Reinforcement materials and ground reinforcement methods

The reinforcing material with screw blades and a core material addresses the challenges of large drilling machines and cement grout by providing effective pull-out resistance and preventing soil displacement, contributing to carbon neutrality.

JP7955189B2Active Publication Date: 2026-11-24NITTOC CONSTRUCTION CO LTD
View PDF 7 Cites 0 Cited by

Patent Information

Application Number
JP2023034249
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Filing Date
2023-03-07
Publication Date
2026-11-24
Estimated Expiration
2043-03-07

AI Technical Summary

Technical Problem

Existing ground reinforcement methods require large drilling machines, are difficult to implement in confined spaces, and involve carbon-intensive cement grouting, which contradicts carbon neutrality goals.

Method used

A reinforcing material with spiral-shaped screw blades and a core material that is screwed into the ground, combined with a bearing plate, providing pull-out resistance without cement grout, and designed to integrate with the ground to prevent soil displacement.

Benefits of technology

Reduces carbon emissions by eliminating cement grout, shortens construction time, and lowers energy consumption while maintaining effective pull-out resistance and preventing ground deformation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007955189000001
    Figure 0007955189000001
  • Figure 0007955189000002
    Figure 0007955189000002
  • Figure 0007955189000003
    Figure 0007955189000003
Patent Text Reader

Abstract

To provide a reinforcement material and a ground reinforcement method not requiring a large boring machine such as a machine for a double pipe boring, allowing construction even at a narrow site to be carried out, and not requiring filling of cement milk in a bore hole.SOLUTION: A reinforcement material (10) of the present invention comprises a core material (1) and screw blades (2) in a spiral shape arranged on an outer periphery of the core material. The screw blades have such a shape of being screwed in the ground through rotation thereof, the screw blades do not extend over a whole length of the core material and are intermittently arranged on the underground side further than a slide surface (SS) at a construction site, a distance (NP) between adjacent screw blades is an integral multiple of a pitch (SP) of the screw blades, and an outer diameter (WD) of the screw blade is equal to or larger than an outer diameter (PD) of a compressed area (PA) around the core material when the core material is pressed-in the ground as well as allows the same to be screwed in the soil, which is used by combination of a bearing plate (3) having such rigidity that force acting on the ground side rather than the slide surface can be neglected.SELECTED DRAWING: Figure 1
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to, for example, a reinforcing material for reinforcing soft ground and a ground reinforcing method using the reinforcing material.

Background Art

[0002] As a long reinforcing material for reinforcing soft ground, for example, there exists a rock bolt (for example, see Patent Document 1 and Patent Document 2). When placing a rock bolt in the ground to reinforce embankments or soft ground, deformation of the upper ground occurs due to collapse of the wall of the drilled hole, and there are also cases where the problem arises that construction cannot be carried out as designed. In order to prevent such problems, double-pipe drilling is often performed during rock bolt construction. However, when performing double-pipe drilling, there is a problem that the drilling machine required for construction becomes large-sized. Also, if the drilling machine becomes large-sized, construction becomes difficult at narrow sites. Further, in order to increase the proof strength of the rock bolt, after inserting the rock bolt into the drilled hole, cement milk is filled, and the pull-out resistance (proof strength) of the rock bolt may be improved by the adhesive force between the cement milk and the soil. However, when cement milk is filled, the amount of carbon dioxide emissions increases, including during the cement manufacturing process, and there is the problem that this goes against the direction of the so-called "carbon neutral".

Prior Art Documents

Patent Documents

[0003]

Patent Document 1

Patent Document 2

Summary of the Invention

Problem to be Solved by the Invention

[0004] This invention was proposed in view of the problems of the prior art described above, and aims to provide a reinforcing material and ground reinforcement method that does not require large drilling machines such as double-pipe drilling machines, can be implemented even in confined sites, and does not require filling the excavated hole with cement grout. [Means for solving the problem]

[0005] The reinforcing material (10) of the present invention has a core material (1) and spiral-shaped screw blades (2) provided on the outer circumference of the core material (1), The screw blades (2) are shaped to be screwed into the ground by rotating the core material (1). In the reinforcing material , The screw blade (2) (of the reinforcing material 10) On the underground side of the slip surface (SS) at the construction site, Core material (1) They are provided intermittently in the axial direction, intermittent target The distance (NP) between a provided screw blade (2) and an adjacent screw blade (2) in the axial direction of the core material is an integer multiple of the pitch (SP) of the screw blades (2). The outer diameter dimension (WD) of the screw blade (2) is equal to or larger than the outer diameter dimension (PD) (relative to the central axis of the core material) of the region (PA) that is compressed around the core material (1) when the core material (1) is pressed into the ground, and is a size that allows it to be screwed into the soil at the construction site. The reinforcing member (10) is used in combination with the bearing plate (3), and a force T1pa+T0 acting on the ground side of the sliding surface (SS), the allowable tensile force Tsa of the reinforcing member (10), and a force T2pa acting on the region underground side of the sliding surface (SS) act upon it. The force T1pa acting on the ground side of the aforementioned sliding surface (SS) is given by the formula T1pa = {1 / (1-μ)}τ1pa × s, where μ is the slope reduction coefficient of the bearing surface (3), τ1pa is the shear stress between the reinforcing material (10) and the soil, and s is the contact area between the reinforcing material (10) and the soil in the region above ground side of the aforementioned sliding surface (SS). The rigidity of the bearing plate (3) increases as the slope reduction coefficient μ of the bearing plate (3) in the formula increases, and the force T1pa shown in the formula increases. The allowable tensile force Tsa of the reinforcing member (10) and the force T1pa become very large values ​​and can be ignored. The bearing capacity of the reinforcing member (10) is set so that the force T2pa acting in the region underground side of the sliding surface (SS) is the dominant parameter. It is characterized by the following.

[0006] Furthermore, the ground reinforcement method of the present invention is Determine the slip surface (SS), Select a reinforcing material such that the screw blades (2) are located in the area underground, below the sliding surface (SS). It has a core material (1) and spiral-shaped screw blades (2) provided on the outer circumference of the core material (1), The screw blades (2) are shaped to be screwed into the ground by rotating the core material (1), The screw blade (2) is On the underground side of the slip surface (SS) at the construction site, Core material (1) They are provided intermittently in the axial direction, The distance (NP) between an intermittently arranged screw blade (2) and an adjacent screw blade (2) in the axial direction of the core material is an integer multiple of the pitch (SP) of the screw blade (2). The outer diameter dimension (WD) of the screw blade (2) is equal to or larger than the outer diameter dimension (PD) (relative to the central axis of the core material) of the region (PA) that is compressed around the core material (1) when the core material (1) is pressed into the ground, and is a size that allows it to be screwed into the soil at the construction site. the law of nature , The reinforcing member (10) is used in combination with the bearing plate (3), and a force T1pa+T0 acting on the ground side of the sliding surface (SS), the allowable tensile force Tsa of the reinforcing member (10), and a force T2pa acting on the region underground side of the sliding surface (SS) act upon it. The force T1pa acting on the ground side of the sliding surface (SS), other than the force T0 acting from the bearing plate (3) to the ground, is given by the formula T1pa = {1 / (1-μ)}τ1pa × s, where μ is the slope reduction coefficient of the bearing plate (3), τ1pa is the shear stress between the reinforcing material (10) and the soil, and s is the contact area between the reinforcing material (10) and the soil in the region on the ground side of the sliding surface (SS). The rigidity of the bearing plate (3) increases as the slope reduction coefficient μ of the bearing plate (3) in the above formula increases, and the force T1pa shown in the above formula increases. The allowable tensile force Tsa of the reinforcing material (10) and the force T1pa are very large values ​​and can be ignored. The bearing capacity of the reinforcing material (10) is set to a value in which the force T2pa acting in the region underground side of the sliding surface (SS) is the dominant parameter. The reinforcing member (10) Without generating soil Screw it into the ground and fix it in place. do It is characterized by the following.

[0007] In the present invention, if the diameter (Φ) of the core material (1) is 25 mm, it is preferable that the outer diameter dimension (WD) of the screw blade (2) is 100 mm.

[0008] Furthermore, in the present invention, it is preferable that the bearing plate (3) is a square shape with sides of 1 m. Furthermore, the thickness of the bearing plate (3) is preferably set such that, due to the rigidity of the bearing plate (3), the slope reduction coefficient (μ) of the bearing plate (3) is approximately 1.0, and the force acting on the ground side of the sliding surface (SS) is negligible. [Effects of the Invention]

[0009] According to the present invention, which has the above-described configuration, sufficient pull-out resistance (yield strength) can be obtained without filling with cement grout, since the screw blades (2) are present. Therefore, cement grout is unnecessary in the present invention, and the amount of carbon dioxide emitted can be reduced by at least the amount of carbon dioxide generated during cement production. Furthermore, since cement milk is unnecessary, the present invention also eliminates the need for cement milk or grout filling work, shortening the construction period. Accordingly, the energy consumed during construction is reduced, leading to a decrease in carbon dioxide emissions. Therefore, the present invention can contribute to carbon neutrality.

[0010] Moreover, according to the present invention, the screw blades (2) allow integration with the ground, similar to conventional rock bolts, to exert the necessary pullout resistance. Furthermore, according to the present invention, the screw blades (2) are intermittently provided on the underground side of the slip surface (SS) at the construction site (of the reinforcing material 10) and do not extend continuously to the ground surface. Thus, when the reinforcing material (10) is screwed into the soil, the soil displaced by the reinforcing material (10) is not conveyed to the ground surface by the screw blades (2), but is instead stored in areas where the screw blades (2) are not installed. Since the displaced soil is not discharged to the ground surface, deformation of the upper ground is prevented. Additionally, soil disposal is unnecessary, reducing construction costs accordingly. Furthermore, carbon dioxide emissions are reduced by the amount of carbon dioxide that would otherwise be generated during soil disposal.

[0011] According to the present invention, since the reinforcing material is used in combination with a rigid bearing plate (3), if the bearing plate (3) has high rigidity and its slope work reduction coefficient (μ) is approximately 1.0, the pullout resistance in the area above the slip surface (SS) can be neglected. In such cases, only the pullout resistance in the area below the slip surface (SS) needs to be considered. Therefore, the screw blades (2) can be provided only on the underground side of the slip surface (SS) at the construction site.

[0012] In the present invention, the outer diameter dimension (WD) of the screw blade (2) is set to be equal to or larger than the outer diameter dimension (PD) (relative to the central axis of the core material) of the region (PA) that is compressed around the core material (1) when the core material (1) is pressed into the ground. Therefore, the screw blade (2) is reliably supported in the ground by the region (PA) that is compressed around the core material (1) when the core material (1) is pressed into the ground, and the necessary pull-out resistance force can be reliably obtained. Furthermore, the outer diameter (WD) of the screw blade (2) is set to a range that allows it to be screwed into the soil at the construction site. This prevents the screw blade (2) from being damaged or the core material (1) from bending when screwed into the ground, reduces the possibility of the screwed reinforcing material (10) interfering with gravel or other obstacles present in the ground, and prevents excessive friction between the screw blade (2) and the cohesive soil, even if the soil at the construction site is cohesive. Furthermore, it prevents the outer diameter (WD) of the screw blade (2) from being too large, which would make manufacturing difficult. In the reinforcing material (10) of the present invention, the axial distance (NP) between adjacent screw blades is set to an integer multiple of the screw pitch (SP) of the screw blade (2), thereby facilitating the manufacture of the screw blades. [Brief explanation of the drawing]

[0013] [Figure 1] This is a perspective view of a reinforcing material according to an embodiment of the present invention. [Figure 2] This is an explanatory diagram illustrating the forces acting in the illustrated embodiment. [Figure 3] This is an explanatory diagram of the outer diameter dimensions of a screw blade. [Figure 4] This is an explanatory diagram showing the pitch of the screw blades and the spacing between adjacent screw blades. [Figure 5] This is an explanatory diagram showing one step of a reinforcement method using a reinforcing material according to the illustrated embodiment. [Figure 6] This is an explanatory diagram showing the process following Figure 5. [Modes for carrying out the invention]

[0014] Embodiments of the present invention will be described below with reference to the attached drawings. The reinforcing material in the illustrated embodiment is a rock bolt, not a ground anchor. In Figure 1, the reinforcing member 10 according to the illustrated embodiment has a core material 1 and screw blades 2. Although not explicitly shown in the diagram, core material 1 may be a solid steel bar or a hollow pipe. Furthermore, the cross-sectional shape of core material 1 is not limited to a circle. In other words, if the core material is a hollow annular member, it may be a square pipe as well as a cylindrical pipe.

[0015] In Figure 1, screw blades 2 are attached to the outer circumference of the core material 1. For example, welding or other known methods can be used to attach the screw blades 2 to the outer circumference of the core material 1. In Figure 1, the outer diameter of the core material is indicated by the symbol φ, and the outer diameter of the screw blades 2 is indicated by the symbol WD. As is clear from Figure 1, the screw blades 2 are not provided along the entire length of the core material 1 in the axial direction. The screw blades 2 are provided intermittently in the region corresponding to the area underground (the right-hand region in Figure 1) at the construction site (of the reinforcing material 10) relative to the sliding surface SS. The screw blades 2 have a shape that allows them to be screwed into the ground by rotating the core material 1. In Figure 1, screw blades 2 are provided intermittently for two pitches, but it is also possible to provide a single screw blade 2 for only one pitch. Alternatively, if the conditions described later are met, it is possible to provide three or more pitches of screw blades 2. In the illustrated embodiment, the reinforcing member 10 has screw blades 2 on the outer circumference of the core material 1, so when the reinforcing member 10 is pulled out, the screw blades 2 resist. Therefore, sufficient pull-out resistance (bearing capacity) can be obtained without filling with cement grout. As a result, cement grout is not required, and the amount of carbon dioxide emitted can be reduced by at least the amount of cement production. Furthermore, since cement grout or grout filling work is not required, the construction period is shortened in the illustrated embodiment, and consequently, the power consumption during construction decreases, and carbon dioxide emissions decrease. In this way, the illustrated embodiment can contribute to carbon neutrality.

[0016] Refer to Figure 2 to explain the forces acting on the rock bolt. In Figure 2, rock bolts 20 (reinforcement members) are placed in the ground G (regions GR1 and GR2). In the ground G, the rock bolts 20 extend across both region GR1, which is above ground level, and region GR2, which is below ground level, with the slip surface SS in between. A highly rigid bearing plate 30 is fixed to the above-ground end. Unlike the reinforcement member 10 in the illustrated embodiment, the rock bolts 20 (reinforcement members) shown in Figure 2 do not have screw blades and consist only of members corresponding to the core material in the illustrated embodiment. In Figure 2, The symbol T1pa indicates the force acting on the region on the ground side of the slip surface SS. The symbol T2pa indicates the force acting in the region underground beyond the slip surface SS. The symbol Tsa indicates the allowable tensile force of the rock bolt 20 (core material).

[0017] In designing the rock bolt 20, the smallest of the acting forces T1pa, T2pa, and the allowable tensile force Tsa of the rock bolt 20 is the dominant parameter, and the design is carried out in accordance with that dominant parameter. Here, the allowable tensile force Tsa of the rock bolt 20 (core material) is a very large value, so it can be ignored during the design process.

[0018] In Figure 2, regarding the force T1pa acting on the region on the ground side of the sliding surface SS, when the rock bolt 20 is combined with a highly rigid bearing plate 30 at its ground-side end, a force "T1pa + T0" acts on the region on the ground side of the sliding surface. Here, force T0 is the tensile force of the reinforcing material acting at the joint between the slope protection structure and the reinforcing material, and force T1pa is expressed by the following equation. T1pa = (1 / 1 - μ)τ1pa × s (1) In equation (1), "μ" is the slope reduction coefficient of the bearing plate, "τ1pa" is the shear stress between the rock bolt 20 and the soil (not shown in Figure 2), and "s" is the contact area between the rock bolt 20 and the soil in the region above ground level than the sliding surface SS. If the bearing plate 30 has high rigidity, the slope reduction coefficient μ of the bearing plate 30 will be close to 1 (μ≈1), and the value of (1 / 1-μ) in equation (1) will be large, so the value of T1pa will also be very large. Therefore, if a highly rigid bearing plate 30 is present, the force T2pa acting on the region underground relative to the sliding surface SS will be the smallest. In other words, when a highly rigid bearing plate 30 is present, the force T1pa acting on the region above ground relative to the sliding surface SS and the allowable tensile force Tsa of the rock bolt 20 can be ignored when designing the rock bolt 20, and the force T2pa acting on the region underground relative to the sliding surface SS becomes the dominant parameter for determining the strength of the rock bolt.

[0019] When there is a highly rigid bearing plate 30, the force T2pa acting on the region underground beyond the sliding surface SS becomes dominant in determining the bearing capacity of the rock bolt 20. Therefore, to improve the bearing capacity of the rock bolt 20, screw blades should be provided on the region underground beyond the sliding surface SS of the rock bolt 20. Based on the aforementioned knowledge, in the reinforcing member 10 shown in Figures 1, 3 to 7, screw blades 2 are provided on the outer circumference of the portion corresponding to the area underground beyond the sliding surface SS of the core material. This is then used in combination with a bearing plate 3 (see Figure 6) having rigidity such that the force acting above ground beyond the sliding surface SS is negligible; in other words, a bearing plate 3 having rigidity such that only the pull-out resistance in the area underground beyond the sliding surface SS needs to be considered. In the reinforcing material 10 shown in Figures 1, 3 to 7, the screw blades 2 allow it to integrate with the ground in the same way as conventional rock bolts, and exert the necessary pull-out resistance. Furthermore, it is possible to install screw blades 2 in the area on the ground side of the slip surface SS. Therefore, the same reinforcing material can be used regardless of the different positions of the slip surface at each construction site.

[0020] As a bearing plate with high rigidity, a bearing plate is selected such that the slope reduction coefficient μ of the bearing plate is close to 1 (μ ≈ 1), and the force T1pa acting from the bearing plate to the ground G is greater than the force T2pa acting in the region underground beyond the sliding surface SS. In other words, in the design of the bearing capacity of the rock bolt, a bearing plate is selected such that the force T2pa acting in the region underground beyond the sliding surface is dominant. As an example of such a bearing plate, a square bearing plate with sides of 1m is selected, in which the force T0 acting from the bearing plate to the ground G is set to be greater than the force T2pa acting in the region underground beyond the sliding surface SS.

[0021] Here, the bearing plate must be able to withstand the axial force in the core material of the reinforcing material. That is, T0r / Tmax must > 1. Here, T0r: Bearing capacity of the bearing plate Tmax: Axial force of the rock bolt (maximum axial force) Furthermore, even if screw blades 2 are placed in the area on the ground side of the sliding surface SS, the load-bearing capacity will not improve.

[0022] Next, with reference to Figure 3, the outer diameter WD of the screw blade 2 will be explained. In Figure 3, when the core material 1 is inserted (screwed) into the ground, the area PA surrounding the core material 1 becomes consolidated. In particular, when a reinforcing material 10 with a large diameter core material 1, such as a hollow pipe, is inserted into the ground, the tendency for the surrounding area PA to become consolidated is particularly pronounced. Note that in Figure 3, to avoid the complexity of the illustration, the radially outer periphery of the consolidated surrounding area PA is shown as a straight line. In the illustrated embodiment, the outer diameter WD of the screw blade 2 is set to be equal to or larger than the outer diameter dimension PD of the core material with respect to the central axis of the compacted region PA. Furthermore, the outer diameter dimension WD of the screw blade 2 is set to a range that allows it to be screwed into the soil at the construction site. Since the outer diameter dimension WD of the screw blade 2 is set to be equal to or larger than the outer diameter dimension PD, the screw blade 2 is reliably supported by the compressed region PA around the core material 1 when the reinforcing material 10 is pressed into the ground, and the screw blade 2 can obtain the necessary pull-out resistance. In the illustrated embodiment, if the diameter of the core material 1 is, for example, 25 mm, then the diameter of the screw blades 2 is, for example, 100 mm.

[0023] Here, if the diameter of the core material 1 is too large, the manufacturing cost of the reinforcing material 10 becomes excessive. Also, as with double-pipe excavation, the machine used to screw the reinforcing material 10 into the ground becomes larger, increasing construction costs. Furthermore, the use of larger machinery makes construction difficult in confined work sites.

[0024] If the outer diameter WD of the screw blade 2 is too large, it becomes difficult to manufacture the screw blade 2, leading to increased manufacturing costs. Furthermore, if the outer diameter WD of the screw blade 2 is too large, it becomes difficult to screw the screw blade 2 into the ground, and the screw blade 2 may be damaged or the reinforcing material 10 may deform when screwing it into the ground. Furthermore, there is a higher possibility of interference with various obstacles when screwing it into the ground. In addition, if the soil at the construction site is particularly cohesive, the friction between the screw blades 2 and the cohesive soil increases, hindering construction. On the other hand, if the outer diameter WD of the screw blade 2 is too small, the necessary pull-out resistance force for the reinforcing material 10 cannot be obtained.

[0025] In the illustrated embodiment, the outer diameter dimension WD of the screw blade 2 of the reinforcing member 10 is set to prevent the above-mentioned problems. Therefore, it prevents the screw blades 2 from having an excessively large outer diameter WD, which would make manufacturing difficult. It also prevents the screw blades 2 from being damaged when the reinforcing material 10 is screwed into the ground, and prevents the core material 1 from bending. Furthermore, it reduces the possibility of the screwed-in reinforcing material 10 interfering with various obstacles in the ground. In addition, it prevents excessive friction between the soil at the construction site and the screw blades 2.

[0026] Next, with reference to Figure 4, the pitch of the screw blades 2 of the reinforcing member 10 will be explained. As shown in Figure 4, the screw blades 2 are not provided along the entire axial length of the core material 1, but rather intermittently. Figure 4 shows two screw blades 2, and the pitch of each screw blade 2 is indicated by the symbol SP. In this specification, the pitch indicated by the symbol SP may be referred to as "screw blade pitch SP". Furthermore, the distance in the axial direction of the core material between an intermittently arranged screw blade 2 and an adjacent screw blade 2 is indicated by the symbol NP. In this specification, this distance NP may be expressed as "screw blade spacing NP".

[0027] If the screw blade spacing NP is too large, the number of screw blades 2 that can be formed on the core material 1 (of the reinforcing material 10) of a predetermined length will decrease, and the required load-bearing capacity will not be obtained. On the other hand, if the screw blade spacing NP is too small, it becomes difficult to process the screw blades 2, and the manufacturing cost of the reinforcing material 10 increases. In other words, the number of screw blades 2 formed on the core material 1 becomes too large, which increases the manufacturing cost. In the illustrated embodiment, the screw blade spacing NP (the distance in the axial direction of the core material between an intermittently arranged screw blade 2 and an adjacent screw blade 2) is set to an integer multiple of the screw blade pitch SP. By setting the screw blade spacing NP to an integer multiple of the screw blade pitch SP, the intermittently formed screw blades 2 in the illustrated embodiment appear as if a part of a continuous single helix has been omitted, making manufacturing easier.

[0028] Next, referring to Figures 5 and 6, we will explain the process of the reinforcement method using the reinforcing material 10, which was described with reference to Figures 1 to 4. In the process shown in Figure 5, the slip surface SS at the construction site (for example, the ground G or the ground areas GR1, GR2) is determined. The slip surface SS is determined by a conventionally known method. In the process shown in Figure 5, a reinforcing material 10 is selected such that the screw blades 2 are provided in the area underground (the area indicated by arrow D in Figure 5, area GR2) below the sliding surface SS. When selecting the reinforcing material 10, the required load-bearing capacity and screwing force should be considered according to the soil conditions of the construction site, and a reinforcing material 10 with appropriate outer diameter Φ of the core material 1, outer diameter WD of the screw blades 2, screw blade pitch SP, and screw blade spacing NP should be selected. For example, a reinforcing material 10 with an outer diameter Φ of 25 mm for the core material 1, an outer diameter of 100 mm for the screw blades 2, and a screw blade spacing NP that is an integer multiple of the screw blade pitch SP should be selected.

[0029] Next, as shown in Figure 6, the reinforcing material 10 and the bearing plate 3 are assembled and installed. Then, the bearing plate 3 is set in place. Here, the bearing plate 3 is selected such that, in designing the load-bearing capacity of the reinforcing member 10, the force T2pa (see Figure 2) acting in the region underground relative to the slip surface is dominant (i.e., the force acting above ground relative to the slip surface SS is negligible). For example, a bearing plate 3 that is a square with sides of 1 m is selected. As explained with reference to Figure 2, when a rigid bearing plate 3 and reinforcing material 10 are used in combination, the rigidity of the bearing plate 3 is high, and the slope reduction coefficient μ of the bearing plate 3 becomes approximately 1.0. In this case, forces in the region above ground level than the sliding surface SS can be ignored, and only the pull-out resistance in the region below ground level than the sliding surface SS needs to be considered.

[0030] In the process shown in Figure 6, the reinforcing material 10 selected in the process shown in Figure 5 is screwed into the ground and fixed in place. As shown in Figure 6, the reinforcing material 10 selected in the process of Figure 5 has two screw blades 2-1 and 2-2 in the region of the core material 1 that is underground relative to the sliding surface SS. When the reinforcing material 10 is screwed in, no soil is generated by the screw blades 2-1 and 2-2, and the soil is not discharged to the ground.

[0031] Since the excavated soil is not discharged onto the surface, deformation of the upper ground is prevented, eliminating the need for soil treatment and thus reducing construction costs. Furthermore, the amount of carbon dioxide emissions is reduced by the amount that would otherwise be released during soil treatment. After the reinforcing member 10 is screwed in (rotatably inserted), the bearing plate 3 is installed. However, the bearing plate 3 can also be installed at a time other than after the rotational insertion of the reinforcing member 10.

[0032] The illustrated embodiments are for illustrative purposes only and are not intended to limit the technical scope of the present invention. [Explanation of Symbols]

[0033] 1. Core material 2. Screw blades 3. Bearing plate 10. Reinforcement material NP... Distance in the axial direction of the core material between adjacent screw blades PA...the area compressed around the core material PD...Outer diameter dimension of the area compressed around the core material SP...Pitch of screw blades SS...Slip surface WD...Outer diameter of screw blades

Claims

1. It has a core material and spiral-shaped screw blades provided on the outer circumference of the core material. The screw blades are in a reinforcing material that is screwed into the ground by rotating the core material, The aforementioned screw blades are intermittently provided in the axial direction of the core material, on the ground side of the sliding surface at the construction site. The distance between the intermittently arranged screw blades and adjacent screw blades in the axial direction of the core material is an integer multiple of the screw blade pitch. The outer diameter of the screw blades is equal to or larger than the outer diameter of the area compressed around the core material when the core material is pressed into the ground, and is also large enough to be screwed into the soil at the construction site. The reinforcing material is used in combination with a bearing plate, and a force T1pa + T0 acting on the ground side of the sliding surface, the allowable tensile force Tsa of the reinforcing material, and a force T2pa acting on the region underground side of the sliding surface act upon it. The force T1pa acting on the ground side of the slip surface, other than the force T0 acting from the bearing plate to the ground, is given by the formula T1pa = {1 / (1-μ)}τ1pa × s, where μ is the slope reduction coefficient of the bearing plate, τ1pa is the shear stress between the reinforcing material and the soil, and s is the contact area between the reinforcing material and the soil in the region on the ground side of the slip surface. The rigidity of the bearing plate is such that the slope reduction coefficient μ of the bearing plate in the formula becomes large, the force T1pa shown in the formula becomes large, the allowable tensile force Tsa of the reinforcing material and the force T1pa become very large values ​​and can be ignored, and the load-bearing capacity of the reinforcing material is set to a value in which the force T2pa acting in the region underground side of the sliding surface becomes the dominant parameter.

2. The thickness dimension of the bearing plate is set such that, due to the rigidity of the bearing plate, the slope reduction coefficient of the bearing plate is approximately 1.0, and the force acting on the ground side of the sliding surface can be ignored.

3. Determine the sliding surface, Select a reinforcing material in which the screw blades are located in the area underground, below the sliding surface. The aforementioned reinforcing material is It has a core material and spiral-shaped screw blades provided on the outer circumference of the core material. The aforementioned screw blades are shaped to be screwed into the ground by rotating the core material. The aforementioned screw blades are intermittently provided in the axial direction of the core material, on the ground side of the sliding surface at the construction site. The distance between the intermittently arranged screw blades and adjacent screw blades in the axial direction of the core material is an integer multiple of the screw blade pitch. The outer diameter of the screw blades is equal to or larger than the outer diameter of the area compressed around the core material when the core material is pressed into the ground, and is also large enough to be screwed into the soil at the construction site. The reinforcing material is used in combination with a bearing plate, and a force T1pa + T0 acting on the ground side of the sliding surface, the allowable tensile force Tsa of the reinforcing material, and a force T2pa acting on the region underground side of the sliding surface act upon it. The force T1pa acting on the ground side of the slip surface, other than the force T0 acting from the bearing plate to the ground G, is given by the formula T1pa = {1 / (1-μ)}τ1pa × s, where μ is the slope reduction coefficient of the bearing plate, τ1pa is the shear stress between the reinforcing material and the soil, and s is the contact area between the reinforcing material and the soil in the region on the ground side of the slip surface. The rigidity of the bearing plate increases as the slope reduction coefficient μ of the bearing plate in the formula increases, and the force T1pa shown in the formula increases. The allowable tensile force Tsa of the reinforcing material and the force T1pa become very large values ​​and can be ignored, and the bearing capacity of the reinforcing material is set to a value in which the force T2pa acting in the region underground from the sliding surface becomes the dominant parameter. A ground reinforcement method characterized by screwing and fixing the reinforcing material into the ground without generating soil excavation.

Citation Information

Patent Citations

  • Lock bolt construction method

    JP1985192100A

  • Foundation pile structure using existing pile with spiral blade, construction of existing pile with spiral blade, existing pile with spiral blade, and propelling casing

    JP2004052538A

  • Rock bolt

    JP2005314993A

  • Inclined ground stabilizing tool and inclined ground stabilizing construction method

    JP2006089979A

  • Steel pipe pile and construction method for the same

    JP2012136823A