Work site determination system and work site determination method

The work site determination system assesses terrain and obstacle data to determine the suitability of slot dozing by evaluating excavation lane angles, enhancing the safety and efficiency of excavation operations.

JP7955141B2Active Publication Date: 2026-11-24KOMATSU LTD
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
JP2022180995
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Filing Date
2022-11-11
Publication Date
2026-11-24
Estimated Expiration
2042-11-11

AI Technical Summary

Technical Problem

Slot dozing operations can be challenging due to varying terrain conditions, making it difficult to determine the appropriateness of performing such tasks.

Method used

A work site determination system that includes a current terrain data receiving unit and a determination unit to assess the inclination angle of excavation lanes for slot dozing, using sensors to gather data on terrain and obstacles, and a management device to determine the suitability of slot dozing based on these angles.

Benefits of technology

Enables effective determination of whether slot dozing is appropriate by evaluating terrain and obstacle data, ensuring safe and efficient excavation operations.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007955141000001
    Figure 0007955141000001
  • Figure 0007955141000002
    Figure 0007955141000002
  • Figure 0007955141000003
    Figure 0007955141000003
Patent Text Reader

Abstract

To provide a work site determination system capable of determining whether or not slot dozing is appropriate.SOLUTION: The work site determination system includes: a current terrain data receiver that receives current terrain data of a work site where a bulldozer slot dozes; and a determination unit that determines whether or not slot dozing should be performed based on at least a portion of the inclination angle of a slot-dozing excavation lane.SELECTED DRAWING: Figure 9
Need to check novelty before this filing date? Find Prior Art

Description

[Technical Field]

[0001] The present disclosure relates to a work site determination system and a work site determination method. [Background Art]

[0002] In the technical field related to work machines, slot dozing as disclosed in Patent Document 1 is known. [Prior Art Documents] [Patent Documents]

[0003] [Patent Document 1] Japanese Unexamined Patent Application Publication No. 2019-214868 [Summary of the Invention] [Problem to be Solved by the Invention]

[0004] For example, depending on the terrain of the work site, it may be difficult to perform slot dozing.

[0005] An object of the present disclosure is to determine whether slot dozing is appropriate to perform. [Means for Solving the Problem]

[0006] According to the present disclosure, there is provided a work site determination system including: a current terrain data receiving unit that receives current terrain data of a work site where a bulldozer performs slot dozing; and a determination unit that determines whether slot dozing is appropriate to perform based on an inclination angle of at least a part of an excavation lane for slot dozing. [Effect of the Invention]

[0007] According to the present disclosure, it is possible to determine whether slot dozing is appropriate to perform. [Brief Description of Drawings]

[0008] [Figure 1]Figure 1 is a schematic diagram showing a work site management system according to an embodiment. [Figure 2] Figure 2 is a schematic side view showing a work machine according to an embodiment. [Figure 3] Figure 3 is a schematic plan view showing the three-dimensional sensor and obstacle sensor according to the embodiment. [Figure 4] Figure 4 is a schematic diagram illustrating an example of the operation of a work machine according to the embodiment. [Figure 5] Figure 5 is a block diagram showing the determination system of a work machine according to an embodiment. [Figure 6] Figure 6 is a diagram illustrating the stored data in the current terrain data storage unit according to this embodiment. [Figure 7] Figure 7 is a diagram illustrating the method for calculating the inclination angle of the excavation lane according to the embodiment. [Figure 8] Figure 8 is a diagram illustrating the method for calculating the position of an obstacle according to the embodiment. [Figure 9] Figure 9 shows the display data displayed on the display device according to the embodiment. [Figure 10] Figure 10 is a flowchart showing a method for displaying a work site according to an embodiment. [Figure 11] Figure 11 is a flowchart showing a method for displaying a work site according to an embodiment. [Figure 12] Figure 12 is a block diagram showing a computer system according to an embodiment. [Modes for carrying out the invention]

[0009] The embodiments of this disclosure will be described below with reference to the drawings, but this disclosure is not limited to these embodiments. The components of the embodiments described below can be combined as appropriate. In addition, some components may not be used.

[0010] [Management System] Figure 1 is a schematic diagram showing a work site management system 1 according to an embodiment. In this embodiment, the work site is a mine. A mine is a place or business establishment where minerals are extracted. Examples of mines include metal mines where metals are extracted, non-metallic mines where limestone is extracted, and coal mines where coal is extracted. Multiple work machines 2 are in operation at the work site. In this embodiment, the work machines 2 are bulldozers. The work machines 2 perform predetermined tasks at the work site. Examples of tasks performed by the work machines 2 include excavation, earthmoving, and leveling.

[0011] Management system 1 comprises a management device 3 and a communication system 4. Management device 3 includes a computer system. Management device 3 is located outside the work machine 2. Management device 3 is installed in the control facility 5 at the work site. Management device 3 manages the work site and the work machine 2. An administrator is located in the control facility 5. Examples of communication system 4 include the internet, a mobile phone network, a satellite network, or a local area network (LAN). An example of a local area network is Wi-Fi®, a standard for wireless LANs.

[0012] The work machine 2 has a control device 6 and a wireless communication device 4A. The control device 6 includes a computer system. The wireless communication device 4A is connected to the control device 6. The communication system 4 includes the wireless communication device 4A connected to the control device 6 and the wireless communication device 4B connected to the management device 3. The management device 3 and the control device 6 of the work machine 2 communicate wirelessly via the communication system 4.

[0013] [Working machinery] FIG. 2 is a side view schematically showing the work machine 2 according to the embodiment. As shown in FIG. 2, the work machine 2 includes a vehicle body 7, a travel device 8, an excavation work machine 9, a ripper work machine 10, a position sensor 11, an inclination sensor 12, a three-dimensional sensor 13, and an obstacle sensor 14. The vehicle body 7 includes an engine room 15. An engine 16 is accommodated in the engine room 15. The engine 16 is a drive source of the work machine 2. The travel device 8 supports the vehicle body 7 and travels. The travel device 8 has a pair of crawler belts 17. The work machine 2 travels as the crawler belts 17 rotate.

[0014] The excavation work machine 9 performs excavation work, earth-pushing work, or ground-leveling work on a work target. The excavation work machine 9 is attached to the vehicle body 7. At least a part of the excavation work machine 9 is arranged in front of the vehicle body 7. The excavation work machine 9 includes an excavation blade 18, a lift frame 19, a tilt cylinder 20, and a lift cylinder 21.

[0015] The excavation blade 18 is arranged in front of the vehicle body 7. The excavation blade 18 includes a cutting edge 18A. The lift frame 19 supports the excavation blade 18. One end of the lift frame 19 is connected to the back surface of the excavation blade 18 via a rotation mechanism. The other end of the lift frame 19 is connected to the vehicle body 7 via a rotation mechanism. The other end of the lift frame 19 may be connected to the travel device 8 via a rotation mechanism.

[0016] Each of the tilt cylinder 20 and the lift cylinder 21 operates the excavation blade 18. The tilt cylinder 20 drives the excavation blade 18 to perform a tilting operation. The lift cylinder 21 drives the excavation blade 18 to move up and down. One end of the tilt cylinder 20 is connected to the rear surface of the excavation blade 18 via a rotation mechanism. The other end of the tilt cylinder 20 is connected to the upper surface of the lift frame 19. As the tilt cylinder 20 expands and contracts, the tilt angle of the excavation blade 18 changes. One end of the lift cylinder 21 is connected to the lift frame 19 via a rotation mechanism. The other end of the lift cylinder 21 is connected to the vehicle body 7 via a rotation mechanism. As the lift cylinder 21 expands and contracts, the excavation blade 18 moves in the vertical direction.

[0017] The ripper work implement 10 performs a ripping operation including cutting or crushing of a work target. The ripper work implement 10 is attached to the vehicle body 7. At least a part of the ripper work implement 10 is arranged behind the vehicle body 7. The ripper work implement 10 includes a shank 22, a ripper arm 23, a tilt cylinder 24, a lift cylinder 25, and a beam 26. The shank 22 is arranged behind the vehicle body 7. The shank 22 has a ripper point 22A. The ripper point 22A is provided at the tip of the shank 22. The ripper arm 23 supports the shank 22. The ripper arm 23 connects the vehicle body 7 and the shank 22. One end of the ripper arm 23 is connected to the rear portion of the vehicle body 7 via a rotation mechanism. The other end of the ripper arm 23 is connected to the beam 26. The beam 26 is rotatably connected to the ripper arm 23. The shank 22 is connected to the ripper arm 23 via the beam 26.

[0018] The tilt cylinder 24 and the lift cylinder 25 each operate the shank 22. The tilt cylinder 24 and the lift cylinder 25 are each connected to the vehicle body 7. The tilt cylinder 24 drives the shank 22 to tilt. The lift cylinder 25 drives the shank 22 to move up and down. One end of the tilt cylinder 24 is connected to the beam 26 via a pivot mechanism. The other end of the tilt cylinder 24 is connected to the rear of the vehicle body 7. As the tilt cylinder 24 extends and retracts, the tilt angle of the shank 22 changes. The tilt cylinder 24 moves the shank 22 in the front-rear direction. One end of the lift cylinder 25 is connected to the beam 26 via a pivot mechanism. The other end of the lift cylinder 25 is connected to the rear of the vehicle body 7. As the lift cylinder 25 extends and retracts, the shank 22 moves in the up-and-down direction. The lift cylinder 25 moves the shank 22 in the up-and-down direction.

[0019] The ripper work machine 10 pierces the workpiece with its ripper point 22A. As the traveling device 8 moves with the ripper point 22A embedded in the workpiece, the workpiece is cut or crushed. The shank 22 may move vertically and longitudinally while the traveling device 8 is moving.

[0020] The position sensor 11 detects the position of the work machine 2. The position of the work machine 2 is detected using the Global Navigation Satellite System (GNSS). The Global Navigation Satellite System includes the Global Positioning System (GPS). The Global Navigation Satellite System detects the position in a global coordinate system defined by latitude, longitude, and altitude coordinate data. A global coordinate system refers to a coordinate system fixed to the Earth. The position sensor 11 includes a GNSS receiver. The position sensor 11 detects the position of the work machine 2 in the global coordinate system. The position sensor 11 is located on the vehicle body 7.

[0021] The tilt sensor 12 detects the tilt of the vehicle body 7. The tilt sensor 12 detects the tilt angle of the vehicle body 7 with respect to the horizontal plane. The tilt sensor 12 includes an inertial measurement unit (IMU). The tilt sensor 12 is positioned on the vehicle body 7.

[0022] The 3D sensor 13 detects the 3D shape of the object to be detected. The 3D sensor 13 detects the 3D shape of the object without contacting it. The object to be detected by the 3D sensor 13 includes the work site. The 3D sensor 13 detects the 3D shape of the work site. The 3D shape of the work site includes the terrain of the work site. The 3D sensor 13 detects the distance to the surface of the object to be detected. The 3D sensor 13 detects the 3D shape of the surface of the object to be detected by detecting the relative distance to each of the multiple detection points on the surface of the object to be detected. The 3D data showing the 3D shape of the object to be detected includes point cloud data consisting of multiple detection points. The 3D data includes the relative distance and relative position between the 3D sensor 13 and each of the multiple detection points defined on the object to be detected. The 3D data includes height data for each of the multiple detection points. An example of the 3D sensor 13 is a laser sensor (LIDAR: Light Detection and Ranging) that detects the object by emitting laser light. Note that the 3D sensor 13 may also be a 3D camera such as a stereo camera. The 3D sensor 13 is positioned on the vehicle body 7.

[0023] The obstacle sensor 14 detects obstacles to the work machine 2 present at the work site. The obstacle sensor 14 detects obstacles without contact. An example of the obstacle sensor 14 is a radar sensor (RADAR: Radio Detection and Ranging) that detects obstacles by emitting radio waves. Alternatively, the obstacle sensor 14 may be an infrared sensor that detects obstacles by emitting infrared light. The obstacle sensor 14 is positioned on the vehicle body 7.

[0024] Figure 3 is a schematic plan view showing a 3D sensor 13 and an obstacle sensor 14 according to an embodiment. As shown in Figure 3, the 3D sensor 13 has a detection range 130. The 3D sensor 13 detects 3D data of an object to be detected located within the detection range 130. In this embodiment, the 3D sensor 13 includes a 3D sensor 13F that detects 3D data in front of the vehicle body 7 and a 3D sensor 13B that detects 3D data behind the vehicle body 7. The detection range 130 of the 3D sensor 13 includes the detection range 130F of the 3D sensor 13F and the detection range 130B of the 3D sensor 13B. At least a portion of the detection range 130F is defined in front of the excavating machine 9. At least a portion of the detection range 130B is defined behind the ripper machine 10.

[0025] As shown in Figure 3, the obstacle sensor 14 has a detection range 140. The obstacle sensor 14 detects obstacles located within the detection range 140. In this embodiment, the obstacle sensor 14 detects obstacles behind the vehicle body 7. The obstacle sensor 14 includes an obstacle sensor 14L located to the left of the center of the vehicle body 7 in the left-right direction, and an obstacle sensor 14R located to the right. The detection range 140 of the obstacle sensor 14 includes the detection range 140L of the obstacle sensor 14L and the detection range 140R of the obstacle sensor 14R. At least a portion of the detection range 140L and at least a portion of the detection range 140R are defined behind the vehicle body 7. At least a portion of the detection range 140L is defined to the left of the vehicle body 7. At least a portion of the detection range 140R is defined to the right of the vehicle body 7.

[0026] [Operation of the work machine] Figure 4 is a schematic diagram showing an example of the operation of the work machine 2 according to the embodiment. In this embodiment, the work machine 2 can perform slot dozing. Slot dozing is a construction method in which the work machine 2 excavates the work object by repeatedly moving forward and backward along a slot-shaped excavation lane formed in the work object. In this embodiment, the work machine 2 performs slot dozing by automatic control. As shown in Figure 4, the work machine 2 performs slot dozing so that the current terrain takes shape along the final design plane 27Z. In the example shown in Figure 4, in the first excavation, the work machine 2 excavates the work object with the excavating machine 9 while moving forward from the excavation start point 27S so that the current terrain takes shape along the first intermediate design plane 27A. After the first excavation is completed, the work machine 2 moves backward to return to the excavation start point 27S. In the second excavation, the work machine 2 excavates the work object with the excavating machine 9 while moving forward from the excavation start point 27S so that the current terrain takes shape along the second intermediate design plane 27B. The work machine 2 repeatedly moves forward and backward until the current terrain is shaped to conform to the final design plane 27Z.

[0027] The automatic control of the work machine 2 may be semi-automatic control performed in conjunction with manual operation by an operator, or it may be fully automatic control performed without manual operation. In the case of semi-automatic control, the operating device for manual operation may be mounted on the work machine 2 and operated by an operator who is on board the work machine 2. Alternatively, the operating device for manual operation may be located outside the work machine 2 and operated remotely by an operator who is outside the work machine 2.

[0028] [Judgment System] Figure 5 is a block diagram showing the determination system 100 of the work machine 2 according to the embodiment. The management system 1 includes the determination system 100. The determination system 100 determines whether or not to perform slot dosing. The determination system 100 includes a control device 6, a position sensor 11, a tilt sensor 12, a three-dimensional sensor 13, an obstacle sensor 14, a management device 3, an input device 40, and a display device 41. The control device 6 includes a position data acquisition unit 61, a three-dimensional data acquisition unit 62, an obstacle data acquisition unit 63, a current terrain data creation unit 64, and a current terrain data storage unit 65. The management device 3 includes a current terrain data receiving unit 31, an obstacle data receiving unit 32, a current terrain data creation unit 33, a current terrain data storage unit 34, an excavation lane setting unit 35, a determination unit 36, and a display control unit 37.

[0029] The position data acquisition unit 61 acquires position data indicating the current position of the work machine 2. The current position of the work machine 2 includes detection data from the position sensor 11. The position data acquisition unit 61 acquires the detection data from the position sensor 11 as position data.

[0030] The 3D data acquisition unit 62 acquires 3D data showing the 3D shape of the work site where the work machine 2 operates. The 3D data of the work site includes detection data from the 3D sensor 13. The 3D data acquisition unit 62 acquires the detection data from the 3D sensor 13 as 3D data. The position data acquisition unit 61 acquires posture data showing the posture of the work machine 2. The posture of the work machine 2 includes detection data from the tilt sensor 12. The position data acquisition unit 61 acquires the detection data from the tilt sensor 12 as posture data.

[0031] The obstacle data acquisition unit 63 acquires obstacle data indicating obstacles present at the work site. The obstacle data acquisition unit 63 acquires obstacle data indicating obstacles present around the work machine 2. The obstacle data includes detection data from the obstacle sensor 14. The obstacle data acquisition unit 63 acquires detection data from the obstacle sensor 14 as obstacle data. The obstacle data may also include 3D data indicating the 3D shape of the object detected by the 3D sensor 13. The obstacle data acquisition unit 63 may acquire the position obtained by integrating the representative point of the parking structure detected from the point cloud data included in the 3D data with the detection data from the obstacle sensor 14 as obstacle data.

[0032] The current terrain data creation unit 64 creates current terrain data of the work site based on the 3D data acquired by the 3D data acquisition unit 62, the position data acquisition unit 61 which shows the current position of the work machine 2, and the position data acquisition unit 61 which shows the posture of the work machine 2. The current terrain data creation unit 64 also creates current terrain data of the work site based on the detection data from the 3D sensor 13, the detection data from the position sensor 11, and the detection data from the tilt sensor 12.

[0033] The current terrain data storage unit 65 stores the current terrain data of the work site created by the current terrain data creation unit 64.

[0034] The current terrain data receiving unit 31 receives current terrain data of the work site from the current terrain data storage unit 65 via the communication system 4. As described above, there are multiple work machines 2 at the work site. Each of the multiple work machines 2 transmits the current terrain data stored in the current terrain data storage unit 65 to the management device 3 via the communication system 4. The current terrain data receiving unit 31 receives the current terrain data transmitted from each of the multiple work machines 2.

[0035] The obstacle data receiving unit 32 receives obstacle data from the obstacle data acquisition unit 63 via the communication system 4. Each of the multiple work machines 2 transmits obstacle data to the management device 3 via the communication system 4. The obstacle data receiving unit 32 receives the obstacle data transmitted from each of the multiple work machines 2.

[0036] The current terrain data creation unit 33 creates current terrain data for the work site based on the current terrain data received by the current terrain data receiving unit 31. The current terrain data creation unit 33 integrates the current terrain data transmitted from each of the multiple work machines 2 to create current terrain data for the work site. The current terrain data storage unit 34 stores the current terrain data created by the current terrain data creation unit 33. Each of the multiple work machines 2 transmits current terrain data to the management device 3 at predetermined time intervals. Each of the multiple work machines 2 transmits current terrain data to the management device 3, for example, every second. The current terrain data creation unit 33 creates current terrain data each time it receives current terrain data. Each time the current terrain data creation unit 33 creates current terrain data, the current terrain data stored in the current terrain data storage unit 34 is updated.

[0037] The drilling lane setting unit 35 sets the drilling lanes for slot dosing. As described above, the work machine 2 can perform slot dosing at the work site. In slot dosing, the work machine 2 excavates the work object by repeatedly moving forward and backward along the slot-shaped drilling lanes formed in the work object. The manager can set the drilling lanes by operating the input device 40. Examples of the input device 40 include a computer keyboard, touch panel, or mouse. The drilling lane setting unit 35 sets the drilling lanes based on the input data generated by the operation of the input device 40.

[0038] The determination unit 36 ​​determines whether or not to perform slot dozing based on the inclination angle of at least a portion of the drilling lane for slot dozing.

[0039] The display control unit 37 causes the current terrain data received by the current terrain data receiving unit 31 to be displayed on the display device 41. Examples of the display device 41 include a flat panel display such as a liquid crystal display or an organic EL display.

[0040] [Stored data] Figure 6 is a diagram illustrating the stored data in the current terrain data storage unit 65 according to the embodiment. As shown in Figure 6, the 3D data of the work site includes the height data of each of the multiple detection points 28 defined on the surface of the terrain of the work site. Based on the current position of the work machine 2 when the 3D data was acquired, the orientation of the work machine 2, and the 3D data, the position of each of the multiple detection points 28 in the global coordinate system is determined. The position of the detection points 28 may be defined in the global coordinate system or in a predetermined coordinate system such as the local coordinate system set for the work machine 2. Time data indicating the time is assigned to each of the multiple detection points 28. The time indicated by the time data refers to the time when the 3D data acquisition unit 62 acquired the detection point 28, or the time when the position data acquisition unit 61 acquired the position data corresponding to the detection point 28. The time in the time data may be considered as the time when the 3D sensor 13 detected the detection point 28. The time data is stored in association with each of the multiple detection points 28. In addition, attribute data indicating the attributes is assigned to each of the multiple detection points 28. The attributes indicated by the attribute data refer to the attributes of the detection point 28. The attributes of the detection point 28 include attributes related to the terrain of the work site and attributes related to obstacles present at the work site. The attribute data is stored in association with each of the multiple detection points 28.

[0041] [Method for calculating the slope angle of the excavation lane] Figure 7 is a diagram illustrating the method for calculating the inclination angle of the excavation lane 42 according to the embodiment. As described above, the excavation lane 42 is set by the administrator. The determination unit 36 ​​calculates the inclination angle of the ground of the excavation lane 42 based on the excavation lane 42 and the current terrain data inside the excavation lane 42. The inclination angle of the excavation lane 42 includes at least a portion of the inclination angle in the direction of travel (longitudinal direction) of the excavation lane 42. The inclination angle of the excavation lane 42 includes at least a portion of the inclination angle in the width direction (short direction) of the excavation lane 42.

[0042] When calculating the inclination angle in the direction of travel, the determination area for determining the inclination angle is set in the direction of travel. In the example shown in Figure 7, the determination area is the area between the first position 43 and the second position 44 set in the excavation lane 42. In the direction of travel of the excavation lane 42, the first position 43 and the second position 44 are set at different positions from each other. The determination unit 36 ​​calculates the inclination angle between the first position 43 and the second position 44 based on the current terrain data. The inclination angle of the determination area is the difference between the height of the first position 43 and the height of the second position 44. After calculating the inclination angle of the determination area between the first position 43 and the second position 44, the determination unit 36 ​​moves the determination area by a predetermined distance Um in the direction of travel. After moving the determination area by a predetermined distance Um in the direction of travel, the determination unit 36 ​​calculates the inclination angle of the determination area after the move. The determination unit 36 ​​repeats the movement of the determination area in the direction of travel and the calculation of the inclination angle of the determination area after the move. This allows the angle of inclination to be calculated for each of the multiple determination areas set in the direction of travel of the excavation lane 42. The determination unit 36 ​​also calculates the angle of inclination in the width direction of the excavation lane 42. The determination unit 36 ​​calculates the angle of inclination in the width direction for each of the multiple determination areas set at different positions in the direction of travel. This allows the angle of inclination to be calculated for each of the multiple determination areas set in both the direction of travel and the width direction of the excavation lane 42.

[0043] The determination unit 36 ​​determines whether or not slot dosing can be performed based on the inclination angle calculated for each determination area in the direction of travel and the width direction of the excavation lane 42. For example, if the inclination angle in the width direction is greater than or equal to a predetermined threshold, the determination unit 36 ​​determines that slot dosing cannot be performed in that excavation lane 42. The threshold is, for example, 30 degrees with respect to the horizontal plane. The determination unit 36 ​​may also determine that slot dosing cannot be performed in that excavation lane 42 if the inclination angle in the direction of travel is greater than or equal to a predetermined threshold.

[0044] [Method for calculating the position of obstacles] Figure 8 is a diagram illustrating the method for calculating the position of an obstacle according to an embodiment. The obstacle data receiving unit 32 receives obstacle data indicating obstacles present at the work site. The obstacle data receiving unit 32 receives obstacle data from each of the multiple work machines 2. The obstacle data indicates the position of the part of the obstacle.

[0045] As shown in Figure 8, multiple parts 45 of a single obstacle may be detected by mutually different obstacle sensors 14. In the example shown in Figure 8, the obstacle data receiving unit 32 may receive obstacle data indicating a first part 45A of the obstacle detected by the first obstacle sensor 14, or the first obstacle sensor 14 and the first 3D sensor 13; obstacle data indicating a second part 45B of the obstacle detected by the second obstacle sensor 14, or the second obstacle sensor 14 and the second 3D sensor 13; and obstacle data indicating a third part 45C of the obstacle detected by the third obstacle sensor 14, or the third obstacle sensor 14 and the third 3D sensor 13. When multiple obstacle data indicating each of the multiple parts 45 of a single obstacle are received, the obstacle data receiving unit 32 integrates the multiple obstacle data into a single obstacle data. In this embodiment, the obstacle data receiving unit 32 integrates the parts 45 indicated by the multiple obstacle data into a single location if the relative distance between the multiple obstacle data is less than or equal to a predetermined value. The obstacle data receiving unit 32 determines the centroid position of the multiple obstacle data as the location of the obstacle if the relative distance between the multiple obstacle data is less than or equal to a predetermined value.

[0046] [Display device] Figure 9 shows the display data displayed on the display device 41 according to the embodiment. As shown in Figure 9, the display control unit 37 causes the display device 41 to display the current terrain data received by the current terrain data receiving unit 31. The display control unit 37 also causes the display device 41 to display the excavation lanes 42 set by the excavation lane setting unit 35 together with the current terrain data. In the example shown in Figure 9, the first excavation lane 42A and the second excavation lane 42B are displayed on the display device 41.

[0047] The display control unit 37 causes the display device 41 to display a first predetermined area 46 in the excavation lane 42 where the inclination angle in the direction of travel is greater than or equal to a threshold, in a first display mode. In the example shown in Figure 9, the first predetermined area 46 is located in the second excavation lane 42B. The first predetermined area 46 is displayed in yellow, for example. The display control unit 37 also causes the display device 41 to display a second predetermined area 47 in the excavation lane 42 where the inclination angle in the width direction is greater than or equal to a threshold, in a second display mode. In the example shown in Figure 9, the second predetermined area 47 is located in the first excavation lane 42A. The second predetermined area 47 is displayed in red, for example.

[0048] The first predetermined area 46 is considered to be a cliff located in the second excavation lane 42B. The display control unit 37 causes the display device 41 to display a first symbol 48 indicating the location of the cliff in the second excavation lane 42B of the slot dozing, along with the current terrain data. The first symbol 48 may be, for example, a yellow triangular icon. The display control unit 37 displays the first symbol 48 at the center in the width direction of the second excavation lane 42B. In the example shown in Figure 9, there are multiple first predetermined areas 46 in the direction of travel of the second excavation lane 42B. The display control unit 37 displays the first symbol 48 at the location of the cliff closest to the excavation start point 27S of the slot dozing, among the multiple cliffs (first predetermined areas 46) located in the second excavation lane 42B. If there is only one cliff in the second excavation lane 42B, the display control unit 37 may display the first symbol 48 at the location of that cliff.

[0049] The display control unit 37 causes the display device 41 to display a second symbol 49 indicating the location of an obstacle present at the work site. The second symbol 49 may be, for example, a red triangular icon. As explained with reference to Figure 8, if the relative distance between multiple obstacle data is less than or equal to a predetermined value, the display control unit 37 displays the second symbol 49 at the centroid position of the multiple obstacle data. If the relative distance between multiple obstacle data is less than or equal to a predetermined value, the display control unit 37 may also display the second symbol 49 at any position in the region obtained by integrating the parts 45 indicated by the multiple obstacle data into a single position.

[0050] As described above, the determination unit 36 ​​determines that slot dosing cannot be performed if the inclination angle in the width direction of the drilling lane 42 is greater than or equal to a threshold. In the example shown in Figure 9, if the inclination angle of the second predetermined area 47 of the first drilling lane 42A is greater than or equal to a threshold, the determination unit 36 ​​determines that slot dosing cannot be performed in the first drilling lane 42A. The display control unit 37 causes the display device 41 to display "unavailable" display data 50 indicating that it has been determined that slot dosing cannot be performed. In the example shown in Figure 9, the display control unit 37 displays character data indicating that slot dosing cannot be performed in the first drilling lane 42A as "unavailable" display data 50 on the display device 41. In the example shown in Figure 9, the display control unit 37 may also display the first symbol 48 at the position of the second predetermined area 47 closest to the drilling start point 27S of the slot dosing.

[0051] [Display method] Figures 10 and 11 are flowcharts illustrating a method for displaying a work site according to an embodiment. As shown in Figure 10, the current terrain data receiving unit 31 receives current terrain data from each of the multiple work machines 2 (step SA1). The determination unit 36 ​​calculates the inclination angle of the excavation lane 42 set by the excavation lane setting unit 35 based on the current terrain data received in step SA1 (step SA2). The determination unit 36 ​​determines whether the inclination angle of the excavation lane 42 in the direction of travel is greater than or equal to a threshold (step SA3). In parallel with the processing in step SA3, the determination unit 36 ​​determines whether the inclination angle of the excavation lane 42 in the width direction is greater than or equal to a threshold (step SA6).

[0052] If, in step SA3, it is determined that the inclination angle of the drilling lane 42 in the direction of travel is not greater than or equal to a threshold (step SA3: No), and if, in step SA6, it is determined that the inclination angle of the drilling lane 42 in the width direction is not greater than or equal to a threshold (step SA6: No), the process returns to step SA1.

[0053] In step SA3, if it is determined that the inclination angle of the drilling lane 42 in the direction of travel is greater than or equal to a threshold (step SA3: Yes), the display control unit 37 displays the first predetermined area 46 in which the inclination angle in the direction of travel is greater than or equal to the threshold on the display device 41 in a first display mode (step SA4). The display control unit 37 also displays a first symbol 48 indicating the location of a cliff present in the drilling lane 42 on the display device 41 (step SA5).

[0054] In step SA6, if it is determined that the widthwise inclination angle of the excavation lane 42 is greater than or equal to a threshold (step SA6: Yes), the display control unit 37 displays the second predetermined area 47 in which the widthwise inclination angle is greater than or equal to the threshold on the display device 41 in a second display mode (step SA7). The display control unit 37 also displays "unavailable" display data 50 on the display device 41 indicating that it has been determined that slot dosing cannot be performed in the excavation lane 42 including the second predetermined area 47 (step SA8). The display control unit 37 also displays a first symbol 48 on the display device 41 indicating the location of a cliff present in the excavation lane 42 (step SA5).

[0055] As shown in Figure 11, the obstacle data receiving unit 32 receives obstacle data from each of the multiple work machines 2 (step SB1). The obstacle data receiving unit 32 determines whether or not an obstacle exists at the work site (step SB2). If it is determined in step SB2 that no obstacle exists (step SB2: No), the process returns to step SB1. If it is determined in step SB2 that an obstacle exists (step SB2: Yes), the obstacle data receiving unit 32 determines whether or not the relative distance between the multiple obstacle data is less than or equal to a predetermined value (step SB3). If it is determined in step SB3 that the relative distance between the multiple obstacle data is less than or equal to a predetermined value (step SB3: Yes), the obstacle data receiving unit 32 calculates the centroid position of the multiple obstacle data (step SB5). The display control unit 37 displays the second symbol 49 at the centroid position of the multiple obstacle data (step SB4). In step SB3, if it is determined that the relative distance between multiple obstacle data is not less than or equal to a predetermined value (step SB3: No), the display control unit 37 displays the second symbol 49 based on the positions of the multiple obstacle data (step SB4).

[0056] [Computer System] Figure 12 is a block diagram showing a computer system 1000 according to an embodiment. Each of the management device 3 and control device 6 described above includes the computer system 1000. The computer system 1000 has a processor 1001 such as a CPU (Central Processing Unit), a main memory 1002 including non-volatile memory such as ROM (Read Only Memory) and volatile memory such as RAM (Random Access Memory), a storage 1003, and an interface 1004 including input / output circuits. The respective functions of the management device 3 and control device 6 described above are stored in the storage 1003 as computer programs. The processor 1001 reads the computer program from the storage 1003, loads it into the main memory 1002, and executes the above-mentioned processing according to the program. The computer program may be distributed to the computer system 1000 via a network.

[0057] The computer system 1000 or computer program can, in accordance with the above-described embodiment, receive current topographic data of the work site where the work machine 2, which is a bulldozer, will perform slot dozing, and determine whether or not to perform slot dozing based on the inclination angle of at least a portion of the excavation lane 42 for slot dozing.

[0058] [effect] As described above, the work site determination system 100 according to the embodiment includes a current terrain data receiving unit 31 that receives current terrain data of the work site where the work machine 2, which is a bulldozer, performs slot dozing, and a determination unit 36 ​​that determines whether or not to perform slot dozing based on the inclination angle of at least a part of the excavation lane 42 for slot dozing. The determination system 100 can determine, for example, that performing slot dozing is unsuitable if the inclination angle is greater than or equal to a threshold. The determination system 100 can determine, for example, that performing slot dozing is appropriate if the inclination angle is less than the threshold.

[0059] [Other embodiments] In the above-described embodiment, at least some of the functions of the control device 6 may be provided in the management device 3. At least some of the functions of the management device 3 may be provided in the control device 6.

[0060] In the above-described embodiment, for example, the position data acquisition unit 61, the 3D data acquisition unit 62, the obstacle data acquisition unit 63, the current terrain data creation unit 64, and the current terrain data storage unit 65 may each be configured with separate hardware.

[0061] In the above-described embodiment, the display control unit 37 may display the cliff location determined based on the 3D data of the 3D sensor 13 on the display device 41 in a first display mode, a second display mode, or a third display mode. The control device 6 can determine that a location is a cliff if the terrain has a slope greater than a certain level, based on the height data of the detected points included in the 3D data. The display control unit 37 may display the cliff location determined by the control device 6 on the display device 41 in a first display mode, a second display mode, or a third display mode. The display control unit 37 may display the first symbol 48 at the cliff location closest to the drilling start point 27S of the slot dozing, among the multiple cliffs (first predetermined area 46, second predetermined area 47, cliff determined by the control device 6) present in the drilling lane 42.

[0062] In the above-described embodiment, the work machine 2 is a bulldozer. However, the work machine 2 may be other work machines such as a hydraulic excavator, wheel loader, or motor grader. [Explanation of Symbols]

[0063] 1...Management system, 2...Working machine, 3...Management device, 4...Communication system, 4A...Radio communication device, 4B...Radio communication device, 5...Control facility, 6...Control device, 7...Vehicle body, 8...Running gear, 9...Excavating work machine, 10...Ripper work machine, 11...Position sensor, 12...Tilt sensor, 13...3D sensor, 13F...3D sensor, 13B...3D sensor, 14...Obstacle sensor, 14L...Obstacle sensor, 14R...Obstacle sensor, 15...Engine room, 16...Engine, 17...Tracks 18...Drilling blade, 18A...Cutting edge, 19...Lift frame, 20...Tilt cylinder, 21...Lift cylinder, 22...Shank, 22A...Ripper point, 23...Ripper arm, 24...Tilt cylinder, 25...Lift cylinder, 26...Beam, 27A...First intermediate design plane, 27B...Second intermediate design plane, 27S...Drilling start point, 27Z...Final design plane, 28...Detection point, 31...Current terrain data receiving unit, 32...Obstacle data receiving unit, 33...Current terrain data Creation unit, 34...Current terrain data storage unit, 35...Excavation lane setting unit, 36...Determination unit, 37...Display control unit, 40...Input device, 41...Display device, 42...Excavation lane, 42A...First excavation lane, 42B...Second excavation lane, 43...First position, 44...Second position, 45...Part, 45A...First part, 45B...Second part, 45C...Third part, 46...First predetermined area, 47...Second predetermined area, 48...First symbol, 49...Second symbol, 50...Unavailable display data, 6 1...Position data acquisition unit, 62...3D data acquisition unit, 63...Obstacle data acquisition unit, 64...Current terrain data creation unit, 65...Current terrain data storage unit, 100...Determination system, 130...Detection range, 130F...Detection range, 130B...Detection range, 140...Detection range, 140L...Detection range, 140R...Detection range, 1000...Computer system, 1001...Processor, 1002...Main memory, 1003...Storage, 1004...Interface.

Claims

1. A current terrain data receiving unit receives current terrain data of the work site where the bulldozer is slot-dosing, The system includes a determination unit that determines whether or not to perform the slot dozing based on the inclination angle of at least a portion of the drilling lane for the slot dozing. A judgment system for the work site.

2. The determination unit changes the determination area for determining the inclination angle at predetermined distances in the direction of travel of the excavation lane, and determines whether or not slot dozing is appropriate for each determination area. A work site determination system according to claim 1.

3. The aforementioned inclination angle includes at least a portion of the inclination angle in the direction of travel of the excavation lane. A work site determination system according to claim 1.

4. The excavation lane includes a display control unit that displays a first predetermined area in a first display mode on a display device where the inclination angle in the direction of travel is greater than or equal to a threshold. The work site determination system according to claim 3.

5. The aforementioned inclination angle includes at least a portion of the inclination angle in the width direction of the excavation lane. A work site determination system according to claim 1.

6. The system includes a display control unit that displays a second predetermined area in the excavation lane where the inclination angle in the width direction is greater than or equal to a threshold value on a display device in a second display mode. The work site determination system according to claim 5.

7. The determination unit determines that slot dozing cannot be performed if the inclination angle in the width direction is greater than or equal to a threshold. The work site determination system according to claim 5.

8. The system includes a display control unit that displays "Not Displayable" data on a display device indicating that it has been determined that the aforementioned slot dozing cannot be performed. The work site determination system according to claim 7.

9. Receiving current terrain data of the work site where the bulldozer will slot-dos, This includes determining whether or not the slot dozing is appropriate to perform based on the inclination angle of at least a portion of the drilling lane for the slot dozing, Methods for determining the work site.

Citation Information

Patent Citations

  • Shovel

    JP2016172963A

  • Work vehicle control system, method, and work vehicle

    JP2019214868A

  • System and method for controlling working machine

    JP2021001437A

  • System and method for controlling work machine

    WO2022018993A1