Conduit construction management system, management server, conduit construction management method, and conduit construction management program
Patent Information
- Application Number
- MYPI2025002324
- Authority / Receiving Office
- MY · MY
- Patent Type
- Applications
- Current Assignee / Owner
- Priority Date
- 2022-10-18
- Filing Date
- 2023-07-27
- Publication Date
- 2024-04-18
AI Technical Summary
In pipeline construction projects, managing construction plan data and performance data is inefficient due to the manual recording of measurements, extensive document preparation, and the complexity of processing large amounts of data across multiple steps and companies, leading to a heavy burden on workers.
A pipeline construction management system that includes a management server and a performance acquisition terminal, which generates and links construction plan information to management items, allowing for efficient data processing and comparison of construction plans and results, and reduces document creation workload through automated data organization and photo management.
The system enables efficient processing and management of construction performance data, simplifies document creation, and streamlines photo management by associating construction plans with performance information and management positions, reducing the workload and improving data organization.
Smart Images

Figure PI2025002324_DRAWING_001 
Figure PI2025002324_DRAWING_002 
Figure PI2025002324_DRAWING_003
Abstract
Description
Pipeline construction management system, management server, pipeline construction management method, and pipeline construction management program
[0001] The present invention relates to a pipeline construction management system for managing pipeline construction, a management server, a pipeline construction management method, and a pipeline construction management program.
[0002] Generally, water utilities are required to record the details of construction work as it progresses. The details that need to be recorded vary depending on the water utility that orders the work. In addition, water utilities are required to prepare and submit documents in the format specified by each water utility.
[0003] In the waterworks industry, for example, the shape, dimensions, etc. of the completed portion of a planned construction site (hereinafter referred to as "as-built") are measured and recorded in accordance with predetermined standards. Furthermore, in the waterworks industry, the difference between the recorded measurements and the design values of the construction is recorded (hereinafter referred to as "as-built management"). Furthermore, in the as-built management, a predetermined format as-built management table is created that lists the design values, the measured values, and the differences between the measured values and the design values.
[0004] In the above-mentioned completed work management, the person in charge generally records the measurements taken at the construction site by hand on a paper management sheet, and then transcribes the measurements recorded on the paper management sheet into a spreadsheet or other software on a computer in the office using a keyboard or the like.
[0005] Therefore, Patent Document 1 proposes to assist in the creation of a completed work management sheet by inputting inspection information at the construction site required for construction management using a mobile terminal and collecting the input information on a server.
[0006] Furthermore, each stage of construction requires photographic management. The number of photographs that need to be managed during construction is extremely large. As a result, the task of photo management takes a lot of time. For example, it took a lot of time for the person in charge to link the management location of the construction site with the photographs taken at that location. Furthermore, for photo management, the person in charge would take photographs of the blackboard on which the details of the construction were handwritten, along with the construction status on site. As a result, taking photographs for photo management took a lot of time.
[0007] Therefore, Patent Documents 2 and 3 propose creating a blackboard electronically and generating a photographic image with an electronic blackboard.
[0008] JP 2017-102935 A JP 2008-225862 A JP 2016-189199 A
[0009] As shown in the above-mentioned Patent Documents 1 to 3, in as-built management or photo management, documents are created that associate the construction plan with the construction results.
[0010] A pipeline construction project involves multiple processes. Furthermore, in the pipeline construction project, multiple documents must be prepared for each of the multiple processes. Therefore, in the pipeline construction project, a large number of documents must be prepared.
[0011] Furthermore, in the pipeline construction business, the multiple processes are handled by multiple pipeline construction contractors, and therefore, many pipeline construction contractors are involved in the preparation of the above-mentioned documents.
[0012] As described above, in the pipeline construction business, there are many types of documents to be prepared and many pipeline construction contractors are involved in the document preparation, so when preparing documents using construction plan data and construction performance data, the amount of data to be processed is large and the data processing is cumbersome. Therefore, in the pipeline construction business, the burden on workers who manage the construction performance, including document preparation, is heavy.
[0013] In response to this, it is desired to efficiently process data on construction plans and data on construction results, and to more efficiently manage construction results.
[0014] An object of the present invention is to realize a pipeline construction management system or the like that can efficiently process construction plan data and construction performance data, and more efficiently manage construction performance.
[0015] A pipeline construction management system according to one embodiment of the present invention is a system for managing pipeline construction. The pipeline construction management system includes a management server and a performance acquisition terminal capable of communicating with the management server and acquiring performance information related to construction performance corresponding to management items for managing performance in the pipeline construction. The management server includes a construction plan information generation unit that links information related to a construction plan for the pipeline to be constructed with the management items to generate construction plan information, and a construction management information generation unit that links the performance information acquired by the performance acquisition terminal with the construction plan information to generate construction management information (first configuration).
[0016] With the above-described configuration, the management server generates construction plan information in which information related to the construction plan is linked to the management item for managing the results.
[0017] The result acquisition terminal acquires data on construction results corresponding to the management items as result information. In response, the management server associates the result information with the construction plan information to generate construction management information.
[0018] This allows the construction plan information and the performance information to be associated via the management items, thereby enabling efficient data processing of the construction plan data and the construction performance data, and more efficient management of the performance of the construction work.
[0019] In the first configuration, the construction management information generation unit links the construction plan information and the performance information to a management position that is a management target in the pipeline, and generates the construction management information (second configuration).
[0020] This allows for efficient organization of the vast amount of data on construction plan information and performance information, and also makes it easy to compare the construction plan information with performance information at each management location.
[0021] In the second configuration, the management server further has a work information management list generation unit that creates data for a list of performance information obtained during a specified construction period based on the construction management information (third configuration).
[0022] This allows the user to check the list of performance information to be acquired during a specific construction period, thereby providing the on-site worker with the opportunity to acquire the performance information that should be acquired.
[0023] In the second configuration, the management server further has a document creation unit that creates documents in which the performance information is linked to each management location in accordance with a predetermined format based on the construction management information (fourth configuration).
[0024] This reduces the workload when creating documents for each management location based on construction management information.
[0025] In the second configuration, the construction plan information includes design values for earthwork of the pipeline construction. The data on construction performance are actual measured values corresponding to the design values. The construction management information generation unit calculates the difference between the design values and the actual measured values included in the performance information acquired by the performance acquisition terminal, and links the design values, the actual measured values, and the difference to the management positions to generate the construction management information (fifth configuration).
[0026] This allows the design values, actual measurement values, and differences between the design values and the actual measurement values related to earthworks in pipeline construction to be linked to management locations and managed as construction management information.
[0027] Therefore, it is possible to efficiently manage the design values, the measured values, and the difference between them, that is, the finished product management.
[0028] In the second configuration, the management item is a photograph. The performance data acquisition terminal acquires photographed photograph data as performance data. The construction management information generation unit associates the photographed photograph data with the management location to generate the construction management information (sixth configuration).
[0029] This allows for the management of photographic records (photographic management) to be linked to the management location, thereby enabling efficient photo management.
[0030] In the sixth configuration, the management server further includes an electronic whiteboard creation unit that creates an electronic whiteboard to be added to the photo data based on the construction plan information. The construction management information generation unit links the photo data to which the electronic whiteboard has been added to the management location and generates the construction management information (seventh configuration).
[0031] This allows the management server to easily create an electronic whiteboard to be added to the photo data, and thus makes it possible to easily create image data in which the electronic whiteboard is added to the photo data, thereby enabling efficient management of image data to which an electronic whiteboard has been added.
[0032] In any one of the first to sixth configurations, the construction plan information, the performance information, and the construction management information are each linked to the work scope of the pipeline construction work (eighth configuration).
[0033] With the above-described configuration, pipeline construction can be planned and managed for each work area. Therefore, even if a change in the plan occurs, the plan can be easily changed and calculation processing can be easily performed according to the work area.
[0034] In the eighth configuration, the construction plan information is linked to work schedule information, which is information regarding the schedule of work within the work range, and the performance acquisition terminal acquires the construction plan information from the management server, while acquiring performance information that corresponds to the construction plan information and is linked to the work range and the work schedule information, and then outputs the performance information to the management server, and the management server modifies the construction plan information based on the performance information output from the performance acquisition terminal (ninth configuration).
[0035] As described above, in pipeline construction, by modifying the construction plan information using the performance information linked to the work scope, the construction plan information can be easily modified. In other words, the pipeline construction plan can be easily changed according to the work scope.
[0036] A management server according to an embodiment of the present invention manages pipeline construction work. The management server includes a construction plan information generation unit that generates construction plan information by linking information about a construction plan for a pipeline that is a target of the pipeline construction work to management items that manage the results of the pipeline construction work, a communication unit that can communicate with a performance acquisition terminal that acquires data on construction results corresponding to the management items as performance information, and a construction management information generation unit that receives the performance information from the performance acquisition terminal and links the received performance information to the construction plan information to generate construction management information (tenth configuration).
[0037] With the above-described configuration, the management server generates the construction plan information in which information relating to the construction plan is linked to the management items.
[0038] The management server also links the performance information acquired by the performance acquisition terminal to the construction plan information to generate construction management information.
[0039] This allows the construction plan information and the performance information to be associated via the management items, thereby enabling efficient data processing of the construction plan data and the construction performance data, and more efficient management of the performance of the construction work.
[0040] This also allows efficient calculation processing using the management server and the result acquisition terminal.
[0041] In the tenth configuration, the construction management information generation unit links the construction plan information and the performance information to the management position that is the object of management in the pipeline, and generates the construction management information (eleventh configuration).
[0042] This allows for efficient organization of the vast amount of data on construction plan information and performance information, and also makes it easy to compare the construction plan information with performance information at each management location.
[0043] In the tenth or eleventh configuration, a document creation unit is further provided that creates documents in which the performance information is linked to each management location based on the construction management information in accordance with a predetermined format (twelfth configuration).
[0044] This reduces the workload when creating documents for each management location based on construction management information.
[0045] A pipeline construction management method according to one embodiment of the present invention includes a performance acquisition terminal and a management server, and controls a pipeline construction management system that manages pipeline construction. The pipeline construction management method includes a construction plan information generation step in which the management server links information related to a construction plan for a pipeline that is the target of the pipeline construction to management items to generate construction plan information, a construction plan information transmission step in which the management server transmits the construction plan information to the performance acquisition terminal, a performance information acquisition step in which the performance acquisition terminal acquires data related to construction performance corresponding to the management items for the pipeline construction as performance information, a performance information reception step in which the management server receives the performance information from the performance acquisition terminal, and a construction management information generation step in which the management server links the performance information received from the performance acquisition terminal to the construction plan information to generate construction management information (a thirteenth configuration).
[0046] With the above-described configuration, the management server generates the construction plan information in which information relating to the construction plan is linked to the management items.
[0047] The result acquisition terminal acquires data on construction results corresponding to the management items as result information. In response to this, the management server associates the result information acquired by the result acquisition terminal with the construction plan information to generate construction management information.
[0048] This allows the construction plan information and the performance information to be associated via the management items, thereby enabling efficient data processing of the construction plan data and the construction performance data, and more efficient management of the performance of the construction work.
[0049] In the 13th configuration, in the construction management information generation process, the management server links the construction plan information and the performance information to the management position that is the object of management in the pipeline, and generates the construction management information (14th configuration).
[0050] This allows for efficient organization of the vast amount of data on construction plan information and performance information, and also makes it easy to compare the construction plan information with performance information at each management location.
[0051] In the thirteenth or fourteenth configuration, the management server further has a document creation process for creating documents in which the performance information is linked to each management location in accordance with a predetermined format based on the construction management information (fifteenth configuration).
[0052] This reduces the workload when creating documents for each management location based on construction management information.
[0053] A pipeline construction management program according to one embodiment of the present invention has a performance acquisition terminal and a management server, and controls a pipeline construction management system that manages pipeline construction. The pipeline construction management program causes the management server to execute a construction plan information generation process that links information about a construction plan for a pipeline that is the target of the pipeline construction to management items and generates construction plan information, a construction plan information transmission process that transmits the construction plan information to the performance acquisition terminal, a performance information reception process that receives performance information from the performance acquisition terminal that has acquired performance information including data about construction performance corresponding to the management items for the pipeline construction, and a construction management information generation process that links the performance information received from the performance acquisition terminal to the construction plan information and generates construction management information (a sixteenth configuration).
[0054] With the above-described configuration, the management server generates the construction plan information in which information relating to the construction plan is linked to the management items.
[0055] The management server also links the performance information acquired by the performance acquisition terminal to the construction plan information to generate construction management information.
[0056] This allows the construction plan information and the performance information to be associated via the management items, thereby enabling efficient data processing of the construction plan data and the construction performance data, and more efficient management of the performance of the construction work.
[0057] In the 16th configuration, the construction management information generation process includes a process in which the management server links the construction plan information and the performance information to the management location that is the object of management in the pipeline, and generates the construction management information (17th configuration).
[0058] This allows for efficient organization of the vast amount of data on construction plan information and performance information, and also makes it easy to compare the construction plan information with performance information at each management location.
[0059] In the 16th or 17th configuration, the management server is further made to execute a submission document creation process that creates documents in accordance with a predetermined format, in which the performance information is linked to each management location, based on the construction management information (18th configuration).
[0060] This reduces the workload when creating documents for each management location based on construction management information.
[0061] In one embodiment of the present invention, the management server has a construction plan information generation unit that links information regarding the construction plan of the pipeline that is the subject of the pipeline construction to management items to generate construction plan information, and a construction management information generation unit that links the performance information acquired by the performance acquisition terminal to the construction plan information to generate construction management information.
[0062] This allows for efficient data processing of construction plan data and construction performance data, enabling more efficient management of construction performance.
[0063] FIG. 1 is a functional block diagram showing a schematic configuration of a water pipe construction management system according to a first embodiment of the present invention. FIG. 2 is a functional block diagram showing a schematic configuration of a management server, a construction planning terminal, and a performance acquisition terminal included in the water pipe construction management system. FIG. 3 is a diagram explaining the width of an excavation trench and soil cover at a location where a water pipe is to be buried. FIG. 4 is a diagram explaining the type and thickness of road pavement or roadbed. FIG. 5 is a diagram explaining a method for setting the start point and end point of a water pipe pipeline to be subjected to water pipe construction. FIG. 6 is a diagram explaining a method for setting the management position of a pipeline in water pipe construction. FIG. 7 is a flow chart showing the processing flow of a water pipe construction management method for controlling a water pipe construction management system that manages water pipe construction. FIG. 8 is a functional block diagram showing a schematic configuration of a water pipe construction management system according to a second embodiment of the present invention. FIG. 9 is a diagram showing a template of a completed form management table, which is an example of construction plan information. FIG. 10 is a diagram showing a completed form management table, which is an example of documents to be submitted. FIG. 11 is a functional block diagram showing a schematic configuration of a water pipe construction management system according to a third embodiment of the present invention. FIG. 12 is a diagram illustrating a method for setting a management position of a pipeline in photo management. FIG. 13 is a diagram illustrating an example of an electronic whiteboard. FIG. 14 is a diagram illustrating an example of a work information management list. FIG. 15 is a diagram illustrating an example of a monitor image of a performance record acquisition terminal when a photograph is taken. FIG. 16 is a diagram illustrating a monitor image with an electronic whiteboard added. FIG. 17 is a functional block diagram illustrating a schematic configuration of a water pipe construction management system according to a fourth embodiment of the present invention. FIG. 18 is a diagram schematically illustrating section drawing data. FIG. 19 is a diagram schematically illustrating construction plan information. FIG. 20 is a diagram schematically illustrating a process for correcting construction plan information.
[0064] Each embodiment will be described below with reference to the drawings. In each drawing, the same parts are designated by the same reference numerals, and the description of the same parts will not be repeated. Note that the dimensions of the components in each drawing do not faithfully represent the actual dimensions of the components and the dimensional ratios of the components.
[0065] [First Embodiment] (Water Pipe Construction Management System) FIG. 1 is a functional block diagram showing a schematic configuration of a water pipe construction management system (pipe construction management system) 1 according to a first embodiment of the present invention.
[0066] The water pipe construction management system 1 is a system for managing the results of water pipe construction (pipe construction). The water pipe construction refers to construction work to bury water pipes, etc. underground. The water pipe construction includes not only construction work to bury new water pipes, etc. underground, but also construction work to renew water pipes, etc., buried underground. The water pipes, etc. include not only water pipes but also parts necessary to configure the pipeline, such as valves.
[0067] 1, the water pipe construction management system 1 includes a management server 3, a construction planning terminal 5, and a performance record acquisition terminal 7. The management server 3 and the construction planning terminal 5 are connected to each other via a network such as the Internet so that they can communicate with each other. The management server 3 and the performance record acquisition terminal 7 are also connected to each other via a network such as the Internet so that they can communicate with each other.
[0068] The management server 3 is a server device that has a database in which various data for managing water pipe construction work is stored, and also provides a function for processing the data.
[0069] The construction planning terminal 5 is a front-end terminal for creating information related to the construction plan for the water pipe line that is the target of the water pipe construction work. The user of the construction planning terminal 5 is the planner U1 who is in charge of creating the construction plan. The construction planning terminal 5 is used by the user, planner U1, to create the construction plan. The construction planning terminal 5 can be realized by, for example, a personal computer or a tablet terminal. The construction planning terminal 5 accesses the management server 3 via wired or wireless communication, and performs an operation to link information related to the construction plan for the water pipe line that is the target of the water pipe construction work to management items that manage the results of the water pipe construction work.
[0070] The result acquisition terminal 7 acquires data on construction results corresponding to the management items as result information. The user of the result acquisition terminal 7 is the water pipe construction site worker U2. The result acquisition terminal 7 is used by the user, the site worker U2, to input result information. The result acquisition terminal 7 can be realized by, for example, a notebook PC, a tablet terminal, or a mobile terminal such as a smartphone. Since the result acquisition terminal 7 is used on-site, it is preferable that it is capable of wireless communication, but wired communication may also be used.
[0071] (Management Server) FIG. 2 is a functional block diagram showing the schematic configuration of the management server 3, construction planning terminal 5, and performance record obtaining terminal 7 included in the water pipe construction management system 1.
[0072] As shown in FIG. 2, the management server 3 includes a communication unit 31 , a storage unit 32 , and a control unit 33 .
[0073] The communication unit 31 is a network interface for connecting to a wired or wireless network and performing communication.
[0074] The storage unit 32 stores programs executed by the control unit 33, data used by the programs, etc. Details of the data stored in the storage unit 32 will be described later.
[0075] The control unit 33 executes programs to perform various functions in the management server 3. Details of the control unit 33 will be described later.
[0076] (Construction Planning Terminal) As described above, the construction planning terminal 5 has a communication function with the management server 3. Furthermore, the construction planning terminal 5 can realize various functions by executing various processes such as local programs, etc. Furthermore, the construction planning terminal 5 can store local programs and various data used in the programs.
[0077] The construction planning terminal 5 has an operation input unit (not shown) that can be operated by the user, the planner U1. The construction planning terminal 5 executes various processes such as programs based on the input operation content. The construction planning terminal 5 may have a display unit, or may be configured to be able to output display data to another display unit.
[0078] Furthermore, the construction planning terminal 5 transmits the input operation details to the management server 3. In accordance with the operation details, the management server 3 executes various applications.
[0079] For example, the construction planning terminal 5 has CAD software or the like installed as a local program, and can edit information related to the construction plan. In addition, the construction planning terminal 5 can synchronize the edited information related to the construction plan with the data stored in the storage unit 32 of the management server 3 by communicating with the management server 3 via a network.
[0080] (Record Acquisition Terminal) As shown in FIG. 2 , the record acquisition terminal 7 includes a communication unit 71 , a storage unit 72 , a control unit 73 , and a touch panel unit 74 .
[0081] The communication unit 71 is a network interface for connecting to a mobile phone communication network, a wireless network conforming to a wireless communication standard, or a wired network to perform communication.
[0082] The storage unit 72 stores various data including programs executed by the control unit 73 and data used in the programs. Details of the data stored in the storage unit 72 will be described later.
[0083] The control unit 73 executes various functions in the result obtaining terminal 7 by executing a program.
[0084] The touch panel unit 74 accepts touch inputs from the user of the result acquisition terminal 7 and displays various screens to the user. The result acquisition terminal 7 executes various processes based on the operation content accepted by the touch panel unit 74. The result acquisition terminal 7 also transmits the operation content accepted by the touch panel unit 74 to the management server 3.
[0085] (Details of the control unit of the management server) As shown in FIG. 2, the control unit 33 of the management server 3 has a construction plan information generation unit 51, an information transmission unit 54, a construction management information generation unit 55, and a submission document creation unit 56.
[0086] The construction plan information generating unit 51 links information 320 relating to the construction plan of the water pipe pipeline that is the target of water pipe construction to management items, and generates construction plan information 327. The construction plan information generating unit 51 also links the management items to management positions that are management targets in the pipeline.
[0087] The information 320 relating to the construction plan includes, for example, design information 3201 , earthwork information 3202 , obstacle information 3203 , construction case information 3204 , site information 3205 , ground information 3206 , and process information 3207 .
[0088] The design information 3201 is information related to the design of a pipeline. The design information 3201 includes information related to water pipes, such as the diameter, length, type (straight pipe, irregular pipe, cut pipe, etc.), number, and arrangement of water pipes used in water pipe construction. The design information 3201 is, for example, information obtained from a water pipe pipeline diagram or the like. In other words, the design information 3201 includes information related to the designed pipeline (hereinafter referred to as the "designed pipeline"). The design information 3201 is created, for example, based on the operation content on the construction planning terminal 5.
[0089] The earthwork information 3202 is information related to earthwork for water pipe construction. A more specific explanation will be given below with reference to Figs. 3 and 4. Fig. 3 is a diagram illustrating the width of the excavation trench and the soil cover at the location where the water pipe 91 is to be buried. Fig. 4 is a diagram illustrating the type and thickness of the pavement or roadbed of the road. As shown in Fig. 3, the earthwork information 3202 includes the width W of the excavation trench at the location where the water pipe 91 is to be buried, 1 and excavation depth H 1 and the soil covering H for the water pipe 91 2As shown in FIG. 4 , the earthwork information 3202 also includes the types L1, L2, and L3 of the pavement or roadbed before and after burial, and the thicknesses T1, T2, and T3 of each type. The types may indicate the structure of layers above the roadbed within the structure of the road R. For example, type L1 is the surface layer, type L2 is the upper roadbed, and type L3 is the lower roadbed. The earthwork information 3202 also includes standard values for information regarding the design dimensions of these earthworks. Standard values are values that indicate the allowable range of error for the design dimensions. The earthwork information 3202 may also include information regarding the characteristics of the road structure and the locations of retaining walls.
[0090] The obstacle information 3203 includes information on underground obstacles (underground structures such as cross pipes, other underground buried objects, etc.) at the location where the water pipe is to be buried. The obstacle information 3203 may further include information on at least one of road structure, soil quality, and groundwater.
[0091] The construction project information 3204 includes information related to the water pipe construction project. The construction project information 3204 may include, for example, identification information for identifying the water pipe construction project, the location of the construction, the name of the water pipe construction project, the type of work, a rough sketch or an order number, etc.
[0092] The site information 3205 includes information related to site conditions, such as available work hours, available workers, the type and number of work machines to be used, whether parallel work can be performed, whether parallel use of work machines can be performed, the time required to transport soil or water pipes, and whether test excavation is required.
[0093] The ground information 3206 includes information related to the ground of the location where the water pipe is to be buried. Specifically, the ground information 3206 includes information related to the ground surroundings and information related to road conditions.
[0094] The above-ground surrounding information includes information about the environment near the location where the water pipe construction work will be performed. For example, the information about the environment near the location where the water pipe construction work will be performed includes information about whether there are facilities that are regularly used by local residents in the area facing the construction site or in the surrounding area. Such facilities include homes, stores, parking lots, etc. The information about the environment near the location where the water pipe construction work will be performed also includes information about whether the construction site is in a city or a suburb.
[0095] The road condition related information includes traffic information at the location where the water pipe construction work is to be carried out, and, if the location where the water pipe construction work is to be carried out is a road, information on the width and number of lanes of the road.
[0096] The process information 3207 is information relating to the construction schedule of the target pipeline.
[0097] The management items are items for which the performance of the water pipe construction work is managed. The management items include, for example, items to be listed in submitted documents.
[0098] The construction plan information generating unit 51 links, for example, information 320 relating to the construction plan to the management item and the management position as described below.
[0099] Fig. 5 is a diagram illustrating a method for setting a start point P1 and an end point P2 of a design pipeline TP of a water pipe PL that is the target of water pipe construction. Fig. 6 is a diagram illustrating a method for setting a management position of a pipeline in water pipe construction.
[0100] As shown in FIG. 5, the construction plan information generating unit 51 sets a start point P1 and an end point P2 of a design pipe line TP of a water pipe PL that is the target of water pipe construction work in response to a user's operation on the construction plan terminal 5.
[0101] Then, as shown in FIG. 6, the construction plan information generating unit 51 sets the management positions A0, . . . , A9+10.0 for the design pipeline TP.
[0102] The management positions include basic measurement points set at a predetermined interval M from the starting point P1 (=A0) and additional measurement points set at singular points.
[0103] The management positions that are the basic measurement points are assigned an identification number, for example, "A" plus a number. Management positions A0, A1, ..., A9, etc. correspond to basic measurement points. The predetermined interval M is, for example, 50 m. Therefore, the basic measurement points do not necessarily coincide with the joints between water pipes.
[0104] The additional measurement points set at the singular points are assigned to detour piping sections, such as overpass sections. The overpass sections are sections where piping bypasses underground obstacles, such as cross pipes 92, at locations where the obstacles are present underground. Other examples of detour piping sections include overpass sections that bypass underground obstacles and twisted sections where the pipeline is bent horizontally to bypass the obstacles. Additional measurement points set at the singular points include locations where the earthwork cross section changes. Even if the end point is located at a position other than the basic measurement points, actual measurements are required at the end point.
[0105] The additional measurement points are identified by their planimetric distance from the base measurement point. For this reason, the management positions that are the additional measurement points are assigned identification numbers such as "A," the number of the reference base measurement point, and the planimetric distance from the base measurement point. In Figure 6, management position A5+20.0 is an additional measurement point at the bridging section. In Figure 6, management position A9+10.0 is an additional measurement point at the end point. Additional measurement points can be set manually or automatically, separate from the base measurement points.
[0106] Each management location is linked to an earthwork section B1 to B4. Here, an earthwork section refers to a section that has the same earthwork information. In other words, the same earthwork information is applied within the same earthwork section.
[0107] As described above, the construction plan information generation unit 51 links the information 320 related to the construction plan of the water pipe pipeline that is the target of the water pipe construction work to the management items and the management locations to generate the construction plan information 327. Furthermore, the management items and the management locations may be linked with identification information for identifying the water pipe construction project or the construction name of the water pipe construction project. That is, the construction plan information 327 may include identification information for identifying the water pipe construction project or the construction name of the water pipe construction project. The construction plan information generation unit 51 stores the created construction plan information 327 in the storage unit 32.
[0108] The information transmitting unit 54 transmits the construction plan information 327 generated by the construction plan information generating unit 51 to the track record obtaining terminal 7. The information transmitting unit 54 may also transmit the construction management information 328 generated by the construction management information generating unit 55 (described later) to the track record obtaining terminal 7.
[0109] The construction management information generation unit 55 links the performance information 722 acquired by the performance acquisition terminal 7 to the construction plan information 327 to generate construction management information 328. The construction management information generation unit 55 stores the generated construction management information 328 in the storage unit 32.
[0110] The submitted document creation unit 56 creates documents in a predetermined format in which the performance information 722 is linked to each management location, based on the construction management information 328 generated by the construction management information generation unit 55. The submitted document creation unit 56 stores the created submitted document data 329 in the storage unit 32.
[0111] As described above, the water pipe construction management system 1 is a system for managing water pipe construction. The water pipe construction management system 1 has a management server 3 and a performance acquisition terminal 7 that can communicate with the management server 3 and acquires data on construction performance corresponding to management items for managing performance in water pipe construction as performance information 722.
[0112] The management server 3 has a construction plan information generation unit 51 that links information 320 regarding the construction plan of the designed pipeline TP of the water pipe PL that is the target of the water pipe work to the management items to generate construction plan information 327, and a construction management information generation unit 55 that links the performance information 722 acquired by the performance acquisition terminal 7 to the construction plan information 327 to generate construction management information 328.
[0113] With the above-described configuration, the management server 3 generates construction plan information 327 in which the information 320 relating to the construction plan is linked to the management items.
[0114] Furthermore, the performance acquisition terminal 7 acquires data on the performance of construction work corresponding to the management items as performance information 722. The performance information 722 may include identification information for identifying the water pipe construction project or the name of the water pipe construction project. In response to this, the management server 3 links the performance information 722 to the construction plan information 327 to generate construction management information 328. The management server 3 may link the performance information 722 and the construction plan information 327 via the identification information for identifying the water pipe construction project or the name of the water pipe construction project. Furthermore, the construction management information 328 may include identification information for identifying the water pipe construction project or the name of the water pipe construction project.
[0115] This allows the construction plan information 327 and the performance information 722 to be associated via the management items. Therefore, the data of the construction plan and the data of the construction performance can be efficiently processed, and the performance of the construction can be managed more efficiently.
[0116] This also allows the management server 3 and the result acquisition terminal 7 to perform calculation processing efficiently.
[0117] In addition, the construction management information generation unit 55 of the management server 3 links the construction plan information 327 and the performance information 722 acquired by the performance acquisition terminal 7 to the management position that is the object of management in the pipeline, and generates construction management information 328.
[0118] This allows the vast amount of data in the construction plan information 327 and performance information 722 to be efficiently organized, and also makes it easy to compare the construction plan information 327 with the performance information 722 at each pipeline position.
[0119] The management server 3 further includes a submitted document creation unit 56 that creates documents in which the performance information 722 is linked for each management location in accordance with a predetermined format, based on the construction management information 328 .
[0120] This reduces the workload when creating documents for each management location based on the construction management information 328.
[0121] (Processing Flow of Water Pipe Work Management Method) FIG. 7 is a flowchart showing the processing flow of a water pipe work management method (pipe work management method) for controlling the water pipe work management system 1 that manages water pipe work.
[0122] 7, first, the management server 3 associates information 320 relating to the construction plan of the water pipe line that is the target of the water pipe construction with the management items to generate construction plan information 327 (construction plan information generation step) (step S11). The management server 3 may execute step S11 in response to a request from the construction plan terminal 5.
[0123] Next, the management server 3 transmits the construction plan information 327 to the result acquisition terminal 7 (construction plan information transmission step) (step S12).
[0124] In response to this, the result acquisition terminal 7 acquires data on the construction results corresponding to the management items in the water pipe construction as the result information 722 (result information acquisition step) (step S21).
[0125] Next, the management server 3 receives the performance information 722 from the performance information obtaining terminal 7 (performance information receiving step) (step S13). The performance information 722 is transmitted from the performance information obtaining terminal 7 to the management server 3 in association with the corresponding management item.
[0126] Next, the management server 3 links the performance information 722 received from the performance information obtaining terminal 7 to the construction plan information 327 to generate construction management information 328 (construction management information generating step) (step S14).
[0127] Furthermore, the management server 3 creates documents in accordance with a predetermined format for each management location based on the construction management information 328 (document creation process) (step S15).
[0128] The above-described water pipe construction management method efficiently processes construction plan data and construction performance data, enabling more efficient management of construction performance. It also efficiently organizes the vast amount of data in the construction plan information 327 and performance information 722, and facilitates comparison of the construction plan information 327 and performance information 722 at each management location. It also reduces the workload of creating documents for each management location based on the construction management information 328.
[0129] (Water pipe construction management program) The water pipe construction management program (pipe construction management program) may be a program that causes the management server 3 constituting part of the water pipe construction management system 1 to execute steps S11 to S15 shown in Fig. 7. By executing this program by the management server 3, the water pipe construction management system 1 and the water pipe construction management method according to this embodiment can be realized.
[0130] The water pipe construction business support system control program according to this embodiment is a program for controlling a water pipe construction management system 1 that has a performance record acquisition terminal 7 and a management server 3 and manages water pipe construction work.
[0131] The water pipe construction management program causes the management server 3 to execute a construction plan information generation process that links information 320 related to the construction plan of the water pipe pipeline that is the target of the water pipe construction to management items and generates construction plan information 327; a construction plan information transmission process that transmits the construction plan information 327 to the track record acquisition terminal 7; a performance information reception process that receives performance information 722 from the track record acquisition terminal 7 that has acquired performance information 722 including data related to the construction performance corresponding to the management items in the water pipe construction; and a construction management information generation process that links the performance information 722 received from the track record acquisition terminal 7 to the construction plan information 327 and generates construction management information 328.
[0132] In addition, in the water pipe construction management program, the construction management information generation process includes a process in which the management server 3 links the construction plan information 327 and performance information 722 to the management position that is the object of management in the pipeline, and generates construction management information 328.
[0133] The water pipe construction management program also causes the management server 3 to execute a submission document creation process for creating documents in accordance with a predetermined format for each management location based on the construction management information 328 .
[0134] The water pipe construction management program described above efficiently processes construction plan data and construction performance data, enabling more efficient management of construction performance. It also efficiently organizes the vast amount of data in the construction plan information 327 and performance information 722, and easily compares the construction plan information 327 with the performance information 722 at each management location. It also reduces the workload of creating documents for each management location based on the construction management information 328.
[0135] Second Embodiment FIG. 8 is a functional block diagram showing a schematic configuration of a water pipe construction management system 11 according to a second embodiment of the present invention.
[0136] The water pipe construction management system 11 according to the second embodiment is a system for performing as-built management. The water pipe construction management system 11 differs from the water pipe construction management system 1 according to the first embodiment in that it manages the management items required for as-built management. In addition, in the water pipe construction management system 11, performance information, which is data on construction performance corresponding to the management items, includes, for example, actual measured values relative to design values of the pipeline. The performance acquisition terminal 7 acquires actual measured value information 723 as performance information.
[0137] In the description of the second embodiment, the details of the parts common to the water pipe construction management system 1 according to the first embodiment will not be repeated.
[0138] 8 , the storage unit 72 of the result acquisition terminal 7 stores actual measurement value information 723 that constitutes part of the result information. The actual measurement value information 723 is, for example, information related to actual measurement values measured on-site, and is input to the result acquisition terminal 7 via the touch panel unit 74. The result acquisition terminal 7 transmits the actual measurement value information 723 to the management server 3.
[0139] (Management Server) As shown in FIG. 8 , the storage unit 32 of the management server 3 stores construction plan information 627 , construction management information 628 , and submitted document data 629 .
[0140] The control unit 33 of the management server 3 also includes a construction plan information generation unit 151 , an information transmission unit 154 , a construction management information generation unit 155 , and a submission document creation unit 156 .
[0141] The construction plan information generation unit 151 generates construction plan information 627 by linking information 320 relating to the construction plan for the water pipe pipeline that is the subject of the water pipe work to the management items and management positions required in the completed form management.
[0142] In the case of as-built management, the management items include various dimensions in water pipe construction. In as-built management, the management items may be set for each type of work. Examples of types of work in water pipe construction include piping earthwork, pipe laying work, roadbed work, and paving work. The type of work is set manually or automatically for each management position. As shown in Figures 3 and 4, in piping earthwork, the management items include, for example, the excavation trench width and excavation depth where the water pipe is to be buried. In addition, in backfill work such as roadbed work and paving work, the management items include the type of pavement or roadbed and its thickness. Note that the management positions for as-built management are as described in the first embodiment. That is, the management positions for as-built management include basic measurement points set at predetermined intervals and additional measurement points set at detour piping sections such as overpasses, points where the earthwork cross section changes, and singular points such as the end point P2.
[0143] The construction plan information 627 generated by the construction plan information generating unit 151 is linked to identification information for identifying the water pipe construction project or the construction name of the water pipe construction project. The construction plan information 627 also includes design values for earthwork of the water pipe construction project.
[0144] An example of the construction plan information 627 will be described below with reference to Fig. 9. Fig. 9 is a diagram showing a template of an as-built management table, which is an example of the construction plan information 627. The construction plan information 627 includes a template of an as-built management table as shown in Fig. 9.
[0145] The completed work management table shown in Figure 9 is a style for which the type of work is earthwork for piping. The list TBL1 included in the completed work management table includes the excavation trench width W as one of the management items. 1 and excavation depth H 1 The list TBL1 also includes the excavation trench width W associated with the management position No. A0, A1, A2, . . . 1 and excavation depth H 1 The design value of the excavation trench width W is listed at the top of the table TBL1. 1 The lower limit of the standard value is -30 mm and the excavation depth H 1 The upper limit of the standard value +100 mm and the lower limit of the standard value -50 mm are listed. The date, actual measurement value, and difference corresponding to control position No. A0, A1, A2, etc. are left blank if no actual measurement value has been measured.
[0146] The information transmitting unit 154 transmits the construction plan information 627 including the completed form management table to the result obtaining terminal 7. In addition, the information transmitting unit 154 may synchronize the construction management information 628 generated by the construction management information generating unit 155 described later with the result obtaining terminal 7.
[0147] The construction management information generating unit 155 links the actual measurement values included in the actual measurement value information 723 acquired by the result acquisition terminal 7 to the construction plan information 627 to generate construction management information 628.
[0148] An example of the construction management information 628 will be described below with reference to Fig. 10. Fig. 10 is a diagram showing an as-built management table, which is an example of a document to be submitted. The construction management information 628 includes an as-built management table having a list TBL2 in which at least some of the actual results values are listed, as shown in Fig. 10.
[0149] The construction management information generating unit 155 calculates the difference between the design value included in the construction plan information 627 and the actual measurement value acquired by the result acquisition terminal 7. Furthermore, the construction management information generating unit 155 links the design value, the actual measurement value, and the difference to the management position, and generates a completed form management table, which is an example of the construction management information 628.
[0150] The submission document creation unit 156 creates a completed form management table in accordance with a specified format, in which design values and actual measured values are linked for each management position, based on the construction management information 628 generated by the construction management information generation unit 155.
[0151] As described above, in the water pipe construction management system 11, the construction plan information 627 includes design values related to the earthwork of the water pipe construction work. Furthermore, the data related to the construction performance includes actual measurement values corresponding to the design values. Furthermore, the construction management information generation unit 155 calculates the difference between the design values and the actual measurement values included in the performance information acquired by the performance acquisition terminal 7, and links the design values, the actual measurement values, and the difference to the management position to generate the construction management information 628.
[0152] This allows the design values, actual measurement values, and the difference between the design values and the actual measurement values for earthwork in water pipe construction to be linked to the management position and managed as construction management information 628.
[0153] Therefore, it is possible to efficiently manage the design values, the measured values, and the difference between them, that is, the finished product management.
[0154] Third Embodiment FIG. 11 is a functional block diagram showing a schematic configuration of a water pipe construction management system 12 according to a third embodiment of the present invention.
[0155] The water pipe construction management system 12 according to the third embodiment is a system for managing photographs. The water pipe construction management system 12 differs from the water pipe construction management system 11 according to the second embodiment in that photographs are managed as management items. In the case of photograph management, the management items are, for example, photographs that are required to be taken at the location where the water pipe is to be buried or near the site.
[0156] In addition, in the water pipe construction management system 12, the construction results information, which is data related to the construction results corresponding to the management items, includes photographic data taken at the site. The result acquisition terminal 7 acquires the photographic data 724 as the construction results information.
[0157] In the description of the third embodiment, the details of the parts common to the water pipe construction management system 11 according to the second embodiment will not be repeated.
[0158] (Performance Acquisition Terminal) As shown in FIG. 11, the memory unit 72 of the performance acquisition terminal 7 differs from the memory unit 72 of the performance acquisition terminal 7 according to the second embodiment in that it further stores photo data 724, which constitutes part of the performance information, an electronic whiteboard 725, and a work information management list 726.
[0159] The track record acquisition terminal 7 has a photographing unit 75 for taking photos. The track record acquisition terminal 7 executes photographing with the photographing unit 75 in response to, for example, a user operation received via the touch panel unit 74. The control unit 73 of the track record acquisition terminal 7 generates photo data 724 to which an electronic whiteboard 725 has been added. The control unit 73 of the track record acquisition terminal 7 stores the generated photo data 724 in the storage unit 72. A method of adding the electronic whiteboard 725 to the photo data 724 will be described in detail later. The track record acquisition terminal 7 transmits the generated photo data 724 to the management server 3.
[0160] (Management Server) As shown in FIG. 11, the control unit 33 of the management server 3 has a construction plan information generation unit 251, an electronic whiteboard creation unit 252, an information transmission unit 254, a construction management information generation unit 255, a submission document creation unit 256, and a work information management list generation unit 257.
[0161] The construction plan information generation unit 251 generates construction plan information 927 by linking information 320 relating to the construction plan for the water pipe pipeline that is the subject of water pipe work to the management items and management locations required in photo management.
[0162] In photo management, water utilities determine the photographic items to be managed, as well as the locations and content of each photograph. Also, certain photographic items may require specific attachments. For example, the following photographic locations, content, and photographic items may be specified:
[0163] At all measurement points and change points, photos of the site before and after work begins and as-built photos are required. As-built photos are required at buried locations of special-shaped pipes and the like other than measurement points. Situation photos and quality control photos are required at 150-m intervals. That is, the photographed items may include the work content at the management location linked to the photographed item. Note that there may be multiple work content for one management location. At the location of valves and stopcocks, photos of gate valves and the like are required. At the location of temporary work, photos of retaining walls and the like are required. At road restoration locations, photos of water supply pipe switching work are required. That is, the photographed items may include the equipment at the management location linked to the photographed item. Furthermore, at the location of temporary equipment, such as an on-site office or parking lot, photos of the temporary equipment are required. Furthermore, photos of the inspection of pipe materials, such as water pipes, are required. Furthermore, to confirm safety management, photos of on-site patrol status and the like are required.
[0164] 12 is a diagram illustrating a method for setting the management positions of a pipeline in photograph management. As shown in FIG. 12, the construction plan information generating unit 251 sets management positions A0, ..., A9+10.0, C1 to C9 as photographing locations for a designed pipeline TP whose start point and end point have been set.
[0165] The control points A0, ..., A9+10.0 indicated by white and black circles include the basic and additional measurement points mentioned above. Black circles A3, A6, and A9 represent measurement points every 150 m from the starting point. White circles A0, A1, A2, A4, A5, A5+20.0, A7, A8, and A9+10.0 represent measurement points other than the 150 m measurement points. That is, black circles A3, A6, and A9 require the taking of pre-work, post-completion, status photos, as-built photos, and quality control photos. White circles A0, A1, A2, ... require the taking of pre-work, post-completion, and as-built photos.
[0166] Triangle marks C3 and C7 indicate the locations where the special-shaped pipes are to be placed. Therefore, at triangle marks C3 and C7, photographs of the finished product are required.
[0167] White squares C1, C4, and C8 indicate the locations of gate valves, and therefore require photographs of valves and plugs to be taken at the locations of white squares C1, C4, and C8.
[0168] Stars C2 and C5 indicate retaining walls, and therefore require photographs of the temporary structures at star marks C2 and C5.
[0169] The black squares C6 and C9 indicate the locations where water supply pipe switching work will be performed. Therefore, at the black squares C6 and C9, photographs of the water supply pipe switching work are required to be taken.
[0170] As described above, the construction plan information generating unit 251 links the information 320 relating to the construction plan of the water pipe pipeline that is the target of the water pipe construction work with the photographed items and the management location to generate the construction plan information 927. The photographed items include the work content or equipment at the management location.
[0171] The electronic whiteboard creation unit 252 creates an electronic whiteboard 952 to be added to the photo data 724 based on the construction plan information 927. Whether or not an electronic whiteboard 952 needs to be added is also set for each photo requested at each management position. The electronic whiteboard creation unit 252 creates the electronic whiteboard 952 depending on whether or not the electronic whiteboard 952 needs to be added.
[0172] 13 is a diagram showing an example of an electronic whiteboard. As shown in Fig. 13, the electronic whiteboard E1 includes a construction name E11, a construction type E12, a photographing date E13, a management position E14, a design dimension E15, an actual measurement dimension E16, a command number E17, and a schematic diagram E18.
[0173] The electronic whiteboard creation unit 252 sets the photography date E13 based on the process information included in the construction plan information 927. Furthermore, when it is necessary to set dimensions, the electronic whiteboard creation unit 252 sets the design dimensions E15 based on the design information included in the construction plan information 927. The actual measured dimensions E16 can be set after the actual measurement value information 723 including actual measured values is acquired by the result acquisition terminal 7. Furthermore, the electronic whiteboard creation unit 252 sets the work name E11, the type of work E12, and the command number E17 based on the information 320 related to the construction plan included in the construction plan information 927.
[0174] The electronic whiteboard creation unit 252 stores the electronic whiteboard 952 created as described above in the storage unit 32 .
[0175] The information transmitting unit 254 transmits the construction plan information 927 generated by the construction plan information generating unit 251 and the electronic whiteboard image of the electronic whiteboard 952 created by the electronic whiteboard creating unit 252 to the track record acquiring terminal 7. The information transmitting unit 254 may also synchronize the construction management information 928 created by a construction management information generating unit 255 (described later) with the track record acquiring terminal 7. The information transmitting unit 254 also synchronizes the work information management list 953 created by a work information management list generating unit 257 (described later) with the work information management list 726 stored in the memory unit 72 of the track record acquiring terminal 7.
[0176] The construction management information generation unit 255 links the photo data 724 acquired by the result acquisition terminal 7 to the construction plan information 927, and generates the construction management information 928. More specifically, the construction management information generation unit 255 acquires the result information including the photo data 724 from the result acquisition terminal 7, and links the photo data 724 to which the electronic whiteboard 725 has been added to the management position, and generates the construction management information 928.
[0177] This allows the management server to easily create an electronic whiteboard image to be added to the photo data 724. This makes it easy to create image data in which an electronic whiteboard image is added to the photo data 724. This allows efficient management of the image data corresponding to the electronic whiteboard 952.
[0178] The submitted document creation unit 256 creates a construction photo ledger in which photographs as management items are linked to each management location in accordance with a predetermined format, based on the construction management information 928 generated by the construction management information generation unit 255. The submitted document creation unit 256 stores the created construction photo ledger in the memory unit 32 as submitted document data 929.
[0179] The work information management list generation unit 257 creates a work information management list 953, which is a list of performance information 722 acquired during a specified construction period, based on the construction management information 928. The specified construction period includes the construction period of a major process, which may range from one day to one month or one year. The work information management list generation unit 257 also creates a work information management list 953 for each management location. The work information management list generation unit 257 determines, based on the construction management information 928, whether a photograph serving as performance information has already been taken at the management location. If a photograph serving as performance information has already been taken at the management location, the work information management list generation unit 257 sets a completion flag indicating that the photograph has been taken.
[0180] 14 is a diagram showing an example of the work information management list 953. In the example shown in Fig. 14, three electronic whiteboards E21, E22, and E23 have been created at the management position No. 2. Because a photo has already been acquired for the electronic whiteboard E21, the work information management list generation unit 257 sets a completion flag E211 for the electronic whiteboard E21.
[0181] This allows the user to check the list of performance information to be acquired during a specific construction period, thereby providing the on-site worker with the opportunity to acquire the performance information that should be acquired.
[0182] (Adding an electronic whiteboard to photo data) A method for adding an electronic whiteboard to photo data will be described with reference to Figs. 14 to 16. Fig. 15 is a diagram showing an example of a monitor image of the result acquisition terminal 7 when a photo is taken. Fig. 16 is a diagram showing a monitor image with an electronic whiteboard E3 added.
[0183] The result acquisition terminal 7 stores the work information management list 726 received from the management server 3 in the storage unit 72 .
[0184] 14, the track record acquisition terminal 7 displays the contents of the work information management list 726 on the touch panel unit 74. The track record acquisition terminal 7 accepts the selection of an electronic whiteboard from the user. The electronic whiteboard E21 displays each of the electronic whiteboards E21 to E23 in thumbnail format on the touch panel unit 74. Here, since a photo has already been acquired for the electronic whiteboard E21, the track record acquisition terminal 7 displays the remaining electronic whiteboards E22 and E23 on the touch panel unit 74 in a selectable state.
[0185] In the following example, it is assumed that the user has selected the electronic whiteboard E23. The result acquisition terminal 7 captures an image using the photographing unit 75. A monitor image F1 as shown in FIG. 15 is obtained by the camera constituting the photographing unit 75. The control unit 73 of the result acquisition terminal 7 superimposes an electronic whiteboard image E231 of the electronic whiteboard E23 on the monitor image F1 and displays it on the touch panel unit 74, as shown in FIG. 16. The position at which the electronic whiteboard image E231 is superimposed on the monitor image F1 may be set to the upper left of the monitor image F1 by default, or may be changeable in response to a user operation. The photograph is completed when the user performs a shutter operation.
[0186] When the photographing is completed, the control unit 73 of the result acquisition terminal 7 stores photo data 724 in which the electronic whiteboard image is superimposed on the photographed image in the storage unit 72. That is, the control unit 73 of the result acquisition terminal 7 stores the photo data 724 to which the electronic whiteboard E23 has been added in the storage unit 72.
[0187] As described above, in the water pipe construction management system 12, the management item is a photograph. The result acquisition terminal 7 acquires the photographed photograph data 724 as performance information. The construction management information generation unit 255 associates the photographed photograph data 724 taken by the result acquisition terminal 7 with the management position to generate construction management information 928.
[0188] This allows the photo management, which is the management of results using photos, to be performed in association with the management location, thereby enabling the photo management to be performed efficiently.
[0189] Fourth Embodiment FIG. 17 is a functional block diagram showing a schematic configuration of a water pipe construction management system 13 according to a fourth embodiment of the present invention.
[0190] The water pipe construction management system 13 according to the fourth embodiment differs from the water pipe construction management system 11 according to the second embodiment in that construction plan information 627 and construction management information 628 are linked to the work scope.
[0191] In the description of the fourth embodiment, the details of the parts common to the water pipe construction management system 11 according to the second embodiment will not be repeated.
[0192] (Management Server) (Management Server Memory) The information 320 related to construction plans stored in the memory 32 of the management server 3 further includes business entity information 3208. The business entity information 3208 includes information related to the identification ID of a water utility. The information related to the identification ID of a water utility includes, for example, a code uniquely assigned to each water utility and the name of the water utility. The business entity information 3208 is linked to construction project information 3204. For example, the water pipe construction project in the construction project information 3204 is linked to the identification ID of the water utility that ordered the water pipe construction project.
[0193] (Control unit of management server) The construction plan information generation unit 151 links information 320 related to the construction plan of the water pipe pipeline that is the target of the water pipe work to the management items and management positions required in as-built management for each predetermined section of the designed pipeline included in the design information 3201, and generates construction plan information 627. Specifically, the construction plan information generation unit 151 reads information 320 related to the construction plan from the storage unit 32 for each predetermined section of the designed pipeline included in the design information 3201, and generates construction plan information 627. As a result, the construction plan information 627 is generated for each of the predetermined sections.
[0194] The predetermined section is, for example, a section included in one piece of drawing data for the designed pipeline. Hereinafter, drawing data relating to the predetermined section for the designed pipeline will be referred to as section drawing data. The designed pipeline includes at least one piece of section drawing data. Note that the predetermined section may be a section other than that included in one piece of drawing data, as long as it is a predetermined section for the designed pipeline.
[0195] The section plan data is linked to the water pipe construction work indicated in the construction project information 3204. In other words, the section plan data is linked to business entity information 3208 linked to the construction project information 3204.
[0196] The section plan data includes construction section data for at least one construction section. The construction section data is data for each construction section in the section plan data. The construction section is a unit for managing water pipe construction. For multiple construction sections, for example, different water pipe construction contractors may carry out the water pipe construction, construction schedules may overlap, and different performance acquisition terminals may be assigned to acquire construction performance information, as described below.
[0197] The construction section data includes work range data relating to at least one work range. The work range data is data for each work range in the construction section data. The work range is the smallest unit for managing water pipe construction work. The work range may be determined based on a construction schedule or may be determined according to the work content. For example, the work range may be the work range for one day when the construction plan information is created, or may be the work range determined when the design information or the construction plan information is created.
[0198] FIG. 18 is a diagram schematically illustrating section drawing data. FIG. 18 shows an example in which design information 3201 includes three section drawing data DD11, DD12, and DD13 as the section drawing data. FIG. 18 shows an example of section drawing data DD11. Section drawing data DD11 includes construction section data for two construction sections K1 and K2. Construction section K1 includes three work areas K11, K12, and K13. Construction section K2 includes two work areas K21 and K22. In FIG. 18, AA0 to AA5 indicate management positions, P1 indicates the start point of the design pipeline TP, and P2 indicates the end point of the design pipeline TP.
[0199] The construction plan information generation unit 151 generates the construction plan information for each work area using the design information and the attribute data. Specifically, the construction plan information generation unit 151 generates the construction plan information 627 using information about the designed pipeline included in the design information 3201 and various information (3201-3208) included in the construction plan information 320. The construction plan information 627 is generated in association with the work area. The construction plan information 627 associated with the work area is also associated with the construction section including the work area. The construction plan information 627 associated with the work area is also associated with section drawing data including data related to the work area and the construction section. The construction plan information 627 associated with the work area is also associated with the construction schedule included in the process information 3207. In other words, the construction plan information 627 is associated with work schedule information, which is information about the schedule of work in the work area associated with the construction plan information 627.
[0200] 19 is a diagram schematically showing the construction plan information 627 generated by the construction plan information generation unit 151. The construction plan information 627 is generated by the construction plan information generation unit 151 for each of the section drawing data DD11, DD12, and DD13. As shown in FIG. 19 , for example, the construction plan information generated based on the section drawing data DD11 includes construction plan information generated based on the construction sections K1 and K2. The construction plan information generated based on the construction section K1 includes construction plan information generated based on the work areas K11, K12, and K13. The construction plan information generated based on the construction section K2 includes construction plan information generated based on the work areas K21 and K22.
[0201] The construction plan information 627 generated by the construction plan information generation unit 151 is stored in the storage unit 32. In this case, the construction plan information 627 may be stored in the storage unit 32 for each section drawing data, for each construction section, or for each work range. Note that Fig. 19 shows an example in which the construction plan information is stored in the storage unit 32 for each section drawing data.
[0202] The information transmitting unit 154 outputs the construction plan information 627 generated by the construction plan information generating unit 151 and stored in the storage unit 32 to the track record acquiring terminal 7, which will be described later. Specifically, the information transmitting unit 154 reads the construction plan information 627 from the storage unit 32 while linking it to the work range, and outputs the read construction plan information 627 to the track record acquiring terminal 7 via the communication unit 31. In the example shown in FIG. 19 , on work day: N, the information transmitting unit 154 reads from the storage unit 32 the construction plan information linked to work ranges KK11, KK12, and KK13 on and after the construction schedule N, and transmits the read construction plan information 627 to the track record acquiring terminal 7. Note that the information transmitting unit 154 may transmit only the construction plan information linked to the work range KK11 of the construction schedule N, which is the day of work day N, to the track record acquiring terminal 7.
[0203] The construction management information generation unit 155 acquires, via the communication unit 31, the performance information acquired by the performance acquisition terminal 7 and linked to the work scope. The construction management information generation unit 155 links the performance information acquired from the performance acquisition terminal 7 to the construction plan information 627 to generate construction management information 628. The construction management information generation unit 55 stores the generated construction management information 628 in the memory unit 32. The memory unit 32 stores the construction plan information 627 and the construction management information 628, each linked to the work scope.
[0204] The submitted document preparation unit 156 may create submitted document data 629 using construction plan information 627 and construction management information 628, at least one of which is linked to a construction section. In this case, the submitted document preparation unit 156 may create submitted document data 629 using the construction plan information 627 or the construction management information 628, which is linked to the work scope. Furthermore, the submitted document preparation unit 156 may create, as submitted documents, daily reports based on performance information for the construction schedule N, in accordance with the construction management information 628. The submitted document preparation unit 156 may create submitted documents for a work section or a construction section for any period, in response to a request from the construction planning terminal 5.
[0205] 17, the control unit 33 further includes a construction plan information correction unit 157. The construction plan information correction unit 157 corrects the construction plan information 627 based on the performance information output from the performance acquisition terminal 7. The construction plan information correction unit 157 will be described in detail later.
[0206] (Results Acquisition Terminal) The results acquisition terminal 7 acquires results information 722 of water pipe construction work in accordance with the construction plan information acquired from the management server 3 as described above. Specifically, the results acquisition terminal 7 acquires results information 722 corresponding to the construction plan information 721 linked to the work scope in accordance with input from a site worker or output from a detection device such as a sensor. The results information 722 may be linked to information regarding the work dates for the work scope in addition to actual measurement value information 723. The results acquisition terminal 7 may be configured by the construction planning terminal 5.
[0207] The performance acquisition terminal 7 acquires construction plan information 721 linked to the work scope from the management server 3, and then acquires performance information 722 corresponding to the construction plan information 721 and linked to the work scope and work date, and then outputs the performance information 722 to the management server 3.
[0208] (Construction plan information correction process) The construction plan information correction unit 157 corrects the construction plan information 627 based on the construction management information 628 stored in the storage unit 32. In other words, the construction plan information correction unit 157 corrects the construction plan information 627 based on the performance information transmitted from the performance acquisition terminal 7. For example, when the performance information in the construction management information 628 indicates that the construction is progressing faster or is behind schedule than planned in the construction plan information 627, the construction plan information correction unit 157 corrects the construction plan information 627 using the construction management information 628. In this case, the construction plan information correction unit 157 corrects the construction plan information 627 using the construction management information 628 stored in the storage unit 32 and linked to the work scope.
[0209] 19 and 20, a specific example of the correction process of the construction plan information 627 will be described. FIG. 20 is a diagram schematically showing the correction process of the construction plan information 627 by the construction plan information correcting unit 157.
[0210] In the following, a case will be described in which the performance information in the construction management information 628 indicates that the construction is progressing faster than the schedule planned in the construction plan information 627.
[0211] Of the construction plan information 721 linked to the work ranges shown in FIG. 19 , the construction plan information 721 linked to work range K11 indicates work scheduled for construction schedule N, and the construction plan information 721 linked to work range K12 indicates work scheduled for construction schedule N+1. In the example shown in FIG. 20 , on work day N, the track record acquisition terminal 7 acquires track record information 722 corresponding to the construction plan information 721 linked to work ranges K11 and K12 among the construction plan information 721 linked to the work ranges shown in FIG. 19 . Furthermore, the track record information 722 corresponding to the construction plan information 721 linked to work ranges K11 and K12 is linked to work day N. This means that work for work range K12 was completed on construction schedule N, which is earlier than the scheduled construction schedule N+1. The track record acquisition terminal 7 outputs the track record information 722 linked to work ranges K11 and K12 to the management server 3.
[0212] In the management server 3, the construction plan information correction unit 157 corrects the construction plan information 627 based on the performance information 722 transmitted from the performance acquisition terminal 7. Specifically, as described above, since the work for the planned work area K12 was completed on construction schedule N, which is earlier than construction schedule N+1, the construction plan information correction unit 157 updates the construction schedule in the construction plan information 721 linked to the work area K12 to N based on the performance information 722 linked to the work area K12. Furthermore, the construction plan information correction unit 157 advances the construction schedule in the construction plan information 627 linked to the work area K13 on construction schedule N+2 to N+1. Note that the construction plan information correction unit 157 may set a flag indicating that the work has been completed in the construction plan information 721 linked to the work area K12, rather than changing the construction schedule in the construction plan information 721 linked to the work area K12 for which the work was completed earlier than planned.
[0213] The following describes a case where the performance information in the construction management information 628 indicates that the construction is behind schedule as planned in the construction plan information 627.
[0214] In this case, the construction plan information correction unit 157 may postpone the construction schedule for the incomplete work scope.
[0215] For example, if the performance information 722 transmitted from the performance information acquisition terminal 7 indicates that work in work area K11 has not been completed, the construction plan information correction unit 157 corrects the construction schedule in the construction plan information 627 linked to work area K13 to N+1. That is, the construction plan information correction unit 157 corrects the construction schedule for work area K11 to the "next day" after the originally scheduled N. In response to this, the construction plan information correction unit 157 further sets the construction schedules in the construction plan information 627 linked to work areas K12 and K13 after construction schedule N+1 by one day each. That is, the construction schedules of the incomplete work areas may be postponed in order.
[0216] Furthermore, for example, if an obstacle such as a large rock appears in the work area K11 and the removal of the obstacle cannot be completed on the same day but will take several days, the construction plan information correction unit 157 may postpone the construction schedule for the work area K11 to another day after N. In other words, the order of the incomplete work areas may be changed to postpone the construction schedule. If this affects the construction schedules of the subsequent work areas K12 and K13, the construction plan information correction unit 157 corrects the construction schedules for the work areas K12 and K13.
[0217] In this way, the construction plan information correction unit 157 uses the construction management information 628 as performance information linked to the work scope to advance or postpone the construction schedule of the construction plan information 627. In other words, the construction plan information correction unit 157 corrects the construction plan information 627 using the construction management information 628.
[0218] As described above, in water pipe construction work, by modifying the construction plan information 627 using the construction management information 628 as performance information linked to the work scope, it is possible to easily modify the construction plan information 627. In other words, the water pipe construction plan can be easily changed in accordance with the work scope.
[0219] [Other Embodiments] While the embodiments of the present invention have been described above, the above-described embodiments are merely examples for carrying out the present invention. Therefore, the present invention is not limited to the above-described embodiments, and it is possible to appropriately modify the above-described embodiments within the scope of the spirit thereof.
[0220] In each of the above embodiments, the water pipe construction management system 1 is a system that manages water pipe construction. The management server 3 also manages water pipe construction. However, the configuration of each of the above embodiments can also be used to manage pipeline construction for sewerage, agricultural water, and the like, in addition to water supply (tap water). That is, the configuration of each of the above embodiments can be realized as a pipeline construction management system, a pipeline construction management method for controlling the pipeline construction management system, and a pipeline construction management program. In this case, the management server is a server that manages pipeline construction.
[0221] In each of the above-described embodiments, the completed form management table does not include a schematic drawing. However, the completed form management table may include a schematic drawing.
[0222] Although not specifically described in the above embodiments, the storage unit of the management server, the plan creation terminal, or the performance acquisition terminal can be realized by, for example, a storage device such as a volatile or non-volatile RAM (Read Only Memory) or ROM (Random Access Memory). The storage unit can be realized by, for example, an internal or external storage device or removable media. Specific examples of the storage unit include a cache memory and a main storage device. Also, specific examples of the storage unit include an auxiliary storage device such as an SSD (Solid State Drive) or an HDD (Hard Disk).
[0223] Although not specifically described in the above embodiments, the control unit of the management server, the planning terminal, or the performance acquisition terminal realizes various functions by executing programs using an arithmetic device such as a central processing unit (CPU) or a micro processing unit (MPU). However, some or all of the various functions realized by the control unit may be realized in hardware using a dedicated processor, an arithmetic circuit, or the like. Furthermore, the program may be stored in a computer-readable storage medium that can be stored not temporarily but substantively. The storage medium may be included in the storage unit of the management server, the planning terminal, or the performance acquisition terminal. Furthermore, the program may be supplied to the management server, the planning terminal, or the performance acquisition terminal via a wired or wireless transmission medium.
[0224] Although not specifically described in the above embodiments, the management server may be realized by one or more computer devices.
[0225] In each of the above-described embodiments, the water pipe construction management systems 1, 11, 12, and 13 include a construction planning terminal 5 used by a planner U1 and a performance record acquisition terminal 7 used by a site manager U2. However, the water pipe construction management systems may also include a water utility terminal used by a water utility. The water utility terminal may access a management server and be able to refer to various data such as construction plan information, construction management information, and submitted document data.
[0226] In each of the above embodiments, the construction management information generation unit 55, 155, 255 links the construction plan information 327, 627, 927 and the performance information to the management position of the pipeline that is the object of management, to generate the construction management information 328, 628, 928. However, the construction management information generation unit does not have to link the construction plan information and the performance information to the management position of the pipeline that is the object of management. For example, the construction management information generation unit may link the construction plan information and the performance information to map information.
[0227] In each of the above-described embodiments, the management server 3 includes the submitted document preparation unit 56, 156, 256. However, the document preparation unit may be omitted.
[0228] In each of the above-described embodiments, the result acquisition terminal 7 has the touch panel unit 74. However, the result acquisition terminal may have a display device and an input device different from the touch panel unit.
[0229] In the third embodiment, the result acquisition terminal 7 adds the electronic whiteboard 725 to the photo data 724. However, the management server 3 may add the electronic whiteboard 725 to the photo data 724. More specifically, this is as follows. The result acquisition terminal 7 acquires image data on which an electronic whiteboard image is not superimposed as photo data. The result acquisition terminal 7 transmits the image data and the electronic whiteboard corresponding to the image data to the management server 3. The management server 3 adds the electronic whiteboard to the photo data.
[0230] In the third embodiment, the electronic whiteboard creation unit 252 creates an electronic whiteboard 952 to be added to the photo data 724 based on the construction plan information 927. However, the electronic whiteboard creation unit may be omitted.
[0231] In the third embodiment, the work information management list generation unit 257 generates a work information management list 953, which is data of a list of performance information 722 acquired during a predetermined construction period, based on the construction management information 928. However, the work information management list generation unit may be omitted.
[0232] In the fourth embodiment, the control position AA0 and the control position AA3 are located at both ends of the construction section K1. Also, a control position is located at both ends of each work section. However, a control position does not have to be located at at least one of the ends of the construction section. Also, a control position may be located midway through a work section. A work section may include multiple control positions.
[0233] In the fourth embodiment, the construction plan information and the construction management information are each linked to the work scope. However, the construction plan information may be linked to a parameter other than the work scope. The construction management information may be linked to a parameter other than the work scope.
[0234] In the fourth embodiment, the management server 3 has the construction plan information correction unit 157. However, the management server of other embodiments may have the construction plan information correction unit. A device other than the management server may have the construction plan information correction unit.
[0235] In the fourth embodiment, the construction plan information 627 is generated for each of the predetermined sections by the management server 3. However, a management server in another embodiment may generate the construction plan information for each of the predetermined sections.
[0236] The present invention can be used in a pipeline construction management system that manages pipeline construction work, etc.
[0237] 1, 11, 12, 13 Water pipe construction management system (pipe construction management system) 3 Management server 31 Communication unit 32 Memory unit 3201 Design information 3202 Earthwork information 3203 Obstacle information 3204 Construction case information 3205 Site information 3206 Ground information 3207 Process information 3208 Business entity information 327, 627, 927 Construction plan information 328, 628, 928 Construction management information 329, 629, 929 Submitted document data 952 Electronic whiteboard 953 Work information management list 33 Control unit 51, 151, 251 Construction plan information generation unit 54, 154, 254 Information transmission unit 55, 155, 255 Construction management information generation unit 56, 156, 256 Submitted document creation unit 157 Construction plan information correction unit 252 Electronic whiteboard creation unit 257 Work information management list generation unit 5 Construction plan terminal 7 Results acquisition terminal 71 Communication unit 72 Memory unit 721 Construction plan information 722 Results information 723 Actual measurement value information 724 Photo data 725 Electronic whiteboard 726 Work information management list 73 Control unit 74 Touch panel unit 75 Photography unit DD11, DD12, DD13 Section drawing data K1, K2 Construction section K11, K12, K13, K21, K22 Work range AA0, AA1, AA2, AA3, AA4, AA5 Management position P1 Start point P2 End point TP Design pipeline
Claims
1. A pipeline construction management system that manages pipeline construction, comprising: a management server; and a performance acquisition terminal that can communicate with the management server and acquires data on construction performance corresponding to management items for managing performance in the pipeline construction as performance information, wherein the management server comprises: a construction plan information generation unit that links information on the construction plan for the pipeline that is the subject of the pipeline construction to the management items to generate construction plan information; and a construction management information generation unit that links the performance information acquired by the performance acquisition terminal to the construction plan information to generate construction management information.
2. A pipeline construction management system as described in claim 1, wherein the construction management information generation unit links the construction plan information and the performance information to a management position that is the object of management in the pipeline, and generates the construction management information.
3. A pipeline construction management system as described in claim 2, wherein the management server further has a work information management list generation unit that creates data for a list of performance information obtained during a specified construction period based on the construction management information.
4. A pipeline construction management system as described in claim 2, wherein the management server further has a document creation unit that creates documents in accordance with a predetermined format, in which the performance information is linked to each management location, based on the construction management information.
5. A pipeline construction management system as described in claim 2, wherein the construction plan information includes design values related to earthworks for the pipeline construction, the data related to construction performance are actual measured values corresponding to the design values, and the construction management information generation unit calculates the difference between the design values and the actual measured values included in the performance information acquired by the performance acquisition terminal, and links the design values, the actual measured values and the difference to the management location to generate the construction management information.
6. A pipeline construction management system as described in claim 2, wherein the management item is a photograph, the performance acquisition terminal acquires photographed photograph data as performance information, and the construction management information generation unit links the photographed photograph data taken by the performance acquisition terminal to the management location to generate the construction management information.
7. A pipeline construction management system as described in claim 6, wherein the management server further has an electronic whiteboard creation unit that creates an electronic whiteboard to be added to the photo data based on the construction plan information, and the construction management information generation unit links the photo data to which the electronic whiteboard has been added to the management location, and generates the construction management information.
8. A pipeline construction management system according to any one of claims 1 to 6, wherein the construction plan information, the performance information and the construction management information are each linked to the scope of work in the pipeline construction.
9. A pipeline construction management system as described in claim 8, wherein the construction plan information is linked to work schedule information, which is information regarding the schedule of work within the work area; the performance acquisition terminal acquires the construction plan information from the management server, and after acquiring performance information that corresponds to the construction plan information and is linked to the work area and the work schedule information, outputs the performance information to the management server; and the management server modifies the construction plan information based on the performance information output from the performance acquisition terminal.
10. A management server for managing pipeline construction work, comprising: a construction plan information generation unit that generates construction plan information by linking information regarding the construction plan of the pipeline that is the subject of the pipeline construction work to management items that manage performance in the pipeline construction work; a communication unit that can communicate with a performance acquisition terminal that acquires data regarding construction performance corresponding to the management items as performance information; and a construction management information generation unit that receives the performance information from the performance acquisition terminal, links the received performance information to the construction plan information, and generates construction management information.
11. A management server according to claim 10, wherein the construction management information generation unit generates the construction management information by linking the construction plan information and the performance information to a management position in the pipeline that is the subject of management.
12. A management server according to claim 10 or 11, further comprising a document creation unit that creates documents in accordance with a predetermined format, in which the performance information is linked to each of the management locations, based on the construction management information.
13. A pipeline construction management method having a performance acquisition terminal and a management server, and controlling a pipeline construction management system that manages pipeline construction, comprising: a construction plan information generation step in which the management server links information related to the construction plan of the pipeline that is the subject of the pipeline construction to management items, and generates construction plan information; a construction plan information transmission step in which the management server transmits the construction plan information to the performance acquisition terminal; a performance information acquisition step in which the performance acquisition terminal acquires data related to the construction performance of the pipeline construction that corresponds to the management items as performance information; a performance information reception step in which the management server receives the performance information from the performance acquisition terminal; and a construction management information generation step in which the management server links the performance information received from the performance acquisition terminal to the construction plan information, and generates construction management information.
14. A pipeline construction management method as described in claim 13, wherein in the construction management information generation process, the management server links the construction plan information and the performance information to a management position in the pipeline that is to be managed, and generates the construction management information.
15. A pipeline construction management method as claimed in claim 13 or 14, further comprising a document creation step in which the management server creates documents in accordance with a predetermined format, in which the performance information is linked to each of the management locations, based on the construction management information.
16. A pipeline construction management program having a performance acquisition terminal and a management server, for controlling a pipeline construction management system that manages pipeline construction, the program causing the management server to execute the following: a construction plan information generation process that links information regarding the construction plan of the pipeline that is the subject of the pipeline construction to management items, and generates construction plan information; a construction plan information transmission process that transmits the construction plan information to the performance acquisition terminal; a performance information reception process that receives performance information from the performance acquisition terminal that has acquired the performance information including data regarding construction performance corresponding to the management items for the pipeline construction; and a construction management information generation process that links the performance information received from the performance acquisition terminal to the construction plan information, and generates construction management information.
17. A pipeline construction management program as described in claim 16, wherein the construction management information generation process includes a process in which the management server links the construction plan information and the performance information to a management position in the pipeline that is to be managed, and generates the construction management information.
18. A pipeline construction management program as described in claim 16 or 17, further causing the management server to execute a submission document creation process that creates documents in accordance with a predetermined format, in which the performance information is linked to each management location, based on the construction management information.