Conductor supported pulltube bundle

MYPI1999000932A0Inactive Publication Date: 1999-09-14SHELL INTERNATIONALE RESEARCH MAATSCHAPPIJ BV
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
MYPI1999000932
Authority / Receiving Office
MY · MY
Patent Type
Applications
Current Assignee / Owner
Priority Date
1998-03-14
Filing Date
1999-03-12
Publication Date
1999-09-14
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

Conventional offshore platforms require additional structural modifications and increased material costs to support multiple flowlines, complicating the connection of remote wells to processing facilities, which impacts project economics.

Method used

The use of a conductor-supported pull-tube bundle system, where curved pull-tubes with horizontal and vertical sections are secured to the platform base and bracing assembly, allowing flowlines to pass through a central passage to the well-bay, reducing the need for additional structural legs and minimizing steel usage.

Benefits of technology

This design reduces overall platform weight and simplifies the routing of flowlines, lowering installation costs and maintaining efficient hydrocarbon processing without substantial structural modifications.

✦ Generated by Eureka AI based on patent content.
Patent Text Reader

Abstract

AN OFFSHORE PLATFORM (12) COMPRISING A JACKET STRUCTURE (14) SUPPORTING A PLATFORM DECK (15) HAVING A WELLBAY (23), THE JACKET STRUCTURE (14) HAVING A PLURALITY OF LEGS (18) AND A BRACING ASSEMBLY (20), AT LEAST ONE FLOWLINE (46) EXTENDING FROM A REMOTE WELL TO A LOWER PART OF THE JACKET STRUCTURE (14) AND FROM THERE IN UPWARD DIRECTION TO THE WELLBAY (23), WHEREIN EACH FLOWLINE (46) EXTENDS THROUGH A PASSSAGE FORMED WITHIN THE JACKET STRUCTURE (14) AND ALIGNED WITH THE WELLBAY (23), WHEREBY THE FLOWLINE (46) IS SUPPORTED BY THE BRACING ASSEMBLY (20).(FIG.1)
Need to check novelty before this filing date? Find Prior Art

Description

CONDUCTOR SUPPORTED PULLTUBE BUNDLEOffshore development of hydrocarbon reserves requires substantial investments into both well development and infrastructure. Further, project economics increasingly demand the best utilization of equipment. In this development, the production facilities of a bottom founded platform may be useful for initial processing of hydrocarbons produced from wells not drilled and completed from the platform, e.g., from satellite subsea wells or from minimal platforms not providing such initial processing capabilities. Platforms with such processing capabilities then become central hubs upon which the minimal facilities depend for economic development of a region.Providing this support to these remote wells requires that the wells be connected to the platform facilities by pipeline along the ocean floor and through vertical flowlines.In the conventional practice, flowlines are run within or exteriorly aside the legs of the platform and require frequent support points connecting the flowlines to the vertical legs of the platform. This can require that the jacket be designed with additional legs to accommodate the flowlines, thus increasing the cost of materials (more steel) .and increasing installation weight. This also requires a more complicated deck and facility design because produced fluids are conducted to the initial processing facilities from the exterior legs as well as from the central well bay. Such complications can substantially impact the economics of developing the region substantially more than the incremental cost of providing greater processing facilities.Another design is disclosed in USA patent specification No. 5 035 "922, This publication discloses an offshore platform comprising a jacket structure resting on a seabed, a platform deck supported by the jacket structure, a J-tube having a substantially horizontal lower end and a substantially vertical upper end extending to above the seawater, and a flowline extending from a remote well through the J-tube to the platform deck. In this known platform there is one flowline per J-tube.A further design is disclosed in USA patent specification No. 4 519 726. This publication discloses an offshore platform comprising a jacket structure resting on a seabed, a platform- deck supported by the jacket structure, a conductor vertically extending from the seabed to the platform deck, and a flowline, wherein the conductor is provided with a deflecting shoe, and wherein the flowline extends from the platform deck through the conductor and the deflector shoe to a remote well. Although this design allows more than one flowline per conductor, providing the conductor with the deflecting shoe is a difficult and time-consuming task.Thus there is a need for an improved offshore platform for tying such remote production into a ' platforms processing facilities with minimal impact on the structure itself.In accordance with the invention there is provided an offshore platform comprising a jacket structure supporting a platform deck having a well-bay, which jacket structure consists of a platform base secured to a seabed and an upper structure, the platform base and the upper structure comprising a plurality of legs and a bracing assembly, which offshore platform further comprises a pull-tube bundle, guide-tubes and flowlines, wherein the pull-tube bundle comprises curved pull-tubes having a substantially horizontal lower part and a substantially vertical upper part, wherein the substantially vertical upper parts of the pull-tubes of a pull-tube bundle are kept together and secured to the platform base, wherein each guide-tube is aligned with the well-bay and extends upwards through the upper structure of the platform from the substantially vertical upper part of a pull-tube so as to form a passage that extends from the lower part of the pull-tube to the upper end of the guide-tube, wherein the guide-tubes extending from a pull-tube bundle are kept together and laterally supported by the bracing assembly, and wherein each flowline extends from a remote well to the platform base and from there through the passage to the well-bay.By positioning the flowline in the passage aligned with the wellbay and supporting the flowline at the bracing assembly it is achieved that additional steel for connecting each flowli-ne to the legs is avoided, thus allowing a lower overall platform weight. Furthermore, it is avoided that the flowlines must be routed from the upper ends of the legs to the wellbay. It is to be understood that the wellbay is the area at the platformdeck to which the flowlines from individual wells below the platform transport extend. Thus, in the platform of the present invention the flowlines from the remote well and the flowlines from the wells below the platform extend within the jacket structure to a common wellbay.The invention will be described hereinafter in more detail and by way of example with reference to the accompanying drawings, in whichFig. 1 schematically shows a side view of a platform system according to the invention;Fig. 2 schematically shows a perspective view of a jacket base applied in conjunction with the platform system of Fig. 1;Fig. 3 is a top view of the jacket base of Fig. 2;Fig. 4 schematically shows a longitudinal section of a conductor applied in conjunction with the platform system of Fig. 1;Fig. 5A is a cross-section along line 5A-5A of Fig. 4;Fig. 5B is a cross-section along line 5B-5B of Fig. 4; andFig. 5C is a cross-section of an alternative embodiment in accordance with the platform system according to the invention.In Fig. 1 is shown an offshore platform 12 installed on the sea bed 16, the platform 12 including a platform deck 15 supported by a support structure 14 (also referred to as jacket) having four legs 18 and bracing 20 (simplified for the purpose of illustration). The jacket has a central passage 21 through which five conductor conduits 22 extend from near a lower end of the jacket 14 to a well bay 23 provided at the platform deck 15. The jacket is assembled from a lower portion in the form of platform base 24 and an upper portion 26, which portions are interconnected by docking pins (hot shown) at connections 28. The two portions 24, 26 are fabricated as separate pieces. During installation the platform base 24 is first installed on the sea bed 16 whereafter the upper portion 26 is lowe;red through the water so as to be connected to the platform base 24.As shown in more detail in Figs. 2 and 3, the platform base 24 is provided with five pull-tube bundles 30, each pull-tube bundle including a number of curved pull-tubes 31 extending from a substantially horizontal orientation near the lower perimeter of the platform base 24 to a substantially vertical orientation at the central passage 21. The pull-tubes 31 are fixedly connected to the bracing 20 and to the legs 18 or pilesleeves 32 of the platform 12. This arrangement has the advantage that maximum protection is provided to the pull-tubes against the damaging effects of snagging anchors. Each pull-tube is at its lower end provided with an outwardly tapering guide funnel 34 for receiving a flowline as will be discussed hereinafter. The upper end parts of the individual pull-tubes 31 of each bundle 30 are held together by a conductor conduit sleeve 36 into which said upper end parts of the pull-tubes 31 converge, each pull-tube 31 being at its upper end provided with an outwardly tapering funnel 37 welded to the inner surface of the conductor conduit sleeve 36. The conductor conduit sleeves 36 are fixedly connected to the platform bracing 20 and are vertically aligned with the well bay 23.Referring to Fig. 4, each conductor conduit sleeve 3 6 is connected to a corresponding one of the conductor conduits 22 in a vertically aligned relationship by means of a conductor connector 38. Lateral support is provided to the conductor conduits 22 at regular intervals by conductor guides (not shown) attached to the platform bracing 20. Thus the conductor guides have the same function as conductor guides conventionally applied to support large diameter, thick walled "drive pipes" or "conductors" through which drill strings, casing, tubing and production risers are run into wells below the platform. Each conductor conduit 22 is at its upper end provided with a circular plate 40 of larger diameter than the conductor, which plate 40 vertically suspends the conductor at the platform bracing 20. Furthermore, at least part of the required vertical support for each conductor conduit 22 is provided by the conductor conduit sleeve 36 to which the conductor conduit 22 is connected. The upper end part of each pull-tube 31 is vertically aligned with a corresponding guide-tube 42 extending fromwithin an upper part of the conductor conduit 22 conduit via an opening in the plate 40, to a short distance above the conductor conduit 22. The guide-tubes 42 are substantially straight and have a diameter and a wall thickness similar to the pull-tubes. The lower end of each guide tube 42 is provided with a guide funnel 44 located only a short distance below the circular plate 40 and welded to the inner surface of the conductor conduit 22.During normal use of the offshore platform 12 each pull-tube 31 is provided with a primary messenger wire (not shown) extending through the pull-tube and having a primary connector extending above the respective funnel 37. Each primary messenger wire is at its lower end connected to a pulling cable (not show) protruding through the lower end of the pull-tube 31. The platform base 24 with the pull-tube bundles 30 connected thereto is then lowered to the seabed 16 and fixed by piles (not shown) driven into the seabed through the pile sleeves 32. In a next step the upper jacket portion 26 is lowered to the platform base and connected thereto at connections 28, during which step the conductor conduits 22 are still absent from the upper jacket portion 26. Once the upper portion 26 has been fixedly connected to the platform base 24, each conductor conduit 22 is lowered in vertical orientation through the central passage 21 until the lower end of the conductor conduit 22 is at a selected distance above the upper end of the corresponding conductor conduit sleeve 32. A secondary messenger wire (not shown) is then lowered through each guide-tube 42, which secondary messenger wire is at its lower end provided with a secondary connector and which at its upper is connected to hoisting equipment (not shown) arranged at the platform deck 15. Next a remotely operated vehicle (ROV) is deployed toconnect the primary and secondary connectors of each pair of corresponding primary and secondary messenger wires to each other. The conductor conduit 22 is then further lowered so as to become connected to the corresponding conductor conduit sleeve 36 by means of the conductor connector 38. In this position the circular plate 40 of the conductor conduit 22 is suspended from the upper platform bracing 20, while part of the weight of the conductor conduit 22 is carried by the conductor conduit sleeve 36.After the conductor conduits 22 have been installed in the manner described above, the hoisting equipment is operated to pull the messenger wires and the respective pulling cables attached thereto, through the respective pull-tubes and guide-tubes to the platform deck. Once the upper end of each pulling cable has been pulled to the platform deck, the lower end of the pulling cable is connected to a respective flowline extending along the seabed 16 to a satellite well (not shown). The hoisting equipment is then operated to pull each flowline through the corresponding pull-tube 31, conductor conduit 22 and guide-tube 42 to the platform deck 15 where the flowline is connected to suitable hydrocarbon fluid production equipment (not shown). Production of hydrocarbon fluid from each satellite well through the respective flowlines commences once all required flowline connections have been completed.In Fig. 5A is shown cross-section 5A-5A of Fig. 4 after installation of the flowlines, indicating the arrangement of pull-tubes 31 and flowlines 46 inside one of the conductor conduit sleeves 36.In Fig. 5B is shown cross-section 5B-5B of Fig. 4 after installation of the flowlines, indicating the arrangement of the flowlines 46 inside one of theconductor conduit sleeves 36 at a position between the pull-tubes and the guide-tubes.An alternative embodiment of the platform system according to the invention is shown in Fig. 5C where reference numeral 48 indicates a bundle of pull-tubes 47. In this embodiment the conductors described above are replaced by clamps 50 which hold together a number of pull-tubes 47 so as to form the pull-tube bundle 48. Each pull-tube 47 contains a flowline 52 which has been installed in the same manner as described with reference to Figs. 1-4. Each pull-tube bundle 48 is connected to the jacket 14 at regular intervals in vertical direction. For example each bundle can be provided lateral support by conductor guides similar to those applied with reference to Figs. 1-4.Instead of the conductor conduit being connected to the conductor sleeve by the conductor connector described above, the conductor conduit can be provided at its lower end with a plate assembly of at least two vertical plates which are suspended from the conductor conduit sleeve. For example two such plates can be applied to form a plate assembly having a cruciform cross-section, whereby the plates are suspended in corresponding vertical slots provided in the conductor conduit sleeve.

Claims

CLAIMS 1. An offshore platform (12) comprising a jacket structure (14) supporting a platform deck (15) having a well-bay (23), which jacket structure (14) consists of a platform base (24) secured to a seabed (16) and an upper structure (26), the platform base (24) 5 and the upper structure (26) comprising a plurality of legs (18) and a bracing assembly (20), which offshore platform (12) further comprises a pull-tube bundle (30), guide-tubes (42) and flowlines (46), wherein the pull-tube bundle (30) comprises curved pull-tubes (31) having a substantially horizontal lower part and a substantially vertical upper part, wherein the substantially vertical upper parts of the pull-tubes (31) of a 10 pull-tube bundle (30) are kept together and secured to the platform base (24), wherein each guide-tube (42) is aligned with the well-bay (23) and extends upwards through the upper structure of the platform (12) from the substantially vertical upper part of a pull-tube (31) so as to form a passage that extends from the lower part of the pull-tube (31) to the upper end of the guide-tube (42), wherein the guide-tubes (42) extending 15 from a pull-tube bundle (30) are kept together and laterally supported by the bracing assembly (20), and wherein each flowline (46) extends from a remote well to the platform base (24) and from there through the passage to the well-bay (23).

2. The offshore platform (12) of claim 1, wherein the guide-tubes (42) extending from a 20 pull-tube bundle (30) are arranged in a conductor conduit (22) that is laterally supported by the bracing assembly (20).

3. The offshore platform (12) of claim 1, wherein the substantially vertical upper parts of the pull-tubes (31) of a pull-tube bundle (30) are arranged in a conductor conduit 25 sleeve (36) that is secured to the platform base (24).

4. The offshore platform (12) of claim 2, wherein the substantially vertical upper parts of the pull-tubes (31) of a pull-tube bundle (30) are arranged in a conductor conduit sleeve (36) that is secured to the platform base (24), and wherein the upper end of the PI 99000932 conductor conduit sleeve (36) is connected to the lower end of the conductor conduit 22).

5. The offshore platform (12) of claim 1, wherein the guide-tubes (42) extending from a 5 pull-tube bundle (30) are kept together by means of clamps.

6. The offshore platform (12) of claim 5, wherein the substantially vertical upper parts of the pull-tubes (31) of a pull-tube bundle (30) are arranged in a conductor conduit sleeve (36) that is secured to the platform base (24). o7. The offshore platform (12) of claim 5, wherein the substantially vertical upper parts of the pull-tubes (31) of a pull-tube bundle (30) are kept together by means of clamps.