Device for use in an installation or in a system for the treatment of construction elements, particularly for the treatment of electric semi-conductor construction elements
Patent Information
- Application Number
- MYPI1996001376
- Authority / Receiving Office
- MY · MY
- Patent Type
- Applications
- Current Assignee / Owner
- Priority Date
- 1996-03-16
- Filing Date
- 1996-04-11
- Publication Date
- 1996-10-12
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
Existing devices struggle to reliably and efficiently process and measure electric semi-conductor construction elements of extremely small dimensions, particularly SMD elements, due to difficulties in precise electrical measurement and lead bending at high processing rates.
A compact, fully-functioning device with a control slide system that actuates measuring contacts via cams, ensuring secure clamping and synchronous movement of measuring contacts to avoid oscillations and ensure accurate measurement, and can be adapted for bending and levelling stations.
Enables reliable and efficient treatment of small electric construction elements by preventing lead bending and ensuring precise measurement with minimal impact on the elements, while being a compact, easily exchangeable unit within larger installations.
Abstract
Description
Device for Use in an Installation or in a System for the Treatment of Construction Elements, particularly for the Treatment of Electric Semi-ConductorConstruction ElementsThe invention concerns a device according to the generic term of patent claim 1.Construction elements according to the present invention are especially semi-conductor construction elements, particularly so-called SMD-construction elements of extremely small dimensions, i.e. of dimensions of 2 mm and even smaller.For devices for processing such construction elements, particularly for devices whereby these construction elements (SMD-construction elements) are punched out of a lead frame, it may be necessary to electrically measure or check these construction elements, and / or to bend the leads of the construction elements in a prescribed manner, etc.In practice, the electric measuring process of the construction elements has been difficult thus far, particularly when a high level of performance (large numbers of construction elements per unit of time) is required during processing of the construction elements.It is the task of the invention to produce a device whereby the reliable treatment of construction elements, especially of electric construction elements of extremely small dimensions, is possible via relatively simple means.In order to implement this task, a device according to the characterising part of patent claim 1 was constructed.The particular advantage of the device according to the invention is the fact, among others, that this device constitutes a fully-functioning construction unit and can therefore be installed in a larger installation, and can also be exchanged in case of necessary repairs.For the device according to the invention, the actuation of at least one first slide as well as of at least one second slide occurs via a common control slide; the actuation process occurs in a forced manner, via one cam each arranged at the control slide, in such a way that in each case the particular construction element has been securely clamped before the tool is actuated via the working slide.In the case of one design type of the invention, the tool consists of a measuring contact, preferably a measuring contact in the shape of a laminated spring, whereby its construction is effected in such a way that each measuring contact together with another measuring contact forms a contact pair, and the measuring contacts of each pair are moved, via a second slide, synchronously from two sides onto a measuring plane where the lead of that particular construction element which is to be touched by the measuring contacts is located. The movement of the control slide occurs here in a manner that is cross-wise, or vertical, to the movement of the measuring contacts when the latter are opening or closing, which has the advantage that oscillations resulting in impacts to the measuring contacts during the measuring process are avoided in the machine or the device, respectively.A particular advantage of the invention is the fact that the device is a compact, fully-functioning construction unit and can be constructed in such a way that at least one control slide can be operated like a plunger, i.e. via an outer drive element which merely exerts an axial pressure onto the control slide.The device according to the invention can also be applied, however, for other stations, such as bending stations, etc.Further developments of the invention are the subject matter of the sub-claims.The invention is further explained below via design types by means of the Figures:Fig. 1 shows in an enlarged representation a section of a measuring station for the purpose of measuring electric construction elements (SMD semi-conductor construction elements) according to the invention; 10 Fig. 2 shows a section corresponding to the line A - A of Fig. 1; Fig. 3 shows a section corresponding to the line B-B of Fig. 1; Fig. 4 shows in a greatly enlarged representation one of the construction elements, together with two measuring contacts touching a lead of the construction • element; 15 Fig. 5 shows a plan view of the representation of Fig. 4,Fig. 6 shows the course of cams in positions a) - c);Fig. 7 and Fig. 8 show, in a representation similar to that of Fig. 1 and Fig. 2, a bending station for shaping the leads of an electric construction element (SMD semiconductor construction element);Fig. 9 shows, in a representation similar to that of Fig. 7, a further station with levelling elements or slides for the levelling of the electric construction elements;Fig. 10 shows a plan view of the station of Fig. 9;Fig. 11 shows a detailed representation of Fig. 10.The purpose of the device shown in Fig. 1 - Fig. 6 is to measure electric parameters of semi-conductor construction elements 2, which are SMD construction elements of very small dimensions in the design type represented. As is already known, each construction element 2 consists of an approximately square casing 3 made of plastic, containing the actual semi-conductor chip, which is provided with leads 4, punched out of a lead frame and projecting from two longitudinal sides of casing 3; the leads 4 are bent into an S-shape in such a way that that the free end of each lead 4 constitutes a contact surface 5. The contact surfaces 5 of all leads 4 are located in a common plane E, extending a little below the bottom of casing 3. Typically, the dimensions of casing 3 are a length of 1.5 mm and a width smaller than 1 mm, whereby the length of each contact surface extending parallel to the bottom of the casing has the dimension of 0.15 mm.For example, device 1 serves as a working station in a processing line, where among other processes the construction elements 2 are punched out of the lead frame and the leads 4 are bent in the way represented in Fig. 4 and described above; subsequently the construction elements are measured by means of device 1 in order to be sorted and / or eliminated.The measuring process of each construction element 2 at the device is carried out by means of measuring contacts 6, which are each shaped as a laminated spring and are provided in pairs. For measuring purposes, each construction element 2 is initially centred and clamped at the device in a mould or die 7, respectively, which is adapted to the shape of the casing 3; centring and clamping of the construction element 2 are done in such a way that the plane E, where the contact surfaces 5 are arranged, is located in the horizontal measuring plane. Subsequently the free ends 6' of the measuring contacts 6 of each measuring contact pair are moved towards each other, in such a way that the end 6' of the upper measuring contact of the particular pair of measuring contacts which is positioned above plane E moves from above onto plane E and the end 6' of the lower measuring contact positioned below plane E moves from below onto plane E.All measuring contacts 6, not only those of each pair, are moved synchronously, by means of tangs (8, 9) acting on these measuring contacts, in such a way that between the free ends 6' and the clamped ends 6, tangs 8 act on the upper measuring contacts 6 from above and tangs 9 act on the lower measuring contacts 6 from below, so that the free end 6' of each measuring contact 6, which is elastically shaped as a laminated spring, comes into contact with the upper or lower surface, respectively, of contact surface 5. When the measuring process is completed, the measuring contacts 6 are opened, i.e. moved away from the contact surfaces 5 first. Only then is the clamped construction element released.The advantage of the measuring contacts 6 lies in the fact that due to their synchronous movement when the measuring contacts are closing, any forces that could affect leads 4, possibly disorient the construction element 2 and / or bend leads 4 out of shape, are avoided. Due to the fact that the measuring contacts 6 are shaped as laminated springs, a reproducing contact force is obtained when the measuring contacts are closed. In addition, a grinding movement of end 6' will occur along the contact surface 5 at the end of the closing process of the measuring contacts, i.e. after each end 6' first comes into contact with the contact surface 5 as well as during the subsequent movement of the tang 8 or 9, respectively; due to this fact any dirt, oxides etc. on the contact surface 5 are removed and an optimum measuring value is obtained.The various movements for clamping and releasing the construction element in die 7, and for opening and closing the measuring contacts 6, i.e. for the descending and ascending movement of the tangs 8 and for the ascending and descending movement of the tangs 9 are realised in the device represented in Fig. 1 to Fig. 6.In these Figures, 10 is a pipette-like holder into which underpressure is introduced, thus the upper side of casing 3 of a construction element 2 can be held at the lower end 10' of each holder 10. The holders 10 are part of a transportation system whereby these holders are moved horizontally, i.e. vertical to the drawing plane of Fig. I (in a Z-axis), step-by-step in the direction of the arrow TR (Fig. 2 and Fig. 3). For this purpose each holder is arranged within a carrier piece 11, in such a way that it can be moved in the vertical direction around a given throw against the effect of a spring, from an upper into a lower position. Carrier pieces 11 are provided at an endless conveyor belt 12 circulating in a cycled manner by means of a drive. 13 and 14 are lateral guideways for the conveyor belt, or for the carrier pieces 11, respectively, whereby at the same time guideway 13 is shaped in such a way as to provide the vacuum supply for the pipette-like holders 10. The upper end of each holder 10 is provided with a roll 15 which touches, from below, a stationary counter surface 16 in the area of device 1, in such a way that the holder 10 is provided with a fixed altitude.Device 1 is further provided with a casing 17 whose upper part is provided with clamping elements 18 for clamping or holding, respectively, the measuring contacts 6 at their ends 6'.Within the casing 17, two slides each, one slide 19 and one slide 20, movable in a vertical direction (Y-axis), are provided at each side of the path of movement of the pipette-like holders 10. Each slide 19 carries a tang 8 and each slide 20 carries a tang 9. In the design type shown, each tang consists of a roll made of plastic, mounted at the particular slide 19 or 20 in such a way that they can freely rotate around a horizontal axis (Z-axis), vertical to the longitudinal extension of measuring contacts 6, or in the transport direction or direction of movement of the holders 10, respectively. For the design type shown, altogether four slides 19 and 20 are provided, i.e. one slide 19 and one slide 20 at each side of the path of movement of holder 10.Further, a control slide 21, movable in the horizontal direction, i.e. in an axial direction (X-axis) which is vertical to the direction of movement of slides 19 and 20 as well as vertical to the direction of movement of holders 10, is provided within the casing 17, in the case of the representation of Fig. 1, the control slide 21 is movable against the effects of a spring 22 from the first position shown here (when spring 22 is at rest) to the right into a second position where spring 22 is in a state of tension. The movement of control slide 21 occurs via a ram 23, movable in the same axial direction (X-axis) within the casing 17, one of whose ends acts on that end of the control slide 21 facing away from spring 22, and whose other end, protruding from casing 17 , is acted on by a swivel or actuation lever 24 (drag lever) with a head piece 25, belonging to a drive otherwise not represented here, in order to effect the movement of control slide 21 between its two positions. That end of operation lever 24 distant from the head 25 is swivel-mounted, for example, around an axis parallel to the Z-axis and is swivelled via an eccentric drive against the effect of a reset-spring in the direction of arrow S, in order to move the control slide 21 against the effect of spring 22, via the ram 23, from the first into the second position.For the design type shown, both slides 19 are positioned at one side of control slide 21, and both slides 20 are positioned at the other side, which is staggered in the direction of the Z-axis, of the control slide 21. Casing 17 is provided with a further slide 26, movable in the vertical direction, i.e. the Y-axis, which is positioned between one of these pairs of slides, i.e.between both slides 19. Further, in the central plane including the X-axis and the Y-axis of the control slide 12, a holding fixture 27 is provided within the casing 17 above control slide 12; this holding fixture 27 is movable in the vertical direction, i.e. in the direction of the Y-axis, around a limited throw, but is arranged in such a way that it cannot be twisted around this axis. The holding fixture 27 is pre-stressed in the Y-axis towards the top via a spring 28, and its upper end forms a matrix 7, shaped as a recess in the design type shown according to Fig.3; this recess is open at two sides, towards the top and in the direction of the X-axis, so that while each construction element 2 can be taken up by the die or by the recess constituting the die, respectively, the leads 4 are accessible at the same time to the measuring contacts 6.At the upper end of slide 26 an arm or block 29 is provided, which serves as a tang for the holding fixture 27, i.e. when slide 26 is descending, holding fixture 27 is also lowered against spring 26. In the reverse manner, holding fixture 27 is raised via spring 28 when slide 26 is ascending, whereby the movement of slide 26 is adjusted in such a way that the die 7 is already touching the bottom of a construction element 2 held by holder 10 before slide 2 reaches its upper position.Slides 19, 20 and 26 are forced-controlled via control slide 21. For this purpose, control slide 21 is provided with cams, arranged at those two of its sides which are staggered in the direction of the Z-axis and are located in a plane including the X-axis and the Y-axis; at one of these sides cams 30 and 31 are provided for the two slides 19, and at the other side cams 32 and 33 are provided for both slides 20. Further, a cam 34 is provided at one surface for the additional slide 26.Each of the slides 19, 20 and 26 is provided with tangs 35 (rolls), each of which fits exactly into its respective cam 30 - 34.Cams 30 and 31 are staggered in the direction of the X-axis, but also in the direction of the Y-axis, respectively, otherwise, however, they are similarly constructed. The same applies to cams 32 and 33, whereby in the design type shown cams 30 and 32, and cams 31 and 33, respectively, are staggered against each other in the direction of the Z-axis, i.e. they are arranged at the two different sides of control slide 21.As is shown in Fig. 6 in the enlarged representation a) for cam 32 (via uninterrupted lines) and for cam 30 (via dotted lines), each cam consists of a first section 30' or 32', respectively, extending in the direction of the X-axis, which corresponds to the initial position of the respective slide 19 or 20, and of a section 30 or 32, respectively, which corresponds to the working position of the respective slide (section 30 corresponding to the lowered position of slide 19 and section 32 corresponding to the raised position of slide 20).In the viewing direction, sections 30' and 32' are positioned in a congruent manner one after the other, corresponding to the Z-axis, at the different sides of control slide 21. As shown in Fig. 6, position b), the same conditions apply for the two cams 31 and 33, whereby the course of cam 31 is identical with that of cam 30, and the course of cam 33 is identical with that of cam 32. Due to the staggering in the direction of the X-axis, as well as in order to realise the cams in as simple a way as possible, sections 31 and 33 are of a greater length than sections and 32.Sections 30', 32', 33 and 32 each extend along the X-axis, while sections 30' and 30 as well 20 as sections 32' and 32 are staggered against each other along the Y-axis and are adjoining each other via a slanted transition.As shown in representation c) of Fig. 6, the course of cam 34 corresponds to the course of cam 32, for example, i.e. cam 34 possesses the two sections 34' and 34 which extend along the X-axis and are staggered against each other along the Y-axis, with section 34' corresponding to the lower initial position of slide 26 and section 34 corresponding to the upper position of this slide. However, sections 34' and 34, as well as the transition between these sections, were selected in such a way that only when tang 35 of slide 26 has passed from section 34' to section 34 during the movement of control slide 21, the tangs 35 of slides 19 and 20 can leave section 30' - 33', thus actuating these slides.The method of operation of device 1 can be described as follows;The control slide 21 is in its initial position where the slides 19 are raised and the slides 20 and are lowered.Swivel lever 24 is actuated synchronously with the movement of holders 10. Whenever a holder 10 with a construction element 2 is positioned above the die 7, the drive of the conveyor belt is stopped and swivel lever 24 is actuated, whereby the control slide 21 is moved into the working position. Then, holding fixture 27 is progressively released by slide 26, so that the die 7 touches the bottom of construction element 2 via the force of spring 28, thus effecting the clamping of construction element 2 or its casing 3, respectively, between the lower end 10' of holder 10 and die 7. As control slide 21 continues to move into the working position, slides 19 are lowered and slides 20 are raised, in order to close the measuring contacts 6. Subsequently, i.e. when the measuring process is completed, control slide 21 again moves towards the direction of its initial position via spring 22, whereby first the slides 19 and are lowered in order to open the measuring contacts 6, then, only when these contacts are fully open, slide 26 is lowered as well, in order to remove die 7 from the construction element 2 which continues to be held by holder 10.The advantages of device 1 can be summarised as follows:Symmetrical movement of the measuring contacts 6;Movement of the control slide 21 across the transport direction TR, whereby, in particular, any impact to the measuring contacts 6 due to oscillations can be prevented;Friction occurs when the measuring contacts 6, or their ends 6', respectively, are moved during the closing process, thus ensuring faultless contacts;Clamping and centring of each construction element 2 prior to the closing as well as the opening of the measuring contacts prior to the release of each construction element 2, so that the required exact position of the construction element 2 at holder 10 is not abandoned.A further essential advantage is the fact that device 1 constitutes a fully-functioning basic unit assembly group, easy to assemble, but also easy to remove or exchange. A particular advantage in this case is also the fact that tolerances of the outer drive (swivel lever 24 and its drive) have no bearing on the function of the device. The swivel throw of swivel lever 24 merely has to be of a minimum size, whereby any deviations can be compensated by the fact that the cams 30 - 34, or their sections, respectively, are of a certain length.As a further design type, Fig. 7 shows a device la whose construction essentially corresponds to that of device 1, whose purpose, however, is not the electric measuring of construction elements 2, but the bending of leads 4, i.e. its purpose is to carry out two successive, with regard to time, stages of operation for this bending process.Device la is also provided with control slide 21, which is again the means for actuating two pairs of vertical, i.e. movable in the direction of the Y-axis, slides 19a and 20a, staggered in the direction of the Z-axis or transport direction TR; in the case of device 1 a, these pairs of slides 19a and 20a are again moved synchronously via cams 36 or 37, respectively, provided at different sides of control slide 21a. The two slides 19a are here associated with a first working station, and the two slides 20a are associated with a second working station. Each working station is provided with a further slide 37, movable in the direction of the Y-axis, which is force-controlled via a cam 38 of control slide 21a, and which acts via a spring 39 on a holding fixture 40 for a construction element 2. Each holding fixture 40 is shaped as a bending mould. Each of the slides 19a and 20a is provided with outer bending tools 41 or 42, respectively. The course of cams 36, 37, 38, into which the slides engage via their tang elements 35, is designed in such a way that every time control slide 21a is actuated, the additional slides 37 for the clamping of the respective construction element between the lower end of a holder 10 and the holding fixture 40 are raised first, before the slides 19a and 20a are lowered in order to carry out the bending process at the clamped construction element 2 centred in holding fixture 40.Fig. 9 to Fig. 11 show a device lb serving to level the construction elements 2 at their respective holder 10, in order to pass these construction elements in an exact position on to a further station.For levelling purposes, two slides 50, movable to and fro in the horizontal direction, are 5 provided, which can be moved in a counter-current but synchronous manner in the horizontal direction, i.e. in the direction of the X-axis, towards the central plane positioned in the Y - Z plane, or the central axis M located there, respectively, and which can also be moved away from this central plane. The central axis extends along the Y-axis.Each slide 50 is provided with two recesses 51 arranged at its side facing the other slide.When the slides 50 have moved towards each other, two recesses 51 each combine to form a die precisely adapted to the shape of casing 3. Both slides 50 are arranged at the upper side of a casing 52. Inside the casing, a vertical slide 26d can be raised and lowered in the direction of the Y-axis and the central plane M; this slide is controlled via control slide 21 located inside casing 52 and movable to and fro in the direction of the X-axis. The upper surface of slide 26b constitutes a contact surface for the bottom of casing 3, in such a way that when slide 26b is raised, the construction elements 2 are each clamped between this contact surface 53 and the holder 10.Casing 52 is provided with an additional control slide 54, movable in the direction of the X-axis. Control slide 54 is provided with a tang 55 engaging into a control groove 56 of a ring57 which can be freely rotated around the central axis M of casing 52 in the area of the upper surface of the casing, and which is positioned below slides 50.The upper surface of the ring 57 is provided with two control grooves 58, staggered by 180° around central axis M. One end of each control groove is provided with a section 58' having a smaller radial distance from central axis M, while the other end is provided with a section 58 having a greater radial distance from central axis M, whereby both sections are overlapping, and each section extends over a certain arc of the rotating movement of ring 57. The bottom of each slide 50 is provided with a guiding piece 59 engaging into a control groove 58, so that during the rotating or swivelling action of the ring 57 around the central axis, both slides 50 move towards each other, or away from each other, respectively, in a counter-current manner. The respective end positions of slides 50 are determined by the radial distances of sections 58' and 58. Since each of these sections extends in a circular manner around central axis M around a certain arc, the tolerances of the rotating or swivelling movement of the ring 57 have no influence on the end positions of the slides 50. Ring 57 merely has to swivel far enough around, so that tangs 59 will actually reach the sections 58' and 58. This also means that a possible clearance between tang 55 and control groove 56, as well as tolerances occurring when the control slide 54 is moved, do not influence the precision of the movement of slides50.Control slide 54 is moved from an initial position, against the effects of a spring 60, into a working position, so that it is again possible for slide 54 to be actuated via an outer pressure unit, for example an outer swivel lever 24 or an outer ram.A special feature of the invention is the fact that the device is formed as a fully-functioning compact construction unit, i.e. as a fully-functioning compact module, which can used as a working station or as a part of such a working station in an installation or in a system for the treatment of electric semi-conductor construction elements. The invention has been described above by means of design types. It is understood that a number of changes or variations are possible for this derice without abandoning the original idea upon which the invention is based.Reference List1, la, lb Device 2 Construction element 3 Casing 5 4 Lead 5 Contact surface 6 Measuring contact 6’, 6 End 7 Die 10 8,9 Tangs 10 Holder 11 Carrier piece 12 Conveyor belt 13, 14 Guideway 15 15 Roll 16 Counter surface 17 Casing 18 Clamping element 19, 19a Slide 20 20, 20a Slide 21,21a Control slide 22 Spring 23 RamReference List (continued)24 Swivel lever 58 Control groove 25 Head 58', 58 Section 26, 26b Slide 59 Tang 27 Holding fixture 60 Spring 28 Spring 29 Tang arm 30-34 Cam 35 Tang element 36,36' · Cam 37 Slide 38 Cam 39 Spring 40 Holding fixture 41,42 Bending tool 50 Slide 51 Recess 52 Casing 53 Contact surface 54 Control slide 55 Tang 56 Control groove 57 Control ring
Claims
Claims Device for use in an installation or in a system for the treatment of construction elements, particularly of electric semi-conductor construction elements (2), with means for the clamping of one construction element (2) each and / or for actuating at least one tool (6, 41, 42, 50) coming into contact with the construction element (2), characterised by the fact that the device (1, la, lb) is constructed as a fullyfunctioning compact construction unit and is provided with at least one slide (19, 20, 19a, 20a, 26, 37, 26b) located inside a casing (17, 52), movable in a first axial direction (Y-axis) between at least one initial position and one working position, which effects the clamping of the construction element (2) and / or actuation of the tool, that inside the casing (17), in a second axial direction (X-axis) running vertical to the first axial direction, a control slide (21,21a) is provided which is movable between an initial position and at least one working position, and that the control slide (21, 21a) is provided with cams (30 - 34, 36, 36') into which the tangs (35) of the slides (19, 20, 19a, 20a, 26, 37, 26b) engage for the purpose of force-controlling these slides. Device according to claim 1, characterised by the fact that within the casing (17) at least two slides (19, 20, 19a, 20a, 26, 37) are provided, of which at least one first slide effects the clamping of the construction element (2) and at least one second slide effects actuation of the tool. Device according to claim 2, characterised by the fact that the cams (30 - 34, 36, 36') are designed in such a way that during each movement of the control slide (21,21a) 4. 5 5.
6.
7.
8. from the initial position into the working position, clamping of the construction element occurs before the tool is actuated. Device according to one of the previous claims, characterised by the fact that the control slide (21,21a, 54) can be operated like a plunger. Device according to one of the previous claims, characterised by the fact that the first slide (26, 37) interacts with a holding fixture (27, 40) preferably shaped as a die, in order to clamp the respective construction element (2) between this holding fixture and a counter surface preferably consisting of a holder (10) of a conveyor (12). Device according to one of the previous claims, characterised by the fact that while the upper part of construction element (2) is held by the holder (10), its lower part is clamped by the die or holding fixture (7, 27, 40). Device according to one of the previous claims, characterised by the fact that the construction elements (2) can be moved past the device (1, la) in an axial direction (Z-axis) via a conveyor (12), and that the direction of movement of the control slide (21, 21a) is vertical to this axial direction of movement (Z-axis). Device according to one of the previous claims, characterised by the fact that the movement of the slides (19, 20, 19a, 20a, 26, 37) and the direction of movement (X-axis) of the control slide (21, 21a) are in a common plane which is vertical to the direction of movement (Z-axis) of the conveyor (12) for the construction elements (2).
9. Device according to one of the previous claims, characterised by the fact that the control slide (21, 21a, 54) is pre-stressed in its initial position via at least one re-set spring (22).
10. Device according to one of the previous claims, characterised by an outer drive (24)5 for actuating the control slide (21,21a), whereby the outer drive is preferably provided with a swivel lever (24) which is operated via a drive, for example an eccentric drive.
11. Device according to one of the previous claims, characterised by a ram (23) which is movable within the casing (17), by means of which the control slide (21,21a) can be moved.10 12. Device according to one of the previous claims, characterised by the fact that the tools consist of measuring contacts (6).
13. Device according to claim 12, characterised by the fact that each measuring contact is shaped as a laminated spring and has one free end (6') for measuring purposes as well as one clamped end (6), and that each measuring contact (6) is provided with a tang 15 (8, 9), arranged at a second slide (19, 20), which acts on the measuring contact (6) between the two ends (6', 6) in order to move the measuring contact (6), against its own elasticity, from an initial position into a working position.
14. Device according to claim 13, characterised by the fact that each tang (8, 9) is associated with several measuring contacts (6).
15. Device according to claim 13 or 14, characterised by the fact that at least two measuring contacts constituting a pair of measuring contacts are arranged at both sides of a measuring plane (E), and that the measuring contact (6) at one side of the plane is provided with a tang (8) arranged at a second slide (19), while the measuring contact 5 (6) at the other side of the plane is provided with a tang (9) arranged at another second slide (20), and that both slides (19, 20) can be moved in a counter-current manner via the control slide (21).
16. Device according to one of the previous claims, characterised by the fact that all second slides (19, 20) can be moved synchronously via the control slide (21). 1017. Device according to one of the previous claims, characterised by the fact that several measuring contacts (6) are actuated by each tang (8, 9) arranged at a first slide (19, 20).
18. Device according to one of the previous claims, characterised by the fact that the die (7), or the holding fixture (27) constituting this die, respectively, is pre-stressed via a 15 spring (28) into the position for clamping the construction element (2), and that in the working position the first slide (26) releases the holding fixture (27), and in the initial position the first slide (26) resists the effects of the clamping spring (28).
19. Device according to one of the previous claims, characterised by the fact that at least one first slide (19a, 20a) is provided with a bending tool (41, 42).
20. Device according to one of the previous claims, characterised by the fact that two first slides (19, 20; 19a, 20a) each are provided at both sides of a path of movement of a holder (10) for the construction elements (2).
21. Device according to one of the previous claims, characterised by the fact that a 5 common control slide (21, 21a) is provided for all first and second slides.
22. Device according to one of the previous claims, characterised by the fact that the holder consists of a vacuum holder, a gripping holder, a magnet holder or a similar type of holder.
23. Device according to one of the previous claims, characterised by an additional control 1θ slide (54) and a control ring (57), swivelled to and fro around an axis (Y-axis) via this control slide (54), with control grooves (58) for operating at least one slide constituting a tool, preferably a levelling tool.
