Self-elevating platform with submerged reservoir and method for placing and raising the reservoir

MYPI1999000871A0Inactive Publication Date: 1999-09-11TECHNIP GEOPRODUCTION (SOCIETE ANONYME)
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
MYPI1999000871
Authority / Receiving Office
MY · MY
Patent Type
Applications
Current Assignee / Owner
Priority Date
1998-03-11
Filing Date
1999-03-10
Publication Date
1999-09-11
Estimated Expiration
Not applicable · inactive patent
Patent Text Reader

Abstract

THE INVENTION RELATES TO A JACK-UP PLATFORM OF THE TYPE COMPRISING A BUOYANT UPPER BARGE (10) MOUNTED SO THAT IT CAN BE MOVED ALONG THE LENGTH OF BEARING LEGS (12), MECHANICAL MEANS (18) OF MOVING THE LEGS (12) RELATIVE TO THE BARGE (10), AND A SUBMERGED STORAGE TANK (14) INTENDED TO REST ON THE BOTTOM. THE TANK (14) COMPRISES A LOWER OPENING (26) ALLOWING THE INSIDE OF THE TANK (14) TO BE PLACED IN CONTACT WITH THE MARINE ENVIRONMENT. WHICH TANK DEFINES A BELL-SHAPED CAVITY CONFINING AN AIR BUBBLE (30) ON ITS UPPER PART. THE TANK (14) IS CONNECTED TO THE LOWER END OF THE LEGS (12) SO THAT IT CAN BE MOVED RELATIVE TO THE BARGE (10) FROM THE SAID MECHANICAL MEANS (18) OF MOVING THE LEGS.(FIGURE 5)
Need to check novelty before this filing date? Find Prior Art

Description

SELF-ELEVATING PLATFORM WITH SUBMERGED RESERVOIR AND METHOD FOR PLACING AND RAISING THE RESERVOIRThe present invention relates to a self-elevating platform of the type comprising a floating upper hull mounted so that it can move along the length of bearing legs, mechanical means for moving the legs in relation to the hull, and a submerged storage tank, intended to rest on the seabed.It furthermore relates to a method of installing and a method of raising a submerged tank of a self-elevating platform of the aforementioned type.Such types of platform are used for operating oil fields. Indeed, before the extracted oil is transported, for example by boat, to land, the submerged tank is used for its storage.For this purpose, it is known practice to provide a large-capacity storage tank on which the tegs of the self-elevating platform rest.In known platforms, the tank is generally made with concrete walls. It forms a base on which the rest of the platform rests.When installing the platform, the storage tank is floated out separately to the site where the platform is to be installed. It is then submerged by weighing it down by filling it with water taken from the sea.When the tank is resting on the seabed, the hull ofthe platform bearing the legs is transported, while floating, to a location over the tank. The legs are then lowered until their lower ends become supported on the upper surface of the tank. The hull is then hoisted up above water level.Such a method of installing a platform is effective and well mastered. However, in the case of platforms which have to be moved around the oil field a number of times during their life, the storage tank cannot be reused.Indeed, since the tank is independent, it is extremely tricky and risky to refloat it.Thus, each time the platform is moved to a new site, it is necessary to initially install a new tank. This considerably increases the cost of resiting the platform.Furthermore, abandoning the submerged storage tank once the upper hull has been re-sited is harmful to the environment.Document Fr-A-2225582 discloses a self-elevating platform of the type comprising a submersible storage tank with controllable flotation.The aim of the invention is to propose a self-elevating platform, and a method of installing and uninstalling it, that allow the platform to be employed successively at separate locations, at a lower cost and with no impact on the environment.To this end, the object of the invention is a self-elevating platform as defined in Claim 1.According to specific embodiments, the platform comprises one or more characteristics defined in the dependent claims.Another object ofthe invention is a method of installing a submerged tank of a self-elevating platform according to Claim 12.A final object of the invention is a method of raising a submerged tank of a self-elevating platform according to Claim 16.The invention will be better understood from reading the description which will follow, given solely by way of example and made with reference to the drawings in which:FIG. 1 is a three-quarter perspective view of a self-elevating platform according to the invention in a transport position;FIG. 2 is an elevation of the platform of FIG. 1 during transport;FIGS. 3,4, 5, 6 and 7 are elevations of the platform during successive installation stages thereof; andFiG. 8 is a curve representing the force applied onto the leg moving means as a function of the depth at which the tank is submerged.The platform according to the invention, depicted in the transport position in FIGS. 1 and 2, comprises an upper hull 10 which is mounted so that it can be moved and so that its position can be adjusted on vertical legs 12. It further comprises a submerged storage tank 14 intended to rest on the seabed via support soles 16. After installation, the tank 14 equipped with the soles 16 form a base 17 that supports the structure formed of the hull 10 and of the legs 12.The hull 10 comprises a hermetically sealed caisson. It is conventionally fitted with production equipment and living quarters, and with a derrick arranged above a transverse passage 10A. These are not depicted in the figures.The hull has, for example, the shape of an equilateral triangle with sides 90 meters long.The height of the hull is 10 meters. Its mass with the equipment it carries is about 25,000t. The volume of the hull is about 40,000m3.Furthermore, the hull 10 is equipped, for each (eg 12, with a lifting mechanism 18. These mechanisms are adapted to move the legs 12 in relation to the hull 10, and in particular to lower the legs then raise the hull up above sea level after the legs have become supported on the seabed. Likewise, these lifting mechanisms 18 are adapted to allow the legs 12 and the tank 14 to be raised back up.Each vertical leg 12 in this particular instance has a triangular section. It is made up of three vertical chords connected together by a lattice of metal tubes. The lower end of each leg is welded to the upper surface of the tank 14.The total mass of the legs is about 5000t.The tank 14 has the overall shape of an equilateral triangle. One of the apexes is truncated. Thus, the longest side ofthe tank is 120m long, whereas the two sides which lead to the truncated apex are 95m long.The tank 14 is formed by a metal caisson. It has a base part 20 with a surface area greater than that ofthe hull 10. This base is laterally bordered along two sides adjacent to the truncated apex by two upper rims 22 forming shields. These rims 22 delimit a triangular area 20A on the base 20, and this is for supporting the hull 10. This support area 20A has a surface area that slightly exceeds that ofthe hull 10. It is open along a side opposite the truncated apex of the tank.The base part 20 is 7m thick. It has a vertical passage 28 passing through it for the oil production pipework.The rims 22 forming shields are delimited by the metal caisson forming the tank. Thus, contained within their thickness is part of the tank 14. The rims 22 extend over a height of 11m above the support area 20A. The tank 14 thus has, laterally along two sides, flanks which have a total height of 18m. The total volume of the tank is about 60,000m3, for a mass of about 7200t.The lower wall of the tank 14 has a valve 26 selectively allowing the inside ofthe tank 14 and the surrounding marine environment to be brought into communication.Furthermore, the inside ofthe tank 14 is connected, by a pipe 27A passing along a leg 12, to an air compressor 27 installed on the hull 10.The soles 16 are formed by heavy solid blocks. The total mass of the soles is about 6000t. The height of each sole is substantially equal to 2m. They are attached under the underside of the tank 14 in its corners. Advantageously, the lower surface area of the tank 14 covered by the soles 16 is less than half the total lower surface area of the tank. The soles are, for example, in the shape of equilateral triangles with sides 30m tong.The soles are fixed under the tank 14 by retaining means which can be released when the base 17 is placed on the seabed. These retaining means are made up for example of a mechanical lock or any other appropriate means, for example a wedge fitted through two lugs, one secured to the tank and the other secured to the sole that is to be fixed.To construct such an oil platform, the first stage is to manufacture the caisson that forms the tank 14. This can then be put afloat.The hull 10 and the legs 12 are then constructed directly on the central support area 20A of the tank, while the latter is afloat. Thus, the manufacture of such a platform requires the use of a dock only for the initial stage of construction.Once the hull 10 and the legs 12 have been completed, the soles 16 are transported out to the underside ofthe tank 14. For this purpose, the soles 16 are prefabricated and then submerged and kept near the surface by buoys of an appropriate volume. They are slipped under the corners of the tank 14 and are secured there by the retaining means.To install the platform according to the invention, the successive steps illustrated in FIGS. 2 to 7 are performed.In the configuration depicted in FIGS. 1 and 2, while the valve 26 is closed and the tank 14 is empty, the hull 10 is kept above sea level. The platform is thus ferried out to the site where it is to be installed.While it is being transported, the lateral rims 22, which form shields, protect the hull equipped with the production instruments from the waves.The shields 22 constitute protective freeboards with a height of about 11 meters above sea level, the tank being sunk into the water to a depth of about 7m.Once the platform production site is reached, the valve 26 in the underside of the tank 14 is opened. Thus, under the action of the total weight of the platform, the latter gradually sinks into the water as the tank 14 fills.As the tank 14 has no opening in its upper part, the air initially contained therein compresses into one or more air bubbles 30 confined in the upper parts ofthe tank 14. In particular, the air compresses inside the rims 22 which constitute bell-shaped cavities.When the pressure in the air bubbles 30 is equal to the pressure of the water in the tank, the platform is in a position of equilibrium, as depicted in FIG. 3. In this position, the height of the air bubbles 30 is denoted B3. This height corresponds to the distance separating the upper wall of the rims 22 from the level of liquid in the tank 14. For this height B3 of air bubbles, the volume of air trapped in the tank 14 is about 33,000m3.In this position of equilibrium, with the platform sinking into the water, the hull 10 is partially submerged. It thus plays a part in keeping the entire platform floating. In particular, in the example being considered, the hull 10 is submerged to a depth denoted C3 of about 5m.In this position, the force applied to the lifting mechanisms corresponds to an upwards thrust on the legs under the action of buoyancy applied to the tank 14. This condition corresponds to the point denoted A3 in FIG. 8, where the force is negative.While the platform is in this position, compressed air is injected into the tank 14.Thus, the thrust exerted by the tank 14 via the legs on the lifting mechanisms 18 increases and corresponds to a condition represented by the point A3' in FIG. 8.In this position, the height ofthe air bubble B3 is increased and the depth C3 to which the hull 10 is submerged is correspondingly reduced.The volume of air in the tank is now, for example, 55,000m3.From this position, with the valve 26 kept open, a force is applied to the tegs 12 using the lifting mechanism 18 to make the tank 14 to sink.During this sinking, the upper part ofthe rims 22 pass beyond the surface ofthe water, such that the entire tank 14 is submerged, as depicted in FIG.4. In this position, the height B4 of the air bubbles 30 is reduced accordingly. Likewise, the depth C4 to which the hull 10 is submerged is decreased. This is, for example, about 1m. For this given depth ofthe tank 14, the force applied by the lifting means 18 corresponds to the point A4 in FIG. 8.The tank 14 is lowered slowly enough to guarantee that the pressures outside and inside the tank 14 will reach equilibrium, through water entering the tank 14 through the valve 26. In particular, pauses are observed at regular intervals during the descent.The force applied by the lifting means 18 to the legs 12 to lower the tank 14 continues as depicted in FIG. 5. Thus, as the tank 14 gradually sinks, the height B5 of the air bubbles 30 trapped in the tank 14 decreases. At the same time, the height, denoted C5, by which the hull 10 is submerged, increases.In FIG. 8, this initial stage of lowering the tank 14 corresponds to the curve portion denoted A5. As depicted in this figure, as the tank 14 gradually sinks, the force applied by the lifting mechanisms decreases in terms of absolute value. Indeed, since the hydrostatic pressure of the water increases with depth, the volume of air contained in the air bubbles 30 decreases, thus reducing the buoyancy of the tank 14.For a given depth of submersion, denoted Pi, which, in the example in question, is substantially equal to 40m, the force applied on the lifting mechanisms is cancelled out.For depths in excess of this depth of submersion Pi, the air bubbles 30 confined in the tank 14 are not enough to ensure flotation thereof. Thus, the tank 14 exerts a pulling force on the legs 12. This pulling force is transmitted to the lifting mechanisms 18 which are then subjected to a positive force, as depicted in FIG. 8 by the curve portion A6.This later stage of lowering the tank 14 corresponds to the stage depicted in FIG. 6, where the height B6 of the air bubbles is reduced. Furthermore, as the legs 12 are exerting a pulling force on the hull 10, the depth, denoted C6, to which it is submerged, increases. It is then, for example, approximately 7m, when the tank 14 is in close proximity to the seabed.Throughout the stage corresponding to curve portion A6, the hull 10 restrains the tank 14 to prevent the latter from descending too fast. In particular, the lifting mechanisms 18 are released slowly enough to allow the pressures inside and outside the tank 14 to reach equilibrium.Finally, once the tank 14 has been placed on the seabed via the soles 16, the hull 10 is raised up above sea level. The air contained in the tank is extracted, for example, through the vertical pipework installed in the chords of the legs.The force exerted on the lifting means then corresponds to the point A7 in FIG. 8. In this position, the legs 12 are locked directly to the hull, avoiding prolonged strain on the lifting mechanisms 18.Once the platform has been installed, as indicated earlier, the enclosure formed by the tank 14 is used to store the oil extracted by the platform.It is understood that throughout the lowering of the tank 14, the pressures inside and outside this tank are substantially constantly equal, which avoids high stress being applied to the walls of the tank. Thus, these walls can be made of relatively low-thickness plate.It order to re-site the oil platform, it should be returned to its transport position depicted in FIG. 2.To do this, the steps followed for lowering the tank 14 are reproduced in the reverse order.In particular, an air bubble with a height B7 is first of all injected into the tank.A pulling force is then exerted on the legs 12 using the lifting mechanisms18. This pulling force is exerted until the tank 14 reaches the submersion depth Pi.The tank 14 then tends to rise to the surface of its own accord. To limit the speed at which it rises, the lifting mechanisms 18 exert thrust on the legs 12 so that they force the tank downwards. In this configuration, the hull 10 weighs down on the tank.Thus, the raising speed can be reduced such that at any time the pressure difference between the inside and the outside of the tank is substantially zero.Observing decompression steps allows water to flow satisfactorily through the valve 26 so that the pressure in the tank 14 is equal to the hydrostatic pressure at the depth at which the tank is submerged.Thus, under any circumstances, be this during installation, operation or dismantling, the tank is in pressure equilibrium.Furthermore, with a platform as described here, the force applied to the lifting mechanisms is relatively low for installing a large-capacity tank.Moreover, when towering and raising the tank, this tank acts as a stabiliser for the hull floating on the water.During manufacture, the special shape ofthe tank allows it to act as a floating dock which makes it possible for the hull and the legs to be manufactured directly on the floating tank.Under certain particularly arduous conditions, notably when the seabed is soft, there is a risk that the underside of the base 17 may stick to the seabed.In this case, before raising the tank 14, the retaining means 19 that make the tank 14 integral with at least some soles 16 are released. This may be performed, for example, by a diver. Thus, some ofthe soles 16 remain on the seabed, allowing the tank 14 to be raised.Indeed, because of the thickness ofthe soles 16, when the base 17 is placed on the bottom, the central region ofthe tank 14 is spaced away from the bottom by a space I (FIG. 7) about 2 m tall. Thus, the underside of the tank 14 is not kept firmly stuck against the seabed and the tank can therefore be raised.Such soles may be used with any type of tank or submerged element intended to rest on the seabed and then be raised back up to the surface.

Claims

CLAIMS 1. A self-elevating platform comprising bearing legs, a floating upper hull (10) mounted so that it can move along the length of the bearing legs (12), mechanical means (18) for moving the legs (12) in relation to the hull (10), and a submersible storage tank (14), intended to rest on the seabed, wherein the tank (14) comprises a lower opening (26) allowing the inside ofthe tank (14) to be brought into contact with the marine environment such that the pressures inside and outside the tank are substantially constantly the same, which tank defines a betl-shaped cavity for confinement of an air bubble (30) in its upper part, and the tank (14) is connected to the lower end of the legs (12) so that it can be moved in relation to the hull (10, from said mechanical means (18) for moving the legs, the mechanical means (18) being adapted to apply to the tegs, on the one hand, a force for making the tank (14) sink, and, on the other, an opposite force for making the tank (14) rise.

2. The platform according to Claim 1, characterised in that it comprises means (27,27A) for injecting gas under pressure into the tank (14).

3. The platform according to Claim 1 or 2, characterised in that the tank (14) comprises a base part (20A), the surface area of which is at least equal to the surface area ofthe hull (10) and at least one upper shield (22) partially bordering the base part (20A) and extending along said hull (10) when it is in immediate proximity to the base (20A).

4. The platform according to Claim 3, characterised in that the or each shield (22) is formed by a part of the tank (14).

5. The platform according to Claim 3 or 4, characterised in that the tank (14) is substantially polygonal shaped, notably triangular or rectangular shaped, and in that shields (22) extend along most of the length of at least two sides of the tank (14).

6. The platform according to any one ofthe preceding claims, characterised in that the lower opening of the tank is equipped with a valve (26).

7. The platform according to any one of the preceding claims, characterised in that it comprises at least one sole (16) for support on the seabed, the or each sole (16) being made integral with the underside ofthe tank (14) by retaining means, which can be released, when the base (17) is supported on the seabed, so as to allow the tank (14) to rise without at least one sole (16).

8. The platform according to Claim 7, characterised in that the lower surface area ofthe bearing structure (14) covered by the or each sole (16) is less than half of the total lower surface area of the bearing structure (14).

9. The platform according to Claim 7 or 8, characterised in that the or each sole (16) is disposed In proximity to the outer contour of the tank (14), leaving the central area ofthe tank (14) free.

10. The platform according to any one of Claims 7 to 9, characterised in that the height of the or each sole (16) is adapted to keep a free space (I) between the seabed and the area of the underside of the tank (14) which has no sole.

11. The platform according to any one of Claims 7 to 10, characterised in that the releasable retaining means comprise a mechanical lock. A method of installing a submerged tank (14) of a self-elevating platform according to any one of Claims 1 to 11, the tank (14) being initially immediately below the hull (10), whereby said hull (10) floats at the water surface, characterised in that it comprises the following successive steps: a) the tank (14) is brought into communication with the marine environment via its lower opening (26), such that a pressure balance is established between the air bubble (30) and the water, the tank (14) being initially acted upon solely by its own weight, b) the legs (12) are gradually lowered in relation to the hull (10) which is kept constantly afloat, by allowing water to gradually enter into the tank (14) via the lower opening (26), thus keeping the pressure in the tank (14) substantially equal to the hydrostatic pressure at the depth at which the tank is situated, the legs (12) being gradually lowered first by applying to the legs from the mechanical means (18) a force for making the tank (14) sink, and then by applying to the legs from the mechanical means (18) a force for making the tank (14) rise, and c) after applying the tank (14) to the seabed, the hull is hoisted above water level by moving the hull in relation to the legs. The method according to Claim 12, characterised in that, prior to step b) for lowering the legs, a gas is injected into the tank (14).

14. The method according to Claim 7 or 8, characterised in that the volume of the air bubble (30) is adapted such that, during step b) for lowering the legs, at an initial stage, the moving means (18) urge the legs (12) downwards and, at a subsequent stage, the moving means (18) act as a restraint against the descent of the legs (12) driven by the tank (14).

15. The method according to any one of Claims 12 to 14, characterised in that, during step b) for lowering the legs (12), pauses are observed to enable the pressures inside and outside the tank (14) to be balanced by water entering therein.

16. A method of raising a submerged tank (14) of a self-elevating platform according to any one of Claims 1 to 11, the tank (14) initially being placed on the seabed, the hull (10) floating at the water surface, characterised in that it comprises the following steps: a) the tank (14) is brought into communication with the marine environment via its lower opening (26); b) an air bubble (30) is trapped inside the tank (14), the pressure of the air bubble (30) being equal to the hydrostatic pressure at the depth at which the tank (14) is situated; c) the legs (12) are gradually raised in relation to the hull (10) which is kept constantly afloat, by allowing the water to gradually exit, thus keeping the pressure in the tank (14) substantially equal to the hydrostatic pressure at the depth at which the tank (14) is situated, the legs (12) being gradually lifted first by applying to the legs from the mechanical means (18) a force for making the tank (14) rise, and then by applying to the legs from the mechanical means (18) a force for making the tank (14) sink.

517. The method according to Claim 16, characterised in that, prior to step c) for raising the legs, a gas is injected into the tank (14).

18. The method according to Claim 16 or 17, characterised in that the volume of the air bubble (30) is adapted such that, during step c) for 10 raising the legs, at an initial stage, the moving means (18) urge the legs (12) upwards and, at a subsequent stage, the moving means (18) act as a restraint against the rising ofthe legs (12) pushed by the tank (14). 15 19. The method according to any one of Claims 16 to 18, characterised in that, during step c) for raising the legs (12), pauses are observed which enable the pressures inside and outside the tank (14) to be balanced by the exit of water therein.