Remote monitoring and control system, remote monitoring and control method
The remote monitoring and control system addresses diverse factory equipment challenges by using a remote center unit to determine equipment states and generate adaptive control commands, enhancing operational efficiency and reducing labor and energy use.
Patent Information
- Application Number
- JP2023033759
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Filing Date
- 2023-03-06
- Publication Date
- 2026-11-24
- Estimated Expiration
- 2043-03-06
AI Technical Summary
Existing factory equipment management systems struggle with diverse control parameters, varying control types, and labor and energy inefficiencies due to differences in equipment versions and changing environmental conditions, exacerbated by a decline in skilled workers and resource shortages.
A remote monitoring and control system with a remote center unit that determines equipment states, generates control commands based on impact analysis, and utilizes pre-stored processing models to manage equipment flexibly and efficiently, incorporating human-machine collaboration and automated control.
Enables flexible and efficient remote control of factory equipment, reducing labor and energy consumption while ensuring consistent and optimized operation across varying equipment states and conditions.
Smart Images

Figure 0007955188000001 
Figure 0007955188000002 
Figure 0007955188000003
Abstract
Description
[Technical Field]
[0001] The present embodiment relates to a remote monitoring and control system and a remote monitoring and control method for remotely controlling various types of equipment in a factory (including power equipment, manufacturing equipment, logistics equipment, and the like). [Background Art]
[0002] A large number of techniques for improving factory equipment have been developed conventionally. The types of such techniques are numerous and diverse. In recent years, it has also been common practice to arrange IoT (Internet of Things) connected to sensors at various locations of factory equipment, and to provide a monitoring device that enables the functions and operating status of the factory equipment to be grasped using the output of the IoT.
[0003] In addition, the operating status of factory equipment in the physical space is also monitored by transmitting digital data, which is the output of the IoT, to a cloud (server). The data stored in the server is also referred to as a digital twin. A system having a virtual (Cyber) space represented by computer data and a physical (Physical) space as described above is sometimes referred to as a cyber-physical system (hereinafter abbreviated as CPS). [Prior Art Documents] [Patent Documents]
[0004] [Patent Document 1] Japanese Patent No. 5752525 [Patent Document 2] Japanese Patent No. 6187704 [Summary of the Invention] [Problem to be Solved by the Invention]
[0005] By the way, factory equipment is constantly being developed and improved. Furthermore, even within the same factory equipment, there may be older and newer versions of the same product being manufactured. These older and newer versions may differ in their control parameters, control types, and processing speeds. Regarding control types, there are those that require human intervention and manual operation, and those that are fully automated.
[0006] Furthermore, the existence of a wide variety of factories has created numerous challenges that need to be addressed, including a decline in skilled workers in various manufacturing technologies, a decrease in the population needed to secure workers, changes in the natural environment, and a shortage of energy sources.
[0007] Therefore, the objective of this embodiment is to provide a remote monitoring and control system and remote monitoring and control method that can remotely control various equipment within a factory from a sophisticated perspective, and can flexibly perform appropriate monitoring and control measures for each piece of equipment according to its various states, thereby contributing to labor saving and energy saving. [Means for solving the problem]
[0008] According to one embodiment, It is equipped with a remote center unit that remotely monitors the status of multiple monitored targets, A state level determination means that determines the state level based on monitoring conditions, If the state level determination means determines an abnormality, the automatic control means notifies the relevant monitored target of a control command or control request based on a combination of the state level and the range of impact on other monitored targets, the type of monitored target, or an indicator. The system includes a storage means, i.e., a database, for storing a processing model that defines a processing pattern corresponding to the control command or the control request, A remote monitoring and control system is provided, characterized by controlling the monitored object, determining its state level, or performing a stop process according to the processing model corresponding to the control command or control request notified by the automatic control means. [Brief explanation of the drawing]
[0009] [Figure 1] This is a block diagram showing a schematic configuration of one embodiment of the present invention. [Figure 2] This block diagram shows a schematic configuration of another embodiment of the present invention. [Figure 3] This block diagram shows a schematic configuration of yet another embodiment of the present invention. [Figure 4A] This block diagram shows a schematic configuration of yet another embodiment of the present invention. [Figure 4B] This is a block diagram to illustrate the configuration of Figure 4A in more detail. [Figure 5] This is a block diagram showing the optimization algorithm processing unit extracted from an embodiment of the present invention. [Figure 6A] This is an explanatory diagram illustrating the characteristics of the control type employed in the present invention. [Figure 6B] This is an explanatory diagram that broadly classifies and explains the usage patterns of the control types described above. [Figure 7] This diagram illustrates the flow of the setup process when performing initial setup of equipment and devices within this system. [Figure 8] This diagram illustrates a system overview for the edge device E900, explaining its function of pre-preparing multiple algorithms for the equipment, devices, and functions managed by the edge device E900. [Figure 9A] This diagram illustrates the judgment (diagnosis) results obtained by evaluating the status data of the system's equipment and devices, and the action functions that should be taken in response to the judgment factors or judgment results. [Figure 9B] This diagram shows the relationship between the analysis / judgment block 3001 and the equipment 1000. [Figure 9C] This diagram illustrates the system's method for detecting equipment status data and the key components of its configuration. [Figure 9D]FIG. 10 is a diagram illustrating an example of a mechanism for accurately capturing response data corresponding to a command by a facility state data analysis unit when a facility responds to a request. [Figure 9E] FIG. 11 is a diagram illustrating a basic example of a communication data format used in a data transmission / reception function of a system. [Figure 9F] FIG. 12 is a diagram illustrating an example of a table of request control data used in the present system. [Figure 10] FIG. 13 is an explanatory diagram illustrating an example of a facility in which a sequence-type SEQT program, a star-type STAT program, and a human-machine collaboration-type MMCT program are adopted for control data processing, and an example of a relationship between the facility and an event occurring in the facility. [Figure 11] FIG. 14 is an explanatory diagram illustrating still another example of a facility in which a sequence-type SEQT program, a star-type STAT program, and a human-machine collaboration-type MMCT program are adopted for control data processing, and an example of a relationship between the facility and an event occurring in the facility. [Figure 12] FIG. 15 is a flowchart schematically illustrating how the entire system is controlled based on a diagnosis result obtained by determining state data of a facility / device. [Figure 13A] FIG. 16 is a diagram collectively illustrating a facility state when a state of a facility to be monitored in the present system is determined to be “high B01” meaning that an urgency level is high, and an action by the present system with respect to the facility state, timing of the action, and the like. [Figure 13B] FIG. 13B is a diagram illustrating a continuation of FIG. 13A. [Figure 13C] FIG. 13C is a diagram illustrating a continuation of FIG. 13B. [Figure 14A] FIG. 17 is a diagram collectively illustrating a facility state when a state of a facility to be monitored in the present system is determined to be “medium B02” meaning that an urgency level is medium, and an action by the present system with respect to the facility state, timing of the action, and the like. [Figure 14B] FIG. 14B is a diagram illustrating a continuation of FIG. 14A. [Figure 15]This diagram summarizes the actions taken by this system and the timing of those actions when the status of the monitored equipment is determined to be of low urgency and non-urgent. [Figure 16] This diagram illustrates the concepts of upper layers, lower layers, upstream, and downstream in this system. [Figure 17A] This diagram illustrates how multiple processing steps are executed over time in the manufacturing process of industrial products, and shows an example of what happens when an emergency occurs. [Figure 17B] This diagram illustrates how multiple processing steps are executed over time in the manufacturing process of industrial products, and also shows another example of what happens when an emergency occurs. [Modes for carrying out the invention]
[0010] The embodiments will be described below with reference to the drawings. Figure 1 shows an example configuration of one embodiment of a remote monitoring and control system and remote monitoring and control method. It consists of first and second equipment 1000 and 2000 including the equipment to be monitored, and a remote center unit 5001 that remotely monitors and controls the equipment to be monitored.
[0011] The first equipment 1000 and the second equipment 2000 represent the downstream and upstream equipment, respectively. In this embodiment, the downstream equipment is described as manufacturing equipment, and the upstream equipment as power equipment. These equipment 1000 and 2000 may also be referred to as monitored equipment.
[0012] The first equipment 1000 corresponds to the downstream equipment to be monitored and includes a manufacturing equipment 1001 to be monitored, an equipment status detection unit 1002 that detects the status of the manufacturing equipment 1001, an equipment status data transmission unit 1003 that transmits the status data detected by the equipment status detection unit 1002 to the remote center unit 5001, a receiving unit 1004 that receives control data for the manufacturing equipment 1001 from the remote center unit 5001, and a response data transmission unit 1005 that transmits data (response data) output from the manufacturing equipment 1001, which is controlled based on the control data from the remote center unit 5001, to the remote center unit 5001. The second equipment 2000 corresponds to the upstream equipment to be monitored and includes a power equipment 2001 to be monitored, an equipment status detection unit 2002 that detects the status of the power equipment 2001, an equipment status data transmission unit 2003 that transmits the status data detected by the equipment status detection unit 2002 to the remote center unit 5001, a receiving unit 2004 that receives control data for the power equipment 2001 from the remote center unit 5001, and a response data transmission unit 2005 that transmits data (response data) output from the power equipment 2001, which is controlled based on the control data from the remote center unit 5001, to the remote center unit 5001.
[0013] The remote center unit 5001 includes analysis and judgment blocks 3001 and 4001 that analyze and judge the status data of each piece of equipment received from the first and second pieces of equipment 1000 and 2000 and perform predetermined control on the first and second pieces of equipment 1000 and 2000; monitoring devices 3011 and 4011 that monitor the status of the first and second pieces of equipment 1000 and 2000; a request control data generation unit 5002 that generates control data to be executed on the first and second pieces of equipment 1000 and 2000; and an optimization algorithm processor 6000 that controls the first and second pieces of equipment 1000 and 2000 to an optimal state.
[0014] The analysis and determination blocks 3001 and 4001 include equipment status data analysis units 3002 and 4002 that analyze status data received from equipment status data transmission units 1003 and 2003, status level determination units 3005 and 4005 that determine the status from the results of the analysis, instructions to the request control data generation unit 5002 that generates control signals for performing necessary control based on the determination results, and automatic control units 3006 and 4006 that transmit request control data to each of the first equipment 1000 and the second equipment 2000, and databases DB1 and DB2 that store processing patterns when control is executed.
[0015] Equipment status data is data based on detection signals acquired by equipment, sensors, cameras, etc., within the equipment, and it is possible to determine the equipment status from one or more data points. Determining the status means diagnosing the condition of the equipment, and the level of diagnosis ranges from urgent to non-urgent depending on the content.
[0016] Manufacturing equipment 1001 is a production line, which is a single unit for manufacturing specific products or items targeted by the factory. This production line consists of multiple devices (including, for example, loading mechanisms, presses, and unloading devices). Power equipment 2001 is the power source for driving manufacturing equipment 1001, or the equipment that creates the manufacturing environment for manufacturing equipment 1001. Therefore, power equipment 2001 is sometimes referred to as ancillary equipment. Power equipment 2001 includes power equipment (electricity-related equipment), water treatment equipment, and petroleum, coal, and gas-related equipment. It also includes generators, motors, electric wires, piping, cables, and wires. Furthermore, ancillary equipment includes compressors, boilers, refrigerators, and air conditioners.
[0017] Manufacturing equipment includes, in particular, on-site environmental equipment, operational equipment, and inspection (or monitoring) equipment. Environmental equipment includes devices such as air conditioners, cleaners, lighting, fire extinguishers, thermometers, hygrometers, pressure gauges, etc., while operational equipment includes robots, conveyors, cutting machines, molding machines, packaging machines, transport machines, die-casting machines, circuit board mounting machines, mounters, etc. Inspection equipment includes various sensors, instruments, cameras, and other devices placed on-site.
[0018] In this embodiment, the manufacturing equipment 1001 is considered downstream equipment and the power equipment 2001 is considered upstream equipment. However, in reality, multiple manufacturing facilities exist from upstream to downstream, and there are multiple manufacturing (or processing) stages from upstream to downstream. Therefore, in addition to defining upstream and downstream on a per-equipment basis, each of these manufacturing (or processing) stages may also be defined as a sequence.
[0019] The equipment status detection units 1002 and 2002 detect the status of each piece of equipment in the manufacturing equipment 1001 and 2001. Specifically, they detect the status from various sensors installed in various locations on the devices and equipment that make up the equipment.
[0020] The equipment status detection data detected by the equipment status detection units 1002 and 2002 is transmitted to the remote center unit 5001 by the equipment status detection data transmission units 1003 and 2003.
[0021] The remote center unit 5001 includes a downstream analysis / determination block 3001 and an upstream analysis / determination block 4001 for remotely monitoring equipment 1001 and 2001. The downstream analysis / determination block 3001 performs analysis and determination using data received from downstream equipment 1000. The upstream analysis / determination block 4001 performs analysis and determination using data received from upstream equipment 2000.
[0022] The equipment status detection data transmitted from the equipment status detection data transmission unit 1003 is sent to the equipment status analysis unit 3002. The equipment status detection data may be transmitted via a network and / or digital cyberspace (NET) during transit.
[0023] In this system, equipment 1000 and 2000 are sometimes referred to as lower nodes (lower layers), and the remote center unit 5001 is sometimes referred to as an upper node (upper layer). In this system, for example, if equipment 1000 is designated as "the relevant layer," then if a problem occurs in equipment 1000 and can be resolved within equipment 1000, that problem is referred to as a problem of "the relevant layer." Examples of problems include a decrease in temperature that can be controlled on-site, or a decrease in conveying speed. However, if a problem occurring in equipment 1000 cannot be resolved by the control system of this equipment, for example, if there is a shortage of supply of parts or materials processed or handled by this equipment, or if a defect (deformation or defect) occurs in the product being manufactured, it may be necessary to inform the higher layer of this situation and seek a solution. In this case, it is referred to as a problem that requires coordination with the "higher layer." Furthermore, if a problem occurring in equipment 1000 cannot be resolved by "the relevant layer," and the problem is notified to the "higher layer," the "higher layer" may control upstream equipment 2000 to resolve the problem. For example, downstream equipment 1000 may experience a decrease in power supply or air supply from the compressor. In such cases, the "upper layer" may control the upstream equipment, such as increasing the power output or controlling the compressor's power output.
[0024] The equipment status data (which may also be called events) analyzed by the equipment status data analysis unit 3002 is then used by the status level determination unit 3005 to perform an equipment diagnosis using the equipment status data, and the urgency (or importance or status level) is determined. In other words, the response (action) to this data is determined to be extremely urgent, somewhat urgent, can be handled normally, or can be handled slowly. The response (action) in this case is executed based on the results of a determination of whether it will affect upstream or downstream equipment, i.e., the scope of the impact. Naturally, the content of the response (action) will differ depending on the type of equipment being monitored (which is also the equipment being controlled). Furthermore, each monitored equipment has indicators set to determine whether its status is normal / abnormal or the degree of achievement of the plan.
[0025] The thresholds that define the occurrence of the above responses (actions) are set by system designers, experts, and even through learning. As a result, it can be said that the system's operational event known as a "response" takes into account a combination of factors, such as the scope of impact the event has on the monitored target, the type of monitored target, the indicator, and the anomaly level (judgment or diagnostic level) of the event data.
[0026] Upon receiving the determination result from the state level determination unit 3005, the automatic control unit 3006 instructs the request control data generation unit 5002 to generate appropriate request control data corresponding to the content of the equipment state data. This request control data can be of various types and includes control commands for directly controlling the target equipment, as well as control requests for predetermined data requests or the results of predetermined operations (state and data after the operation) from the target equipment.
[0027] For example, if the equipment status data indicates a rapid temperature rise and the equipment is determined to be in danger, the automatic control unit 3006 instructs the request control data generation unit 5002 to send an alarm signal to the relevant parts and to emergency stop the equipment.
[0028] Alternatively, if the equipment status data indicates a decrease in the speed of the manufacturing line and determines that the efficiency of parts manufacturing has decreased, the automatic control unit 3006 issues a command to the request control data generation unit 5002 to investigate the cause of the decrease in the speed of the manufacturing line. Furthermore, once the cause of the decrease in speed is identified, the automatic control unit 3006 controls the request control data generation unit 5002 to output a command to eliminate that cause and increase the speed of the manufacturing line.
[0029] The state level determination unit 3005 and the automatic control unit 3006 may be an integrated control unit.
[0030] The control data output by the request control data generation unit 5002 is received by the receiving unit 1004 of the manufacturing equipment 1001. As a result, the manufacturing equipment 1001 executes operations based on the request control data.
[0031] When processing based on request control data is executed, a different sensor output is naturally obtained from the manufacturing equipment 1001. This sensor output is called response data. This response data is returned to the remote center unit 5001 via the response data transmission unit 1005. The response data is then taken into the optimization algorithm processor 6000 via the equipment status data analysis unit 3002, or directly.
[0032] The optimization algorithm processor 6000 can determine the status of the equipment by checking the contents of the response data. For example, it can determine whether the equipment has made an emergency stop and an alarm signal has been output at the site. Alternatively, it can determine whether the slowdown in the production line has improved.
[0033] The response data from the equipment and the request control data output by the request control data generation unit 5002 are correlated with each other and are used by the optimization algorithm processor 6000 as follows. In other words, the control data is recorded in a data file (not shown) as reference data and is used for learning when reconstructing or updating the control data (control commands or the control requests). That is to say, this system has a learning function for updating and reconstructing control data.
[0034] The optimization algorithm processor 6000 does not simply receive a single response data and end the control of the equipment; rather, it constantly monitors the status of the equipment and repeatedly executes the control routines described above, thereby working to increase the productivity of the entire factory, for example. When the response data reaches a predetermined target value (such as the speed of the manufacturing equipment, the amount of products produced, or the quality of the manufactured goods), the optimization algorithm processor 6000 maintains a stable control state thereafter.
[0035] Furthermore, the optimization algorithm processor 6000 can select and combine control patterns appropriate for a piece of equipment according to the status level (diagnosis result) of multiple pieces of equipment, and create combined request control data. Then, via the request control data generation unit 5002, it can set a control sequence using the combined request control data for the equipment at an appropriate timing.
[0036] In this case, the monitoring of the target by the remote center unit 5001 is repeatedly performed as described above, and the control commands or control requests and processing models notified by the request control data generation unit 5002 are dynamically changed according to the monitoring results, under the control of the automatic control units 3006 and 4006. In other words, it is possible to dynamically change the next feedback process based on the results of the feedback process. In this case, the learning results of the learning function described above are utilized.
[0037] In the configuration and operation described above, the automatic control unit 3006 instructs the request control data generation unit 5002 to generate appropriate request control data corresponding to the content and status of the equipment status data. The mechanism for generating request control data will now be briefly explained.
[0038] The system in this embodiment utilizes multiple processing models that have been pre-classified into control patterns. In this specification, the classified basic control patterns are referred to as human-machine collaborative MMCT, star-type STAT, and sequence-type SEQT. Human-machine collaborative MMCT is a control type in which human intervention occurs, and is used in environments where it is difficult to handle everything with automatic control. Star-type STAT is a type in which multiple peripheral nodes (peripheral devices or equipment) exist around a predetermined central node (central device or equipment). In this type, the central node gives commands (control commands) to the multiple peripheral nodes and collects responses from the peripheral nodes. Sequence-type SEQT is a type that controls multiple nodes (devices or equipment) in an orderly and continuous manner. Therefore, when the first node receives control and outputs a response, the next node receives control and outputs a response.
[0039] This classification focuses on the fact that when automatically controlling equipment in factories and other facilities, the sequence of operations of the devices and mechanisms that make up the equipment, the sequence of adjusting the operating levels, and the sequence of setting speed and temperature are often predetermined.
[0040] By classifying the types of program sequences in this way, the design and creation of each type of sequence are made easier. This reduces the burden on designers when designing equipment control sequences compared to when sequence patterns are not considered. Furthermore, having these classified patterns prepared makes it less likely to generate or modify incorrect sequences when generating or modifying optimization algorithms.
[0041] Therefore, this system pre-stores control data for processing patterns corresponding to the above-mentioned control commands or control requests as processing models in the database D1 described above. Then, under the control of the automatic control unit 3006, the desired processing model is read from database D1 and set in the request control data generation unit 5002 or in the optimization algorithm processing 6000.
[0042] The sequence types of the processing models described above can also be used in the following ways: Suppose the control sequence of a certain piece of equipment is a sequence-type SEQT, and for example, in a manufacturing line, equipment A → equipment B → equipment C, which constitute the equipment, are controlled sequentially (sequentially via SEQT). In this case, it is more efficient to check the status of each piece of equipment using a sequence-type SEQT to ensure that the control results are reflected sequentially, such as the state of equipment A → the state of equipment B → the state of equipment C. Therefore, in this system, the acquisition of status data for each piece of equipment and the type of data check basically follow the control sequence and use a sequence-type SEQT. Furthermore, if the control sequence of a certain piece of equipment is a sequence-type SEQT, it is preferable that the emergency stop sequence type for the multiple pieces of equipment constituting that equipment also adopts a sequence-type SEQT. Other types are basically used in a similar manner. This method ensures consistency in control, status data detection and check processing, and stop control for each piece of equipment, making unnecessary accidents less likely. It also improves the efficiency of the design work for designers of control and check systems. However, the control sequence and the status check sequence do not necessarily have to be absolutely the same, and exceptions should be allowed.
[0043] A hybrid of these sequence types may also be provided. The characteristics of this program sequence will be discussed further later.
[0044] Of course, in the remote center unit 5001, experts in equipment such as engineers, supervisors, and managers can design, adjust, update, and monitor control data. In this case, experts can use a specific password to activate the monitoring device 3011 and review the equipment status data and its target values to determine if they are appropriate. Experts can also manually adjust target values as needed. Furthermore, the monitoring device 3011 displays an image that visualizes the control pattern being controlled (a pattern image showing a sequence type SEQT or a star type STAT, etc.), and displays marks that move or change colors in real time according to the progress of the control, allowing the operating status of the equipment to be seen on the image. For example, it is possible to display an image that looks like the second hand of a clock moving, or like water filling a cup moment by moment. The monitoring device 3011 is equipped with an algorithm that performs such image processing. Therefore, by looking at the monitoring device 3011 during equipment testing, the administrator can determine whether the control progress is proceeding according to the planned time schedule. Depending on the judgment result, it is also possible to adjust the speed of the equipment (specifically, adjust the parameters of the control data). When such adjustments are made, the optimization algorithm processor can store the adjusted control data in memory using its learning function and use it as optimal control data. When the control data for equipment 1000 is corrected by the optimization algorithm processor 6000 to optimal (efficient) data, the control data (parameters, etc.) at that time is stored in the database DB1 as updated control data or learned control data.
[0045] The above describes the relationship between equipment 1000 and the remote center unit 5001, and the relationship between the second equipment 2000 and the remote center unit 5000 is similar. Therefore, as described above, the power equipment 2001 also includes the equipment status detection unit 2002, the equipment status transmission unit 2003, the reception unit 2004, and the response data transmission unit 2005. Furthermore, the remote center unit 5001 has an upstream analysis / determination block 4001. This analysis / determination block 4001 includes the equipment status data analysis unit 4002, the status level determination unit 4005, the automatic control unit 4006, and the database DB2. The remote center unit 5001 also includes a monitoring device 4011.
[0046] Furthermore, the request control data generation unit 5002 may also be provided separately for downstream and upstream use. The embodiment shown in Figure 1 above is an example of a configuration in which the remote center unit 5001 and the equipment 1000 and 2000 are connected via a network and / or cyber digital space NET. However, the embodiment of the system of the present invention is not limited to the configuration shown in Figure 1, and various configurations are possible.
[0047] Figure 2 shows an example configuration of a second embodiment of the present invention. The same reference numerals are used for parts identical to those in Figure 1, and detailed descriptions are omitted. The system configuration example in Figure 2 is an example in which the analysis / decision blocks 3001 and 4001 and the equipment 1000 and 2000 are integrated. In other words, the analysis / decision blocks 3001 and 4001 are arranged as edge devices for the equipment 1000 and 2000. Therefore, the analysis / decision blocks 3001 and 4001 may be called edge devices or agents. These analysis / decision blocks 3001 and 4001 are connected to the remote center unit 5001 via a network.
[0048] Therefore, in this configuration, the remote center unit 5001 includes the request control data generation unit 5002, the optimization algorithm processor 6000, and the monitoring devices 3011 and 4011. The request control data generation unit 5002 and the optimization algorithm processor 6000 may be configured as an integrated unit.
[0049] The basic operation of the system in Figure 2 is the same as that of the system described in Figure 1. In this configuration, the analysis and judgment blocks 3001 and 4001 are often located within the factory as analysis and judgment edge devices. Therefore, the reaction and response to the equipment of the analysis and judgment edge devices can be obtained immediately, and the response processing to the equipment in the event of a high-priority event (product defect, gas leak, fire, etc.) can be expedited. The analysis and judgment edge devices (analysis and judgment blocks 3001 and 4001) are located within the factory and are equipped with communication units 34 and 35 that communicate with the external remote center unit 5001 via a network.
[0050] Figure 3 shows an example configuration of a third embodiment of the present invention. The same reference numerals are used for parts identical to those in Figures 1 and 2, and detailed descriptions are omitted. The example configuration in Figure 3 is an embodiment that shows an example in which the storage unit databases DB1 and DB2 and the optimization algorithm processor 6000 shown in Figure 2 are constructed in cyberspace CY via a network (not shown). Therefore, in this system, the remote center unit 5001 is connected to the cyberspace databases D1 and D2 and the analysis / decision blocks 3001 and 4001 via a network (not shown).
[0051] In this case as well, the basic operation is the same as the system described in Figure 1. Specifically, this system includes a remote center unit 5001 that remotely monitors the status of multiple monitoring targets (first equipment, second equipment 1000, 2000). Status level determination units 3005 and 4005 determine the status (status / emergency) level based on monitoring conditions (emergency determination). Then, if the status level determination units 3005 and 4005 diagnose an abnormality (status / emergency), the automatic control units 3006 and 4006 notify the relevant monitoring target of a control command or control request based on a combination of the diagnostic level and the scope of impact on other monitoring targets, the type of monitoring target, or an indicator (feedback based on urgency + other judgment criteria). Furthermore, the storage databases DB1 and DB2 store processing models that define processing patterns corresponding to the control commands or control requests (effectively utilized for executing feedback processing applying sequence type, star type, or MM collaborative type).
[0052] Then, the system controls the monitored object, determines its state level, or performs a stop process according to the processing model corresponding to the control command or control request notified by the automatic control units 3006 and 4006.
[0053] Thus, this system is designed to perform optimal operation control according to the operating status of equipment 1000 and 2000.
[0054] Furthermore, the system includes equipment status detection units 1001 and 2002 that monitor the equipment and continuously output its operating status as equipment status data, and a remote center unit 5001 that monitors the operating status and remotely controls the equipment.
[0055] The equipment side has equipment status data transmission units 1003 and 2003 that transmit the equipment status data to the remote center unit 5001. The receiving side has equipment status data analysis units 3002 and 4002 that analyze the equipment status data. The remote center unit 5001 has a request control data generation unit 5002 that creates optimal request control data for the equipment based on the analysis results of the equipment status data analysis units 3002 and 4002, and the equipment that receives the request control data has a response data transmission unit 1005 and 2005 that transmits the control result to the remote center unit as response data.
[0056] Furthermore, this system remotely monitors multiple pieces of equipment. The system includes an acquisition unit that acquires equipment status data from the multiple pieces of equipment, and a determination unit (also called a diagnostic unit) that determines whether or not the equipment is abnormal based on the equipment status data and equipment management data for managing the equipment.
[0057] Then, based on the equipment status data, equipment management data, and the urgency level (priority, importance, etc.) of the equipment determined to be abnormal by the determination unit, abnormality processing is performed for the equipment.
[0058] Figures 4A and 4B are system block diagrams showing the optimization algorithm processor 6000 applied to the above embodiment, shown independently. The optimization algorithm processor 6000 communicates not only with one analysis / decision block 3001, but also with multiple analysis / decision blocks 4001, 3A01, 3B01, ... Furthermore, the optimization algorithm processor 6000 takes in various information from the outside and uses it as an element for thought control (learning).
[0059] Figure 4A shows an example of the optimization algorithm processor 6000, described in Figures 1, 2, and 3, being removed and placed in cyberspace. It also shows an example of the analysis / judgment block 3001 and analysis / judgment block 4001, described in Figures 1, 2, and 3, being placed in the first facility 1000 and the second facility 2000, respectively.
[0060] In this configuration, the analysis / judgment block 3001 and the analysis / judgment block 4001 are configured to exchange data with the external optimal algorithm processor 6000 via communication equipment. Therefore, the analysis / judgment block 3001 and the analysis / judgment block 4001 function as analysis / judgment edge devices for equipment 1000 and 2000, respectively.
[0061] In actual factories, there isn't just one piece of equipment 1000, but rather multiple pieces of equipment 1A00, 1B00, etc., existing in parallel or in series. For example, in an automobile manufacturing plant, there are lines (equipment) for manufacturing chassis, lines (equipment) for manufacturing bodies, lines (equipment) for assembling bodies and chassis, painting lines (equipment), etc.
[0062] Analysis and judgment edge blocks 3A01, 3B01, etc. correspond to the first equipment 1A00, 1B00, etc., as described above. The second equipment 2000 (power equipment or ancillary equipment) is used in common with these. A dedicated analysis and judgment block 4001 is provided for the second equipment 2000. The second equipment 2000 supplies power (electricity), fuel, air, water, hot water, and liquid materials (paint, adhesive, etc.) to multiple first equipment 1A00, 1B00, etc.
[0063] Furthermore, the optimization algorithm processor 6000 is connected to each of the first equipment units 1000, 1A00, 1B00, etc., via communication equipment, allowing each unit to be controlled in parallel.
[0064] Figure 4B shows a representative interior of the first equipment 1000 shown in Figure 4A, specifically focusing on the part related to the optimization algorithm processor 6000. The interiors of the other first equipment 1A00, 1B00, etc. are omitted. The interior of the second equipment 2000 shows the controlled objects 1a, 1b, 1c, etc., which are overseen by the analysis and judgment block 4001.
[0065] The first equipment 1000 includes controlled objects 2a, 2b, 2c, ... 2n. Here, for example, control devices 2a and 2n are accompanied by sound sensor devices 3a and 3n as sensors. These sound sensor devices 3a and 3n collect and digitize sound when the equipment is operating and monitor changes in the sound frequency band. The digital sound output of the sound sensor devices 3a and 3n is taken up by the analysis and judgment block 3001. The analysis and judgment block 3001 can determine that abnormal operation is occurring, for example, if sound is generated in a frequency band different from the sound frequency band when the equipment is operating normally.
[0066] Furthermore, the data path between each controlled object and the analysis / decision block 3001 may be mediated by blocks of the microservice MS. The microservice MS has instruction and data conversion functions that bridge control commands between devices, even if they are from different manufacturers or use different programming languages (or code). This microservice MS may be built as a so-called management shell (AAS). As a management shell, it is possible to manage multiple controlled objects together. In addition, by utilizing the hierarchical structure of the management shell, data conversion and data recovery between higher and lower layers become easier, enabling smooth data exchange between various controlled objects and the analysis / decision block 3001. This means that the system can be extremely versatile (effective for component replacement, sensor replacement, and performance improvement of devices).
[0067] The analysis and judgment block 3001 is equipped with a control algorithm unit DB3 (corresponding to databases DB1 and DB2 in Figure 2) for each piece of equipment (control target), and normally controls each control target according to the algorithms stored in this database.
[0068] Response data from each piece of equipment is constantly monitored and checked by the optimization algorithm processor 6000. The optimization algorithm processor 6000 takes in equipment status data from the analysis / judgment block 3001 into the data unit K111, analyzes the equipment status data in the analysis unit K112, and based on the analysis results, the operation unit K113 feeds back a control request (request control data) to the analysis / judgment block 3001. Therefore, in this case, the optimization algorithm processor 6000 is integrated with the aforementioned request control data generation unit 5002.
[0069] The optimization algorithm processor 6000 is connected to a monitoring device 3001 in the remote center, although this is not shown in Figures 4A and 4B. The monitoring device 3001 has the function of controlling the optimization algorithm processor 6000 as needed, and has the function of supplying various data to the optimization algorithm processor 6000, as well as adjusting and maintaining the control functions of the optimization algorithm processor 6000.
[0070] For this purpose, the optimization algorithm processor 6000 can refer to production plan information KK11, power utilization plan information KK12, weather forecast information KK13, past power supply and utilization performance information KK14, and equipment status information KK15 provided by an external system such as a remote center.
[0071] Furthermore, the system generates optimal request control data for the equipment by referring to equipment specification information KK16, various indicators, KPIs (Key Performance Indicators), and objective functions (KK17).
[0072] Therefore, external influences may cause changes in the content of the control data generated by the optimal algorithm processor 6000 (i.e., the control data that is fed back to the equipment).
[0073] The optimization algorithm processor 6000's control over a single analysis / decision block does not simply end after receiving a single response data; it must constantly monitor the equipment's status and repeatedly execute control to, for example, increase the overall productivity of the factory. Furthermore, once multiple response data points reach their respective set target values, the optimization algorithm processor 6000 maintains a stable control state thereafter.
[0074] Furthermore, the optimization algorithm processor 6000 can perform a diagnosis based on the status data of multiple or one piece of equipment, select and combine appropriate control patterns for that equipment, and create combined request control data. Then, for example, it can set a control sequence for the equipment using the combined request control data at an appropriate timing.
[0075] In this case, the monitoring of the target being monitored by the remote center unit 5001 is repeatedly performed as described above, and the control commands or control requests and processing models notified by the automatic control units 3006 and 4006 can be dynamically changed according to the monitoring results. In other words, it is possible to dynamically change the next feedback process based on the results of the feedback process. In this case, the learning results of the learning function described above are utilized. Therefore, the optimal algorithm processor 6000 is equipped with a periodic execution function, an execution function each time an event occurs (an execution function when there is a difference between the plan / prediction and the actual results), an execution function based on human judgment, and a combination of these functions.
[0076] Figure 5 is a block diagram that simplifies the constituent blocks of Figure 3 and also includes elements representing other embodiments. Therefore, the blocks corresponding to the constituent blocks of Figure 3 are denoted by the same reference numerals as in Figure 3.
[0077] In Figure 5, the analysis and judgment blocks 3001 and 4001 (which may also be called analysis and judgment edge devices) of the previous embodiment are shown together within the real space PH.
[0078] Analysis and judgment blocks 3001 and 4001 control the controlled equipment 1000 and 2000 based on a pre-set program sequence. Analysis and judgment blocks 3001 and 4001 constantly monitor the status data of equipment 1000 and 2000, make judgments (diagnoses) on the equipment's status data, and in the event of an emergency, can immediately perform emergency control of equipment 1000 and 2000.
[0079] Furthermore, in this embodiment, a manual operation automation device 120 is positioned between the analysis / judgment blocks 3001 and 4001 and the controlled equipment 2000. This manual operation automation device 120 is also referred to as Robotic Process Automation (RPA). Even if a part of the controlled equipment 2000 requires manual operation, this automation device 120 can perform such manual operation (e.g., operation of push buttons) using a robot (e.g., a complex such as an electromagnet switch) that moves according to a control signal. Of course, the equipment 2000 can also be operated or controlled by an operator 121. The manual operation automation device 120 may also include the functionality of a touch panel emulator combined with RPA. This functionality allows operation signals to be output from the operation touch panel by automatically controlling the coordinate positions of the operation buttons displayed on the operation touch panel based on the control sequence of the RPA. By using this manual operation automation device 120, which combines the functions of RPA and a touch panel emulator, it is possible to continue using equipment 2000, for example, even if it has an outdated operating system, without wasting the equipment.
[0080] Furthermore, the above-mentioned manual operation automation device 120 can also be connected to other systems. The status data of the above-mentioned equipment 1000 and equipment 2000 (sensor output data, product inspection data, etc.) and the status data of worker 121 (control data based on worker operations) are monitored through virtual equipment 1000C, equipment 2000C, and virtual worker 121C formed (mapped) in cyberspace CY. A management shell AAS may be placed in part of the communication path (network NET) between the real space PH and the virtual space CY. Transmission data or reception data from each device exists at the location of this management shell AAS. For this reason, it is desirable that the management shell AAS placed at this location does not individually and in parallel transmit and receive the transmission and reception data of each device, but rather is a type of management shell that sends and receives the transmission and reception data of each device in a hierarchical data format in order of the priority of checking (or needing to verify) the data.
[0081] The cyberspace CY contains a block that includes the databases DB1 and DB2, request control data, and the optimization algorithm processor 6000 described in the previous embodiment. This block constantly communicates with the on-site analysis and judgment blocks 3001 and 4001, and sends request control data and update data to the analysis and judgment blocks 3001 and 4001 as instructions based on the judgment results of the analysis and judgment blocks. The request control data is sent based on the results of the equipment status data analysis by the analysis and judgment blocks 3001 and 4001, and is the request control data optimized for the equipment. The equipment that receives the request control data sends the control result as response data to the cyberspace CY, and also sends it to the remote center unit 5001 via the analysis and judgment blocks 3001 and 4001.
[0082] In this example, the remote center unit 5001 has three remote monitoring and control consoles 5011, 5012, and 5013, but the number is not necessarily limited. Appropriate remote monitoring and control consoles may be prepared depending on the equipment or some of the devices or equipment of the equipment. This is because the control sequence and control level of equipment or parts of equipment may change based on improvements or functional upgrades. In such cases, experts from the equipment manufacturer or device manufacturer may arbitrarily adjust the control sequence and control level, which may result in an increase or decrease in the number of remote monitoring and control consoles for a single piece of equipment.
[0083] Therefore, the remote monitoring and control consoles 5011, 5012, and 5013 each include request control data generation units 5002a, 5002b, and 5002c, respectively. The control data anticipated in advance by the request control data generation units 5002a, 5002b, and 5002c is stored in databases DB1 and DB2 via analysis and judgment blocks 3001 and 4001. This configuration means that even if the devices and equipment constituting the facility are replaced or upgraded, the system can flexibly adapt as a control system.
[0084] From the remote monitoring and control consoles 5011, 5012, and 5013, arrows 11a, 12a, and 13a to the analysis and judgment blocks 3001 and 4001 represent the pathways for control requests (request control data), while arrows 11b, 12b, and 13b represent the pathways for response data.
[0085] When control data is updated, analysis and judgment blocks 3001 and 4001 have the function to update the corresponding control data in databases DB1 and DB2.
[0086] When the equipment is in operation, the analysis and judgment blocks 3001 and 4001 analyze the equipment's status data. Based on the analysis results, the analysis and judgment blocks 3001 and 4001 read request control data from databases DB1 and DB2 and provide it to the corresponding equipment. Data indicating the control result of the equipment controlled by the request control data (response data) is sent to the corresponding remote monitoring and control console. Remote monitoring and control consoles 5011, 5012, and 5013 are each equipped with display devices that visualize and display the response data, allowing technicians to recognize the equipment's status by viewing the visualized graphs and numerical values. The status includes things like the appropriate temperature of the equipment and materials, the appropriate quantity of materials, the appropriate speed of conveyors, and the quality of the products.
[0087] Here, we will explain the case where test mode is set in this system. In this mode, the remote monitoring and control consoles 5011, 5012, and 5013 display the equipment under their control and the type of request control data for that equipment (which may also be called the processing type, processing model, or basic model) on the display, based on user operation. The user selects the equipment they want to test via the console. They also perform the "execute" operation by changing the parameters set in the processing model (control level, threshold, numerical value, output level, etc.). This allows the system to collect equipment status data when the equipment is started.
[0088] In the above test mode, it is desirable to perform simulations using digital data in a virtual space sequentially from upstream to downstream of the equipment during installation. For parameters, it is desirable to set limits on the variable range of parameters by trying upper and lower limits. The simulation program uses virtual (ideal) response data from the equipment side to pre-created test control data. The simulation program then checks whether the actual response data matches the ideal response data when the test control data is given to the actual equipment. If the actual response data deviates from the ideal response data, adjustments to the parameters included in the control data or adjustments to the functions of the actual equipment are carried out by a specialist engineer.
[0089] If no problems are found after the above simulation is completed, an experiment will be conducted to manufacture an actual prototype. During this experiment, control data for the specific processing model, including parameters, will be stored in databases BD1 and BD2 via analysis and judgment blocks 3001 and 4001.
[0090] Figure 6A is an explanatory diagram illustrating the characteristics of the control type (which may also be called an algorithm or processing model) adopted in this system. In the two-dimensional blocks of Figure 6A, the blocks in column Y1, in order from top to bottom (X1,Y1), (X2,Y1), (X3,Y1), (X4,Y1), show marks for human-machine collaborative, sequence, star, and composite program sequences. In column Y2, the blocks in order from top to bottom (X1,Y2), (X2,Y2), (X3,Y2), (X4,Y2), show examples of descriptive characters for the program sequence marks: MMCT, SEQT, STAT, and MIXT. Furthermore, in column Y3, the blocks in order from top to bottom (X1,Y3), (X2,Y3), (X3,Y3), (X4,Y3), describe the characteristics of the corresponding algorithms.
[0091] X1, Y3 (Human-Machine Collaborative Type)... This is an algorithm in which control is performed while humans manually handle some of the machinery or devices in the equipment. This includes manual cleaning, switch operation, etc. X2, Y3 (Sequence Type) ... This is an algorithm that controls multiple machines or devices making up a facility in a predetermined order. X3, Y3 (Star-shaped type)... This is an algorithm in which a central device (e.g., an analysis / judgment block) controls multiple machines or devices that make up a facility, either all at once, randomly, or sequentially, while checking the reactions of the other devices. X4, Y3 (combined type)... This is an algorithm that combines the human-machine collaborative, sequence, and star type algorithms described above.
[0092] Figure 6B is an explanatory diagram that broadly classifies the usage patterns of the control types described above. In the two-dimensional block of Figure 6B, column TY1 shows examples of equipment actions controlled by MMCT (Man-Machine Collaborative Type), and column TY2 shows examples of equipment actions controlled by SEQT (Sequence Type) and STAT (Star Type).
[0093] The trigger type for the above action is described in column TY0. In this example, the trigger types are broadly divided into EV1 (event) and PL1 (plan). EV1 (Event)... This is a control that is activated and executed when a high-priority event such as an abnormal situation occurs. When this event occurs, the equipment or function controlled by MMCT (Man-Machine Collaborative Type) is equipment or function that requires human intervention in response to an alert detected by monitoring (EV11). In addition, when this event occurs, the equipment or function controlled by SEQT (Sequence Type) or STAT (Star Type) is equipment or function for which the response method (procedure) to the alert is predetermined and controlled based on that response method. Control in this case tends to be executed automatically (EV12). PL1 (Plan)... This refers to control that is started up or operated based on a plan. At this time, equipment and functions to which control by MMCT (Man-Machine Collaborative Type) is applied are, for example, equipment and functions to which control is applied during remote maintenance or initial setup of PLC (Programmable Logic Control) (PL11). Also, equipment and functions to which control based on an operation plan is applied are equipment and functions to which control based on an operation plan is applied at this time, such as SEQT (Sequence Type) or STAT (Star Type) (PL12).
[0094] Furthermore, the operating plan is pre-programmed by the equipment and its manufacturers and engineers, including programs for normal (non-urgent) operation, abnormal (emergency) operation, and operation changes, and is set for the equipment and its functions. In particular, it is desirable that the change patterns of control data during normal operation of the equipment and the change patterns of the equipment's state data acquired by monitoring (sensors) at that time are the same pattern or have a specific correlation.
[0095] As described above, this system classifies control types for each piece of equipment and function, and understands and organizes control patterns that represent the control sequence for each piece of equipment and function. Therefore, it is possible to understand and anticipate the overall operation pattern of the equipment from the program (control type) in each situation: when performing inspection and repair, when the equipment is operating stably, and when there is a high level of urgency. For example, if the overall performance changes when some parts of the equipment are replaced, it becomes easier to determine from the control pattern in the program whether the operation of the said part (response speed or temperature change) is having an effect. Also, when adjusting the control parameters of the replaced part, the work becomes easier as it only requires adjusting the parameters of the step corresponding to the replaced part within the control pattern.
[0096] While three control types were described above, in this embodiment, the control type is applied not only to the control program but also to the "type of state data collection program." That is, when equipment is controlled by a human-machine collaborative type, the equipment state data resulting from that control is also collected by a human-machine collaborative type. Similarly, when equipment is controlled by a sequence type, the equipment state data resulting from that control is also collected by a sequence type. Similarly, when equipment is controlled by a star type, the equipment state data resulting from that control is also collected by a star type. In other words, it is designed so that state data generated based on the control results is collected according to the control sequence. State data in response to control is collected synchronously in the order of control.
[0097] This method prevents incorrect judgments (diagnoses) because, even if multiple pieces of equipment or functions have different response times, the order in which equipment status data is collected remains unchanged. In other words, when devices or functions A, B, C, and D are controlled in a sequence, the status data of those devices or functions is also collected by a sequence-type status data collection program. For example, even if the control response time of B is long, the status data of C will be collected after the status data of B has been collected.
[0098] The above explains that the status data of the controlled device (equipment) is collected in synchronization with the control type (a type that outputs multiple control commands sequentially). In other words, the control type in this embodiment assumes that multiple control commands are given to the controlled device (equipment) sequentially with a time difference.
[0099] However, looking at it in finer time units, a single command may result in multiple actions in a single controlled device (equipment), and multiple state data may be collected from multiple sensors monitoring each action. In this case, there may be a time lag before the state data output from multiple sensors stabilizes. Therefore, if, after a single command is given to the controlled device, the output data from each sensor is simultaneously held (into a register) at the same time and treated as state data, it will result in obtaining inaccurate state data. Countermeasures for this will be explained later in Figures 9A-9F. Figure 7 is an explanatory diagram illustrating the flow of the setup process when performing initial setup of equipment and devices in this system. It shows the procedure for setting control data for various control patterns to the analysis / judgment block (e.g., 3001) (step F3) via, for example, the optimization algorithm processor 6000 (step F2) on the cloud server from the remote center unit 5001 (step F1). In this case, the order of steps F2 and F3 may be reversed.
[0100] The database of the analysis / judgment block stores control data for controlling the equipment, devices, or functions of the facility that the analysis / judgment block 3001 is responsible for. The optimization algorithm processor 6000 also stores control data for controlling multiple analysis / judgment blocks 3001 that it oversees.
[0101] The analysis / judgment block 3001 can then set the corresponding control data for the device, equipment, or function it is responsible for (step F4).
[0102] In the remote center unit 5001 described above, the user can formulate control methods corresponding to the plans explained in Figure 6B for each piece of equipment, and can also formulate response methods for events, etc. (F11). Based on this formulation, control data corresponding to each plan and event is created. In other words, this control data is used to issue commands to the equipment, set schedules, and also to enable the equipment to automatically respond to events and alerts. This control data utilizes algorithms belonging to the control types explained earlier in Figures 6A and 6B (F21), and the appropriate type of algorithm is selected for each piece of equipment.
[0103] Then, the above control data is set for the cloud server's optimization algorithm processor 6000 (F2).
[0104] Next, the analysis / decision block 3001 sets the algorithm in the format received from the server to the device or equipment to be controlled (F3, F31). Here, the control data (commands, etc.) based on the control type algorithm may be converted to the specific format of the device or equipment within the facility. This conversion is, for example, the instruction format and instruction code of the control data, and does not change the control content or affect the control. This conversion process may be performed by the manual operation automation device 120 shown in Figure 5.
[0105] Next, the devices and equipment execute scheduled operations according to the algorithm. They also notify higher layers of job information and status data. These higher layers include, for example, cloud servers and upstream equipment analysis / decision blocks (or edge devices) (F41).
[0106] As described above, this system employs a method that classifies remote control algorithms into several types (control types) and identifies the control type that is basically suitable for each piece of equipment. Identifying the appropriate control type for the equipment in this way makes it easier to design and modify the control algorithm for the controlled equipment from a management perspective. For example, by providing attribute data that indicates the control type of an algorithm, it becomes easier to identify algorithms. Furthermore, by using attribute data to simplify the classification and organization of algorithms, and the selection and specification of algorithms, it is also possible to simplify the process of combining algorithms. Moreover, it becomes possible to detect when the control type of an algorithm under design is built to a type different from the attribute type (i.e., when it is built to an impossible type), thereby detecting design errors.
[0107] Figure 8 is a diagram illustrating a system overview that explains a function in which, for example, the analysis and judgment block 3001 allows for the pre-preparation of multiple algorithms for devices and equipment within the facility 1000 under the jurisdiction of the analysis and judgment block 3001.
[0108] In the factory, it is necessary to test the functions of the devices and equipment under the jurisdiction of analysis and judgment block 3001 and check whether they are operating normally.
[0109] This analysis and determination block 3001 includes the main control unit E903 and the equipment / function control unit E904, which correspond to the equipment status data analysis unit 3002, automatic control unit 3006, status level determination unit 3005, and request control data generation unit 5002 shown in Figures 1 to 3. In particular, the main control unit E903 and the equipment / function control unit E904 construct the automatic control unit 3006 and the request control data generation unit 5002 described earlier.
[0110] The analysis and judgment block 3001 is required to notify alerts when abnormalities occur in factory equipment, machinery, or manufactured goods, including, for example, emergency shutdowns of production lines.
[0111] To this end, the analysis and judgment block 3001 needs to be equipped with various algorithms. These algorithms are stored in the database DB1. For example, multiple algorithms of the same control type (e.g., star configuration) may be provided for multiple devices or equipment within the same facility. Even among these multiple algorithms of the same control type, there may be differences in the set parameters or some of the commands. These algorithms are used when the overall production efficiency is varied, or when devices with the same function are switched from the first device to the second device.
[0112] Furthermore, even with the same control type, an emergency stop algorithm may be provided. In the event of an emergency, this algorithm is selected by the equipment / function control unit E904 and provided to equipment 1000.
[0113] The above-mentioned equipment / function control unit E904 operates in response to notifications from the cloud server or instructions from the remote center unit 5000. The equipment / function control unit E904 can connect to the remote center unit 5000 via the main control unit E903 and the transceiver unit E902.
[0114] The remote center unit 5000 can remotely control the analysis / judgment block 3001 and has multiple modes. The first mode is the line startup mode, in which the remote center unit 5000 can work with the analysis / judgment block 3001 to select and set an appropriate algorithm for each control target. This algorithm is provided in advance by the equipment design manufacturer, and the remote center unit 5000 can register this algorithm in the database DB1 of the corresponding analysis / judgment block.
[0115] The second mode is the trial run mode, in which the analysis / judgment block, server, and remote center unit 5000 can monitor the operating status of the equipment. In this monitoring, it is possible to check whether predetermined equipment status data has been obtained.
[0116] In trial operation mode, if predetermined equipment status data is not obtained, the remote center unit 5000 adjusts the parameters of the corresponding equipment algorithm as feedback control. If equipment status data is obtained through this adjustment, the remote center unit 5000 stores the algorithm with these parameters as the reference algorithm in the database DB1.
[0117] In this trial mode, inspectors can intentionally lower the hydraulic pressure or change the temperature of the equipment or machinery to check whether the anomaly detection system is functioning correctly. The response time delay during this process can also be monitored, for example, by a monitoring device, and if the delay time meets the specified requirements, the anomaly detection algorithm is judged to be functioning correctly.
[0118] When equipment and machinery are in operation, for example, if the weather forecast predicts cloudy or rainy weather in a few hours, the amount of solar power generated will decrease, and countermeasures must be taken. In such cases, inspectors can intentionally reduce the power to check whether backup power generation is activated or whether the power consumption reduction function for the entire system is activated.
[0119] Furthermore, some equipment is interconnected, utilizing parts manufactured at other factories or other locations. In such cases, accidents along the transportation route from other factories or other locations to the relevant equipment may prevent the acquisition of planned assembly parts. While countermeasures are necessary, this system allows for the configuration of stopping certain manufacturing lines or varying the manufacturing speed by switching the algorithms stored in the database DB1 of the analysis / judgment block 3001 mentioned above. Figure 9A is a diagram illustrating the diagnostic content (which may also be called the diagnostic level) based on the determination of the status data of the equipment and machinery of this system, and the action functions that should be taken in accordance with the determination factors or determination results.
[0120] In this system, equipment status data is constantly monitored by the equipment status data analysis unit 3002 (4002) and the status level determination unit 3005 (4005). The status data received from the equipment is analyzed by the status data analysis unit 3002, and based on the results, the status level determination unit 3005 determines the status level. In other words, a diagnosis is performed (diagnosis level 20a). Here, there are multiple status levels, ranging from "non-urgent," which does not require any action for normal operation, to "urgent," which requires immediate action depending on the nature of the abnormality. Control is performed for equipment corresponding to each status level. If the status level determination unit 3005 (4005) determines that the status is "non-urgent," the operation control program for the equipment executes optimal operation control of the entire equipment, control of the manufacturing efficiency of the production line, determination of productivity quality, calculation of total energy costs, and calculation of CO2 emissions. Such operation control is entrusted to the optimization algorithm processor 6000 described earlier. This operation control needs to be performed on a factory-by-factory basis depending on the situation, and in that case, the control is performed not based on information from a single analysis / determination block 3001, but also using information from analysis / determination blocks of multiple pieces of equipment (21a). The determination results (diagnosis results) of the status data can be checked from the monitor devices 3011 and 4011 (shown in Figures 1, 2, and 3).
[0121] If the status level determination unit 3005 (4005) determines that the status of the equipment has shifted from "highly urgent" to "urgent" (lowly urgent), the optimal operating state of the individual equipment is checked, and feedback is provided to each individual piece of equipment. In such cases, as explained earlier in Figure 8, the appropriate algorithm is selected from among multiple algorithms of the same control type and provided as feedback to the equipment. This enables the optimal operation of the individual equipment (21b).
[0122] An example of a situation where the state level determination unit 3005 (4005) determines that the equipment status has shifted from "highly urgent" to "lowly urgent" is when the performance of the power system or manufacturing system deteriorates (21c). In this case, control is required to balance and level the power system and manufacturing system lines. Imbalances and non-levelings can be caused by mismatches in processing time or processing volume between consecutive pieces of equipment, so feedback control is immediately performed in the analysis and determination block. If the system does not stabilize as a result of the feedback control, control is performed using an appropriate algorithm, such as generating an alarm or human intervention, to stabilize the entire system.
[0123] An example of a situation where the status level determination unit 3005 (4005) determines that the equipment status has transitioned to "medium-urgent" is when the performance of a single piece of equipment, such as a power system or manufacturing system, deteriorates (21d). In such cases, as explained earlier in Figure 8, an appropriate algorithm is selected from among multiple algorithms of the same control type and fed back to the equipment. It is desirable that this process be performed by the on-site analysis and determination block. In this case as well, if the performance deterioration does not improve, control is performed using an appropriate algorithm, such as by generating an alarm or human intervention, to attempt improvement.
[0124] Examples of situations in which the status level determination unit 3005 (4005) determines that the equipment status has transitioned to "highly urgent" include cases where a disaster occurs, safety is compromised (gas leak, liquid leak, reduction in power energy, etc.), or a piece of equipment stops (21e). In these cases, control data involving the occurrence of alarms or human intervention is used.
[0125] Furthermore, the criteria for determining non-urgent and urgent conditions based on the state level determination unit 3005 (4005) are not limited to those described above, and even finer levels may be set. For example, during periods when a mild or moderate emergency occurs, this can also be used as a preparation period for feedback (control data) that is expected to be used next.
[0126] Figures 9B, 9C, and 9D illustrate the characteristics of this system when commands for controlling the equipment are given from the automatic control unit 3006 to the manufacturing equipment (controlled unit) 1001.
[0127] Figure 9B shows a representative relationship between the analysis / judgment block 3001 and the equipment 1000. As explained earlier, when some kind of control is required for the equipment 1000, the control command or control request output from the automatic control unit 3006 is received by the receiving unit 1004 of the equipment 1000 and provided to the controlled unit within the equipment. In this case, the command may be single or multiple commands issued simultaneously. Similarly, the controlled unit may be single or multiple units.
[0128] Inside the equipment 1000, when a command received by the receiving unit 1004 is given to a control unit within the equipment, the control unit operates according to the command. The equipment status detection unit 1002 detects the state of the control unit that has operated based on the command.
[0129] Status data indicating changes in the state of equipment that have been operated in response to a command is transmitted to the equipment status data analysis unit 3002 by the response data transmission unit 1005. The status data may include not only changes in the state of the equipment but also changes in the state of the manufactured products.
[0130] In this system, the response data transmission unit 1005 specifically sends out controlled equipment status data as response data in response to request control data. In contrast, the equipment status data transmission unit 1003 regularly sends out equipment status data when the equipment is in a stable state. However, these can, of course, be configured as a single unit.
[0131] Figure 9C simplifies the above system and shows how sensors are provided at multiple locations on the equipment (controlled unit) 1001, and how the equipment state detection unit 1002 detects the detection signals from each sensor. As shown in the figure, the state of the controlled unit is detected by three sensors 1, 2, and 3. In reality, there are various outputs from various sensors (temperature, humidity, amount and weight of material, image data, changes in liquid volume, etc.), and the sensor group will differ depending on the manufacturing equipment.
[0132] The outputs of sensors 1, 2, and 3, which change in response to a single command included in the request control data, are transmitted to the equipment status data analysis unit 3002 via the response data transmission unit 1005. When the outputs of sensors 1, 2, and 3 are stable, they are transmitted to the equipment status data analysis unit 3002 via the equipment status data transmission unit 1003.
[0133] Figure 9D shows an example timing chart from the time the receiving unit 1004 receives a request control data (including one or more commands) until the response data transmission unit 1005 transmits the response data corresponding to that command. The sensor detects the state of the object (part of the device or function of the device) that responds to the command. However, multiple parts of the device or multiple functions of the device do not all respond simultaneously at the moment a command is given. Even if commands are given to parts of the device or functions of the device at the same time, the reaction (response) times of these parts of the device or functions of the device often differ. In addition, due to the characteristics of multiple sensors, the response times of multiple sensors to a command given simultaneously may differ.
[0134] For example, if the control data includes a command that controls the motor speed of the equipment and a parameter that controls the liquid volume in the cleaning fluid tank, there will be a difference between the time it takes for the motor speed to reach the target value after the command is received and the time it takes for the liquid volume to reach the target value after the command is received. Other types of commands include those for controlling the on / off state of switches and raising / lowering the temperature.
[0135] As shown in Figure 9D, let's assume that sensors 1, 2, and 3 are installed in various locations (each with a different function) within a single piece of equipment. Now, let's assume that request control data is provided to the equipment, and each command within the control data is assigned to a different function.
[0136] For each point in time TS1, the time TS from that point in time TS1 to point in time TS2, when the response states of multiple equipment parts and functions stabilize, is measured in advance through testing and stored in the response data transmission unit 1005. Then, when a command is received by the receiving unit 1004 and time TS has elapsed from point in time TS1 assigned to the equipment parts and functions, the output of each sensor is received from the equipment state detection unit 1002 and transmitted as response data to the equipment state data analysis unit 3002. As a result, the equipment state is accurately determined by the state level determination unit 3005.
[0137] In the above explanation, it is assumed that the response data transmission unit 1005 manages the time for transmitting response data to the equipment status data analysis unit 3002. That is, the response data transmission unit 1005 stores the time TS until the point TS2 when the response states of multiple equipment parts and functions stabilize. However, this time management may also be performed by the equipment status detection unit 1002. In other words, the equipment status detection unit 1002 may manage the time TS from the point TS1 when the receiving unit 1004 receives a single command to the point TS2 when detection data from multiple sensors is sent out. As described above, for example, if you start the equipment with a single command, multiple devices within the equipment will turn on simultaneously. However, the startup time differs for each piece of equipment (the time from startup to when it is ready varies). Therefore, the maximum time TS (Time Stamp) required for all devices within the equipment to be ready is measured in advance, and the output of the status detection sensors for all devices is detected at time TS2 in Figure 9D.
[0138] Figure 9E shows a basic example of the communication data format used in the data transmission and reception function of this system.
[0139] First, in this system, identification data (command ID) is added to the command described above, and when the sensor output is sent to the equipment status analysis unit 3002 as response data, the command ID (attribute data) is added to the response data. This makes it possible to identify the command that caused the response when the response data is analyzed. In this way, when the equipment status data analysis unit 3002 analyzes the response data, it can accurately collect and analyze the response data corresponding to the command sent by the automatic control unit 3006.
[0140] Figure 9E(a) shows the basic structure of the data section of the communication data sent for requests from the analysis / decision block (3001 in Figure 9B, 3001 and 4001 in Figure 5) or the optimization algorithm processor (6000 in Figure 5). At the beginning of the data, the request header Ta1 is written, which also includes the source ID. The source ID is, for example, the identification data of the request control data generation unit 5002. Next, the identification data ID Ta2 of the equipment to be controlled is written. Next, the identification data ID Ta3 of the processing model is written, followed by the number of control targets, which indicates the number of target locations to be controlled, and the command ID Ta4, which was explained earlier. After that, the control target location ID and the command Ta5 indicating the control content are written. These control target location IDs and the commands Ta5, Ta6, ... Tan indicating the control content are arranged in an order according to the processing model. Finally, the END data is written at the end of the data.
[0141] Figure 9E(b) shows the basic structure of the response data sent from the controlled equipment (1000 in Figure 9B, 1a-2n in Figure 5) in response to the above request. At the beginning of the data is the response data header Tb1, which also includes the source ID. The source ID here is also the identification data of the request control data generation unit 5002. Next is the identification data IDTb2 of the equipment that is making the response, followed by the identification data IDTb3 of the processing model used for control. Then the number of controlled objects and the command IDTb4, which was explained earlier, are described. After that, the controlled object location IDs, in the same order as the above request data, and the sensor outputs obtained from these controlled object locations, i.e., state data (Tb5, Tb6...Tbn), which may be more than one, are arranged. Finally, the END data is described at the end of the data. There may be more than one state data because the controlled object location is monitored by various sensors and IoT devices.
[0142] The above response data includes the command ID assigned to the equipment. Therefore, when the equipment status data analysis unit 3002 receives the response data, it can detect which command the response data was obtained in response to. Moreover, as explained earlier, even if there is a time lag until the accurate value of the response data from each sensor is obtained (even if the time from the time TS1 when the command is given until the accurate value is obtained differs between sensors), this system can handle response data when the detection state of all sensors is stable.
[0143] Figure 9E(c) shows an example of a data format used when a user directly remotely controls equipment or a part thereof from the remote center unit 5001. The data begins with a remote operation header Tc1, which also includes the source ID. Next, the identification data ID Tc2 of the equipment to be controlled is described. The following command is an individual control ID Tc3, indicating that it is individual control. Therefore, the analysis and judgment block (3001 in Figure 4B) that recognizes this data recognizes that it will control only the devices to be controlled (1a to 2n in Figure 4B) and their control points. Next, the identification ID of the control target point and the command Tc4 are described. Therefore, the analysis and judgment block (3001 in Figure 5) remotely controls only the specified control target point.
[0144] In the system described above, the automatic control unit 3006 and the equipment status data analysis unit 3002 each have a command ID processing function (processing circuit). This processing function (processing circuit) also includes a function to compare the command ID when the automatic control unit 3006 sends request control data with the command ID when the equipment status data analysis unit 3002 receives response data. When the command ID at the time of transmission and the command ID at the time of reception match, it is determined that the data is a response data corresponding to the transmitted command.
[0145] The processing function (processing circuit) described above may be configured between the receiving unit 1004 and the response data transmission unit 1005 and the equipment status data transmission unit 1003. In other words, this processing circuit determines that the received command corresponds to the response data when the command ID at the time of reception matches the command ID at the time of preparation for transmission. Based on this determination, the response data is transmitted to the equipment status analysis unit 3002.
[0146] The above data format is merely an example and is not limited to this form; various arrangements of data and variations are possible.
[0147] As described above, this system has a receiving unit that simultaneously receives commands for each of the multiple control units of the equipment from an external source. It also has multiple sensors that detect the actions of the multiple control units in response to each command. Furthermore, it has a response data transmission unit that sends the outputs of the multiple sensors to the outside as response data. Here, the response data transmission unit adds the command ID, which is the command identification data, to the response data before transmitting it.
[0148] Furthermore, the equipment status detection unit sets the capture timing for each sensor output according to the response characteristics of the control unit to which the sensor is attached. Therefore, the outputs of the multiple sensors are collected (captured) by the equipment status detection unit at the set timing and input to the response data transmission unit.
[0149] Figure 9F shows a table of request control data used according to the diagnostic level 20a, which is the result of analysis by the state data analysis unit 3002. This table DB3T is prepared, for example, in DB3 in Figure 8.
[0150] Request control data is prepared according to the control target locations of the equipment 1, 2...n. Specifically, table DB3T shows the diagnostic (judgment) levels, which are numerical values ranging from urgent to non-urgent, diagonally to the left of the diagram. Although only one diagnostic level 20a is shown in the diagram, there are separate diagnostic levels for each of the equipment 1 through n, shown vertically to the left of the diagram.
[0151] Equipment 1 through equipment n each include control target locations 1, 2, ..., n. Request control data can be prepared for each control target location.
[0152] Furthermore, the request control data can be in the form of sequence-type SEQT, star-type STAT, human-machine collaborative MMCT, or a combination thereof, and multiple sets can be prepared in advance. In the diagram, SEQT(1,1) represents the memory area (storage location) of request control data (sequence-type) that can be prepared for control target location 1 of equipment 1, STAT(1,1) represents the memory area of request control data (star-type) that can be prepared at control target location 1 of equipment 1, and MMCT(1,1) represents the memory area of request control data (human-machine collaborative type) that can be prepared for control target location 1 of equipment 1. Request control data is not prepared in all of these storage locations; it is possible to prepare the control data necessary for control target location 1.
[0153] Furthermore, memory areas are also reserved for preparing request control data for other candidate sequence-type SEQT, star-type STAT, and human-machine collaborative MMCT for the same control target location 1. In the example shown in the figure, the areas for SEQT(1,m), STAT(1,m), and MMCT(1,m) are shown, making it possible to prepare m request control data. Of course, it is not necessary to store control data in all areas, and areas where control data is not needed will be left empty.
[0154] Which request control data is adopted is determined based on the judgment result of the automatic control unit 3006 or the optimization algorithm processor 6000, depending on whether equipment 1 is in an urgent or non-urgent state.
[0155] The above describes how to prepare request control data for control target location 1 of equipment 1, but the same procedure applies to control target locations 2, 3, ..., n. Furthermore, the same procedure applies to other equipment 2, 3, ..., n as to control target location 1 of equipment 1.
[0156] By preparing a database in the format described above, it becomes easier to manage control data for each part and function of the equipment. Of course, the tables described above are assigned addresses to the storage locations of each request control data to enable maintenance. Furthermore, the data is visible to the user on a monitor, and it is possible to adjust the commands and parameters within the control data.
[0157] The DB3T table described above has multiple areas for describing request control data for a single controlled location, allowing for the preparation of multiple request control data sets. However, it is not necessary to fill all areas, and the usage method can be configured as appropriate by the equipment designer.
[0158] As can be understood from the explanations in Figures 9A-9F and Figure 8 above, in this system, even for the same sequence-type SEQT program, there are programs used in non-urgent situations and programs used in emergency situations. The same applies to star-type STAT programs and human-machine collaborative MMCT programs, where there are programs used in non-urgent situations and programs used in emergency situations. Furthermore, even for the same sequence-type SEQT program, even if it is used in non-urgent situations, there may be multiple versions with different control levels (control strengths). The same applies to star-type STAT programs and human-machine collaborative MMCT programs.
[0159] Therefore, the equipment / function control unit E904 (shown in Figure 8) of the analysis / determination block 3001 can select appropriate sequence request control data from the database according to the content of the response from the equipment and feed it back to the equipment or device.
[0160] Figure 10 shows an example of equipment that employs a sequence-type SEQT program, a star-type STAT program, and a human-machine collaborative MMCT program as basic control data, and an example of the relationship between these equipment and the events that occur in the equipment. It also explains the state level determination results (abnormal NG or normal G) for events by the state level determination units 3005 and 4005, and examples of their scenarios.
[0161] Column 42 shows the type of each program, Column 43 shows the remote monitoring equipment and the controlled equipment, and Column 44 describes the issues (events, etc.) that occur in the monitored and controlled equipment, and shows the status level determination result (abnormal NG, normal G) when the issue (event) occurs. First, let's explain an example of controlling equipment using a sequence-type SEQT program. This example assumes that equipment 1000 includes general-purpose equipment and a die-casting machine. Now, let's assume that the sequence-type SEQT is applied to the operation control of the general-purpose equipment (conveyor belt, product checking device, etc.) 43a and the die-casting machine 43b, and that the general-purpose equipment has detected a quality abnormality as an event (44a). In this case, the state level determination unit 3005 determines that the abnormality is NG. In this case, the system scenario might involve, for example, detecting anomalies in process data to trigger an alert indicating a quality anomaly, followed by a failure analysis based on process conditions. In another scenario, the die-casting machine 43b undergoes optimization control of the mold temperature, and the mold temperature is controlled to an appropriate level. In this case, the state level determination unit 3005 determines that the result is normal (G). In this system scenario, production cannot begin until the mold temperature before closing is within a certain range; therefore, temperature optimization control is required. When controlling equipment and machinery in this way according to a predetermined process, a sequence-type SEQT program is applied for control.
[0162] Next, we will explain an example in which equipment 1002 is controlled by a star-type STAT program. In this example, the star-type STAT is applied to the operation control of general-purpose equipment 43c and facility management equipment 43d, and as an event, general-purpose equipment 43c performs scheduling of multiple peripheral equipment (44c), and there were no particular problems. In this case, the state level determination unit 4005 determines that it is normal G. In this case, the system scenario involves, for example, remote monitoring of equipment to suggest appropriate maintenance timings for multiple pieces of equipment. In another event, the facility management equipment 43d checks, for example, the linkage status between power consumption and production planning, and based on the results of this check, improvements are made to the equipment operation (44d). In this case, the status level determination result is normal G. In this case, a possible scenario for the system is to monitor, for example, the predicted value of electricity consumption every 30 minutes and the actual production results against the product production plan in the building. Then, measures are taken to increase or decrease electricity consumption so that the actual production results fall within the desired range (46d). Various measures can be taken to increase or decrease electricity consumption, such as controlling the amount of electricity generated and controlling the increase or decrease of electricity used.
[0163] Next, we will explain an example of controlling equipment 1000 using a human-machine collaborative MMCT program. Let's assume that equipment 1000 includes a circuit board assembly manufacturing line 43e, a general-purpose equipment process diagnostic 43f, and a die-casting machine 43g. As an event, suppose that defects such as defects (unevenness), wrinkles, solder wetting defects, and misalignment of components occurred in the circuit board assembly manufacturing line 43e as single, sporadic, or continuous occurrences (44e). In this case, the state level determination unit 3005 determines that it is abnormal (NG).
[0164] One such scenario involves applying a defect correction module (a module has been prepared in advance) to address the problem that has occurred, and then issuing instructions to the site from the remote center unit 5001 to take action. The results of the work at the site are then reflected on the dashboard, which the operator can then review.
[0165] Another event is the process diagnostic event 43f for general-purpose equipment. In this event, for example, in the aforementioned PCB assembly manufacturing line, collaborative control by humans and machines is implemented for events that resulted in an NG (Not Good) status. After the collaborative control is implemented, monitoring and inspection data (temperature, humidity, on-site photos, videos, etc.) is transmitted to the remote center unit 5001, where it is determined whether the result is normal or abnormal. (Here, let's assume it is determined to be normal G.) In this scenario, for example, photos or videos of the workbench are displayed on the monitor device of the remote center unit 5001, and a technician makes a judgment input indicating that it is normal (OK).
[0166] Another event occurs in die-casting machine 43g. For example, an event occurs when a defect occurs in the mold (44g). In this case, the condition level determination units 3005 and 4005 determine it as abnormal (NG). In this case, the scenario would be as follows, depending on the stage at which the defect occurred. These include scenarios for the setup phase after removing the mold and moving on to the next mass production stage, scenarios for the start-up phase after raising the temperature from the cooled state and moving into mass production mode, scenarios for adjusting conditions by changing settings such as temperature during mass production based on judgment on-site for minor defects, scenarios for repairing molds while they are attached to the die-casting machine for minor mold defects, scenarios for repairing the machine when a problem occurs in a part of the die-casting machine, scenarios for testing by setting the conditions and making a prototype product when a new part is adopted, and production planning scenarios that involve stopping equipment when there is free time in the schedule.
[0167] Figure 11 shows another example. It is an example of using a sequence-type SEQT program for monitoring and control of product manufacturing line 43h. Here, we assume that there is a request for line quality improvement as an event (44h). This request can exist in both normal and abnormal systems. In this scenario, the remote center unit 5001 or the optimal algorithm processor 6000 performs situation analysis using multiple algorithms in response to the detection and input of (manufacturing performance data + quality information data). Based on the analysis results, it provides the equipment with corrective actions (request control data) via an analysis / decision block. It also visualizes the analysis results on a dashboard or similar to make it easier for the user to confirm or make decisions. Here, combinations of algorithms are analyzed for each factor of line quality degradation, but when the analysis results are reflected as control data, a sequence-type SEQT program is basically adopted.
[0168] Another example is the use of a star-type STAT program in the monitoring and control of a supplier diagnostic tool (43j). In this case, the diagnostic request visualizes both the supplier's quality and the quality of the manufactured product (44j). This event occurs when the status level is determined to be normal (G). In this case, the most suitable scenario is one in which a process diagnosis is conducted, including the quality of the suppliers.
[0169] Next, another application example of the human-machine collaborative MMCT program will be described. This example is applied to the control of equipment performing injection molding 43k, and in this control, information from production planning and performance management 44k is used as the occurrence of events. This control is adopted when the equipment environment is determined to be in a normal state G as a result of the state level determination. In this scenario, when the equipment becomes ready for production (for example, when the die-casting mold temperature reaches an appropriate value and manufacturing preparations are complete), the equipment is manually started by an operator. In this case, production planning and performance management are handled according to predetermined procedures (controlled by a sequence-type SEQT). In some cases, all aspects may be handled solely by sequence-type SEQT control.
[0170] As an example of applying other machine-collaborative MMCT programs, we will describe an example where it is applied to the control of equipment performing injection molding 43m. In this example, the status level judgment results in an abnormal system NG, and maintenance 44m is performed as an event. One possible scenario in this case is that an alert is triggered based on the equipment status (such as dirt in the piping), and maintenance is performed. After the maintenance, the equipment status is checked again.
[0171] Figure 11 shows yet another example. This is an example where the program of a human-machine collaborative MMCT is applied to a monitoring function or system 43n that checks for discrepancies between normal products and newly manufactured products. In this example, an abnormal system NG is determined as a result of the state level determination, and as an event, determination 44n is performed to determine when, where, and what kind of abnormality occurred. In this scenario, the focus is not on the quality of the product itself, but rather on discovering "differences from the norm" in the production conditions of each individual shot.
[0172] Another example involves applying a human-machine collaborative MMCT program to the control of injection molding equipment (43p). In this example, the state level determination resulted in a normal system G, and the event is an example of an event aimed at improving energy efficiency. The monitoring target is the efficiency of facility and equipment management (43p). There are various methods for determining whether equipment is operating efficiently, depending on the facility and equipment. Furthermore, the criteria for determination may differ depending on the amount of energy supplied from the outside and its allowable value. One possible scenario involves investigating the relationship between product production volume and energy consumption on a manufacturing line to identify points where production volume is high and energy consumption is low. Another scenario involves understanding the utilization status of each factory building and determining whether the building utilization is appropriate based on its relationship with product production volume. Furthermore, there is a method of determining whether energy conservation has been achieved on the production line based on IoT detection data installed on equipment and machinery.
[0173] Figure 12 schematically shows an example of the operation steps of this system that operate based on the determination 20a by the state level determination unit 3005 and / or 4005 described above. These operation steps include the following steps: When the operation of the equipment and / or equipment group is started (Step SA1), the system performs status monitoring and captures and analyzes status data from each part (Step SA2).
[0174] The system is determined to be in the process of recovery (step SC1). If it is not in the process of recovery, the process moves to step SA3. If it is in the process of recovery, the process moves to step SC2, which will be explained later.
[0175] The analysis results are used by a diagnostic function to determine whether the system status is at a non-urgent or urgent level (step SA3). If it is determined to be non-urgent, the equipment and equipment groups are controlled according to the control type SEQT (sequence type), STAT (star type), or MMCT (man-machine collaborative type) that is set in advance for each piece of equipment and equipment group (step SA4). Next, inspection data is acquired using the same type of collection program as the control type set above (step SA5). Then, the process returns to step SA2, and if the system is in a non-urgent state, the routines SA2-SA5 are repeated. Although not shown in the diagram, the process may include steps to improve the performance of the manufacturing line or to implement CO2 reduction measures.
[0176] If an emergency is determined in step (SA3), the process will proceed to steps SB5, SB6, etc.
[0177] In step (SB5), if a strong emergency is detected, the equipment and equipment group are automatically stopped using a control type with a predetermined sequence. The remote center unit 5001 then diagnoses the results of the analysis of the status data up to that point and identifies the cause of the emergency level. Furthermore, it initiates emergency response using a control type predetermined for that cause. Therefore, the control type in this case is not necessarily the same as the control type used in non-emergency situations.
[0178] Next, in step (SB6), emergency response programs (MMCT, SEQT, STAT) are used. These programs are not necessarily the same type as those used in non-urgent situations. When this emergency response is in progress, status data for equipment, equipment groups, and finished products are visualized and monitored by the user on the monitoring device of the remote center unit 5001. The user of the remote center unit 5001 also gives instructions and performs operations to restore the equipment.
[0179] As a result, the status data of each part acquired in step SA2 changes. Then, in step SC1, it is determined that the process is currently in the process of recovery. Then, in step SC2, it is determined from the status data whether or not the equipment and / or group of equipment has recovered.
[0180] If the system is still not restored, proceed to step SB5; otherwise, proceed to step SC3. In step SC3, the system is restarted and the corresponding equipment and / or equipment groups are controlled using a pre-configured control type.
[0181] Figures 13A to 15 illustrate specific examples of operations based on the determination results by the state level determination unit 3005 or 4005 shown in Figure 12.
[0182] Figures 13A-13C summarize the situation when "High B01," which indicates a high level of urgency, is determined in the system's state level determination, as well as the actions taken by the system in response to that situation and the timing of those actions. In other words, when "High B01" is determined, it summarizes what kind of impact (trigger) occurs in each piece of equipment and its surroundings, and what kind of system response action is taken in response to this trigger.
[0183] A high level of urgency refers to situations requiring immediate action, such as when equipment must be shut down due to a disaster or safety concerns, or when equipment performance has significantly deteriorated.
[0184] In the diagram, the rows show the target equipment E00 and E01, the status monitoring content E02 for these equipment E00 and E01, the scope of impact when an abnormality is detected E03, and the indicator for the equipment E04. Furthermore, the first action of the system when the equipment becomes abnormal is shown as action (1) E05, the execution timing of action (1) is shown as E06, the second action is shown as action (2) E07, and the execution timing of action (2) E08 are described in the specification, for example, as explanations F1, G1, H1, J1, K1, L1, and M1. In addition, the types of control models that describe the various behaviors of the system in response to the occurrence of an abnormality in the equipment, which are applied when executing the first and second actions, are shown as E06' and E08'. There are three processing models: STRT for the star type, SEQT for the sequence type, and MMCT for the human-machine collaborative type.
[0185] In the left column of the diagram, items are numbered in the direction of the column, and various types of equipment are shown to the right of the numbers.
[0186] Furthermore, the processes described in each of the items below are executed using the following configuration shown in Figure 1.
[0187] The status monitoring content E01 is the result of the equipment status being detected by the equipment status detection units 1002 and 2002 shown in Figure 1, and then analyzed and the status level being determined by the equipment status analysis units 3002 and 4002 and the status level determination units 3005 and 4005 of the remote center unit 5001 via the equipment status data transmission units 1003 and 2003.
[0188] The affected area E03 is identified, as described above, by analyzing the equipment status using the optimization algorithm 6000 of the remote center unit 5001. As shown in Figure 4, the indicator E04 is input to the optimization algorithm 6000 from an external source, thereby identifying indicators for the monitored object. Based on the relationship between these indicators and the determined equipment status level, appropriate actions are executed at predetermined timings. Control of the equipment (execution of actions) is performed via the automatic control units 3006, 4006 and the receiving units 1004, 2004 shown in Figure 1.
[0189] The following are specific examples. No. 1... If the equipment malfunctions, specifically the compressor (which is considered ancillary equipment but may also be considered part of the manufacturing equipment), the following measures should be taken. • Condition monitoring involves monitoring the amount of high-pressure air (Explanation F1), and the scope of influence extends not only to the equipment itself but also to other equipment (higher layers) belonging to the same system (Explanation G1). • The supply volume of high-pressure air is an indicator (Explanation H1), Action (1) is to make an adjustment request to the output of equipment within the system, rather than to individual equipment, based on the indicators. This request is made when it is executed as an adjustment request to the analysis / judgment block at the site (Action Description J1, and Timing Description K1), and is executed using a star-type STAT control model. Action (2) is a notification (request for equipment setting review) from the remote center to the on-site user based on the request result of Action (1). This action is executed immediately (Action Description L1 and Timing Description M1), and is performed using the control model of the human-machine collaborative MMCT.
[0190] In the above explanations, the explanations with (Explanation F1, G1, H1, J1, K1, L1, M1) attached are the same explanations located in the same block in Figure 13A where Explanation F1, G1, H1, J1, K1, L1, M1 is also written. Similarly, in the following explanations, there is a correspondence between the symbols attached to the explanations in the specification and the symbols written in the corresponding blocks in the figures.
[0191] No. 2... Similarly, in the case of a compressor malfunction, if the status monitoring is as follows, the following actions should be taken. Condition monitoring involves monitoring for abnormal heat generation and vibration during equipment operation (Explanation of Condition Monitoring F2), and the scope of impact directly affects the individual piece of equipment being monitored (the relevant layer) (Explanation of Scope of Impact G2). • Maintaining a state of normal operation is the indicator (Indicator Explanation H2), Action (1) controls operation based on indicators, resulting in either stopping or operating in low-load mode. This action is executed immediately (see Action Description J2 and Timing Description K2) and is performed using a sequence-type SEQT control model. Action (2) involves immediately notifying the power manager of a maintenance request, along with controlling Action (1) (Action Description L2 and Timing Description M2), and is executed in the human-machine collaborative MMCT control model.
[0192] No. 3...If the equipment is a boiler malfunction, the following measures will be taken. • Condition monitoring involves monitoring hot water flow rate and hot water temperature (Condition Monitoring Explanation F3), and the scope of influence extends not only to the equipment itself but also to other equipment belonging to the same system (higher layers) (Monitoring Explanation G3). • Hot water supply volume and shared quality are indicators (Indicator Explanation H3), Action (1) is to request adjustments to the output of equipment within the system, rather than individual equipment, based on indicators, and to the analysis / judgment block at the site. The timing is when it is executed as an adjustment request (Action Description J3, and Timing Description K3), and it is executed using a star-type STAT control model. Action (2) is a notification (request for equipment setting review) from the remote center to the on-site user based on the request result of Action (1), and the timing of this action is immediate (Action Description L3 and Timing Description M3), and it is executed using the human-machine collaborative MMCT control model.
[0193] No. 4... If the equipment is malfunctioning due to a boiler problem, but in other cases, the following actions will be taken. Condition monitoring involves monitoring for abnormal heat generation and vibration during equipment operation (Monitoring Explanation F4), and its impact directly affects the individual piece of equipment being monitored (the relevant layer) (Impact Explanation G4). • Maintaining a state of normal operation is the indicator (Indicator Explanation H4), Action (1) controls operation based on indicators, resulting in either stopping or low-load mode operation control. The action is executed immediately (see Action Description J4 and Timing Description K4) and is performed using a sequence-type SEQT control model. Action (2) involves requesting maintenance from the power manager in conjunction with the control of Action (1), and the timing is executed by immediately notifying the request (Action Description L4 and Timing Description M4) in the human-machine collaborative MMCT control model.
[0194] No. 5...If the equipment is malfunctioning due to a refrigeration unit, the following measures will be taken. • Condition monitoring involves monitoring hot water flow rate and hot water temperature (Monitoring Explanation F5), and the scope of influence extends not only to the equipment itself but also to other equipment (higher layers) belonging to the same system (Influence Explanation G5). • Hot water supply volume and shared quality are indicators (Indicator Explanation H5), Action (1) is to request adjustments to the output of equipment within the system, rather than individual equipment, based on indicators, and to the analysis and judgment block at the site. The timing is when the adjustment request is executed (Action Description J5 and Timing Description K5), and it is executed using a star-type STA control model. Action (2) is the immediate execution of a notification (request for equipment setting review) from the remote center to the on-site user based on the request result of Action (1) (Action description L5, and timing description M5). This is executed using the control models of sequence-type SEQT and human-machine collaborative MMCT.
[0195] No. 6... If the equipment is malfunctioning in the refrigeration unit but in other conditions, the following actions will be taken. • The condition monitoring involves monitoring the chilled water efficiency (Monitoring Explanation F6), and the scope of impact directly affects the individual piece of equipment being monitored (the relevant layer) (Impact Explanation G6). • Maintaining a state of normal operation is the indicator (Indicator Explanation 6), Action (1) involves immediate execution of operational control based on indicators, changes to output parameters, etc. (Action Description J6, and Timing Description L2), and is performed using a sequence-type SEQT control model. Action (2) is executed in conjunction with the control of Action (1) by immediately notifying the on-site user (request for equipment setting review) from the remote center (Action Description L6, and Timing Description M6) using the human-machine collaborative MMCT control model.
[0196] No. 7... If the equipment is also malfunctioning due to a refrigeration unit, and there are other conditions, the following actions will be taken. Condition monitoring involves monitoring for abnormal heat generation and vibration during equipment operation (Monitoring Explanation F7), and the scope of impact directly affects the individual piece of equipment being monitored (the relevant layer) (Impact Explanation G7). • Maintaining a state of normal operation is the indicator (Indicator Explanation H7), Action (1) is performed immediately by the sequence-type SEQT control model to control, stop, or operate in low-load mode based on indicators (Action Description J7 and Timing Description K7). Action (2), along with the control of Action (1), is the immediate execution of a maintenance request notification to the power manager (Action Description L7, and Timing Description M7), and is executed in the human-machine collaborative MMCT control model.
[0197] No. 8...If the equipment is an air conditioning system and there is a malfunction, the following actions will be taken. • The condition monitoring involves monitoring the temperature at the outlet of the air conditioner (Monitoring Explanation F8), and the scope of influence extends not only to the individual unit but also to other units belonging to the same system (higher layers) (Influence Explanation G8). • Maintaining temperature and humidity is the indicator (Indicator Explanation H8), Action (1) involves, based on indicators, adjusting the output of equipment within the system, not just individual equipment, by sending an adjustment request to the on-site analysis and judgment block. This adjustment is performed at the time of the request (see Action Description J8 and Timing Description K8), and is executed using a star-type STAT control model. Action (2) is the immediate execution of a notification (request for equipment setting review) from the remote center to the on-site user based on the request result of Action (1) (Action description L8 and timing description M8), and is executed using the human-machine collaborative MMCT control model.
[0198] No. 9...If the equipment is an air conditioning system and the malfunction is due to a cause other than those mentioned above, the following measures will be taken. • The condition monitoring involves monitoring the remaining amount of refrigerant (Monitoring Explanation F9), and the scope of the impact directly affects the individual piece of equipment being monitored (the relevant layer) (Impact Explanation G9). • Maintaining a state of normal operation is the indicator (Indicator Explanation H9), Action (1) is the immediate execution of operational control based on indicators, changes to output parameters, etc. (Action Description J9, and Timing Description K9), and is executed in the sequence-type SEQT control model. Action (2) involves the immediate execution of a notification (request for equipment setting review) from the remote center to the on-site user, along with the control of Action (1) (Action description L9, and timing description M9), and is executed using the human-machine collaborative MMCT control model.
[0199] No. 10...If the equipment is an air conditioning system and the malfunction is due to a cause different from those described above, the following measures will be taken. • The condition monitoring is for monitoring a decrease in temperature conversion efficiency (Monitoring Explanation F10), and the scope of the impact directly affects the monitored equipment unit (the relevant layer) (Impact Explanation G10). • Maintaining a state of normal operation is the indicator (Indicator Explanation H10), Action (1) is the immediate execution of operational control based on indicators, and changes to parameters to increase output (Action Description J10, and Timing Description K10), and is executed in the sequence-type SEQT control model. Action (2) involves the immediate execution of a notification (request for equipment setting review) from the remote center to the on-site user, along with the control of Action (1) (Action Description L10, and Timing Description M10), and is executed using the control model of the human-machine collaborative MMCT.
[0200] No. 11...If the equipment is an air conditioning system and the malfunction is due to a cause different from those described above, the following measures will be taken. Condition monitoring involves monitoring for abnormal heat generation and vibration during equipment operation (Monitoring Explanation F11), and the scope of impact directly affects the individual piece of equipment being monitored (the relevant layer) (Impact Explanation G11). • Maintaining a state of normal operation is the indicator (Indicator Explanation H11), Action (1) is the immediate execution of control, stop, or low-load mode operation control based on indicators (Action Description J11, and Timing Description K11), and is executed using a sequence-type SEQT control model. Action (2), along with the control of Action (1), is executed in the human-machine collaborative MMCT control model by immediately notifying the power manager of a maintenance request (Action Description L11, and Timing Description M11).
[0201] No. 12...If the equipment is power equipment and there is a malfunction in that equipment, the following actions will be taken. • Status monitoring involves monitoring for power output degradation (Monitoring Explanation F12), and the scope of impact extends not only to the equipment itself but also to other equipment (higher layers) belonging to the same system (Impact Explanation G12). • The stability of the power supply is the indicator (Indicator Explanation H12), Action (1) is to request and execute an adjustment request to the analysis and judgment block for the output of equipment within the system, rather than for individual equipment, based on the indicators (Action Description J12 and Timing Description L12), and is executed using a star-type STAT control model. Action (2) is to immediately notify the on-site user (request for equipment setting review) from the remote center based on the request result of Action (1) (Action description and timing description M12), and is executed in the control model of the human-machine collaborative MMCT.
[0202] No. 13...If the equipment is power equipment and the malfunction is due to other factors, the following measures will be taken. • Status monitoring involves monitoring for increases in load (Monitoring Explanation F13), and the scope of impact extends not only to the equipment itself but also to other equipment (higher layers) belonging to the same system (Impact Explanation G13). • Balancing of power usage within the grid is the indicator (Indicator Explanation H13), Action (1) is to request and execute an adjustment request to the analysis and judgment block for the output of equipment within the system, rather than for individual equipment, based on the indicators (Action Description J13 and Timing Description L13), and is executed using a star-type STAT control model. Action (2) is executed by the human-machine collaborative MMCT control model by immediately notifying the power manager of a maintenance request based on the request result of Action (1) (Action description L13 and timing description M13).
[0203] No. 14...If the equipment is power equipment and the equipment malfunctions due to other factors, the following measures will be taken. Condition monitoring involves monitoring for abnormal heat generation during equipment operation (Monitoring Explanation F14), and the scope of impact directly affects the monitored equipment unit (the relevant layer) (Impact Explanation G14). • Maintaining a state of normal operation is the indicator (Indicator Explanation H14), Action (1) is the immediate execution of control, stop, or low-load mode operation control based on indicators (Action Description J14 and Timing Description K14), and is executed using a sequence-type SEQT control model. Action (2) is executed in the human-machine collaborative MMCT control model by immediately issuing a maintenance notification to the power manager (Action Description L14, and Timing Description M14) in conjunction with the control of Action (1).
[0204] Refer to Figure 13B for further explanation. No. 15...If the equipment is a water treatment facility and there is a malfunction in that facility, the following actions will be taken. • Status monitoring involves monitoring processing quality (Impact Explanation F15), and the scope of impact extends not only to the equipment in question but also to other equipment belonging to the same system (upstream layer) (Impact Explanation G15). • Maintaining a state of normal operation is the indicator (Indicator Explanation H15), Action (1) is an indicator-based control of operation, such as the immediate execution of control such as stopping water discharge (Action Description J15, and Timing Description K15), and is executed using a sequence-type SEQT control model. Action (2), along with the control of Action (1), is executed by the human-machine collaborative MMCT control model by immediately requesting the power manager to review the equipment settings (Action Description L14, and Timing Description M14).
[0205] No. 16... Similarly, if the equipment is a water treatment facility and is malfunctioning due to other factors, the following measures will be taken. • The condition monitoring involves monitoring the remaining amount of chemicals (Monitoring Explanation F16), and the scope of impact directly affects the individual piece of equipment being monitored (the relevant layer) (Impact Explanation G16). • Maintaining a state of normal operation is the indicator (Indicator Explanation H16), There are no actions such as control of the equipment (Action (1)), and Action (2) is the immediate execution of a notification to the power manager requesting a review of the equipment settings based on the indicators (Action description L16, Timing description M16). This is executed using the control model of the human-machine collaborative MMCT.
[0206] No. 17... Similarly, if the equipment is a water treatment facility and is malfunctioning due to other factors, the following measures will be taken. Condition monitoring involves monitoring equipment cleanliness, pump operation, etc. (Monitoring Explanation F17), and the scope of impact directly affects the individual piece of equipment being monitored (the relevant layer) (Impact Explanation G17). • Maintaining a state of normal operation is the indicator (Indicator Explanation H17), Action (1) is the control of operation based on indicators, such as the immediate execution of control by an automatic cleaning function or an automatic recovery program, with immediate timing (Action Description J17 and Timing Description K17), and is executed using a sequence-type SEQT control model. Action (2), along with the control of Action (1), is the immediate execution of a maintenance request notification to the power manager (Action Description L17, and Timing Description M17), and is executed in the human-machine collaborative MMCT control model.
[0207] No. 18...If the equipment is a melting furnace or holding furnace and there is a malfunction in the equipment, the following actions will be taken. • Condition monitoring involves monitoring the molten metal temperature (Monitoring Explanation F18), and the scope of influence extends not only to the equipment itself but also to other equipment (higher layers) belonging to the same system (Influence Explanation G18). • The quality under normal conditions (quality data) is the indicator (Indicator Explanation H18), Action (1) involves controlling the operation of the equipment based on indicators, such as immediately executing changes to control data parameters (Action Description J18 and Timing Description K18), and switches from a star-type STAT control model to a sequence-type SEQT control model for execution. Action (2) is the feedback of quality information to the higher-layer system and the request for improvement, and the timing is when the improvement request is made (Action description L18, and timing description M18). It will be executed using the control model of a sequence-type SEQT.
[0208] No. 19... If the equipment is a melting furnace or holding furnace, and the equipment malfunctions due to a factor other than those mentioned above, the following actions will be taken. Condition monitoring involves monitoring the safety devices of the equipment (Monitoring Explanation F19), and the scope of impact directly affects the individual piece of equipment being monitored (the relevant layer) (Impact Explanation G19). • Maintaining the same level of operation as during safe operation is the indicator (Indicator explanation H19), Action (1) is the control of operation based on indicators, which involves the immediate execution of actions such as stopping operation (starting and stopping) (Action Description J19, and Timing Description K19), and is executed using the sequence-type SEQT control model. Action (2), along with the control of Action (1), is the immediate execution of a notification to the on-site user requesting correction of the operation (Action Description L19, and Timing Description M19), and is executed in the control model of the human-machine collaborative MMCT.
[0209] No. 20... If the equipment is die-casting and malfunctions, the following actions will be taken. • Condition monitoring involves monitoring the mold temperature (Monitoring Explanation F20), and the scope of influence extends not only to the equipment itself but also to other equipment belonging to the same system (higher layers) (Influence Explanation G20). • The quality under normal conditions (quality data) is the indicator (Indicator Explanation H20), Action (1) involves controlling the operation of the equipment based on indicators, such as immediately executing changes to control data parameters (Action Description J20 and Timing Description K20), and switches from a star-type STAT control model to a sequence-type SEQT control model for execution. Action (2) is the feedback of quality information to the higher-layer system and a request for quality improvement, which is executed in the sequence-type SEQT control model at the time of the improvement request (Action Description L20 and Timing Description M20).
[0210] No. 21... If the equipment is die-casting and malfunctions due to other factors, the following measures will be taken. Condition monitoring involves monitoring the pressure at a specific point in the die casting process (Monitoring Explanation F21), and the scope of influence extends not only to the device itself but also to other equipment (higher layers) belonging to the same system (Influence Explanation). • The quality under normal conditions (quality data) is the indicator (indicator explanation H21), Action (1) involves controlling the operation of the equipment based on indicators, such as immediately executing changes to control data parameters (Action Description J21 and Timing Description K21), and switches from a star-type STAT control model to a sequence-type SEQT control model for execution. Action (2) involves providing feedback of quality information to the higher-layer system and requesting quality improvements, and the timing of this action is the same as the request for improvement (Action Description L21 and Timing Description M23), and is executed using the sequence-type SEQT control model.
[0211] No. 22... If the equipment is die-casting and malfunctions due to other factors, the following measures will be taken. • Condition monitoring involves monitoring the injection rate in die casting (Monitoring Explanation F22), and the scope of influence extends not only to the equipment in question but also to other equipment belonging to the same system (upstream layer) (Influence Explanation G22). Control of the alloy injection rate in the upstream equipment becomes necessary. • The quality under normal conditions (quality data) is the indicator (indicator explanation H22), Action (1) involves controlling the operation of the equipment based on indicators, such as immediately changing parameters of control data (Action Description J22 and Timing Description K22), and is executed by switching from a star-type STAT control model to a sequence-type SEQT control model. Action (2) involves providing feedback of quality information to the higher-layer system and requesting quality improvement, and the timing of this action is the same as the request for improvement (Action Description L22 and Timing Description M22), and is executed using the sequence-type SEQT control model.
[0212] No. 23... If the equipment is die-casting and malfunctions due to other factors, the following measures will be taken. • Condition monitoring involves monitoring the safety devices of the equipment (Monitoring Explanation F23), and the scope of impact directly affects the individual piece of equipment being monitored (the relevant layer) (Impact Explanation G23). • Maintaining the same level of operation as during safe operation is the indicator (Indicator Explanation H23), Action (1) is the control of operation based on indicators, which involves the immediate execution of actions such as stopping operation (starting and stopping) (Action Description J23, and Timing Description K23), and is executed using the sequence-type SEQT control model. Action (2), along with the control of Action (1), is the immediate execution of a notification to the on-site user requesting correction of the operation (Action Description L23, and Timing Description M23), and is executed in the control model of the human-machine collaborative MMCT.
[0213] No. 24... If the facility has an X-ray inspection device and there is a malfunction in that equipment, the following actions will be taken. • Status monitoring involves monitoring the defect rate of the judgment results (Monitoring Explanation F24), and the scope of impact extends not only to the equipment itself but also to other equipment (higher layers) belonging to the same system (Impact Explanation G24). • Maintaining the same state as when stable is the indicator (Indicator Explanation H24), Action (1) is to immediately implement the following based on the indicators: product disposal, rejection of X-ray inspection equipment data, and review of control and adjustment parameters (Action Description J24 and Timing Description K24), and to switch from the star-type STAT control model to the sequence-type SEQT control model. Action (2) is the feedback of inspection quality information to the higher-layer system and the request for inspection quality improvement, which is performed at the time of the improvement request (Action Description L24 and Timing Description M24) using the sequence-type SEQT control model.
[0214] No. 25...Similarly, if the equipment includes an X-ray inspection device and malfunctions due to other factors, the following measures will be taken. Condition monitoring involves monitoring the safety devices of the equipment (Monitoring Explanation F25), and the scope of impact directly affects the individual piece of equipment being monitored (the relevant layer) (Impact Explanation G25). • Maintaining the same level of operation as during safe operation is the indicator (Indicator Explanation H25), Action (1) is the control of operation based on indicators, which involves the immediate execution of actions such as stopping operation (start-stop) (Action Description J25 and Timing Description K25), and is executed using the sequence-type SEQT control model. Action (2), along with the control of Action (1), is the immediate execution of a notification to the on-site user requesting correction of the operation (Action Description L25, and Timing Description M25), and is executed in the control model of the human-machine collaborative MMCT.
[0215] Let's move on to Figure 13C and explain. No. 26... If the equipment is a conveyor and there is a malfunction in that equipment, the following actions will be taken. • Condition monitoring involves monitoring the transport speed (Monitoring Explanation F26), and the scope of impact extends not only to the equipment itself but also to other equipment (higher layers) belonging to the same system (Impact Explanation G26). • Production efficiency is the indicator (Indicator explanation H26), Action (1) is the immediate execution of changes to parameters of control data for transport speed, etc., based on the indicator (Action Description J26 and Timing Description K26), and is executed by switching from a star-type STAT control model to a sequence-type SEQT control model. Action (2) is a request to adjust the operation of lines within the facility or other facilities, and its timing is when the above adjustment request is made (Action Description L26 and Timing Description M26), and it is executed using the sequence-type SEQT control model.
[0216] No. 27... Similarly, if the equipment is a conveyor and malfunctions due to factors other than those mentioned above, the following measures will be taken. Condition monitoring involves monitoring for abnormalities such as vibration during manufacturing (transportation) (Monitoring Explanation F27), and the scope of impact directly affects the individual piece of equipment being monitored (the relevant layer) (Impact Explanation G27). • The indicator is the same as the conditions during safe operation (Indicator Explanation H27), There are no actions such as control of the equipment (Action (1)), and Action (2) is the immediate execution of a notification to the on-site user requesting correction of the operation based on the indicator (Action description L27, and timing description M27). This is executed using the control model of the human-machine collaborative MMCT.
[0217] No. 28... Similarly, if the equipment is a conveyor and malfunctions due to factors other than those mentioned above, the following measures will be taken. • Condition monitoring involves monitoring for abnormalities in the conveyor's safety devices (Monitoring Explanation F28), and the scope of impact directly affects the monitored equipment unit (the relevant layer) (Scope of Impact Explanation G28). • The indicator is the same as the conditions during safe operation (Indicator Explanation H28). Action (1) is the control of operation based on indicators, which involves the immediate execution of actions such as stopping operation (start-stop) (Action Description J28 and Timing Description K28), and is executed using the sequence-type SEQT control model. Action (2), along with the control of Action (1), is the immediate execution of a notification to the on-site user requesting correction of the operation (Action Description L28, and Timing Description M28), and is executed in the control model of the human-machine collaborative MMCT.
[0218] No. 29... If the equipment is a mounter and there is a malfunction in that equipment, the following actions will be taken. • Condition monitoring involves monitoring the number of products processed, processing time, etc. (Monitoring explanation F29), and the scope of impact extends not only to the equipment itself but also to other equipment belonging to the same system (higher layers) (Impact explanation G29). • The set or planned production efficiency is the indicator (Indicator Explanation H29), Action (1) involves controlling the operation of the equipment based on indicators, such as immediately executing changes to control data parameters (Action Description J29 and Timing Description K29), and switches from a star-type STAT control model to a sequence-type SEQT control model for execution. ·Action (2) is a request to adjust the operation of lines within the equipment or other facilities, and its timing is when the above adjustment is requested (action description L29 and timing description M29), which is executed by the control model of the sequence type SEQT.
[0219] No.30... Similarly, the equipment is a mounter, and if the equipment is abnormal due to other factors, the following measures will be taken. ·Condition monitoring is the monitoring of the safety device of the equipment (monitoring description F30), and the impact range directly affects the individual equipment to be monitored (the relevant layer) (impact description G30). ·The indicator is to maintain the same operation as during safe operation (indicator description H30), ·Action (1) is the operation control based on the indicator, for example, the immediate execution of measures such as operation stop (start / stop) (action description J30 and timing description K30), which is executed by the control model of the sequence type SEQT. ·Action (2), together with the control of action (1), is the immediate execution of a notification requesting on-site users to correct operations (action description L30 and timing description M30), which is executed by the control model of the human-machine collaboration type MMCT.
[0220] No.31... The equipment is an inspection device, and if the equipment is abnormal, the following measures will be taken. ·Condition monitoring is, for example, the monitoring of the function or quality judgment result or defect rate of a product (which may also be the equipment) (monitoring description F31), and the impact range affects not only the individual equipment but also other equipment belonging to the same system (upper layer) (impact description G31). ·The indicator is to maintain production quality (indicator description H31), ·Action (1) is the immediate execution of requests for product scrapping, data rejection, control, and adjustment parameter review based on the indicator (action description J31 and timing description K31), which is executed by switching from the control model of the star type STAT to the control model of the sequence type SEQT. ·Action (2) involves feeding back inspection quality information to the upper-layer system and requesting inspection quality improvement. Its timing is when the above improvement request is made (action description L31, and timing description M31), and is executed using the control model of the sequence type SEQT.
[0221] In the above cases, when the urgency level is high, operation (startup) shutdown may be executed. When this operation (startup) shutdown is executed, it corresponds to the content of action (1) described in, for example, No.2, No.4, No.7, No.11, No.14, No.15, No.19, No.23, No.25, No.28, and No.30. Especially when shutdown is executed, depending on the plurality of controlled objects (devices or equipment), it may be sufficient to only perform shutdown control on the device at the relevant layer of the facility where the problem occurred, or it may be necessary to perform shutdown or control even on upstream facilities different from the relevant facility. For example, in the case of the action of the die casting description J15 in No.15, control or shutdown of the alloy injection speed of the upstream equipment is required.
[0222] In other words, the program that executes actions is designed to perform controls such as "shutdown" according to the priority order of the facilities. In this example, this is because the range of influence in an emergency is not limited to the monitored facility alone, but there is influence from the upper layers of other facilities belonging to the same line as the monitored facility. The example shown here is just an example, and even in the overall configuration of complex facilities (with a multi-layer structure), the system is configured considering the influence on upper layers, lower layers, and / or upstream layers and downstream layers. In other words, the execution order of actions regarding from which end the shutdown is executed is included in the design requirements in advance. Then, the emergency processing pattern stored in the database is selected by the optimization algorithm processor. Note that these processing patterns may be prepared in advance in the analysis / judgment block.
[0223] Other examples where the action order needs to be considered include cases where problems of different degrees occur in the monitoring state of the same facility. For problems of different degrees, this system performs recovery measures (actions) according to the layer where the problem occurred.
[0224] The details will be explained using the example of a water treatment facility as the target of monitoring. Examples No. 15 to No. 17 are water treatment facilities.
[0225] In example No. 15, the monitoring of processing quality affects the higher layers of other equipment belonging to the same system as the monitored equipment, and operational control based on the indicator, such as stopping discharge (Action (1)), is executed.
[0226] In example No. 16, the monitoring of the remaining amount of chemicals directly affects the relevant layer of the monitored equipment, and based on the indicator, an action (Action (2)) is taken to notify the power manager of a request to review the equipment settings.
[0227] Furthermore, in example No. 17, the condition of the equipment, such as dirt buildup and pump operation, is monitored, and the situation directly affects the relevant layer of the monitored equipment. Based on the indicators, operation is controlled, and actions such as automatic cleaning functions or automatic recovery programs (Action (1)) are executed. In addition, along with the control of Action (1), a maintenance request is notified to the power manager (Action (2)).
[0228] The scope of impact in monitoring the three identical water treatment equipment described above is as follows: for No. 15, it is the impact on higher layers of other equipment belonging to the same series as the equipment being monitored; and for Nos. 16 and 17, it is the impact on the corresponding layer of the equipment being monitored.
[0229] If the above three conditions occur simultaneously or with a time difference (a few minutes), the system will prioritize the countermeasures (actions) set at the higher layer. In other words, this system is designed to implement countermeasures when a problem occurs with the same equipment and the scope of impact extends to higher or upstream layers. Even in the case of multiple manufacturing equipment that make up a production line, the system is structured so that control of the upstream product manufacturing process is prioritized. This helps to suppress the spread of accidents and damage. In addition, power supply equipment that drives multiple pieces of equipment often shuts off power sequentially, starting with the upstream equipment.
[0230] Figures 14A and 14B summarize the status of each piece of equipment when the system determines a "medium B02" status, which indicates a moderate level of urgency, as well as the actions taken by the system in response to that status and their timing. In other words, when the status is "medium B02," it summarizes what kind of impact (trigger) occurs in and around each piece of equipment, and what kind of system response action is taken in response to this trigger.
[0231] Here, a moderate level of urgency refers to situations where the urgency is relatively high, but the impact on safety is relatively low. For example, this could include cases where the performance of multiple pieces of equipment in the same series is deteriorating as a whole, or where there is a deviation from the set optimized operating state.
[0232] In the diagram, the rows show the target equipment E00 and E01, the status monitoring content E02 for these equipment E00 and E01, the scope of impact when an abnormality is detected E03, and the indicator for the equipment E04. Furthermore, the first action of the system when the equipment becomes abnormal is shown as action (1) E05, the execution timing of action (1) is shown as E06, the second action is shown as action (2) E07, and the execution timing of action (2) E08 are described in the specification, for example, in explanations N1, P1, Q1, R1, S1, T1, and U1. In addition, the types of control models that describe the various behaviors of the system in response to the occurrence of an abnormality in the equipment, which are applied when executing the first and second actions, are shown as control model E06' and control model E08'. There are three processing models: STRT for star type, SEQT for sequence type, and MMCT for human-machine collaborative type. In the left column of the diagram, items are numbered in the direction of the column, and various types of equipment are shown to the right of the numbers. The determination of a moderate urgency level (B02) is based on factors such as a decline in equipment performance and a deviation from the optimal operating state of individual equipment (C02).
[0233] Furthermore, the processing of each item described below will be performed by the same processing unit as described above for cases with a high level of urgency.
[0234] No. 1... The equipment is a compressor, and the status of the equipment (medium level of urgency), the impact of that status, and the actions to be taken are as follows. • Condition monitoring involves monitoring the total output of high-pressure air (Monitoring Explanation N1), and the scope of the monitoring results affects not only the equipment itself but also other equipment (higher layers) belonging to the same system (Impact Explanation P1). • The indicator is supplying the high-pressure quantities necessary for production (Indicator Explanation Q1), Action (1) is a request to revise the higher-level power plan belonging to the same system as the monitored equipment, based on the equipment status and indicators obtained through monitoring. The timing of this request is at the time of the request (Action Description R1 and Timing Description S1), and it is executed using a star-type STAT control model. Action (2) is a notification to the power manager, at which point the request to the higher level has been approved, and the notification is made on the same day (Action Description T1 and Timing Description U1), and is executed using the human-machine collaborative MMCT control model.
[0235] No. 2... Similarly, if the equipment is a compressor and is in a different condition than described above, the impact and actions that may result from that condition are as follows. • Status monitoring is performed when the operating status and load status of each compressor are monitored (Monitoring Explanation N2), and the scope of influence of the monitoring results directly affects the monitored equipment (the relevant layer) (Influence Explanation P2). • Maintaining equipment balance is the indicator (Indicator Explanation Q2), Action (1) involves reviewing the operating plans of equipment within the system, not just individual equipment, based on monitoring results and indicators, providing feedback to the site, and implementing measures such as optimizing operation on an immediate or monthly basis (Action explanation R2 and Timing explanation S2), using both the star-type STAT control model and the sequence-type SEQT control model. Action (2) involves notifying the power manager of the revised plan in Action (1), and immediately implementing the control based on the revised plan after approval (Action Description T2, and Timing Description U2), and is executed using the human-machine collaborative MMCT control model.
[0236] No. 3... The equipment is a boiler, and the status of the equipment (medium level of urgency), the impact of that status, and the actions to be taken are as follows. • Status monitoring involves monitoring the total hot water output (Monitoring Explanation N3), and the scope of impact from the monitoring results affects not only the equipment itself but also other equipment (higher layers) belonging to the same system (Impact Explanation P3). • The amount of hot water supplied for production is the indicator (Indicator Explanation Q3), ·Action (1) is a request for review of the higher-level power plan based on the monitoring result and the index, and its timing is at the time of the above request (action description R3 and timing description S3), and is executed by the control model of the star-type STAT. ·Action (2) is to notify the power manager of the higher-level power plan reviewed in Action (1), and after approval of the review plan, execute the control based on the review plan on the same day (action description T3 and timing description U1), and is executed by the control model of the human-machine cooperative MMCT.
[0237] No. 4 ... The equipment is a refrigerator, and the state of the equipment (medium urgency level), the influence of the state, the action, etc. are handled as follows. ·The state monitoring is monitoring of the total chilled water output (monitoring description N4), and the influence range of the monitoring result affects not only the equipment itself but also other equipment belonging to the same system (upper layer) (influence description P4). ·The supply amount of chilled water required for production is an index (index description Q4), ·Action (1) is a request for review of the higher-level power plan based on the monitoring result and the index, and its timing is at the time of the above request (action description R4 and timing description S4), and is executed by the control model of the star-type STAT. ·Action (2) is to notify the power manager of the higher-level power plan reviewed in Action (1), and after approval of the review plan, execute the control based on the review plan on the same day (action description T4 and timing description U1), and is executed by the control model of the human-machine cooperative MMCT.
[0238] No. 5 ... Similarly, the equipment is a refrigerator, and the other state of the equipment (medium urgency level), the influence of the state, the action, etc. are handled as follows. ·The state monitoring is monitoring of the heat source heat generation amount (monitoring description N5). The influence range of the monitoring result directly affects the monitored equipment itself (the layer) (influence description P5). ·Maintaining the state during optimal operation is an index (index description Q5), Action (1) involves reviewing the operating plans of equipment within the system, not just individual equipment, based on monitoring results and indicators, providing feedback to the site, and implementing measures such as optimizing operation on an immediate or monthly basis (Action explanation R5, and timing explanation S5), using both the star-type STAT control model and the sequence-type SEQT control model. Action (2) is performed using the human-machine collaborative MMCT control model, which involves notifying the power manager of the revised plan in Action (1), and immediately implementing the control based on the revised plan after approval (Action Description T5 and Timing Description U5).
[0239] No. 6... Similarly, the equipment is a refrigeration unit, and the following are the responses to other conditions of the equipment (medium level of urgency), the impact of those conditions, and the actions to be taken. • Status monitoring involves monitoring the operating status and load of each chiller (Monitoring Explanation N6), and the scope of influence of the monitoring results directly affects the individual piece of equipment being monitored (the relevant layer) (Influence Explanation P6). • Maintaining good equipment balancing is the indicator (Indicator Explanation Q6), Action (1) involves reviewing the operating plans of equipment within the system, not just individual equipment, based on monitoring results and indicators, providing feedback to the site, and implementing measures such as optimizing operation on an immediate or monthly basis (Action Description R6, and Timing Description S6). This is carried out using a combination of the star-type STAT control model and the sequence-type SEQT control model. Action (2) involves notifying the power manager of the revised plan in Action (1), and immediately implementing the control based on the revised plan after approval (Action Description T6, and Timing Description U6), and is performed using the human-machine collaborative MMCT control model.
[0240] No. 7... The equipment is a power facility, and the status of the equipment (medium level of urgency), the impact of that status, and the actions to be taken are as follows. • Status monitoring is performed based on total power output (Monitoring Explanation N7), and the scope of the monitoring results affects not only the equipment itself but also other equipment (higher layers) belonging to the same system (Impact Explanation P7). • The amount of hot water supplied for production is the indicator (Indicator Explanation Q7), Action (1) is a request to revise the power plan based on monitoring results and indicators, at the time of the request (Action Description R7 and Timing Description S7), and is executed using a star-type STAT control model. Action (2) is to immediately notify the power manager of the power plan reviewed in Action (1) (Action Description T7 and Timing Description U7), and will be carried out using the human-machine collaborative MMCT control model.
[0241] No. 8... Similarly, the equipment is a power facility, and the following responses apply to other conditions of the equipment (medium level of urgency), the impact of those conditions, and the actions to be taken. • Status monitoring involves monitoring the operating status of each distribution board and main line equipment, as well as the output load of the equipment (Monitoring Explanation N8). The scope of impact of the monitoring results directly affects the individual piece of equipment being monitored (the relevant layer) (Impact Explanation P8). • Maintaining good equipment balancing is the indicator (Explanation of indicator Q8), Action (1) involves reviewing the operating plans of equipment within the system, not just individual equipment, based on monitoring results and indicators, providing feedback to the site, and implementing measures such as optimizing operation on an immediate or monthly basis (Action Description R8, and Timing Description S8). This is carried out using a combination of the star-type STAT control model and the sequence-type SEQT control model. Action (2) involves notifying the power manager of the revised plan in Action (1), and immediately implementing the control based on the revised plan after approval (Action Description T8, and Timing Description U8), and is performed using the human-machine collaborative MMCT control model.
[0242] No. 9... The equipment is die-casting, and the status of the equipment (medium level of urgency), the impact of that status, and the actions to be taken are as follows. • Condition monitoring monitors the production output of the die-casting production line (Monitoring Explanation N9). The scope of the monitoring results affects not only the individual piece of equipment but also other equipment (higher layers) belonging to the same system (Impact Explanation P9). • Production volume KPI is the indicator (indicator explanation Q9), Action (1) is the planned implementation, either on a daily or monthly basis, of measures such as reviewing the in-line production plan and equipment operation plan based on monitoring results and indicators, providing feedback to the site, and aiming for optimized operation (Action Description R9 and Timing Description S9), and is carried out using a combination of the star-type STAT control model and the sequence-type SEQT control model. Action (2) involves notifying the production manager of the revised plan in Action (1), and immediately implementing the control based on the revised plan after approval (Action Description T9 and Timing Description U8), and is performed using the human-machine collaborative MMCT control model.
[0243] No. 10... Similarly, the equipment is die-casting, and the following are the other conditions of the equipment (medium level of urgency), the impact of those conditions, and the actions to be taken. • Condition monitoring involves monitoring the operating rate of equipment on the die-casting production line (Monitoring Explanation N10), and the scope of impact of the monitoring results directly affects the individual piece of equipment being monitored (the corresponding layer) (Monitoring Explanation P7). • The equipment utilization rate KPI is the indicator (indicator explanation Q10), Action (1) is the planned implementation, either on a daily or monthly basis, of measures such as reviewing the in-line production plan and equipment operation plan based on monitoring results and indicators, providing feedback to the site, and aiming for optimized operation (Action Description R10, and Timing Description S10), and is carried out using a combination of the star-type STAT control model and the sequence-type SEQT control model. Action (2) involves notifying the production manager of the revised plan in Action (1), and immediately implementing the control based on the revised plan after approval (Action Description T10 and Timing Description U10), and is executed using the human-machine collaborative MMCT control model.
[0244] No. 11... Similarly, the equipment is die-casting, and the following are the other conditions (medium level of urgency) of the equipment, the impact of those conditions, and the actions to be taken. • Condition monitoring involves monitoring the defect rate on the die-casting production line (Monitoring Explanation N11), and the scope of the monitoring results directly affects the individual piece of equipment being monitored (the corresponding layer) (Impact Explanation P11). • The defect rate KPI is the indicator (indicator explanation Q11), Action (1) is the planned execution, either on a daily or monthly basis, of measures such as recalculating parameters of in-line equipment based on monitoring results and indicators, providing feedback to the site, and aiming for optimized operation (Action Description R11, and Timing Description S11), and is carried out using a combination of the star-type STAT control model and the sequence-type SEQT control model. Action (2) involves notifying the production manager of the parameters reviewed in Action (1), and immediately executing control based on the reviewed parameter values after approval (Action Description T11 and Timing Description U11), and is executed using the human-machine collaborative MMCT control model.
[0245] No. 12... Similarly, the equipment is die-casting, and the following are the responses to other conditions of the equipment (medium level of urgency), the impact of those conditions, and the actions to be taken. • Condition monitoring involves monitoring power consumption on the die-casting production line (Monitoring Explanation N12), and the scope of the monitoring results affects not only the equipment itself but also other equipment (higher layers) belonging to the same system (Impact Explanation P12). • Energy saving KPIs are the indicators (Indicator Explanation Q12), Action (1) is a request to higher levels for revision of the production plan and power plan based on monitoring results and indicators (Action Description R12, and Timing Description S12), and is executed in a star-type STAT control model. Action (2) involves notifying the power manager of the revised plan in Action (1), and immediately implementing the control based on the revised plan after approval (Action Description T12, and Timing Description U12), which will be implemented using the human-machine collaborative MMCT control model.
[0246] No. 13... The equipment is a circuit board assembly production line, and the status of the equipment (medium level of urgency), the impact of that status, and the actions to be taken are as follows. • Status monitoring involves monitoring production volume on the PCB assembly production line (Monitoring Explanation N13), and the scope of influence of the monitoring results affects the production volume KPI (Influence Explanation P13). • Production volume KPI is the indicator (indicator explanation Q13), Action (1) involves reviewing the in-line production plan and equipment operation plan based on monitoring results and indicators, providing feedback to the site, and implementing measures such as optimizing operation on an immediate or monthly basis (Action Description R13 and Timing Description S13), and is carried out using a combination of the star-type STAT control model and the sequence-type SEQT control model. Action (2) involves notifying the production manager of the revised plan in Action (1), and immediately implementing the control based on the revised plan after approval (Action Description T13 and Timing Description U13), and is executed using the human-machine collaborative MMCT control model.
[0247] No. 14... The equipment is a circuit board assembly production line, and the following are the other conditions of the equipment (medium level of urgency), the impact of those conditions, and the actions to be taken. • Status monitoring involves monitoring the equipment utilization rate on the PCB assembly production line (Monitoring Explanation N14), and the scope of impact of the monitoring results affects the equipment utilization rate KPI (Impact Explanation P14). • The equipment utilization rate KPI is the indicator (indicator explanation Q14), Action (1) is the planned implementation, either on a daily or monthly basis, of measures such as reviewing the in-line production plan and equipment operation plan based on monitoring results and indicators, providing feedback to the site, and aiming for optimized operation (Action Description R14 and Timing Description S14), and is carried out using a combination of the star-type STAT control model and the sequence-type SEQT control model. Action (2) involves notifying the production manager of the revised plan in Action (1), and immediately implementing the control based on the revised plan after approval (Action Description T14 and Timing Description U14), and is executed using the human-machine collaborative MMCT control model.
[0248] No. 15... The equipment is a circuit board assembly production line, and the following are the other conditions (medium level of urgency) of the equipment, the impact of those conditions, and the actions to be taken. • Condition monitoring involves monitoring the defect rate on the PCB assembly production line (Monitoring Explanation N15), and the scope of the monitoring results directly affects the individual piece of equipment being monitored (the corresponding layer) (Impact Explanation P15). • The defect rate KPI is the indicator (indicator explanation Q15), Action (1) is the planned execution, either on a daily or monthly basis, of measures such as recalculating the parameters of in-line equipment based on monitoring results and indicators, providing feedback to the site, and aiming for optimized operation (Action Description R15, and Timing Description S15), and is carried out using a combination of the star-type STAT control model and the sequence-type SEQT control model. Action (2) involves notifying the production manager of the parameters reviewed in Action (1), and immediately executing control based on the reviewed parameter values after approval (Action Description T15 and Timing Description U15), and is executed using the human-machine collaborative MMCT control model.
[0249] No. 16... The equipment is a circuit board assembly production line, and the following are the further conditions (medium level of urgency) of the equipment, the impact of those conditions, and the actions to be taken. • Condition monitoring involves monitoring power consumption on the PCB assembly production line (Monitoring Explanation N16). Based on the monitoring results, the scope of impact extends not only to the individual piece of equipment but also to other equipment (higher layers) belonging to the same system (Impact Explanation P12). • Energy saving KPIs are the indicators (Indicator Explanation Q12), Action (1) is a request to higher levels for revision of the production plan and power plan based on monitoring results and indicators. This request is made at the designated timing (see Action Description R16 and Timing Description S16) and is executed using the star-type STAT control model. Action (2) involves notifying the power manager of the revised plan in Action (1), and immediately implementing the control based on the revised plan after approval (Action Description T16 and Timing Description U16), and is performed using the human-machine collaborative MMCT control model.
[0250] Figure 15 is a table summarizing the equipment status when the system determines a "Low B03" (non-urgent) status, which indicates an extremely low level of urgency, as well as the actions taken by the system in response to that situation and the timing of those actions. Here, a level of extremely low urgency refers to situations where, for example, the operating state of an entire facility, such as an entire factory, consisting of multiple systems with multiple pieces of equipment, deviates from the set optimal operating state. In other words, it does not require immediate attention, but action is needed from the perspective of optimal operation.
[0251] In the diagram, the rows show the target equipment E00 and E01, the status monitoring content E02 for these equipment E00 and E01, and the indicator E04 for the equipment. Furthermore, the system action E05 for the equipment, the timing of the action execution E06, and the control model E06' which describes the various system behaviors and countermeasures applied to the equipment when the action is executed are described in the specification, for example, in explanations V1, W1, X1, and Y1. In the left column of the diagram, numbers are assigned in the direction of the column, and the above explanations are written to the right of the numbers in the specification. Furthermore, the processing of each item described below will be performed by the same processing unit as described above for high-level and medium-level urgency.
[0252] No. 1... The equipment category covers the condition of all company-wide equipment. Status monitoring involves monitoring company-wide productivity and output (Monitoring Explanation V1), and the indicator is the improvement of productivity and output, with target data (Indicator Explanation W1). Actions include the formulation of production plans, which also incorporate support for management decisions. Actions are implemented according to medium- to long-term plans (Action Explanation X1, and Timing Explanation Y1), and are executed using a combination of a star-type STAT control model and a human-machine collaborative MMCT control model.
[0253] No. 2... The equipment monitoring covers the status of all company-wide equipment. Status monitoring involves monitoring the company-wide energy usage and CO2 emissions (Monitoring Explanation V2), and the indicators are the reduction of company-wide energy usage and CO2 emissions (Indicator Explanation W2). Actions include formulating energy-saving plans, which also incorporate support for management decisions. Actions are implemented according to medium- to long-term plans (Action Explanation X2, and Timing Explanation Y2), using a combination of a star-type STAT control model and a human-machine collaborative MMCT control model.
[0254] In the above explanation, although "urgent" was used, "tension" or "unease" could also be used. Similarly, although "not urgent" was used, "relaxation" or "peace" could also be used.
[0255] Figure 16 illustrates the concepts of upstream, downstream, upper layer, and lower layer in this system. On the diagram, the left side along the X-axis represents the upstream, and the right side represents the downstream. Furthermore, this system defines the direction of the physical space and the digital space, i.e., the Y-axis direction, with the upper side of the diagram representing the upper layer and the lower side representing the lower layer. Additionally, the Z-axis, perpendicular to the X and Y axes, is defined.
[0256] Upstream in the physical layer, there exists a resource layer 2001d. This resource layer includes, for example, energy resources (oil, coal, gas, etc.) and environmental resources (water, air, oxygen, etc.).
[0257] Downstream of resource layer 2001d are power equipment 2001e and environmental equipment 2001f. Downstream of power equipment 2001e and environmental equipment 2001f, various equipment 1001 are deployed, and each piece of equipment 1001 uses power energy and environmental control energy supplied from power equipment 2001e and environmental equipment 2001f.
[0258] Various information from the analysis and judgment blocks of each piece of equipment (equipment status data, job information of the analysis and judgment blocks, etc.) is transmitted to the optimization algorithm processor 6000 via the network.
[0259] The optimization algorithm processor 6000 and the remote center unit 5001 work together to generate request control data and send it to each analysis / decision block. Therefore, the optimization algorithm processor 6000 and the remote center unit 5001 manage information such as the IP address (destination information) of each analysis / decision block.
[0260] Furthermore, the optimization algorithm processor 6000 and the remote center unit 5001 can read control data of any control type from the table described earlier in Figure 9F, in accordance with the various information sent from the analysis and judgment block, and transmit it to the database unit of the desired analysis and judgment block.
[0261] Furthermore, the optimization algorithm processor 6000 understands the addresses of the analysis and judgment blocks of each piece of equipment in three dimensions (upstream, downstream, upper layer, lower layer). Therefore, if a material shortage occurs in one production line, and alternative materials are available in another production line, this can be notified to the remote center unit 5001.
[0262] Furthermore, as explained earlier, this system can determine the scope of impact (whether the problem can be addressed at the current layer, whether there will be an impact upstream and / or downstream, whether notification to higher layers is necessary, etc.) according to the urgency level of the status data, and can take action to address the problem, including notifying higher layers of information and implementing controls on higher layers.
[0263] Depending on the control method, instead of feeding back a single request control data to the problem area based on the state data collection and analysis results, the process may be repeated multiple times, modifying the feedback information each time. The emergency / non-urgent determination function, as explained in Figure 9A, is included in the analysis and determination block for each piece of equipment. The initial settings for this determination function are configured according to the specific equipment that each analysis and determination block corresponds to. For example, the initial settings are configured assuming that each piece of equipment is operating normally. Furthermore, the status data in each analysis and determination block in the digital space is initially configured in the same way as the higher layers in the physical space. The emergency / non-urgent determination (judgment) function described in the explanations of Figures 9A to 15 is equipped in the analysis / judgment block of each piece of equipment.
[0264] After the equipment starts operating, the analysis and judgment block determines the status level, and if an emergency is detected, this analysis and judgment block will take action (notify) to generate control data in the relevant layer (lower layer) and the upper layer (digital space).
[0265] Figure 17A illustrates how multiple processing steps are executed over time in the manufacturing process of an industrial product. Each step includes equipment containing analysis and judgment blocks. Here, the diagram is simplified to make the arrangement of the multiple pieces of equipment easier to understand.
[0266] The lower layer 9001 shows equipment 2001d, 2001e, and 2001f together. Further down the 9001 layer, multiple manufacturing devices 1001a, 1001b, ..., device 1001n are shown. Each of the equipment 100a, equipment 100b, ..., device 100n is equipped with an analysis / determination block.
[0267] In this system, in the multiple processing steps for manufacturing industrial products, the equipment that processes in earlier steps is designated as upstream equipment, and the equipment that processes in later steps is designated as downstream equipment, thereby distinguishing between the multiple processes as upstream and downstream.
[0268] The upper layer 9002 includes an optimal algorithm processor 6000 and a request control data generation unit 5002. The upper layer 9002 analyzes information from the lower layer 9001 and provides feedback (request control data) to the appropriate process equipment in the lower layer.
[0269] The request control data provides each pre-configured piece of equipment with control data of the appropriate type (sequence-type SEQT program, star-type STAT program, human-machine collaborative MMCT program).
[0270] Figure 17A shows an example where an emergency status level is detected in an upstream power equipment 2001. In this case, the analysis and judgment block of the lower (relevant) layer 9001 responds (ST1), and the analysis and judgment block of the upper layer also responds (ST2).
[0271] For example, if the emergency information indicates a shortage of water or chemicals, upstream in the lower layer, actions such as securing a water source or taking emergency measures at water treatment equipment, or replenishing chemicals at chemical treatment equipment, are taken, and commands (ST3...STn) to shut down or otherwise control the equipment downstream in the lower layer are fed back (notified). Finally, commands (Ste) concerning the electrical system are fed back (notified) to each downstream piece of equipment. The command for the electrical system (STe) is placed last because the shutdown state of the downstream equipment is controlled electrically.
[0272] Figure 17B shows how, in the devices 2a, 2b, and 2c that make up the downstream facility 1000, an emergency state was detected as a result of the state level determination of the last device 2c.
[0273] For example, suppose the emergency information is based on the detection that the adhesion or bonding strength is insufficient due to insufficient application of the drug.
[0274] In response to emergency information in this case, the lower layer 9001 analysis / decision block responds first (ST1), and the upper layer analysis / decision block also responds (in the order of ST2, ST3, ST4, ST5).
[0275] Specifically, the device 2c in the relevant layer is shut down, and via the upper layer 9002, the chemical supply equipment in facility 2001, the cleaning function of device 2a, and the chemical application function of the next device 2b are also shut down. Finally, an electrical system command (Ste) is fed back (notified) to each downstream device. In this way, the electrical system command (STe) is given last because the shutdown state of the downstream devices is controlled electrically.
[0276] The system described above has the following characteristics: A1) Control execution and request instructions are given based on monitoring results using a processing model. Specifically, the system includes a remote center unit 5001 that remotely monitors the status of multiple monitoring targets 1000, 2000, and state level determination means 3005, 4005 that determine the status level based on monitoring conditions. If the state level determination means 3005, 4005 determine an abnormality, the system includes automatic control units 3006, 4006 that notify the relevant monitoring target of a control command or control request based on a combination of the status level and the range of impact on other monitoring targets, the type of monitoring target, or an indicator. The system also includes storage means DB1, DB2 that store processing models that define processing patterns corresponding to the control commands or control requests. The system is characterized by controlling the monitoring target, determining its status level, or performing a stop process according to the processing model corresponding to the control command or control request notified by the automatic control units 3006, 4006.
[0277] A2) This system can dynamically change the processing model (execution process) based on the monitoring results. That is, in the system described in A1) above, the remote center unit 5001 repeatedly performs monitoring of the monitored target, and dynamically changes the control command or control request and the processing model notified by the automatic control units 3006 and 4006 according to the monitoring results.
[0278] A3) This system has three processing models, namely, in the system of A1) or A2) above, the processing models include a sequence processing model that sequentially executes predetermined processes, a composite processing model that executes predetermined processes on multiple monitored targets, and a man-machine processing model that executes predetermined processes on monitored targets with human assistance.
[0279] B1) Furthermore, this system is equipped with an optimization algorithm and performs optimal control. That is, it is a system that performs optimal operation control according to the operating status of equipment 1000, 2000, and comprises equipment status detection units 1001, 2002 that monitor the equipment and constantly output the operating status as equipment status data, and a remote center unit 5001 that monitors the operating status and remotely controls the equipment. Furthermore, it comprises equipment status data transmission units 1003, 2003 that transmit the equipment status data to the remote center unit 5001, and equipment status data analysis units 3002, 4002 that analyze the equipment status data. The remote center unit 5001 is equipped with a request control data generation unit 5002 that creates optimal request control data for the equipment (including devices and functions) based on the results of the equipment status data analysis units 3002, 4002. The equipment that receives the request control data is a remote monitoring and control system that includes response data transmission units 1005 and 2005 that transmit the control result as response data to the remote center.
[0280] B2) Furthermore, this system includes the concept of layers, and in B1) above, the equipment 1000, 2000 and the remote center unit 5001 consist of two or more layers.
[0281] If a B3) layer is included, in the data transmission (request / response) between the equipment (lower-level device) of B2) and the higher-level device, The equipment 1000 receives request control data from the upper layer of the layers and sends response data to the upper layer.
[0282] B4) This system has an urgency determination function, that is, in any of B1) to B3) above, the equipment status data analysis units 3002, 4002 and the status level determination means 3005, 4005 determine the degree of urgency, which is the degree of urgency that should be addressed, based on the equipment status data.
[0283] B5) The system described in B4) above performs control processing according to the urgency level. The equipment status data analysis unit is provided in all layers and equipment. Based on the urgency level, if the urgency level is above a predetermined threshold, control is performed in the same lower layer. If the urgency level is below the predetermined threshold (not urgent), the system waits for the receipt of the request control data from the upper layer and performs processing according to the request.
[0284] B6) The request control data described above corresponds to three models, and the request control data has control pattern models that include a sequence type that performs sequence processing, a star type that performs processing in cooperation with other nodes, and an MM collaborative type that performs processing in cooperation with humans and machines.
[0285] B7) The system described above includes a specific mechanism (request / response) for dynamically changing the control process, and the request control data generation unit 5002 generates the next request control data based on the response data.
[0286] B8) The timing of the request control data generation described above is based on data collected from the equipment, and the request control data generation unit generates the request control data based on the equipment monitoring data from multiple pieces of equipment.
[0287] B9) The timing of the above-mentioned request control data generation is based on KPIs, and the request control data generation unit generates the request control data based on the KPIs of the equipment or equipment system.
[0288] B10) This involves making decisions based on whether the manufacturing equipment or the power equipment is used for branching. If the aforementioned equipment includes manufacturing equipment and power equipment, and the request control data is generated based on the determination of the state level determination unit, the power equipment can be considered upstream and the manufacturing equipment downstream. In the case of an emergency, the upstream equipment can be given priority in control, and in the case of a non-urgent situation, the downstream equipment can be given priority in control.
[0289] B11) It is possible to link with a manual operation automation device (on-site screen monitoring), and for specific equipment that can be operated manually, the output of the request control data generation unit can be used to perform control based on the request control data via the manual operation automation device.
[0290] B12) The above system is capable of having a learning function, and an optimization algorithm processor 6000 is placed between the remote center unit and the equipment, and the optimization algorithm processor manages at least the equipment status data, the equipment request control data and the response data, and has a learning function for generating the next request control data by accumulating and correlating the changes in the response data with respect to the request control data.
[0291] C1) Furthermore, the present invention provides a system for remotely monitoring multiple pieces of equipment, comprising: an acquisition unit that acquires equipment status data from the multiple pieces of equipment; and a determination unit that determines whether or not the equipment is abnormal based on the equipment status data and equipment management data for managing the equipment. This can be described as a remote monitoring and control system that performs abnormal processing on equipment based on the equipment status data, equipment management data, and the urgency (priority, importance) of the equipment determined to be abnormal by the aforementioned determination unit.
[0292] C2) The above remote monitoring and control system can be described as a control system that, when indicating the timing of the termination of control, includes data including equipment, urgency, and indicators (termination criteria), and terminates the processing in the event of an abnormality based on the indicators.
[0293] C3) The above system may also enable processing prioritization and may include means for determining whether or not to stop processing an abnormality if a more urgent abnormality occurs while an abnormality processing is in progress.
[0294] C4) Another pattern for prioritizing processing is as follows: the equipment management data includes the scope of impact, and when abnormal processing is performed on the equipment, processing based on the scope of impact on the equipment is also performed, and the processing based on the scope of impact is performed only when there is no processing of a higher urgency than the scope of impact.
[0295] While several embodiments of the present invention have been described, these embodiments are presented as examples only and are not intended to limit the scope of the invention. These novel embodiments can be implemented in various other forms, and various omissions, substitutions, and modifications can be made without departing from the spirit of the invention. These embodiments and their variations are included in the scope and spirit of the invention, as well as in the claims and their equivalents. Furthermore, even if each component of a claim is expressed by dividing it, by combining multiple components, or by combining them, it remains within the scope of the present invention. Multiple embodiments may also be combined, and embodiments composed of such combinations also fall within the scope of the invention.
[0296] Furthermore, drawings may schematically represent the width, thickness, shape, etc., of each part compared to the actual embodiment in order to make the explanation clearer. Also, the present invention is applied even when the claims are expressed as control logic, as a program including instructions for a computer to execute, or as a computer-readable recording medium on which such instructions are written. Moreover, the names and terms used are not limited, and other expressions are included in the present invention if they are substantially the same in content and intent. [Explanation of Symbols]
[0297] 1001, 2001... Equipment, 1002, 2002... Equipment status detection unit, 1003, 2003... Equipment status data transmission unit, 1004, 2004... Receiving unit, 1005, 2005... Response data transmission unit, NET... Network, 3001, 4001... Edge device, 3002, 4002... Equipment status data analysis unit, 3005, 4005... Status level determination unit, 3006, 4006... Automatic control unit, 5002... Request control data generation unit, 6000... Optimization algorithm processor, 3011, 4011... Monitor device.
Claims
1. It is equipped with a remote center unit that remotely monitors the status of multiple monitored targets, A state level determination means that determines the state level based on monitoring conditions, If the state level determination means determines an abnormality, the automatic control means notifies the relevant monitored target of a control command or control request based on a combination of the state level and the range of impact on other monitored targets, the type of monitored target, or an indicator. The system includes a storage means for storing a processing model that defines a processing pattern corresponding to the control command or the control request, A remote monitoring and control system characterized by controlling the monitored object, determining its state level, or performing a stop process in accordance with the processing model corresponding to the control command or control request notified by the automatic control means.
2. The remote monitoring and control system according to claim 1, characterized in that the remote center unit repeatedly performs monitoring of the target to be monitored, and dynamically changes the control command or control request and the processing model notified by the automatic control means according to the monitoring results.
3. The remote monitoring and control system according to claim 1 or 2, characterized in that the processing model includes a sequence processing model that sequentially executes predetermined processes, a composite processing model that executes predetermined processes on multiple monitored targets, and a man-machine processing model that executes predetermined processes on monitored targets with human assistance.
4. The storage means shall, for the same monitored object, It stores multiple processing models belonging to the same control type. The automatic control means, according to the state level of the monitored object, The remote monitoring and control system according to claim 1, characterized in that it selects an appropriate processing model from among the plurality of processing models and applies it to the object being monitored.
5. The state level includes a plurality of stages corresponding to the degree of urgency, The storage means stores a processing model corresponding to each of the multiple stages. The remote monitoring and control system according to claim 1, characterized in that the automatic control means selects a corresponding processing model according to the urgency level determined by the state level determination means and notifies the monitored object of a control command or control request.
6. The monitored object comprises a plurality of sensors that detect the state of a plurality of parts or functions of the monitored object, The outputs of the plurality of sensors are collected when the response state of the monitored object to the control command or the control request becomes stable. The remote monitoring and control system according to claim 1, characterized in that the outputs of the multiple sensors collected are transmitted to the state level determination means as response data to which command identification data identifying the control command or the control request is added.
7. The monitored object, after receiving the control command or the control request, The system includes a time management means that stores in advance the time it takes for the response state of multiple parts or functions of the monitored target to stabilize, The remote monitoring and control system according to claim 6, characterized in that the time management means collects the output of sensors that detect the state of the plurality of parts or functions after the time has elapsed from the time of receipt of the control command or the control request, and transmits the collected output of the sensors to the state level determination means.
8. The storage means corresponds to a combination of a plurality of monitored objects and a plurality of controlled locations of said monitored objects, It has a table that stores multiple processing models, including at least one of sequence processing models, composite processing models, and human-machine processing models. The automatic control means is Based on the state level determined by the state level determination means, the corresponding processing model is read from the table and a control command or control request is generated for the monitored target. The remote monitoring and control system according to claim 1.
Citation Information
Patent Citations
Method for press forming
JP1982052525A
Catalyst for polymerization
JP1986087704A
Remote monitoring system and remote monitoring method
JP2008027201A
Wind power plant management system and method thereof
US20160034856A1