Fire safety apparatus and operation method the same for performance testing of electric power-based hybrid system
Patent Information
- Application Number
- KR1020250022322
- Authority / Receiving Office
- KR · KR
- Patent Type
- Patents
- Current Assignee / Owner
- Filing Date
- 2025-02-20
- Publication Date
- 2026-09-15
- Estimated Expiration
- 2045-02-20
Smart Images

Figure 112025019931543-PAT00001_ABST
Abstract
Description
Technology Field
[0001] The present invention relates to a fire safety device for performance testing of a power-based hybrid system and a method of operation thereof, and more specifically, to a fire safety device for performance testing of a power-based hybrid system and a method of operation thereof that prevents and suppresses a fire that may occur during the performance testing of a power-based hybrid system by using a cooling water supply device. Background Technology
[0003] Recently, the importance of safety devices and safety measures for performance testing of power-based hybrid systems has been highlighted.
[0004] A power-based hybrid system, comprising a fuel cell system, power conversion system, power distribution system, power load system, battery system, cooling module, and cooling water supply system, requires safety devices and appropriate control methods to prevent accidents such as fire and explosion that may occur during performance testing.
[0005] In addition, since a dedicated laboratory environment equipped with various safety measures is required for performance testing of power-based hybrid systems, general fire safety devices such as fire detection sensors and fire extinguishing systems are provided for laboratory safety management.
[0006] However, in the case of power-based hybrid systems, there is a possibility of fire and explosion due to electrical factors, chemical factors, and overheating, as they include hydrogen fuel cells, water electrolysis systems, power conversion systems, battery systems, and high-voltage cables.
[0007] In particular, energy storage systems (ESS), such as battery systems, have a high risk of fire due to thermal runaway, and if thermal runaway occurs, the fire spreads rapidly and is difficult to suppress.
[0008] Therefore, in the case of power-based hybrid systems, it is required to provide additional emergency fire response devices in addition to the basic fire safety devices equipped in the laboratory.
[0009] Meanwhile, conventional power-based hybrid systems use a cooling water supply device to set the operating temperature conditions of a normal test object.
[0010] However, since these conventional power-based hybrid systems use the cooling water supply device solely to set the operating temperature conditions of the test subject, there is a problem in that they cannot provide the function of an additional emergency fire response device capable of delaying battery thermal runaway and heat transfer phenomena in the components of the power-based hybrid system. Prior art literature
[0012] Korean Registered Patent Publication No. 10-2507576 (Registered on March 3, 2023) Korean Published Patent Publication No. 10-2024-0037432 (Published on March 22, 2024) Korean Published Patent Publication No. 10-2023-0044043 (Published on April 3, 2023) The problem to be solved
[0013] The objective of the present invention, which aims to solve the above problem, is to provide a fire safety device for performance testing of a power-based hybrid system and a method of operation thereof, capable of responding to a fire that may occur during performance testing of a power-based hybrid system by utilizing a cooling water supply device included in the power-based hybrid system. means of solving the problem
[0015] To achieve the above objective, a fire safety device for performance testing of a power-based hybrid system according to an embodiment of the present invention is a fire safety device for performance testing of a power-based hybrid system including a fuel cell, a battery, a power distribution device, or a power conversion system, characterized by comprising: a heat blocking unit that blocks heat diffusing in the space between each of the fuel cell, the battery, the power distribution device, or the power conversion system using cooling water supplied to the power-based hybrid system; and a cooling water control unit that controls the cooling water supplied to the heat blocking unit.
[0016] In addition, the cooling water control unit of the fire safety device for performance testing of a power-based hybrid system according to an embodiment of the present invention is characterized by measuring the temperature of the power-based hybrid system using attached temperature sensors or thermal imaging sensors installed at multiple locations.
[0017] In addition, the fire safety device for performance testing of a power-based hybrid system according to an embodiment of the present invention further comprises a heat cutoff control valve that controls the cooling water supplied to the heat cutoff unit by opening and closing according to a cooling water control signal received from a cooling water control unit.
[0018] In addition, the heat cutoff control valve of the fire safety device for performance testing of a power-based hybrid system according to an embodiment of the present invention is characterized by controlling the flow rate of the cooling water supplied to the heat cutoff unit in real time using a proportional control method.
[0019] In addition, the heat blocking part of the fire safety device for performance testing of a power-based hybrid system according to an embodiment of the present invention is installed in the space between the above, and is characterized in that the internal flow path through which the cooling water travels is formed as a partition structure.
[0020] In addition, the heat blocking portion of the fire safety device for performance testing of a power-based hybrid system according to an embodiment of the present invention is characterized by forming the internal flow path with heat-resistant silicone and installing it in close contact with the shape of the power-based hybrid system component.
[0021] And, to achieve the above objective, a fire safety device for performance testing of a power-based hybrid system according to an embodiment of the present invention is a fire safety device for performance testing of a power-based hybrid system including a fuel cell, a battery, a power distribution device, or a power conversion system, and is characterized by comprising: a heat blocking unit that blocks heat diffusing in the space between each of the fuel cell, the battery, the power distribution device, or the power conversion system using cooling water supplied to the power-based hybrid system; a battery cooling unit that cools the battery by immersing it in the cooling water; and a cooling water control unit that controls the cooling water supplied to the heat blocking unit and the battery cooling unit.
[0022] In addition, the fire safety device for performance testing of a power-based hybrid system according to an embodiment of the present invention further comprises a battery cooling control valve that controls the cooling water supplied to the battery cooling unit by opening and closing according to a cooling water control signal received from the cooling water control unit.
[0023] In addition, the battery cooling control valve of the fire safety device for performance testing of a power-based hybrid system according to an embodiment of the present invention is characterized by supplying cooling water to the battery cooling unit using an on / off type control method when the valve is opened according to the cooling water control signal.
[0024] In addition, the battery cooling unit of the fire safety device for performance testing of a power-based hybrid system according to an embodiment of the present invention is characterized by comprising: a liquid immersion tank formed to immerse the battery; and a cooling water spray nozzle for spraying cooling water into the liquid immersion tank.
[0025] In addition, the liquid immersion tank of the fire safety device for performance testing of a power-based hybrid system according to an embodiment of the present invention is characterized by receiving a cooling water control signal from the cooling water control unit and immersing the battery when a temperature above a preset temperature is detected by any one of the temperature measuring sensors of the cooling water control unit.
[0026] In addition, the cooling water spray nozzle of the fire safety device for performance testing of a power-based hybrid system according to an embodiment of the present invention is characterized by spraying cooling water into the liquid immersion tank by adjusting the spray angle, flow rate, or pressure according to a control signal received from the cooling water control unit, and removing toxic gases or fine particles generated from a fire in the battery using the sprayed cooling water.
[0027] In addition, the fire safety device for performance testing of a power-based hybrid system according to an embodiment of the present invention is characterized by further including an immersion tank control valve that controls the cooling water inside the immersion tank to recover the cooling water supplied to the immersion tank.
[0028] And, to achieve the above objective, a method of operation of a fire safety device for performance testing of a power-based hybrid system according to an embodiment of the present invention, wherein the method of operation of a fire safety device for performance testing of a power-based hybrid system including a fuel cell, a battery, a power distribution device, or a power conversion system comprises: (a) a step in which a cooling water control unit controlling cooling water supplied to the power-based hybrid system supplies cooling water to a heat blocking unit disposed in the space between each of the fuel cell, the battery, the power distribution device, or the power conversion system; (b) a step in which the cooling water control unit measures a temperature using a temperature measuring sensor installed at a plurality of locations of the power-based hybrid system; and (c) a step in which, when a temperature greater than a preset temperature is measured at any one of the plurality of locations and the cooling water control unit transmits a cooling water control signal to a battery cooling unit that cools the battery, the battery cooling unit immerses the battery in a liquid immersion tank.
[0029] In addition, step (a) of the method of operation of a fire safety device for performance testing of a power-based hybrid system according to an embodiment of the present invention further comprises the step of the cooling water control unit controlling a heat blocking control valve that supplies cooling water to the heat blocking unit to regulate the flow rate of the cooling water supplied to the heat blocking unit.
[0030] In addition, step (c) of the method of operation of a fire safety device for performance testing of a power-based hybrid system according to an embodiment of the present invention further comprises the step of, when the battery cooling unit receives the cooling water control signal from the cooling water control unit, the cooling water spray nozzle of the battery cooling unit sprays cooling water into the immersion tank.
[0031] In addition, the method of operation of a fire safety device for a performance test of a power-based hybrid system according to an embodiment of the present invention further comprises the step of (d) recovering the cooling water supplied to the immersion tank through an immersion tank control valve that controls the cooling water inside the immersion tank when the temperature of the battery immersed in the immersion tank decreases to a preset temperature or lower.
[0032] And, to achieve the above objective, the fire safety device for performance testing of a power-based hybrid system according to an embodiment of the present invention is characterized by operating using the method of operation of the fire safety device for performance testing of a power-based hybrid system according to the embodiment of the present invention described above.
[0034] Specific details of other embodiments are included in "Specific details for implementing the invention" and the attached "drawings".
[0035] The advantages and / or features of the present invention and the methods for achieving them will become clear by referring to the various embodiments described below in detail together with the accompanying drawings.
[0036] However, it should be understood that the present invention is not limited to the configurations of each embodiment disclosed below, but may be implemented in various different forms, and that each embodiment disclosed in this specification is provided merely to make the disclosure of the present invention complete and to fully inform those skilled in the art of the scope of the present invention, and that the present invention is defined only by the scope of each claim of the claims. Effects of the invention
[0038] According to the present invention, by controlling the direction of cooling water flow to a water-cooled thermal shield module installed between components included in a power-based hybrid system using a cooling water emergency control device, heat transfer between components included in a power-based hybrid system can be prevented.
[0039] In addition, according to the present invention, by supplying cooling water to an immersion tank in the event of an explosion or fire in a battery device included in a power-based hybrid system using a cooling water emergency control device connected to a temperature sensor, the thermal runaway phenomenon of the battery device that has exploded or caught fire can be delayed through the immersion tank.
[0040] In addition, according to the present invention, by forming an internal flow path for cooling water for thermal shielding according to the shape of the power-based hybrid system component, it can be applied to all performance test environments where various types of components are used.
[0041] In addition, according to the present invention, a water scrubber effect is generated through the injection of cooling water, thereby enabling the removal of harmful gases and fine dust caused by fire. Brief explanation of the drawing
[0043] FIG. 1 is a configuration diagram showing the configuration of a fire safety device for performance testing of a water-cooled power-based hybrid system according to one embodiment of the present invention. FIG. 2 is a configuration diagram showing the configuration of a fire safety device for performance testing of a water-cooled and air-cooled power-based hybrid system according to another embodiment of the present invention. FIG. 3 is a flowchart illustrating the operation method of a fire safety device for performance testing of a power-based hybrid system according to one embodiment of the present invention. Specific details for implementing the invention
[0044] Before describing the present invention in detail, it should be understood that the terms and words used in this specification should not be interpreted as being limited to their ordinary or dictionary meanings, and that the inventor of the present invention may appropriately define and use the concepts of various terms to best describe their invention, and furthermore, that these terms and words should be interpreted in a meaning and concept consistent with the technical spirit of the present invention.
[0045] In other words, it should be understood that the terms used in this specification are used merely to describe preferred embodiments of the present invention and are not intended to specifically limit the content of the present invention, and that these terms are defined in consideration of various possibilities of the present invention.
[0046] In addition, it should be noted that in this specification, singular expressions may include plural expressions unless the context clearly indicates a different meaning, and that even if they are expressed in a similarly plural form, they may include the meaning of the singular.
[0047] Throughout this specification, where it is stated that a component "includes" another component, unless specifically stated otherwise, this may mean that it does not exclude any other component but may include any other component.
[0048] Furthermore, it should be noted that in cases where it is stated that a component "exists inside or is installed in connection with" another component, this component may be installed in direct connection or contact with the other component, or it may be installed at a certain distance apart, and in the case where it is installed at a certain distance apart, there may be a third component or means for fixing or connecting the component to the other component, and a description of this third component or means may be omitted.
[0049] On the other hand, if it is stated that one component is "directly connected" or "directly connected" to another component, it should be understood that there is no third component or means.
[0050] Likewise, other expressions describing the relationship between each component, such as “between” and “right between”, or “adjacent to” and “directly adjacent to”, should be interpreted as having the same intent.
[0051] In addition, it should be understood that in this specification, terms such as “one side,” “other side,” “one side,” “other side,” “first,” “second,” etc., are used to clearly distinguish one component from another component, and that the meaning of the component is not restricted by such terms.
[0052] In addition, position-related terms such as "up," "down," "left," and "right" used in this specification should be understood as indicating the relative position of the corresponding component in the drawing, and unless an absolute position is specified, these position-related terms should not be understood as referring to an absolute position.
[0053] Furthermore, in specifying the reference numerals for each component of each drawing in this specification, the same component has the same reference numeral even if it is shown in different drawings; that is, the same reference numeral throughout the specification indicates the same component.
[0054] In the drawings attached to this specification, the size, position, connection relationships, etc., of each component constituting the present invention may be described in a partially exaggerated, reduced, or omitted manner for the convenience of explanation or to sufficiently clearly convey the concept of the present invention, and therefore, the proportions or scale may not be strictly accurate.
[0055] In addition, in the following description of the present invention, detailed descriptions of components that are deemed to unnecessarily obscure the essence of the present invention, such as known technologies including prior art, may be omitted.
[0056] Hereinafter, embodiments of the present invention will be described in detail with reference to the relevant drawings.
[0058] FIG. 1 is a configuration diagram showing the configuration of a fire safety device for performance testing of a water-cooled power-based hybrid system according to one embodiment of the present invention, and FIG. 2 is a configuration diagram showing the configuration of a fire safety device for performance testing of a water-cooled and air-cooled power-based hybrid system according to another embodiment of the present invention.
[0059] Referring to FIGS. 1 and 2, a fire safety device (1000) for performance testing of a power-based hybrid system according to one embodiment of the present invention may include a cooling water control unit (100), a heat blocking unit (200), and a battery cooling unit (300).
[0060] Specifically, a cooling water control unit (100) according to one embodiment of the present invention can control the cooling water supplied to a power-based hybrid system and supply it to a heat blocking unit (200) and a battery cooling unit (300).
[0061] More specifically, as illustrated in FIGS. 1 and 2, a cooling water control unit (100) according to one embodiment of the present invention is configured to include a cooling water supply system and a temperature and flow rate control controller, which are components of a power-based hybrid system, thereby enabling control of the cooling water supplied to the cooling module, heat blocking unit (200), and battery cooling unit (300) of the power-based hybrid system.
[0062] In addition, a cooling water control unit (100) according to one embodiment of the present invention can measure the temperature of a power-based hybrid system using an attached temperature sensor or a thermal imaging sensor installed at a plurality of locations of the power-based hybrid system.
[0063] Through this, the cooling water control unit (100) according to one embodiment of the present invention can control the cooling water supplied to the heat blocking unit (200) and the battery cooling unit (300) according to the temperature of the components of the power-based hybrid system.
[0064] Here, the components of the power-based hybrid system may include a fuel cell, a battery, a power distribution device, a power conversion system, and cables.
[0065] Additionally, as illustrated in FIGS. 1 and 2, a fire safety device (1000) for performance testing of a power-based hybrid system according to one embodiment of the present invention may further include a heat cutoff control valve (400) that controls the cooling water supplied to the heat cutoff unit (200) by opening and closing according to a cooling water control signal received from the cooling water control unit (100).
[0066] For example, a heat blocking control valve (400) according to one embodiment of the present invention can control the flow rate of cooling water supplied to the heat blocking unit (200) in real time using a proportional control method.
[0067] Specifically, the heat cutoff control valve (400) according to one embodiment of the present invention utilizes a proportional control method that can continuously adjust the degree of valve opening, thereby enabling fine adjustment of the flow rate of the cooling water supplied to the heat cutoff unit (200) according to the control of the cooling water control unit (100) based on the temperature change of the fuel cell and power conversion system.
[0068] In addition, the heat cutoff control valve (400) according to one embodiment of the present invention is preferably composed of a solenoid valve that controls the opening and closing of the valve by flowing current through an electrical signal to form a magnetic field, but is not limited thereto, and any device or means capable of continuously adjusting the degree of opening of the valve using a proportional control method according to the control of the cooling water control unit (100) may be applied.
[0069] Subsequently, a cooling water control unit (100) according to one embodiment of the present invention can transmit a cooling water control signal to a heat cutoff control valve (400) to control the opening and closing of the heat cutoff control valve (400) using a wired or wireless communication method.
[0070] Here, wired and wireless communication methods may refer to wired communication methods including CAN (Controller Area Network), RS-485 and Modbus (RTU / TCP) and wireless communication methods including Bluetooth, Zigbee and 5G / LTE (Cellular IoT).
[0071] A heat blocking control valve (400) according to one embodiment of the present invention can open the valve and change the direction of the cooling water when it receives a cooling water control signal from a cooling water control unit (100), thereby supplying cooling water to a heat blocking unit (200).
[0072] As illustrated in FIGS. 1 and 2, a heat blocking unit (200) according to one embodiment of the present invention can receive cooling water from a heat blocking control valve (400) when the heat blocking control valve (400), which has received a cooling water control signal from a cooling water control unit (100), opens the valve.
[0073] In addition, a heat blocking unit (200) according to one embodiment of the present invention can block heat diffusing in the space between each of the fuel cell, battery, power distribution device, or power conversion system using cooling water supplied to the power-based hybrid system.
[0074] Here, a heat blocking unit (200) according to one embodiment of the present invention is installed in the space between each of a fuel cell, a battery, a power distribution device, or a power conversion system, and an internal flow path through which coolant travels may be formed as a partition structure.
[0075] For example, a heat blocking member (200) according to one embodiment of the present invention may be installed in close contact with the shape of a component of a power-based hybrid system by forming an internal flow path with heat-resistant silicone, which is a flexible material.
[0076] That is, the heat blocking unit (200) according to one embodiment of the present invention is preferably installed at the location shown in FIGS. 1 and 2, but is not limited thereto, and can be installed at a location where heat conduction occurs between power-based hybrid system components depending on the shape of the power-based hybrid system components to block heat diffusion.
[0077] Accordingly, the heat blocking unit (200) according to one embodiment of the present invention can be connected in series or parallel between internal flow paths depending on the shape of the power-based hybrid system components, and can be connected in the longitudinal or transverse direction.
[0078] By doing so, the fire safety device (1000) for performance testing of a power-based hybrid system according to one embodiment of the present invention can effectively block heat conduction occurring between components according to the form of the components of the power-based hybrid system including a fuel cell, a power conversion system, a battery, and a cable.
[0079] In addition, in a fire safety device (1000) for performance testing of a power-based hybrid system according to one embodiment of the present invention, cooling water flowing through an internal path of a heat blocking unit (200) is initially introduced by a cooling water control unit (100) into a heat blocking module (200) located in the space between a fuel cell system and a power conversion system, and the introduced cooling water can pass through a heat blocking module (200) located in the space between a power conversion system and a power distribution device, and then flow into a heat blocking module (200) located in the space between a power distribution device and a battery system.
[0080] However, it is not limited to this, and cooling water may be supplied first to a heat blocking module (200) installed in the space between the system or device constituting the power-based hybrid system where heat generation is most severe.
[0081] For example, a fire safety device (1000) for performance testing of a power-based hybrid system according to one embodiment of the present invention can supply cooling water to all heat blocking modules (200), including a heat blocking module (200) installed in the space between a fuel cell system and a power conversion system, a heat blocking module (200) installed in the space between a power conversion system and a power distribution device, and a heat blocking module (200) installed in the space between a power distribution device and a battery system, by connecting a heat blocking control valve (400) and a heat blocking unit (200) in parallel.
[0082] Meanwhile, a battery cooling unit (300) according to one embodiment of the present invention can cool the battery by immersing it in the cooling water of a power-based hybrid system.
[0083] Here, a battery cooling unit (300) according to one embodiment of the present invention may include a liquid immersion tank (310) and a cooling water spray nozzle (320).
[0084] A liquid immersion tank (310) according to one embodiment of the present invention may be formed to immerse a battery, and a cooling water spray nozzle (320) according to one embodiment of the present invention may spray cooling water into the liquid immersion tank (310).
[0085] Specifically, according to one embodiment of the present invention, the liquid immersion tank (310) can immerse the battery by receiving a cooling water control signal from the cooling water control unit (100) when a temperature above a preset temperature is detected by any one of the temperature measuring sensors of the cooling water control unit (100) installed at a plurality of locations of the power-based hybrid system.
[0086] For example, the cooling water control unit (100) may pre-set a temperature that determines a plurality of fire occurrences in the power-based hybrid system, and if a temperature above the pre-set temperature is detected by any one of the plurality of temperature measurement sensors, it may transmit a cooling water control signal to the liquid immersion tank (310) of the battery cooling unit (300).
[0087] Afterwards, when the immersion tank (310) receives a cooling water control signal from the cooling water control unit (100), it can immerse the battery in the tank equipped with cooling water.
[0088] In addition, when the cooling water spray nozzle (320) according to one embodiment of the present invention receives a cooling water control signal from the cooling water control unit (100), it sprays cooling water into the liquid immersion tank (310) by adjusting the spray angle, flow rate, or pressure according to the cooling water control signal, and can remove toxic gases or fine particles generated from a fire in the battery using the sprayed cooling water.
[0089] Specifically, a cooling water spray nozzle (320) according to one embodiment of the present invention can remove toxic gases or fine particles generated during a battery fire by adjusting the spray pattern according to a cooling water control signal to spray cooling water evenly over a wide area or by concentrating spraying at a specific point, thereby generating a water scrubber effect.
[0090] By doing so, the cooling water spray nozzle (320) according to one embodiment of the present invention can directly cool the battery or fill the immersion tank (310) with cooling water and immerse the battery in the immersion tank (310) by spraying cooling water onto the immersion tank (310) and the battery immediately upon receiving a cooling water control signal from the cooling water control unit (100).
[0091] Additionally, as illustrated in FIGS. 1 and 2, a cooling water spray nozzle (320) according to one embodiment of the present invention can spray cooling water supplied from a cooling water control unit (100) and cooling water supplied from a heat blocking unit (200) into a liquid immersion tank (310).
[0092] A fire safety device (1000) for performance testing of a power-based hybrid system according to one embodiment of the present invention may further include a battery cooling control valve (500) that controls the cooling water supplied to the battery cooling unit (300) by opening and closing according to a cooling water control signal received from a cooling water control unit (100).
[0093] Specifically, a battery cooling control valve (500) according to one embodiment of the present invention can supply cooling water to a battery cooling unit (300) using an ON-OFF control method when the valve is opened according to a cooling water control signal.
[0094] Here, the on / off control method may mean a control method in which the battery cooling control valve (500) fully opens or closes the valve as soon as it receives a cooling water control signal from the cooling water control unit (100).
[0095] Additionally, the battery cooling control valve (500) according to one embodiment of the present invention is preferably composed of a solenoid valve that controls the opening and closing of the valve by flowing current through an electrical signal to form a magnetic field, but is not limited thereto, and any device or means capable of immediately opening the valve using an on / off control method according to the control of the cooling water control unit (100) may be applied.
[0096] Through this, the battery cooling control valve (500) according to one embodiment of the present invention can supply cooling water to the cooling water injection nozzle (320) by controlling the opening and closing of the valve and the direction of cooling water flow according to the received cooling water control signal, as shown in FIGS. 1 and 2.
[0097] That is, according to one embodiment of the present invention, the battery cooling unit (300) can receive the cooling water from the heat blocking unit (200) and the cooling water directly supplied from the cooling water control unit (100) through the battery cooling control valve (500) in accordance with the cooling water control signal of the cooling water control unit (100), and cool the battery by immersing it.
[0098] In addition, a fire safety device (1000) for performance testing of a power-based hybrid system according to one embodiment of the present invention may further include a liquid immersion tank control valve (600) that controls the cooling water inside the liquid immersion tank (310) to recover the cooling water supplied to the liquid immersion tank (310).
[0099] A liquid immersion tank control valve (600) according to one embodiment of the present invention can open the valve in accordance with a cooling water control signal received from a cooling water control unit (100) to recover cooling water inside the liquid immersion tank (310).
[0100] For example, a cooling water control unit (100) according to one embodiment of the present invention measures the temperature of the battery, and if the measured temperature of the battery decreases to a preset temperature or lower, it determines that the fire of the battery has been extinguished and transmits a cooling water control signal to the liquid immersion tank control valve (600).
[0101] Subsequently, when the liquid immersion tank control valve (600) according to one embodiment of the present invention receives a cooling water control signal from the cooling water control unit (100), the valve is opened to recover the cooling water inside the liquid immersion tank (310), thereby allowing it to be reused for performance testing of a power-based hybrid system under the control of the cooling water control unit (100).
[0102] Specifically, the coolant reused by the coolant control unit (100) can be supplied to the cooling module, heat blocking unit (200), and battery cooling unit (300) of the power-based hybrid system.
[0104] In summary, the cooling water control unit (100) of the fire safety device (1000) for performance testing of a power-based hybrid system according to one embodiment of the present invention can circulate and supply cooling water to the cooling module and the heat blocking unit (200) of the power-based hybrid system.
[0105] By doing so, the fire safety device (1000) for performance testing of a power-based hybrid system according to one embodiment of the present invention can effectively prevent the occurrence of a fire in the power-based hybrid system by preventing heat diffusion due to heat generation of the components of the power-based hybrid system.
[0106] On the other hand, a fire safety device (1000) for performance testing of a power-based hybrid system according to one embodiment of the present invention can block thermal runaway caused by fire in the battery by transmitting a cooling water control signal to a battery cooling unit (300) and a battery cooling control valve (400) when the cooling water control unit (100) detects a temperature above a preset temperature in the power-based hybrid system and determines that a fire has occurred, thereby immersing the battery in the cooling water.
[0107] In addition, the fire safety device (1000) for performance testing of a power-based hybrid system according to one embodiment of the present invention can recover the cooling water sprayed into the liquid immersion tank (310) of the battery cooling unit (300) through the control of the cooling water control unit (100) when the temperature of the power-based hybrid system decreases and changes to a normal state, and reuse it in the power-based hybrid system and the fire safety device (1000).
[0109] FIG. 3 is a flowchart illustrating the operation method of a fire safety device for performance testing of a power-based hybrid system according to one embodiment of the present invention.
[0110] Referring to FIG. 3, the operation method of a fire safety device (1000) for performance testing of a power-based hybrid system according to one embodiment of the present invention may include steps S100, S200, and S300.
[0111] In step S100, a cooling water control unit (100) that controls the cooling water supplied to the power-based hybrid system can supply cooling water to a heat blocking unit (200) placed in the space between each of the fuel cell, battery, power distribution device, or power conversion system.
[0112] Additionally, in step S100, the cooling water control unit (100) may further include a step of controlling a heat blocking control valve (400) connected to the heat blocking unit (200) to supply cooling water to the heat blocking unit (200) and thereby controlling the flow rate of cooling water supplied to the heat blocking unit (200).
[0113] Specifically, in step S100, the cooling water control unit (100) transmits a cooling water control signal to the heat cutoff control valve (400), and when the heat cutoff control valve (400) receives the cooling water control signal, the heat cutoff control valve (400) can adjust the temperature and flow rate of the cooling water supplied to the heat cutoff unit (200) in real time using a proportional control method according to the cooling water control signal received from the cooling water control unit (100).
[0114] In step S200, the cooling water control unit (100) can measure the temperature using temperature measurement sensors installed at multiple locations of the power-based hybrid system.
[0115] In step S300, when a temperature above a preset level is measured at any one of the multiple locations and the cooling water control unit (100) transmits a cooling water control signal to the battery cooling unit (300) that cools the battery, the battery cooling unit (300) can immerse the battery in a liquid immersion tank.
[0116] Additionally, in step S300, when the battery cooling unit (300) receives a cooling water control signal from the cooling water control unit (100), the step of the cooling water injection nozzle (320) of the battery cooling unit (300) spraying cooling water into the immersion tank (310) may be further included.
[0117] Specifically, in step S300, when the cooling water control unit (100) determines that a fire has occurred at a location where a temperature above a preset temperature is measured at any one of a plurality of locations, it transmits a cooling water control signal to the battery cooling unit (300). When the battery cooling unit (300) receives the cooling water control signal, the cooling water spray nozzle (320) sprays cooling water into the immersion tank (310), thereby immersing the battery in the immersion tank (310) to cool it.
[0118] More specifically, in step S300, when the battery cooling unit (300) and the battery cooling control valve (400) receive a cooling water control signal from the cooling water control unit (100), the battery cooling control valve (400) immediately opens the valve using an on / off control method to supply cooling water to the battery cooling unit (300), and the battery cooling unit (300) can spray the cooling water supplied from the battery cooling control valve (400) onto the liquid immersion tank (310) and the battery through the cooling water spray nozzle (320).
[0119] Additionally, in step S300, when the temperature of the battery immersed in the immersion tank (310) decreases to below a preset temperature, the method may further include a step of recovering the cooling water supplied to the immersion tank (310) through the immersion tank control valve (600) that controls the cooling water inside the immersion tank (310).
[0120] Specifically, in step S300, when the battery immersed in the liquid immersion tank (310) is cooled and the temperature of the battery decreases to below a preset temperature, the cooling water control unit (100) can transmit a cooling water control signal to the liquid immersion tank control valve (600).
[0121] Accordingly, when the liquid immersion tank control valve (600) receives a cooling water control signal from the cooling water control unit (100), the cooling water of the liquid immersion tank (310) can be recovered and reused for cooling the power-based hybrid system.
[0123] That is, according to the method of operation of the fire safety device (1000) for performance testing of a power-based hybrid system according to one embodiment of the present invention, the cooling water of the power-based hybrid system can be supplied to the heat blocking unit (200) and the battery cooling unit (300) through the control of the cooling water control unit (100).
[0124] By doing so, the heat diffusing between the components of the power-based hybrid system during performance testing of the power-based hybrid system is blocked through a heat blocking unit (200) using cooling water, thereby minimizing malfunction and damage to the components of the power-based hybrid system caused by heat generation.
[0125] In addition, when a high temperature is detected at any location during a performance test of a power-based hybrid system and the cooling water control unit (100) determines that a fire has occurred, the battery is immediately immersed and cooled to prevent thermal runaway caused by the fire in the battery, thereby preventing a secondary fire in the laboratory.
[0126] In addition, harmful gases and fine dust generated from battery fires can be removed due to the water scrubber effect caused by coolant injection.
[0127] In addition, by forming the structure of the internal flow path of the heat blocking section (200) according to the shape of the power-based hybrid system component, the fire safety device (1000) according to the present invention can be applied in a performance test environment where various types of components, such as fuel cells or batteries, are used.
[0129] Although various preferred embodiments of the present invention have been described above with some examples, the descriptions of various embodiments described in the "Specific details for carrying out the invention" section are merely illustrative, and those skilled in the art to which the present invention pertains will understand that the present invention can be modified in various ways or equivalent embodiments can be carried out based on the above description.
[0130] In addition, since the present invention can be implemented in various other forms, the present invention is not limited by the description above. The above description is provided merely to make the disclosure of the present invention complete and to fully inform those skilled in the art of the scope of the present invention, and it should be understood that the present invention is defined only by each claim of the claims. Explanation of the symbols
[0132] 100 : Coolant control unit 200 : Thermal blocking section 300: Battery cooling unit 310 : Liquid immersion tank 320: Coolant spray nozzle 400 : Heat cutoff control valve 500 : Battery cooling control valve 600 : Liquid immersion tank control valve 1000: Fire safety device for performance testing of power-based hybrid systems
Claims
Claim 1 A fire safety device for a performance test of a power-based hybrid system including a fuel cell, a battery, a power distribution device, or a power conversion system, comprising: a heat blocking unit that blocks heat diffusing in the space between each of the fuel cell, battery, power distribution device, or power conversion system using cooling water supplied to the power-based hybrid system; and a cooling water control unit that controls the cooling water supplied to the heat blocking unit; wherein the heat blocking unit comprises a plurality of heat blocking modules installed in each of the spaces between the heat blocks, and an internal flow path through which the cooling water travels is formed in a partition structure, and the internal flow path is formed of heat-resistant silicone and installed in close contact according to the shape of the components of the power-based hybrid system, and the cooling water supplied from the cooling water control unit travels along the internal flow path of the plurality of heat blocking modules installed in the spaces between the heat blocks. Claim 2 A fire safety device for performance testing of a power-based hybrid system according to claim 1, wherein the cooling water control unit measures the temperature of the power-based hybrid system using an attached temperature sensor or a thermal imaging sensor installed at a plurality of locations. Claim 3 A fire safety device for performance testing of a power-based hybrid system, characterized in that, in claim 1, it further includes a heat cutoff control valve that controls the cooling water supplied to the heat cutoff unit by opening and closing according to a cooling water control signal received from the cooling water control unit. Claim 4 A fire safety device for performance testing of a power-based hybrid system, wherein, in claim 3, the heat cutoff control valve controls the flow rate of cooling water supplied to the heat cutoff unit in real time using a proportional control method. Claim 5 delete Claim 6 delete Claim 7 A fire safety device for a performance test of a power-based hybrid system including a fuel cell, a battery, a power distribution device, or a power conversion system, comprising: a heat blocking unit that blocks heat diffusing in the space between each of the fuel cell, the battery, the power distribution device, or the power conversion system using cooling water supplied to the power-based hybrid system; a battery cooling unit that cools the battery by immersing it in the cooling water; and a cooling water control unit that controls the cooling water supplied to the heat blocking unit and the battery cooling unit; wherein the heat blocking unit comprises a plurality of heat blocking modules installed in each of the spaces between the heat blocking units, and an internal flow path through which the cooling water travels is formed as a partition structure, and the internal flow path is formed of heat-resistant silicone and installed in close contact according to the shape of the power-based hybrid system components, and the cooling water supplied from the cooling water control unit travels along the internal flow path of the plurality of heat blocking modules installed in the spaces between the heat blocking units. Claim 8 A fire safety device for performance testing of a power-based hybrid system, characterized in that, in claim 7, it further includes a battery cooling control valve that controls the cooling water supplied to the battery cooling unit by opening and closing according to a cooling water control signal received from the cooling water control unit. Claim 9 A fire safety device for performance testing of a power-based hybrid system, wherein, in claim 8, the battery cooling control valve supplies cooling water to the battery cooling unit using an on / off control method when the valve is opened according to the cooling water control signal. Claim 10 A fire safety device for performance testing of a power-based hybrid system, wherein, in claim 7, the battery cooling unit comprises: a liquid immersion tank formed to immerse the battery; and a cooling water spray nozzle for spraying cooling water into the liquid immersion tank. Claim 11 A fire safety device for performance testing of a power-based hybrid system according to claim 10, wherein the liquid immersion tank receives a cooling water control signal from the cooling water control unit and immerses the battery when a temperature above a preset temperature is detected by any one of the temperature measuring sensors of the cooling water control unit. Claim 12 A fire safety device for performance testing of a power-based hybrid system according to claim 11, wherein the cooling water injection nozzle sprays cooling water into the liquid immersion tank by adjusting the spray angle, flow rate, or pressure according to a control signal received from the cooling water control unit, and removes toxic gases or fine particles generated from a fire in the battery using the sprayed cooling water. Claim 13 A fire safety device for performance testing of a power-based hybrid system, characterized in that, in claim 10, it further comprises a liquid immersion tank control valve that controls the cooling water inside the liquid immersion tank to recover the cooling water supplied to the liquid immersion tank. Claim 14 A method of operation of a fire safety device for a performance test of a power-based hybrid system including a fuel cell, a battery, a power distribution device, or a power conversion system, comprising: (a) a cooling water control unit controlling cooling water supplied to the power-based hybrid system, wherein the cooling water control unit supplies cooling water to a heat blocking unit disposed in the space between each of the fuel cell, the battery, the power distribution device, or the power conversion system; (b) a step in which the cooling water control unit measures a temperature using a temperature measuring sensor installed at a plurality of locations of the power-based hybrid system; and (c) a step in which, when a temperature above a preset temperature is measured at any one of the plurality of locations and the cooling water control unit transmits a cooling water control signal to a battery cooling unit that cools the battery, the battery cooling unit immerses the battery in a liquid immersion tank; wherein the heat blocking unit comprises a plurality of heat blocking modules installed in each of the interspaces, and an internal flow path through which the cooling water travels is formed as a partition structure, and the internal flow path is formed of heat-resistant silicone and installed in close contact according to the shape of the power-based hybrid system component, and wherein the cooling water supplied from the cooling water control unit in step (a) moves along the internal flow path of the plurality of heat blocking modules installed in the interspaces. Claim 15 A method of operation of a fire safety device for performance testing of a power-based hybrid system, wherein, in claim 14, the step (a) further comprises the step of the cooling water control unit controlling a heat blocking control valve that supplies cooling water to the heat blocking unit to regulate the flow rate of cooling water supplied to the heat blocking unit. Claim 16 A method of operation of a fire safety device for performance testing of a power-based hybrid system, wherein, in claim 14, the step (c) further comprises the step of, when the battery cooling unit receives the cooling water control signal from the cooling water control unit, the cooling water injection nozzle of the battery cooling unit sprays cooling water into the immersion tank. Claim 17 A method of operation of a fire safety device for performance testing of a power-based hybrid system, characterized in that, in claim 14, (d) when the temperature of the battery immersed in the immersion tank decreases to a preset temperature or lower, the cooling water supplied to the immersion tank is recovered through an immersion tank control valve that controls the cooling water inside the immersion tank. Claim 18 A fire safety device for performance testing of a power-based hybrid system, characterized by operating using the method of operation of a fire safety device for performance testing of any one of claims 14 to 17.
Citation Information
Patent Citations
Fire extinguishing system for battery of vehicle
KR1020220168596A
Battery rack of energy storage system having automatic fire extinguishing apparatus
KR1020240055234A
Battery pack and device including the same
KR1020240063785A