Revenue management device, revenue management method, and revenue management program

The revenue management device accurately tracks revenue for construction projects by associating tax-inclusive and tax-exclusive amounts with contracts, addressing over-recording issues and ensuring precise progress recognition for taxable and tax-exempt businesses.

JP7955253B2Active Publication Date: 2026-11-24OBIC CO LTD
View PDF 7 Cites 0 Cited by

Patent Information

Application Number
JP2023210045
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Filing Date
2023-12-13
Publication Date
2026-11-24
Estimated Expiration
2043-12-13

AI Technical Summary

Technical Problem

In construction projects where payment is made in stages based on progress, accurately recognizing revenue for both taxable and tax-exempt businesses is challenging due to over-recording of tax deductions, leading to inaccurate progress recognition.

Method used

A revenue management device and method that associates tax-inclusive and tax-exclusive amounts with construction work contracts, allowing for accurate revenue recognition by calculating progress through journal entry data creation, considering tax deductions for both taxable and tax-exempt businesses.

Benefits of technology

Enables precise revenue recognition even when acceptance is divided, ensuring compliance with the invoice system and accurate progress tracking for both taxable and tax-exempt businesses.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007955253000001
    Figure 0007955253000001
  • Figure 0007955253000002
    Figure 0007955253000002
  • Figure 0007955253000003
    Figure 0007955253000003
Patent Text Reader

Abstract

To provide a profit management device, a profit management method, and a profit management program which can accurately recognize profit, even if acceptance is divided, when sales are recorded based on the progress of construction for a taxable entity or a non-taxable entity.SOLUTION: A profit management device includes: an acceptance input step of receiving input of acceptance data in which at least a contract construction number, an acceptance date, an order destination code, a current accepted tax-included amount, a current accepted amount, and a current accepted consumption tax are associated with an acceptance number, and registering the acceptance data; a calculation step of calculating a progress by dividing the current accepted amount in the acceptance data by an order amount in construction order data, on the basis of the construction order data and the acceptance data; and a journalizing step of generating journal data for sales by multiplying the progress by a tax-excluded amount in contract amount data.SELECTED DRAWING: Figure 1
Need to check novelty before this filing date? Find Prior Art

Description

[Technical Field]

[0001] The present invention relates to a profit management device, a profit management method, and a profit management program. [Background Art]

[0002] Patent Document 1 creates explanatory content including videos explaining documents such as a notification of a taxable business operator for consumption tax exchanged between two parties, a notification of a tax-exempt business operator for consumption tax, and a notification of selection of a taxable business operator for consumption tax, thereby making it easier for the receiving side to check than before. [Prior Art Documents] [Patent Documents]

[0003] [Patent Document 1] Japanese Unexamined Patent Application Publication No. 2023-69816 [Summary of the Invention] [Problems to be Solved by the Invention]

[0004] By the way, in contract construction, when inspecting ordered construction work, there are cases where payment is made as partial inspection according to the progress of the construction work, instead of inspecting everything at once. In this case, when registering the inspection amount on the system, the inspected amount and the remaining balance are managed.

[0005] However, as a response to the invoice accuracy, it is necessary to perform tax deduction for tax-exempt business operators. If the deducted amount is included and subtracted from the remaining balance, when recording sales using the progress of construction work (progress basis or progress rate), the amount of tax deduction is over-recorded, so there is a problem that the progress cannot be accurately recognized when the inspection of the tax-exempt business operator is divided.

[0006] The present invention has been made in view of the above, and aims to provide a revenue management device, revenue management method, and revenue management program that can accurately recognize revenue even when acceptance is divided, when revenue is recorded by adopting the progress of construction for taxable businesses or tax-exempt businesses. [Means for solving the problem]

[0007] To solve the above-mentioned problems and achieve the objective, the revenue management device according to the present invention is a revenue management device comprising a control unit, which is capable of accessing contract amount data, which associates at least the tax-inclusive amount, the tax-exclusive amount, and the consumption tax with the contract number of the construction work, and construction order data, which associates at least the order amount, the tax-exclusive amount, and the consumption tax with the contract number of the construction work, and the control unit comprises a revenue inspection power unit that receives and registers the input of inspection data, which associates at least the construction work contract number, the inspection date, the supplier code, the tax-inclusive amount of the inspection this time, the inspection amount this time, and the consumption tax this time with the inspection number, and a journal entry data creation processing unit that calculates the progress by dividing the inspection amount in the inspection data by the order amount in the construction order data based on the construction order data and the inspection data, and generates journal entry data that records the amount obtained by multiplying the progress by the tax-exclusive amount in the contract amount data as sales.

[0008] Furthermore, the revenue management method according to the present invention is a revenue management method performed by a revenue management device equipped with a control unit, wherein the revenue management device is able to access contract amount data, which associates at least the tax-inclusive amount, the tax-exclusive amount, and the consumption tax with the contract number of the construction work, and construction order data, which associates at least the order amount, the tax-exclusive amount, and the consumption tax with the contract number of the construction work, and is characterized by including, in the control unit, an inspection revenue input step that receives and registers inspection data, which associates at least the construction work contract number, the inspection date, the supplier code, the tax-inclusive amount of the inspection this time, the inspection amount this time, and the consumption tax this time, and an inspection data creation step that calculates the progress by dividing the inspection amount in the inspection data by the order amount in the construction order data based on the construction order data and the inspection data, and generates journal entry data that records the amount obtained by multiplying the progress by the tax-exclusive amount in the contract amount data as sales.

[0009] Furthermore, the revenue management program according to the present invention is a revenue management program to be executed by a revenue management device equipped with a control unit, wherein the revenue management device has access to contract amount data, which associates at least the tax-inclusive amount, the tax-exclusive amount, and the consumption tax with the contract number for the construction work, and construction order data, which associates at least the order amount, the tax-exclusive amount, and the consumption tax with the contract number for the construction work, and causes the control unit to execute a revenue inspection input step, which accepts and registers inspection data, which associates at least the contract number, the inspection date, the supplier code, the tax-inclusive amount for the inspection this time, the inspection amount this time, and the consumption tax for the inspection this time with the inspection number, and a journal entry data creation processing step, which calculates the progress by dividing the inspection amount in the inspection data by the order amount in the construction order data based on the construction order data and the inspection data, and generates journal entry data that records the amount obtained by multiplying the progress by the tax-exclusive amount in the contract amount data as sales. [Effects of the Invention]

[0010] According to the present invention, when a taxable or tax-exempt business adopts the percentage-of-completion method to record sales, it has the effect of accurately recognizing revenue even when acceptance is divided into phases. [Brief explanation of the drawing]

[0011] [Figure 1] Figure 1 is a schematic diagram showing an overview of an example of the configuration of a revenue management device according to an embodiment, in the form of a block diagram. [Figure 2] Figure 2 shows an example of a supplier master table in the supplier master included in the revenue management device according to the embodiment. [Figure 3] Figure 3 shows an example of an account master table in the account master included in the revenue management device according to the embodiment. [Figure 4] Figure 4 shows an example of an account attribute master table in the account attribute master included in the revenue management device according to the embodiment. [Figure 5] Figure 5 shows an example of a journal entry pattern master table in the journal entry pattern master provided in the revenue management device according to the embodiment. [Figure 6] Figure 6 shows an example of a journal entry creation type classification master table in the journal entry creation type classification master included in the revenue management device according to the embodiment. [Figure 7] Figure 7 is a flowchart illustrating the overview of the revenue recognition process performed by the revenue management device according to the embodiment. [Figure 8] Figure 8 shows an example of a contract amount data table received by the contract input unit of the revenue management device according to the embodiment. [Figure 9] Figure 9 shows an example of a construction order data table received by the order confirmation processing unit of the revenue management device according to the embodiment. [Figure 10] Figure 10 shows an example of an acceptance data table in the acceptance data. [Figure 11] Figure 11 shows an example of a payment schedule data table in the payment schedule data. [Figure 12] Figure 12 is a diagram illustrating an example of an occurrence journal entry. [Figure 13] Figure 13 is a diagram illustrating an example of a journal entry data table in journal entry data. [Figure 14] Figure 14 is a diagram illustrating an example of an acceptance data table in acceptance data. [Figure 15] Figure 15 is a diagram illustrating an example of a payment schedule data table in payment schedule data. [Figure 16] Figure 16 is a diagram illustrating an example of an occurrence journal entry. [Figure 17] Figure 17 is a diagram illustrating an example of a journal entry data table in journal entry data. [Figure 18] Figure 18 is a diagram illustrating an example of an acceptance data table in acceptance data. [Figure 19] Figure 19 is a diagram illustrating an example of a payment schedule data table in payment schedule data. [Figure 20] Figure 20 is a diagram illustrating an example of an occurrence journal entry. [Figure 21] Figure 21 is a diagram illustrating an example of a journal entry data table in journal entry data. [Figure 22] Figure 22 is a diagram illustrating an example of an acceptance data table in acceptance data. [Figure 23] Figure 23 is a diagram illustrating an example of a payment schedule data table in payment schedule data. [Figure 24] Figure 24 is a diagram illustrating an example of an occurrence journal entry. [Figure 25] Figure 25 is a diagram illustrating an example of a journal entry data table in journal entry data. [[Embodiments for Carrying Out the Invention]]

[0012] Hereinafter, embodiments of a revenue management device, a revenue management method, and a revenue management program according to the present invention will be described in detail with reference to the drawings. The present invention is not limited by the present embodiment.

[0013] [1. Structure] An example of the configuration of the revenue management device according to this embodiment will be described with reference to Figure 1, etc. Figure 1 is a schematic diagram showing an overview of an example of the configuration of the revenue management device in a block diagram.

[0014] The revenue management device 100 shown in Figure 1 is a commercially available desktop personal computer. However, the revenue management device 100 is not limited to stationary information processing devices such as desktop personal computers; it may also be a portable information processing device such as a commercially available notebook computer, PDA (Personal Digital Assistant), smartphone, or tablet personal computer.

[0015] The revenue management device 100 comprises a control unit 102, a communication interface unit 104, a storage unit 106, and an input / output interface unit 108. Each part of the revenue management device 100 is connected to communicate via any communication path.

[0016] The communication interface unit 104 connects the revenue management device 100 to the network 300 via a communication device such as a router and a wired or wireless communication line such as a dedicated line. The communication interface unit 104 has the function of communicating data with other devices and via the communication line. Here, the network 300 has the function of connecting the revenue management device 100 and the server 200 so that they can communicate with each other, and is, for example, the internet or a LAN (Local Area Network). The data stored in the storage unit 106 may be stored in, for example, the server 200.

[0017] The input / output interface unit 108 is connected to an input device 112 and an output device 114. The output device 114 can be a monitor (including a home television), a speaker, or a printer. The input device 112 can be a keyboard, a mouse, a microphone, or a monitor that works in conjunction with the mouse to provide pointing device functionality. In the following, the output device 114 may be referred to as the monitor 114, and the input device 112 may be referred to as the keyboard 112 or mouse 112.

[0018] The memory unit 106 stores various databases, tables, and files. The memory unit 106 also stores computer programs that work in cooperation with the OS (Operating System) to give instructions to the CPU (Central Processing Unit) to perform various processes. The memory unit 106 can be, for example, a memory device such as RAM (Random Access Memory) or ROM (Read Only Memory), a fixed disk device such as a hard disk, a flexible disk, or an optical disk. The memory unit 106 stores the supplier master 106a, the account master 106b, the account attribute master 106c, the journal entry pattern master 106d, and the journal entry creation type classification master 106e.

[0019] The supplier master table 106a stores the supplier name and tax exemption classification associated with the supplier code. Figure 2 shows an example of the supplier master table in supplier master table 106a. As shown in Figure 2, the first row of supplier master table T1 stores the supplier code "HAC0001" associated with the supplier name "OB Construction Co., Ltd." and the tax exemption classification "Taxable". Similarly, the second row of supplier master table T1 stores the supplier code "HAC0002" associated with the supplier name "Obic Construction" and the tax exemption classification "Tax-Exempt".

[0020] The subject master 106b stores subject names in association with subject codes. Figure 3 shows an example of a subject master table in subject master 106b. As shown in Figure 3, the first row of the subject master table T2 stores the subject name "Completed Construction Sales" in association with the subject code "00001".

[0021] The subject attribute master 106c stores attribute names in association with attribute codes. Figure 4 shows an example of a subject attribute master table in subject attribute master 106c. As shown in Figure 4, the first row of the subject attribute master table T3 stores attribute code "10" in association with attribute name "Income".

[0022] The journal entry pattern master 106d stores the journal entry pattern code, associating it with the journal entry pattern name, account attribute code, and account code. Figure 5 shows an example of the journal entry pattern master table in the journal entry pattern master 106d. As shown in Figure 5, the first row of the journal entry pattern master table T4 stores the journal entry pattern code "SIW00001" as associating it with the journal entry pattern name "Contract Work", account attribute code "10", and account code "00001".

[0023] The journal entry creation type classification master 106e stores the journal entry creation type classifications in association with the journal entry creation type names. Figure 6 shows an example of the journal entry creation type classification master table in the journal entry creation type classification master 106e. As shown in Figure 6, the first row of the journal entry creation type classification master table T5 stores the journal entry creation type classification "001" in association with the journal entry creation type name "Sales".

[0024] Returning to Figure 1, we will continue the explanation of the configuration of the revenue management device 100. The control unit 102 is a CPU or the like that comprehensively controls the revenue management device 100. The control unit 102 has an internal memory for storing control programs such as the OS, programs that define various processing procedures, and required data, and executes various information processing based on these stored programs. The control unit 102 includes a contract input unit 102a, an order confirmation processing unit 102b, a determination unit 102c, a revenue verification unit 102d, and a journal entry data creation processing unit 102e.

[0025] The contract input unit 102a performs a contract input process that accepts contract amount data based on sales information entered by the operator via the input device 112.

[0026] The order confirmation processing unit 102b executes an order confirmation process to create construction order data in response to an order confirmation operation entered by an operator via the input device 112.

[0027] The determination unit 102c determines whether or not a supplier is a taxable business based on the supplier master 106a and the supplier code of the supplier entered by the operator via the input device 112.

[0028] The inspection revenue processing unit 102d performs inspection revenue processing to register inspection data, including the inspection amount entered by the operator via the input device 112, and to generate payment schedule data based on the inspection data. Specifically, the inspection revenue processing unit 102d receives inspection data input, which associates at least the construction contract number, inspection date, supplier code, current inspection tax amount, current inspection amount, and current inspection consumption tax with the inspection number, and registers it in the storage unit 106.

[0029] The journal entry data creation processing unit 102e selects accounts corresponding to journal entry patterns and generated journal entries based on the acceptance data and construction order data generated by the acceptance data unit 102d, and executes a journal entry data creation process to create journal entry data. Specifically, the journal entry data creation processing unit 102e calculates the progress rate by dividing the current acceptance amount in the acceptance data by the order amount in the construction order data, and generates journal entry data that records the amount obtained by multiplying this progress rate by the pre-tax amount in the contract amount data as sales. Here, progress rate includes progress rate and percentage-of-completion criteria. Furthermore, if the determination unit 102c determines that the client is not a taxable business operator, the journal entry data creation processing unit 102e calculates the progress rate by dividing the current acceptance amount (after tax deduction) in the acceptance data by the order amount in the construction order data, and generates journal entry data that records the amount obtained by multiplying this progress rate by the pre-tax amount in the contract amount data as sales. Furthermore, if there are multiple acceptance inspections, the journal entry data creation processing unit 102e calculates the progress by dividing the sum of the tax-deducted acceptance amounts from each acceptance inspection data by the order amount in the construction order data, multiplies this progress by the tax-exclusive amount in the contract amount data, and subtracts the amount already recorded in each inspection to generate a journal entry data for sales recording as the amount recorded this time.

[0030] [2. Revenue recognition process performed by the revenue management device] Next, we will describe the revenue recognition process performed by the revenue management device 100. Figure 7 is a flowchart showing an overview of the revenue recognition process performed by the revenue management device 100.

[0031] As shown in Figure 7, first, the contract input unit 102a executes a contract input process (step S101) to receive contract amount data based on sales information entered by the operator via the input device 112. Figure 8 shows an example of a contract amount data table received by the contract input unit 102a. As shown in the contract amount data table T10 in Figure 8, the contract contract number (contract contract information) is associated with and stored the tax-inclusive amount "1,320,000", the tax-exclusive amount "1,200,000", the consumption tax "120,000", and the journal entry pattern code "SIW00001".

[0032] Next, the order confirmation processing unit 102b executes an order confirmation process to create construction order data in response to the order confirmation operation entered by the operator via the input device 112 (step S102). Figure 9 shows an example of a construction order data table that the order confirmation processing unit 102b has received input from. As shown in the construction order data table T11 in Figure 9, the order amount "1,100,000", the tax-inclusive amount "100,000", and the journal entry pattern code "SIW00001" are associated and stored with the construction contract number (construction contract information). After order confirmation, the operator receives an acceptance request from the supplier and recognizes the payment amount based on the acceptance ability.

[0033] Subsequently, the determination unit 102c determines whether the supplier is a taxable business operator based on the supplier master 106a and the supplier code of the supplier entered by the operator via the input device 112 (step S103). If the determination unit 102c determines that the supplier is a taxable business operator (step S103: Yes), the revenue management device 100 proceeds to step S104, which will be described later. On the other hand, if the determination unit 102c determines that the supplier is not a taxable business operator (step S103: No), the revenue management device 100 proceeds to step S106, which will be described later.

[0034] In step S104, the acceptance processing unit 102d performs acceptance processing to register acceptance data, including the acceptance amount entered by the operator via the input device 112, and to generate payment schedule data based on the acceptance data. Figure 10 shows an example of an acceptance data table for acceptance data. Figure 11 shows an example of a payment schedule data table for payment schedule data.

[0035] As shown in Figure 10, the acceptance data table T12 stores the following information associated with the acceptance number "KEN0001": the contract number "K000001", the acceptance date "2024 / 03 / 01", the supplier code "HAC0001", the amount including tax for this acceptance "550,000", the amount for this acceptance "500,000", and the consumption tax for this acceptance "50,000".

[0036] Furthermore, as shown in Figure 11, the payment schedule data tables T13 and T14 are generated by associating the payment schedule number with the acceptance number, contract number, recording date, supplier code, journal entry linkage date, payment schedule amount including tax, payment schedule amount excluding tax, and payment schedule consumption tax. Specifically, the first row of the payment schedule data tables T13 and T14 is generated by associating the payment schedule number "S000001" with the contract number "K000001", the supplier code "HAC0002", the payment schedule amount including tax "550,000", the payment schedule amount excluding tax "500,000", and the payment schedule consumption tax "50,000". Furthermore, in the second row of the payment schedule data tables T13 and T14 (corresponding to the payment data for KEN0001), the payment schedule number "S000002" is associated with the acceptance number "KEN000001", the contract number "K000001", the accounting date "2024 / 03 / 31", the supplier code "HAC0002", the payment schedule amount including tax "550,000", the payment schedule amount excluding tax "500,000", and the payment schedule consumption tax "50,000". In this case, as shown in the first row of the payment schedule data table T13 in Figure 11, the acceptance unit 102d accounts for the remaining amount after partial acceptance without registering an accounting date, at the time of acceptance.

[0037] Returning to Figure 7, we will continue the explanation from step S105 onwards. In step S105, the journal entry data creation processing unit 102e selects accounts corresponding to the journal entry pattern and generated journal entries based on the acceptance data and construction order data generated by the acceptance data unit 102d, and executes a journal entry data creation process to create journal entry data.

[0038] First, the journal entry data creation processing unit 102e calculates the progress by dividing the amount of the current acceptance in the current acceptance data (500,000) by the order amount in the construction order data (1,000,000), based on the acceptance data and construction order data generated by the acceptance data and construction order data generated by the acceptance data unit 102d. More specifically, the journal entry data creation processing unit 102e calculates the progress (%) using the following formula (1). 500,0000 ÷ 1,000,000 = 50 (%) ... (1)

[0039] Subsequently, the journal entry data creation processing unit 102e records the amount corresponding to the progress as sales. Specifically, the journal entry data creation processing unit 102e records the completed construction sales as the value obtained by multiplying the contract amount data (1,200,000) by the progress (50%). More specifically, the journal entry data creation processing unit 102e calculates the completed construction sales using the following formula (2). 1,200,000 × 50% = 600,000 (660,000 including tax) ... (2)

[0040] In this way, the journal entry data creation processing unit 102e refers to the account master 106b, account attribute master 106c, journal entry pattern master 106d, journal entry creation type classification master 106e, and journal entry data to create accrued journal entries, including accrued payable journal entries, completed transfer journal entries, and sales journal entries, and also selects accounts according to the journal entry pattern and accrued journal entries to create journal entry data. Figure 12 is a diagram showing an example of accrued journal entries. Figure 13 is a diagram showing an example of a journal entry data table in the journal entry data.

[0041] As shown in Figure 12, the generated journal entry P1 includes accrued payable entries, completed transfer entries, and sales entries. In addition, the journal entry data table T15 in Figure 13 stores the journal entry details Guid, associating it with the journal entry creation type, date of occurrence, debit account code, debit account name, debit tax-inclusive amount, debit tax-exclusive amount, and debit consumption tax. Similarly, the journal entry data table T16 in Figure 13 stores the credit account code, associating it with the credit tax-inclusive amount, credit tax-exclusive amount, and credit consumption tax. This allows the revenue management device 100 to prevent discrepancies in revenue recognition, even in the case of a taxable business. After step S105, the revenue management device 100 terminates this process.

[0042] Returning to Figure 7, we continue the explanation from step S106 onwards. In step S106, the inspection power unit 102d performs inspection power processing to register inspection data, including the inspection amount entered by the operator via the input device 112, and to generate payment schedule data based on the inspection data. Details of the inspection power processing for tax-exempt businesses will be described later.

[0043] Next, the journal entry data creation processing unit 102e selects accounts corresponding to the journal entry patterns and generated journal entries based on the acceptance data and construction order data generated by the acceptance data unit 102d, and executes a journal entry data creation process to create journal entry data (step S107). After step S107, the revenue management device 100 terminates this process. Details of the journal entry data creation process for tax-exempt businesses will be described later.

[0044] [2-1. In the case of tax-exempt businesses] Here, we will explain in detail the verification of income processing and journal entry data creation processes for tax-exempt businesses in steps S106 and S107 described above.

[0045] [2-1-1. Register without deducting tax at the time of acceptance] First, let's explain the case where tax deductions are not considered during the acceptance inspection process. Figure 14 shows an example of an acceptance data table for acceptance data. Figure 15 shows an example of a payment schedule data table for payment schedule data. Note that in Figure 14, the deduction rate is assumed to be 80%.

[0046] As shown in Figures 14 and 15, the inspection power unit 102d registers inspection data, including the inspection amount entered by the operator via the input device 112, and generates payment schedule data based on the inspection data.

[0047] In the acceptance data table T17 shown in Figure 14, the acceptance number "KEN0001" is associated with the construction contract number "K000001", the acceptance date "2024 / 03 / 01", the supplier code "HAC0002", the amount including tax for this acceptance "550,000", the amount for this acceptance "510,000", and the consumption tax for this acceptance "40,000" (500,000 x 0.8 = 40,000).

[0048] Furthermore, in the first row of the payment schedule data tables T18 and T19 shown in Figure 15, the payment schedule number "S000001" is associated with the contract number "K000001", the supplier code "HAC0002", the payment schedule amount including tax "550,000", the payment schedule amount excluding tax "500,000", and the payment schedule consumption tax "50,000". Furthermore, in the second row of the payment schedule data tables T18 and T19 (corresponding to the payment data for KEN0001), the payment schedule number "S000002" is associated with the acceptance number "KEN000001", the contract number "K000001", the accounting date "2024 / 03 / 31", the supplier code "HAC0002", the payment schedule amount including tax "550,000", the payment schedule amount excluding tax "510,000", and the payment schedule consumption tax "40,000". In this case, as shown in the first row of the payment schedule data table T18 in Figure 15, the acceptance unit 102d accounts for the remaining balance after partial acceptance without registering an accounting date, at the time of acceptance. Furthermore, as shown in the planned consumption tax payment of "40,000" in the second row of the payment schedule data table T19, the verification unit 102d refers to the supplier master 106a and updates the amount after deducting the tax because the supplier code is "HAC0002" and the order tax exemption category is tax exempt.

[0049] The journal entry data creation processing unit 102e selects accounts corresponding to journal entry patterns and generated journal entries based on the acceptance data (see Figure 14) and construction order data (see Figure 9) generated by the acceptance data unit 102d, and executes a journal entry data creation process to create journal entry data.

[0050] First, the journal entry data creation processing unit 102e calculates the progress by dividing the amount of the current acceptance in the current acceptance data (510,000) by the order amount in the construction order data (1,000,000), based on the acceptance data and construction order data generated by the acceptance data and construction order data generated by the acceptance data unit 102d. More specifically, the journal entry data creation processing unit 102e calculates the progress (%) using the following formula (3). 510,0000 ÷ 1,000,000 = 51 (%) ... (3)

[0051] Subsequently, the journal entry data creation processing unit 102e records the amount corresponding to the progress as sales. Specifically, the journal entry data creation processing unit 102e records the completed construction sales as the value obtained by multiplying the contract amount data (1,200,000) by the progress (51%). More specifically, the journal entry data creation processing unit 102e calculates the completed construction sales using the following formula (4). 1,200,000 × 51% = 612,000 (673,200 including tax) ... (4)

[0052] In this way, the journal entry data creation processing unit 102e refers to the account master 106b, account attribute master 106c, journal entry pattern master 106d, journal entry creation type classification master 106e, and journal entry data to create accrued journal entries, including accrued payable journal entries, completed transfer journal entries, and sales journal entries, and also selects accounts according to the journal entry pattern and accrued journal entries to create journal entry data. Figure 16 is a diagram showing an example of accrued journal entries. Figure 17 is a diagram showing an example of a journal entry data table in the journal entry data.

[0053] As shown in Figure 16, the generated journal entry P2 includes accrued payable entries, completed transfer entries, and sales entries. Furthermore, the journal entry data table T20 in Figure 17 stores the journal entry details Guid, associating it with the journal entry creation type, date of occurrence, debit account code, debit account name, debit tax-inclusive amount, debit tax-exclusive amount, and debit consumption tax. Similarly, the journal entry data table T21 stores the credit account code, associating it with the credit tax-inclusive amount, credit tax-exclusive amount, and credit consumption tax. As shown in Figures 16 and 17, if tax deductions are not considered during the conventional acceptance process, sales revenue will increase, making it impossible to correctly recognize the percentage-of-completion method.

[0054] [2-1-2. Register with tax deductions in mind at the time of acceptance inspection] Next, we will explain the case where tax deductions are taken into consideration during acceptance inspection. While the above explanation described the case where the revenue management device 100 performs acceptance inspection in two stages, the following explanation will describe the case where the revenue management device 100 performs acceptance inspection in three stages. However, the same process will be followed even if the acceptance inspection is performed in three or more stages.

[0055] First, let's explain the initial acceptance inspection performed by the revenue management device 100. Figure 18 shows an example of an acceptance data table for acceptance data. Figure 19 shows an example of a payment schedule data table for payment schedule data.

[0056] As shown in Figures 18 and 19, the inspection power unit 102d registers inspection data, including the inspection amount entered by the operator via the input device 112, and generates payment schedule data based on the inspection data.

[0057] In the acceptance data table T22 shown in Figure 18, the acceptance number "KEN0001" is associated with the construction contract number "K000001", the acceptance date "2024 / 03 / 01", the supplier code "HAC0002", the amount including tax for this acceptance "330,000", the amount for this acceptance "300,000", and the consumption tax for this acceptance "30,000".

[0058] Furthermore, in the first row of the payment schedule data tables T23 and T24 shown in Figure 19, the payment schedule number "S000001" is associated with the contract number "K000001", the supplier code "HAC0002", the payment schedule amount including tax "770,000", the payment schedule amount excluding tax "700,000", and the payment schedule consumption tax "70,000". Furthermore, in the second row of the payment schedule data tables T23 and T24 (corresponding to the payment data for KEN0001), the payment schedule number "S000002" is associated with the acceptance number "KEN000001", the contract number "K000001", the accounting date "2024 / 03 / 31", the supplier code "HAC0002", the payment schedule amount including tax "330,000", the payment schedule amount excluding tax "306,000", and the payment schedule consumption tax "24,000". In this case, as shown in the first row of the payment schedule data table T23 in Figure 19, the acceptance unit 102d accounts for the remaining amount after partial acceptance without registering an accounting date, at the time of acceptance.

[0059] The journal entry data creation processing unit 102e selects accounts corresponding to journal entry patterns and generated journal entries based on the acceptance data (see Figure 18) and construction order data (see Figure 9) generated by the acceptance data unit 102d, and executes a journal entry data creation process to create journal entry data.

[0060] First, the journal entry data creation processing unit 102e calculates the progress by dividing the amount of the current acceptance in the current acceptance data (300,000) by the order amount in the construction order data (1,000,000), based on the acceptance data and construction order data generated by the acceptance data and construction order data generated by the acceptance data unit 102d. More specifically, the journal entry data creation processing unit 102e calculates the progress (%) using the following formula (5). 300,000 ÷ 1,000,000 = 30 (%) ... (5)

[0061] Subsequently, the journal entry data creation processing unit 102e records the amount corresponding to the progress as sales. Specifically, the journal entry data creation processing unit 102e records the completed construction sales as the value obtained by multiplying the contract amount data (1,200,000) by the progress (30%). More specifically, the journal entry data creation processing unit 102e calculates the completed construction sales using the following formula (6). 1,200,000 × 30% = 360,000 (396,000 including tax) ... (6)

[0062] In this way, the journal entry data creation processing unit 102e refers to the account master 106b, account attribute master 106c, journal entry pattern master 106d, journal entry creation type classification master 106e, and journal entry data to create accrued journal entries, including accrued payable journal entries, completed transfer journal entries, and sales journal entries, and also selects accounts according to the journal entry pattern and accrued journal entries to create journal entry data. Figure 20 shows an example of an accrued journal entry. Figure 21 shows an example of a journal entry data table in the journal entry data.

[0063] As shown in Figure 20, journal entry P3 includes accrued payable entries, completed transfer entries, and sales entries. In addition, the journal entry data table T25 in Figure 21 stores the journal entry details Guid, associating it with the type of journal entry, date of occurrence, debit account code, debit account name, debit tax-inclusive amount, debit tax-exclusive amount, and debit consumption tax. Similarly, the journal entry data table T26 stores the credit account code, associating it with the credit tax-inclusive amount, credit tax-exclusive amount, and credit consumption tax.

[0064] Next, we will explain the second acceptance inspection performed by the revenue management device 100. Figure 22 shows an example of an acceptance data table for acceptance data. Figure 23 shows an example of a payment schedule data table for payment schedule data.

[0065] As shown in Figures 22 and 23, the inspection power unit 102d registers inspection data, including the inspection amount entered by the operator via the input device 112, and generates payment schedule data based on the inspection data.

[0066] In the acceptance data table T27 shown in Figure 22, the acceptance number "KEN0002" is associated with the construction contract number "K000001", the acceptance date "2024 / 04 / 01", the supplier code "HAC0002", the amount including tax for this acceptance "550,000", the amount for this acceptance "500,000", and the consumption tax for this acceptance "50,000".

[0067] Furthermore, in the third row of the payment schedule data tables T28 and T29 shown in Figure 23, the payment schedule number "S000003" is associated with the acceptance number "KEN000002", the contract number "K000001", the accounting date "2024 / 04 / 30", the supplier code "HAC0002", the payment schedule amount including tax "550,000", the payment schedule amount excluding tax "510,000", and the payment schedule consumption tax "40,000". In this case, the acceptance unit 102d updates the journal entry linkage date in the second row of the payment schedule data table T28 in Figure 23 by storing "2024 / 03 / 31".

[0068] The journal entry data creation processing unit 102e selects accounts corresponding to the journal entry pattern and generated journal entries based on the acceptance data (see Figure 22) and construction order data (see Figure 9) generated by the acceptance data unit 102d, and executes a journal entry data creation process to create the second set of journal entry data.

[0069] First, the journal entry data creation processing unit 102e calculates the progress by dividing the sum of the accepted amounts in the current acceptance data (300,000 + 500,000 = 800,000) by the order amount in the construction order data (1,000,000), based on the acceptance data and construction order data generated by the acceptance data and construction order data generated by the acceptance data unit 102d. More specifically, the journal entry data creation processing unit 102e calculates the progress (%) using the following formula (7). 800,0000 ÷ 1,000,000 = 80 (%) ... (7)

[0070] Subsequently, the journal entry data creation processing unit 102e records the amount (outsourcing date) according to the progress. In this case, the journal entry data creation processing unit 102e calculates the amount to be recorded this time (500,000) by subtracting the amount already recorded (300,000) from the amount accepted (800,000). Specifically, the amount to be recorded this time is calculated using the following formula (8). 800,000 - 300,000 = 500,000 ... (8)

[0071] Next, the journal entry data creation processing unit 102e records the completed construction sales as the value obtained by multiplying the contract amount data (1,200,000) by the progress rate (80%). More specifically, the journal entry data creation processing unit 102e calculates the completed construction sales using the following formula (9). 1,200,000 × 80% = 960,000 (1,056,000 including tax) ... (9)

[0072] Subsequently, the journal entry data creation processing unit 102e subtracts the amount already recorded (360,000) from the completed construction sales (960,000) to calculate the amount to be recorded this time. Specifically, the amount to be recorded this time is calculated using the following formula (10). 960,000 - 360,000 = 600,000 (660,000 including tax) ... (10)

[0073] In this way, the journal entry data creation processing unit 102e refers to the account master 106b, account attribute master 106c, journal entry pattern master 106d, journal entry creation type classification master 106e, and journal entry data to create accrued journal entries, including accrued payable journal entries, completed transfer journal entries, and sales journal entries, and also selects accounts according to the journal entry pattern and accrued journal entries to create journal entry data. Figure 24 shows an example of an accrued journal entry. Figure 25 shows an example of a journal entry data table in the journal entry data.

[0074] As shown in Figure 24, the generated journal entry P4 includes accrued payable entries, completed transfer entries, and sales entries. Furthermore, the journal entry data table T30 in Figure 25 stores the journal entry details Guid, associating it with the journal entry creation type, date of occurrence, debit account code, debit account name, debit tax-inclusive amount, debit tax-exclusive amount, and debit consumption tax. Similarly, the journal entry data table T31 stores the credit account code, associating it with the credit tax-inclusive amount, credit tax-exclusive amount, and credit consumption tax. As a result, the revenue management device 100 can correctly recognize the progress while complying with the invoice system, regardless of whether the business is taxable or tax-exempt, and can be designed to avoid affecting revenue recognition.

[0075] According to the embodiments described above, the journal entry data creation processing unit 102e selects accounts corresponding to the journal entry pattern and generated journal entries based on the acceptance data and construction order data generated by the acceptance data unit 102d, and executes a journal entry data creation process to create journal entry data. Therefore, when revenue is recorded by adopting the progress of construction for taxable businesses or tax-exempt businesses, revenue can be accurately recognized even when acceptance is divided into installments.

[0076] Furthermore, according to this embodiment, the journal entry data creation processing unit 102e calculates the progress by dividing the amount of acceptance in the acceptance data by the order amount in the construction order data, and generates journal entry data that records the amount obtained by multiplying this progress by the tax-exclusive amount in the contract amount data as sales. This allows for accurate recognition of the progress and precise revenue recognition while complying with the invoice system.

[0077] Furthermore, according to the embodiment, if the judgment unit 102c determines that the ordering party is not a taxable business operator, the journal entry data creation processing unit 102e calculates the progress by dividing the tax-deducted amount of the accepted inspection in the inspection data by the order amount in the construction order data, and generates journal entry data that records the amount obtained by multiplying this progress by the tax-exclusive amount in the contract amount data as sales. Therefore, regardless of whether the business is tax-exempt, the progress can be correctly recognized and revenue can be accurately recognized while complying with the invoice system.

[0078] Furthermore, according to the embodiment, if there are multiple acceptance inspections with the supplier, the journal entry data creation processing unit 102e calculates the progress by dividing the sum of the tax-deducted acceptance amounts in the acceptance data for each inspection by the order amount in the construction order data. It then generates journal entry data in which the amount recorded this time is recorded as sales by subtracting the amount recorded in each inspection from the amount obtained by multiplying this progress by the tax-exclusive amount in the contract amount data. Thus, the progress can be correctly recognized and revenue can be accurately recognized while complying with the invoice system.

[0079] Furthermore, according to the embodiment, if the determination unit 102c determines that the ordering party is a taxable business operator, the journal entry data creation processing unit 102e calculates the progress rate by dividing the amount of acceptance in the acceptance data by the order amount in the construction order data, based on the construction order data and the acceptance data, and generates journal entry data that records the amount obtained by multiplying this progress rate by the tax-exclusive amount in the contract amount data as sales. In this way, the progress rate can be correctly recognized for taxable business operators, and revenue can be accurately recognized.

[0080] Furthermore, according to this embodiment, the journal entry data creation processing unit 102e refers to the account master 106b, account attribute master 106c, journal entry pattern master 106d, journal entry creation type classification master 106e, and journal entry data to create accrued journal entries, including accrued payable journal entries, completed transfer journal entries, and sales journal entries, so that each of the accrued payable journal entries, completed transfer journal entries, and sales journal entries can be identified.

[0081] [3. Contribution to the United Nations-led Sustainable Development Goals (SDGs)] This embodiment can contribute to improving operational efficiency and promoting appropriate management decisions within companies, thereby enabling contributions to SDGs Goals 8 and 9.

[0082] Furthermore, this embodiment can contribute to reducing waste and promoting paperless and digital processes, thereby contributing to SDGs Goals 12, 13, and 15.

[0083] Furthermore, this embodiment can contribute to strengthening control and governance, thereby enabling contributions to SDG Goal 16.

[0084] [4. Other Embodiments] In addition to the embodiments described above, the present invention may be implemented in various different embodiments within the scope of the technical idea described in the claims.

[0085] For example, among the processes described in the embodiments, all or part of the processes described as being performed automatically can be performed manually, or all or part of the processes described as being performed manually can be performed automatically by known methods.

[0086] Furthermore, the processing procedures, control procedures, specific names, information including parameters such as registration data and search conditions for each process, screen examples, and database configuration shown in this specification and in the drawings may be changed at will unless otherwise specified.

[0087] Furthermore, with respect to the revenue management device 100, each component shown in the diagram is a functional concept and does not necessarily need to be physically configured as shown.

[0088] For example, the processing functions of the revenue management device 100, particularly those performed in the control unit, may be implemented in whole or in part by a CPU and a program interpreted and executed by the CPU, or they may be implemented as wired logic hardware. The program is recorded on a non-temporary computer-readable recording medium containing programmed instructions for causing the information processing device to execute the processing described in this embodiment, and is mechanically read by the revenue management device 100 as needed. That is, a storage unit such as ROM or HDD (Hard Disk Drive) contains a computer program that works in cooperation with the OS to give instructions to the CPU and perform various processing tasks. This computer program is executed by being loaded into RAM and works in cooperation with the CPU to constitute the control unit.

[0089] Furthermore, this computer program may be stored on an application program server connected to the revenue management device 100 via any network, and it is possible to download all or part of it as needed.

[0090] Furthermore, the program for executing the processing described in this embodiment may be stored on a non-temporary computer-readable recording medium, or it may be configured as a program product. Here, "recording medium" includes any "portable physical medium" such as memory cards, USB (Universal Serial Bus) memory, SD (Secure Digital) cards, flexible disks, magneto-optical disks, ROMs, EPROMs (Erasable Programmable Read Only Memory), EEPROMs (Registered Trademark) (Electrically Erasable and Programmable Read Only Memory), CD-ROMs (Compact Disk Read Only Memory), MOs (Magneto-Optical disks), DVDs (Digital Versatile Disks), and Blu-ray (Registered Trademark) Discs.

[0091] Furthermore, "program" refers to a data processing method described in any language or writing method, regardless of its format, such as source code or binary code. Note that "program" is not necessarily limited to a single, monolithic structure; it also includes distributed structures consisting of multiple modules or libraries, and those that work in cooperation with other programs, such as an operating system, to achieve their functions. Regarding the specific configuration and reading procedures for reading the recording medium in each device shown in the embodiments, as well as the installation procedures after reading, well-known configurations and procedures can be used.

[0092] The various databases stored in the memory unit are memory devices such as RAM and ROM, fixed disk devices such as hard disks, flexible disks, and optical disks, and store various programs, tables, databases, and web page files used for various processes and website provision.

[0093] Furthermore, the revenue management device 100 may be configured as a known personal computer or workstation or other information processing device, or as an information processing device to which any peripheral devices are connected. Alternatively, the revenue management device 100 may be implemented by installing software (including programs or data, etc.) on the device that enables the processing described in this embodiment.

[0094] Furthermore, the specific forms of distribution and integration of the devices are not limited to those shown in the figures, and all or part of them can be configured by functionally or physically distributing and integrating them in any unit according to various additions or functional loads. In other words, the embodiments described above may be implemented in any combination, or the embodiments may be implemented selectively. [Industrial applicability]

[0095] This invention is useful in industries and sectors that perform contract work, such as building maintenance and the real estate development industry. [Explanation of Symbols]

[0096] 100 Revenue Management Device 102 Control Unit 102a Contract Work Input Section 102b Order Confirmation Processing Unit 102c Judgment section 102d Inspection and Revenue Unit 102e Journal entry data creation processing unit 104 Communication Interface Section 106 Storage section 106a Supplier Master 106b Subject Master 106c Subject Attribute Master 106d Journal Entry Pattern Master 106e Journal Entry Creation Type Classification Master 108 Input / Output Interface Section 112 Input device 114 Output device 200 servers 300 Networks

Claims

1. A revenue management device comprising a control unit, The contract number for the construction work must be associated with contract amount data that includes at least the tax-inclusive amount, the tax-exclusive amount, and the consumption tax, Construction order data that associates the contract number with at least the order amount, the amount excluding tax, and the consumption tax, Accessible, The control unit, An inspection power unit that accepts and registers inspection data, which associates the inspection number with at least the construction contract number, inspection date, supplier code, the total amount including tax for the inspection, the total amount of the inspection, and the consumption tax for the inspection. A journal entry data creation processing unit generates journal entry data that records a sales amount obtained by multiplying the amount of the current acceptance in the acceptance data by the tax-exclusive amount in the construction order data, based on the aforementioned construction order data and the aforementioned acceptance data, and multiplying the said progress by the tax-exclusive amount in the aforementioned contract amount data. Equipped with, A revenue management device characterized by the following features.

2. A revenue management device according to claim 1, It is also possible to access a supplier master database that associates the supplier code with the supplier name and tax exemption classification. The control unit, The system further includes a determination unit that determines whether or not a supplier is a taxable business based on the supplier master and the supplier code of a supplier entered from an external source. The aforementioned journal entry data creation processing unit, If the determination unit determines that the ordering party is not a taxable business operator, the inspection unit calculates the progress by dividing the amount of the current inspection in the inspection data, which was registered considering tax deductions at the time of inspection, by the tax-exclusive amount in the construction order data, and generates journal entry data that records the amount obtained by multiplying the progress by the tax-exclusive amount in the contract amount data as sales. A revenue management device characterized by the following features.

3. A revenue management device according to claim 2, The aforementioned journal entry data creation processing unit, If the determination unit determines that the ordering party is not a taxable business operator, and there are multiple acceptance inspections for the ordering party with the same construction contract number, the progress is calculated by taking all the acceptance data for the ordering party with the same construction contract number, summing up the acceptance amounts for the current inspection in the acceptance data registered by the acceptance power unit considering tax deductions at the time of inspection, and dividing the sum by the tax-exclusive amount in the construction order data. Then, the progress is multiplied by the tax-exclusive amount in the contract amount data, and the completed construction sales that have already been recorded are subtracted from this amount to generate a journal entry data in which the amount recorded this time is recorded as sales. A revenue management device characterized by the following features.

4. A revenue management device according to claim 3, The aforementioned journal entry data creation processing unit, If the determination unit determines that the ordering party is a taxable business operator, the progress is calculated by dividing the amount of the current acceptance in the acceptance data by the amount excluding tax in the construction order data, based on the construction order data and the acceptance data. A revenue management device characterized by the following features.

5. A revenue management device according to claim 4, A subject master that associates subject codes with subject names, A subject attribute master that associates attribute names with attribute codes, A journal entry pattern master, which associates the journal entry pattern code with the journal entry pattern name, account attribute code, and account code, A journal entry creation type classification master, which associates the journal entry creation type name with the journal entry creation type classification, Further access is available, The aforementioned journal entry data creation processing unit, Referencing the aforementioned account master, account attribute master, journal entry pattern master, journal entry creation type classification master, and journal entry data, the system creates accrual journal entries, including accrual journal entries, completed transfer journal entries, and sales journal entries. A revenue management device characterized by the following features.

6. A revenue management method performed by a revenue management device equipped with a control unit, The revenue management device is, The contract number for the construction work must be associated with contract amount data that includes at least the tax-inclusive amount, the tax-exclusive amount, and the consumption tax, Construction order data that associates the contract number with at least the order amount, the amount excluding tax, and the consumption tax, Accessible, The control unit executes the following: The acceptance process includes an acceptance step that accepts and registers acceptance data, which associates the acceptance number with at least the construction contract number, acceptance date, supplier code, the amount including tax for the current acceptance, the amount of the current acceptance, and the consumption tax for the current acceptance. A journal entry data creation process step that generates journal entry data in which, based on the aforementioned construction order data and the aforementioned acceptance data, the progress is calculated by dividing the amount of acceptance in the current acceptance data by the aforementioned tax-exclusive amount in the aforementioned construction order data, and the amount obtained by multiplying the progress by the aforementioned tax-exclusive amount in the aforementioned contract amount data is recorded as sales; Including, A revenue management method characterized by the following:

7. A revenue management program to be executed by a revenue management device equipped with a control unit, The revenue management device is, The contract number for the construction work must be associated with contract amount data that includes at least the tax-inclusive amount, the tax-exclusive amount, and the consumption tax, Construction order data that associates the contract number with at least the order amount, the amount excluding tax, and the consumption tax, Accessible, The control unit, The acceptance process includes an acceptance step that accepts and registers acceptance data, which associates the acceptance number with at least the construction contract number, acceptance date, supplier code, the amount including tax for the current acceptance, the amount of the current acceptance, and the consumption tax for the current acceptance. A journal entry data creation process step that generates journal entry data in which, based on the aforementioned construction order data and the aforementioned acceptance data, the progress is calculated by dividing the amount of acceptance in the current acceptance data by the aforementioned tax-exclusive amount in the aforementioned construction order data, and the amount obtained by multiplying the progress by the aforementioned tax-exclusive amount in the aforementioned contract amount data is recorded as sales; To make it happen A revenue management program characterized by [features].

Citation Information

Patent Citations

  • Counterbalance journal entry recording device, counterbalance journal entry recording method, and counterbalance journal entry recording program

    JP2017182765A

  • Construction progress basis accounting system, construction progress basis accounting method and construction progress basis accounting program

    JP2019046168A

  • Profit recognizing device, profit recognizing method, and profit recognizing program

    JP2020181343A

  • Net-sales and journal entry apparatus, net-sales and journal entry method, and net-sales and journal entry program

    JP2021144688A

  • Business support device, business support program, and business support method

    JP2022039638A