Control device, desulfurization system, control method, and control program

The control device addresses piping clogging in desulfurization systems by detecting absorbent accumulation and adjusting the slurry flow control valve, maintaining optimal flow velocity for effective desulfurization.

JP7955417B2Active Publication Date: 2026-11-24MITSUBISHI HEAVY IND LTD
View PDF 9 Cites 0 Cited by

Patent Information

Application Number
JP2025063605
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Filing Date
2025-04-08
Publication Date
2026-11-24
Estimated Expiration
2045-04-08

AI Technical Summary

Technical Problem

Existing desulfurization systems face issues with piping clogging due to absorbent accumulation, leading to disturbances in slurry flow velocity and inadequate sulfur oxide removal.

Method used

A control device and method that includes a detection unit to identify absorbent accumulation and a correction unit to adjust the slurry flow control valve opening based on detected accumulation, preventing full opening and maintaining appropriate slurry flow velocity.

Benefits of technology

The solution effectively suppresses piping blockage while stabilizing slurry flow velocity, ensuring consistent desulfurization performance.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007955417000001
    Figure 0007955417000001
  • Figure 0007955417000002
    Figure 0007955417000002
  • Figure 0007955417000003
    Figure 0007955417000003
Patent Text Reader

Abstract

The present invention provides a control device, a desulfurization system, a control method, and a control program that control the desulfurization system to suppress pipe blockage while suppressing external disturbances. [Solution] A control device 50 for controlling a desulfurization apparatus that removes sulfur oxides from exhaust gas by bringing exhaust gas into contact with an absorbent liquid, comprising: a detection unit 51 for detecting the accumulation of absorbent in the piping; and a correction unit 53 for correcting the opening command value of the slurry flow control valve by a valve opening correction value based on the detected accumulation of absorbent, wherein when the detection unit 51 detects the accumulation of absorbent, the correction unit 53 corrects the opening command value by increasing it using the valve opening correction value.
Need to check novelty before this filing date? Find Prior Art

Description

TECHNICAL FIELD

[0001] The present disclosure relates to a control device, a desulfurization system, a control method, and a control program. BACKGROUND ART

[0002] Large boilers such as power generation boilers include a hollow furnace installed in the vertical direction, and a plurality of burners are arranged on the furnace wall along the circumferential direction of the furnace. In addition, a large boiler has a flue connected to the upper side of the furnace in the vertical direction, and a heat exchanger for generating steam is arranged in the flue. The burners inject a mixture of fuel and air (oxidizing gas) into the furnace, forming a flame and generating combustion gas that flows into the flue. A heat exchanger is installed in the area where the combustion gas flows, and water or steam flowing in the heat transfer tubes of the heat exchanger is heated to generate superheated steam.

[0003] A desulfurization device is installed downstream of the boiler to remove sulfur oxides from the exhaust gas by bringing an absorption liquid into contact with the exhaust gas. Absorbent may accumulate in the piping that supplies the absorption liquid to the desulfurization device. If the piping becomes clogged due to the accumulation of absorbent, the specified amount of absorption liquid may not be supplied, and the removal in the desulfurization device may not be performed properly.

[0004] For example, in Patent Document 1, in order to suppress clogging of the piping by slurry, the valve provided in the piping is periodically switched between fully open and fully closed. RELATED ART DOCUMENTS PATENT DOCUMENTS

[0005] Patent Document 1 Japanese Unexamined Patent Application Publication No. 2023-59309 SUMMARY OF THE INVENTION PROBLEMS TO BE SOLVED BY THE INVENTION

[0006] However, the invention described in Patent Document 1 had a problem in that, because it periodically switches between fully open and fully closed, the slurry flow velocity becomes excessive when fully open, which becomes a source of disturbance in the feedback control of the slurry supply amount.

[0007] This disclosure has been made in view of these circumstances and aims to provide a control device, a desulfurization system, a control method, and a control program for controlling a desulfurization system to suppress blockage of piping while suppressing disturbances. [Means for solving the problem]

[0008] To solve the above problems, the control device, desulfurization system, control method, and control program of this disclosure employ the following means. The control device of the present disclosure is a control device for controlling a desulfurization system equipped with a desulfurization apparatus that removes sulfur oxides from exhaust gas by bringing exhaust gas into contact with an absorbent liquid, and comprises a detection unit that detects the accumulation of absorbent in a pipe, and a correction unit that corrects the opening command value of a slurry flow control valve by a valve opening correction value based on the detected accumulation of absorbent, wherein when the detection unit detects the accumulation of absorbent, the correction unit corrects the opening command value by increasing it by the valve opening correction value.

[0009] The desulfurization system of this disclosure comprises a desulfurization apparatus and the control device described above.

[0010] The control method of the present disclosure is a control method for a desulfurization system that is executed by a computer and includes a desulfurization apparatus that removes sulfur oxides from exhaust gas by bringing exhaust gas into contact with an absorbent liquid, comprising: a detection step of detecting the accumulation of absorbent in a pipe; and a correction step of correcting the opening command value of a slurry flow control valve with a valve opening correction value based on the detected accumulation of absorbent, wherein the correction step, when it detects the accumulation of absorbent in the detection step, corrects the opening command value to increase by the valve opening correction value.

[0011] The control program disclosed herein causes a computer to execute the control method described above. [Effects of the Invention]

[0012] According to this disclosure, the slurry flow control valve can be controlled to suppress blockage of the piping while suppressing disturbances, thereby setting the slurry flow velocity to an appropriate value. [Brief explanation of the drawing]

[0013] [Figure 1] This is a schematic diagram showing a boiler in some embodiments of the present disclosure. [Figure 2] This is a schematic diagram showing a desulfurization system equipped with a desulfurization apparatus in some embodiments of the present disclosure. [Figure 3] This is a schematic diagram showing piping in some embodiments of the present disclosure. [Figure 4] This is a schematic diagram showing piping in some embodiments of the present disclosure. [Figure 5] This is a schematic diagram showing piping in some embodiments of the present disclosure. [Figure 6] This figure shows the flow of correction control by a control device according to some embodiments of the present disclosure. [Figure 7] This diagram shows the flow control mechanism for the slurry. [Figure 8] This figure shows an example of the functions of a control device in several embodiments of the present disclosure. [Figure 9] This figure shows the changes in various values ​​during slurry deposition in a desulfurization system in several embodiments of the present disclosure. [Modes for carrying out the invention]

[0014] Embodiments relating to this disclosure will be described below with reference to the drawings. Note that this embodiment does not limit the disclosure, and if there are multiple embodiments, they may be combinations of these embodiments. In the following description, "up" or "above" refers to the upper vertical direction, and "down" or "below" refers to the lower vertical direction; the vertical direction is not precise and includes some error.

[0015] FIG. 1 is a schematic configuration diagram illustrating a boiler in some embodiments of the present disclosure.

[0016] The boiler 10 of the power generation plant 1 of the present disclosure is a boiler capable of burning pulverized fuel obtained by pulverizing solid fuel with a burner, and exchanging heat generated by this combustion with feed water or steam to generate superheated steam. Biomass fuel, coal, or the like is used as the solid fuel.

[0017] The boiler 10 includes a furnace 11, a combustion device 20, and a combustion gas passage 12. The furnace 11 has a hollow shape of a square cylinder and is installed along the vertical direction. A furnace wall 101 forming an inner wall surface of the furnace 11 is composed of a plurality of heat transfer tubes and fins connecting the heat transfer tubes, and heat generated by combustion of the pulverized fuel is exchanged with water or steam flowing through the heat transfer tubes to recover the heat, while suppressing a temperature rise of the furnace wall 101.

[0018] The combustion device 20 is installed in a lower region of the furnace 11. In the present embodiment, the combustion device 20 includes a plurality of burners 21A, 21B, 21C, 21D, 21E, and 21F (hereinafter, may be collectively referred to as "burner 21") attached to the furnace wall 101. The burners 21 are arranged in a plurality of stages along the vertical direction, with one set being a plurality of burners arranged at equal intervals along the circumferential direction of the furnace 11 (for example, four burners installed at each corner of the square furnace 11). In FIG. 1, for convenience of illustration, only two burners in one set are shown, and reference numerals 21A, 21B, 21C, 21D, 21E, and 21F are assigned to each set. The shape of the furnace 11, the number of burner stages, the number of burners in one stage, the arrangement of the burners, and the like are not limited to this embodiment.

[0019] Burners 21A, 21B, 21C, 21D, 21E, and 21F are each connected to multiple mills 31A, 31B, 31C, 31D, 31E, and 31F (hereinafter collectively referred to as "mills 31") via multiple fine fuel supply pipes 22A, 22B, 22C, 22D, 22E, and 22F (hereinafter collectively referred to as "fine fuel supply pipes 22"). Mills 31 crush solid fuel to produce fine fuel, and are, for example, vertical roller mills configured such that a crushing table (not shown) is supported inside so as to be rotatable, and multiple crushing rollers (not shown) are supported above the crushing table so as to be rotatable in conjunction with the rotation of the crushing table. The solid fuel crushed by the cooperation of the crushing rollers and the crushing table is conveyed to a classifier (not shown) equipped in mill 31 by primary air (conveying gas, oxidizing gas) supplied to mill 31. In the classifier, the crushed solid fuel is classified into fine fuel particles with a particle size suitable for combustion in the burner 21 and coarse fuel particles with a particle size larger than that. The fine fuel particles that pass through the classifier are supplied to the burner 21 via the fine fuel supply pipe 22 along with primary air. The coarse fuel particles that do not pass through the classifier fall onto the crushing table inside the mill 31 due to their own weight and are crushed again.

[0020] An air register 23 is provided on the outside of the furnace 11 where the burner 21 is installed, and one end of an air duct 24 is connected to this air register 23. A forced draft fan (FDF) 32 is connected to the other end of the air duct 24. The air supplied from the forced draft fan 32 is heated by an air preheater 42 installed in the air duct 24 (details will be described later), and is supplied to the burner 21 as secondary air (combustion air, oxidizing gas) via the air register 23 and introduced into the furnace 11.

[0021] The combustion gas passage 12 is connected to the upper vertical part of the furnace 11. The combustion gas passage 12 is equipped with superheaters 102A, 102B, 102C (hereinafter sometimes collectively referred to as "superheater 102"), reheaters 103A, 103B (hereinafter sometimes collectively referred to as "reheater 103"), and an economizer 104 as heat exchangers for recovering heat from the combustion gas. Heat exchange takes place between the combustion gas generated in the furnace 11 and the feedwater or steam circulating inside each heat exchanger. Note that the arrangement and shape of each heat exchanger are not limited to the configuration shown in Figure 1.

[0022] Downstream of the combustion gas passage 12 is a flue 13 through which the combustion gas, for which heat has been recovered by the heat exchanger, is discharged. An air preheater (air heater) 42 is installed between the flue 13 and the air duct 24, and heat exchange takes place between the air flowing through the air duct 24 and the combustion gas flowing through the flue 13. By heating the primary air supplied to the mill 31 and the secondary air supplied to the burner 21, heat is further recovered from the combustion gas after heat exchange with water or steam.

[0023] Furthermore, a denitrification device 43 may be provided in the flue 13 upstream of the air preheater 42. The denitrification device 43 supplies a reducing agent, such as ammonia or urea solution, which has the effect of reducing nitrogen oxides, to the combustion gas flowing through the flue 13. The reaction between the nitrogen oxides (NOx) in the combustion gas to which the reducing agent has been supplied and the reducing agent is promoted by the catalytic action of a denitrification catalyst installed in the denitrification device 43, thereby removing and reducing nitrogen oxides in the combustion gas. A gas duct 41 is connected downstream of the air preheater 42 in the flue 13. The gas duct 41 is equipped with dust collection devices 44, such as an electrostatic precipitator, to remove ash and other particles from the combustion gas, and environmental devices such as a desulfurization device 46 to remove sulfur oxides, as well as an induced draft fan (IDF) 45 to guide the exhaust gas to these environmental devices. The downstream end of the gas duct 41 is connected to a chimney 47, and the combustion gas treated by the environmental devices is discharged outside the system as exhaust gas.

[0024] In the boiler 10, when multiple mills 31 are driven, the crushed and classified pulverized fuel is supplied to the burner 21 via the pulverized fuel supply pipe 22 along with primary air. In addition, secondary air heated by the air preheater 42 is supplied to the burner 21 from the air duct 24 via the wind box 23. The burner 21 blows a pulverized fuel mixture, which is a mixture of pulverized fuel and primary air, into the furnace 11, and also blows secondary air into the furnace 11. The pulverized fuel mixture blown into the furnace 11 ignites and reacts with the secondary air to form a flame. The flame is formed in the lower region of the furnace 11, and the high-temperature combustion gas rises inside the furnace 11 and flows into the combustion gas passage 12. In this embodiment, air is used as the oxidizing gas (primary air, secondary air), but a gas with a higher or lower oxygen content than air may also be used, and stable combustion in the furnace 11 can be achieved by adjusting the ratio of oxygen to the supplied fuel amount to an appropriate range.

[0025] Furthermore, above the mounting position of the burner 21 in the furnace 11, a number of additional air ports (AA ports) 25 are provided to supply additional combustion air (AA) into the furnace 11. The ends of additional air ducts (AA ducts) 26, which branch off from the air duct 24, are connected to the additional air ports 25, and a portion of the air supplied from the forced draft fan 32 can be supplied to the additional air ports 25 as additional combustion air via the additional air ducts 26.

[0026] The combustion gas flowing into the combustion gas passage 12 undergoes heat exchange with water and steam in the superheater 102, reheater 103, and economizer 104 located inside the combustion gas passage 12, before being discharged into the flue 13. There, nitrogen oxides are removed in the denitrification device 43, and after heat exchange with primary and secondary air in the air preheater 42, it is further discharged into the gas duct 41. Ash and other contaminants are removed in the dust collector 44, and sulfur oxides are removed in the desulfurization device 46 before being discharged out of the system through the chimney 47. Note that the arrangement of each heat exchanger in the combustion gas passage 12 and each device from the flue 13 to the gas duct 41 does not necessarily have to be in the order described above with respect to the combustion gas flow.

[0027] The steam generated after passing through the superheater 102 of the boiler 10 drives a steam turbine (not shown). A generator is connected to the steam turbine, which generates electricity.

[0028] Figure 2 is a schematic diagram showing a desulfurization system equipped with a desulfurization apparatus in some embodiments of the present disclosure. The desulfurization system 100 includes a gypsum production system 70 and a limestone supply system 80, in addition to the desulfurization apparatus 46.

[0029] The desulfurization unit (absorption tower) 46 is a device that removes sulfur oxides such as SO2 from exhaust gas and purifies it, mainly using the limestone-gypsum method. The desulfurization unit 46 comprises a desulfurization unit body 46a which serves as a container into which exhaust gas is introduced, a spray pipe 46b which sprays an absorbent liquid inside the desulfurization unit body 46a, and a mist eliminator 46c installed above the spray pipe 46b.

[0030] Below the desulfurization unit body 46a is an exhaust gas inlet duct 46d for introducing exhaust gas into the desulfurization unit body 46a, and above the desulfurization unit body 46a is an exhaust gas outlet duct 46e for discharging the desulfurized exhaust gas to the outside of the desulfurization unit body 46a. Below the desulfurization unit body 46a is a storage section 46f for temporarily storing the absorbent liquid. The storage section 46f is located below the exhaust gas inlet duct 46d.

[0031] The spray pipe 46b is equipped with multiple spray nozzles, from which absorbent liquid is sprayed downwards. An absorbent liquid supply channel 62 is provided between the spray pipe 46b and the storage section 46f. An absorbent liquid supply pump 61 is provided in the absorbent liquid supply channel 62. The operation of the absorbent liquid supply pump 61 is controlled by a desulfurization apparatus control unit (not shown). By driving the absorbent liquid supply pump 61, the absorbent liquid temporarily stored in the storage section 46f is supplied to the spray pipe 46b through the absorbent liquid supply channel 62. In this way, the absorbent liquid circulates through an absorbent liquid circulation path that circulates via the storage section 46f, the absorbent liquid supply channel 62, and the spray pipe 46b.

[0032] A portion of the absorbent liquid is branched off from the absorbent liquid supply channel 62 and supplied to the gypsum production system 70. The gypsum production system 70 is equipped with a hydrocyclone 73 that separates water from the absorbent liquid and discharges the concentrated liquid. A portion of the absorbent liquid branched off from the absorbent liquid supply channel 62 is sent to the hydrocyclone 73. The concentrated liquid concentrated in the hydrocyclone 73 is separated into by-product gypsum and water. The separated water is temporarily stored in the gypsum dewatering drainage tank 71. The separated water stored in the gypsum dewatering drainage tank 71 is partially sent by a pump 72 to a wastewater treatment device, and part of it is sent to the limestone slurry tank 81 of the limestone supply system 80 as water to be used as a solvent for the slurry.

[0033] The limestone slurry tank 81 is a tank for storing slurry-like absorbents (e.g., limestone slurry) used in the desulfurization unit 46. The limestone slurry tank 81 is a device that mixes limestone supplied from the limestone silo 83 with separated water to form a slurry, and supplies the slurry-like desulfurization agent (absorbent) to the desulfurization unit 46.

[0034] The limestone silo 83 is a device that temporarily stores powdered limestone and supplies it to the limestone slurry tank 81. The absorbent supplied to the limestone slurry tank 81 is mixed with separated water in the limestone slurry tank 81 to form a slurry. The slurry-like absorbent stored in the limestone slurry tank 81 is guided to the desulfurization apparatus body 46a via slurry piping (piping) 84 by slurry pump 82. The operation of slurry pump 82 is controlled by a desulfurization apparatus control unit (not shown). Hereafter, the slurry-like absorbent, which is a mixture of water (slurry solvent) and limestone (slurry solids), will be referred to as slurry.

[0035] A slurry flow rate control valve 85 is provided in the middle of the slurry piping 84. The slurry flow rate control valve 85 is a control valve that adjusts the flow rate of slurry flowing through the slurry piping 84. A slurry flow meter 86 is provided downstream of the slurry flow rate control valve 85 in the slurry piping 84. The slurry flow meter 86 may be provided upstream of the slurry flow rate control valve 85.

[0036] A desulfurization fan 91 is installed in the flue between the exhaust gas outlet duct 46e of the desulfurization unit 46 and the chimney 47. The exhaust gas discharged from the exhaust gas outlet duct 46e is sent by the desulfurization fan 91 to a GGH (Gas Heater) 90, where it is reheated by heat exchange with the exhaust gas supplied to the desulfurization unit 46 and then discharged into the atmosphere through the chimney 47.

[0037] The accumulation of slurry in the slurry piping 84 of the desulfurization system 100 will be explained with reference to Figures 3 to 5. Figures 3 to 5 are schematic diagrams showing piping in some embodiments of the present disclosure. Figure 3 shows the case where there is no slurry accumulation in the slurry pipe 84, Figure 4 shows the case where slurry has begun to accumulate in the slurry pipe 84, and Figure 5 shows the case where there is slurry accumulation in the slurry pipe 84 and the slurry pipe 84 is blocked.

[0038] As shown in Figure 3, in this disclosure, slurry flows through the slurry pipe 84 from left to right (arrow direction) in the drawing. A slurry flow rate control valve 85 is provided in the middle of the slurry pipe 84, and a slurry flow meter 86 for measuring the slurry flow rate is provided downstream of the slurry flow rate control valve 85. In the case of Figure 3, since no slurry has accumulated in the slurry pipe 84, a specified amount of slurry is supplied to the desulfurization unit 46. The slurry flow meter 86 may be provided upstream of the slurry flow rate control valve 85, or at any position where the effect of flow turbulence caused by the slurry pump 82 (see Figure 2) is minimized.

[0039] The flow velocity of the slurry circulating within the slurry pipe 84 is set within an appropriate range (optimal value). This includes an upper limit to the flow velocity to suppress wear on the slurry pipe 84 and a lower limit to the flow velocity to suppress the settling of slurry solids (absorbent, lime) within the slurry pipe 84. Since the slurry is a mixture of water and lime, the slurry flowing through the slurry pipe 84 must have a flow velocity greater than or equal to the settling velocity, which is the flow velocity at which the water and lime do not separate and settle. The settling velocity value, or a value obtained by adding a margin to the settling velocity, is set as the lower limit of the flow velocity.

[0040] For example, even when boiler 10 is operating at partial load, meaning the amount of exhaust gas discharged from boiler 10 is small and the amount of slurry required is small, the diameter of the slurry piping 84 is designed so that the slurry flow velocity is above the appropriate value (lower limit of flow velocity). However, depending on the type of fuel used in boiler 10 (sulfur oxide content), the amount of sulfur oxides may decrease, resulting in a reduced slurry flow rate, which may prevent operation within the appropriate range of slurry flow velocity. Furthermore, during the slurry flow rate control process, a flow rate command that transiently falls below the lower limit of flow velocity may be issued.

[0041] In such cases, the slurry solids (absorbent, lime) settle into the slurry pipe 84, and the slurry solids accumulate in the slurry pipe 84. When slurry solids accumulate in the slurry pipe 84, the slurry pipe 84 becomes blocked, and the slurry flow velocity decreases. Hereafter, the state in which the slurry solids settle and accumulate in the slurry pipe 84 will also be referred to as "slurry accumulation."

[0042] In the case shown in Figure 4, slurry has begun to accumulate upstream of the slurry flow control valve 85. When slurry begins to accumulate, it becomes difficult for the slurry to flow downstream of the slurry pipe 84, and the slurry flow velocity decreases. The decrease in slurry flow velocity can be detected by the decrease in the slurry flow rate measured by the slurry flow meter 86.

[0043] When slurry begins to accumulate, the slurry flow velocity in the piping decreases, and the amount of accumulation increases further. When the amount of slurry accumulation increases, the situation shown in Figure 5 occurs. When slurry accumulates, operations are performed to reduce the amount of accumulation by increasing the slurry flow velocity to flush away the accumulated slurry solids. However, when the amount of slurry accumulation becomes large and the slurry piping 84 approaches a blockage state, even if the slurry flow velocity is increased, the accumulated slurry solids cannot be efficiently flushed away, and it takes time to deal with the problem. For this reason, it is necessary to detect and address slurry accumulation early.

[0044] Figure 6 shows the flow control of the slurry. The flow rate of the slurry supplied to the desulfurization unit 46 is controlled by the opening command value of the slurry flow rate control valve 85. The slurry flow rate is controlled as follows: The AFD (Air Flow Demand) 201, which is a control command value for the combustion air flow rate supplied to the boiler 10, is input to the exhaust gas flow rate setter 202. The exhaust gas flow rate setter 202 has defined exhaust gas flow rates for values ​​of AFD 201, for example, as shown in function 210. The exhaust gas flow rate setter 202 outputs an exhaust gas flow rate value corresponding to the input AFD 201.

[0045] Meanwhile, the desulfurization inlet exhaust gas SO2 concentration 203 is input to the primary lag circuit 204. The primary lag circuit 204 is given a delay time that takes into account the response time of the system including the boiler 10 and the desulfurization device 46. The desulfurization inlet exhaust gas SO2 concentration 203 is the value obtained by measuring the SO2 concentration of the exhaust gas in the exhaust gas inlet duct 46d of the desulfurization device 46. The multiplier 205 receives the exhaust gas flow rate corresponding to AFD201 and the output value of the desulfurization inlet exhaust gas SO2 concentration 203 from the primary lag circuit 204 as inputs, and outputs the multiplied value. Therefore, the output of the multiplier 205 represents the amount of slurry required for desulfurization of the exhaust gas.

[0046] Furthermore, the slurry flow rate 206 obtained from the slurry flow meter 86 is input to the primary lag circuit 207. The primary lag circuit 207 is given a delay time that takes into account the response time of the system, including the boiler 10 and the desulfurization unit 46. The subtractor 208 receives the amount of slurry required for desulfurization, which is the output of the multiplier 205, and the output value of the slurry flow rate 206 from the primary lag circuit 207, and outputs the subtracted value. Therefore, the output of the subtractor 208 represents the deviation of the actual slurry flow rate from the amount of slurry required for desulfurization.

[0047] The deviation between the required amount of slurry and the actual slurry flow rate, which is the output of the subtractor 208, is input to the PI controller 209, where it is proportionally and integrally processed and output to the slurry flow rate control valve 85 as an opening command value for the slurry flow rate control valve 85.

[0048] In this disclosure, in slurry flow control, slurry accumulation is detected and the adder 211 corrects the opening of the slurry flow control valve 85 by increasing it according to the valve opening correction value of the correction unit 53, thereby eliminating and suppressing slurry accumulation. In other words, the opening command value, which is the output of the PI controller 209, is corrected. The correction unit 53 and the valve opening correction value will be described later.

[0049] Figure 7 is a diagram showing an example of the hardware configuration of a control device in some embodiments of the present disclosure. As shown in Figure 7, the controller 50 is a computer system, and for example, it includes a CPU (Central Processing Unit: processor) 1100, secondary storage (ROM, Secondary storage: memory) 1200, main memory (RAM, Main Memory) 1300, a hard disk drive (HDD) 1400 as a mass storage device, and a communication unit 1500 for connecting to a network, etc. A solid-state drive (SSD) may be used as the mass storage device. These parts are connected via a bus 1800.

[0050] The CPU 1100 controls the entire control unit 50 using an OS (Operating System) stored in a secondary storage device 1200 connected via a bus 1800, and performs various processes by executing various programs stored in the secondary storage device 1200. One or more CPUs 1100 may be provided and may cooperate with each other to achieve processing.

[0051] The main memory 1300 consists of writable memory such as cache memory and RAM (Random Access Memory), and is used as a work area for reading the CPU 1100's executable program and writing processing data by the executable program.

[0052] The secondary storage device 1200 is a non-transitory computer-readable storage medium. Examples of secondary storage devices 1200 include magnetic disks, magneto-optical disks, CD-ROMs, DVD-ROMs, and semiconductor memory. Examples of secondary storage devices 1200 include ROM (Read Only Memory), HDD (Hard Disk Drive), SSD (Solid State Drive), and flash memory. The secondary storage device 1200 stores, for example, an OS for controlling the entire information processing device such as Windows®, iOS®, and Android®, a BIOS (Basic Input / Output System), various device drivers for hardware operation of peripheral devices, various application software, and various data and files. Furthermore, the secondary storage device 1200 stores programs for implementing various processes and various data required to implement those processes. Multiple secondary storage devices 1200 may be provided, and the aforementioned programs and data may be divided and stored in each secondary storage device 1200.

[0053] Furthermore, the control device 50 may include an input unit consisting of a keyboard or mouse, and a display unit consisting of a liquid crystal display device or the like for displaying data. It may also include a notification unit that includes a display unit and outputs lights, sounds, and especially alarm sounds, such as a speaker.

[0054] Figure 8 is a diagram illustrating an example of the functions of a control device in some embodiments of the present disclosure. As shown in Figure 8, the control device 50 includes a detection unit 51 and a correction unit 53.

[0055] A series of processes for realizing the functions of the control device 50 are stored, for example, in the form of a program in the secondary storage device 1200 (see Figure 7). The CPU (processor) 1100 (see Figure 7) reads this program into the main memory device 1300 (see Figure 7) and performs information processing and calculations to realize various functions. The program may be pre-installed in the secondary storage device 1200, provided stored in other non-temporary computer-readable storage media, or distributed via wired or wireless communication. Examples of non-temporary computer-readable storage media include magnetic disks, magneto-optical disks, CD-ROMs, DVD-ROMs, and semiconductor memory.

[0056] The detection unit 51 shown in Figure 8 detects the accumulation of slurry in the slurry piping 84. Slurry accumulation is detected by an increase in the opening command value for the slurry flow rate control valve 85. The detection unit 51 may also detect slurry accumulation by detecting a decrease in slurry flow velocity calculated from the slurry flow rate measured by the slurry flow meter 86.

[0057] The correction unit 53 corrects the opening command value of the slurry flow control valve 85 by a valve opening correction value based on the slurry accumulation detected by the detection unit 51. That is, when the detection unit 51 detects slurry accumulation, the correction unit 53 corrects the opening command value of the slurry flow control valve 85 by adding a valve opening correction value to increase it. The correction of the opening command value of the slurry flow control valve 85 by the correction unit 53 is performed so that the opening of the slurry flow control valve 85 does not become fully open.

[0058] Figure 9 shows the changes in various values ​​during slurry deposition in a desulfurization system in several embodiments of the present disclosure. The horizontal axis in Figure 9 represents time. In Figure 9(a), the solid line shows the opening degree of the slurry flow control valve 85 at time t1, and the thick line shows the actual change in the opening degree of the slurry flow control valve 85. In Figure 9(b), the solid line shows the required slurry flow rate, and the dashed line shows the actual slurry flow rate. In Figure 9(c), the solid line shows the slurry flow velocity in the slurry pipe 84, and the shaded area enclosed by the dashed line shows the appropriate range (optimal value) of the slurry flow velocity, which is the range enclosed by the upper limit of the flow velocity to suppress wear of the slurry pipe 84 and the lower limit of the flow velocity to suppress sedimentation of slurry solids (absorbent) in the slurry pipe 84. The slurry flow velocity is determined based on the slurry flow rate measured by the slurry flow meter 86. In Figure 9(d), the shaded area shows the amount of slurry accumulated in the slurry pipe 84.

[0059] At time t0, each value is set. Time t1 indicates the point in time after the third predetermined time has elapsed since the last change in the opening degree of the slurry flow control valve 85. The third predetermined time will be described later. The opening degree of the slurry flow control valve 85 at time t1 is set as the reference opening degree of the slurry flow control valve 85.

[0060] Assume that at time t2, slurry begins to accumulate as shown in (d). As slurry accumulation increases, the slurry flow velocity in slurry pipe 84 decreases as shown by the solid line in (c). Also, as slurry accumulation increases and flow velocity decreases, the actual slurry flow rate decreases as shown by the dashed line in (b). Furthermore, as slurry accumulation increases, the actual slurry flow rate decreases, and slurry flow velocity decreases, the opening of the slurry flow control valve 85, shown by the thick line in (a), increases to compensate for the insufficient slurry.

[0061] At time t4, if the opening degree of the slurry flow control valve 85 increases by a predetermined percentage from the reference opening degree of the slurry flow control valve 85 at time t1, that is, if the opening degree command value for the slurry flow control valve 85 increases by a predetermined percentage, the detection unit 51 detects that slurry has accumulated in the slurry piping 84.

[0062] When the system detects that slurry has accumulated in the slurry piping 84, the correction unit 53 uses a valve opening correction value that is a specified opening degree based on the opening degree of the slurry flow control valve 85 at time t4 when the detection unit 51 detected the slurry accumulation, and corrects the command value of the slurry flow control valve 85 by increasing the valve opening correction value. The specified opening degree is, for example, 10% of the opening degree of the slurry flow control valve 85 at time t4.

[0063] At time t4, when the correction unit 53 performs control to correct the opening degree of the slurry flow control valve 85 in the open direction, the correction of the opening degree of the slurry flow control valve 85 continues for a predetermined period of time (from time t4 to time t6).

[0064] At time t4, when the correction unit 53 corrects the opening of the slurry flow control valve 85 to the open direction, the actual slurry flow rate increases with a delay from time t4, as shown in (b). As the slurry flow rate increases, the flow velocity in the slurry pipe 84 increases with a delay, as shown in (c), and the solid matter of the slurry accumulated in the slurry pipe 84 is washed away, reducing the amount of accumulation, as shown in (d).

[0065] If, due to an increase in the actual slurry flow rate, the uncorrected opening command value for the slurry flow rate control valve 85 decreases by a predetermined percentage at time t6, the detection unit 51 detects that the slurry buildup in the slurry piping 84 has been eliminated.

[0066] When it is detected that the slurry accumulation has been eliminated, the correction of the valve opening correction value by the correction unit 53 for the slurry flow control valve 85 is terminated, and the opening of the slurry flow control valve 85 decreases to the opening command value as shown in (a). After that, the opening of the slurry flow control valve 85 is set by repeatedly increasing and decreasing. The decrease in the opening command value accompanying the release of the correction may be by decreasing the added correction value (10% in the above example) all at once, or by decreasing it gradually at a predetermined rate.

[0067] As shown in (b), the actual flow rate of the slurry decreases from time t6, and then stabilizes while repeatedly increasing and decreasing. Also, as shown in (c), the flow velocity of the slurry decreases from time t6, and then stabilizes within the appropriate range while repeatedly increasing and decreasing.

[0068] The detection unit 51 uses the opening degree of the slurry flow control valve 85 after a third predetermined time has elapsed from the time t6 when the correction by the correction unit 53 is completed (released) (corresponding to the time t1 mentioned above) as the new reference opening degree of the slurry flow control valve 85, and detects slurry accumulation again. The third predetermined time is the time from when the correction by the correction unit 53 is released until each value is settled, and a different time is set depending on the configuration of the desulfurization system 100, but for example, 15 minutes is set.

[0069] The detection unit 51 detects that slurry has accumulated in the slurry pipe 84 when the opening command value for the slurry flow rate control valve 85 increases by a predetermined percentage, but other detection methods may be used. For example, the detection unit 51 may detect that slurry has accumulated when the slurry flow velocity in the slurry pipe 84 remains below the lower limit of the flow velocity, which is the lower limit of the appropriate value, for a first predetermined time or longer. Since the slurry flow velocity is a variable value, it may temporarily fall below the lower limit of the flow velocity, so accumulation is detected (determined to have accumulated) when the time during which the flow velocity falls below the lower limit of the flow velocity is first predetermined time or longer. For example, in (c), the slurry flow velocity falls below the lower limit of the flow velocity at time t3, and then the accumulation of slurry is detected at time t4, which is the first predetermined time after that.

[0070] The detection unit 51 detects that the accumulation of slurry in the slurry pipe 84 has been eliminated when the opening command value for the slurry flow rate control valve 85 before correction decreases by a predetermined percentage. However, other detection methods may be used. For example, the detection unit 51 may detect that the accumulation of slurry has been eliminated (determine that the accumulation has been eliminated) when the flow velocity of the slurry in the slurry pipe 84 continuously exceeds the upper limit of the flow velocity, which is the upper limit of the appropriate value, for a second predetermined time or longer. Since the flow velocity of the slurry is a variable value, it may temporarily exceed the upper limit of the flow velocity. Therefore, the accumulation is detected when the time during which the flow velocity exceeds the upper limit of the flow velocity is second predetermined time or longer. For example, in (c), the slurry accumulation is detected to have been eliminated at time t6, which is the second predetermined time after the flow velocity of the slurry shown in (c) exceeded the upper limit of the flow velocity at time t5.

[0071] The control device 50 may define a predetermined time (correction duration), and if the predetermined time elapses from the time t4 when the correction by the correction unit 53 is started until the detection unit 51 detects that the slurry accumulation has been eliminated, the correction by the correction unit 53 may be stopped.

[0072] If the slurry accumulation is not resolved by the correction using the valve opening correction value of the correction unit 53 in the above control flow, the control device 50 may repeatedly perform the control from time t4 to t6.

[0073] <Note> The control device, desulfurization system, control method, and control program described in the embodiments above can be understood, for example, as follows.

[0074] A control device (50) according to a first aspect of the present disclosure is a control device for controlling a desulfurization system (100) which includes a desulfurization device (46) that removes sulfur oxides from exhaust gas by bringing exhaust gas into contact with an absorbent liquid, and comprises a detection unit (51) that detects the accumulation of absorbent in a pipe (84), and a correction unit (53) that corrects the opening command value of a slurry flow control valve (85) by a valve opening correction value based on the detected accumulation of absorbent, wherein when the detection unit detects the accumulation of absorbent, the correction unit corrects the opening command value by increasing it by the valve opening correction value.

[0075] When blockage occurs in the piping due to the accumulation of absorbent slurry, the slurry flow velocity falls below the valve opening command value. However, the valve opening command value is corrected to increase the opening by the valve opening correction value, thereby discharging the accumulated absorbent slurry and setting the slurry flow velocity to an appropriate value. Furthermore, by correcting the valve opening command value and preventing full opening, it is possible to prevent the slurry flow velocity from becoming excessive and causing disturbances in the feedback control.

[0076] In the control device according to a second aspect of the present disclosure, in the first aspect, the detection unit may detect the accumulation of the absorbent when the slurry flow velocity, which is the flow velocity of the absorbent liquid, falls below a lower limit of the flow velocity for a first predetermined time or longer, or when the opening command value of the slurry flow rate control valve increases by a predetermined percentage.

[0077] When the slurry flow velocity falls below the lower limit for a specified period of time or longer, it indicates that the slurry accumulation has caused blockage in the piping, resulting in a decrease in slurry flow velocity. Furthermore, when the opening command value of the slurry flow velocity control valve increases by a specified percentage, it indicates that, despite a specified slurry requirement, the slurry accumulation has caused blockage in the piping, reducing the slurry flow velocity and resulting in insufficient slurry. Thus, a decrease in slurry flow velocity allows for the detection of slurry accumulation in the absorbent material.

[0078] In a control device according to a third aspect of the present disclosure, in the first or second aspect, the valve opening correction value is an opening based on the opening command value at the time the detection unit detects the accumulation of the absorbent, and the correction unit may correct the opening command value by adding the valve opening correction value.

[0079] By adding a valve opening correction value based on the current opening command value to the opening command value, it is possible to perform valve opening correction according to the current opening state of the slurry flow control valve.

[0080] In the control device of the fourth aspect of this disclosure, in any of the first to third aspects, the detection unit may detect that the accumulation of the absorbent has been released when the slurry flow velocity, which is the flow velocity of the absorbent liquid, exceeds the flow velocity upper limit for a second predetermined time or longer, or when the opening command value of the slurry flow rate control valve before correction decreases by a predetermined percentage, and the correction unit may release the correction of the opening command value by the valve opening correction value.

[0081] When the slurry flow velocity exceeds the upper limit for a predetermined period of time, it means that the blockage in the piping has been cleared and the slurry flow velocity has increased (become high speed). Furthermore, when the opening command value of the slurry flow velocity control valve before correction decreases by a predetermined percentage, it means that while there is a specified amount of slurry required, the slurry flow velocity has increased and more slurry is being supplied than the required amount. In this way, by detecting that the slurry flow velocity has increased, it is possible to detect that the accumulation of the absorbent slurry has been cleared, and the correction can be released to stop the correction control of the slurry flow control valve.

[0082] In the control device according to the fifth aspect of the present disclosure, in the fourth aspect, the detection unit may detect the accumulation of the absorbent based on the opening command value of the slurry flow rate control valve after a third predetermined time has elapsed since the release of the correction by the correction unit.

[0083] Since the detection of absorbent accumulation is performed based on the opening command value of the slurry flow control valve after a third predetermined time has elapsed since the correction was released, it is possible to wait until the slurry flow control valve returns to the static characteristic position after the correction, and then perform subsequent control based on the static characteristic position.

[0084] A desulfurization system according to a sixth aspect of this disclosure comprises a desulfurization apparatus and a control device according to any of the first to fifth aspects.

[0085] A control method according to a seventh aspect of the present disclosure is a control method (50) executed by a computer for controlling a desulfurization system (1) which includes a desulfurization device (46) that removes sulfur oxides from exhaust gas by bringing exhaust gas into contact with an absorbent liquid, the method comprising: a detection step for detecting the accumulation of absorbent in a pipe (84); and a correction step for correcting the opening command value of a slurry flow control valve with a valve opening correction value based on the detected accumulation of absorbent, wherein the correction step corrects the opening command value to increase by the valve opening correction value when the accumulation of absorbent is detected in the detection step.

[0086] The control program of the eighth aspect of this disclosure causes a computer to execute the control method described in the seventh aspect.

[0087] In the embodiments described above, the boiler 10 of the present disclosure was described as a boiler that uses solid fuel. As solid fuels used in the boiler 10, coal, biomass fuel, petroleum coke (PC) fuel, petroleum residue, etc., can be used. Furthermore, the boiler 10 can use not only solid fuels, but also liquid fuels such as heavy oil, light oil, heavy crude oil, and other petroleum products, as well as industrial wastewater and liquefied ammonia. In addition, gaseous fuels such as natural gas, various petroleum gases, by-product gases generated in steelmaking processes, hydrogen gas, and ammonia gas can also be used. Furthermore, this can also be applied to co-firing boilers that use a combination of these various fuels. [Explanation of Symbols]

[0088] 1. Power plant 10 Boilers 11 Furnace 12 Combustion gas passage 13 Flue 20 Combustion device 21 Burner 22 Fine fuel supply pipe 23. Air register 24. Air ducts 25 Additional Air Ports 26 Additional air ducts 31. Mill (Grinder) 32 Forced draft fan (FDF) 41 Gas duct 42 Air preheater 43 Denitration equipment 44 Dust collection device 45. Induced Draft Fan (IDF) 46 Desulfurization equipment 46a Desulfurization unit 46b Spray tube 46c Mist Eliminator 46d Exhaust gas inlet duct 46e Exhaust Outlet Duct 46f Storage section 47 Chimney 50 Control device 51 Detection unit 53 Correction section 61 Absorption solution supply pump 62 Absorption liquid supply channel 70 Gypsum production system 71 Gypsum dehydration drain tank 72 pumps 73 Hydrocyclone 80 Limestone supply system 81 Limestone slurry tank 82 Slurry Pump 83 Limestone silo 84. Slurry piping (piping) 85. Slurry flow control valve 86 Slurry flow meter 90 GGH (Gas Heater) 91 Desulfurization ventilator 101 Furnace wall 102 Superheater 102A 1st superheater 102B 2nd superheater 102C 3rd superheater 103 Reheater 103A 1st reheater 103B 2nd reheater 104 Economizer 1100 CPU 1200 Secondary storage 1300 Main storage 1500 Communications Department 1800 Bus

Claims

1. A control device for controlling a desulfurization system that includes a desulfurization apparatus for removing sulfur oxides from exhaust gas by contacting the exhaust gas with an absorbent liquid, A detection unit that detects the accumulation of absorbent material inside the pipe, The system includes a correction unit that corrects the opening command value of the slurry flow control valve by a valve opening correction value based on the detected accumulation of the absorbent, The correction unit is a control device that, when the detection unit detects the accumulation of the absorbent, corrects the valve opening command value by increasing it using the valve opening correction value.

2. The control device according to claim 1, wherein the detection unit detects the accumulation of the absorbent when the slurry flow velocity, which is the flow velocity of the absorbent liquid, falls below a lower limit of the flow velocity for a first predetermined time or longer, or when the opening command value of the slurry flow rate control valve increases by a predetermined percentage.

3. The valve opening correction value is the opening degree based on the opening degree command value at the time the detection unit detects the accumulation of the absorbent, The control device according to claim 1, wherein the correction unit corrects the opening command value by adding the valve opening correction value.

4. The detection unit detects that the accumulation of the absorbent has been released when the slurry flow velocity, which is the flow velocity of the absorbent liquid, exceeds the upper limit of the flow velocity for a second predetermined time or longer, or when the opening command value of the slurry flow rate control valve before correction decreases by a predetermined percentage. The control device according to claim 1, wherein the correction unit cancels the correction of the opening command value by the valve opening correction value.

5. The control device according to claim 4, wherein the detection unit detects the accumulation of the absorbent based on the opening command value of the slurry flow rate control valve after a third predetermined time has elapsed since the correction by the correction unit was released.

6. Desulfurization equipment, A desulfurization system comprising the control device described in claim 1.

7. A control method for a desulfurization system that includes a desulfurization apparatus for removing sulfur oxides from exhaust gas by contacting the exhaust gas with an absorbent liquid, A detection process for detecting the accumulation of absorbent material inside the pipe, The system includes a correction step of correcting the opening command value of the slurry flow control valve by a valve opening correction value based on the detected accumulation of the absorbent, The correction step is a control method executed by a computer, in which, upon detecting the accumulation of the absorbent in the detection step, the opening command value is corrected to increase by the valve opening correction value.

8. A control program for causing a computer to execute the control method described in claim 7.

Citation Information

Patent Citations

  • Wet line gypsum method

    JP1988156522A

  • Operation of wet tube mill

    JP1992341353A

  • Wet type flue gas desulfurization apparatus

    JP1997248420A

  • Control of flow rate of absorbent slurry of stack gas desulfurizer and device therefor

    JP1999244646A

  • Spray device and mercury removal system

    JP2012005978A