Shear reinforcement structure for connecting boxes, and method for constructing connecting boxes.
The shear reinforcement structure with intersecting steel members and bolts addresses the inadequacy of conventional methods by enhancing shear resistance and simplifying construction in underground box connections.
Patent Information
- Application Number
- JP2022145760
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Filing Date
- 2022-09-14
- Publication Date
- 2026-11-24
- Estimated Expiration
- 2042-09-14
AI Technical Summary
Conventional methods for connecting box bodies in underground structures fail to provide sufficient reinforcement against shear forces, especially in narrow spaces, leading to complex and time-consuming construction processes.
A shear reinforcement structure using intersecting shear reinforcement members, such as structural steel or steel plates, attached to the main girders of adjacent box bodies, along with longitudinal connecting bolts, to enhance shear resistance.
The solution effectively reinforces against shear forces, simplifies construction, reduces on-site work, and ensures durability by embedding materials in concrete, preventing corrosion.
Smart Images

Figure 0007955110000001 
Figure 0007955110000002 
Figure 0007955110000003
Abstract
Description
[Technical Field]
[0001] The present invention relates to a technology for forming an underground space using a lining body composed of a plurality of box bodies, and more specifically, to a connected box shear reinforcement structure that reinforces against shear force generated between connected box bodies, and a connected box construction method for constructing connected boxes using this structure. [Background Art]
[0002] Road tunnels, subway tunnels, and utility tunnels that collectively accommodate power lines in urban areas are usually installed under roads. These road tunnels are generally constructed using tunnels excavated by the pipe jacking method or shield method after ground launching shafts and ground receiving shafts are prepared in advance. Road tunnels and similar structures are often constructed by excavating a single tunnel, in other words, by providing a single through-hole in the ground.
[0003] On the other hand, large-diameter road tunnels (especially at branching and merging sections), underground malls, and subway station sections require considerable underground space to accommodate various facilities such as pedestrian passages, shops, and platforms, thus requiring the construction of tunnels with large internal cross-sections. However, there is a limit to the cross-sectional area that can be excavated by the pipe jacking method or shield method, and it is difficult to secure a large-scale space like an underground mall with only a single tunnel excavation.
[0004] Therefore, when forming such a large-scale underground space, the tunnel structure shown in Figure 13 may be adopted. In the tunnel structure shown in this figure, a lining body LN composed of a plurality (19 in the figure) of box bodies PB is formed, and this lining body LN supports the load from the ground to ensure a stable underground space US. The procedure for forming the lining body LN as shown in Figure 13 will be described below.
[0005] First, as shown in Figure 14(a), the first tunnel is constructed by installing multiple box-shaped PB structures aligned along the tunnel axis while excavating using the pipe jacking method or shield tunneling method. Since box-shaped PB structures are often rectangular (especially square), it is advisable to use an excavation machine capable of excavating rectangular cross-sections. Once the first tunnel is constructed, the second tunnel is constructed adjacent to it in the same manner as the first tunnel. At this time, the box-shaped PB structures of the second tunnel are installed while being connected to (or later connected together with) the box-shaped PB structures of the first tunnel. Then, by repeating this tunnel construction a predetermined number of times (19 in the case of Figure 13), a ring-shaped lining LN consisting of multiple (19 in the case of Figure 13) box-shaped PB structures is formed. Furthermore, as shown in Figure 14(b), a space SP is formed inside the box-shaped PB structures, so main reinforcement and distribution reinforcement are installed in this space SP, and then concrete is poured. Through these processes, a reinforced concrete lining LN is formed, and a stable underground space US is secured.
[0006] As described above, in forming the tunnel lining LN, it is necessary to connect the box bodies PB of adjacent tunnels. However, since the work must be carried out in a narrow space within the ground, the work involved in this connection has been considerably time-consuming and complicated. For this reason, various improvement techniques for this connection work have been proposed. For example, Patent Document 1 proposes a technique in which the protruding part 3 of the subsequent box body is inserted into the groove part 2 of the preceding box body, and then the subsequent box body is installed. [Prior art documents] [Patent Documents]
[0007] [Patent Document 1] Japanese Patent Publication No. 2011-256538 [Overview of the Initiative] [Problems that the invention aims to solve]
[0008] Incidentally, the completed lining body LN is subjected to loads from the ground (especially vertical loads), and shear forces are generated at the connection points where the box-shaped PB structures are linked together. Depending on the environment in which the box-shaped PB structures are constructed (such as overburden pressure and groundwater pressure), considerable shear forces may act on these connection points. However, conventional technology has rarely proposed any special reinforcement techniques to counter the shear forces acting on the lining body LN that form large underground spaces US, that is, the shear forces generated at the connection points between the box-shaped PB structures.
[0009] For example, in the case of Patent Document 1, adjacent box bodies are connected by inserting a protruding section 3 into a groove 2. As a result, the shear force generated between the box bodies is borne by the protruding section 3 (especially its web 32). However, assuming a considerable shear strength, this cannot be considered a sufficient shear reinforcement structure. Therefore, as shown in Figure 15, it is conceivable to construct a connecting concrete CN with shear reinforcement bars ST between adjacent box bodies PB. Figure 15 schematically shows a connecting concrete CN and shear reinforcement bars ST constructed between box bodies PB, where (a) is a cross-sectional view seen in the transverse direction (i.e., cut in a vertical section in the direction of the tunnel axis), and (b) is a cross-sectional view seen in the direction of the tunnel axis (i.e., cut in a vertical section in the transverse direction). Here, the direction of the tunnel axis is literally the direction of the tunnel axis (the so-called longitudinal direction), and the transverse direction is the horizontal direction perpendicular to the tunnel axis. In other words, in this example, the "U" shaped shear reinforcement bars (loop bars) are arranged in line in the direction of the tunnel axis.
[0010] If the shear reinforcement structure shown in Figure 15 is adopted, it is expected that a certain degree of shear force can be resisted by adjusting the spacing (density) of the shear reinforcement bars ST. However, if the distance between adjacent box plasterboard structures (i.e., the width of the connecting concrete CN) is narrow, the number of shear reinforcement bars ST that can be placed will be limited, and as a result, it may not be possible to create a shear reinforcement structure sufficient for considerable shear strength. In addition, if the space between adjacent box plasterboard structures is narrow, the connecting concrete CN may be in a state close to direct shear, in which case the shear reinforcement bars ST arranged in Figure 15 will not be able to perform their role. If we assume that the connecting concrete CN will be in a state of direct shear, it may be possible to use steel materials (such as reinforcing bars or structural steel) placed in the transverse direction as shear reinforcement, but in this case, a certain length is required to anchor the steel material in the concrete inside the box plasterboard structure, resulting in a significant deterioration of constructability (ensuring anchorage, supporting the steel material before concrete pouring, etc.).
[0011] The object of the present invention is to solve the problems of the prior art, namely, to provide a technology that can effectively reinforce against shear forces occurring at the connection point, even when the space between adjacent boxes is narrow. [Means for solving the problem]
[0012] The present invention focuses on the fact that shear reinforcement is provided against shear forces occurring between individual box bodies by attaching shear reinforcement members to the main girders of one adjacent individual box body and the main girders of the other individual box body, and is an invention based on an unprecedented idea.
[0013] The shear reinforcement structure for connected box bodies of the present invention is a structure that reinforces against shear forces occurring between adjacent box bodies in a connected box body in which two or more individual box bodies are connected transversely in the ground, and is equipped with connecting shear reinforcement members that are attached to adjacent individual box bodies. Each individual box body has an opening in the center when viewed in cross-section, and has main girders arranged around the opening. The shear reinforcement members are attached to the main girders of one adjacent individual box body and also to the main girders of the other adjacent individual box body.
[0014] The shear reinforcement structure of the connecting box body of the present invention may also utilize narrow members made of structural steel as shear reinforcement members. In this case, the shear reinforcement members are formed by a pair of "first shear reinforcement members and second shear reinforcement members" arranged to intersect each other. The first shear reinforcement member is positioned at an angle to the main girder and attached to the front side of the main girder in the tunnel axis direction, while the second shear reinforcement member is positioned at an angle to the main girder and attached to the rear side of the main girder in the tunnel axis direction. One or more pairs of shear reinforcement members can be attached to the same main girder.
[0015] The shear reinforcement structure for connecting boxes of the present invention may also utilize steel plates as shear reinforcement materials. One or more shear reinforcement materials may be attached to the same main girder.
[0016] The shear reinforcement structure of the connecting box body of the present invention may also include a central main girder. The central main girder is positioned midway along the tunnel axis among the individual box bodies. In this case, the shear reinforcement material is attached to the central main girder.
[0017] The shear reinforcement structure of the connecting box body of the present invention may further include longitudinal connecting bolts. In this case, the main girder is defined as the individual box body including the side main girders located at the front and rear in the tunnel axis direction, and the shear reinforcement is attached to the side main girders. The longitudinal connecting bolts then connect the front side shear reinforcement to the side main girder, and the rear side shear reinforcement to the side main girder, respectively.
[0018] The method for constructing a connected box structure according to the present invention is a method for constructing a connected box structure underground using the connected box structure shear reinforcement structure of the present invention, and comprises a preceding individual box structure installation step, a succeeding individual box structure installation step, and a shear reinforcement step. In the preceding individual box structure installation step, the preceding individual box structure is installed while excavating the ground, and in the succeeding individual box structure installation step, the succeeding individual box structure is installed while excavating the ground so as to be adjacent to the preceding individual box structure. In the shear reinforcement step, shear reinforcement is performed by attaching shear reinforcement materials to adjacent preceding and succeeding individual box structures. In the shear reinforcement step, shear reinforcement materials are attached to the opposing side main girders of adjacent preceding and succeeding individual box structures to reinforce against the shear force generated between adjacent individual box structures.
[0019] The method for constructing connected box bodies according to the present invention may also be further provided with a surveying step. In this surveying step, the distance between the position of an adjacent preceding individual box body and the position of a subsequent individual box body is measured. In this case, two or more types of shear reinforcement materials formed with different dimensions are prepared in advance. Then, in the shear reinforcement step, one type of shear reinforcement material is selected from the two or more types of shear reinforcement materials according to the distance obtained in the surveying step, and the selected shear reinforcement material is attached to the main girder. [Effects of the Invention]
[0020] The shear reinforcement structure for connecting boxes and the method for constructing connecting boxes according to the present invention have the following effects. (1) Even if the space between adjacent box sections is narrow, the connection can be effectively reinforced against the shear force generated therein. (2) In addition, it is possible to avoid complicated construction work such as arranging reinforcing bars in narrow spaces, and as a result, rapid construction and labor saving can be achieved. (3) Since the members necessary for the present invention, such as shear reinforcing materials and longitudinal connecting bolts, can generally be manufactured in factories, on-site work such as welding can be reduced. (4) Since the shear reinforcing material and the longitudinal connecting bolt are embedded in the concrete at the joint, it can be expected to avoid strength deterioration due to corrosion or the like. (5) By appropriately designing the steel materials constituting the individual boxes, that is, by adopting steel materials of appropriate material (for example, SM570, etc.), shape, and dimensions, an individual box having the intended rigidity and strength can be obtained. As a result, a connected box shear reinforcement structure composed of a plurality of individual boxes can be evaluated as a permanent structure. [Brief Description of Drawings]
[0021] [Figure 1] (a) is a cross-sectional view schematically showing a connected box, and (b) is a longitudinal view schematically showing a part of the connected box. [Figure 2] (a) is a front view of the individual box viewed in the tunnel axis direction, (b) is a cross-sectional view taken along the arrow A-A showing a part of the wall of the individual box, and (c) is a cross-sectional view taken along the arrow B-B showing a part of the wall of the individual box. [Figure 3] (a) is a side view of the individual box with the skin plate installed, viewed in the transverse direction, and (b) is a side view of the individual box with the skin plate removed, viewed in the transverse direction. [Figure 4] (a) is a cross-sectional view showing a state in which a shear reinforcing material is attached to individual boxes adjacent in the transverse direction, and (b) is a plan view showing a state in which a shear reinforcing material is attached to individual boxes adjacent in the transverse direction. [Figure 5] A cross-sectional view schematically showing a state in which two sets of shear reinforcing materials are attached to the main girder of 1. [Figure 6] (a) is a cross-sectional view schematically showing a shear reinforcing material bolted at one location per side and a central main girder, and (b) is a cross-sectional view schematically showing a shear reinforcing material bolted at two locations per side and a central main girder. [Figure 7] A schematic top view showing how shear reinforcement members 230 are attached to the front and rear opposing side main girders 212 using longitudinal connecting bolts. [Figure 8] (a) is a cross-sectional view showing the state in which shear reinforcement made of steel plates is attached to adjacent individual box bodies, and (b) is a plan view showing the state in which shear reinforcement made of steel plates is attached to adjacent individual box bodies. [Figure 9] A schematic cross-sectional view showing a main girder (1) with two shear reinforcement plates made of steel attached to it. [Figure 10] A flowchart showing the main steps of the method for constructing a connected box according to the present invention. [Figure 11] A cross-sectional view of the connection section where ground improvement has been carried out, viewed in the direction of the tunnel axis. [Figure 12] A schematic cross-sectional view showing individual box bodies connected by jointing materials. [Figure 13] A schematic cross-sectional view showing the lining structure, which consists of 19 box-shaped structures, and the underground space secured by the lining structure. [Figure 14] (a) is a schematic longitudinal section showing multiple box structures arranged in the direction of the tunnel axis, and (b) is a schematic perspective view showing adjacent box structures in the transverse direction. [Figure 15] (a) is a vertical cross-sectional view in the transverse direction schematically showing the connecting concrete and shear reinforcement constructed between box bodies, and (b) is a vertical cross-sectional view in the tunnel axis direction schematically showing the connecting concrete and shear reinforcement constructed between box bodies. [Modes for carrying out the invention]
[0022] Examples of the shear reinforcement structure for connecting boxes and the method for constructing connecting boxes according to the present invention will be explained with reference to the figures.
[0023] 1.Overview The present invention relates to a structure for reinforcing a connecting box structure for forming an underground space, and a method for constructing the reinforced connecting box structure. Figure 1 is a schematic diagram of the connecting box structure 100, where (a) is a cross-sectional view cut in a vertical plane, and (b) is a longitudinal section showing a part of the connecting box structure 100. As shown in Figure 1(a), the connecting box structure 100 is a structure in which a plurality of box structures (19 in the figure) (hereinafter referred to as "individual box structures 200" for convenience) are connected, and can form a stable underground space US by supporting loads from the surrounding ground (that is, by functioning as a lining).
[0024] As shown in Figure 1(b), a tunnel structure (hereinafter referred to as "unit tunnel 110" for convenience) is formed by the continuous arrangement of multiple individual box bodies 200. This unit tunnel 110 is constructed by providing an underground launching section (e.g., a launching shaft) and an underground receiving section (e.g., a receiving shaft), and then excavating from the underground launching section using the pipe jacking method or shield tunneling method, and continuously arranging the hollow individual box bodies 200. In other words, the connected box body 100 is a three-dimensional structure composed of multiple (19 in Figure 1) unit tunnels 110, and the underground space US is formed as a tunnel with a large cross-section. For convenience, as shown in Figure 1, the axial direction of the tunnel (unit tunnel 110 or underground space US) will be referred to as the "tunnel axis direction," and the horizontal direction perpendicular to this tunnel axis direction will be referred to as the "transverse direction."
[0025] 2. Shear reinforcement structure for connecting box bodies The shear reinforcement structure for connecting boxes of the present invention will be described. The method for constructing connecting boxes of the present invention is a method for constructing connecting boxes 100 reinforced by the shear reinforcement structure for connecting boxes of the present invention. Therefore, the shear reinforcement structure for connecting boxes of the present invention will be described first, followed by the method for constructing connecting boxes of the present invention.
[0026] (Individual box) Figure 2 is a schematic diagram of the individual box structure 200, where (a) is a front view seen in the direction of the tunnel axis, (b) is a cross-sectional view taken along arrow AA (Figure 1(a)) showing a part of the wall that constitutes the individual box structure 200, and (c) is a cross-sectional view taken along arrow BB (Figure 1(a)) showing a part of the wall. Figure 3 is a side view of the individual box structure 200 seen in the transverse direction, where (a) shows the state with the skin plate 220 installed and (b) shows the state with the skin plate 220 removed.
[0027] As shown in Figures 2(a) and 3, the individual box-shaped structure 200 has a roughly rectangular cross-section (including a rectangle) and a space (hereinafter referred to as the "opening") inside, giving it a generally box-like shape. More specifically, the individual box-shaped structure 200 is formed by connecting four walls arranged on the top, bottom, left, and right sides at their respective ends, and these four walls form an opening that penetrates in the direction of the tunnel axis. In other words, four walls are arranged around the opening. As an example of the shape of the individual box-shaped structure 200, the length (transverse direction) dimension can be 5m, the width (in the direction of the tunnel axis) dimension can be 1m, and the height dimension can be 2.5m.
[0028] Each wall surrounding the opening is formed by a main girder 210 and a skin plate 220. For example, the left and right walls, positioned horizontally, are formed by a main girder 210 and a skin plate 220, as shown in Figure 2(b). The skin plate 220 is attached to the main girder 210, which extends roughly the entire length of the left (right) wall, by welding or other means. The upper and lower walls, positioned vertically, have a similar configuration to the left and right walls, as shown in Figure 2(c). The main girder 210 can be made of steel, such as steel plates, and the skin plate 220 can also be made of steel, such as steel plates. Furthermore, as will be described later, the skin plate 220 is removed during construction (Figure 3(b)), so it is preferable to attach the skin plate 220 to the main girder 210 using a method that allows for relatively easy removal.
[0029] The main girder 210 that constitutes the wall can be formed by a central main girder 211 and side main girders 212. For example, as shown in Figure 3(b), the main girder 210 can be formed by side main girders 212 positioned at the front and rear in the tunnel axis direction, respectively, and a central main girder 211 positioned between these side main girders 212 (i.e., near the middle in the tunnel axis direction). Alternatively, the main girder 210 can be formed by various combinations of the central main girder 211 and side main girders 212 (such as the number of central main girders 211 and side main girders 212 arranged), such as forming the main girder 210 with only the central main girder 211, or forming the main girder 210 with only the front and rear side main girders 212.
[0030] Naturally, the individual box bodies 200 are designed to withstand various anticipated loads. Specifically, the length, width, and height dimensions of the individual box bodies 200 are determined based on design calculations, and the specifications such as the materials and dimensions of the walls (left wall, right wall, upper wall, and lower wall) are also determined based on design calculations. In particular, the main girders 210 that constitute the walls are the members that primarily bear external forces during service, so the material of the steel used (such as SM570), as well as the thickness and width dimensions, are designed in detail. For example, by designing the main girders 210 to have considerable rigidity and strength, the connected box bodies 100, in which concrete is finally filled into the openings, can be made of unreinforced concrete with the arrangement of structural reinforcement omitted, or of concrete with only shear reinforcement among the structural reinforcement.
[0031] (Shear reinforcement material) Figure 4 schematically shows a state in which shear reinforcement members 230 are attached to adjacent individual box bodies 200, where (a) is a cross-sectional view in the direction of the tunnel axis and (b) is a plan view of the connection part viewed from above. The individual box bodies 200 that make up the connecting box body 100 may be adjacent to each other horizontally as shown in Figure 1, or they may be adjacent vertically or diagonally, but for convenience, the example in which the individual box bodies 200 are adjacent horizontally will be explained here.Therefore, as shown in Figure 4, the one located on the left of the two adjacent individual box bodies 200 (for example, the preceding individual box body 200) will be called the left individual box body 200L, and the one located on the right (for example, the succeeding individual box body 200) will be called the right individual box body 200R.
[0032] The shear reinforcement members 230 are attached to a portion of the opposing main girders 210 of adjacent individual box bodies 200, thereby providing reinforcement against the shear force generated between the individual box bodies 200. More specifically, the shear reinforcement members 230 are attached to the main girder 210 of the right wall of the main girder 210 that constitutes the left individual box body 200L, and the shear reinforcement members 230 are attached to the main girder 210 of the left wall of the main girder 210 that constitutes the right individual box body 200R. The shear reinforcement members 230 can be attached to the main girders 210 by bolts (i.e., bolted connections) or by welding. Furthermore, if the main girder 210 is formed by a central main girder 211 and side main girders 212, the shear reinforcement members 230 can be attached to the central main girder 211, or in addition to (or instead of) the central main girder 211, the side main girders 212 can also be attached.
[0033] The shear reinforcement member 230 can be a so-called narrow member in which the length is disproportionate to the width, and can utilize structural steel such as angle steel or CT-shaped steel. In the example shown in Figure 4, channel steel is used as the shear reinforcement member 230, and is positioned at an angle to the central main girder 211, which is in a nearly vertical (including vertical) position, and is attached to the central main girder 211.
[0034] Furthermore, when the shear reinforcement member 230 is a narrow member, it is preferable to configure two narrow members as a pair. For convenience, here we will refer to one of the two narrow members as the "first shear reinforcement member 230L" and the other as the "second shear reinforcement member 230R". The first shear reinforcement member 230L and the second shear reinforcement member 230R are then attached to the main girder 210 in an X-shape, so to speak. For example, in Figure 4, the first shear reinforcement member 230L, positioned with its left end diagonally upward and its right end diagonally downward, is attached to the left central main girder 211L (central main girder 211 of the right individual box casing 200R) on its left side, and to the right central main girder 211R (central main girder 211 of the right individual box casing 200R) on its right side. On the other hand, the second shear reinforcement member 230R is positioned with its right end diagonally upward and its left end diagonally downward, and is attached to the left central main girder 211L on its left side and to the right central main girder 211R on its right side.
[0035] The first shear reinforcement 230L and the second shear reinforcement 230R should be attached so as to sandwich the main girder 210, that is, one end should be attached to one side (front) of the main girder 210 and the other end to the other side (back) of the main girder 210. For example, in Figure 4(b), the first shear reinforcement 230L is placed in front of the central main girder 211 (left central main girder 211L or right central main girder 211R) (however, in the direction of the tunnel axis), and the second shear reinforcement 230R is placed in rear of the central main girder 211 (however, in the direction of the tunnel axis), and these shear reinforcements 230 (first shear reinforcement 230L and second shear reinforcement 230R) are then attached to the central main girder 211. In Figure 4(b), the shear reinforcement 230 and the central main girder 211 are joined by bolts, but only the upper bolts are shown. This indicates that the left end (upper end) of the first shear reinforcement 230L is joined to the left central main girder 211L, and the right end (upper end) of the second shear reinforcement 230R is joined to the right central main girder 211R. It does not mean that the bolts penetrate all of the first shear reinforcement 230L, the central main girder 211, and the second shear reinforcement 230R.
[0036] A shear reinforcement 230, consisting of a first shear reinforcement 230L and a second shear reinforcement 230R as a set, can be attached to one main girder 210 as a single set, as shown in Figure 4, or two sets of shear reinforcement 230 can be attached to one main girder 210, as shown in Figure 5. Alternatively, three or more sets of shear reinforcement 230 can be attached to one main girder 210. When attaching two or more sets of shear reinforcement 230 to one main girder 210, it is preferable to arrange the first shear reinforcement 230L and the second shear reinforcement 230R in an X-shape, and furthermore, to sandwich the main girder 210 as shown in Figure 4(b), and then attach each to the main girder 210.
[0037] When joining the shear reinforcement member 230 and the main girder 210 by fastening them with bolts BN, the bolt connection can be made at one point on each side of the shear reinforcement member 230, as shown in Figure 6(a), or it can be made at two or more points (two points in the figure) on each side of the shear reinforcement member 230, as shown in Figure 6(b). If the shear strength of a single bolt BN is sufficient, the bolt connection can be made as shown in Figure 6(a), but if the shear strength of a single bolt BN is insufficient, the bolt connection as shown in Figure 6(b) will be used. Note that the bolt connection shown in Figure 6(a) results in a truss structure overall, while the bolt connection shown in Figure 6(b) results in a rigid frame structure overall.
[0038] Incidentally, the connecting box body 100 is constructed by connecting adjacent individual box bodies 200 in the transverse direction, as shown in Figure 1(a), and further by connecting adjacent individual box bodies 200 in the tunnel axis direction, as shown in Figure 1(b). When connecting adjacent individual box bodies 200 in the tunnel axis direction, it is common practice to connect opposing main girders 210 in the front and rear directions (however, in the direction of the tunnel axis) using bolts (hereinafter, especially "longitudinal connecting bolts 240"). More specifically, the front main girders 210 (especially the side main girders 212) of the main girders 210 constituting the rear individual box body 200 and the rear main girders 210 (especially the side main girders 212) of the main girders 210 constituting the front individual box body 200 are bolted together by passing through longitudinal connecting bolts 240.
[0039] In the shear reinforcement structure of the connecting box body of the present invention, the longitudinal connecting bolt 240 can also be used as a joining bolt for attaching the shear reinforcement material 230 to the main girder 210. Figure 7 is a schematic top view showing the situation in which the shear reinforcement material 230 is attached to the front and rear opposing side main girders 212 by the longitudinal connecting bolt 240. In this figure, three individual box bodies 200 that are continuous in the tunnel axis direction are shown, and each of the individual box bodies 200 shown in this figure has a main girder 210 consisting of a central main girder 211 and a front side main girder 212 (hereinafter referred to as "front side main girder 212F") and a rear side main girder 212 (hereinafter referred to as "rear side main girder 212B"). In Figure 7, only the main girders 210 (central main girder 211 and side main girders 212) of the three continuous individual box bodies 200 are shown. For convenience, the main girder 210 associated with the rearmost individual box structure 200 in the tunnel axis direction will be referred to as "rear main girder 210B," the main girder 210 associated with the frontmost individual box structure 200 will be referred to as "front main girder 210F," and the main girder 210 located between the rear main girder 210B and the front main girder 210F will be referred to as "intermediate main girder 210M."
[0040] As shown in Figure 7, the front side main girder 212F of the rear main girder 210B and the rear side main girder 212B of the intermediate main girder 210M are arranged facing each other front and rear, while the front side main girder 212F of the intermediate main girder 210M and the rear side main girder 212B of the front main girder 210F are arranged facing each other front and rear. In addition, a rear shear reinforcement member 230B (shear reinforcement member 230 for the rear main girder 210B) is placed on the front side main girder 212F of the rear main girder 210B, and a central shear reinforcement member 230M (shear reinforcement member 230 for the intermediate main girder 210M) is placed on the rear side main girder 212B of the intermediate main girder 210M. Similarly, a forward shear reinforcement 230F (shear reinforcement 230 for the forward main girder 210F) is placed on the rear side main girder 212B of the front main girder 210F, and a central shear reinforcement 230M is also placed in front of the front side main girder 212F of the intermediate main girder 210M. In this diagram, the shear reinforcement 230 is attached only to the central main girder 211 of the intermediate main girder 210M, but this is simply an omission for convenience regarding the rear main girder 210B and the front main girder 210F, and of course, shear reinforcement 230 can also be attached to the central main girder 211 of these as well.
[0041] The longitudinal connecting bolts 240 fasten the opposing front and rear main girders 210 together, and also fasten the opposing front and rear shear reinforcement members 230 together, before bolting them together. More specifically, the longitudinal connecting bolts 240 fasten and bolt together the front side main girder 212F of the rear main girder 210B and the rear shear reinforcement member 230B, and the rear side main girder 212B of the intermediate main girder 210M and the central shear reinforcement member 230M, passing through all of them. Similarly, the longitudinal connecting bolts 240 fasten and bolt together the rear side main girder 212B of the front main girder 210F and the front shear reinforcement member 230F, and the front side main girder 212F of the intermediate main girder 210M and the central shear reinforcement member 230M, passing through all of them.
[0042] In this case as well, as shown in Figure 4(a), the two shear reinforcement members 230 are arranged in an X-shape, and as shown in Figure 4(b), they are positioned to sandwich the two side main girders 212, and then attached to the side main girders 212. In other words, where the rear main girder 210B (specifically the front side main girder 212F) and the intermediate main girder 210M (specifically the rear side main girder 212B) face each other, the rear shear reinforcement 230B is designated as the second shear reinforcement 230R, and the central shear reinforcement 230M is designated as the first shear reinforcement 230L. The rear shear reinforcement 230B (i.e., the second shear reinforcement 230R) is positioned behind the rear main girder 210B (specifically the front side main girder 212F), and the central shear reinforcement 230M (i.e., the first shear reinforcement 230L) is positioned in front of the intermediate main girder 210M (specifically the rear side main girder 212B), and then each is attached to the side main girder 212. Similarly, where the intermediate main girder 210M (specifically the front side main girder 212F) and the front shear reinforcement 230F (specifically the rear side main girder 212B) face each other, the central shear reinforcement 230M is designated as the second shear reinforcement 230R, and the front shear reinforcement 230F is designated as the first shear reinforcement 230L. The central shear reinforcement 230M (i.e., the second shear reinforcement 230R) is positioned behind the intermediate main girder 210M (specifically the front side main girder 212F), while the rear shear reinforcement 230B (i.e., the first shear reinforcement 230L) is positioned in front of the front shear reinforcement 230F (specifically the rear side main girder 212B), and then both are attached to the side main girder 212.
[0043] The shear reinforcement member 230 can be made of narrow members such as structural steel, or, as shown in Figure 8, a steel plate. A shear reinforcement member 230 made of a steel plate can be attached to an adjacent individual box body 200 by, for example, attaching one end of the shear reinforcement member 230 (left side in the figure) to the left central main girder 211L with a bolt, and attaching the other end of the shear reinforcement member 230 (right side in the figure) to the right central main girder 211R with a bolt, as shown in Figure 8(a). In this case, as shown in Figure 8(b), it is preferable to arrange the two shear reinforcement members 230 so as to sandwich the main girder 210 (central main girder 211 in the figure). That is, one shear reinforcement member 230 is attached to the front surface (front) of the central main girder 211, and the other shear reinforcement member 230 is attached to the rear surface (back side) of the main girder 210.
[0044] As shown in Figure 8, the shear reinforcement members 230 made of steel plates can be attached to one main girder 210 as a single unit, or two shear reinforcement members 230 can be attached to one main girder 210 as shown in Figure 9. Alternatively, three or more shear reinforcement members 230 can be attached to one main girder 210. When attaching two or more shear reinforcement members 230 to one main girder 210, it is best to arrange them so as to sandwich the main girder 210, as shown in Figure 8(b), and then attach each to the main girder 210.
[0045] 3. Connection box construction method Next, the method for constructing the connected box according to the present invention will be explained. The method for constructing the connected box according to the present invention is a method for constructing a connected box 100 reinforced by the connected box shear reinforcement structure according to the present invention. Therefore, explanations that overlap with those explained for the connected box shear reinforcement structure according to the present invention will be avoided, and only the contents specific to the method for constructing the connected box according to the present invention will be explained. In other words, contents not described here are the same as those explained in "2. Connected Box Shear Reinforcement Structure".
[0046] Figure 10 is a flowchart showing the main steps of the method for constructing a connected box structure according to the present invention. As shown in this figure, in constructing the connected box structure 100 according to the present invention, first the underground launching section (e.g., launching shaft) and the underground arrival section (e.g., arrival shaft) are constructed (Step 301 in Figure 10). Then, other planned temporary facilities and equipment are installed, and after that, the first unit tunnel 110 is constructed (Step 302 in Figure 10). The procedure for constructing the unit tunnel 110 will be described below. Note that the excavation of the unit tunnel 110 can be carried out by the pipe jacking method, the shield tunneling method, or other conventional methods, but for convenience, the example of excavation by the pipe jacking method will be described here.
[0047] To construct a unit tunnel 110, a thrusting device is first installed in the underground launching section. Then, the thruster lowered into the underground launching section excavates the ground. However, since the individual box bodies 200 that make up the connected box bodies 100 are roughly rectangular in cross-section, it is preferable to use a thruster designed for rectangular cross-sections (rectangular thruster). As the thruster excavates the ground, the thrusting device simultaneously pushes the individual box bodies 200 in the face direction (tunnel axis direction). The individual box bodies 200 are installed so as to be aligned in the tunnel axis direction from the tunnel entrance (underground launching section) side of the thruster, and as excavation progresses, individual box bodies 200 are supplied from the underground launching section while the thrusting device pushes the entire individual box body 200. In this way, the unit tunnel 110 is constructed by repeating "ground excavation ~ thrusting of individual box bodies 200" until the thruster reaches the underground reaching section (Step 305 in Figure 10).
[0048] Once the first unit tunnel 110 is constructed, subsequent unit tunnels 110 are constructed in adjacent locations. Specifically, as described above, the ground is excavated using a thruster (rectangular thruster) (Step 303 in Figure 10), and the individual box bodies 200 are moved towards the tunnel face using thrust equipment (Step 304 in Figure 10). This series of processes (excavation of the ground ~ thrusting of the individual box bodies 200) is repeated until the thruster reaches the underground section, thereby constructing subsequent unit tunnels 110 (Step 305 in Figure 10).
[0049] When the subsequent unit tunnel 110 is constructed, that is, when the preceding unit tunnel 110 and the subsequent unit tunnel 110 are placed side by side, a section of natural ground (hereinafter referred to as the "connection section") remains between the two unit tunnels 110, as shown in Figure 11. Ultimately, concrete will be filled into this connection section as well, so it is necessary to excavate the connection section. However, in order to ensure the safety of those performing the excavation work and to prevent water leakage, the surrounding ground is improved (Step 306 in Figure 10). For example, in Figure 11, the ground is improved by injecting chemicals into the upper and lower parts of the connection section.
[0050] When ground improvement is performed at the connection point, the skin plate 220 is removed from the opening side of the individual box casing 200. At this time, only the skin plate 220 of the wall facing the individual box casing 200 is removed. For example, if two individual box casings 200 are adjacent to each other left and right, the skin plate 220 of the right wall of the left individual box casing 200L is removed, and the skin plate 220 of the left wall of the right individual box casing 200R is removed. Once the predetermined skin plates 220 are removed, the ground at the connection point is excavated from the opening side (Step 307 in Figure 10).
[0051] After excavating the ground at the connection point, a survey is conducted to confirm the placement of the preceding individual box section 200 (referred to here as the left individual box section 200L for convenience) and the following individual box section 200 (referred to here as the right individual box section 200R for convenience) (Step 308 in Figure 10). Various conventional surveying techniques, such as measurements using a total station (TS), can be used for this survey.
[0052] By surveying the individual box casings 200 to determine whether they are positioned as planned or to what extent there is an error from the planned position, the adjacent left individual box casing 200L and right individual box casing 200R are connected. When connecting the left individual box casing 200L and right individual box casing 200R, it is advisable to use a joint material 250, for example, as shown in Figure 12. This joint material 250 is a member having a web plate and flanges positioned on both sides of it, and the left individual box casing 200L and right individual box casing 200R are connected by inserting the flanges of the joint material 250 into grooves provided in a part of the individual box casing 200. Note that the joint material 250 is installed for each individual box casing 200, that is, it is installed throughout the entire unit tunnel 110. Therefore, it is advisable to install a towing device such as a winch at the underground launching or underground arrival section and use this towing device to install the joint material 250.
[0053] When the adjacent left individual box 200L and right individual box 200R are connected (Step 309 in Figure 10), shear reinforcement members 230 are attached to a portion of each main girder 210 (Step 310 in Figure 10). By attaching these shear reinforcement members 230, it is possible to reinforce against the shear force generated between the left individual box 200L and the right individual box 200R.
[0054] Incidentally, if there is an error between the planned position and the actual position as a result of surveying the individual box casing 200 (Step 308 in Figure 10), there may be cases where the shear reinforcement members 230 of the planned dimensions cannot be installed. For example, if the distance between the left individual box casing 200L and the right individual box casing 200R (hereinafter referred to as "separation") is greater than the planned value, it is possible that the shear reinforcement members 230 of the planned dimensions will not reach from the left individual box casing 200L to the right individual box casing 200R. Therefore, it is advisable to prepare in advance shear reinforcement members 230 of various planned dimensions in addition to the shear reinforcement members 230 of the planned dimensions. Depending on the results of surveying the individual box casing 200, an appropriate shear reinforcement member 230 is selected from among several types of shear reinforcement members 230, and that selected shear reinforcement member 230 is then attached to the main girder 210. Furthermore, in cases where the shear reinforcement member 230 and the main girder 210 are bolted together, it is advisable to provide multiple bolt holes in the shear reinforcement member 230. This allows for the selection of appropriate bolt holes based on the survey results of the individual box casing 200, and then the attachment of the shear reinforcement members 230 to the main girder 210. Furthermore, if a "displacement" occurs in the tunnel axial direction (longitudinal direction) between the left individual box casing 200L and the right individual box casing 200R, it is advisable to insert spacers such as washers when bolting them together before tightening.
[0055] By performing the series of steps described so far (Steps 303 to 310 in Figure 10), the preceding unit tunnel 110 and the subsequent unit tunnel 110 are connected and shear reinforcement is applied. By repeating this series of steps, a connecting box body 100, such as the one shown in Figure 1, is constructed (Step 311 in Figure 10). At this stage, the openings of the individual box bodies 200 that make up the connecting box body 100 remain hollow, and the connecting box body 100 is, so to speak, an "outer shell". Depending on the design conditions, this outer shell can be considered the completed form of the connecting box body 100, but usually concrete is filled into the openings of the individual box bodies 200 and into the connections between adjacent individual box bodies 200. In this case, first, the necessary reinforcing bars (e.g., shear reinforcement bars) are placed (Step 312 in Figure 10), and then concrete with a predetermined strength (e.g., high-strength concrete) is filled into the openings and connections (Step 313 in Figure 10).
[0056] Once the filled concrete has hardened sufficiently, the concrete connecting box 100 is completed (Step 314 in Figure 10), and by excavating the inside of the connecting box 100 (Step 315 in Figure 10), the underground space US is formed (Step 316 in Figure 10). [Industrial applicability]
[0057] The shear reinforcement structure for connecting box bodies and the method for constructing connecting box bodies of the present invention can be used in the construction of underground shopping malls and subway stations, as well as road tunnels, railway tunnels, water and sewage tunnels, utility tunnels, and power and telecommunications tunnels. Considering that the present invention enables the efficient construction of tunnel structures, which are social infrastructure, it can be said that this invention is not only industrially applicable but also has the potential to make a significant contribution to society. [Explanation of Symbols]
[0058] 100 connected box 110 Unit Tunnel 200 individual boxes 200L (Left individual box of individual boxes) 200R (Among the individual boxes) Right individual box 210 (Main girder of individual box) 210B (of the main girders) rear main girder 210M (Intermediate main girder of the main girder) 210F (Front main girder of the main girder) 211 (Central main girder of the main girders) 211L (of the central main girders) Left central main girder 211R (of the central main girders) Right central main girder 212 Side main girder (of the main girder) 212B (of the side main girders) Rear side main girder 212F (Front side main girder of the side main girder) 220 Skin Plates 230 Shear reinforcement 230B (of the lateral shear reinforcement members) posterior shear reinforcement members 230M (Central shear reinforcement among lateral shear reinforcements) 230F (Among the lateral shear reinforcements) Forward shear reinforcement 230L (First shear reinforcement among the lateral shear reinforcements) 230R (of the lateral shear reinforcement members) Second shear reinforcement member 240 Longitudinal connecting bolts 250 fittings BN Bolt CN connection section concrete LN lining PB box SP space ST Shear Muscle US underground space
Claims
1. A structure that reinforces against shear forces occurring between adjacent individual boxes in a connected box structure, which is formed by linking two or more individual boxes constructed underground, The adjacent individual box is equipped with a shear reinforcement member, The aforementioned individual box has an opening in the center when viewed in cross-section, and has main girders arranged around the opening. Two opposing main girders of adjacent individual boxes are arranged so as to be perpendicular or substantially perpendicular to the adjacent direction of the individual boxes. The shear reinforcement members are attached to each of the two opposing main girders. A shear reinforcement structure for connecting boxes, characterized by the following features.
2. The aforementioned shear reinforcement is a narrow member made of structural steel, and is formed by a pair of first and second shear reinforcement members arranged to intersect each other. The first shear reinforcement member is positioned at an inclination with respect to the main girder and attached to the front side of the main girder in the tunnel axis direction. The second shear reinforcement member is positioned at an inclination with respect to the main girder and attached to the rear side of the main girder in the tunnel axis direction. One or more sets of the shear reinforcement members are attached to the same main girder. The shear reinforcement structure for connecting boxes according to feature 1.
3. Two or more sets of shear reinforcement members are attached to the same main girder, The shear reinforcement structure for connecting boxes according to feature 2.
4. The main girder includes side main girders that are positioned at the front and rear in the tunnel axis direction of the individual box structure. The tunnel further includes longitudinal connecting bolts that connect the front and rear opposing side main girders of the individual box bodies adjacent in the tunnel axis direction, The shear reinforcement member is attached to the side main girder. The longitudinal connecting bolts connect the front side main girder, the rear side main girder, and the shear reinforcement member by sewing them together. The shear reinforcement structure for connecting boxes according to feature 2.
5. The aforementioned shear reinforcement is a steel plate. The shear reinforcement structure for connecting boxes according to feature 1.
6. A method for constructing a connected box structure underground, which consists of two or more individual boxes connected together, The aforementioned individual box has an opening in the center when viewed in cross-section, and has main beams arranged around the opening. The process involves installing the preceding individual box structures while excavating the ground, A subsequent individual box installation process involves excavating the ground while installing subsequent individual box bodies adjacent to the preceding individual box bodies, The process includes a shear reinforcement step of attaching shear reinforcement members to adjacent preceding individual box bodies and subsequent individual box bodies, In the subsequent individual box installation step, two opposing main girders from the adjacent preceding individual box and the subsequent individual box are arranged so as to be perpendicular or substantially perpendicular to the adjacent direction of the individual boxes. In the shear reinforcement step, the shear reinforcement material is attached to each of the two opposing main girders to reinforce against the shear force generated between adjacent individual box bodies. A method for constructing a connected box, characterized by the features described herein.
7. Prepare two or more types of shear reinforcement materials formed with different dimensions, The system further includes a surveying step for measuring the distance between the position of an adjacent preceding individual box and the position of a subsequent individual box. In the shear reinforcement step, one shear reinforcement material is selected from two or more types of shear reinforcement materials according to the separation obtained in the surveying step, and the selected shear reinforcement material is attached to the main girder. The method for constructing a connected box according to claim 6, characterized in that it is as described above.
Citation Information
Patent Citations
Segment made of steel and execution method of tunnel lining body
JP1999270294A
Construction method for branching and meeting parts between main line tunnel and rampway
JP1999350895A
Segment connecting structure and arrangement structure
JP2007277953A
Connection method of case body
JP2011256538A
Lining skeleton structure and construction method thereof
JP2020079490A
