Jacket structure and its construction method

The jacket structure is divided into units for land transport and installation, addressing large-scale construction issues by allowing land-based assembly and error absorption, enhancing efficiency and cost-effectiveness.

JP7955466B1Active Publication Date: 2026-11-24YOKOGAWA SUMIKIN BRIDGE CORP +1
View PDF 10 Cites 0 Cited by

Patent Information

Application Number
JP2025219002
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Filing Date
2025-12-02
Publication Date
2026-11-24
Estimated Expiration
2045-12-02

AI Technical Summary

Technical Problem

Existing jacket construction methods face challenges with large-scale structures that complicate land transportation and construction, especially for aging port piers, due to budget constraints and the inability of crane vessels to enter shallow waters.

Method used

A jacket structure is divided into unidirectional vertical units and steel girder units, with connecting parts allowing for land transport and installation using land cranes, incorporating gaps to absorb installation errors.

Benefits of technology

Enables land-based transportation and construction of jacket structures, reducing costs and overcoming installation challenges through unitization and error absorption.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007955466000001_ABST
    Figure 0007955466000001_ABST
Patent Text Reader

Abstract

This invention provides a jacket structure and a construction method for the jacket structure that divides and unitizes the jacket structure in the jacket construction method, enabling land transportation and construction from land. [Solution] The jacket structure 1 is composed of a unidirectional vertical unit 2A which consists of a plurality of steel pipe legs 2 arranged vertically in one direction from among a plurality of steel pipe legs 2, and a plurality of steel girders 3a which connect the steel pipe legs 2, and a plurality of steel girder units 3b which connect the plurality of parallel unidirectional vertical units 2A. The upper part of the steel pipe leg 2 has a connecting part 6 which has an arm portion 4 that extends in a direction intersecting the vertical direction of the unidirectional vertical unit 2A, and the tip of the arm portion 4 has a connecting receiving portion 5 for connecting the steel girder unit 3b, and a connecting projection 7 is fitted into the connecting receiving portion 5 at the end of the steel girder unit 3b, thereby connecting the plurality of parallel unidirectional vertical units 2A and the plurality of steel girder units 3b.
Need to check novelty before this filing date? Find Prior Art

Description

[Technical Field]

[0001] The present invention relates to a jacket structure mainly used for piers, wharves, and the like, and a construction method thereof. [Background Art]

[0002] The jacket method is a construction method in which a jacket structure consisting of legs, steel girders, and braces is placed over steel pipe piles, joined and integrated by grout material, welding, or the like, and combined with a reinforced concrete (hereinafter referred to as RC) deck. Steel jacket structures are often mainly manufactured in factories and assembled there as well, but they are extremely large, with dimensions in width, depth, and height ranging from several meters to over ten meters. For example, inventions related to the jacket method include those described in Patent Documents 1 to 3.

[0003] On the other hand, the sheath pipe method is a construction method in which steel pipe piles are covered with sheath pipes, RC girders are provided between the sheath pipes for integration, and an RC deck is constructed on top. Examples include the invention described in Patent Document 4.

[0004] The invention described in Patent Document 1 discloses a jacket-type structure including a plurality of steel pipe piles fixed to the ground and a jacket supported by the plurality of steel pipe piles. The jacket includes a main body and a plurality of protruding connecting portions that protrude downward from the main body and are respectively connected to the plurality of steel pipe piles in a straight line. In at least one pair of the steel pipe pile and the protruding connecting portion, the steel pipe pile and the protruding connecting portion are connected using a bridging steel member that spans between the upper end surface of the steel pipe pile and the lower end surface of the protruding connecting portion. This is a jacket-type structure.

[0005] Patent Document 2 discloses a jacket to be installed above a plurality of piles, characterized by comprising: a plurality of steel pipe legs having an internal cavity into which each of the plurality of piles can be inserted; a plurality of upper girders connecting the upper ends of the plurality of steel pipe legs; and an upper steel plate attached to the plurality of upper girders by welding or mechanical joining, which covers the space between the plurality of upper girders from above, but does not cover the internal cavity of the steel pipe legs from above.

[0006] Patent Document 3 discloses a pier renovation structure in which, after cutting the piles directly below the superstructure of an existing pile pier supported by a large number of vertical piles to remove the superstructure, a jacket is installed on the remaining piles to replace the existing superstructure. The jacket, which is fabricated on land, has a grid-like deck made of steel vertical and horizontal beams, with steel pipe legs of a predetermined length protruding below each grid point, and grout material is injected into the gap between the inner circumference of these legs and the outer circumference of the piles.

[0007] The invention described in Patent Document 4 discloses a pile support structure comprising a joining member joined to the top of a pile columnar body and a prefabricated beam member erected between adjacent joining members, wherein the prefabricated beam member comprises a flat top plate portion, side wall portions hanging down from both longitudinal edges of the top plate portion, and a beam member sheath embedded in the side wall portion, and the joining member comprises a pile joining portion into which the top is inserted, a receiving shelf portion protruding from the outer surface and on which the end of the top plate portion is placed, and a joining member sheath opening on both sides of the receiving shelf portion and connected to the beam member sheath, wherein a PC member inserted through the beam member sheath and the joining member sheath is fixed in a tensioned state, and the joining member and the prefabricated beam member are joined. [Prior art documents] [Patent Documents]

[0008] [Patent Document 1] Japanese Patent Publication No. 2023-164649 [Patent Document 2] Japanese Patent Publication No. 2023-126586 [Patent Document 3] Japanese Patent Publication No. 2004-183324 [Patent Document 4] Japanese Patent Publication No. 2021-070949 [Non-patent literature]

[0009] [Non-Patent Document 1] Nippon Steel Engineering Co., Ltd., "Application of Technology Cultivated in Deep Water: Jacket-Type Pier Repair Method," [online], November 21, 2019, Nagoya Port and Airport Technology Research Office, [Accessed April 22, 2025], Internet <URL: https: / / www.meigi.pa.cbr.mlit.go.jp / file / kouryuukai / 21th / 21th_05_shiryou.pdf> [Overview of the Initiative] [Problems that the invention aims to solve]

[0010] More than 50 years have passed since the jacket construction method was put into service, and the number of aging port piers is rapidly increasing. Therefore, renovation work is necessary, but there are transportation and construction problems, such as the inability of crane vessels to enter the port due to the shallow water depth. In addition, sea work is more expensive than land work in terms of transportation and construction, and there are constraints on comprehensive renovation work due to budgetary reasons. For this reason, there is a demand for smaller-scale, single-structure units.

[0011] The invention described in Patent Document 1 is a structure that connects inclined steel pipe piles via joint steel pipes (bridge steel members) without inserting inclined legs (protruding connecting parts) into inclined steel pipe piles. This is a jacket-type structure with a high degree of freedom in construction method, regardless of the direction of the steel pipe piles supporting the jacket, and a construction method suitable for jacket-type structures. However, it is clear that the jacket is large in scale, making land transportation and construction from land difficult.

[0012] The invention described in Patent Document 2 is a jacket structure that uses a jacket suitable for providing a composite floor slab as a superstructure, which can shorten the usage period of work vessels (crane ships, etc.) and shorten the construction period at the site, but like the invention described in Patent Document 1, it does not focus on the size of the jacket.

[0013] The invention described in Patent Document 3 involves dividing the jacket to replace the existing superstructure into multiple blocks in the direction of the pier normality, manufacturing these blocks in a land yard or factory, transporting them by sea to the site, and installing them in block units on top of the piles where the superstructure of the existing pile pier has been removed. However, transporting the jacket in block units by land and constructing it from land is difficult.

[0014] The present invention aims to solve the above-mentioned problems and provides a jacket structure and construction method therefor that enables land transport and construction from land by dividing and unitizing the jacket structure in a jacket construction method. [Means for solving the problem]

[0015] The present invention relates to a jacket structure comprising a plurality of steel pipe legs that are placed over the upper parts of each of a plurality of piles fixed to the ground, and steel girders that connect the upper ends of the steel pipe legs, wherein the jacket structure is composed of a unidirectional vertical unit comprising a plurality of steel pipe legs arranged vertically in one direction from among the plurality of steel pipe legs, a plurality of steel girders that connect the plurality of steel pipe legs arranged vertically in one direction, and a plurality of steel girder units that connect the plurality of parallel unidirectional vertical units, wherein the upper part of the steel pipe legs constituting the unidirectional vertical unit is provided with a connecting part having an arm portion that extends in a direction intersecting the vertical direction of the unidirectional vertical unit, the tip of the arm portion is provided with a connecting receiver portion for connecting the steel girder unit, and the plurality of parallel unidirectional vertical units and the plurality of steel girder units are connected by fitting a downward-facing connecting protrusion provided at the end of the steel girder unit into the connecting receiver portion.

[0016] The jacket structure of the present invention is divided into multiple parallel unidirectional longitudinal units and multiple steel girder units, which allows for land transport and construction using land cranes.

[0017] In the jacket structure of the present invention, the arm portion is provided in one direction or two or more directions of the connection part.

[0018] In the jacket structure of the present invention, it is preferable that a gap is provided between the inner peripheral surface of the connection receiving portion and the outer peripheral surface of the connection convex portion. This gap, in addition to the gap between the pile and the steel pipe leg, provides a mechanism that can flexibly absorb horizontal installation errors of the pile and horizontal installation errors of the unidirectional tandem unit of the jacket structure.

[0019] Further, it is preferable that a filler is filled in the gap provided between the inner peripheral surface of the connection receiving portion and the outer peripheral surface of the connection convex portion.

[0020] A method for constructing a jacket structure according to the present invention, comprising: (1) A step of sequentially installing the unidirectional tandem units by covering the upper portions of a plurality of piles arranged in tandem in one direction among a large number of new or existing piles whose lower ends are fixed to the ground with each steel pipe leg of the unidirectional tandem units. (2) A step of sequentially installing the steel girder units between the parallel unidirectional tandem units by fitting the connection receiving portion and the connection convex portion. (3) A step of filling the gap between the connection receiving portion and the connection convex portion with a filler. It is characterized by comprising the above steps.

[0021] The connection receiving portion 5 and the connection convex portion 7 are not particularly limited as long as they have a shape and size that allow the connection convex portion 7 to be fitted into the connection receiving portion 5, such as a cylindrical shape or a box shape with a rectangular cross section.

Effects of the Invention

[0022] The jacket structure of the present invention, by being divided into units, can be transported by land and installed using a land crane. Furthermore, by having a connecting projection inserted into a connecting receiving part attached to a steel pipe leg, installation errors can be absorbed by the gap created in the inserted portion. Since the jacket structure is made of steel, each part is lighter than in a similar divided conduit construction method, and the equipment used is more economical. [Brief explanation of the drawing]

[0023] [Figure 1] This is a schematic diagram showing an embodiment of the jacket structure of the present invention. [Figure 2] This is a plan view showing an embodiment of the jacket structure of the present invention. [Figure 3] This is an enlarged view showing the upper part of a steel pipe leg in the jacket structure of the present invention, where (a) is a plan view and (b) is a cross-sectional view. [Figure 4] This is a schematic diagram illustrating the procedure of an embodiment of the construction method for the jacket structure of the present invention. [Figure 5] This shows an embodiment of the construction method for the jacket structure of the present invention, where (a) is a plan view of the upper girder, (b) is a front view in the X direction, and (c) is a front view in the Y direction. [Modes for carrying out the invention]

[0024] Specific embodiments of the present invention will be described below with reference to the accompanying drawings. However, the present invention is not limited to the embodiments shown below.

[0025] Figure 1 is a schematic diagram showing one embodiment of the jacket structure 1 of the present invention. A steel girder 3a is attached to the upper part of a steel pipe leg 2 in one direction (the depth direction in Figure 1). In addition, a connecting part 6 is attached to the lower part of the steel pipe leg 2 where the steel girder 3a is attached.

[0026] The connecting part 6 consists of an arm portion 4 extending horizontally from the steel pipe leg 2 and a connecting receiving portion 5 provided at the tip of the arm portion 4. Depending on the installation position of the steel pipe leg 2, the arm portion 4 of the connecting part 6 may be provided in one horizontal direction or in two or more directions. It is preferable to attach the steel girder 3a and the connecting part 6 to the steel pipe leg 2 in advance to form a one-way vertical unit 2A before installing the jacket structure 1 on top of the pile 10.

[0027] The steel girder unit 3b is installed by inserting the connecting projection 7 of the steel girder unit 3b into the connecting receiving portion 5 provided between adjacent unidirectional longitudinal units 2A. The connecting receiving portion 5 is cylindrical and provided at the end of the arm portion 4, with a closed bottom and an open top. In this example, the bottom of the connecting receiving portion 5 is closed, but it is not necessary for the bottom to be closed.

[0028] Furthermore, since the steel girder unit 3b is installed by inserting the connecting projection 7 into the connecting receiving portion 5, it is preferable that the connecting projection 7 has a slightly smaller cross-sectional shape and size than the connecting receiving portion 5. When the connecting projection 7 is inserted into the connecting receiving portion 5, a gap is created inside the connecting receiving portion 5, and this gap can absorb the horizontal installation error between the pile 10 and the steel pipe leg 2. The gap can be filled with a filler material 8, such as grout.

[0029] Both ends of the steel girder unit 3b are rested on the arm portions 4 of the connecting part 6, creating a stable structure, and the height at which the steel girder 3a and the steel girder unit 3b are installed is the same. Furthermore, because both ends of the steel girder unit 3b are rested on the connecting part 6, the length of the steel girder unit 3b can be made shorter than the length between the steel pipe legs 2 of the adjacent unidirectional longitudinal unit 2A.

[0030] The jacket structure 1 of the present invention is configured such that a unidirectional vertical unit 2A is formed by a plurality of steel pipe legs 2 arranged vertically in one direction and a plurality of steel girders 3a connecting the plurality of steel pipe legs 2, and the parallel plurality of unidirectional vertical units 2A are connected by a plurality of steel girder units 3b, thereby making it possible to create a size that can be transported by land and constructed using a land crane.

[0031] Figure 2 shows a plan view of an embodiment of the jacket structure 1 of the present invention. In Figure 2, four steel pipe legs 2 are provided in the X direction (horizontal direction) and four in the Y direction (vertical direction), and the steel pipe legs 2 are connected by steel girders 3a or steel girder units 3b.

[0032] A steel pipe leg 2 is pre-attached with a steel girder 3a extending in the Y direction and a connecting part 6 provided in the X direction to form a one-way longitudinal unit 2A. In this example, the connecting part 6 for columns X1 and X4 is in one horizontal direction, and the connecting part for columns X2 and X3 is in two horizontal directions.

[0033] A steel girder unit 3b, equipped with connecting protrusions 7, is installed between the connecting parts 6 of adjacent unidirectional longitudinal units 2A between X1 and X2, X2 and X3, and X3 and X4. The steel girder 3a and connecting parts 6 can be pre-attached to the steel pipe leg 2, and the unidirectional longitudinal unit 2A and the steel girder unit 3b can be separated and unitized.

[0034] Figure 3 is an enlarged view showing the upper part of the steel pipe leg 2 in the jacket structure of the present invention, where (a) is a plan view and (b) is a cross-sectional view. A ring plate 2a is provided at the leg top of the steel pipe leg 2. The steel girder 3a is attached so as to extend vertically from the ring plate 2a in Figure 3(a).

[0035] The connecting part 6 consists of an arm section 4 and a connecting receiving section 5, with the arm section 4 attached horizontally from the cross-section of the steel pipe leg 2. The arm section 4 has reinforcing plates 4a on the top and bottom, and a shear force transmitting steel plate 4b between the upper and lower reinforcing plates 4a.

[0036] The connecting receiver 5 is made of a steel pipe with a smaller diameter than the steel pipe leg 2 and is provided at the end of the arm section 4. Furthermore, the reinforcing plate 4a on the underside of the arm section 4 extends to the bottom of the connecting receiver 5, and in this example, the bottom of the connecting receiver 5 is closed. The upper part of the connecting receiver 5 is shaped to have an opening into which the connecting projection 7 can be inserted, and the reinforcing plate 4a on the upper surface of the arm section 4 is provided in this shape.

[0037] A stubbling steel pipe with a smaller diameter than the connecting receiving portion 5 is attached to the lower surface of the lower flange of the H-shaped steel girder unit 3b by welding or other means, forming a connecting projection 7. A reinforcing plate 3c is attached to the web of the steel girder unit 3b located above the connecting projection 7. As shown in Figure 3, by providing a support plate 3d on the lower flange where the connecting projection 7 is provided, the steel girder unit 3b can be made more stable when placed on the connecting part 6.

[0038] Figure 4 is a schematic diagram showing the procedure of an embodiment of the construction method for the jacket structure of the present invention. Figure 5 shows an embodiment of the construction method for the jacket structure of the present invention, where (a) is a plan view of the upper girder showing the procedure of the embodiment, (b) is a front view in the X direction, and (c) is a front view in the Y direction.

[0039] Figure 4(a) shows a state in which one-way longitudinal units 2A, each with steel girders 3a and connecting parts 6 pre-attached to steel pipe legs 2, are arranged in parallel. The structural faces of the steel pipe legs 2 that constitute the one-way longitudinal units 2A are installed so as to overlap the top of the piles, and the steel girders 3a are installed in rows X1 to X4 in Figure 5 so that they are arranged in parallel.

[0040] Figure 4(b) shows the state before the steel girder unit 3b is installed. Connecting protrusions 7 are attached to both ends of the steel girder unit 3b, protruding downwards. The connecting protrusions 7 are inserted from above into two connecting receiving parts 5 provided between adjacent unidirectional longitudinal units 2A, and the steel girder unit 3b is installed between adjacent steel pipe legs 2.

[0041] Figure 4(c) shows the state in which a steel girder unit 3b is installed between adjacent steel pipe legs 2. The steel girder unit 3b is installed between the steel pipe legs 2 between X1-X2, X2-X3, and X3-X4 on Y1-4 as shown in Figure 5.

[0042] In the embodiments shown in Figures 1-5, the connecting receiving portion 5 and the connecting projection 7 are shown to be cylindrical, but any shape and size that allows the connecting projection 7 to fit into the connecting receiving portion 5 is acceptable, such as a rectangular box-shaped (square tube) shape.

[0043] An example of the procedure for implementing a construction method using the jacket structure 1 of the present invention is shown. 1) When constructing a new structure or replacing piles, the piles 10 are driven into the ground. When renovating, the existing jacket structure 1 is cut and removed from the top of the piles 10. 2) The steel girder 3a and connecting parts 6 are attached to the top of the steel pipe leg 2 in advance at a factory or similar facility, and a one-way longitudinal unit 2A is manufactured with the steel girder 3a and connecting parts 6 attached to the steel pipe leg 2.

[0044] 3) Attach the connecting protrusion 7 to the steel girder unit 3b. 4) Place the steel pipe legs 2 of the one-way longitudinal unit 2A, which has steel girders 3a and connecting parts 6 attached, over the top of the piles 10, and install the one-way longitudinal units 2A sequentially (rows X1 to X4 in Figure 5).

[0045] 5) Insert the connecting projection 7 provided on the steel girder unit 3b from above into the connecting receiving portion 5 at the tip of the connecting part 6 provided on the steel pipe leg 2, and install the steel girder units 3b sequentially (rows Y1 to Y4 in Figure 5, and between X1 to X2, X2 to X3, and X3 to X4). 6) The gap created by inserting the connecting projection 7 into the connecting receiving portion 5 is filled with filler material 8. A stopper or similar device may also be provided in the gap.

[0046] This invention allows the jacket structure 1, which was conventionally constructed as a single unit, to be divided into units, making it possible to construct it by land transport or land crane. Furthermore, the gap between the pile 10 and the steel pipe leg 2, and the gap between the connecting receiving part 5 and the connecting protrusion 7, can absorb horizontal installation errors between the pile 10 and the steel pipe leg 2, as well as horizontal installation errors of the unidirectional vertical unit 2A of the jacket structure 1. The jacket structure 1 of this invention can be applied to both the renovation of existing structures such as piers and the construction of new structures. [Explanation of Symbols]

[0047] 1. Jacket structure 2 Steel pipe legs 2a Ring plate 2A One-way tandem unit 3 steel girder 3a steel girder 3b Steel girder unit 3c reinforcement plate 3D support plate 4. Arm section 4a Reinforcement plate 4b Shear force transmission steel plate 5. Connection receiving part 6 connecting parts 7. Connecting protrusion 8 Filler 10 stakes

Claims

1. In a jacket structure comprising multiple steel pipe legs placed over the top of each of multiple piles fixed to the ground, and a steel girder connecting the upper ends of the steel pipe legs, The jacket structure is composed of a unidirectional vertical unit comprising a plurality of steel pipe legs arranged vertically in one direction from among the plurality of steel pipe legs, a plurality of steel girders connecting the plurality of steel pipe legs arranged vertically in one direction, and a plurality of steel girder units connecting the plurality of parallel unidirectional vertical units. The upper part of the steel pipe leg constituting the one-way column unit is provided with a connecting part having an arm portion extending in a direction intersecting the column direction of the one-way column unit, and the tip of the arm portion is provided with a connecting receiver portion for connecting the steel girder unit. A jacket structure characterized in that a plurality of parallel unidirectional column units and a plurality of steel girder units are connected by fitting a downward-facing connecting projection provided at the end of the steel girder unit into the connecting receiving portion.

2. The jacket structure according to claim 1, characterized in that the arm portion is provided in one or more directions of the connecting part.

3. A jacket structure according to claim 1, characterized in that a gap is provided between the inner circumferential surface of the connecting receiving portion and the outer circumferential surface of the connecting protrusion.

4. A jacket structure according to claim 3, characterized in that the gap is filled with a filler material.

5. A construction method for a jacket structure according to claim 4, (1) Installing the one-way vertical row unit sequentially by placing each steel pipe leg of the one-way vertical row unit over the top of a plurality of piles arranged vertically in one direction from among a number of newly constructed or existing piles whose lower ends are fixed to the ground, (2) The step of sequentially installing the steel girder units between the parallel unidirectional longitudinal units by fitting the connecting receiving portion and the connecting projection portion together, (3) The step of filling the gap between the connecting receiving portion and the connecting protrusion with a filler material, A construction method for a jacket structure characterized by having the following features.

Citation Information

Patent Citations

  • Repair structure and repair construction method for existing pile pier

    JP2004183324A

  • Joining structure

    JP2017190571A

  • Method for constructing pile type structure

    JP2018141326A

  • Pile support structure and construction method thereof

    JP2021070949A

  • Jacket type structure and construction method thereof

    JP2021130983A