Methods and apparatus for monitoring water process equipment

MYPI1998003976A0Inactive Publication Date: 1999-03-26BETZDEARBORN INC
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
MYPI1998003976
Authority / Receiving Office
MY · MY
Patent Type
Applications
Current Assignee / Owner
Priority Date
1998-03-25
Filing Date
1998-08-28
Publication Date
1999-03-26
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

Current methods fail to accurately detect leaks in boilers that use temperature control liquid, as they do not effectively account for the dynamic rates of feedwater supplementation and removal, leading to inefficiencies in monitoring and maintenance.

Method used

Measuring and correcting the rates of feedwater supplementation and removal, determining the unaccounted for water rate, and comparing it to zero to detect potential leaks, utilizing an automatic liquid level control mechanism.

Benefits of technology

This approach enables precise leak detection, improving boiler efficiency and reducing maintenance costs by accurately identifying leak conditions.

✦ Generated by Eureka AI based on patent content.
Patent Text Reader

Abstract

METHODS AND APPARATUS ARE PROVIDED FOR DETECTION OF LEAKS IN BOILERS CONTAINING A TEMPERATURE CONTROL LIQUID WHICH IS SUPPLEMENTED WITH FEEDWATER AND REMOVED AS BLOWDOWN, MAIN STEAM AND SOOTBLOWER STEAM. IN A PREFERRED EMBODIMENT, THE BOILER HAS AN AUTOMATIC LIQUID LEVEL CONTROL MECHANISM. THE METHODS INCLUDE MEASURING RATES ASSOCIATED WITH FEEDWATER SUPPLEMENTATION AND REMOVAL, CORRECTING FOR THE OFFSET BETWEEN THE SUPPLEMENTATION AND REMOVAL RATES, DETERMINING THE UNACCOUNTED FOR THE WATER RATE, AND COMPARING THE UNACCOUNTED FOR WATER RATE WITH ZERO TO DETERMINE IF A LEAK CONDITION IS PRESENT.(FIGURE 1)
Need to check novelty before this filing date? Find Prior Art

Description

Methods and apparatus are provided for detection of leaks in boilers containing a temperature control liquid which is supplemented with feedwater and removed as blowdown, main steam and sootblower steam. In a preferred embodiment, the boiler has an automatic liquid level control mechanism. The methods include measuring rates associated with feedwater supplementation and removal, correcting for the offsets between the supplementation and removal rates, determining the unaccounted for water rate, and comparing the unaccounted for water rate with zero to determine if a leak condition is present.

Claims

1. A method for detecting a leak in a boiler having an automatic liquid level control mechanism in which a temperature control liquid in a containment means is supplemented with feedwater and is removed as blowdown, main steam and sootblower steam comprising: a) measuring a rate associated with said feedwater supplementation to obtain data; b) measuring a rate associated with said blowdown, main steam, and sootblower steam removal to obtain data; c) determining time and flowmeter reading offsets between feedwater supplementation means and removal means; d) determining an unaccounted for water rate according to the formula: U(i)=l(i-(b / At))-a*O(i)-c where: U=unaccounted for water rate; i=time index; t=time; l=water input rate; b=a determinable constant; a=a determinable constant; O=water output rate; and c=a determinable constant; e) comparing said unaccounted for water rate with zero; and f) indicating a leak condition if said unaccounted for water rate is greater than zero.

2. The method as claimed in claim 1 wherein said rate in steps (a) and (b) is in weight per time unit.

3. The method as claimed in claim 1 wherein said boiler is a black liquor recovery boiler.

4. The method as claimed in claim 1 wherein said leak condition is indicated by electronic means.

5. The method as claimed in claim 1 wherein said measurements in steps (a) and (b) are by flow meters.

6. The method as claimed in claim 1 wherein said determinations in steps (c), (d) (e) are made by a computer.

7. The method as claimed in claim 1 wherein said offsets determination is for the time index or the magnitude of flowmeter reading.

8. The method as claimed in claim 1 wherein b is adjusted to the time index.

9. The method as claimed in claim 1 further comprising physically analyzing said boiler in response to a positive difference between said unaccounted for water rate and zero.

10. A system for detecting a leak in a boiler having an automatic liquid control level mechanism in which a temperature control liquid in a containment means is supplemented with feedwater and is removed as blowdown, main steam and sootblower steam, said system comprising: measuring means in communication with feedwater supplementation means for measuring the rate associated with said feedwater supplementation; measuring means in communication with said containment means for monitoring a rate associated with said blowdown, main steam and sootblower steam removal by removal means; correction means in communication with said feedwater supplementation means and said removal means to determine time and flowmeter reading offsets between water input rate and water output rate to correct for calibration mismatch and time lag; determination means in communication with said feedwater supplementation means, said removal means, and said correction means for determining the unaccounted for water rate; and comparison means in communication with said unaccounted for water rate determination means for comparing said rate determination means with zero.

11. The system as claimed in claim 10 wherein said measuring means are in electrical communication with said feedwater supplementation means and said containment means.

12. The system as claimed in claim 10 wherein said determination means comprise a computer.

13. The system as claimed in claim 10 wherein said comparison means comprise a computer.

14. An improved method for detecting a leak in a steam generating system having an automatic liquid level control mechanism in which a temperature control liquid in a containment means is supplemented with feedwater and is removed as blowdown, main steam, and sootblower steam, the improvement comprising correcting for offsets which comprises correcting for calibration mismatch and time lag between feedwater supplementation means and removal means.

15. The method as claimed in claim 1, wherein b is negative.

16. The system as claimed in claim 10, wherein the water output rate is corrected to lag the water input rate.

17. The system as claimed in claim 14, wherein a rate of blowdown, main steam, and sootblower steam is corrected to lag a rate of the 5 feedwater.

18. The method as claimed in claim 1, wherein determining the unaccounted for water rate comprises a correcting for calibration mismatch and time lag.