Abstract

The present invention relates to a sunshade device for pouring concrete in the rain. A sunshade device for pouring concrete in the rain according to embodiments of the present invention comprises: a sunshade unit having a sunshade membrane that covers the upper part of a slab formwork for forming a slab of a building and is positioned on the upper part of the slab formwork; and a sunshade unit support member that is coupled to the slab formwork and supports the sunshade unit, wherein the sunshade unit support member comprises: a vertical support member whose lower end is positioned at a predetermined location on the slab formwork; and a horizontal support member that is coupled to the upper end of the vertical support member and supports the sunshade unit. According to the sunshade device for pouring concrete in the rain according to the embodiments of the present invention, by placing a sunshade unit equipped with a sunshade on the upper part of a slab formwork used to form a slab at a construction site of a building, the sunshade can be used with a simpler structure to improve not only the shading and sunshade effects but also the curing effect according to the working environment at the construction site, such as heatwaves, snowfall, and cold waves, as well as rainy environments such as rain and showers.
Need to check novelty before this filing date? Find Prior Art

Description

Technology Field

[0001] The present invention relates to a sunshade device for pouring concrete in the rain, and more specifically, to a sunshade device for pouring concrete in the rain that can improve the shading and sunshade effects as well as the curing effect by using a sunshade membrane according to working environments at construction sites such as rain, showers, heatwaves, snowfall, and cold waves, as well as rain environments such as rain and showers, with a simpler structure, and can increase the efficiency of construction work such as pouring concrete for forming walls and slabs when the sunshade unit is combined. Background Technology

[0002] Generally, walls and slabs of buildings such as apartments, public housing, and high-rise buildings are constructed by installing wall formwork and slab formwork of various structures and then pouring and curing concrete.

[0003] Wall formwork is installed on both sides of a wall to maintain a certain spacing to form the walls of a building. Recently, for the construction of core or exterior walls in multi-story buildings, gang forms—large steel structures that integrate formwork panels for exterior wall concrete pouring with cages for formwork installation, dismantling, and concrete finishing—are being used.

[0004] Slab formwork is a formwork in which concrete is poured from the top to form a slab that functions as a floor or ceiling between floors of a building, and it generally consists of formwork panels (plywood), joists, yoke, and supports (shoring). For example, the structure of a general slab formwork is disclosed in Korean Registered Patent Publication No. 10-0638848 (Slab formwork of a building) (published on October 25, 2006), etc.

[0005] Meanwhile, most construction sites cannot provide protection from snow or rain, making it impossible for workers to proceed with construction tasks. Consequently, there was a problem in that snow or rain at the construction site disrupted the work process, inevitably leading to delays in the construction period.

[0006] In addition, when concrete is poured to form walls or slabs when the temperature drops below freezing in winter, there was a problem in that not only was the curing of the concrete not carried out smoothly, but the poor curing of the concrete also caused delays in construction work and a deterioration in the quality of the building.

[0007] Therefore, in order to proceed with the construction of walls and slabs using wall formwork and slab formwork at a construction site, it is common practice to install tents or covers through separate temporary structures for purposes such as shading from snow or rain, and curing and protecting the concrete.

[0008] For example, Korean registered patent publication No. 10-1904832 (Tent construction method for building construction) (published on October 5, 2018) and Korean registered patent publication No. 10-0828087 (Temporary construction system for all-weather construction) (published on May 6, 2008) disclose the structure of a shading device in which a tent or shading screen is installed for the purposes of shading, sun protection, and protection at a construction site where wall and slab construction work is performed.

[0009] However, the sunshade devices disclosed in the aforementioned patent documents have a structure in which the sunshade is installed before construction work on a wall or slab is performed and the sunshade is retrieved after the construction work is completed. Therefore, not only is the overall structure complex, but the entire construction work is cumbersome and time-consuming in that the installation, collection, and dismantling of the sunshade must be performed separately.

[0010] Therefore, there is a need for a sunshade device for pouring concrete in rainy conditions that can improve shading, sunshade, and protection effects by using a sunshade screen according to working conditions at construction sites, such as heatwaves, snowfall, and cold waves, as well as rainy conditions such as rain and showers, with a simpler structure, and can also increase the efficiency of construction work, such as pouring concrete for forming walls and slabs, when the sunshade unit is combined. Prior art literature

[0011] Korean Registered Patent Publication No. 10-0638848 (Slab Formwork for Buildings) (Published October 25, 2006) Korean Registered Patent Publication No. 10-1904832 (Tent Construction Method for Building Construction) (Published October 5, 2018) Korean Registered Patent Publication No. 10-0828087 (Temporary Construction System for All-Weather Construction) (Published May 6, 2008) The problem to be solved

[0012] The present invention was developed to improve the aforementioned problems. The problem that the present invention aims to solve is to provide a sunshade device for pouring concrete in rainy conditions, which can improve the shading and sunshade effects as well as the curing effect by using a sunshade to suit working conditions at a construction site, such as heatwaves, snowfall, and cold waves, as well as rainy conditions such as rain and showers, by placing a sunshade unit equipped with a sunshade on the upper part of a slab formwork used to form a slab at a construction site, thereby increasing the efficiency of construction work, such as pouring concrete for forming walls and slabs, while the sunshade unit is combined.

[0013] The technical problems of the present invention are not limited to those mentioned above, and other unmentioned technical problems will be clearly understood by those skilled in the art from the description below. means of solving the problem

[0014] To achieve the above objective, a sunshade device for pouring concrete in rain according to embodiments of the present invention comprises: a sunshade unit having a sunshade membrane that covers the upper part of a slab formwork for forming a slab of a building and is positioned on the upper part of the slab formwork; and a sunshade unit support member coupled to the slab formwork and supporting the sunshade unit, wherein the sunshade unit support member comprises: a vertical support member whose lower end is positioned at a predetermined location on the slab formwork; and a horizontal support member coupled to the upper end of the vertical support member and supporting the sunshade unit.

[0015] For example, the slab formwork comprises a sleeve member into which the vertical support member is inserted and which supports the central portion of the vertical support member in a state where the vertical support member is inserted through it, wherein the vertical support member comprises: a pipe member into which the sleeve member is inserted through and whose outer surface is supported by the sleeve member; and a first support member provided at the lower end of the pipe member and which is placed at the lower part of the slab formwork and supported by a first slab after concrete curing is completed.

[0016] As another example, the slab formwork comprises a sleeve member into which the vertical support member is inserted and which supports the upper portion of the vertical support member in a state where the vertical support member is inserted through it, wherein the vertical support member comprises: a pipe member into which the outer surface of the upper portion is inserted through the sleeve member and which is supported by the sleeve member; a first support member provided on the outer surface of the central portion of the pipe member and coupled to the upper portion of a first through hole formed through a first slab that is placed at the bottom of the slab formwork and has completed concrete curing, thereby supporting the outer surface of the central portion of the pipe member; and a second support member provided at the bottom of the pipe member and which is supported by a second slab that is placed at the bottom of the first slab and has completed concrete curing.

[0017] At this time, the vertical support member is characterized by having at least one arranged along the central part of the length direction or width direction of the slab formwork.

[0018] In addition, the above-mentioned sunshade unit is characterized by having a pair provided facing both sides relative to the horizontal support member.

[0019] Additionally, the sunshade unit comprises: a sunshade membrane whose length changes from the central portion in the longitudinal or width direction of the slab formwork toward the outer edge of the slab formwork; a fixed bracket coupled to the horizontal support member; a roller shaft rotatably installed inside the fixed bracket and winding or pulling out the sunshade membrane by rotation; a front bar spaced apart from the front end of the roller shaft and supporting the front end of the sunshade membrane pulled out from the roller shaft; and a pair of folding arms, one end of which is rotatably connected to the fixed bracket and the other end of which is rotatably connected to the front bar, and which support the sunshade membrane pulled out from the roller shaft or wound by the roller shaft.

[0020] Specific details of other embodiments are included in the detailed description and drawings. Effects of the invention

[0021] According to the sunshade device for pouring concrete in the rain according to the embodiments of the present invention, by placing a sunshade unit equipped with a sunshade on the upper part of a slab formwork used to form a slab at a construction site of a building, the sunshade can be used with a simpler structure to improve not only the shading and sunshade effects but also the curing effect according to the working environment at the construction site, such as heatwaves, snowfall, and cold waves, as well as rainy environments such as rain and showers.

[0022] In addition, according to the sunshade device for pouring concrete in the rain according to the embodiments of the present invention, by configuring the vertical support member of the sunshade unit support member that supports the sunshade unit placed on the upper part of the slab formwork to be supported by a sleeve member provided in the slab formwork and at least one slab placed on the lower part of the slab formwork and having completed concrete curing, construction work such as pouring concrete for forming walls and slabs can be easily performed while the sunshade unit is combined, and the sunshade unit can be lifted directly to the upper floor and used without the need for disassembly, collection, and reinstallation work of the sunshade unit after the pouring and curing of concrete for forming walls and slabs is completed, thereby increasing the efficiency of construction work.

[0023] The effects of the present invention are not limited to those mentioned above, and other unmentioned effects will be clearly understood by those skilled in the art from the description in the claims. Brief explanation of the drawing

[0024] FIG. 1 is a perspective view showing the structure of a sunshade device for pouring concrete in the rain according to the first embodiment of the present invention. FIG. 2 is a front view showing the structure of a sunshade device for pouring concrete in the rain according to the first embodiment of the present invention. FIG. 3 is a perspective view showing the structure of a sunshade unit constituting a sunshade device for pouring concrete in the rain according to the first embodiment of the present invention. FIG. 4 is an exploded perspective view showing the structure of a sunshade unit constituting a sunshade device for pouring concrete in the rain according to the first embodiment of the present invention. FIG. 5 is a plan view showing the structure of a sunshade unit constituting a sunshade device for pouring concrete in the rain according to the first embodiment of the present invention. FIG. 6 is a plan view showing a modified example of a sunshade unit constituting a sunshade device for pouring concrete in the rain according to the first embodiment of the present invention. FIG. 7 is a perspective view showing the structure of a sunshade unit support member constituting a sunshade device for pouring concrete in the rain according to the first embodiment of the present invention. FIG. 8 is a side view showing the structure of a sunshade unit support member constituting a sunshade device for pouring concrete in the rain according to the first embodiment of the present invention. FIG. 9 is a perspective view showing the structure of a sunshade device for pouring concrete in the rain according to a second embodiment of the present invention. FIG. 10 is a front view showing the structure of a sunshade device for pouring concrete in the rain according to a second embodiment of the present invention. FIG. 11 is a perspective view showing the structure of a sunshade unit support member constituting a sunshade device for pouring concrete in the rain according to a second embodiment of the present invention. FIG. 12 is a side view showing the structure of a sunshade unit support member constituting a sunshade device for pouring concrete in the rain according to a second embodiment of the present invention. Specific details for implementing the invention

[0025] Hereinafter, preferred embodiments of the present invention will be described in detail with reference to the attached drawings so that a person skilled in the art to which the present invention pertains can easily practice the present invention.

[0026] In describing the embodiments, technical details that are well known in the art to which the present invention belongs and are not directly related to the present invention are omitted. This is intended to convey the essence of the present invention more clearly without obscuring it by omitting unnecessary explanations.

[0027] For the same reason, some components in the attached drawings have been exaggerated, omitted, or schematically depicted. Additionally, the size of each component does not entirely reflect its actual dimensions. Identical or corresponding components in each drawing have been assigned the same reference numbers.

[0028] Additionally, regarding terms such as device or element orientation (e.g., "front," "back," "up," "down," "top," "bottom," "left," "right," "lateral"), it will be understood that the expressions and terms used herein are used merely to simplify the description of the invention and do not indicate or imply that the related device or element must simply have a specific orientation.

[0029] Furthermore, throughout the specification, when a part is described as being "connected" to another part, this includes not only cases where they are "directly connected," but also cases where they are "indirectly connected" with other members in between. Additionally, when a part is described as "including" a certain component, this may mean that it includes additional components rather than excluding other components, unless specifically stated otherwise.

[0030] Hereinafter, the present invention will be described with reference to the drawings for explaining a sunshade device for pouring concrete in rainy weather according to embodiments of the present invention.

[0031] First, with reference to FIGS. 1 to 8, the structure of a sunshade device for pouring concrete in the rain according to the first embodiment of the present invention will be described.

[0032] FIG. 1 is a perspective view showing the structure of a sunshade device for pouring concrete in the rain according to a first embodiment of the present invention, and FIG. 2 is a front view showing the structure of a sunshade device for pouring concrete in the rain according to a first embodiment of the present invention.

[0033] As illustrated in FIGS. 1 and 2, a sunshade device (1) for pouring concrete in the rain according to the first embodiment of the present invention may be configured to include a sunshade unit (100) and a sunshade unit support (200).

[0034] The sunshade unit (100) is positioned on the upper part of the slab formwork (30), and a sunshade membrane (110) covering the upper part of the slab formwork (30) may be provided.

[0035] As illustrated in FIG. 2, the wall formwork (20) is installed on the wall (11) of the building (10), and a slab formwork (30) can be attached to the top. Additionally, the slab formwork (30) is placed on the top of the wall formwork (20) for forming the wall (11) of the building (10), and concrete can be poured on the top to form the slab (S) of the building (10).

[0036] The slab formwork (30) is formed by pouring concrete from the top to form a slab (S) that functions as a floor or ceiling between floors of a building, and may be composed of a plurality of plywood or metal panels assembled to form the shape of the slab in direct contact with the poured concrete.

[0037] Although not shown in the drawings, the slab formwork (30) may further include a plurality of joists supporting a plurality of plywood or metal panels, a plurality of yokees arranged vertically with respect to the plurality of joists and supporting the plurality of joists, and a plurality of supports (shoring) arranged below the plurality of plywood, etc. to support the plurality of yokees and installed vertically on the upper surface of the concrete cured slab (12).

[0038] Meanwhile, FIG. 1 illustrates an example of using a gang form as an example of a wall formwork (20). As shown in FIG. 1, a wall formwork (20) in the form of a gang form may be configured to include a plate positioned facing the outer surface of a wall (11) of a building (10), a plurality of horizontal supports arranged at regular intervals along the vertical direction of the plate and supporting the plate in the horizontal direction, and a plurality of vertical supports installed at regular intervals along the horizontal direction of the plate and supporting the plurality of horizontal supports.

[0039] Although not shown, the plate may be formed so that a portion of its interior is open to correspond to an opening formed in the wall (11) of the building (10) for installing a balcony, etc. For convenience of explanation, FIG. 1 schematically illustrates an example in which a wall formwork (20) in the form of a gang form includes a plate, a plurality of horizontal supports and a plurality of vertical supports, but may further include a work platform (not shown), a lifting hook (not shown), etc.

[0040] The specific structure of the sunshade unit (100) shown in FIGS. 1 and FIGS. 2 will be described in detail later with reference to FIGS. 3 to 6.

[0041] The sunshade unit support member (200) is coupled to the slab formwork (30) and can support the sunshade unit (100). As shown in FIGS. 1 and 2, the sunshade unit support member (200) may be configured to include at least one vertical support member (210) and a horizontal support member (220). The specific structure of such a sunshade unit support member (200) will be described in detail later with reference to FIGS. 7 and 8.

[0042] For convenience of explanation, FIGS. 1 and 2 illustrate an example in which one sunshade unit support (200) is installed on one slab formwork (30) and two sunshade units (100) are installed on one sunshade unit support (200), but this is not limited thereto, and the number and arrangement of sunshade units (100) and sunshade unit support (200) installed on one slab formwork (30) can be changed by a person skilled in the art.

[0043] Hereinafter, with reference to FIGS. 3 to 6, the structure of a sunshade unit (100) constituting a sunshade device (1) for pouring concrete in the rain according to the first embodiment of the present invention will be described in detail.

[0044] FIG. 3 is a perspective view showing the structure of a sunshade unit constituting a sunshade device for pouring concrete in the rain according to the first embodiment of the present invention, FIG. 4 is an exploded perspective view showing the structure of a sunshade unit constituting a sunshade device for pouring concrete in the rain according to the first embodiment of the present invention, and FIG. 5 is a plan view showing the structure of a sunshade unit constituting a sunshade device for pouring concrete in the rain according to the first embodiment of the present invention.

[0045] As illustrated in FIGS. 3 to 5, the sunshade unit (100) may have a foldable structure that can fold and unfold a sunshade curtain (110) made of fabric material. This sunshade unit (100) may be configured to include a sunshade curtain (110), a fixing bracket (120), a roller shaft (130), a front bar (140), and a folding arm (150).

[0046] The length of the sunshade (110) can change from the center of the slab formwork (30) in the longitudinal or width direction toward the outer edge of the slab formwork (30). That is, the length of the sunshade (110) can change by being pulled out from the roller shaft (130) by an external force pulling it while it is wound on the roller shaft (130) or by the rotation of the roller shaft (130).

[0047] As illustrated in FIGS. 3 and 4, a fixed bracket (120) is coupled to a horizontal support member (220) that constitutes a sunshade unit support (200), and a roller shaft (130) is rotatably installed inside the fixed bracket (120) so that the sunshade curtain (110) can be wound or pulled out by rotation. Additionally, a front bar (140) is spaced apart from the front end of the roller shaft (130) and can support the front end of the sunshade curtain (110) pulled out from the roller shaft (130).

[0048] A pair of folding arms (150) may be provided on both sides in the width direction of the awning (110), and are structured to unfold the awning (110) drawn out from the roller shaft (130) or to fold the awning (110) wound by the roller shaft (130).

[0049] As illustrated in FIGS. 3 and 4, each folding arm (150) has one end rotatably connected to a fixed bracket (120) and the other end rotatably connected to a front bar (140), and can support a sunshade (110) that is drawn out from a roller shaft (130) or wound by a roller shaft (130).

[0050] Preferably, each folding arm (150) may be composed of a first arm (151) and a second arm (152) that are hinged to each other. That is, one end of a pair of first arms (151) may be rotatably connected to each end of a roller shaft (130), and one end of a pair of second arms (152) may be rotatably connected to the other end of each of a pair of first arms (151) and the other end may be rotatably connected to each end of a front bar (140).

[0051] Meanwhile, the sunshade unit (100) may be manually driven by a worker to wind up or pull out the sunshade film (110), or it may be automatically driven by a separate driving means such as a motor or cylinder.

[0052] First, in the case of manual operation by an operator, the operator can rotate the roller shaft (130) to wind up the sunshade (110) or pull the front bar (140) to pull out the sunshade (110).

[0053] Conversely, in the case of automatic driving by a separate driving means, the sunshade unit (100) may further include an actuator for rotating a roller shaft (130) to wind or unwind a sunshade (110) or an actuator for driving a pair of folding arms (150).

[0054] FIG. 6 is a plan view showing a modified example of a sunshade unit constituting a sunshade device for pouring concrete in the rain according to the first embodiment of the present invention.

[0055] For example, as illustrated in FIG. 6(a), the sunshade unit (100) may include a roller shaft drive unit (160) that is installed at at least one end of the fixed bracket (120) and provides rotational driving force to the roller shaft (130).

[0056] As another example, as illustrated in FIG. 6(b), the awning unit (100) may include a folding arm drive unit (170) connected to one end of each of a pair of folding arms (150) and providing rotational driving force to one end of each of the pair of folding arms (150) when a roller shaft (130) rotates to wind or unwind the awning curtain (110). Preferably, the folding arm drive unit (170) may be connected to one end of a first arm (151) constituting each folding arm (150) (in the example of FIG. 6(b), the lower end of the first arm (151)) to provide rotational driving force.

[0057] As another example, although not illustrated, the sunshade unit (100) may include both a roller shaft drive (160) (Fig. 6 (a)) for providing rotational driving force to the roller shaft (130) and a folding arm drive (170) (Fig. 6 (b)) for providing rotational driving force to each end of a pair of folding arms (150).

[0058] Meanwhile, in FIGS. 3 to 6, a sunshade unit (100) having a foldable structure is described as an example, but the type and structure of the sunshade unit (100) can be changed by a person skilled in the art.

[0059] Hereinafter, with reference to FIGS. 7 and 8, the structure of the sunshade unit support member (200) constituting the sunshade device (1) for pouring concrete in the rain according to the first embodiment of the present invention will be described in detail.

[0060] FIG. 7 is a perspective view showing the structure of a sunshade unit support member constituting a sunshade device for pouring concrete in the rain according to the first embodiment of the present invention, and FIG. 8 is a side view showing the structure of a sunshade unit support member constituting a sunshade device for pouring concrete in the rain according to the first embodiment of the present invention.

[0061] As illustrated in FIGS. 7 and 8, the sunshade unit support (200) may be configured to include at least one vertical support member (210) and a horizontal support member (220).

[0062] The lower end of the vertical support member (210) is positioned at a predetermined location on the slab formwork (30), and the horizontal support member (220) is connected to the upper end of the vertical support member (210) and can support the sunshade unit (100). FIGS. 7 and 8 illustrate an example in which the sunshade unit support member (200) is composed of two vertical support members (210) and one horizontal support member (220), but the number and arrangement of the vertical support members (210) and the horizontal support member (220) can be changed by a person skilled in the art.

[0063] Preferably, the vertical support member (210) constituting the sunshade unit support (200) may be supported by the first slab (12A) after concrete curing, with the central part and the lower part respectively positioned at the slab formwork (30) and the lower part of the slab formwork (30).

[0064] First, as illustrated in FIGS. 7 and 8, the slab formwork (30) may include a sleeve member (32) that supports the central part of the vertical support member (210) with the vertical support member (210) inserted through it.

[0065] As illustrated in FIG. 8, the sleeve member (32) can be inserted and coupled into a through hole (31a) formed vertically at a predetermined location in a panel body (31), such as a plurality of plywood panels constituting the slab formwork (30). This sleeve member (32) can be pre-embedded in the through hole (31a) of the panel body (31) to support the vertical support member (210).

[0066] Additionally, as shown in FIGS. 7 and 8, each vertical support member (210) may be configured to include a pipe member (211) and a first support member (212).

[0067] The pipe member (211) is inserted through the sleeve member (32) so as to be movable up and down, and its outer surface can be supported by the sleeve member (32). Additionally, the first support member (212) is provided at the bottom of the pipe member (211) and can be supported by the first slab (12A) which is placed at the bottom of the slab formwork (30) and has finished concrete curing.

[0068] At this time, the first support member (212) can act as a breaker to prevent the lower end of the pipe member (211) from moving downward by the upper surface of the first slab (12).

[0069] Preferably, as shown in FIG. 7, the first support member (212) has a shape in which a thin plate-shaped member is bent into a 'C' shape to wrap around the lower outer surface of the pipe member (211), and can be rotatably coupled to the lower outer surface of the pipe member (211) by a fastening member (212a) such as a bolt, screw, or pin.

[0070] Meanwhile, FIGS. 7 and 8 illustrate an example in which the first support member (212) has a shape bent into a 'C' shape and is rotatably coupled to the lower outer surface of the pipe member (211), but this is not limited thereto, and the shape and coupling method of the first support member (212) can be changed by a person skilled in the art.

[0071] In this way, the sunshade unit support member (200) can stably support the sunshade unit (100) with a simpler structure by means of a sleeve member (32) provided in the slab formwork (30) and a first support member (212) provided in the vertical support member (210).

[0072] Meanwhile, preferably, as shown in FIGS. 2 and 7, at least one vertical support member (210) constituting the vehicle unit support member (200) may be arranged along the central portion of the slab formwork (30) in the longitudinal or width direction. FIGS. 2 and 7 illustrate an example in which two vertical support members (210) are arranged along the central portion of the slab formwork (30) in the longitudinal direction (left-right direction in the example of FIG. 2), but are not limited thereto.

[0073] Accordingly, the sunshade unit (100) supported by the vehicle unit support (200) can minimize the length (i.e., area) of the sunshade membrane (110) that extends from the center of the slab formwork (30) in the longitudinal or width direction toward the outer edge of the slab formwork (30).

[0074] Additionally, preferably, as shown in FIGS. 2 and 7, a pair of sunshade units (100) may be provided facing both sides based on a horizontal support member (220) that constitutes a sunshade unit support (200).

[0075] Accordingly, the sunshade unit (100) can minimize the length (i.e., area) of the sunshade curtain (110) that extends from the sunshade unit support (200) positioned along the central part of the slab formwork (30) in the longitudinal or widthwise direction toward the outer edge of the slab formwork (30), and can also cover the sunshade curtain (110) up to an area that includes both the slab formwork (30) and the wall formwork (20).

[0076] Meanwhile, although not illustrated, the sunshade unit support member (200) is installed in a position adjacent to the horizontal support member (220) and may further include an angle adjustment member (not illustrated) for adjusting the angle at which the sunshade unit (100) is installed on the horizontal support member (220). For example, the angle adjustment member is installed between the horizontal support member (220) and the fixed bracket (120) constituting the sunshade unit (100), and the sunshade unit (100) can be rotatably coupled to the horizontal support member (220) by the angle adjustment member.

[0077] In this way, if the sunshade unit support member (200) further includes an angle adjustment member, the angle of the sunshade curtain (110) unfolded from the sunshade unit (100) can be adjusted according to the working environment, such as heatwaves, rain, or snowfall.

[0078] Hereinafter, with reference to FIGS. 9 to 12, the structure of a sunshade device for pouring concrete in the rain according to a second embodiment of the present invention will be described. For convenience of explanation, the description of a structure substantially identical to the first embodiment shown in FIGS. 1 to 8 will be omitted, and the following description will focus only on the differences.

[0079] FIG. 9 is a perspective view showing the structure of a sunshade device for pouring concrete in the rain according to a second embodiment of the present invention, FIG. 10 is a front view showing the structure of a sunshade device for pouring concrete in the rain according to a second embodiment of the present invention, FIG. 11 is a perspective view showing the structure of a sunshade unit support member constituting a sunshade device for pouring concrete in the rain according to a second embodiment of the present invention, and FIG. 12 is a side view showing the structure of a sunshade unit support member constituting a sunshade device for pouring concrete in the rain according to a second embodiment of the present invention.

[0080] The sunshade device (2) for pouring concrete in rain according to the second embodiment of the present invention shown in FIGS. 9 and 10 differs from the first embodiment shown in FIGS. 1 and 2 in that the upper outer surface, the central outer surface, and the lower end of the vertical support member (310) constituting the sunshade unit support part (300) are each supported by a slab formwork (30), a first slab (12A), and a second slab (12B) that are spaced apart from each other in the vertical direction.

[0081] That is, as illustrated in FIGS. 9 and 10, the sunshade device (2) for pouring concrete in the rain according to the second embodiment of the present invention may be configured to include a sunshade unit (100) and a sunshade unit support member (300). Since the slab formwork (30), sunshade unit (100), and horizontal support member (220) illustrated in FIGS. 9 and 10 are substantially the same as those in the first embodiment illustrated in FIGS. 1 and 2, a redundant description is omitted.

[0082] As shown in FIGS. 11 and 12, each vertical support member (310) may be configured to include a pipe member (311), a first support member (312), and a second support member (313).

[0083] Preferably, the pipe member (311) can be supported by a slab formwork (30), a first slab (12A), and a second slab (12B), the upper outer surface, the central outer surface, and the lower end of which are spaced apart from each other in the vertical direction.

[0084] That is, as illustrated in FIGS. 11 and 12, the upper outer surface of the pipe member (311) is supported by a sleeve member (32) provided in the slab formwork (30), the central outer surface is supported by a first slab (12A) placed at the bottom of the slab formwork (30) and after concrete curing is completed, and the lower end can be supported by a second slab (12B) placed at the bottom of the first slab (12A) and after concrete curing is completed.

[0085] As illustrated in FIG. 12, a first through hole (h1) may be formed through the first slab (12A) in an upward and downward direction at a position corresponding to a through hole (31a) formed in the panel body (31) of the slab formwork (30). Additionally, the outer surface of the central part of the pipe member (311) may be supported by a first support member (312) while the pipe member (311) is inserted through the first through hole (h1) formed through the first slab (12A).

[0086] At this time, the first support member (312) has a wedge shape or a truncated cone shape with a triangular cross-section and is inserted and coupled between the upper end of the first through hole (h1), that is, between the outer surface of the central part of the pipe member (311) and the inner surface of the first through hole (h1), thereby controlling the movement of the pipe member (311) in the up and down direction and supporting the outer surface of the central part of the pipe member (311).

[0087] Meanwhile, the second support member (313) is provided at the bottom of the pipe member (311) and can be supported by the second slab (12A). At this time, the second support member (313) can prevent the bottom of the pipe member (311) from moving downward by the upper surface of the second slab (12B). Since this second support member (313) is substantially the same as the first support member (212) of the first embodiment shown in FIG. 7, a redundant description is omitted.

[0088] In this way, the sunshade device (1, 2) for pouring concrete in the rain according to the embodiments of the present invention can improve the shading and sunshade effects, as well as the protection effect, by using the sunshade (110) according to the working environment at the construction site, such as heatwaves, snowfall, and cold waves, as well as rainy environments such as rain and showers, by placing a sunshade unit (100) equipped with a sunshade (110) on the upper part of a slab formwork (30) used to form a slab (S) at the construction site with a simpler structure.

[0089] In addition, the sunshade device (1, 2) for pouring concrete in the rain according to embodiments of the present invention is configured such that a vertical support member (210, 310) of a sunshade unit support part (200, 300) supporting a sunshade unit (100) placed on the upper part of a slab formwork (30) is supported by a sleeve member (32) provided in the slab formwork (30) and by at least one slab (12, 12A, 12B) placed on the lower part of the slab formwork (30) and having completed concrete curing, thereby not only making it easy to perform construction work such as pouring concrete for forming a wall (11) and a slab (12) while the sunshade unit (100) is combined, but also allowing the sunshade unit (100) to be moved to the upper floor without the need for disassembly, collection, and reinstallation work of the sunshade unit (100) after the pouring and curing of concrete for forming the wall (11) and a slab (12) is completed. Since it can be lifted and used as is, the efficiency of construction work can be increased.

[0090] Meanwhile, the present specification and drawings disclose preferred embodiments of the present invention. Although specific terms have been used, they are used merely in a general sense to facilitate the explanation of the technical content of the present invention and to aid in understanding the invention, and are not intended to limit the scope of the present invention. It is obvious to those skilled in the art that, in addition to the embodiments disclosed herein, other variations based on the technical concept of the present invention are possible. Explanation of the symbols

[0091] <Explanation of symbols for major parts of the drawing> 1, 2: Shade device for pouring concrete in the rain 10: Buildings 11: Wall 12: Slav 20: Wall formwork 30: Slab formwork 31: Panel body 31a: Through hole 32: Sleeve member 100: Sunshade unit 110: Sunshade 120: Fixing bracket 130: Roller shaft 140: Front Bar 150: Folding arm 200: Sunshade unit support 210: Vertical support member 211: Pipe member 212: First supporting member 220: Horizontal support member 300: Shade unit support 310: Vertical support member 311: Pipe member 312: First supporting member 313: Second support member 320: Horizontal support member

Claims

Claim 1 A sunshade device for pouring concrete in rain, characterized in that it comprises: a sunshade unit positioned on the upper part of a slab formwork for forming a slab of a building and having a sunshade membrane covering the upper part of the slab formwork; and a sunshade unit support member coupled to the slab formwork and supporting the sunshade unit, wherein the sunshade unit support member comprises: a vertical support member whose lower end is positioned at a predetermined location on the slab formwork; and a horizontal support member coupled to the upper end of the vertical support member and supporting the sunshade unit. Claim 2 A sunshade device for pouring concrete in rain, characterized in that, in claim 1, the slab formwork comprises a sleeve member into which the vertical support member is inserted and which supports the central portion of the vertical support member in a state where the vertical support member is inserted through, wherein the vertical support member comprises: a pipe member into which the sleeve member is inserted through and whose outer surface is supported by the sleeve member; and a first support member provided at the lower end of the pipe member, disposed at the lower part of the slab formwork, and supported by a first slab after concrete curing is completed. Claim 3 A sunshade device for pouring concrete in rain, characterized in that, in claim 1, the slab formwork comprises a sleeve member into which the vertical support member is inserted and which supports the upper end of the vertical support member in a state where the vertical support member is inserted through, and the vertical support member comprises: a pipe member into which the outer surface of the upper end is inserted through the sleeve member and which is supported by the sleeve member; a first support member provided on the outer surface of the central part of the pipe member and coupled to the upper end of a first through hole formed through a first slab that is placed at the bottom of the slab formwork and has completed concrete curing, thereby supporting the outer surface of the central part of the pipe member; and a second support member provided at the bottom of the pipe member and which is supported by a second slab that is placed at the bottom of the first slab and has completed concrete curing. Claim 4 A sunshade device for pouring concrete in rain, characterized in that, in any one of claims 1 to 3, at least one vertical support member is arranged along the central portion of the longitudinal or width direction of the slab formwork. Claim 5 A sunshade device for pouring concrete in rain, characterized in that, in claim 4, the sunshade unit is provided as a pair facing both sides relative to the horizontal support member. Claim 6 In claim 4, the sunshade unit comprises: a sunshade membrane whose length changes from the central portion in the longitudinal or width direction of the slab formwork toward the outer edge of the slab formwork; a fixed bracket coupled to the horizontal support member; a roller shaft rotatably installed inside the fixed bracket and winding or pulling out the sunshade membrane by rotation; a front bar spaced apart from the front end of the roller shaft and supporting the front end of the sunshade membrane pulled out from the roller shaft; and a pair of folding arms, one end of which is rotatably connected to the fixed bracket and the other end of which is rotatably connected to the front bar, and which support the sunshade membrane pulled out from the roller shaft or wound by the roller shaft.