AI Technical Summary

Technical Problem

Existing garbage crane control systems struggle to accurately record the number of stirrings during manual operation mode, making seamless switching between automatic and manual control modes difficult and leading to incorrect garbage crane control.

Method used

A garbage crane control device that determines the garbage grasping state by considering both weight changes and holding time, and updates information in real-time to accurately count stirrings, including operations like stirring, transshipment, and loading, even in manual mode.

Benefits of technology

Enables accurate recording of stirrings and other operations, ensuring correct garbage crane control after switching back to automatic mode, enhancing operational efficiency and accuracy.

✦ Generated by Eureka AI based on patent content.
Patent Text Reader

Abstract

To correctly execute automatic control of a garbage crane by accurately grasping the garbage grabbing state. The garbage crane control device 1 is a garbage crane control device that controls the operation of a garbage crane 110 that transports garbage within a garbage pit 130, and is equipped with a memory unit 14 that stores the state of garbage within the garbage pit 130, an acquisition unit 11 that acquires information related to the weight of the garbage crane 110 in real time, and a first judgment unit 12 that judges that the garbage crane 110 is in a garbage-grabbing state when a state in which the weight increase amount of the garbage crane 110 is equal to or greater than a predetermined weight threshold continues for equal to or greater than a predetermined retention second threshold based on the information acquired by the acquisition unit 11, and when the garbage crane 110 is in a garbage-grabbing state, the first judgment unit 12 updates the information in the memory unit 14 so that the number of stirrings is counted up.
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] One aspect of the present invention relates to a garbage crane control device and an information update method. [Background technology]

[0002] Patent Documents 1 to 3 describe systems for controlling the operation of a garbage crane that transports garbage in a garbage treatment facility. In such technologies, for example, the agitation state of garbage in a garbage pit is grasped, and the operation of the garbage crane is controlled to improve the agitation state. The agitation state in the garbage pit is determined, for example, based on image data of the inside of the garbage pit. Alternatively, the agitation state in the garbage pit is determined, for example, based on the number of agitations. [Prior art documents] [Patent documents]

[0003] [Patent Document 1] Patent No. 6731680 [Patent Document 2] Patent No. 6651309 [Patent Document 3] Patent No. 6659474 Summary of the Invention [Problem to be solved by the invention]

[0004] In the above-mentioned system, in addition to the automatic control mode in which the garbage crane is automatically controlled, a manual operation mode in which the garbage crane is controlled by the crane operator can be executed. For example, in the automatic control mode, the garbage crane only performs routine operations, so that the number of times of mixing (mixing state) can be recorded by tracing the mixing history by the mixing command, for example.

[0005] On the other hand, in the manual operation mode, the crane operator may perform operations that are different from the routine operations in the automatic control mode, such as opening and closing the garbage crane to remove small or long objects from the garbage, or closing the garbage crane to press the garbage and drop it into the garbage pit.

[0006] In the above-mentioned system, there are cases where the automatic control mode can be temporarily switched off and switched to the manual operation mode, but in such a case, if the number of agitations (agitation state) cannot be accurately recorded during the manual operation mode, it becomes difficult to correctly control the garbage crane based on the correct number of agitations, etc. after returning to the automatic control mode. As described above, in the past, there were cases where it was not possible to accurately control the garbage crane by seamlessly switching between the automatic control mode and the manual operation mode.

[0007] One aspect of the present invention has been made in consideration of the above-mentioned situation, and relates to a garbage crane control device and a garbage crane control method that can correctly control the garbage crane by accurately grasping the garbage gripping state related to the agitation state. [Means for solving the problem]

[0008] A garbage crane control device according to one embodiment of the present invention is a garbage crane control device that controls the operation of a garbage crane that transports garbage within a garbage pit, and is equipped with a memory unit that stores information about garbage in the garbage pit, an acquisition unit that acquires information related to the weight of the garbage crane in real time, and a first judgment unit that determines that the garbage crane is in a garbage-grabbing state when a state in which the weight increase of the garbage crane is equal to or greater than a predetermined weight threshold continues for equal to or greater than a predetermined retention second threshold based on the information acquired by the acquisition unit, and when the first judgment unit determines that the garbage crane is in a garbage-grabbing state, it updates the information in the memory unit so that the number of stirring times is counted up.

[0009] In the garbage crane control device according to one aspect of the present invention, information on the weight of the garbage crane is acquired, and if the garbage crane weight increase is equal to or greater than the weight threshold value and continues for a predetermined number of seconds or more, it is determined that the garbage crane is in a garbage grabbing state. For example, if the garbage grabbing state is determined only from the weight change, there is a risk that a temporary weight change when the garbage crane bucket is hoisted up while empty (not grabbing garbage) is also determined to be a garbage grabbing state. In this regard, by taking the number of seconds of retention into consideration in addition to the weight change, it is possible to avoid erroneously determining that the garbage crane is in a garbage grabbing state based on the above-mentioned temporary weight change, and to determine that the garbage crane is in a garbage grabbing state only when the garbage crane is truly in a garbage grabbing state. In addition, in the garbage crane control device according to one aspect of the present invention, when it is determined that the garbage crane is in a garbage grabbing state, the information in the storage unit is updated so that the number of stirring times is counted up. In this way, the number of stirring times is counted up based on information determined with high accuracy, so that the number of stirring times can be accurately recorded. The inventors of the present invention have come up with the technical idea of ​​accurately grasping the garbage grabbing state in order to accurately grasp the agitation state in the garbage pit, and the garbage crane control device according to one embodiment of the present invention grasps the garbage grabbing state by the above-mentioned method. This makes it possible to accurately grasp the agitation state in the garbage pit even in the manual operation mode, and the garbage crane control (automatic control) can be correctly executed after returning to the automatic control mode. For example, as a configuration for grasping the garbage grabbing state from the garbage crane opening (closing) operation in progress signal, it is conceivable to determine that the garbage crane is in the garbage grabbing state when the garbage crane (bucket) is opened and closed, and to count up the number of agitations. However, with this method, even if garbage is not actually being grabbed, it may be recorded as garbage being grabbed, and the number of agitations may be increased by one. On the other hand, according to one embodiment of the present invention, such a situation can be avoided.

[0010] The acquisition unit may further acquire, in real time, information indicating whether a bucket that holds garbage in the garbage crane is in an open state or a closed state, and the first determination unit may determine that the garbage grabbing state is in a case where a state in which the weight increase amount is equal to or greater than the weight threshold continues for equal to or greater than the retention second threshold and the bucket is in a closed state. In this way, the garbage grabbing state is determined based on the additional condition that the bucket is in a closed state, so that the garbage grabbing state can be determined more accurately.

[0011] The above-mentioned garbage crane control device further includes a second determination unit that determines the operation performed by the garbage crane based on the information acquired by the acquisition unit and the determination result by the first determination unit, and the acquisition unit further acquires information related to the position of the garbage crane in real time, and the second determination unit may determine that the garbage crane has performed any one of the following operations: a stirring operation in which the garbage crane mixes garbage, a throwing operation in which the garbage crane throws garbage into a furnace, or a transfer operation in which the garbage crane transfers garbage when the garbage crane has been determined to be in the garbage grabbing state by the first determination unit and the heightwise position of the garbage crane has changed by a predetermined height threshold or more, and update the information in the memory unit according to the operation performed by the garbage crane. In this way, in addition to simply determining the garbage grabbing state, when the heightwise position of the garbage crane has changed, it is determined that any one of the above-mentioned stirring operation, throwing operation, or transfer operation has been performed, and the information in the memory unit is updated according to these operations, so that the operation of the garbage crane in the manual operation mode and the state of the garbage according to the operation can be properly recorded, and the garbage crane can be more correctly controlled after returning to the automatic control mode.

[0012] The second determination unit may determine that agitation, which is an agitation operation that does not involve three-dimensional position movement, has been performed when the first determination unit determines that the garbage crane is in a garbage-grabbing state, if the heightwise position of the garbage crane has changed by more than a height threshold, and the position of the garbage crane other than in the heightwise direction has not changed by more than a predetermined movement threshold. If the position of the garbage crane has changed only in the height direction after the garbage-grabbing state has been reached, it can be estimated that agitation, which does not involve three-dimensional position movement, has been performed. Therefore, by determining that agitation has been performed as described above and recording information corresponding to the agitation, the garbage crane can be more accurately controlled after returning to the automatic control mode.

[0013] The garbage pit has a receiving pit for receiving garbage and a loading / agitation pit in which the garbage crane performs a loading operation and an agitation operation, and the second determination unit may determine that a transfer operation has been performed when the heightwise position of the garbage crane has changed by more than a height threshold value and a position other than the heightwise position of the garbage crane has changed from the position of the receiving pit to the position of the loading / agitation pit when the first determination unit determines that the garbage is being gripped. If the position of the garbage crane has changed from the position of the receiving pit to the position of the loading / agitation pit after the garbage is gripped, it can be estimated that a transfer operation has been performed. Therefore, by determining that a transfer operation has been performed as described above and recording information corresponding to the transfer operation, the garbage crane can be more accurately controlled after returning to the automatic control mode.

[0014] The garbage pit has a receiving pit for receiving garbage and a garbage dumping / agitation pit in which the garbage crane performs a dumping operation and an agitation operation, and the second determination unit may determine that a stirring operation involving three-dimensional position movement, that is, moving agitation or scattering agitation, has been performed when the heightwise position of the garbage crane has changed by more than a height threshold and a position other than the heightwise direction of the garbage crane has changed by more than a predetermined movement threshold in the garbage dumping / agitation pit in the case where the garbage grabbing state is determined by the first determination unit. If the position of the garbage crane has changed in the garbage dumping / agitation pit after the garbage grabbing state is reached, it can be estimated that moving agitation or scattering agitation involving three-dimensional position movement has been performed. Therefore, by determining that moving agitation or scattering agitation has been performed as described above and recording information corresponding to moving agitation or scattering agitation, the garbage crane can be controlled more correctly after returning to the automatic control mode.

[0015] The garbage pit has a receiving pit for receiving garbage and a garbage dumping / agitation pit in which the garbage crane performs the dumping and agitation operations, and a furnace is installed adjacent to the garbage pit, and the second determination unit may determine that the dumping operation has been performed when the garbage grabbing state is determined by the first determination unit, the heightwise position of the garbage crane has changed by more than a height threshold, and a position other than the heightwise position of the garbage crane has changed to the furnace position. If the position of the garbage crane has changed to the furnace position after the garbage grabbing state is reached, it can be estimated that the dumping operation has been performed. Therefore, by determining that the dumping operation has been performed as described above and recording information corresponding to the dumping operation, the garbage crane can be more accurately controlled after returning to the automatic control mode.

[0016] The storage unit stores information about garbage for each unit space obtained by dividing the space in the garbage pit into areas of a predetermined size, and when the first determination unit determines that the garbage-grabbing state is occurring, the garbage-related information in the storage unit may be updated for each unit space. In this way, by updating the garbage-related information for each unit space stored in the storage unit, the state of the garbage in the garbage pit can be recorded more accurately.

[0017] The memory unit stores information about garbage for each unit space obtained by dividing the space in the garbage pit into areas of a predetermined size, and for a unit space in which the second determination unit determines that an operation has been performed by the garbage crane, the information in the memory unit may be updated according to the operation performed. In this way, by updating the information according to the operation performed for each unit space stored in the memory unit, the state of the garbage in the garbage pit can be recorded more accurately.

[0018] An information updating method according to one aspect of the present invention is an information updating method related to a garbage crane that transports garbage within a garbage pit, and includes the steps of: acquiring information related to the weight of the garbage crane in real time; determining based on the acquired information whether the garbage crane is in a garbage-grabbing state, in which an object weighing more than a predetermined weight threshold is being held for a period of time more than a predetermined holding second threshold; and if it is determined that the garbage crane is in a garbage-grabbing state, updating information in a memory unit that stores information related to the garbage in the garbage pit so that the number of stirring times is counted up. Effect of the Invention

[0019] According to one aspect of the present invention, the garbage gripping state can be accurately grasped, thereby enabling correct control of the garbage crane. [Brief description of the drawings]

[0020] [Figure 1] FIG. 1 is a diagram showing a schematic diagram of a waste treatment facility including a waste crane control device according to this embodiment. [Diagram 2]FIG. 2 is a diagram illustrating an example of area setting in a garbage pit. [Diagram 3] FIG. 3 is a schematic diagram of a garbage crane. [Figure 4] FIG. 4 is a block diagram showing the functions of the garbage crane control device. [Diagram 5] FIG. 5 is a diagram for explaining the dust-grabbing state. [Figure 6] FIG. 6 is a graph for explaining the determination of the dust-grabbing state. [Figure 7] FIG. 7 is a flowchart showing the procedure of the motion determination process. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0021] Hereinafter, an embodiment of the present invention will be described with reference to the drawings. In each drawing, the same or corresponding parts are denoted by the same reference numerals, and duplicated explanations will be omitted.

[0022] Fig. 1 is a diagram showing a schematic diagram of a waste treatment facility 100 including a waste crane control device 1 according to this embodiment. The waste treatment facility 100 includes a waste crane 110, a waste pit 130, a platform 150, a waste input section 180, a furnace (not shown), and the waste crane control device 1. Note that Fig. 1 omits the illustration of a partition wall 133 (see Figs. 2(a) and (b)), which will be described later.

[0023] The furnace (not shown) processes the garbage G in the garbage pit 130 that is input through the garbage input section 180. The furnace may be, for example, a melting furnace such as a shaft-type gasification melting furnace, or an incinerator such as a stoker-type incinerator. The melting furnace is configured to stably and reliably process the garbage G by high-temperature melting (for example, 1,700 to 1,800°C) and to recycle the garbage as a harmless molten material. The incinerator is configured to process the garbage G by incinerating it. The garbage treatment facility 100 may further include a boiler and a steam turbine generator, and may be a power generation plant that generates power by processing the garbage G. It is preferable that the furnace is installed adjacent to the garbage pit 130.

[0024] The platform 150 is provided adjacent to the garbage pit 130, and is an area where garbage trucks C that transport garbage to be brought into the garbage pit 130 run. A wall 160 is provided at the boundary between the platform 150 and the garbage pit 130. The wall 160 is provided with a plurality of receiving doors 161-166. The number of receiving doors is not limited to the above (six). The garbage truck C runs on the running path 151 on the platform 150 and stops in front of any of the receiving doors 161-166. The garbage truck C stops in front of any of the receiving doors 161-166 where no other garbage truck C is stopped. The garbage truck C may also stop in front of any of the receiving doors 161-166 that are determined in consideration of the state of the garbage G in the garbage pit 130 (such as the amount of garbage G). The receiving doors 161 to 166 at which the garbage collection truck C is parked are opened, and garbage is dropped from the garbage collection truck C into the garbage pit 130, whereby the garbage G is carried into the garbage pit 130.

[0025] The garbage input section 180 is a section that connects the garbage pit 130 and the furnace (not shown), and supplies garbage G input from the garbage pit 130 to the inside of the furnace (not shown). The garbage input section 180 is located at the top of the furnace, and can be considered as one of the components of the furnace. The garbage input section 180 has multiple hoppers 181, 182 (two in this example). Garbage in the garbage pit 130 is input into the hoppers 181, 182, and is sent through the hoppers 181, 182 to the furnace (not shown). The hoppers 181, 182 may supply garbage G to the same furnace (not shown), or may supply garbage G to different furnaces (not shown).

[0026] The garbage pit 130 temporarily stores garbage G brought in by the garbage truck C. The garbage pit 130 has a receiving pit 131 and an input / mixing pit 132 (see Figs. 2(a) and (b)). Figs. 2(a) and (b) are plan views of the garbage pit 130, and are diagrams for explaining an example of area setting within the garbage pit 130. The receiving pit 131 is a portion of the garbage pit 130 that receives garbage. The receiving pit 131 is provided in a position near the platform 150 in the garbage pit 130. The input / mixing pit 132 is a portion where the garbage crane 110 performs an input operation of inputting garbage G into a furnace (not shown) via hoppers 181 and 182, and an agitation operation of mixing the garbage G. The input / mixing pit 132 is provided in a position near the garbage input section 180 in the garbage pit 130. The receiving pit 131 and the charging / mixing pit 132 are adjacent to each other via a partition wall 133. The partition wall 133 does not necessarily have to be provided.

[0027] In the garbage pit 130, the garbage crane control device 1 described below (or manual operation by the crane operator) sets areas related to the operations performed by the garbage crane 110. As shown in FIG. 2(a), each area in a plan view of the garbage pit 130 is divided into 36 addresses: 9 (1-9) x 4 (A-D). The size of each address may be set, for example, according to the size of the bucket 111 of the garbage crane 110 (see FIG. 3, described later). The number of addresses may also be determined according to the size of the garbage pit 130. The number of addresses and the way of dividing them may also be determined according to other methods or concepts.

[0028] For example, in the example shown in FIG. 2(a), the area 1-9×A of the receiving pit 131 is set as the receiving area 131a. The area 2-9×D of the input / agitation pit 132 is set as the combined area of ​​the input area 132a and the agitation area 132b. The area 2-9×B, C of the input / agitation pit 132 is set as the transfer area 132c. The area 1×B-D of the input / agitation pit 132 is set as the grass / tree shelter area 132d. The receiving area 131a is an area where the garbage G is received in the garbage pit 130. The input area 132a is an area where the garbage crane 110 performs the input operation of inputting garbage into the furnace through the hoppers 181, 182. The agitation area 132b is an area where the garbage crane 110 performs the agitation operation of mixing the garbage. The transfer area 132c is an area where the waste crane 110 performs a transfer operation to move waste from the receiving pit 131 to the input / mixing pit 132.

[0029] The area setting in the garbage pit 130 is not limited to the above, and for example, during a time period when garbage is not received from the garbage truck C, as shown in FIG. 2(b), the receiving area 131a, the transfer area 132c, and the grass and tree evacuation area 132d may not be set, and only the input area 132a and the mixing area 132b may be set. In the example shown in FIG. 2(b), the area 1-9×C,D of the input and mixing pit 132 is set as the input area 132a, and the area 1-9×B-D of the input and mixing pit 132 is set as the mixing area 132b. The area 1-9×C,D is set as a shared area for the input area 132a and the mixing area 132b. Note that the area setting shown in FIG. 2(a)(b) is merely an example, and the area setting in the garbage pit 130 is not limited to this.

[0030] Returning to FIG. 1, the garbage crane 110 is a crane that transports garbage G within the garbage pit 130. The garbage crane 110 performs the above-mentioned dumping operation, stirring operation, and loading / unloading operation in accordance with the control of the garbage crane control device 1. Note that while only one garbage crane 110 is shown in FIG. 1, multiple garbage cranes 110 may be provided. Details of the garbage crane 110 will be described with reference to FIG. 3.

[0031] Fig. 3 is a schematic diagram of a garbage crane 110. As shown in Fig. 3, the garbage crane 110 includes a bucket 111, a motor 112, a bucket opening / closing mechanism 113, a wire 114, a casing 115, a motor 116, a casing 117, motors 118 and 119, and wheels 120.

[0032] The wire 114 extends in the vertical direction, with its upper end connected to a motor 116 housed in a casing 115 and its lower end connected to a bucket opening and closing mechanism 113. The bucket opening and closing mechanism 113 is a mechanism that opens and closes the bucket 111 in response to power from the motor 112. The motor 112 is a hydraulic motor that provides power to the bucket opening and closing mechanism 113. The bucket 111 holds the waste G by clamping it therebetween.

[0033] The casing 115 is a casing that houses the motor 116. The motor 116 is a motor that winds up and down the wire 114. The casing 117 is a casing that houses the casing 115 and the load cell 400. Four wheels 120, for example, are provided on the bottom surface of the casing 117 on the front, rear, left and right sides.

[0034] The motor 118 is a travel motor that applies power to the wheels 120 to rotate the wheels 120. The wheels 120 rotate on the rails 500. As a result, the casing 117 (and the bucket 111 connected via the wires 114) with the wheels 120 attached to the lower surface thereof moves in the travel direction along the rails 500.

[0035] Motor 119 is a traverse motor that provides power to move casing 117 (and bucket 111 connected via wire 114) in a direction intersecting the above-mentioned traveling direction. In Fig. 3, rails related to traverse movement according to the power of motor 119 are not shown. In this manner, bucket 111 moves in the vertical direction based on motor 116, moves in the traveling direction based on motor 118, and moves in the horizontal direction intersecting the traveling direction based on motor 119.

[0036] The load cell 400 measures the weight of the casing 115, the motor 116, the wire 114, the motor 112, the bucket opening / closing mechanism 113, the bucket 111, and the garbage G held by the bucket 111. By measuring the weight with the load cell 400, it is possible to determine whether or not garbage G is being held by the bucket 111. A load cell 400 is provided, for example, for each wheel 120. That is, four load cells 400 are provided for each garbage crane 110. The weight of the garbage G held by the bucket 111 can be derived by subtracting the weights of the casing 115, the motor 116, the wire 114, the motor 112, the bucket opening / closing mechanism 113, and the bucket 111, which are specified in advance, from the sum of the measured values ​​of the four load cells 400.

[0037] Note that the installation location, the number of load cells 400, and the method of calculating the weight are not limited to those described above, so long as the load cells 400 can measure the weight of the waste G held by the bucket 111. For example, the load cells 400 do not necessarily have to be housed in the casing 117, and do not necessarily have to be provided for each wheel 120.

[0038] Returning to FIG. 1, the garbage crane control device 1 is a device that controls the operation of the garbage crane 110 that transports garbage G within the garbage pit 130. The garbage crane control device 1 is an electronic control unit that has a microcomputer (CPU) as well as memory elements (storage media) such as RAM and ROM. The garbage crane control device 1 has two modes for controlling the garbage crane 110: an automatic control mode in which the garbage crane 110 is automatically controlled, and a manual operation mode in which the garbage crane 110 is controlled by the operation of a crane operator. In the garbage crane control device 1, either the automatic control mode or the manual operation mode is selected to control the garbage crane 110.

[0039] The garbage crane control device 1 employs a garbage pit MAP system that makes it possible to grasp the garbage properties inside the garbage pit 130. The garbage pit MAP system is a technology that numerically models the inside of the garbage pit 130, traces the loading and movement (receiving, transferring, mixing) (transporting and conveying) of garbage G, and records the storage status of the garbage G. By utilizing this system, it is possible to continuously grasp the accumulation status and properties of garbage G throughout the entire garbage pit 130.

[0040] As shown in Fig. 1, in the garbage pit MAP system, the space within the garbage pit 130 is divided into meshes (unit spaces) (blocks), which are rectangular parallelepiped regions of a given size, and the entire garbage pit 130 is modeled. For each mesh, three data items are managed as parameters that represent the pile-up status and properties of the garbage G: (1) garbage level, (2) number of mixing times, and (3) garbage type.

[0041] The garbage level is an index that represents the garbage pile height in the garbage pit 130. The garbage level is added or subtracted for the target mesh in the garbage pit MAP system according to the operation of the garbage crane 110, such as dumping, transferring, stirring, etc. The actual garbage pile height may be estimated from the measurement results of a level sensor, such as an electromagnetic wave level meter, installed near the garbage pit 130, height information when the garbage crane 110 touches down, etc., and the garbage level in the garbage pit MAP system may be corrected based on the estimation result.

[0042] The number of mixing times is an index that indicates the degree of mixing of the garbage, and depending on the operation of the garbage crane 110, the number of mixing times is added to the target mesh in the garbage pit MAP system.

[0043] Using image recognition technology, the type of waste is distinguished and classified into normal waste and waste containing vegetation, and recorded in the corresponding mesh. When the waste crane 110 operates to move the waste G or to throw it into the furnace, the movement of the waste, including the number of times it has been stirred and the type of waste, is traced, and the information in the corresponding mesh is updated.

[0044] Such a garbage pit MAP system makes it possible to quantitatively grasp the accumulation status and properties of garbage G, and, for example, to achieve optimal mixing according to the conditions within the garbage pit 130.

[0045] As described above, the garbage crane control device 1 appropriately switches between the automatic control mode and the manual operation mode to control the garbage crane 110. Even when the two modes are switched in this way, in order to properly manage the properties of the garbage G in each mesh using the garbage pit MAP system described above, it is necessary to continuously record what actions the garbage crane 110 has performed on the garbage G.

[0046] In the automatic control mode, the waste crane 110 only performs standard operations, so for example, the number of times the waste has been stirred (the state of stirring) can be recorded by tracing the stirring history in response to a stirring command. That is, when a stirring command is issued, it is known in advance that a series of cycles will be carried out: move command to a designated waste grabbing address → lower command → landing command → close command (command to close the bucket 111) → rise command → move command to a designated waste release address → open command (command to open the bucket 111), so the number of times the waste has been stirred can be recorded by tracing the stirring history.

[0047] On the other hand, in the manual operation mode, the crane operator may perform operations that are different from the routine operations in the automatic control mode. For example, non-routine operations may be performed, such as opening and closing the garbage crane 110 to remove small or long objects from the garbage, or closing the garbage crane 110 to press the garbage and dropping it directly into the garbage pit 130. For this reason, for example, a configuration may be considered in which the garbage grabbing state is grasped from the garbage crane opening (closing) operation in progress signal, in which it is determined that the garbage crane (bucket) is in the garbage grabbing state and the number of stirring times is counted up when the garbage crane is opened and closed. However, with this method, even if garbage grabbing is not actually performed, it may be recorded as garbage grabbing and the number of stirring times may be increased by one. In this case, an inaccurate number of stirring times will be recorded.

[0048] Thus, in the manual operation mode where non-routine work is performed, it may not be possible to accurately grasp the waste gripping state, and it may not be possible to accurately record the number of agitations (and further, for example, the number of transfers and the number of times waste was gripped). If the number of agitations cannot be accurately recorded during the manual operation mode, it becomes difficult to correctly control the waste crane 110 based on the correct number of agitations, etc., after returning to the automatic control mode. Thus, it is usually difficult to accurately control the waste crane 110 by seamlessly switching between the automatic control mode and the manual operation mode.

[0049] Therefore, the garbage crane control device 1 according to this embodiment acquires information related to the weight of the garbage crane 110 in real time in the manual operation mode, judges whether the garbage crane 110 is in a garbage grabbing state in which an object with a weight equal to or greater than a predetermined weight threshold is held for a period equal to or greater than a predetermined holding second threshold, and, if the garbage crane 110 is in the garbage grabbing state, counts up and records the number of agitations. In this way, it is judged whether the garbage crane 110 is in a garbage grabbing state based on the actual weight and holding time, and the number of agitations is recorded in consideration of the judgment result, so that the number of agitations can be accurately recorded even in the manual operation mode, and the garbage crane 110 can be correctly controlled based on the correct number of agitations, etc., after returning to the automatic control mode. Below, detailed functions of the garbage crane control device 1 in the above-mentioned manual operation mode will be described with reference to Figs. 4 to 6.

[0050] Fig. 4 is a block diagram showing the functions of the garbage crane control device 1. As shown in Fig. 4, the garbage crane control device 1 includes an acquisition unit 11, a first determination unit 12, a second determination unit 13, and a storage unit 14.

[0051] The memory unit 14 stores the state of the garbage in the garbage pit 130. The memory unit 14 stores information about the garbage (the state of the garbage) for each unit space US (see FIG. 1) that divides the space in the garbage pit 130 into rectangular parallelepiped areas of a predetermined size. Specifically, the memory unit 14 stores the above-mentioned three items for each unit space US: (1) garbage level, (2) number of mixing times, and (3) garbage type.

[0052] The acquisition unit 11 acquires information related to the weight of the waste crane 110 in real time, for example, from the four load cells 400. The acquisition unit 11 acquires information related to the weight of the waste crane 110 continuously, for example, at predetermined time intervals.

[0053] The acquisition unit 11 acquires information indicating whether the bucket 111 that holds garbage in the garbage crane 110 is in an open state or a closed state from an encoder of the motor 112. The acquisition unit 11 acquires information indicating whether the bucket 111 is in an open state or a closed state continuously, for example, at a predetermined time interval. Note that the information indicating whether the bucket 111 is in an open state or a closed state may be acquired from a source other than the encoder of the motor 112. For example, a sensor that detects the opening and closing of the bucket 111 may be installed, and information indicating whether the bucket 111 is in an open state or a closed state may be acquired from the sensor.

[0054] The acquisition unit 11 acquires information relating to the position of the garbage crane 110 from the encoders of the motors 116, 118, and 119. Specifically, the acquisition unit 11 acquires the heightwise (up and down) position of the bucket 111 of the garbage crane 110 from the encoder of the motor 116, acquires the position in the travel direction of the bucket 111 of the garbage crane 110 from the encoder of the motor 118, and acquires the horizontal position intersecting the travel direction of the bucket 111 of the garbage crane 110 from the encoder of the motor 119. The acquisition unit 11 acquires information relating to the position of the garbage crane 110 continuously, for example, at a predetermined time interval.

[0055] The first determination unit 12 determines whether or not the weight increase of the waste crane 110 is equal to or greater than a predetermined weight threshold based on the information acquired by the acquisition unit 11. Specifically, the first determination unit 12 determines whether or not the weight increase of the waste crane 110 is equal to or greater than a predetermined weight threshold based on the information related to the weight of the waste crane 110 acquired by the acquisition unit 11 (information acquired from the four load cells 400). As described above, the sum of the measurement values ​​of the four load cells 400 includes, for example, the weights of the casing 115, the motor 116, the wire 114, the motor 112, the bucket opening / closing mechanism 113, and the bucket 111, and the weight of waste held by the bucket 111 (only if any is being held). The weights of the casing 115, the motor 116, the wire 114, the motor 112, the bucket opening / closing mechanism 113, and the bucket 111 are specified in advance, and the weight of the object held by the bucket 111, which is the weight increase of the garbage crane 110, is derived by subtracting these weights, which are specified in advance, from the sum of the measured values ​​of the four load cells 400. When the weight increase of the garbage crane 110 (the weight of the object held by the bucket 111) is equal to or greater than the weight threshold, the first determination unit 12 determines that an object (i.e. garbage) weighing equal to or greater than the weight threshold is being held. The weight threshold is set to the weight of garbage that is at least expected to be held by the bucket 111 when it holds garbage. The weight threshold may be set to, for example, about 50 kg. For example, when the average garbage grab amount of the bucket 111 is 1000 kg, the weight threshold may be set to about 5 to 10% of this (about 50 kg to 100 kg).

[0056] When the weight increase amount is equal to or greater than the weight threshold, the first determination unit 12 determines whether or not the state in which the weight increase amount is equal to or greater than the weight threshold continues for a predetermined holding second threshold or more. When the state in which the weight increase amount is equal to or greater than the weight threshold continues for a predetermined holding second threshold or more, the first determination unit 12 determines that the mobile phone is in a garbage-grabbing state. The holding second threshold may be set to, for example, about 2 seconds.

[0057] The garbage-grabbing state is a state in which garbage is being held by the bucket 111 of the garbage crane 110, as shown in Fig. 5(a). In this case, the bucket 111 is in a closed state. When the bucket 111 is opened, as shown in Fig. 5(b), garbage falls from the bucket 111, and the garbage-grabbing state is no longer present.

[0058] Fig. 6 is a graph for explaining the determination of the dust-grabbing state. With reference to Fig. 6, the reason for determining the dust-grabbing state by taking the holding time into consideration, rather than simply determining the dust-grabbing state from the weight change, will be explained.

[0059] Figure 6(a) shows the change in weight increase (F) over time when the bucket 111 grabs and reels in trash (the wire 114 is reeled in). Figure 6(b) shows the change in weight increase (F) over time when the bucket 111 is empty and reeling in trash (the wire 114 is reeled in). In Figures 6(a) and 6(b), the horizontal axis shows time and the vertical axis shows weight increase.

[0060] As shown in the upper diagrams of FIGS. 6(a) and (b), the weight increases immediately after winding up both when the bucket 111 is gripping garbage and when the bucket 111 is empty. This is because the measurement value of the load cell 400 is affected by the acceleration associated with winding up at the start of winding up. For this reason, for example, when the weight threshold is set to 50 kg, as shown in the upper diagram of FIG. 6(b), it is conceivable that the weight threshold may be temporarily exceeded even when the bucket 111 is empty. In this case, if the garbage-grabbing state were determined based only on the amount of weight increase exceeding the weight threshold, there is a risk of erroneously determining that the bucket 111 is gripping garbage even when it is empty.

[0061] In this regard, by setting a condition for determining that the garbage-grabbing state is present, in addition to the weight change, that the state in which the weight increase amount is equal to or greater than the weight threshold value for a predetermined holding second threshold value or more (e.g., 2 seconds or more), it is possible to avoid erroneously determining that the garbage-grabbing state is present in cases where the weight threshold value is exceeded only momentarily, as shown in the upper diagram of FIG. 6(b). When the bucket 111 is empty, the time that the weight increase during hoisting continues is, for example, less than 1 second. For this reason, by setting the holding second threshold value to 2 seconds or more as described above, it is possible to avoid erroneously determining that the garbage-grabbing state is present when the bucket 111 is empty.

[0062] The first determination unit 12 may determine that the garbage-grabbing state exists only when the state in which the weight increase amount is equal to or greater than the weight threshold continues for equal to or greater than the retention second threshold, and information indicating that the bucket 111 is in a closed state has been acquired by the acquisition unit 11. That is, the first determination unit 12 may determine that the garbage-grabbing state exists when, in addition to the above-mentioned condition of the weight increase amount continuing, the condition that the bucket 111 is in a closed state (see FIG. 5(a)) is further satisfied.

[0063] When first determination unit 12 determines that it is in the garbage-grabbing state, it updates the information in storage unit 14 so that the number of agitations is counted up. Specifically, first determination unit 12 acquires from acquisition unit 11 the position information of bucket 111 when it determines that it is in the garbage-grabbing state and the position information of bucket 111 to which the grabbed garbage is to be moved, and updates the information in storage unit 14 so that the number of agitations of the unit space US corresponding to the position information is counted up.

[0064] The second determination unit 13 determines the operation performed by the waste crane 110 based on the information acquired by the acquisition unit 11 and the determination result by the first determination unit 12. When the first determination unit 12 determines that the waste crane 110 is in the waste grabbing state, the second determination unit 13 determines that one of the stirring operation, the throwing operation, and the transfer operation has been performed if the height position of the bucket 111 of the waste crane 110 has changed by a predetermined height threshold or more. The second determination unit 13 acquires from the acquisition unit 11 the position information (waste grabbing position) of the bucket 111 when the first determination unit 12 determines that the waste crane 110 is in the waste grabbing state, and determines that one of the above-mentioned operations has been performed if the height has changed by a height threshold or more from the waste grabbing position based on the waste grabbing position. The height threshold in this case is, for example, the minimum amount of movement in the height direction that is expected when performing each of the above-mentioned operations.

[0065] The second determination unit 13 may determine that loosening and mixing, which is a mixing operation that does not involve three-dimensional position movement, has been performed when the first determination unit 12 determines that the garbage crane 110 is in a garbage grabbing state, and the height-direction position of the bucket 111 of the garbage crane 110 has changed by a predetermined height threshold or more, and the position of the garbage crane 110 other than the height direction has not changed by a predetermined movement threshold or more. The second determination unit 13 determines that loosening and mixing has been performed when the position of the garbage crane 110 in a direction intersecting the height direction (traveling direction and direction intersecting the traveling direction) acquired from the acquisition unit 11 has not changed by a predetermined movement threshold or more, although the height direction has changed from the garbage grabbing position (changing by a height threshold or more) based on the garbage grabbing position described above. In this case, the movement threshold is set to, for example, the minimum movement amount in the horizontal direction intersecting the height direction (traveling direction and direction intersecting the traveling direction) assumed when performing a loading operation, a moving and mixing / scattering mixing (described later), or a throwing operation.

[0066] The second determination unit 13 may determine that a transfer operation has been performed when the first determination unit 12 has determined that the garbage crane 110 is in a garbage grabbing state, and the heightwise position of the bucket 111 of the garbage crane 110 has changed by a predetermined height threshold or more, and the position of the garbage crane 110 other than the heightwise direction has changed from the position of the receiving pit 131 to the position of the input and mixing pit 132. The second determination unit 13 may determine that a transfer operation has been performed when the position in the horizontal direction (traveling direction and direction intersecting the traveling direction) intersecting the height direction, acquired from the acquisition unit 11, has changed from the position of the receiving pit 131, which is the garbage grabbing position, to the position of the input and mixing pit 132, based on the above-mentioned garbage grabbing position. The second determination unit 13 may determine that a transfer operation has been performed when the position when the bucket 111 has been in an open state, acquired from the acquisition unit 11, is an input and mixing pit 132, based on the above-mentioned garbage grabbing position. Note that the second determination unit 13 may determine that the end point of the position change is the garbage release position. The second determination unit 13 may determine that the position when the information that the bucket 111 has been in an open state is acquired from the acquisition unit 11, is the garbage release position, when garbage grabbing has been detected. In addition, the second judgment unit 13 may further reset the garbage grab detection if the state in which the weight increase amount is less than the weight threshold continues for a predetermined time (e.g., 2 seconds) or more, determining that all garbage has been released from the bucket 111.

[0067] The second determination unit 13 may determine that moving agitation or scattering agitation, which is an agitation operation involving three-dimensional position movement, has been performed when the first determination unit 12 determines that the garbage crane 110 is in a garbage grabbing state, if the heightwise position of the bucket 111 of the garbage crane 110 has changed by a predetermined height threshold or more, and the position of the garbage crane 110 other than the heightwise direction has changed by a predetermined movement threshold or more within the input / agitation pit 132. The second determination unit 13 determines that moving agitation or scattering agitation has been performed when the position in the horizontal direction (traveling direction and direction intersecting the traveling direction) intersecting the height direction, acquired from the acquisition unit 11, has changed by a predetermined movement threshold or more only within the input / agitation pit 132, based on the above-mentioned garbage grabbing position. The second determination unit 13 may determine that the end point of the position change is the garbage release position.

[0068] The second determination unit 13 may determine that a dumping operation has been performed when the first determination unit 12 has determined that the garbage crane 110 is in a garbage grabbing state, the heightwise position of the bucket 111 of the garbage crane 110 has changed by a predetermined height threshold or more, and the position of the garbage crane 110 other than in the heightwise direction has changed to the position of the furnace. The second determination unit 13 may determine that a dumping operation has been performed when the position in the horizontal direction (traveling direction and direction intersecting the traveling direction) intersecting the height direction acquired from the acquisition unit 11 has changed to the garbage dump section 180. The second determination unit 13 may determine that an end point of the position change is the garbage release position.

[0069] The second determination unit 13 updates the information in the memory unit 14 in accordance with the operation performed by the waste crane 110. For a unit space US (see FIG. 1) in which it has been determined that any operation has been performed by the waste crane 110, the second determination unit 13 updates the information in the memory unit 14 in accordance with the operation performed.

[0070] The second determination unit 13 may update the information in the memory unit 14 so that the number of agitations is counted up for the unit space US where it is determined that loosening and agitation has been performed. That is, the number of agitations may be counted up for the unit space US where the garbage crane 110 that performed loosening and agitation is located (where the garbage grabbed by loosening and agitation is located). The second determination unit 13 may update the information in the memory unit 14 so that the number of agitations is counted up for the unit space US where it is determined that the transfer operation has been performed. That is, the number of agitations may be counted up for the unit space US where the garbage release position of the transfer operation (the destination of the garbage crane 110) is located. The second determination unit 13 may update the information in the memory unit 14 so that the number of agitations is counted up for the unit space US where it is determined that the moving and agitating or scattering and agitating has been performed. That is, the number of agitations may be counted up for the unit space US where the garbage release position of the moving and agitating is located (the destination of the garbage crane 110). Also, the number of times of mixing may be counted up in each uppermost unit space US (multiple unit spaces US into which the grabbed garbage is scattered and falls) that is on the movement path of the garbage crane that performs scattering and mixing. When the second determination unit 13 determines that the throwing operation has been performed, it is preferable not to update the information in the memory unit 14 so as to count up the number of times of mixing for the unit space US where it has been determined that the throwing operation has been performed.

[0071] Next, the procedure of the operation determination process executed by the garbage crane control device 1 will be described with reference to Fig. 7. Fig. 7 is a flowchart showing the procedure of the operation determination process.

[0072] 7, in the garbage crane control device 1, first, various information is acquired (step S1). Specifically, information related to the weight of the garbage crane 110 is acquired in real time from the load cell 400, and information related to the position of the garbage crane 110 is acquired from the encoders of the motors 116, 118, and 119.

[0073] Next, based on the information acquired by the acquisition unit 11, it is determined whether the weight increase of the garbage crane 110 is equal to or greater than a predetermined weight threshold, and whether the state in which the weight increase is equal to or greater than the weight threshold has continued for a predetermined holding second threshold or more (step S2). If it is determined in step S2 that the weight increase of the garbage crane 110 is equal to or greater than the predetermined weight threshold, and the state in which the weight increase is equal to or greater than the weight threshold has continued for a predetermined holding second threshold or more, it is determined that the garbage crane 110 is in a garbage grabbing state. In this case, the information in the memory unit 14 for the corresponding unit space US is updated so that the number of agitations is counted up.

[0074] If it is determined that the garbage crane 110 is in a garbage grabbing state, it is determined whether or not there has been a change in the position of the bucket 111 of the garbage crane 110 (step S3). If there has been a change in position, it is determined whether or not the change in position is only a change in the height direction (step S4). In other words, it is determined whether or not the height direction position of the bucket 111 of the garbage crane 110 has changed by more than a predetermined height threshold, and whether or not any position of the garbage crane 110 other than the height direction has changed by more than a predetermined movement threshold.

[0075] In step S4, if it is determined that only the position change in the height direction has occurred, it is determined that loosening and mixing has been performed once (step S5). In this case, the information in the storage unit 14 is updated so that the number of mixing times is counted up for the unit space US in which it is determined that loosening and mixing has been performed.

[0076] If it is determined in step S4 that there is a position change other than in the height direction, it is determined whether there is a movement from the position of the receiving pit 131 to the position of the input mixing pit 132 (step S6). If it is determined in step S6 that there is a movement from the position of the receiving pit 131 to the position of the input mixing pit 132, it is determined that one transfer operation has been performed (step S7). In this case, the information in the memory unit 14 is updated so that the number of mixing times is counted up for the unit space US in which it is determined that the transfer operation has been performed.

[0077] If it is determined in step S6 that the movement is not from the position of the receiving pit 131 to the position of the input mixing pit 132, it is determined whether the movement is within the input mixing pit 132 (step S8). If it is determined in step S8 that the movement is within the input mixing pit 132, it is determined that one time of moving mixing or scattering mixing has been performed (step S9). In this case, the information in the memory unit 14 is updated so that the number of mixing times is counted up for the unit space US where it is determined that moving mixing or scattering mixing has been performed.

[0078] In step S8, if it is determined that the movement is not within the throwing and stirring pit 132, that is, if it is determined that the movement is to the furnace, it is determined that the throwing operation has been performed (step S10).

[0079] Next, the effects of the garbage crane control device 1 according to this embodiment will be described.

[0080] The garbage crane control device 1 of this embodiment is a garbage crane control device that controls the operation of a garbage crane 110 that transports garbage within a garbage pit 130, and is equipped with a memory unit 14 that stores information about garbage in the garbage pit 130, an acquisition unit 11 that acquires information related to the weight of the garbage crane 110 in real time, and a first judgment unit 12 that determines that the garbage crane 110 is in a garbage grabbing state when a state in which the weight increase amount of the garbage crane 110 is equal to or greater than a predetermined weight threshold continues for equal to or greater than a predetermined retention second threshold based on the information acquired by the acquisition unit 11, and when the first judgment unit 12 determines that the garbage crane 110 is in a garbage grabbing state, it updates the information in the memory unit 14 so that the number of stirring times is counted up.

[0081] In the garbage crane control device 1, information on the weight of the garbage crane 110 is acquired, and if the garbage crane 110 continues to have a weight increase equal to or greater than the weight threshold for a predetermined number of seconds or more, it is determined that the garbage crane 110 is in the garbage grabbing state. For example, if the garbage grabbing state is determined only from the weight change, there is a risk that a temporary weight change when the garbage crane 110's bucket 111 is hoisted up in an empty (not grabbing garbage) state may also be determined to be the garbage grabbing state. In this regard, by considering the weight change as well as the number of seconds of retention, it is possible to avoid erroneously determining that the temporary weight change is the garbage grabbing state, and to determine that the garbage crane 110 is in the garbage grabbing state only when the garbage crane 110 is truly in the garbage grabbing state. In addition, in the garbage crane control device 1 according to this embodiment, when it is determined that the garbage crane 110 is in the garbage grabbing state, the information in the memory unit 14 is updated so that the number of agitation times is counted up. In this way, the number of agitation times is counted up based on the garbage grabbing state determined with high accuracy, so that the number of agitation times can be accurately recorded. The inventors of the present invention have arrived at the technical idea of ​​accurately determining the garbage grabbing state in order to accurately determine the agitation state in the garbage pit 130. The garbage crane control device 1 according to this embodiment grasps the garbage gripping state using the method described above, which allows the garbage crane 110 to be correctly controlled (automatically controlled) after returning to the automatic control mode.

[0082] The acquisition unit 11 may further acquire in real time information indicating whether the bucket 111 that holds garbage in the garbage crane 110 is in an open or closed state, and the first determination unit 12 may determine that the garbage grabbing state is in effect when the state in which the weight increase amount is equal to or greater than the weight threshold continues for equal to or greater than the retention second threshold and the bucket 111 is in a closed state. In this way, the garbage grabbing state is determined with the additional condition that the bucket 111 is in a closed state, so that the garbage grabbing state can be determined more accurately.

[0083] The above-mentioned garbage crane control device 1 further includes a second judgment unit 13 which judges the operation performed by the garbage crane 110 based on the information acquired by the acquisition unit 11 and the judgment result by the first judgment unit 12, and the acquisition unit 11 further acquires information related to the position of the garbage crane 110 in real time, and when the first judgment unit 12 judges that the garbage crane 110 is in a garbage-grabbing state, the second judgment unit 13 judges that the garbage crane 110 has performed one of the following operations: a stirring operation of mixing garbage, a throwing operation of throwing garbage into a furnace, or a transfer operation of transferring garbage, and updates the information in the memory unit 14 according to the operation performed by the garbage crane 110 when the vertical position of the garbage crane 110 has changed by more than a predetermined height threshold when the first judgment unit 12 judges that the garbage crane 110 is in a garbage-grabbing state. In this way, in addition to simply determining the garbage-grabbing state, if the vertical position of the garbage crane 110 has changed, it is determined that one of the above-mentioned stirring, dumping, or loading operations has been performed, and the information in the memory unit 14 is updated according to these operations, thereby appropriately recording the operation of the garbage crane 110 in manual operation mode and the state of the garbage according to said operation, and enabling more accurate control of the garbage crane 110 after returning to the automatic control mode.

[0084] The second determination unit 13 may determine that agitation, which is an agitation operation that does not involve three-dimensional position movement, has been performed when the first determination unit 12 determines that the garbage crane 110 is in the garbage grabbing state, if the heightwise position of the garbage crane 110 has changed by more than a height threshold value, and the position of the garbage crane 110 other than the heightwise direction has not changed by more than a predetermined movement threshold value. If the position of the garbage crane 110 has changed only in the height direction after the garbage grabbing state, it can be estimated that agitation without three-dimensional position movement has been performed. Therefore, by determining that agitation has been performed as described above and recording information corresponding to the agitation, the garbage crane 110 can be more accurately controlled after returning to the automatic control mode.

[0085] The second determination unit 13 may determine that a transfer operation has been performed when the first determination unit 12 has determined that the garbage crane 110 is in the garbage grabbing state, and the heightwise position of the garbage crane 110 has changed by more than the height threshold value, and the position of the garbage crane 110 other than the heightwise direction has changed from the position of the receiving pit 131 to the position of the input mixing pit 132. If the position of the garbage crane 110 has changed from the position of the receiving pit 131 to the position of the input mixing pit 132 after the garbage grabbing state is entered, it can be presumed that a transfer operation has been performed. Therefore, by determining that a transfer operation has been performed as described above and recording information corresponding to the transfer operation, the garbage crane 110 can be more accurately controlled after returning to the automatic control mode.

[0086] The second determination unit 13 may determine that a moving agitation or scattering agitation, which is an agitation operation involving three-dimensional position movement, has been performed when the first determination unit 12 determines that the garbage crane 110 is in the garbage grabbing state, if the height-wise position of the garbage crane 110 has changed by more than the height threshold value, and the position of the garbage crane 110 other than the height-wise direction has changed within the input / agitation pit 132. If the position of the garbage crane 110 has changed within the input / agitation pit 132 after the garbage grabbing state, it can be estimated that a moving agitation or scattering agitation involving three-dimensional position movement has been performed. Therefore, by determining that a moving agitation or scattering agitation has been performed as described above and recording information corresponding to the moving agitation or scattering agitation, the garbage crane 110 can be more accurately controlled after returning to the automatic control mode.

[0087] The second judgment unit 13 may judge that a dumping operation has been performed when the first judgment unit 12 judges that the garbage crane 110 is in the garbage grabbing state, the vertical position of the garbage crane 110 has changed by more than a height threshold, and a position other than the vertical position of the garbage crane 110 has changed to the furnace position. If the position of the garbage crane 110 has changed to the furnace position after the garbage grabbing state, it can be presumed that a dumping operation has been performed. Therefore, by judging that a dumping operation has been performed as described above and recording information corresponding to the dumping operation, the garbage crane 110 can be more accurately controlled after returning to the automatic control mode.

[0088] The memory unit 14 stores information about garbage for each unit space US obtained by dividing the space within the garbage pit 130 into areas of a predetermined size, and when the first determination unit 12 determines that a garbage-grabbing state is occurring, the garbage information in the memory unit 14 may be updated for each unit space US. In this way, by updating the garbage information for each unit space US stored in the memory unit 14, the state of the garbage within the garbage pit 130 can be recorded more accurately.

[0089] The memory unit 14 stores information about garbage for each unit space US obtained by dividing the space within the garbage pit 130 into areas of a predetermined size, and for a unit space US in which the second determination unit 13 determines that an operation has been performed by the garbage crane 110, the information in the memory unit 14 may be updated in accordance with the operation performed. In this way, by updating the information in accordance with the operation performed for each unit space US stored in the memory unit 14, the state of the garbage in the garbage pit 130 can be recorded more accurately.

[0090] The disclosure in this specification should be considered to be illustrative and not restrictive in all respects. In other words, various omissions, substitutions, modifications, etc. may be made to the above examples without departing from the scope of the claims and the gist thereof.

[0091] For example, if it is determined that the garbage crane is in a garbage-grabbing state, the information indicating that the garbage crane is in a garbage-grabbing state is updated in the memory unit (for example, an information update is performed such as setting a garbage-grabbing flag or counting up the number of times garbage has been grabbed), and the number of times the garbage has been grabbed may (or may not) be counted up depending on the operation performed by the garbage crane thereafter. A garbage crane control device that controls the operation of a garbage crane that transports garbage in a garbage pit, A storage unit that stores information about the garbage in the garbage pit; An acquisition unit that acquires information related to the weight of the garbage crane in real time; and a first determination unit that determines that the garbage crane is in a garbage grabbing state when a state in which an increase in weight of the garbage crane is equal to or greater than a predetermined weight threshold continues for a predetermined holding time threshold or more based on the information acquired by the acquisition unit, a garbage crane control device, wherein the first determination unit updates information regarding the agitation state of garbage in the garbage pit among the information stored in the memory unit when the first determination unit determines that the garbage is gripping the garbage; may be also possible.

[0092] determining the agitation state of the garbage in the garbage pit based on the number of garbage grabs and the actions performed by the garbage crane; A garbage crane control device that controls the next operation of the garbage crane according to the agitation state. may be also possible.

[0093] The device has a manual operation mode and an automatic control mode (automatic operation mode), a garbage crane control device, wherein the first determination unit determines the garbage grabbing state in a manual operation mode; may be also possible.

[0094] a garbage crane control device that, in an automatic control mode, determines the agitation state of garbage in the garbage pit in a manner different from that in the manual operation mode, and controls the next operation of the garbage crane according to the agitation state; The garbage grabbing state may be determined in the automatic control mode in the same manner as in the manual operation mode, in which case the garbage grabbing state can be accurately determined even if the garbage crane (bucket) fails to grab garbage (i.e., strikes the target). [Explanation of symbols]

[0095] 1...garbage crane control device, 11...acquisition unit, 12...first judgment unit, 13...second judgment unit, 14...memory unit, 110...garbage crane, 111...bucket, 130...garbage pit, 131...receiving pit, 132...feeding and mixing pit, US...unit space.

Claims

1. A garbage crane control device that controls the operation of a garbage crane that transports garbage in a garbage pit, A storage unit that stores information about the garbage in the garbage pit; An acquisition unit that acquires information related to the weight of the garbage crane in real time; a first determination unit that determines that the garbage crane is in a garbage grabbing state when a state in which an increase in weight of the garbage crane is equal to or greater than a predetermined weight threshold continues for a predetermined holding time threshold or more based on the information acquired by the acquisition unit; A second determination unit that determines an operation performed by the garbage crane based on the information acquired by the acquisition unit and the determination result by the first determination unit; Equipped with The acquisition unit further acquires information related to the position of the garbage crane in real time, when the first determination unit determines that the dust-grabbing state is established, the first determination unit updates the information in the storage unit so that the number of stirring times is counted up; The second determination unit is When the first judgment unit judges that the garbage is being gripped, if the heightwise position of the garbage crane has changed by more than a predetermined height threshold, it is judged that the garbage crane has performed one of the following operations: a stirring operation in which the garbage is mixed by the garbage crane, a throwing operation in which the garbage is thrown into a furnace by the garbage crane, or a transfer operation in which the garbage is transferred by the garbage crane; A garbage crane control device that updates the information in the memory unit according to operations performed by the garbage crane.

2. The acquisition unit further acquires information indicating whether a bucket for holding garbage in the garbage crane is in an open state or a closed state in real time, The garbage crane control device according to claim 1, wherein the first judgment unit judges that the garbage grabbing state is in progress when the state in which the weight increase amount is equal to or greater than the weight threshold continues for equal to or greater than the hold second threshold and the bucket is in a closed state.

3. The garbage crane control device of claim 1, wherein the second judgment unit judges that the garbage crane is in the garbage grabbing state by the first judgment unit, and when the heightwise position of the garbage crane has changed by more than the height threshold and the position of the garbage crane other than in the height direction has not changed by more than a predetermined movement threshold, the second judgment unit judges that the stirring operation, which does not involve three-dimensional position movement, has been performed,

4. The garbage pit has a receiving pit for receiving garbage and a garbage dumping / mixing pit in which the garbage crane performs the dumping operation and the mixing operation, A garbage crane control device as described in claim 1, wherein the second judgment unit judges that the garbage crane is in the garbage grabbing state by the first judgment unit, and when the heightwise position of the garbage crane has changed by more than the height threshold and a position other than the heightwise position of the garbage crane has changed from the position of the receiving pit to the position of the input mixing pit, the second judgment unit judges that the transfer operation has been performed.

5. The garbage pit has a receiving pit for receiving garbage and a garbage dumping / mixing pit in which the garbage crane performs the dumping operation and the mixing operation, The garbage crane control device of claim 1, wherein the second judgment unit judges that the garbage crane is in the garbage grabbing state by the first judgment unit, and when the heightwise position of the garbage crane has changed by more than the height threshold and a position other than the heightwise position of the garbage crane has changed by more than a predetermined movement threshold within the input mixing pit, the mixing operation involving three-dimensional position movement, namely moving mixing or scattering mixing, has been performed.

6. The garbage pit has a receiving pit for receiving garbage and a garbage dumping / mixing pit in which the garbage crane performs the dumping operation and the mixing operation, The furnace is installed adjacent to the waste pit, A garbage crane control device as described in claim 1, wherein the second judgment unit judges that the loading operation has been performed when the first judgment unit judges that the garbage grabbing state is being established, the vertical position of the garbage crane has changed by more than the height threshold, and a position other than the vertical position of the garbage crane has changed to the position of the furnace.

7. The storage unit stores information about garbage for each unit space obtained by dividing the space in the garbage pit into areas of a predetermined size, The garbage crane control device according to claim 1 , wherein when the first determination unit determines that the garbage is being gripped, the garbage-related information in the memory unit is updated for each unit space.

8. The storage unit stores information about garbage for each unit space obtained by dividing the space in the garbage pit into areas of a predetermined size, The garbage crane control device according to claim 1 , wherein the information in the memory unit is updated in accordance with the operation performed for the unit space in which the second determination unit determines that any operation has been performed by the garbage crane.

9. A garbage crane control device as described in claim 1, wherein when the first judgment unit determines that the garbage grabbing state is established and the second judgment unit determines that the stirring operation has been performed, the information in the memory unit is updated so that the number of stirring times is counted up.

10. A garbage crane control device as described in claim 1, wherein when the first judgment unit determines that the garbage grabbing state is established and the second judgment unit determines that the transfer operation has been performed, the information in the memory unit is updated so that the number of stirring times is counted up.

11. A garbage crane control device as described in claim 1, wherein when the first judgment unit determines that the garbage grabbing state is established and the second judgment unit determines that the throwing operation has been performed, the information in the memory unit is not updated such that the number of stirring times is counted up.

12. A garbage crane control device as described in claim 8, wherein when the first judgment unit determines that the garbage is being grabbed and the second judgment unit determines that a stirring operation involving three-dimensional position movement has been performed, the information in the memory unit is updated so that the number of times the garbage grabbed by the garbage crane is being moved in the unit space is counted up.

13. A garbage crane control device as described in claim 8, wherein when the first judgment unit determines that the garbage is being grabbed and the second judgment unit determines that a stirring operation has been performed without three-dimensional positional movement, the information in the memory unit is updated so that the number of stirrings in the unit space corresponding to the location of the garbage grabbed by the garbage crane is counted up.

14. The garbage crane includes a manual operation mode in which the garbage crane is controlled by an operation of a crane operator, and an automatic control mode in which the garbage crane is automatically controlled, as a mode for controlling the operation of the garbage crane; The garbage crane control device according to claim 1 , wherein the first determination unit determines the garbage gripping state in the manual operation mode.

15. The garbage crane control device according to claim 14 , wherein the first determination unit determines the garbage gripping state in both the manual operation mode and the automatic control mode.

16. An information update method for a garbage crane that transports garbage in a garbage pit, comprising: obtaining information on the weight of the garbage crane and information on the position of the garbage crane in real time; A step of determining whether the garbage crane is in a garbage grabbing state, in which an object having a weight equal to or greater than a predetermined weight threshold is held for a time equal to or greater than a predetermined holding time threshold, based on the acquired information; updating information in a memory unit that stores information about the garbage in the garbage pit so that the number of stirring times is counted up when it is determined that the garbage is being grasped; and determining an operation performed by the garbage crane based on the information acquired in the acquiring step and the determination result of whether the garbage crane is in a garbage grabbing state. When it is determined that the garbage is being gripped, if the vertical position of the garbage crane has changed by more than a predetermined height threshold, it is determined that the garbage crane has performed one of the following operations: a stirring operation in which the garbage is mixed by the garbage crane, a feeding operation in which the garbage is fed into a furnace by the garbage crane, or a transfer operation in which the garbage is transferred by the garbage crane; An information updating method for updating information in the memory unit in accordance with operations performed by the waste crane.