component for storing the metal raw material 1, and the wheels 22 are a moving mechanism for transporting the storage section 21.
[0046] As shown in Figure 1, the metal raw material 1 is loaded from the top of the furnace body 11 when the furnace lid 16 is moved and the top of the furnace body 11 is open. Specifically, the bucket 12 is lifted by a crane (not shown) and the metal raw material 1 in the storage section 21 is dropped into the furnace body 11. Note that in Figure 1, the bucket 12 is drawn small for illustrative purposes, but normally the bucket 12 is sized to have a capacity close to that of the furnace body 11.
[0047] <Power supply device 13> The power supply unit 13 is a device for applying voltage to the electrodes 14. As described above, in this embodiment, the furnace body 11 is a three-phase AC arc furnace, and the power supply unit 13 applies an AC voltage to the electrodes 14. As shown in Figure 1, the power supply unit 13 is equipped with an electrical quantity measuring device 15. The electrical quantity measuring device 15 is a device for measuring the voltage and current applied to the electrodes 14. In this embodiment, the electrical quantity measuring device 15 includes a voltmeter and an ammeter. Therefore, the power supply unit 13 is configured to measure the respective values of the voltage and current applied to the electrodes 14, and the measured electrical quantities such as voltage, current, and energy can be output from the electrical quantity measuring device 15 to the determination device 40.
[0048] <Judgment device 40> The determination device 40 is a device (addition timing determination device) for determining when to add more metal raw material 1 to the furnace body 11. When the melting equipment 10 of this embodiment is operated continuously, it is necessary to add more metal raw material 1 when the metal raw material 1 charged into the furnace body 11 has melted to a certain extent. If the timing of adding this additional metal raw material 1 is estimated by the operator based on the melting (progress) rate of the metal raw material 1 charged into the furnace body 11 based on experience, rather than using the determination device 40, the error in estimating this melting rate may become large.
[0049] If the estimation of the dissolution rate is large, the amount of energy input and the working time may increase. For example, if the actual dissolution rate is lower than the estimated dissolution rate (i.e., if the actual amount of undissolved material 4 is greater than the estimated amount of undissolved material 4), the bulk volume of metal raw material 1 that can be added to the furnace body 11 will be smaller than estimated. As a result, when metal raw material 1 is added to the furnace body 11, the metal raw material 1 may overflow from the furnace body 11, preventing the furnace lid 16 from closing (so-called overflow). Furthermore, the inability to close the furnace lid 16 may increase heat loss within the furnace body 11. In addition, the operator's working time may increase in order to deal with the inability to close the furnace lid 16.
[0050] Furthermore, to avoid the problem of the actual dissolution rate being lower than the estimated dissolution rate, additional metal raw material 1 can be charged only after the estimated dissolution rate has become sufficiently large (i.e., after the estimated amount of undissolved material 4 has become sufficiently small). However, in this case, the amount of undissolved material 4 actually remaining in the furnace body 11 will be small. If energy is supplied when there is little undissolved material 4 and the furnace walls of the furnace body 11 are exposed, the energy loss will increase.
[0051] Furthermore, if the volume of the metal raw material 1 charged into the furnace body 11 is not measured, and the operator only knows the weight of the metal raw material 1, the error in estimating the dissolution rate may become even larger. Also, if the weight and volume of the metal raw material 1 in the furnace body 11 after additional charging are not quantitatively determined, it is not possible to improve the accuracy of estimating the dissolution rate. In this case, if the overflow rate is high after additional charging of the metal raw material 1, the operator adjusts the dissolution rate estimate based on experience, making it difficult to improve the accuracy of the dissolution rate estimate.
[0052] Therefore, the determination device 40 of this embodiment first calculates the bucket material bulk volume, which is the bulk volume of the metal material 1 in the bucket 12's storage section 21, based on the height information of the metal material 1 in the bucket 12's storage section 21, and also calculates the amount of energy put into the furnace body 11 to melt the metal material 1. Then, it calculates the theoretical melting volume, which is the theoretical value of the bulk volume of the metal material 1 that will be melted with this amount of energy put into it, and uses the theoretical melting volume to calculate the loadable bulk volume, which is an estimated value of the bulk volume of metal material 1 that can be added to the furnace body 11. The determination device 40 of this embodiment determines that it is time to add more material when this loadable bulk volume becomes equal to the bucket material bulk volume.
[0053] As a result, in this embodiment, the timing of additional charging of the metal raw material 1 in the melting equipment 10 can be determined with high accuracy. By accurately determining the timing of additional charging of the metal raw material 1, it is possible to suppress increases in the amount of energy input and working time after additional charging of the metal raw material 1. Furthermore, in this embodiment, as will be described later, the accuracy of the mathematical model for calculating the chargeable bulk volume can be improved.
[0054] <<Details of the judgment device 40>> The details of the determination device 40 will be described below, with reference to Figure 1 again.
[0055] The determination device 40 includes a bucket raw material height measuring device 20, a furnace body raw material height measuring device 30, a control device 41, a calculation device 42, a communication device 43, and an operator terminal 90.
[0056] The bucket material height measuring device 20 is a device for measuring the height of the metal material 1 in the storage section 21 of the bucket 12. The bucket material height measuring device 20 is positioned above the bucket 12, as shown in Figure 1. The bucket material height measuring device 20 has a three-dimensional measuring device capable of measuring the three-dimensional shape of the surface of the metal material 1 in the storage section 21 of the bucket 12. The bucket material height measuring device 20 measures the three-dimensional shape of the surface of the metal material 1 in the storage section 21 of the bucket 12 using, for example, a laser 3D scanner, a LiDAR (Light Detection and Ranging) sensor, radar, etc.
[0057] As shown in Figure 1, the bucket material height measuring device 20 detects the bucket 12 being transported in the forward direction and starts measurement. When measuring the three-dimensional shape of the surface of the metal material 1 inside the storage section 21 of the bucket 12 using a LiDAR sensor, the bucket material height measuring device 20 first scans the shape of the metal material 1 stored in the storage section 21. Next, it synthesizes the scanned point cloud data to reconstruct the shape of the metal material 1 stored in the storage section 21. This allows the bucket material height measuring device 20 to generate three-dimensional point cloud data of the surface of the metal material 1 stored in the storage section 21. The bucket material height measuring device 20 can output the generated three-dimensional point cloud data to the control device 41 and the computing device 42.
[0058] However, the bucket material height measuring device 20 does not necessarily have to be a three-dimensional measuring device, and may be configured to have one or more devices that measure the height of the metal material at a single point on the surface of the metal material 1. Furthermore, the bucket material height measuring device 20 may also have a monitoring camera that detects the bucket 12 being transported.
[0059] The furnace body raw material height measuring device 30 is a device for measuring the height of the metal raw material 1, including the unmelted material 4, inside the furnace body 11. As shown in Figure 1, the furnace body raw material height measuring device 30 is located above the furnace lid 16. The furnace body raw material height measuring device 30 has a three-dimensional measuring device capable of measuring the three-dimensional shape of the surface of the metal raw material 1 inside the furnace body 11. The furnace body raw material height measuring device 30 measures the three-dimensional shape of the surface of the metal raw material 1 inside the furnace body 11 using, for example, a laser 3D scanner, a LiDAR sensor, radar, etc.
[0060] The furnace body raw material height measuring device 30, like the bucket raw material height measuring device 20 described above, can generate three-dimensional point cloud data of the surface of the metal raw material 1, including the unmelted material 4, inside the furnace body 11. The furnace body raw material height measuring device 30 can output the generated three-dimensional point cloud data to the control device 41 and the calculation device 42.
[0061] The furnace body material height measuring device 30 does not necessarily have to be a three-dimensional measuring device, and may be configured to have one or more devices for measuring the height of the metal material at a single point on the surface of the metal material 1. The furnace body material height measuring device 30 may, for example, have an electrode position measuring device for measuring the vertical position of the lower end of the electrode 14. The electrode position measuring device may measure the vertical position of the electrode 14 when energized by the power supply device 13, and the height of the metal material 1 inside the furnace body 11 may be calculated from this vertical position information of the electrode and the values of the voltage and current applied to the electrode.
[0062] The control device 41 is a device for controlling various devices of the determination device 40 (for example, the bucket material height measuring device 20, the furnace body material height measuring device 30, the calculation device 42, the communication device 43, etc.). The control device 41 may also have a function to display the results of various processes in the determination device 40 (for example, the results of the additional loading timing determination process described later, and the results of the mathematical model modification process) on the display device of the operator terminal 90. However, the control device 41 may also display the results of various processes in the determination device 40 on a device other than the display device of the operator terminal 90.
[0063] The control device 41 is not limited to the functions described above, and may also have a function to display the results measured by the bucket material height measuring device 20 and the furnace body material height measuring device 30 (for example, 3D point cloud data) on the display device of the operator terminal 90. Furthermore, the control device 41 may have a function to display an error message as a pop-up on the display device of the operator terminal 90 if a problem occurs in communication with the various devices of the judgment device 40 described above. In addition, the control device 41 may have a function to display an image of the metal material 1 in the bucket 12's storage section 21 or inside the furnace body 11, or an error message or calibration information when the various devices of the judgment device 40 stop, on the display device of the operator terminal 90.
[0064] The arithmetic unit 42 performs various processes in the determination unit 40 (such as the process for determining the timing of additional installations, which will be described later, and the process for modifying the mathematical model), and outputs the results to the control device 41. Details of the various processes in the determination unit 40 will be described later.
[0065] The communication device 43 is a device for connecting to a communication network (not shown). The various devices of the determination device 40 are connected via the communication network. The communication network is, for example, a LAN, VAN, wireless communication network, internet, telephone line network, etc.
[0066] The operator terminal 90 is an information terminal used by the operator. The operator terminal 90 is a terminal that sends commands to various devices of the judgment device 40 and displays information output from various devices of the judgment device 40. The operator terminal 90 is, for example, a personal computer. However, the operator terminal 90 is not limited to a personal computer; for example, it may be a tablet-type mobile terminal or a smartphone. The operator terminal 90 has hardware such as a CPU, memory, storage device, communication module, display device such as a display, and input devices such as a mouse and keyboard (not shown). The judgment device 40 does not need to have an operator terminal 90.
[0067] In this embodiment, the determination device 40 is able to perform various processes through the cooperation of various hardware and software (not shown). The determination device 40 is a computer, such as a server, and has a CPU, memory, storage device, etc. The storage device stores programs and various data related to the various processes performed by the determination device 40.
[0068] For example, the control device 41 reads a program containing a mathematical model stored in the memory and executes it, thereby enabling the arithmetic unit 42 to perform various processes in the determination device 40 (such as the process for determining the timing of additional installations, which will be described later, and the process for modifying the mathematical model). The determination device 40 may include multiple computers. Furthermore, the various processes in the determination device 40 may be executed through the cooperation of these multiple computers via a network.
[0069] In this invention, the height of the metal raw material inside the bucket or furnace body refers to the height of one or more points on the surface of the metal raw material. The more points on which this height is measured, the higher the accuracy of calculating the bulk volume of the metal raw material. Therefore, it is preferable that the bucket raw material height measuring device and the furnace body raw material height measuring device are equipped with a three-dimensional measuring device capable of measuring the three-dimensional shape of the surface of the metal raw material.
[0070] <<Flowchart of Operating Procedures in the Dissolving Equipment>> The following describes a flow of an operating procedure including one embodiment of the method for determining the timing of additional charging according to the present invention in a dissolution facility 10 equipped with a determination device 40.
[0071] Figure 2 is a flowchart of one embodiment of the operating procedure in the melting equipment of this embodiment. Figure 3 is a flowchart of the calculation process for the loadable bulk volume in the melting equipment of this embodiment. Figure 4 is a flowchart of the modification process for the mathematical model in the melting equipment of this embodiment. Figure 5 is an explanatory diagram of the various parameters in the mathematical model in the melting equipment of this embodiment. Note that in Figure 3, each process in the loadable bulk volume calculation process (S004) in the furnace body 11 of Figure 2 is shown, and in Figure 4, each process in the modification process (S008) of the mathematical model in Figure 2 is shown.
[0072] First, before the initial loading of the metal raw material 1 into the furnace body 11, the bulk volume of the metal raw material 1 in the storage section 21 of the bucket 12 at the time of the initial loading is calculated (S001 in Figure 2). Specifically, the bucket raw material height measuring device 20 measures the height of the surface of the metal raw material 1 in the storage section 21 of the bucket 12. The bucket raw material height measuring device 20 then outputs the measured result (information on the surface height of the metal raw material 1) to the calculation device 42. The calculation device 42 receives the measurement result from the bucket raw material height measuring device 20 and calculates the bulk volume of the metal raw material 1 in the storage section 21 of the bucket 12, which is the bucket raw material bulk volume in this invention.
[0073] Next, the metal raw material 1 is initially charged into the furnace body 11 (S002 in Figure 2). At this time, as shown in Figure 1, the furnace lid 16 of the furnace body 11 is opened and the electrodes 14 are raised, and the metal raw material 1 is charged into the furnace body 11 from the top using the bucket 12.
[0074] In the melting equipment 10 of this embodiment, instead of batch operation where all of the metal raw material 1 charged in one go is melted and tapped each time, the operation is performed in which additional metal raw material 1 is charged when the metal raw material 1 charged into the furnace body 11 has melted to a certain extent. Therefore, in the melting equipment 10 of this embodiment, after the initial charge, as preparation for the next additional charge, the bulk volume of the metal raw material 1 in the storage section 21 of the bucket 12 is calculated in the same manner as in S001 before the initial charge (S003 in Figure 2), and the determination device 40 performs a determination process for the timing of the additional charge (S004 and S005 in Figure 2).
[0075] In the process for determining the timing of additional charging, first, a process for calculating the maximum volume that can be charged into the furnace body 11 is performed (S004 in Figure 2). In the process for calculating the maximum volume that can be charged, first, the arithmetic unit 42 reads a program including a mathematical model into memory and executes it to calculate the theoretical dissolution volume Vm, which is the theoretical value of the volume of metal raw material 1 that will be dissolved by the amount of energy supplied to the melting equipment 10 (S101 in Figure 3).
[0076] Theoretical dissolution bulk volume Vm(m 3 ) can be obtained by the following equation 1 included in the mathematical model. Vm = E ÷ {(Sc × ρ) × α} ···(Equation 1) Here, E is the amount of energy (kWh) that has been fed into the dissolution equipment 10. The electrical quantity measuring device 15 of the power supply unit 13 measures the voltage and current applied to the electrode 14, and the calculation unit 42 receives the measurement results from the electrical quantity measuring device 15 (at least the measured voltage and current values) and calculates the amount of energy E that has been fed into the dissolution equipment 10. Also, Sc is the standard energy consumption (kWh / t) which is the energy required to dissolve a unit weight of metal raw material 1, and ρ is the bulk density (t / m³) of metal raw material 1. 3) is the solubility coefficient of the metal raw material 1. For the solubility coefficient α of the metal raw material 1 after the initial charge, for example, the actual value obtained during the previous operation of the melting equipment 10 of this embodiment or the average of multiple actual values obtained during previous operations can be used, but for the first operation, an estimated value calculated based on the actual data from previous operations may be used.
[0077] Next, the arithmetic unit 42 reads a program including a mathematical model into memory and executes it to calculate the loadable bulk volume Vp, which is an estimated value of the bulk volume of additional metal raw material 1 that can be loaded (S102 in Figure 3).
[0078] Chargeable bulk volume Vp(m 3 ) can be obtained by the following equation 2 included in the mathematical model. Vp=Vfb-β=Vf-(Vfs-Vm)-β...(Formula 2) Here, Vfb is the remaining volume inside the reactor (m³ 3 ), Vf is the total space volume (m³) inside the furnace body 11. 3 Vfs is the bulk volume of the raw material in the furnace body 11 after the metal raw material 1 has been charged (before melting begins), which is the bulk volume of the raw material in the furnace body (m³). 3 ), Vm is the theoretical solubility volume (m 3 ), β is the corrected volume (m 3 ) In this embodiment, when determining the timing of the first additional charge after the initial charge, the furnace body raw material bulk volume Vfs is equal to the bucket raw material bulk volume at the time of the initial charge, and this value is used. However, it may also be calculated based on the measurement performed by the furnace body raw material height measuring device 30 after the initial charge. When determining the timing of the second and subsequent additional charges, the furnace body raw material bulk volume Vfs is the furnace body raw material bulk volume calculated in S007 described later after the previous additional charge.
[0079] Here, the term (Vfs−Vm) in Equation 2 is calculated by subtracting the bulk volume of the theoretically melted portion Vm from the furnace main body raw material bulk volume Vfs of the metal raw material 1 inside the furnace main body 11 after the previous charging (before the start of melting). In other words, it is the theoretical value of the bulk volume of the unmelted residual portion 4 of the metal raw material. Hereinafter, the theoretical value of the bulk volume of the unmelted residual portion 4 of the metal raw material may be referred to as the theoretical unmelted residual bulk volume Vr (m 3 ). That is, the in-furnace remaining volume Vfb is obtained by subtracting the theoretical unmelted residual bulk volume Vr from the total spatial volume Vf of the furnace main body 11. Since the bulk volume of the metal raw material 1 that can actually be additionally charged into the furnace is smaller than the in-furnace remaining volume Vfb by a certain degree, a value obtained by subtracting the correction volume β, which is a predetermined constant value, from the in-furnace remaining volume Vfb is taken as the chargeable bulk volume Vp. Note that FIG. 5A illustrates the relationship among the chargeable bulk volume Vp, the total spatial volume Vf inside the furnace main body 11, the furnace main body raw material bulk volume Vfs of the metal raw material 1 inside the furnace main body 11 after the previous charging (before the start of melting), the bulk volume Vm of the theoretically melted portion, the theoretical unmelted residual bulk volume Vr, and the correction volume β, in the case of determining the timing of additional charging from the second time onward. The correction volume β varies depending on the dimensions, shape, and the like of the furnace main body or the bucket; however, for example, a value of approximately 10 to 15% of the total spatial volume Vf inside the furnace main body 11 can be used.
[0080] Next, the arithmetic device 42 determines whether additional charging of the metal raw material 1 is possible (S005 in FIG. 2). Here, the chargeable bulk volume Vp calculated in S004 is compared with the bucket raw material bulk volume calculated in S003, and when the chargeable bulk volume Vp becomes equal to the bucket raw material bulk volume, it is determined that the timing for additional charging of the metal raw material 1 has been reached.
[0081] If the calculation unit 42 determines that it is time to add more metal raw material 1 (YES), it outputs a signal to the control device 41 indicating that it is possible to add more metal raw material 1. Based on this signal, the operator checks the message displayed on the operator terminal 90 and decides to add more metal raw material 1 into the furnace body 11 (S006 in Figure 2). However, if the calculation unit 42 determines that it is time to add more metal raw material 1 (YES), the metal raw material 1 may be automatically added into the furnace body 11 regardless of the message displayed on the operator terminal 90. If the calculation unit 42 determines that it is not time to add more metal raw material 1 (NO), it returns to the above-described process of calculating the loadable bulk volume S004 and repeats the processes of S004 and S005.
[0082] As a result, in this embodiment, the timing for additional charging of metal raw material 1 in the melting equipment 10 can be accurately determined. By accurately determining the timing for additional charging of metal raw material 1, it is possible to suppress increases in the amount of energy input and working time after additional charging of metal raw material 1. Furthermore, if the time when the chargeable bulk volume Vp becomes equal to the bucket raw material bulk volume can be predicted based on the energy input schedule, including the power input schedule and the burner heating schedule, the predicted time or target power input amount may be displayed on the operator terminal 90 a predetermined time before the time when additional charging becomes possible (for example, 1 to 3 minutes before), or the remaining time until additional charging becomes possible may be displayed on the operator terminal 90 in increments of 10 seconds, for example. As a result, when an operator manually adds scrap, the operator can perform preparatory work in advance to match the timing of the next additional charging. Furthermore, if the additional charging is performed automatically, the computing unit 42 may output a signal to the control device 41 a predetermined time before the time when the additional charging becomes possible (for example, 1 to 3 minutes before), causing the device to perform preparatory operations in advance for each device to be operated for the additional charging, such as the furnace lid drive device and crane.
[0083] Furthermore, in this embodiment, the accuracy of estimating the dissolution rate can be improved by quantitatively determining the bulk volume of the metal raw material 1 in the furnace body 11 after additional charging. In the dissolution equipment 10 of this embodiment, the determination device 40 reads a program including a mathematical model into memory and executes it after additional charging to calculate the bulk volume of the furnace body raw material, which is the bulk volume of the metal raw material in the furnace body 11 after additional charging (S007 in Figure 2), and performs a modification process on the mathematical model (S008 in Figure 2).
[0084] In the mathematical model modification process, the computing unit 42 first calculates the actual melted volume, which is an estimate of the volume of metal raw material 1 actually melted in the furnace body 11, based on the first raw material volume, which is the bulk volume of metal raw material 1 in the furnace body 11 after the previous charge (first charge), and the second raw material volume, which is the bulk volume of metal raw material 1 in the furnace body 11 after the current charge (second charge) (S201 in Figure 4).
[0085] Specifically, the computing unit 42 calculates the estimated bulk volume of the remaining undissolved material 4 at the time before the second charge, which is the bulk volume of the remaining undissolved material Vr'(m 3 This is calculated using the following formula 3 included in the mathematical model. Vr' = Vfs' - Vch... (Equation 3) Here, Vfs' is the bulk volume of the second raw material (m³ 3 ), Vch is the bucket material bulk volume (m³) of the bucket that contained the metal raw material 1 charged in the second charge. 3 ) The second raw material bulk volume Vfs' is calculated based on the results of measurements taken by the furnace body raw material height measuring device 30 after the second charge. In other words, the unmelted bulk volume Vr' is the second raw material bulk volume Vfs' minus the bucket raw material bulk volume Vch, which is the bulk volume of the metal raw material 1 charged in the second charge. Note that additional charging is performed when the chargeable bulk volume Vp becomes equal to the bucket raw material bulk volume Vch, so this bucket raw material bulk volume Vch is equal to the chargeable bulk volume Vp in Figure 5.
[0086] Next, the computing unit 42 reads a program including a mathematical model into memory and executes it to calculate the actual melted volume, which is an estimated value of the bulk volume of the metal raw material 1 that was actually melted in the furnace body 11.
[0087] The actual soluble bulk volume Vm' can be determined by the following equation 4 included in the mathematical model. Vm' = Vfs - Vr' ... (Equation 4) Here, Vfs is the bulk volume of the raw material in the furnace body 11 after the previous charge of the metal raw material 1 (first raw material bulk volume) (m³ 3 Therefore, the actual dissolved bulk volume Vm' is obtained by subtracting the undissolved bulk volume Vr', which is calculated using formula 3, from the bulk volume Vfs of the raw material in the furnace body 11 after the previous charge of the metal raw material 1.
[0088] Figure 5B illustrates the relationship between the bulk volume Vfs' of the furnace body material after charging the metal raw material 1 into the furnace body 11, the actual dissolving bulk volume Vm', and the remaining bulk volume Vr'. Additional charging is performed assuming that only the theoretical dissolving bulk volume Vm shown in Figure 5A has dissolved from the furnace body material bulk volume Vfs (first material bulk volume) calculated after the previous charging. However, if the furnace body material bulk volume Vfs' (second material bulk volume) calculated after the second charging corresponds to a height Lm that is shifted by ΔV from the height Lc assumed in Figure 5B for the metal raw material 1 after the second charging, then the theoretical dissolving bulk volume Vm in Figure 5A contains an error of this amount, and the actual dissolving bulk volume Vm' is the correct value, rather than the theoretical dissolving bulk volume Vm.
[0089] Next, the arithmetic unit 42 reads a program containing a mathematical model into memory and executes it to recalculate the calibrated solubility coefficient (calibrated solubility coefficient) α' (S202 in Figure 4).
[0090] For the reasons stated above, the solubility coefficient α' is determined using the actual solubility volume Vm' and the following equation 5 included in the mathematical model. α'=E÷{(Sc×ρ)}÷Vm' (Formula 5) As explained in the explanation of Equation 1, E is the amount of energy (kWh) that has been fed into the dissolution equipment 10. Also, Sc is the standard energy intensity (kWh / t) of metal raw material 1, and ρ is the bulk density (t / m³) of metal raw material 1. 3 ) As can be seen from equation 5, the dissolution coefficient α' is recalculated using the actual dissolution volume Vm'. Modification of the mathematical model is performed by modifying the dissolution coefficient α in equation 1 with the dissolution coefficient α'. Specifically, for example, the dissolution coefficient α in equation 1 may be replaced with the dissolution coefficient α' calculated by a single mathematical model modification process, or the dissolution coefficient α in equation 1 may be replaced with the average value of multiple dissolution coefficients α' obtained during multiple past operations. Furthermore, since the dissolution coefficient α also depends on the type of raw material and the mixing ratio (mixing pattern) contained in the metal raw material 1, data of dissolution coefficients α1, α2, etc. corresponding to mixing patterns P1, P2, etc. may be accumulated, and the dissolution coefficient α calculated by statistical processing based on these may be used according to the mixing pattern.
[0091] As explained above, in the mathematical model modification process, the computing unit 42 calculates the actual melted volume (Vm'), which is an estimate of the volume of metal raw material 1 melted in the furnace body 11 during the period between the first and second charges, based on the first raw material volume (Vfs), which is the bulk volume of metal raw material 1 in the furnace body 11 after the first charge (for example, the initial charge or the first additional charge), and the second raw material volume (Vfs'), which is the bulk volume of metal raw material 1 in the furnace body 11 after the second charge (for example, the first additional charge or the second additional charge), which is the charge following the first charge. The mathematical model is then modified based on the actual melted volume. In this embodiment, the accuracy of the mathematical model for calculating the bulk volume of metal raw material 1 that can be charged into the furnace body 11 can be improved.
[0092] In this embodiment, if the first charge is the initial charge, the bucket material volume at the time of the initial charge is used as the first material volume. Therefore, the calculation device 42 calculates only the second material volume out of the first and second material volume based on the measurement results of the furnace body material height measuring device 30. On the other hand, if the first charge is an additional charge, the first material volume (furnace material volume Vfs) is calculated based on the measurement results of the furnace body material height measuring device 30 performed after the first charge. Therefore, the calculation device 42 calculates both the first and second material volume based on the measurement results of the furnace body material height measuring device 30.
[0093] The above-described modification process of the mathematical model is performed each time additional metal raw material 1 is charged. Subsequently, the determination device 40 determines whether or not to terminate the melting operation (S009 in Figure 2), and if the melting operation is terminated (YES), the process is terminated. If the melting operation is not terminated (NO), the determination device 40 returns to the above-described determination process for the timing of additional charging and repeats the processes from S003 to S008. In this embodiment, the accuracy of the mathematical model that calculates the bulk volume of metal raw material 1 that can be charged into the furnace body 11 can be further improved.
[0094] ===Other=== Although the present invention has been described above using embodiments, the present invention is not limited to these embodiments. The scope of the present invention is determined based on the description in the appended claims, and within that scope, all configurations that omit, modify, or improve upon some of the components shown in the embodiments are included in the present invention.
[0095] For example, the above embodiment shows a case where the amount of energy is calculated using only measured voltage and current values, but the present invention is not limited to this configuration. The amount of energy supplied to the melting equipment is calculated by adding the combustion heat when combustion heat is supplied by a burner. Also, when charcoal is injected from a charcoal injection lance, the combustion heat of this charcoal is added to the calculation.
[0096] Furthermore, although the above embodiment shows a case where the determination device 40 has a furnace body raw material height measuring device 30, the present invention is not limited to this configuration. If there is no need to improve the accuracy of the mathematical model, the determination device 40 does not need to have a furnace body raw material height measuring device 30. In this case, when performing the determination process for the timing of additional charging, the value calculated using the bucket raw material bulk volume may be used as the furnace body raw material bulk volume Vfs. Specifically, for the first additional charging, the bucket raw material bulk volume calculated in S001 may be used as the furnace body raw material bulk volume Vfs, and for the second and subsequent additional charging, the sum of the bucket raw material bulk volume calculated in S003 before the previous additional charging and the theoretical unmelted bulk volume calculated in S004 before the previous additional charging may be used as the furnace body raw material bulk volume Vfs in the determination process for the timing of the current additional charging. [Explanation of Symbols]
[0097] 1 Metal raw materials 2. Molten metal 3 slags 4 Undissolved 10 Melting equipment 11 Furnace body 12 buckets 13 Power supply 14 electrodes 15. Electrical quantity measuring device 16 Hearth cover 17 Outer shell 18 Lining 19 Tilt device 20 Bucket raw material height measuring device 21 Storage Unit 22 wheels 30. Furnace body raw material height measuring device 40 Judgment device 41 Control device 42 Arithmetic unit 43 Communication equipment 90 Operator terminals
Claims
1. A melting apparatus comprising a furnace body into which metal raw materials are charged and which melt the metal raw materials by an arc generated from electrodes inserted from above, a bucket for transporting the metal raw materials and charging them into the furnace body, and a power supply device configured to measure the voltage and current values applied to the electrodes, wherein a determination device for determining when to add more metal raw materials to the furnace body, A bucket material height measuring device for measuring the height of the metal material in the bucket, A calculation device is configured to calculate the bucket material bulk volume, which is the bulk volume of the metal material in the bucket, based on the measurement results by the bucket material height measuring device, calculate the amount of energy put into the furnace body to melt the metal material using at least the measured voltage and the measured current, calculate the theoretical melting volume, which is the theoretical value of the bulk volume of the metal material that will be melted with the amount of energy, and calculate the loadable bulk volume, which is an estimated value of the bulk volume of the metal material that can be loaded into the furnace body, using the theoretical melting volume, and to determine the timing for loading additional metal material based on the comparison result of the loadable bulk volume and the bucket material bulk volume, and to output the determination result, A device for determining the timing of additional installation, characterized by being equipped with the following features.
2. The device for determining the timing of additional loading according to claim 1, characterized in that the bucket raw material height measuring device comprises a three-dimensional measuring device capable of measuring the three-dimensional shape of the surface of the metal raw material in the bucket.
3. The device for determining the timing of additional charging according to claim 1 is configured such that the calculation device calculates the actual melted volume, which is an estimated value of the volume of the metal raw material melted in the furnace body during the period between the first charging and the second charging, based on the first raw material volume, which is the bulk volume of the metal raw material in the furnace body after the first charging of the metal raw material, and the second raw material volume, which is the bulk volume of the metal raw material in the furnace body after the second charging, which is the charging of the metal raw material following the first charging, and modifies the mathematical model based on the actual melted volume.
4. The furnace body material height measuring device further comprises a device for measuring the height of the metal material inside the furnace body. The additional loading timing determination device according to claim 3, characterized in that the calculation device is configured to calculate at least the second raw material volume among the first raw material volume and the second raw material volume based on the results of measurement by the furnace body raw material height measuring device.
5. The additional loading timing determination device according to claim 4, characterized in that the furnace body raw material height measuring device is equipped with a three-dimensional measuring device capable of measuring the three-dimensional shape of the surface of the metal raw material inside the furnace body.
6. The additional loading timing determination device according to claim 4, characterized in that the furnace body raw material height measuring device is equipped with an electrode position measuring device for measuring the vertical position of the lower end of the electrode.
7. A furnace body into which metal raw materials are charged, and which melts the metal raw materials by an arc generated from electrodes inserted from above, A bucket for transporting the metal raw material and loading it into the furnace body, A power supply device configured to measure the values of the voltage and current applied to the electrodes, A dissolution apparatus comprising a device for determining the timing of additional charging according to any one of claims 1 to 6.
8. A melting apparatus comprising a furnace body into which metal raw materials are charged and which melt the metal raw materials by an arc generated from electrodes inserted from above, a bucket for transporting the metal raw materials and charging them into the furnace body, and a power supply device configured to measure the voltage and current values applied to the electrodes, wherein a determination method for determining when to add more metal raw materials to the furnace body, To measure the height of the metal raw material in the bucket, Based on the results of the height measurement, the bulk volume of the metal raw material in the bucket is calculated, and At least the amount of energy used to melt the metal raw material in the furnace body is calculated using the measured voltage and the measured current. To calculate the theoretical dissolution volume, which is the theoretical value of the bulk volume of the metal raw material dissolved by the aforementioned amount of energy, Using the theoretical dissolution volume, the chargeable volume is calculated, which is an estimated value of the bulk volume of the metal raw material that can be charged into the furnace body. Based on the comparison result between the loadable bulk volume and the bucket material bulk volume, the timing for adding the metal material is determined, and the determination result is output. A method for determining the timing of additional installation, characterized by including the following:
9. Based on the first bulk volume of the raw material, which is the bulk volume of the raw material in the furnace body after the first charging of the raw material into the furnace body, and the second bulk volume of the raw material, which is the bulk volume of the raw material in the furnace body after the second charging, which is the charging of the raw material following the first charging, the actual dissolved bulk volume, which is an estimate of the bulk volume of the raw material melted in the furnace body during the period between the first charging and the second charging, The mathematical model used to calculate the loadable bulk volume is modified based on the actual dissolving bulk volume. The method for determining the timing of additional insertion according to claim 8, further comprising:
Citation Information
Patent Citations
Computing method for optimum target total quantity of electricity supply for electric furnace and electric furnace installation
JP1996273826A
Method and apparatus for judgement of time for additional instruction of stock material into electric furnace or tapping of molten metal
JP1997133468A
Method for judging melt-down of raw material in electric furnace and device therefor
JP1997194926A
Method for melting scrap in arc furnace and melting system
JP2002146428A
Electric furnace operation control system, electric furnace, and electric furnace operation control method
JP2018070926A
