Smart Images

  • Figure 112024040988335-PAT00006_ABST
    Figure 112024040988335-PAT00006_ABST
Patent Text Reader

Abstract

The present invention relates to a natural water playground that can block off a part of a stream to provide a separate water playground when necessary, without losing the function of the stream, and can be easily restored to its original state as a stream when not in use. The present invention is characterized by constructing sluice gates on the upstream and downstream sides of a portion of a stream as needed to form a water playground of a predetermined space, allowing a portion of the water on the upstream side of the stream to bypass the water playground and flow downstream of the stream without flowing into the water playground, filtering the water blocked by the upstream sluice gate of the stream and supplying it to the water playground so that water play can be enjoyed, and removing the upstream and downstream sluice gates when the water playground is not in use so that the stream flows back into the water playground and is restored to its original state. The present invention provides a water playground using a river and allows for easy restoration of the river's function when not in use, thereby minimizing damage to nature. Additionally, it has the advantage that the river's function is not lost even when the water playground is in use, as the upstream river water flows downstream.
Need to check novelty before this filing date? Find Prior Art

Description

Technology Field

[0001] The present invention relates to a natural water playground in a river, and more specifically, to a natural water playground that can provide a separate water playground by blocking off a part of the river when necessary without losing the function of the river, and can be easily restored to its original state as a river when not in use. Background Technology

[0003] Generally, swimming is an aerobic exercise performed in water, and facilities such as fitness pools, swimming pools, and water parks are designed to allow people to enjoy swimming by filling a certain amount of water in a designated, limited space.

[0004] Since swimming is a full-body workout that promotes even development of the entire body, and considering it is an aerobic exercise, it not only strengthens cardiorespiratory endurance and function but also does not strain the body during exercise, making it a beneficial activity for people of all ages.

[0005] Recently, as society has developed and advanced, the quality of life has improved significantly compared to the past, and as a result, it is true that citizens' desire for leisure, hobbies, and outdoor activities is increasing.

[0006] However, due to urbanization, industrialization, and population concentration, it is not easy to install water play or swimming facilities in land areas, and there is a problem that there is not enough land available for use and construction costs increase due to rising land prices.

[0007] Therefore, recently, many local governments have been utilizing waterfront spaces such as reservoirs, streams, rivers, and the sea near cities to create separate water playgrounds or swimming pool facilities for citizens to enjoy; however, there is a problem in that the natural advantages of the streams or riversides are not fully utilized because they have a strong artificial feel despite being located along the waterfront.

[0008] Furthermore, utilizing areas for purposes such as water play requires damaging parts of nature, such as rivers; when not in use, these areas are left neglected, which not only spoils the aesthetics but also makes it difficult to restore the damaged rivers, often leaving them in a damaged state. Prior art literature

[0010] Republic of Korea Registered Utility Model No. 20-0390345 The problem to be solved

[0011] The present invention aims to solve the problem of providing a water playground using a river when necessary and easily restoring the river's function when not in use.

[0012] In addition, the present invention has another objective in that even if a water playground is created by damming a stream, upstream stream water flows downstream so that the function of the stream is not lost.

[0013] In addition, the present invention has another objective of supplying water to a water playground by filtering river water.

[0014] In addition, the present invention has another objective in that the water barrier separating the river and the water playground is made of a transparent material so that the water in the river and the water playground cannot be distinguished, thereby providing the same effect as enjoying water play in the river. means of solving the problem

[0016] The present invention is characterized by solving the above-mentioned problem by constructing sluice gates on the upstream and downstream sides of a river as needed to form a water playground of a predetermined space, bypassing a portion of the water on the upstream side of the river so that it does not flow into the water playground and flows to the downstream side of the river, filtering the water blocked by the upstream sluice gate of the river and supplying it to the water playground so that water play can be enjoyed, and removing the upstream and downstream sluice gates when the water playground is not in use so that the river flows into the water playground again and is restored to its original state.

[0017] According to one embodiment of the present invention, the sluice gate comprises a water barrier plate and a riffle gabion supporting the lower side of the water barrier plate, and is further characterized by having a bypass pipe that penetrates the upstream sluice gate and penetrates the downstream sluice gate.

[0018] According to one embodiment of the present invention, the sluice gate comprises riffle gabions installed at predetermined intervals in the transverse direction of the river, and a water barrier plate that blocks the spaced riffle gabions and riffle gabions, and is further characterized by having a bypass pipe that penetrates the upstream sluice gate and penetrates the downstream sluice gate.

[0019] According to one embodiment of the present invention, the water barrier plate of the downstream sluice gate is formed to be adjustable in height, and is characterized by being configured so that the water of the water playground overflows the downstream sluice gate by adjusting the height of the water barrier plate according to the water level of the water playground.

[0020] According to one embodiment of the present invention, the entire or upper portion of the water barrier plate is formed of a transparent separator.

[0021] According to one embodiment of the present invention, the bypass pipe is further provided with a flow control valve for controlling the flow rate.

[0022] According to one embodiment of the present invention, the water barrier is removed, some rows of the riffle gabions are left intact, and only some rows of riffle gabions are removed in between so that the river water flows through the gaps between the riffle gabions, and the remaining riffle gabions are configured to be used as stepping stones to cross the river.

[0023] According to one embodiment of the present invention, the water barrier between the riffle gabions is opened so that the water of the river flows through the gap between the riffle gabions, and the riffle gabions are configured to be used as stepping stones to cross the river.

[0024] According to one embodiment of the present invention, a water distributor is further coupled to the upstream and downstream sides of the bypass pipe, and a plurality of bypass pipes connected to the water distributor are connected to distribute and bypass the water of the river.

[0025] According to one embodiment of the present invention, the bypass tube is characterized by being divided into a plurality of parts and connected by a connecting member.

[0026] According to one embodiment of the present invention, during the winter season, the water level of the water playground is lowered and frozen to be used as an ice rink. Effects of the invention

[0028] The present invention provides a water playground using a river and allows for easy restoration of the river's function when not in use, thereby minimizing damage to nature. Additionally, it has the advantage that the river's function is not lost even when the water playground is in use, as the upstream river water flows downstream.

[0029] In addition, the present invention has the advantage of facilitating water supply by filtering river water and supplying it to the water playground.

[0030] In addition, since the water barrier separating the stream and the water playground is made of a transparent material, the water in the stream and the water playground cannot be distinguished, thereby providing the same effect as enjoying water play in the stream, and by adjusting the height of the water barrier Brief explanation of the drawing

[0032] FIG. 1 is a partial plan view of a natural river water playground according to one embodiment of the present invention. FIG. 2 is a partial illustrative diagram showing the configuration of a natural river water playground according to one embodiment of the present invention. FIG. 3 is an exemplary partial side cross-sectional view illustrating the configuration of a natural river water playground according to an embodiment of the present invention. FIG. 4 is an exemplary diagram of a filtration device for a natural river water playground according to an embodiment of the present invention. FIG. 5 is a partial example illustrating a state in which water is filled in a natural river water playground according to one embodiment of the present invention. FIG. 6 is a partial conceptual diagram illustrating the state of enjoying water play in a natural river water playground according to an embodiment of the present invention. FIG. 7 is a partial conceptual diagram showing the state in which a natural river water playground according to an embodiment of the present invention is restored to its original state and a sluice gate is utilized as a stepping stone. Specific details for implementing the invention

[0033] Specific structural or functional descriptions of embodiments of the present invention disclosed in this specification or application are merely illustrative for the purpose of explaining embodiments according to the present invention, and embodiments according to the present invention may be implemented in various forms and should not be interpreted as being limited to the embodiments described in this specification or application.

[0034] Since embodiments according to the present invention may be subject to various modifications and may take various forms, specific embodiments are illustrated in the drawings and described in detail in this specification or application. However, this is not intended to limit embodiments according to the concept of the present invention to specific disclosed forms, and it should be understood that it includes all modifications, equivalents, and substitutions that fall within the spirit and scope of the present invention.

[0035] Terms such as first and second may be used to describe various components, but said components should not be limited by said terms. For the sole purpose of distinguishing one component from another, for example, without departing from the scope of rights according to the concept of the present invention, the first component may be named the second component, and similarly, the second component may be named the first component.

[0036] When it is stated that one component is "connected" or "connected" to another component, it should be understood that while it may be directly connected or connected to that other component, there may also be other components in between. Conversely, when it is stated that one component is "directly connected" or "directly connected" to another component, it should be understood that there are no other components in between. Other expressions describing the relationship between components, such as "between" and "exactly between," or "adjacent to" and "directly adjacent to," should be interpreted in the same way.

[0037] The terms used herein are merely for describing specific embodiments and are not intended to limit the invention. Singular expressions include plural expressions unless the context clearly indicates otherwise. In this specification, terms such as “comprising” or “having” are intended to specify the existence of the described features, numbers, steps, actions, components, parts, or combinations thereof, and should be understood as not precluding the existence or addition of one or more other features, numbers, steps, actions, components, parts, or combinations thereof.

[0038] Unless otherwise defined, all terms used herein, including technical or scientific terms, have the same meaning as generally understood by those skilled in the art to which the present invention pertains. Terms such as those defined in commonly used dictionaries should be interpreted as having a meaning consistent with their meaning in the context of the relevant technology, and should not be interpreted in an ideal or overly formal sense unless explicitly defined in this specification.

[0039] The water playground (200) of the present invention refers to a specific space formed by blocking the flow of the river by constructing sluice gates (110) (120) on the upstream and downstream sides of the river (100), and in the water playground (200) thus formed, water blocked by the upstream sluice gate (110) is filtered and then supplied so that the user can enjoy water play in clean water.

[0040] Here, the upstream sluice gate (110) may be composed of an upper water barrier plate (111) and a riffle gabion (112), and the upper water barrier plate (111) is formed in the shape of a plate having a predetermined thickness, width, and area to block the flow of the river and may be fixedly installed on the bottom of the river (100).

[0041] To this end, referring to FIG. 3, a fixing member (113) for fixing an upper water barrier plate (111) may be further provided at the bottom of the river (100), and the fixing member (113) may be configured by forming an insertion groove (115) between the two support members (114) so ​​that the upper water barrier plate (111) can be inserted and connected. Accordingly, the upper water barrier plate (111) can be inserted into the insertion groove (115) of the fixing member (113) to be connected or easily separated and removed.

[0042] As another configuration for fixing the upper water barrier plate (111), a support member (114) may be formed protruding from the central part of the fixing member (113), and a fitting groove (116) may be formed in the central part of the upper water barrier plate (111) for fitting the support member (114). Accordingly, the fitting groove (116) of the upper water barrier plate (111) can be fitted into the support member (114) of the fixing member (113) fixed to the bottom of the river (100) to easily connect or disconnect it.

[0043] Additionally, the downstream sluice gate (120) may be composed of a lower water barrier plate (121) and a riffle gabion (122), and the lower water barrier plate (121) is formed in the shape of a plate having a predetermined thickness, width, and area to block water stored in the water playground (200), and is fixedly installed on the bottom of the river (100).

[0044] Additionally, the upper water barrier plate (111) and the lower water barrier plate (121) may each be configured to block the space between the riffle gabions (112)(122) and the riffle gabions (112)(122).

[0045] That is, the riffle gabions (112) and the riffle gabions (112) and the riffle gabions (122) are constructed so that they are not in close contact with each other, but are spaced apart laterally at a predetermined distance, and can be installed so that the spaced-apart area is blocked by an upper water barrier plate (111) or a lower water barrier plate (121).

[0046] The upper water barrier plate (111) or the lower water barrier plate (121) may be configured to slide laterally to facilitate opening, or may be opened by rotating it with a hinge.

[0047] Additionally, the lower water barrier plate (121) may be configured to adjust its height according to the water level of the water playground (200), so that the water of the water playground (200) may overflow over the downstream sluice gate (120).

[0048] That is, a groove may be formed at the top of the lower water barrier plate (121), and the second lower water barrier plate (121) of the next stage may be inserted into the groove and overlapped, and a groove may be formed at the top of the second lower water barrier plate (121) of the next stage, and the third lower water barrier plate (121) of the next stage may be inserted into the groove and overlapped, and so on.

[0049] In another embodiment, two or more upper and lower water barrier plates (121) may be connected to each other by a hinge so as to be folded or unfolded.

[0050] In addition, the entire or upper part of the upper water barrier plate (111) may be formed of a transparent plate such as acrylic so that the boundary between the river (100) and the water playground (200) is not distinguished.

[0051] The gabion (112)(122) is made by placing stones of a predetermined size inside a gabion made of metal or the like, similar to the public notice, and can be constructed by building multiple stages and multiple rows.

[0052] A bypass pipe (130) is connected between the upstream sluice gate (110) and the downstream sluice gate (120) to allow them to communicate with each other. Accordingly, water blocked by the upstream sluice gate (110) of the river (100) is guided to flow downstream through the bypass pipe (130) to the lower side of the downstream sluice gate (120) without passing through the water playground (200). At this time, at least one or more bypass pipes (130) penetrating the upstream and downstream sluice gates (110) (120) can be connected at a predetermined interval.

[0053] Water distributors (140) may be further connected to the upper and lower ends of the bypass pipe (130), respectively, and the bypass pipe (130) between the upper and lower water distributors (140) may be composed of a single large pipe. Additionally, the bypass pipe (130) may be divided into multiple sections and connected to each other by connecting members (131), thereby making separation and connection easy.

[0054] Additionally, each bypass pipe (130) is further equipped with a flow control valve (132) to control the flow rate flowing into the bypass pipe (130).

[0055] Additionally, the water playground (200) may be further equipped with various types of filtration devices (300) to filter and supply river water so that users can use it safely. The filtration device (300) is configured to filter the water from the upper side of the upstream sluice gate (110) and supply it to the water playground (200). Furthermore, after the water playground (200) is filled, the water in the water playground (200) is filtered and then recirculated and supplied back to the water playground (200). A disinfection device (310) using UV light may also be added to this.

[0056] An artificial waterfall (400) may be further installed on one side of the water playground (200) to fall from a predetermined height, and this can be operated by filtering and supplying water from the river (100) or the water playground (200).

[0057] The present invention constructs a water playground (200) in a predetermined space where the river does not flow by blocking a portion of the upper and lower parts of the river (100) with upper and lower sluice gates (110) (120). To this end, an upper water barrier plate (111) and a lower water barrier plate (121) are fixed to the upper and lower sides of the river (100), respectively, so as to cross the river (100), and a riffle gabion (112) (122) is built and supported on the lower side of the upper water barrier plate (111) and the lower side of the lower water barrier plate (121), respectively. The upper and lower water barrier plates (111) (121) may be installed by inserting them into the insertion groove (115) of the fixing member (113) installed on the bottom of the river (100), or by inserting the fitting groove (116) formed in the center of the water barrier plate (111) into the support member (114).

[0058] Additionally, riffle gabions (112) can be constructed on the upstream side at predetermined intervals in the lateral direction, and riffle gabions (122) can also be constructed on the downstream side at predetermined intervals in the lateral direction. In this case, the space between the upstream riffle gabions (112) and the riffle gabions (112) can be blocked by an upper water barrier plate (111), and the space between the downstream riffle gabions (122) and the riffle gabions (122) can be blocked by a lower water barrier plate (121) so that river water does not flow into the water playground (200).

[0059] And, the gabions (112)(122) are stacked in multiple layers at a height equal to or lower than the height of the upper and lower water barrier plates (111)(121), and constructed in multiple rows corresponding to the width of the river (100) to support the upper and lower water barrier plates (111)(121).

[0060] Accordingly, the river (100) is blocked by the upstream sluice gate (110) so that it cannot flow downstream, and a water playground (200) of a predetermined space is formed between the upstream and downstream sluice gates (110) (120).

[0061] At least one bypass pipe (130) is installed to pass through and connect the upstream sluice gate (110) and the downstream sluice gate (120), and the river (100) blocked by the upstream sluice gate (110) is collected in the water distributor (140) through the bypass pipe (130) and then supplied to flow downstream of the downstream sluice gate (120). Accordingly, water flows downstream of the downstream sluice gate (120) as well, so that the function of the river (100) is not lost.

[0062] In the drawings of the present invention, the bypass pipe (130) is shown exposed to the outside, but it is obvious that various modifications are possible, such as burying the bypass pipe (130) in the ground, installing a separate blocking plate on the upper side of the bypass pipe (130) so that the bypass pipe (130) is not exposed to the outside, or installing it on the edge side of the water playground (200).

[0063] At this time, the amount of water can be controlled by adjusting the flow control valve (132) provided in the bypass pipe (130).

[0064] In the water playground (200) of the present invention constructed in this way, water blocked by the upstream sluice gate (110) of the river (100) is filtered by a filtration device (300) to remove foreign substances, and then clean filtered water is supplied after disinfection through a UV disinfection device, etc.

[0065] Therefore, the water playground (200) is filled with high-quality filtered water different from that of the river (100), allowing users to use it with peace of mind. The water filled in the water playground (200) can be filled up to the upper part of the upstream sluice gate (110), and the upstream river (100) and the water playground (200) are not distinguished by the upper water barrier plate (111) formed of a transparent plate, thus providing the same effect as enjoying water play in the river.

[0066] Additionally, the height of the lower water barrier plate (121) can be adjusted according to the amount of water or the number of users in the water playground (200). At this time, the height of the lower water barrier plate (121) is adjusted so that the water filled in the water playground (200) can easily overflow the lower water barrier plate (121). Therefore, if the amount of water in the water playground (200) is too large or the number of users is too large and the water quality is not good, it is desirable to ensure that high-quality water is continuously supplied to the water playground (200) by the filtration device (300) so that the water in the water playground (200) overflows the lower water barrier plate (121).

[0067] In the present invention, when the water playground (200) is not used, the river water is restored by allowing the river (100) to flow again, thereby removing the water playground (200) and restoring the function of the river (100) to its original state.

[0068] That is, the flow control valve (132) is controlled to block the flow of river water through the bypass pipe (130), and then the bypass pipe (130) is separated by releasing the connection of the connecting member (131) and removed together with the water distributor (140).

[0069] And, if the riffle gabions (112)(122) are constructed without being spaced apart, some of the riffle gabions (112)(122) are removed. That is, one row is removed every other row, and some are left behind. Of course, it is obvious that if the riffle gabions (112)(122) are constructed spaced apart at a predetermined interval, there is no need to remove them.

[0070] Additionally, by removing or opening the upper and lower water barrier plates (111) (121) of the upper and lower sluice gates (110) (120), as shown in FIG. 7, the upstream river water of the river (100) flows through the gaps between the riffle gabions (112) and into the water playground (200), and then flows downstream of the river (100) through the riffle gabions (122) of the downstream sluice gate (120).

[0071] Therefore, the stream (100) from which the water playground (200) has disappeared is restored to a stream (100) where the stream water flows like the existing stream as it hits the riffle gabions (112) (122) and flows between the riffle gabions (112) (122), and at this time, it serves to supply oxygen to aquatic life.

[0072] The present invention has the advantage of blocking a part of a river (100) to use it as a water playground (200) while minimizing damage to nature, and also being able to easily restore it to its original state when not in use.

[0073] In addition, the present invention allows for the creation of a water playground (200) by blocking the upstream and downstream sides of the river (100) with upstream and downstream sluice gates (110) and (120) respectively during winter, and then lowering the water level supplied to the water playground (200) and freezing it so that it can be utilized as a snow sledding area, ice rink, etc. In addition, if it is not being utilized, the sluice gates (110) and (120) can be easily removed to restore it to the original river (100).

[0074] Therefore, the present invention can provide a water playground (200) without particularly damaging the river (100), and can also easily restore the river (100) to its function when not in use. Explanation of the symbols

[0076] 100 : River 110 : Upstream sluice gate 111: Upper water barrier 112, 122: Riffle gabion 120: Downstream sluice gate 121: Lower water barrier 130 : Bypass pipe 140 : Water distributor 200 : Water playground 300 : Filtration device 400 : Artificial waterfall

Claims

Claim 1 If necessary, sluice gates are constructed on the upstream and downstream sides of a portion of the stream to form a water playground in a designated space, and water blocked by the upstream sluice gate is filtered and supplied to the water playground for water play. A bypass pipe is further provided that penetrates the upstream sluice gate and then the downstream sluice gate, and a water distributor is further connected to the upstream and downstream sides of the bypass pipe. Multiple bypass pipes connected to the water distributors are connected by connecting members to distribute and bypass the stream water, so that a portion of the upstream water does not flow into the water playground but is bypassed and flows downstream. The sluice gates include riffle gabions installed at predetermined intervals in the transverse direction of the stream, and a water barrier plate that blocks the space between the separated riffle gabions. The entirety or a portion of the upper part of the water barrier plate is formed of a transparent separation membrane, and the water barrier plate of the downstream sluice gate is designed to allow for vertical height adjustment. A natural-type water playground for a stream, characterized by being formed such that the height of the water barrier plate is adjusted according to the water level of the water playground so that the water of the water playground overflows the downstream sluice gate, and when the water playground is not in use, the water barrier plate between the riffle gabions of the upstream and downstream sluice gates is opened so that the stream water flows through the gaps between the riffle gabions, thereby configuring the riffle gabions to be used as stepping stones to cross the stream, and allowing the stream to flow again in the water playground so that it is restored to its original state. Claim 2 A natural water playground in a river, characterized in that, in the first paragraph, the bypass pipe is further equipped with a flow control valve for controlling the flow rate. Claim 3 A natural water playground in a river according to claim 1, characterized by lowering the water level of the water playground and freezing it to be used as an ice rink during the winter season. Claim 4 delete Claim 5 delete Claim 6 delete Claim 7 delete Claim 8 delete Claim 9 delete Claim 10 delete Claim 11 delete

Citation Information

Patent Citations

  • Utilize safe swimming pool of natural river course reconstruction

    CN205604768U

  • Multipurpose stepping-stones

    KR101386586B1

  • Waterproof wall structure having buoyancy reinforce plate

    KR101709274B1

  • The facility of river in the civil center and methodrestoration of it

    KR1020020079707A

  • Apparatus for surf-riding without power

    KR1020120071280A