Power reduction simulation system, power reduction simulation method, and power reduction simulation program

The power reduction simulation system addresses the inefficiencies in existing systems by clustering peak points and integrating solar power and battery storage to achieve substantial reductions in maximum power demand.

JP7955549B1Active Publication Date: 2026-11-24MIRAIT CORP
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
JP2026190004
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Filing Date
2026-08-19
Publication Date
2026-11-24
Estimated Expiration
2046-08-19

AI Technical Summary

Technical Problem

Existing power management systems fail to effectively reduce maximum power demand as they focus on suppressing individual peak points without considering the temporal continuity and consecutive occurrence of peak points, leading to shifts in peak demand and inefficiencies in reducing overall demand.

Method used

A power reduction simulation system that identifies and clusters peak points within a predetermined proximity range, calculates the power difference required to suppress these clusters, and integrates solar power generation and battery storage to optimize power reduction strategies.

Benefits of technology

The system effectively reduces maximum power demand by strategically suppressing peak clusters, utilizing solar power and battery storage to achieve significant and sustained reductions in peak power consumption.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007955549000001_ABST
    Figure 0007955549000001_ABST
Patent Text Reader

Abstract

This invention provides a power reduction simulation system, a power reduction simulation method, and a power reduction simulation program that can effectively reduce maximum power demand. [Solution] The system inputs all the power demand for each predetermined time period within a predetermined period. It stores each input power demand. The stored power demands are ranked in descending order. Those within a predetermined rank are extracted as top peak points. Multiple top peak points within a predetermined proximity range are set as peak clusters on a daily and hourly basis. The system calculates the power difference between the power demand of all top peak points in the peak cluster and a predetermined target power demand, as well as the amount of power required to reduce the power demand of each top peak point to the target power demand from a predetermined time. The obtained amount of required power is stored. The stored amount of required power is output.
Need to check novelty before this filing date? Find Prior Art

Description

TECHNICAL FIELD

[0001] The present invention relates to a power reduction simulation system, a power reduction simulation method, and a power reduction simulation program. BACKGROUND ART

[0002] Electric utilities need to prepare power generation facilities, power transmission and distribution facilities, transformers, and the like in accordance with peak demand so that users can respond to maximum demand at any time. Therefore, in high-voltage commercial contracts for factories, stores, offices, etc., electricity charges consist of a basic charge determined by the maximum demand power and an energy charge determined by the amount of power actually used. Therefore, if the maximum demand power is reduced, the electricity charges can also be reduced. As a method of reducing the maximum demand power, a method of introducing a storage battery and reducing the maximum demand power by the output of the storage battery is generally used.

[0003] As a power management system for reducing maximum demand power using a storage battery, a power management system is known that reduces peak power by controlling the output of a storage battery based on the generated power of a power generator and the purchased power supplied from a commercial power system, the power management system including: a load power acquisition unit that acquires past actual data of daily load power; and a purchased power target value determination unit that determines a target value of the purchased power based on the peak value of the past actual data and the usage range of the SOC of the storage battery (see, for example, Patent Document 1). RELATED ART DOCUMENTS PATENT DOCUMENTS

[0004] Patent Document 1 Japanese Unexamined Patent Application Publication No. 2018-29871 SUMMARY OF THE INVENTION PROBLEMS TO BE SOLVED BY THE INVENTION

[0005] Incidentally, the maximum power demand is determined by the largest 30-minute average power demand within the period in question. Therefore, even if the current No. 1 peak is suppressed, the No. 2 and No. 3 peaks will shift up, becoming the new maximum power demand. Furthermore, the 30-minute average power demand is not a value that occurs and disappears instantaneously like an inrush current, but is observed as the result of load fluctuations that continue for a certain period of time.

[0006] In other words, power demand has temporal continuity, rising over time, forming a peak, and then decreasing again. Therefore, before and after the peak point constituting the maximum power demand, subsequent peak points, caused by the same or related load factors, tend to occur consecutively or in close proximity. This presents a challenge: even if the power at the peak point constituting the maximum power demand is reduced, the maximum power demand cannot be effectively reduced.

[0007] This invention has been made in view of these problems, and aims to provide a power reduction simulation system, a power reduction simulation method, and a power reduction simulation program that can effectively reduce maximum power demand. [Means for solving the problem]

[0008] The inventors of this invention discovered that in order to effectively reduce maximum power demand, it is necessary not to simply look at a single maximum value point, but to extract the entire group of upper peak points and understand which peak points or groups of peaks should be suppressed and in what order to reduce maximum power demand in stages, which led to the present invention.

[0009] In other words, to achieve the above objective, the power reduction simulation system according to the present invention includes: an input means for inputting all the demand power for each predetermined time period of power consumption within a predetermined period; a demand power storage means for storing each demand power input by the input means for each predetermined time period; a ranking means for ranking each demand power stored in the demand power storage means in descending order of size; a top peak point extraction means for extracting those demand powers ranked by the ranking means that are within a predetermined rank as top peak points; and a peak point extraction means for selecting a plurality of top peak points extracted by the top peak point extraction means that are within a predetermined proximity range on a daily and hourly basis. The system is characterized by comprising: a peak cluster setting means for setting a raster; a target demand power setting means for setting a predetermined target demand power; a required power calculation means for calculating the power difference between the demand power of all the upper peak points included in the peak cluster set by the peak cluster setting means and the target demand power set by the target demand power setting means, and the amount of power required to suppress the demand power from each upper peak point to the target demand power over a predetermined time; a required power storage means for storing the required power obtained by the required power calculation means; and an output means for outputting the required power stored in the required power storage means. In the power reduction simulation system according to the present invention, it is preferable that there are multiple peak clusters.

[0010] Furthermore, the power reduction simulation system according to the present invention includes: a power generation estimate storage means for storing the estimated amount of power generated by a solar power generation system for each predetermined time period; a stored energy amount storage means for storing the amount of stored energy in a predetermined storage battery having a predetermined upper limit on charging output and a predetermined upper limit on discharging output; an energy amount calculation means for determining the amount of energy required for each predetermined time period from the demand power for each predetermined time period stored in the demand power storage means in chronological order; and a comparison between the estimated amount of power generated by the solar power generation system stored in the power generation estimate storage means in chronological order and the amount of energy determined by the energy amount calculation means, and if the estimated amount of power generated by the solar power generation system exceeds the amount of energy, the solar power generation Preferably, the system includes a power storage amount update means which adds the amount of power, which is the difference between the estimated amount of power generated by the solar power generation system and the amount of power, to the amount of stored power stored in the power storage amount storage means within the upper limit of the charging output, thereby updating the amount of stored power stored in the power storage amount storage means, and if the estimated amount of power generated by the solar power generation system is less than or equal to the amount of power, it subtracts the amount of power, which is the difference between the estimated amount of power generated by the solar power generation system and the amount of power, from the amount of stored power stored in the power storage amount storage means within the upper limit of the discharge output, thereby updating the amount of stored power stored in the power storage amount storage means, and the output means is configured to output the amount of stored power stored in the power storage amount storage means.

[0011] Furthermore, it is preferable that the power reduction simulation system according to the present invention includes a reduction rate calculation means that calculates the maximum power reduction rate by dividing the difference between the maximum power among the powers stored in the power demand storage means and the target power by the maximum power, and that the output means is configured to output the maximum power reduction rate obtained by the reduction rate calculation means.

[0012] The power reduction simulation method according to the present invention is characterized by comprising the steps of: inputting all the demand power for each predetermined time period of power consumption within a predetermined period; storing each input demand power; ranking each stored demand power in descending order; extracting those ranked within a predetermined rank from each ranked demand power as upper peak points; setting a plurality of the upper peak points that are within a predetermined proximity range on a daily and hourly basis as a peak cluster; determining the power difference between the demand power of all the upper peak points included in the peak cluster and a predetermined target demand power, and the amount of power required to suppress the demand power of each upper peak point from a predetermined time to the target demand power; storing the obtained amount of power required; and outputting the stored amount of power required.

[0013] The power reduction simulation program according to the present invention is a power reduction simulation program that determines the amount of electricity required to suppress demand power to a predetermined target demand power, and is characterized by being a program that causes the execution of the following steps: inputting all the demand power for each predetermined time period of electricity used within a predetermined period; storing each input demand power; ranking each stored demand power in descending order; extracting those ranked within a predetermined rank from each ranked demand power as upper peak points; setting a plurality of upper peak points that are included within a predetermined proximity range on a daily and hourly basis as a peak cluster; determining the amount of electricity required to suppress demand power to the target demand power from the power difference between the demand power of all upper peak points included in the peak cluster and a predetermined target demand power, and the predetermined time for each upper peak point; storing the obtained amount of electricity; and outputting the stored amount of electricity.

[0014] According to the present invention, it is possible to extract top peak points within a predetermined rank, group multiple top peak points within a predetermined proximity range on a daily and hourly basis to form a peak cluster, and determine the amount of power required to suppress all top peak points included in the peak cluster to a target demand power, thereby effectively reducing the maximum demand power.

[0015] The predetermined period is a period of one year or more but not exceeding two years, for example, one year. The predetermined time is preferably 30 minutes. The predetermined rank can be arbitrarily set within the rank of each ranked demand power. The predetermined proximity range on a daily and hourly basis is preferably within ±3 days and ±1 hour from the upper peak point. When performing a power reduction simulation based on power data from the past 1 to 2 years, power demand undergoes seasonal fluctuations as well as fluctuations depending on the day of the week and slight time differences. However, by setting multiple upper peak points within a range of ±3 days and ±1 hour from the upper peak point as a peak cluster, the accuracy of the simulation can be improved. The predetermined target demand power is, for example, half of the maximum demand power.

[0016] Input means include, for example, a keyboard or mouse. Power demand storage means and required power amount storage means include, for example, a hard disk. Ranking means, top peak point extraction means, peak cluster setting means, and required power amount calculation means consist of, for example, the functions of a CPU (Central Processing Unit). Output means include, for example, a monitor or printer. The power reduction simulation method according to the present invention is a method executed by the power reduction simulation system according to the present invention, and can be executed by a computer using a computer-readable recording medium such as a hard disk, CD-ROM, or USB memory that records the power reduction simulation program according to the present invention. In the power reduction simulation method and power reduction simulation program according to the present invention, it is preferable that there are multiple peak clusters.

[0017] Furthermore, the power reduction simulation method according to the present invention preferably includes the steps of: storing the estimated amount of power generated by the solar power generation system for each predetermined time period; storing the amount of stored power in a predetermined storage battery having a predetermined upper limit on charging output and a predetermined upper limit on discharge output; determining the amount of power required for each predetermined time period from the demand power for each predetermined time period stored in chronological order; comparing the estimated amount of power generated by the solar power generation system stored in chronological order with the determined amount of power; if the estimated amount of power generated by the solar power generation system exceeds the amount of power, adding the difference between the estimated amount of power generated by the solar power generation system and the amount of power to the stored amount of stored power within the upper limit on charging output to update the stored amount of stored power; and outputting the stored amount of stored power. Furthermore, the power reduction simulation method according to the present invention preferably includes the steps of: determining the maximum power reduction rate by dividing the difference between the maximum power demand and the target power demand by the maximum power demand; and outputting the determined maximum power reduction rate. The power reduction simulation program according to the present invention is preferably a program for executing each of the steps of the power reduction simulation method according to the present invention. [Effects of the Invention]

[0018] According to the present invention, it is possible to provide a power reduction simulation system, a power reduction simulation method, and a power reduction simulation program that can effectively reduce the maximum power demand. [Brief explanation of the drawing]

[0019] [Figure 1] This is a diagram showing the configuration of a power reduction simulation system according to an embodiment of the present invention. [Figure 2] FIG. 2 is a flowchart illustrating a peak structure extraction and theoretical reduction scenario generation step of a power reduction simulation method using the power reduction simulation system of FIG. 1. [Figure 3] FIG. 3 is a flowchart illustrating a step of structuring and peak clustering of top N% peak point groups in the power reduction simulation method using the power reduction simulation system of FIG. 1. [Figure 4] FIG. 4 is a flowchart illustrating a theoretical reduction scenario generation step when suppressing an N-th cluster in the power reduction simulation method using the power reduction simulation system of FIG. 1. [Figure 5] FIG. 5 is a flowchart illustrating a sequential state transition calculation step using SOC as a state variable in the power reduction simulation method using the power reduction simulation system of FIG. 1. [Figure 6] FIG. 6 is a flowchart illustrating an SOC state transition calculation within a 30-minute frame: an SOC update step according to surplus / deficit in the power reduction simulation method using the power reduction simulation system of FIG. 1. [Figure 7] FIG. 7 is a flowchart illustrating a simultaneous determination step of peak suppression, reduction amount, and residual peak width in the power reduction simulation method using the power reduction simulation system of FIG. 1. [Figure 8] FIG. 8 is a flowchart illustrating a residual peak point extraction and required discharge amount / required SOC amount calculation step in the power reduction simulation method using the power reduction simulation system of FIG. 1. [Figure 9] FIG. 9 is a flowchart illustrating a residual peak intervalization and residual peak blocking step in the power reduction simulation method using the power reduction simulation system of FIG. 1. [Figure 10] FIG. 10 is a flowchart illustrating a required SOC amount per block and monthly required peak shaving SOC calculation step in the power reduction simulation method using the power reduction simulation system of FIG. 1. [Description of Embodiments]

[0020] Embodiments of the present invention will be described below with reference to the drawings. Figures 1 to 10 show a power reduction simulation system and a power reduction simulation method according to an embodiment of the present invention. The power reduction simulation method according to an embodiment of the present invention is a method executed by the power reduction simulation system according to an embodiment of the present invention, and can be executed by a computer using a computer-readable recording medium such as a hard disk, CD-ROM, or flexible disk on which the power reduction simulation program according to an embodiment of the present invention is recorded.

[0021] As shown in Figure 1, the power reduction simulation system comprises a computer 1, input means 2, and output means 3. Input means 2 consists of a keyboard and a mouse. Output means 3 consists of a monitor and a printer. Computer 1 has a CPU (Central Processing Unit) 4 and hard disk memory. The CPU controls various components, transfers data, and performs various calculations.

[0022] As shown in Figure 1, the CPU 4 has the following functions: ranking means 41, top peak point extraction means 42, peak cluster setting means 43, target demand power setting means 44, required power amount calculation means 45, power amount calculation means 46, stored power amount update means 47, and reduction rate calculation means 48. The hard disk memory has a demand power storage means 5, a required power amount storage means 6, a projected power generation amount storage means 7, and a stored power amount storage means 8. Input means 2 can input all the power demand for each predetermined time interval within a predetermined period. The predetermined period is, for example, one year. The predetermined time interval is 30 minutes. The demand power storage means 5 stores each demand power input by the input means 2 at predetermined intervals. The ranking means 41 ranks each demand power stored in the demand power storage means 5 in descending order. The upper peak point extraction means 42 extracts the demand powers ranked by the ranking means 41 that are within a predetermined rank as upper peak points. The predetermined ranking can be, for example, up to 10th place, and can be arbitrarily set within the ranking of each power demand.

[0023] The peak cluster setting means 43 sets a peak cluster of multiple top peak points that are included within a predetermined proximity range on a daily and hourly basis, from among the top peak points extracted by the top peak point extraction means 42. The predetermined proximity range on a daily and hourly basis is, for example, a range of ±3 days and ±1 hour centered on the top peak point. The specified proximity range is a range for converting higher peak points from mere points into actionable units for considering practical peak reduction measures. Since the 30-minute average demand power over a specified period appears not as an instantaneous value but as a load fluctuation that continues for a certain period, proximity peaks based on the same or related load factors are likely to occur before and after the higher peak point. The range of ±1 hour in the time direction is for absorbing the shift in peak occurrence times due to equipment startup, operation start-up, air conditioning start-up, and before and after breaks / end of work, and for treating peaks based on the same or related load factors as the same actionable unit. The range of ±3 days in the date direction is a proximity range roughly equivalent to one week including the center day, for absorbing daily shifts due to weekday / holiday operating conditions, operating day arrangement, weather, solar power generation amount, seasonal load, etc. If the proximity range is too narrow, peaks that should be treated as belonging to the same load factor or as the same mitigation unit may be fragmented, potentially leading to an underestimation of required power and battery capacity. On the other hand, if the proximity range is too wide, peaks based on different load factors or operating conditions may be included in the same cluster, potentially leading to an overestimation of required power and battery capacity. Therefore, ±3 days and ±1 hour are preferred standard settings for extracting peak groups based on the same or related load factors as practical mitigation units and evaluating the power and battery capacity ranges required for peak reduction measures. However, the proximity range can be changed depending on the facility's purpose, operating days, business hours, load characteristics, fluctuations in solar power generation, and the data period to be analyzed. It is not limited to ±3 days or ±1 hour, but can be set as appropriate. It is preferable that there are multiple peak clusters. The target demand power setting means 44 sets a predetermined target demand power. The predetermined target demand power is input by the input means 2, but it may also be set automatically based on the maximum demand power among the individual demand powers obtained from the demand power storage means 5 and a predetermined target reduction rate. The required power calculation means 45 determines the power difference between the demand power of all upper peak points included in the peak cluster set by the peak cluster setting means 43 and a predetermined target demand power, and the required power amount necessary to suppress the demand power of each upper peak point to the target demand power over a predetermined period of time. The required power storage means 6 stores the required power amount obtained by the required power calculation means 45. The output means 3 outputs the required power amount stored in the required power storage means 6. The estimated power generation amount storage means 7 stores the estimated power generation amount of the solar power generation system for predetermined time intervals. The estimated power generation amount of the solar power generation system refers to the amount of electricity expected to be generated based on annual average sunshine condition data for a predetermined solar power generation system equipment capacity. The stored energy amount storage means 8 stores the stored energy amount of a predetermined storage battery having a predetermined charge output upper limit and a predetermined discharge output upper limit. The output means 3 outputs the stored energy amount stored in the stored energy amount storage means 8.

[0024] The power consumption calculation means 46 calculates the amount of power required for each predetermined time period from the power demand for each predetermined time period stored in the power demand storage means 5 in chronological order. The stored energy amount update means 47 compares the estimated amount of power generated by the solar power generation system stored in the estimated power generation amount storage means 7 in chronological order with the amount of energy calculated by the energy amount calculation means 46. If the estimated amount of power generated by the solar power generation system exceeds that amount of energy, the difference between the estimated amount of power generated by the solar power generation system and the amount of energy is added to the stored energy amount stored in the stored energy amount storage means 8, up to the upper limit of the charging output, and the stored energy amount stored in the stored energy amount storage means 8 is updated. If the estimated amount of power generated by the solar power generation system is less than or equal to that amount of energy, the difference between the estimated amount of power generated by the solar power generation system and the amount of energy is subtracted from the stored energy amount stored in the stored energy amount storage means 8, up to the upper limit of the discharge output, and the stored energy amount stored in the stored energy amount storage means 8 is updated.

[0025] The stored energy amount update means 47 sets a predetermined solar power generation system capacity and adds a predetermined amount of generated power within the solar power generation system capacity to the stored energy amount stored in the stored energy amount storage means 8 at a predetermined timing to update the stored energy amount stored in the stored energy amount storage means 8. The reduction rate calculation means 48 calculates the maximum demand power reduction rate by dividing the difference between the maximum demand power among the demand power stored in the demand power storage means 5 and the target demand power set by the target demand power setting means 44 by the maximum demand power. The output means 3 outputs the maximum demand power reduction rate obtained by the reduction rate calculation means 48.

[0026] The following details the power reduction simulation method. First, the following terms used in this specification will be explained. Maximum demand power Maximum power demand refers to the maximum value of the 30-minute average power demand [kW] within the specified period. In this explanation, the amount of electricity [kWh] in each 30-minute time slot is divided by 0.5 hours to convert it to the 30-minute average demand power [kW], and the largest of these values ​​is treated as the maximum demand power. To reduce the peak power demand, simply suppressing the current number one peak is insufficient. This is because suppressing the number one peak will cause the second and third peaks to shift up, becoming the new peak power demands.

[0027] Ranking moved up A "ranking shift" refers to a situation where, after suppressing the peak point that constitutes the current maximum power demand, the next highest-ranking peak point becomes the new maximum power demand. In measures to address peak demand, it is impossible to assess how much peak demand will actually decrease without considering this shift in ranking. Peak point A peak point refers to a 30-minute timeframe in time-series data where the power demand value is highest. For example, when 17,520 30-minute data points from a year are sorted in descending order of power demand, the times at the top of the list become the peak points. These peak points are candidates for constituting the maximum power demand and are the subject of evaluation for peak shaving and equipment countermeasures.

[0028] Top N% peak point group The top N% peak point group refers to the set of peak points that fall within the top N% of all 30-minute timeframes within the target period, ordered by the magnitude of the power demand value. For example, if we treat one year in 30-minute intervals, the total number of data points is 17,520. In this case, the top 1% would be approximately 175 points, and the top 5% would be approximately 876 points. In this process, this top N% peak point group is treated as a candidate area for countermeasures to reduce maximum power demand.

[0029] Peak cluster A peak cluster is a group of peaks from the top N% of peak points that are geographically or chronologically close together. Addressing each peak point individually is often impractical. Therefore, in this process, peak points are clustered based on their proximity, and the order of countermeasures is evaluated for each peak group.

[0030] Distribution area Distribution area is an indicator that shows how far the top N% peak point group is spread across a two-dimensional plane in the date and time directions. If peak point clouds are concentrated in a narrow area, countermeasures targeting specific time periods or seasons may be effective. On the other hand, if they are widely dispersed, a single countermeasure may not be sufficient to reduce peaks.

[0031] Robust distribution area The robust distribution area is an indicator that suppresses the influence of outlier peaks and represents the range of peak distributions that should actually be considered as targets for countermeasures. This method is used to avoid overestimating the distribution range due to being influenced by single or isolated peak points.

[0032] Theoretical Reduction Scenario The theoretical reduction scenario is a calculation that shows how much the maximum power demand will decrease in stages if peak clusters are suppressed in order of priority, such as the first cluster, second cluster, and third cluster. In this process, the remaining maximum power demand, cumulative reduction amount, additional reduction amount, and maximum power demand reduction rate are calculated at each stage.

[0033] SOC State of Charge (SOC) is an indicator that represents the amount of electrical energy remaining in a battery. While it is often expressed as a charge rate [%], in this specification, it is mainly treated as remaining battery capacity [kWh] for use in time-series calculations. In this algorithm, SOC is a state variable that is updated every 30 minutes. That is, the result of charging or discharging at a given time becomes the SOC at the next time, and determines the amount of charge and discharge possible thereafter.

[0034] SOC lower limit The State of Charge (SOC) lower limit refers to the minimum discharge limit from a battery. It is set for purposes such as battery protection, business continuity planning (BCP), system maintenance, and ensuring operational reserves. This algorithm only discharges power as long as the State of Charge (SOC) does not fall below this lower limit. Therefore, even if you want to discharge power from the battery to meet demand, you cannot if the SOC has reached the lower limit, and the deficit will be treated as purchased power or remaining peak power.

[0035] Peak point before implementation The pre-implementation peak point refers to the peak point extracted from time-series data before measures such as the expansion of solar power generation systems or the introduction of storage batteries are reflected. This algorithm compares the pre-implementation peak point with the power demand value at the same time after implementation. This allows it to determine how much the peak that was a problem before implementation has been reduced or how much it remains after implementation.

[0036] Top N% peak score The top N% peak score refers to the points that fall within the top N% of all 30-minute time slots within the target period, ordered by the magnitude of the power demand. For example, if we treat one year as a 30-minute interval, the total number of data points is 17,520. In this case, the top 1% would have approximately 175 points, and the top 5% would have approximately 876 points. This algorithm extracts the top N% peak points and treats them as candidates for peak reduction. In this specification, the number of points themselves is referred to as "top N% peak points," while the set of time points extracted from the pre-implementation time series is referred to as "top N% peak point group."

[0037] Remaining peak width The remaining peak range refers to the range [kW] in which the power demand value after implementation exceeds the target value. If the remaining peak width is 0, it means that the peak at that time was suppressed to below the target value. On the other hand, if the remaining peak width is a positive value, it means that the peak could not be suppressed to the target value due to insufficient State of Charge (SOC) in the battery, insufficient discharge output, insufficient power generation from the solar power system, etc. This remaining peak width is used in the subsequent steps of "remaining peak blocking" and "reverse calculation of required SOC."

[0038] Remaining peak The residual peak refers to the peak power demand that remains above the target demand even after the installation of solar power generation systems and storage batteries. The remaining peak is caused by factors such as insufficient State of Charge (SOC) in the battery, insufficient discharge output, insufficient power generation from the solar power system, or a mismatch between the peak time and the power generation time. Remaining peak point The residual peak point refers to the 30-minute timeframe in which the average power demand over the 30 minutes following implementation exceeds the target power demand. In this process, the remaining peak width is calculated for each remaining peak point, and this is converted into the required discharge amount and required SOC amount in a subsequent stage.

[0039] Required discharge amount Required discharge amount refers to the amount of electricity [kWh] that needs to be supplied to the demand side in order to keep the remaining peak width below the target demand power. For a 30-minute time slot, the required discharge amount is calculated by multiplying the remaining peak width [kW] by 0.5 hours. Required SOC Required SOC refers to the remaining battery capacity [kWh] that needs to be secured on the battery side in order to suppress the remaining peak. When considering discharge efficiency, the required SOC is calculated by dividing the amount of discharge required to be supplied to the demand side by the discharge efficiency. In this process, the required SOC is calculated for each remaining peak block and used as a guideline for the SOC required for peak shaving on a monthly basis.

[0040] Remaining peak section A residual peak interval refers to a group of residual peak points that occur continuously over time. For example, if the target power demand exceeds the target for three consecutive time slots at 13:00, 13:30, and 14:00, these will be treated as a single remaining peak period. Remaining peak block A residual peak block refers to a group of peaks obtained by further aggregating residual peak intervals based on their proximity in the date or time zone direction. The remaining peak block is a unit used to consider the State of Charge (SOC) for peak shaving, and the required discharge amount and required SOC are calculated for each block.

[0041] Monthly peak shaving SOC requirements Monthly peak shaving SOC refers to the minimum amount of SOC that must be secured each month in order to keep the remaining peak block below the target power demand. In this process, the largest required SOC amount among multiple remaining peak blocks within a month is treated as the required SOC for peak shaving for that month.

[0042] (1) Peak structure extraction and theoretical reduction scenario generation process In this process, we extract peak point clouds that constitute the maximum demand power from 30-minute interval power time-series data, and calculate their distribution structure, concentration, cluster structure, and theoretical reduction scenarios. Figure 2 is a flowchart showing the peak structure extraction and theoretical reduction scenario generation process of the power reduction simulation method. Figure 3 is a flowchart showing the structuring and peak clustering process of the top N% peak point cloud of the power reduction simulation method. Figure 4 is a flowchart showing the theoretical reduction scenario generation process when the Nth cluster is suppressed of the power reduction simulation method.

[0043] The maximum power demand is determined by the highest 30-minute average power demand within the period in question. Therefore, even if the current top peak is suppressed, the second and third peaks will shift up, becoming the new maximum power demand. Furthermore, the 30-minute average power demand is not a value that occurs and disappears instantaneously like an inrush current, but rather is observed as the result of load fluctuations that continue for a certain period of time. In other words, power demand has temporal continuity, rising over time, forming a peak, and then decreasing again. For this reason, next-ranking peak points caused by the same or related load factors tend to occur consecutively or in close proximity before and after the peak point that constitutes the maximum power demand.

[0044] Therefore, in order to effectively reduce peak power demand, it is necessary to extract the entire group of top peak points, rather than simply looking at a single maximum value, and to understand which peak points or groups of peaks should be suppressed and in what order to reduce peak power demand in stages. This is because treating peak points occurring in close proximity in time or date as individual, isolated peaks may not adequately determine the actual amount of countermeasures needed. To suppress adjacent peak points, measures such as load reduction, supply from power generation facilities, and battery discharge must be implemented not only at a single point in time, but also over a continuous or adjacent time range. Therefore, in this process, the top N% peak point cloud is extracted, and each peak point is placed on a two-dimensional plane in the date and time directions. Then, peak clusters are calculated based on the distribution area, concentration, dispersion, and adjacency relationships of the peak point cloud. Furthermore, the remaining maximum power demand, cumulative reduction amount, additional reduction amount, and maximum power demand reduction rate are calculated when power is sequentially reduced from the first cluster to the Nth cluster. This makes it possible to quantitatively indicate which peak groups should be prioritized for measures to reduce maximum power demand.

[0045] In this process, the top N% peak point cloud is treated not merely as a ranked list, but as a point cloud on a two-dimensional plane with date and time directions. First, each peak time in the top N% peak point cloud is converted to a date and time. Next, the distribution of the peak point cloud is evaluated. If the peak point cloud is concentrated in a certain month / time zone, the peak may be easily suppressed by specific operational measures or battery control. On the other hand, if the peak point cloud is widely dispersed, it may be difficult to suppress with measures for a single time zone. Therefore, the following structural indicators are calculated for the peak point cloud. Distribution area, robust distribution area, concentration, dispersion, number of peaks, peak composition ratio, month of peak occurrence, time of peak occurrence

[0046] Furthermore, the peak point cloud is classified into one or more peak clusters based on the adjacency relationships in the time and date directions. Here, proximity refers to a relationship where, after converting each peak time into two-dimensional coordinates of date and time, the regions included within a predetermined date-direction tolerance range and time-direction tolerance range centered on the peak point overlap or connect. For example, when using 30-minute values, a neighborhood region is defined around each peak point for a predetermined number of days in the date direction and a predetermined number of frames in the time direction. Peak point groups where these neighborhood regions overlap or connect are treated as the same peak cluster.

[0047] For example, a neighborhood region is defined around each peak point, extending ±3 days in the date direction and ±2 time frames in the time direction. In 30-minute time series data, ±2 time frames roughly corresponds to 1 hour. By unfolding the neighborhood region of each peak point onto the date × time plane and extracting overlapping or connected neighborhood regions as connected components, one or more peak clusters are generated. For each peak cluster, the following is calculated: Peak points within the cluster, maximum power demand within the cluster, average power demand within the cluster, timing of cluster occurrence, time period of cluster occurrence, effective area occupied by the cluster, maximum remaining power demand if the cluster is suppressed, additional reduction amount if the cluster is suppressed.

[0048] The theoretical reduction scenario, assuming sequential suppression from the first to the Nth cluster, is calculated as follows: The distinguishing feature of this algorithm is that it treats the maximum demand power not as a single maximum point, but as a structure of a cluster of peak points with sequential ranking. The peak power demand is determined by the highest 30-minute average power demand within the period in question. Therefore, even if the current peak is suppressed, the next highest peak will become the new peak power demand. This algorithm assumes this rank-shifting structure, extracts the top N% peak points, and quantifies their distribution structure in the date and time directions. Furthermore, peak points adjacent in time or date are grouped together as peak clusters, and the remaining maximum demand power, cumulative reduction amount, additional reduction amount, and reduction rate are calculated when suppressing power sequentially on a cluster-by-cluster basis. This makes it possible to quantitatively indicate which peak groups should be addressed and in what order in order to reduce peak power demand.

[0049] In particular, peak point clusters that are connected in time or date should be evaluated not as peaks at a single time, but as targets for countermeasures that occur continuously or in close proximity. This is because peak reduction measures do not suffice by reducing the demand power value at only one point; they require continuous action over a certain range on multiple connected peak points, such as load reduction, supply from power generation facilities, and battery discharge. In other words, this process is not merely a visualization of peak points, but an algorithm that considers the ranking structure of maximum demand power, the temporal continuity of load fluctuations in 30-minute average power, and the need for continuous countermeasures against connected peaks. Based on the connectivity relationships of neighboring regions in the date and time directions set around each peak point, it transforms the peak point cluster into clusters to be targeted for countermeasures and generates a stepwise theoretical reduction scenario.

[0050] (2) Sequential state transition operation with SOC as the state variable This algorithm scans time-series data in 30-minute intervals for each candidate pattern of solar power generation system capacity and battery capacity, in chronological order. Figure 5 is a flowchart showing the sequential state transition calculation process of the power reduction simulation method, with SOC as the state variable. Figure 6 is a flowchart showing the SOC state transition calculation within a 30-minute time frame of the power reduction simulation method: the SOC update process according to surplus and deficit. Figure 7 is a flowchart showing the simultaneous determination process of peak suppression, reduction amount, and remaining peak width of the power reduction simulation method. At each point in time, the amount of electricity demanded or actually purchased is compared with the estimated amount of electricity generated by the solar power generation system. If a surplus occurs, the amount that can be charged is calculated based on the remaining battery capacity and the physical constraints of the battery.

[0051] On the other hand, if there is a shortage of required power, the amount of dischargeable power is calculated based on the remaining battery capacity, the lower limit of the State of Charge (SOC), the upper limit of the discharge output, and the discharge efficiency. In this process, the battery level at each time point is updated sequentially based on the battery level at the previous time point. Therefore, the result of charging or discharging at a given time point affects the amount of charge / discharge possible and the peak suppression determination for subsequent time points. Furthermore, the amount of electricity purchased after the introduction of each candidate pattern at each time point is converted to a 30-minute average demand power [kW], and the peak suppression judgment, peak reduction amount, and remaining peak width are simultaneously recorded for each time point included in the top N% peak point group extracted from the pre-introduction time series. The distinguishing feature of this calculation is that this algorithm is not a simple comparison of solar power generation amounts that evaluates each time point independently. This algorithm uses the remaining battery level as a state variable, carrying it over time, and sequentially calculates the surplus, deficit, chargeable, dischargeable, purchased electricity, and post-installation power demand at each time point. Therefore, the result of charging or discharging at a given time point affects the peak suppression determination and remaining peak width at subsequent time points.

[0052] Furthermore, this algorithm calculates the peak reduction amount and remaining peak width for the top N% peak point cloud over time by simultaneously converting not only the reduction in purchased electricity [kWh] but also the 30-minute average demand power [kW]. In other words, this process is a state transition calculation that sequentially calculates the charge / discharge amount at each time point, reflecting the upper limit of the battery's State of Charge (SOC), lower limit of SOC, charge / discharge efficiency, and upper limit of charge / discharge output, based on the difference between the actual load value that fluctuates over time and the estimated amount of power generated by the solar power generation system, and carries over the charge / discharge result to the SOC at the next time point.

[0053] Furthermore, in this process, the amount of electricity purchased after introduction at each time point determined by the state transition calculation is converted to the 30-minute average demand power [kW], and the peak point group extracted as the top N% in descending order of demand power value from the peak points in the pre-introduction time series is used as the target for peak reduction evaluation. If each time point is included in this peak point group, the 30-minute average demand power before introduction and the 30-minute average demand power after introduction at that time point are compared, and the peak suppression judgment, reduction amount, and remaining peak width are calculated on the same time series. Therefore, the peak suppression determination, reduction amount, and remaining peak width are not determined by independently comparing each time point, but rather by the SOC carried over from past time points, the estimated amount of power generated by the solar power generation system at that time, and the charge / discharge capacity based on the physical constraints of the battery. Therefore, this process is an algorithm that integrates time-series state transition calculations that reflect the physical constraints of the battery with peak reduction evaluations related to maximum power demand.

[0054] (3) Calculation of the amount of SOC required for blocking remaining peaks and countermeasures In this process, the time series after the introduction of the solar power generation system and storage battery is evaluated, and the remaining peak points that did not fall below the target power demand are extracted and organized as continuous remaining peak blocks in terms of time or date. Figure 8 is a flowchart showing the process of extracting remaining peak points and calculating the required discharge amount / required SOC amount in the power reduction simulation method. Figure 9 is a flowchart showing the process of segmenting remaining peaks and blocking remaining peaks in the power reduction simulation method. Figure 10 is a flowchart showing the process of calculating the required SOC amount by block and the required peak shaving SOC by month in the power reduction simulation method.

[0055] To reduce peak power demand, it is insufficient to evaluate individual peak points. If 30-minute timeframes consecutively exceed the target power demand, sufficient battery capacity is needed to continuously discharge the excess power from each 30-minute timeframe in order to suppress the peak. Therefore, in this process, the time when the 30-minute average power demand after equipment installation exceeds the target power demand is extracted as the remaining peak point, and the remaining peak width is calculated for each remaining peak point. Furthermore, the remaining peak width is converted to the required discharge amount based on the time width of a 30-minute frame, and consecutive remaining peak points in terms of time or date are aggregated as peak blocks. Then, for each peak block, the amount of discharge and the required State of Charge (SOC) are calculated to suppress the entire block to below the target power demand. This allows us to quantitatively indicate not just the presence or absence of residual peaks, but also how much SOC should be reserved for peak shaving purposes on a monthly or period-by-period basis in order to suppress residual peaks.

[0056] In this process, the remaining peak point cloud is classified into one or more remaining peak blocks based on temporal or date continuity. First, we extract the times when the average power demand over the 30 minutes after implementation exceeds the target power demand. Next, we determine whether the remaining peak points are continuous. If, on the same day, adjacent 30-minute time slots consecutively exceed the target power demand, they will be treated as the same remaining peak time slot. Furthermore, if residual peaks occur consecutively within the same time period in the date direction, they can be treated as the same type of peak block. In this way, the remaining peak point cloud is classified into multiple remaining peak blocks. For each remaining peak block, the following is calculated: Number of peak points within a block, block start time, block end time, block duration, maximum remaining peak width within a block, total remaining peak width within a block, required discharge amount for the block, required SOC amount for the block.

[0057] The required SOC amount for each remaining peak block is calculated as the sum of the required SOC amounts for each 30-minute interval within the block. This calculation allows for the calculation of the required SOC in units of peak blocks where continuous discharge is actually needed, rather than just for individual peak points. In the computer calculation, the time when the average power demand for the 30 minutes after installation exceeds the target power demand is extracted as the remaining peak point. Next, the remaining peak points are organized into remaining peak intervals based on temporal continuity, and further aggregated into remaining peak blocks based on proximity in the date or time zone direction. Then, the remaining peak width contained in each block is converted into the required discharge amount and required SOC amount, and the maximum peak block required SOC is calculated on a monthly basis.

[0058] The key feature of this calculation is that it treats residual peaks not merely as points, but as continuous peak blocks in terms of time or date. In mitigating maximum power demand, the amount of discharge required to suppress a single peak can be calculated by multiplying the residual peak width by 30 minutes. However, if residual peaks are continuous across multiple 30-minute intervals, what is needed is not the amount of discharge required to suppress the maximum value at a single point, but the total amount of discharge required to suppress the entire continuous peak interval below the target power demand. This algorithm focuses on this point and blocks peak points that remain after equipment installation based on their temporal or chronological continuity.

[0059] Furthermore, for each peak block, the remaining peak width of each 30-minute frame within the block is converted into the required discharge amount, and the SOC amount necessary to suppress the entire block is calculated. This allows for the quantification of the minimum SOC amount that should be secured for peak shaving, on a monthly or period-by-period basis, rather than simply displaying the remaining peak. In other words, this process is an algorithm that converts the remaining peak point cloud into a series of SOC-required blocks and then calculates the necessary SOC to suppress those blocks. [Examples]

[0060] The following describes embodiments of the present invention. (1) Target data and calculation conditions

[0061] [Table 1]

[0062] In a 30-minute timeframe, the time interval Δ of one timeframe is 0.5 [h]. Therefore, when converting 30-minute electricity consumption [kWh] to 30-minute average demand power [kW], the following relationship applies. 30-minute average power demand [kW] = 30-minute power consumption [kWh] / 0.5[h] = 30-minute power consumption [kWh] × 2

[0063] (2) Example of extracting the top N% peak point cloud For each 30-minute time slot within the target period, the 30-minute average power demand is calculated and ranked in descending order of power demand value. Then, the set of time slots included in the top N% is extracted as the top N% peak point cloud. In this example calculation, 876 points are extracted as the top N% peak point group.

[0064] [Table 2]

[0065] (3) Example of placement on the date x time plane Each time point included in the top N% peak point cloud is converted to a date and time, and then placed as a point on a two-dimensional plane with date and time directions. The following table shows only the times when peak points appeared, extracted from the first peak cluster, which includes the highest power demand, for the three days from December 8th to December 10th, 2025. In actual calculations, all cells of 3 days x 48 frames were considered, and cells containing the highest peak points were extracted.

[0066] [Table 3]

[0067] In this example, the peak points for 2nd, 1st, and 3rd place rankings appear consecutively at 16:30, 17:00, and 17:30 on December 9, 2025. By treating not just a single maximum point, but also the time periods before and after it as a single peak cluster, we can understand the scope where continuous countermeasures are actually needed.

[0068] (4) Specific examples of distribution area, concentration, and dispersion Distribution area, concentration, and dispersion are structural indicators that show how peak point clusters are distributed in the date and time directions. These are not indicators that directly show kWh, but are used to convert peak point clusters into peak clusters that are targets for countermeasures.

[0069] [Table 4]

[0070] For example, the first peak cluster consists of 54 points and is distributed within the range of 08:00 to 18:00 from 2025 / 12 / 03 to 2025 / 12 / 26. The first peak cluster accounts for 6.16% of the total 876 top peak points, but it is highly important from the perspective of reducing peak demand power because it includes the maximum demand power of 632.0 kW. Furthermore, the second and third peak clusters consist of 309 and 475 points, respectively, accounting for approximately 89.50% of the top peak point clusters. This indicates that the peak point clusters are not uniformly distributed, but rather occur in clusters during specific seasons and time periods.

[0071] [Table 5]

[0072] In this example, the degree of concentration is shown by "the number of peak points and their proportion included in a specific cluster," and the degree of dispersion is shown by "the date range, time range, and effective occupied area." That is, if the number of peak points and their proportion are large, and the date range, time range, and effective occupied area are limited, it can be evaluated that the peak point cluster is concentrated in a specific season and time period. On the other hand, if it spans a wide date range and time range, it can be evaluated as dispersed.

[0073] (5) Specific examples of how to calculate the reduction rate This tool calculates, step by step, how much the remaining maximum power demand will decrease when peak clusters are suppressed in order of priority. In this example, the maximum power demand before countermeasures was 632.0 kW. If the first peak cluster is suppressed, the remaining maximum power demand will be 480.0 kW.

[0074] [Table 6]

[0075] This table shows that when peak clusters are suppressed sequentially, the maximum power demand decreases in stages from 632.0kW to 480.0kW, 412.0kW, and 324.0kW, and finally reaches the target power demand of 280.0kW when suppressed down to the 8th cluster.

[0076] (6) Specific examples of kWh conversion Regarding the question of "how many kWh of electricity can be saved," it is more accurate to express it not as "amount of electricity saved," but as the amount of discharge required to keep the peak cluster below the target demand power, or the equivalent amount of demand reduction. This is because, when using storage batteries, the goal is not to eliminate demand itself, but to replace the amount of electricity purchased from the power company during peak hours with supply from the solar power generation system or discharge from the storage battery. For each 30-minute time slot, the amount exceeding the target power demand is defined as the excess, and this is multiplied by 0.5 hours to calculate the required power [kWh].

[0077] [Table 7]

[0078] For example, at the peak point on 2025 / 12 / 09 at 17:00, the 30-minute average power demand is 632.0kW, and the target power demand is 280.0kW, resulting in an excess of 352.0kW. Since this is a 30-minute timeframe, the amount of electricity required to reduce this single point to the target power demand is 176.0kWh. Required electricity amount=(632.0-280.0)×0.5=352.0×0.5=176.0[kWh] For the entire first peak cluster, the same calculation is performed for each peak point within the cluster, and the required power is summed up. As a result, the amount of power required to keep the entire first peak cluster below the target power demand is 1,478.0 kWh.

[0079] (7) Examples of post-implementation evaluation using simulations The above is a theoretical reduction example of the pre-measurement peak structure. In contrast, by setting candidate patterns for the installed capacity of the photovoltaic power generation system and the battery capacity, calculating the average 30-minute post-introduction power demand, and evaluating whether the peak points are expected to be actually eliminated or remain.

[0080] [Table 8]

[0081] For the candidate equipment introduction pattern in this sample data, from the results of scanning 17,520 rows, 874 of the top 876 peak points before introduction were suppressed below the target power demand, and the number of remaining peak points after introduction was 2. The remaining peak points are as follows.

[0082] [Table 9]

[0083] Furthermore, by blocking the remaining peaks, the remaining peak points are organized in units of sections and blocks, and the SOC for peak shaving that should be additionally secured to completely suppress the remaining peaks is calculated.

[0084] [Table 10]

[0085] In the time-series evaluation after introduction, 874 of the top 5% peaks (876 points) before introduction were suppressed below the target power demand, leaving 2 remaining peaks. Furthermore, by blocking the remaining peaks, these 2 points were treated as the same remaining peak block, and the amount of SOC for peak shaving that should be additionally secured to suppress the block below the target power demand was calculated. From the above, in this example, through the aforementioned peak structure analysis, a theoretical reduction scenario for reducing the maximum power demand of 632.0 kW before countermeasures to the target power demand of 280.0 kW was calculated, and the maximum power demand reduction rate in this case is 55.70%.

[0086] Next, using sequential state transition calculations for the State of Control (SOC), the time series after installation was calculated using candidate patterns with a solar power generation system capacity of 164.0 kW and a battery storage capacity of 50.0 kWh. The maximum power demand after installation was found to be 305.2 kW. At this point, the reduction rate of the maximum power demand after installation is approximately 51.71%, from 632.0 kW to 305.2 kW. Furthermore, regarding the two peaks expected to remain after implementation, we performed peak blockization and monthly SOC (State of Charge) requirements calculations. It appears that by securing a maximum required SOC of 15.7 kWh for the December 2025 peak block, we can suppress the remaining peak to below the target power demand of 280.0 kW. Therefore, in this example, while the simulation after equipment installation only shows a maximum power demand of 305.2 kW and a reduction rate of approximately 51.71%, by adding an operation to pre-maintain the SOC necessary for peak shaving to eliminate remaining peak blocks, it is expected that the maximum power demand can reach 280.0 kW and the reduction rate can reach 55.70%, as calculated in the theoretical reduction scenario. [Explanation of Symbols]

[0087] 1. Computer, 2. Input means, 3. Output means, 4. CPU (Central Processing Unit), 5. Demand power storage means, 6. Required energy storage means, 7. Estimated power generation storage means, 8. Energy storage amount storage means, 41. Ranking means, 42. Top peak point extraction means, 43 Peak cluster setting means, 44 Target demand power setting means, 45 required power amount calculation means, 46 power amount calculation means, 47 stored power amount updating means, 48 Reduction Rate Calculation Method

Claims

1. An input means for inputting all the power demand for each predetermined time period within a predetermined period, A demand power storage means that stores each demand power input by the input means at predetermined intervals, A ranking means for ranking each demand power stored in the demand power storage means in descending order, A top peak point extraction means extracts top peak points from among the demand power ranked by the ranking means that are within a predetermined rank, A peak cluster setting means sets a plurality of the above-ranking peak points extracted by the above-ranking peak point extraction means that are included in a predetermined proximity range on a daily and hourly basis as a peak cluster, A target demand power setting means for setting a predetermined target demand power, A power calculation means for determining the power difference between the demand power of all the upper peak points included in the peak cluster set by the peak cluster setting means and the target demand power set by the target demand power setting means, and the amount of power required to suppress the demand power of each upper peak point to the target demand power from a predetermined time, A required power amount storage means for storing the required power amount obtained by the required power amount calculation means, The output means outputs the required amount of power stored in the required power storage means, A power reduction simulation system characterized by having the following features.

2. The power reduction simulation system according to claim 1, characterized in that the aforementioned peak clusters are multiple.

3. A power generation estimate storage means for storing the estimated amount of power generated by the solar power generation system at predetermined intervals, A storage power amount storage means for storing the amount of stored power of a predetermined storage battery having a predetermined upper limit on charging output and a predetermined upper limit on discharging output, A power consumption calculation means that calculates the amount of power required for each predetermined time period from the power consumption for each predetermined time period stored in the power consumption storage means in chronological order, The system includes a power generation amount update means that compares the estimated power generation amount of the solar power generation system stored in the estimated power generation amount storage means in chronological order with the amount of energy calculated by the energy amount calculation means, and if the estimated power generation amount of the solar power generation system exceeds the amount of energy, adds the difference between the estimated power generation amount of the solar power generation system and the amount of energy to the amount of stored energy stored in the energy storage amount storage means, within the upper limit of the charging output, to update the amount of stored energy stored in the energy storage amount storage means, and if the estimated power generation amount of the solar power generation system is less than or equal to the amount of energy, subtracts the difference between the estimated power generation amount of the solar power generation system and the amount of energy from the amount of stored energy stored in the energy storage amount storage means, within the upper limit of the discharge output, to update the amount of stored energy stored in the energy storage amount storage means. The power reduction simulation system according to claim 2, characterized in that the output means has a configuration that outputs the amount of stored energy stored in the stored energy amount storage means.

4. The system includes a reduction rate calculation means that calculates the maximum demand power reduction rate by dividing the difference between the maximum demand power and the target demand power stored in the demand power storage means by the maximum demand power, The power reduction simulation system according to claim 3, characterized in that the output means has a configuration that outputs the maximum demand power reduction rate obtained by the reduction rate calculation means.

5. The power reduction simulation system according to any one of claims 1 to 4, characterized in that the predetermined period is a period of one year or more and not more than two years, and the predetermined proximity range is a range of ±3 days and ±1 hour centered on the upper peak point.

6. The steps include: inputting all the power consumption for each predetermined time period within a predetermined period; A step of storing each input demand power, The steps include ranking each stored power demand in descending order, The steps include: extracting the top peak points from among the ranked power demands that are within a predetermined rank; The steps include setting a peak cluster of multiple upper peak points that are located within a predetermined proximity range on a daily and hourly basis, among the aforementioned upper peak points, The steps include setting a predetermined target power demand, The steps include determining the power difference between the demand power and the target demand power for all the upper peak points included in the peak cluster, and the amount of power required to suppress the demand power to the target demand power from a predetermined time for each upper peak point, The steps include storing the obtained amount of required power, The steps include outputting the stored required amount of power, A power reduction simulation method characterized by having [a certain feature].

7. A power reduction simulation program that determines the amount of electricity required to reduce power demand to a predetermined target power demand, The steps include: inputting all the power consumption for each predetermined time period within a predetermined period; A step of storing each input demand power, The steps include ranking each stored power demand in descending order, The steps include: extracting the top peak points from among the ranked power demands that are within a predetermined rank; The steps include setting a peak cluster of multiple upper peak points that are located within a predetermined proximity range on a daily and hourly basis, among the aforementioned upper peak points, The steps include setting a predetermined target power demand, The steps include determining the power difference between the demand power and the target demand power for all the upper peak points included in the peak cluster, and the amount of power required to suppress the demand power to the target demand power from a predetermined time for each upper peak point, The steps include storing the obtained amount of required power, The steps include outputting the stored required amount of power, A power reduction simulation program to run.

Citation Information

Patent Citations

  • Game machine installation unit and game machine island including the game machine installation unit

    JP2018029871A

  • Power management device and power management method

    JP2019068512A

  • Electric power transaction management system

    JP2021096709A

  • Battery management device, battery management method, and battery management program

    JP2023009189A

  • Power management system, power management device, power management method and computer program

    JP2023083813A